Loading...
0301-229 (CONR)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of, perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date r•. 777699 B 0+1,130.12( Date .y Signature of Contractor .:iW- OWNER-BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). () I am exempt under Section B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carrier LIS -,,U )T . MUTUAL .7 Policy No. WA2621 OOV2:101 IT (This section need not be completed if the permit valuation is for $100.00 or less): ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so'as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Date: Applicant ,2- 7 rr - Warning: Failure to secure WorkersCompensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in.Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on 'his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued_ as a result of this applicaton agrees to, & shall, indemnify ;,& hold harmless the City of La Quinta, its officers, agents and employees. .2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have) "read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon the above-mentioned property for inspection purposes. Signature (Owner/Agent) _ ' -� —�----Date BUILDING PERMIT PERMIT L" DATE VALUATION LOT_ 41301- 29 TRACT y q /y JOB SITE I APN ADDRESS SD -•345 POMELO y7a � 0-t�2t OWNER CONTRACTOR / DESIGNER / EN (NEER TOIL £sZd.O•DWER3 TUC TC7LL13RROTf,-7 IS Mc 73-121 T+it WA I%�t� ioo 93-121F: 'f1°iWARDIGIA00 PALM DEMTr C"4A. 92260 PALM DEJ" fItT CA,. 92260 Q60)674-9699 CB1Jf 3832 USE OF PERMIT "7y %.T p y COW 'X960 M.F. SPR S+Gli,l`!"Y�t17L1A117tA1"lCfAt't)r3.Y. POROWP1 TIO $29,00 OF"' .SPR1NKi t£ 7,430.00 SF A/C -- COMMERCIAL 7}400,00 3F CONTRAC'T.AMOU14T 421,434,00 3 S 4 -T UC;'.1.`,ION' 467,261.70 . Efs--ruled!"b (30S OP Cf?i+a'S'.ki 7f'=vur Frr, t1 J7 A� t COOS TRUC'T10114 FEF 103-000-418-000 s2,952.04 PI.e�1A,f ICfil;4iSC 1rEE 101-000-439-318 3AS37.90 MWRAN [CAL F2.9, 101.000.421.000 $272.00 E1.fi.:C`3'R1C::�I..I�F - - 1:11-fJOQ-4?ti-t3fi0 . �233.?0 PLUICMCBINO FEE' .'.101-000-419-000 $2312S. S'TRONO MOT10H .F'EE - COMM 100-000-24.1-000 12 GRADTNt91FFM 101.000-423.000 s m uo DEVELOPER IMPACT FK8' �13ti9E�.t3C ART 114 PUBLIC PLACES • COM? 270.100-445.000 $2,336.3; FEE DEPOSIT 101-000.439-318 .4000,00 ,ALTS-TOTK,, Ci NIfft°t UC;'T'TC)N ANDPLAN i'FMCs7C $22,636.32 use FPtF PAW Fist; , a�2,G00.00 D T U FEUMIX� FIKEN DMIE 14 Ow S20,0632 MAY 13 2003 :g CITY Or' LA GQUIN� T- • :4r�y ,!�e�v�' � i FINANCE RECEIPT DATE BY 40�P INSPECTOR • .,� t �'.. � • - . x 1, / V INSPECTION RECORD r OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs A Underground Ducts Forms & Footings 01 Slab Grade Ducts Return Air IV Steel v Combustion Air Roof Deck 7 Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation—Vents Fireplace P.L. Grills zq- Fireplace T.O. Fans & Controls Party Wall Insulaticn Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath .. Final Final BLOCKWALL APPROVALS POOLS - SPAS steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVAL Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K for Finish Plaster Sewer Lateral A Pool Colieer ` Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final Finai� Utility Notice {Gas} ELECTRICAL A PR6VALV' Temp. Power Pole Underground Concuit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels 10 oz Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Pero-) JJ ZZAAa-ra COMMENTS: ,o vn ire VF �"�-•L 7 ,.2 VVV r FOUR UNIT MANIFOLD KIT (PART NO. 78694) r I _ — .. u I I I 1 I i 7s• I I I I ' 2 I? INLET 1 AND OUTLET I MANIFOLD CONNECTIONS � \ I 3TYP, 124 U16' i 2 _ SEALED DIRECT VENT VERTICAL 50' INTAKE, 50' EXHAUST SEALED DIRECT VENT SIDEWALL 50' INTAKE, 50' EXHAUST I 1. Direct Vent/Sealed Combustion The ultimate venting system for either horizontal or vertical applications. This system gives the specifier and installer optimum venting flexibility in placing the Cyclone XHE at point of use. The safe, two -vent, system allows clean uncontaminated air to be drawn directly into the unit. The flue gas products are expelled directly through the wall to the outside. This two -vent system protects the unit from harmful flue products being recirculated. 2. Sidewall or Vertical The Cyclone XHE series can be vented directly through an outside wall or vertically up through the roof. Quick and simple. Perfect for retrofit and cost saving installations. INDOOR CONVENTIONAL VERTICAL 50' EXHAUST INDOOR CONVENTIONAL SIDEWALL 50' EXHAUST SEALED DIRECT VENT HORIZONTAL INTAKE VERTICAL EXHAUST SEALED DIRECT VENT . VERTICAL INTAKE HORIZONTAL EXHAUST SEALED DIRECT VENT SEALED DIRECT VENT w/CONCENTRIC VENT w/CONCENTRIC VENT VERTICAL TERMINATION HORIZONTAL TERMINATION A 104.7 2 2 2 2 =I INDOOR CONVENTIONAL VERTICAL 50' EXHAUST INDOOR CONVENTIONAL SIDEWALL 50' EXHAUST SEALED DIRECT VENT HORIZONTAL INTAKE VERTICAL EXHAUST SEALED DIRECT VENT . VERTICAL INTAKE HORIZONTAL EXHAUST SEALED DIRECT VENT SEALED DIRECT VENT w/CONCENTRIC VENT w/CONCENTRIC VENT VERTICAL TERMINATION HORIZONTAL TERMINATION A 104.7 �0�-23-2003 15:33 FROWIVIDS CONSULTING 7607714073 T-578 P.002/002 F-137 PLANNERS I ENGINEERS I SURVEYORS Offices located in Irvine and La Quints June 23, 2003 City of La Quints Building and Safety Department 78495 Calle Tampico La Quinta, CA 92253 Finished Floor Verification Tract No. 30357 We have checked the top of form for the finish floor elevation referenced below and find it to be in substantial conformance with the approved precise grading plan. Lot # Plan Elev. As -Built Elev. Variation 187 -Spa 40.00 1 40.00 NONE Stanley C. Morse R.C.E. 20596 Expires 9/30/05 GA38206\gen\FFeert5 F ESS /p� Z, " No. 20596 Exp. 9-30-05 S P OF CAO Stanley C. Morse 79-799 Old Avenue 52 VOICE: 760-771.4073 Gary W. Dekich La Quante, CA 92257 FAX: 760.771.4077 J.R."Skip^Schultz EMAIL: mdslagOnto 0 diconsulting, not Copy 1"`J nspections Copy 2 Project Superintendent Copy 3 Governing Agency Page 4 of r k oat JCM Inspections 39725 Garand Lane Suite�F� (—� g LM Palm Desert, CA 92211 b C� I N S P E C T I O N S Phone: 760-345-5554 -r Fax: 760-772-3895 I N S P E C T I.O N S REINFORCED CON��RETEINSPE&ION) REP0R1 r`Dat~��' ^� Project Name: Project No:r Mom, - so 0_ `1 Cou,,� � u' ` Project Address: City: Title 24 AWS UB Other: %0 – c o �-„� File # E] D 1.1 Client: Sub -Contractor: App# E] D 1.4 o` r Q CS► GC— ❑ Other General Contractor: Architect:Structural Engineer: A '�\ ei COY\& V 1 0 (� `or O • ct1 , \ Q.. Slump (inches): ,\ a � Supplier: 1y Weather:, YTime Sampled: ' t Mix Design: Time In Mixer (min.): Specified Strength (PSI): un Unresolma Items: Water Added @ Jobsite (gals.): Addmixture: None Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample: ® No Samples Taken Description of Work Inspected: D G,Q' h Q 4 Q. .O P O Ct `lA Q n a: `, f pp t e - De_ tee. ol__S�.O Cp �V i.e 9 t . Rte. .,nc4s \ 1 CQ ok a \ o �_ n i Latwn roe 4A � QT o tw) E� n ` \ i J in Gl C P 3 t r D d� 2 .fl• o �. A_'✓1 p% � p A WAk Q—CAAO C Orr roftnt I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this • rk to comply with thevprov P plans, specifications _applicable building laws. Final report issued at project completion. 14 Inspector: Jack C. Millin IT C if c tion No: 0842216-80 Contractor' R sent e- Q Copy 1"`J nspections Copy 2 Project Superintendent Copy 3 Governing Agency Page 4 of r k oat E �J. w._«, �k�`'�'��"�-�,�R�-.s�-s�.y���� l'ar��y��� � ..''r,`V`r'��"'`�='l'�'�Ex=£u.�•�F.�t�„ 'res,`:; Sladden Engineering ,. 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 -Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date l'7 Z—o? Job No. 127� FIELD MEMO r /� �- Project Name A/jOLAJ?al/t Vieo Client: Site Address s Job Phone ; Work Done . Test Summnary`/ Footings Inspected Test No. Location Elev. Dry Density Moist % 96 Relative Compaction Ref. Max pcf Moist % Comments . 1 od ir? o; CTG/P 0141' .s. Aeld Tech. Super. or Agent 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. RILE No.710 06/25 '03 15:06 ID:R L GOODSON FAX:214 739 6354 PAGE 2 Gelebrakno 5o year 1953 2003 RAYMOND L. GOODSON JR., INC. coNsuLTiW ENGINEERS FIELD REPORT #1 MOUNTAINVIEW COUNTRY CLUB & SPA SpA BUILDING Imo► QUINTA, CA RLG File No., 02515.000 DATE: Tuesday, June 24, 2003 TIME: 1 PM (local time) WEATHER: Sunny, clear, dry, 91°F, wind 7 mph, 19% humidity THOSE PRESENT: Frank Prusa, Hayhoe Construction Corp, Roberto Riquelme, Hayhoe Construction Corp. Santiago Mascorro, rebar foreman Ann -Marie Doughty, TxPE, R.L. Goodson, Jr., Inc. PURPOSE: To observe the general progress and quality of construction. To determine if construction generally conforms to the contract documents. CONSTRUCTION STATUS: The maintenance building has been erected and appears to be in use. The foundation excavation for the spa building has been completed and the foundation reinforcing was about 85% complete at the time of this observation. Mr. Prusa and Mr. Riquelme indicated that they plan to have the foundation reinforcing inspected by the building official on Thursday morning and will follow as soon as possible with the concrete pour. OBSERVATIONS: The foundation excavation was completed during this observation and the perimeter footing reinforcing was In place everywhere except at the rotunda and at the concession building and exterior rooms adjacent to the concession building. Mr. Prusa and Mr, Riquelme indicated that they were waiting for the plumber to finish his work in the concession area and that the rotunda had been the last thing to be excavated so that they could access the rest of the building thru that area. The slab reinforcing was complete in the exercise room, the aerobics room and the locker room areas, however the slab reinforcing in the aerobics room area was not chaired up yet. Mr. Prusa and Mr. Riquelme indicated that the reinforcing would all be chaired up once they had finished laying it in the office and rotunda areas. Several areas along the northeast wall of the exercise room were observed to have pipe penetrations directly adjacent to the reinforcing dowels. Mr. Prusa and Mr. Riquelme indicated that they would move the reinforcing dowels over to allow for the concrete to flow between the pipe and the rebar. .W)HNF. STULL. PL. DAVIDM. (_f)01).',ON, FtF (,:hief Executive 011iu0e Pr(!!*1u111 STt1ARTA. MAHKUSSFN, r'.F... R.P.L.S. AssmiulC knlilni'G.WOOD.R.P.L$. PETER U.IAttSnN.f.E. I xocuBvo Vico f'nsidcrd Vico Pmgiclont MI(:HAkL U. PY_)WELI , P.F. A':: noiH IH ,),mS LA SIEHHA SUITE 300, LB 11 DALLAS, IEXAS 75231 41:38 214/7:39-t3100 FAX 214/739 G3b4 - FIE No . 710 06/25 '03 15:06 I D : R L GOODSON FAX 214 739 6354 PAGE 3 Mountainview Country Club & Spa Page Two Some sloughing of the footing excavation was noted, Mr. Prusa and Mr. Riquelme indicated that they would clean out the bottom of the excavation just prior to pouring concrete to assure a clean, firm bearing surface. Mr. Prusa and Mr. Riquelme also agreed that they would check all of the grade beam reinforcing for adequate concrete cover of 3" bottom and 2" sides prior to pouring concrete. The typical footing/foundation wall section has been replaced by the contractor with a monolithic footing/slab detail. Although this was not pre -approved by the Engineer of Record, the revised detail will be acceptable with the following adjustment. The #3 double hooked stirrup/dowel that was substituted for the footing dowel and the slab dowel must be placed at 12 inches on center maximurn (it was installed at 15 inches on center at the time of this observation.) Mr. Prusa and Mr. Riciuelme indicated that this would be corrected and agreed that changes to the construction documents would be presented to the EOR for approval prior to construction in all future cases. Sill anchors had not been installed at the time of this observation. Mr. Prusa and Mr. Riquelme indicated that they would be tying the anchors in place at the required four feet on center according to the Wood Framing Notes on S2.01. Mr. Prusa and Mr, Riquelme agreed to have the testing lab inspect the final rebar installation and the sill anchor installation prior to the concrete pour. Mr. Prusa and Mr, Riquelme requested a clarification on the installation of the hold down anchors at the ends of the shear walls. The hold down anchors are to be installed per detail 04/S4.01. The anchors are to be drilled and epoxied according to the Post -Installed Anchor Notes on S2.01 for accurate placement. It is not our intent that these hold down anchors be tied in place prior to the concrete pour, but rather that they be located and installed per the detail and notes. Site observations and report by: -7. Ann -Marie ghty, Tx Project Manager cc: Hunt Fugate, Three Architecture E gieaGoodson avid rk Presidentr�'�,ti rij,5 34 I G:1Projedal.ttructural\Prc)duction2002102515 MountainViewc:ovnt y('Iubaspa\Field Hepa+s1FR030624.00c �i s ;� '