Loading...
04-6340 (SFD)ol a Q• �.ot ul'Cv BUILDING & SAFETY DEPARTMENT G Q(760)' 777-7012 . OF 495 C yr��• MPI 0 FAX 760 777-7011 �D r ORNIA 92253 INSPECTION REQUESTS. (760).777-71.53: ' F1NP BUILDING PERMIT Application Number 04-00006340 Date. 10/20/04 Property Address 57355 PENINSULA LN APNc 762 -.150 -011 - Application description DWELLING.- SINGLE FAMILY DETACHED Propert:y. Zoning LOW DENSITY RESIDENTIAL Application valuation 386800 Owner Contractor BELLA OCEANA LTD PARTNERSHIP JACOBS'HOMES INC, PETER. ,.. `--1354-:BELLA .00EANA VISTA P..0. BOX 692 PACIFIC PALISADES CA 90272 LA QUINTA CA:92247 (760)..77.7=9921 WCC.: EXEM'PT : WC: EXEMPT 04/30/05 ' CSLB::. ..:7.99445'.' - 04:/30/05 CCC: B' -- ---. StructLire Information 5163 SQ. F.T. SFD Construction Type TYPE V. -.NON :RATED_ Occupancy Type . . . ... . DWELLG/LODGING/CONG <=10. .Flood Zone . . . NON AO FLOOD .ZONE Other struct info CODE EDITION 2001 CBC #` BEDROOMS 4.-.00 FIRE. SPRINKLERS. NO GARAGE 'SQ. FTG 920:-'00. PATIO SQ FTG 10"19'.0 0 NUMBER - OF UNITS ..... 1:.&0 : - FIRST FLOOR SQ. FTG 5163': b0': Permit. .. . . . . . BUILDING PERMIT Additional desc Permit, Fee 164.4.00 Plan Check.Fee .. 4.6.9.85 Issue Date Valuation 386800. :Qty Unit Charge Per., Extension BASE FEE6'3 9 :.5 0. 287.00 3,.5000 THOU BLDG 100,001-500,000 1004.50 Permit ELEC-NEW RESIDENTIAL Addtional.desc Permit Fee 229.11 Plan Check Fee 57.28 Issue Date. Valuation 0 Qty. Unit Charge Per Extension BASE FEE 15.00 5163.00 .0350 ELEC.NEW RES - 1 OR 2 FAMILY 180.71 920.00 .0200 ELEC GARAGE OR NON-RESIDENTIAL 18.40 1.00 15.0000 EA ELEC-TEMPORARY POWER POLE 15.00 P.O. BOX 1504 TWI Ot 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPARTMENT Application Number: Applicant: Applicant's (ling Address: Architect or Engineer:: VOICE4'(:760) 777=701.2' , FA'X (760) 777-7011 INSPECTIONS (76.0)'777-7153 Date: Architect or Engineer's Address: Lic. No.: BUILDING PERMIT DECLARATIONS' LICENSED CONTRACTOR'S DECLARATION 1 hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code. and my License in full force and effect / Q License Class License No. 7 I Date -J � 2 2 r�Contractor & " Q1- 10 y. . OWNER43UILDER DECLARATION I hereby affirm'under penalty of perjury that 1 am exempt from the Contractors`. State License Law for the following reason (Sea 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter. improve. demolish, or repair any structs ,'prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to time provisions of the Contractors' State License Law (Chapter 9 (commencing with Seddon 7000) of Division 3 of the Business and, Professions Code) or.that he or she Is exempt therefrom and the basis for.the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant. to a civil penally of not more than five hundred dbllars U I,as owner of the property. or my employees with wages as their sole compensation, will do the wok, and the structure is not Intended or offered forsale (Sec: 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the wok himself or herself or through his or her own employees` provided that the improvements are not intended or offered for sale. If, however: the building or improvernent.ls sold within one year d completion, the owner -builder will have the burden of proving that he or she did not build or Improve.for the purpose of sale). U 1. as owner of the property, am exclusively contracting with licensed contractors to constrict the project (Sea 7044, Business and Professions Code: The Contractors' State. License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). U i am exempt under Sea BA P.C. for this reason Date Owner WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty d perjury one df time following declarations:, I have and w01 maintain a certificate d consent to self4 isure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. . _ 1 have and will maintain workers' compensation insurance. as required by Section 3700 of the Labor Code, for the performance of the work for which this pemtit is Issued. My workers' compensation insurance carrier and policy number are: ' Cartier P.oficy Number 1 certiy:ftt, in the performance of the work`for which this: permit is issued, I shall not employ any person In any manner so as to become subject to the workers' conpensatioon laws d California. and agree that, if I should become subject to the workers': compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with Omose provisioi /(11-29 2 WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL", AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES. UP TO ONE HUNDRED THOUSAND DOLLARS (=100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEYS FEES. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a constuction lending agency for the.performance of the work for which this permit is issued (Sea 3097. Civ. C.). Lenders Name Lenders Address APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set font on this application. 1. Each person upon whose.behalf this application is made, each person at whose request and for whose benefit work Is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees lo, and shall, defend, indemnify and hold harmless the City of La Quinta, its _ officers, agents and employees for any act or omission related to the work being performed under or following Issuance of ft permit. 2. Any permit issued as a result of this applicatioit hecornes null and void if work is nd commenced within 180 days from date of Issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct I agree to comply with all city and county ordinances and state haws relating to building construction, and hereby authorize representatives of this county to Aler upon the eaa tioned property for inspection purposes. Date �l ' Z Z2 �/ Signature (Applicant or Ageet): v I Page 2 Application Number 04-00006340 Date 10/20/04 ---------------------------------------------------------------------------- Permit . . . . . . GRADING PERMIT Additional desc Permit Fee . . . . 15.00 Plan Check Fee .00 Issue Date . . . . Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 -----------------------'----------------------------------------------------- Permit . . . . . . MECHANICAL Additional desc Permit Fee . . . . 150.50 Plan Check Fee 37.63 Issue Date Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 5.00 9.0000 EA MECH FURNACE <=100K 45.00 5.00 9.0000 EA MECH B/C <=3HP/100K BTU- 45.00 6.00 6.5000 EA MECH VENT FAN 39.00 1.00 6.5000 EA MECH EXHAUST HOOD 6.50 -------------=-------------------------------------------------------------- Permit . . . . . . PLUMBING Additional desc Permit Fee . . . . 420.00 Plan Check Fee •105.00 Issue Date . . . . Valuation . . 0 Qty Unit Charge Per Extension BASE FEE 15.00 23.00 6.0000 EA PLB FIXTURE 138.00 1.00 15.0000 EA PLB BUILDING SEWER 15.00 2.00 7.5000.EA PLB WATER HEATER/VENT 15.00 1.00 3.0000 EA PLB WATER INST/ALT/REP 3.00 1.00 9.0000 EA PLB LAWN SPRINKLER SYSTEM 9.00 15.00 15.0000 EA PLB GAS METER 225.00 ---------------------------------------------------------------------------- Special Notes and Comments 5163 SQ. FT. SFD. THIS PERMIT DOES NOT INCLUDE POOL & SPA BLOCK WALLS OR DRIVEWAY APPROACH. 9/17/04 11:39:46 AM JJOHNSON.PERMIT FEES WERE ADJUSTED TO SHOW $366.25 DUE CITY FROM 1ST. PLAN CHECK AND $1000 DEP. FOR 2ND. PLAN CHECK. 9/24/04-9:46:14 AM jjohnson.AN ADDITIONAL 1HR FOR GRADING REVISION OF $35 DUE CITY 9/24/04 9:49:14 AM jjohnson e Page 3 Application Number . . . . . 04-00006340 Date 10/20/04 ---------------------------------- Other Fees . . . -- . ... . . ------------------------------'---------- ART IN PUBLIC PLACES -RES 467.00 DIF COMMUNITY CENTERS -RES 97.00 DIF CIVIC CENTER - RES 366.00 ENERGY REVIEW FEE 46.99 DIF FIRE PROTECTION -RES 97.00 GRADING PLAN CHECK FEE .00 DIF LIBRARIES - RES 225.00 DIF PARK MAINT FAC - RES 5.00 DIF PARKS/REC - RES 502.00 STRONG MOTION (SMI) - RES 38.68 DIF STREET MAINT FAC -RES 15.00 DIF TRANSPORTATION - RES 1098.00 Fee summary ----------=------ Charged ---------- Paid Credited ---------- Due Permit Fee Total 2458.61 -------------------- .00 .00 2458.61 Plan Check Total 669.76 .00 .00 669.76 Other Fee Total 2957.67 .00 .00 2957.67 Grand Total 6086.04 .00 .00 6086.04 Coachella Valley Unified School District P.O. Boz 847, Thermal, CA 92274 (760) 398-5909 — Fax (760) 398-1224 This Box For District Use Only DEVELOPER FEES PAID AREA: AMOUNT -LEVEL ONE AMOUNT: LEVEL TWO AMOUNT: MITIGATION AMOUNT: COMM/IND. AMOUNT: DATE, RF.r1F.TPT- CHFrX 8. INITIAI.S- CERTIFICATE OF COMPLIANCE (California Education Code 17620) Project Name: Resident behind PGA Date September 28, 2004 Owner's Name: Bella Oceana LP Phone Project Address: 57-355 Peninsula Lane La Quinta, CA 1 SFD Project Descri tion: APN: 762-150-001 Tract Lot /8 Type of Development: I Residential XXX I Commercial Industrial Total Square Feet of Building Are 5,167 sq. ft. Certification of Applicant/Owners: The person signing certi4es that the ove information is correct and makes this statement under penalty of perjury and further represents that he/she is rize t on behalf of the owner/developer. Date September 28, 2004 1 Signature: SCHOOL DISTRICT'S REQUIREMENTS FOR THE ABOVE PROJECT HAVE BEEN OR WILL BE SATISFIED IN ACCORDANCE WITH ONE OF THE FOLLOWING: (CIRCLE ONE) Education Code Gov. Code Project Agreement Existing Not Subject to Fee 17620 65995 Approval Prior to 1/1/87 Requirement Note: Number of Sq.Ft.5,167 Amount per Sq -Ft. $ 2.68 Amount Collected $ 13,847.56 Building Permit Application Completed: Yes/No By: Carey M. Carlson, Asst. Supt., Business Services NOTICE OF 90 DAY PERIOD FOR PROTEST OF FEES AND STATEMENT OF FEES Section 66020 of the Government Code asserted by Assembly Bill 3081, effective January 1, 1997, requires that this District provide (1) a written notice to the project appellant, at the time of payment of school fees, mitigation payment or other exactions ("Fees"), of the 90 -day period to protest the imposition of these Fees and (2) the amount of the fees. Therefore, in accordance with section 66020 of the Government code and other applicable law, this Notice shall serve to advise you that the 90 -day protest period in regard to such Fees or the validity thereof, commences with the payment of the fees or performance of any other requirements as described in section 66020 of the Government code. Additionally, the amount of the fees imposed is as herein set forth, whether payable at this time or in whole or in part prior to issuance of a Certificate df Occupancy. As in the latter, the 90 days starts on the date hereof: This Certificate of Compliance is valid for thirty (30) days from the date of issuance. Extension will be granted only for good cause, as determined by the School District, and up to three (3) such extensions may be granted. At such time as this Certificate expires, if a building permit has not been issued for the project that is the subject of this Certificate, the owner will be reimbursed all fees that were paid to obtain this Certificate of Compliance. 09-23-2004 15:20 FROM -MDS CONSULTING �:,.. ••�� Ib�/.;; Vi -'A N:'..y-.E R S , =.. ti -'lint �ei!{t ��? itU?i f;''�, r�:'•:,a 7607714073 E N G I N E E R S I S U R V E Y O R! September 22, 2004 City of La Quinta Public Works/Engineering Department 78-495 Calle Tampico La Quinta, California 92253 Rough Grading Verification Tract No. 28522 Peninsula Park T-043 P.003/003 F-763 r We have checked the area referenced below and find it to be in substantial conformance to the As -Built pad elevation, and per precise Plot Plan elevation. Lot # Plan Elev. As -Built Elev. Variation 18 481.6 481.6 0 Stanley C. Mors R.C.E. 20596 Expires 9/30/05 55500lotl Brg. Stanley C. Morse 78.900 Avenue 47 VOICE: 760.771-4013 Gary W. Dokich Suite 208 FAX: 760.771.4073 J.R."Skip"Schultz La Quinta, CA 92253 EMAIL: mdslaquinta0mdscon:uilin8.net �VVISS/01 C. No. 20596 " m kK Exp9 Fr CA \EO���P .. .... . ... . 760 3418543 P. 02 -Fieb'- 1-1: -58A BRISTOL.....CONST l/1 McGEE SURVEYING 43-755 Skyward Way - La Quinta, Ca. 92253 Phone (760) 345-3829 - Fax (760) 772-5705 February 18, 1999 Bristol Construction, Inc. 73-929 Larrea, Ste. I Palin Desert, CA 92260 Re: Revised Pad Elevations Table for Peninsula Project, Tract No. 28522 Pursuant to your request a.ficld survey was conducted e . n - the . . above referenced pro"je-ot to determine the vertical location ofthe existing pads. There are two clevatio . as flistod: 1) pau elevations per the original approved Grading Dftin3ge & Paving Plan; 2) pad elevations, as measured per a field survey in Feb. 1999. 1 have included the differentials between the original and as -built elevations. The above mentioned were found as follows: PAD ELEV. GRADING PAD ELEV. LATS DI&AINAGF 1 478.3 480.3 2 481.2 491.3 3 481, 481.9 4 482.3 482.6' 5 482.3 482.7 6 492.4 493.3 .7 .482.5 483.7 8 482.9 483.7 9 483.5 483.9 10 494.1 494.3- 1.1 ..484.2' 44.3, 12 .484.3 484.3 13 494.2 484.3 14 483.9 483.9 483.2 483.2 16 482.3 492.7 17 481.5 482:5 18 480.3 481.4 Page 1 of 1 +2.0 +0.1 0.0- +0.3 - +0.4 +0.9 +1.2 +0.8 +0_4 +0.2 -+0. f. - 0.0 - +0.1 0.0. 0.0 +0.4 CERTIFICATE OF. FQELD':dERIFICATION AND DIAGNOSTIC TESTI1VG. (D'.611V 1 of CF4R ----------------- Date ' Builder Name Builder/,o jt .0 . , , n I Telenhone Date Firm: Street Address: Copies to: Builder, HERS Provider Plan Number Sample Group Number Sample House Number HERS Provider: City/State zip: HERS RATER COMPLIANCE STATEMENT The house was: JTTested ❑ Approved as part of sample testing, but was not tested As the HERS rater pro 'ding diagnostic testing and field verification, I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or platform returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured values e Flow in CFM If fan flow is calculated as 400e@n/ton x numbertof�genter calculated 1-7— value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan' Flow) _ Check Box for Pass or Fail (Pass=6% or less) P Fail THERMOSTATIC EXPANSION VALVE (TXV) . Ayes ❑ No Thermostatic Expansion Valve is installed and Access is provided for inspection ❑ Yes is a pass ❑ MINIMUM REQUI._ Pass Fail i MENTS.FORD.UCT..D-ESIGN-COMP - L ..E CREDIT ❑ No Design 1' Yes ACCA Manual D Desi requirements have been met (rater has. verified that actual installation matches values in MIR and design on plan. 2' ❑ Yes ❑ No. TXV is installed or Fan flow has been verified. If no TXV, l verified fan flow matches design from CF -IP - Measured Fan Flow = ❑ ❑ Yes for both 1 and 2 is a Pass 'Pass Fail Compliance Forms August 2001 A-16 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING (Page l 0t7)' CF4R _ Zo 3 /DS' Project Title Date ' Protect AAArwcc Builder Name Builder Contact 4 _ LEI Date .. Firm: Street Address:°��,. Copies to: Builder, HERS Provider Plan Number Sample Group Number Sample House Number HERS Provider:���' City/Statc&ip: B 9?�dp HERS RATER COMPLIANCE STATEMENT The house was: Al Tested ❑ Approved as part of sample testing, but was not tested As the HERS rater providing diagnostic testing and field verification, I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or platform returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections, MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured values If fan flow is calculated as 400cfin/ton xnumbesto Leakage is enter w in CFM ted value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) _ Check Box for Pass or Fail (Pass -6% or less) Pass Fail THERMOSTATIC EXPANSION VALVE ffxV) . Yes ❑ No Thermostatic Expansion Valve is installed and Access is provided for inspection 13 Yes is a pass P Fail ❑ MINIMUM REQUIitEMENTS.FOR.DUCT..D.ESIGN-CUMP•LIANCE-CREDIT 1' ❑ Yes ❑ No ACCA Manual D Design requirements have been met (rater has verified that actual installation matches values in CF -1R and design on plan. 2' ❑ Yes ❑ No. TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -1R f Measured Fan Flow = ❑ 13Yes for both I and 2 is a Pass Pass Fail Compliance Forms August 2001 A-16 CERTIFICATE OF FIELD. VERIFICATION AND DIAGNOSTIC'' zo STING (Page 1 of CF -4R /� —.11'/. /Ds� Project Title Date Project Address Bulkier Name Builder Contact Telephone Plan Number �/../___%/.i//_/�_/ - - -•-o ...6......... i Date Mn: Street Address:r�� Copies to: Builder, HERS Provider Sample Group Number Samplo House Number HERS Provider: City/State/Zip: HERS RATER COMPLIANCE STATEMENT The house was: Tested E3 Approved as art of s p ample testing, but was not tested As the HERS rater provi ng diagnostic testing and field verifications I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or platform returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. IMINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured values If fan flow is calculated as 400cfin/ton xnumbest Leakage tons enter w in calculated _ value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) _ Check Box for Pass or Fail (Pass -6% or less) ` I THERMOSTATIC EXPANSION VALVE Yes ❑ No Thermostatic Expansion Valve is installed and Acbess is provided for inspection Yes is a pass MINIMUM RE Q. DIRE _ENTS.FOR.D..UCT..D.ESIGN COMPLIANCE CREDIT 1' ❑ Yes ACCA Manual D Design requirements have been met (rater has verified that actual installation matches values in CF -1R and design on plan. 2' ❑ Yes ❑ No. ' TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -1R. { Measured Fan Flow = Yes for both 1 and 2 is a Pass 13 P Fail ❑ Pas s Fail ❑ ❑ Pass Fair Compliance Forms August 2001 A-16 CERTIFICATE OF FIELD. VERIFICATION -AND DIAGNOSTIC TESTING (PltQe 1'of7) CF4R Project Title Project Address= budder Name ..Firm: .v Street Address: /- ,Zy°�F,, /� ♦ LL �t Copies to: Builder, HERS Provider • Plan Number Sample Group Number Sample House Number HERS Providet: City/State/Zip: 9r�� HERS RATER COMPLIANCE STATEMENT The house was: Tested ❑ Approved as part of sample testing, but was not tested As the HERS rater providing diagnostic testing and field verification, I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has.provided a co of CF -6R COPY -(Installation Certificate. Distribution system is fully ducted (i.e., does not -use building cavities as p Where cloth backed, rubber adhesive duct tape is inslenums or platform returns in lieu of ducts) talled, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured values ow in CFM If fan flow is calculated as 400cfro/ton x numbertoffttons enter calculated—arz-�--- value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) _ Check Box for Pass or Fail (Pass -4% or less) P Fail THERMOSTATIC EXPANSION VALVE ItYes ❑ No Thermostatic Expansion Valve is installed and Access is Provided for inspection ❑ MINIMUM RE UI . Yes is a pass ...:._..Q. ,ItE1xIENTS.EOR.D.UCT..D.ESIGN-COMPL-IANCE-CREDIT ❑ No Design eq 1' Yes ACCA Manual D Desi . requirements have been met (rater has verified that actual installation matches values in CF -IR and design on plan. 2' ❑ Yes ❑ No. TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -1R Measured Fan Flow = Yes for both 1 and 2 is a Pass Compliance Forms August 2001 ❑ ❑ Pass Fail A-16 13 Pass Fail ❑ ❑ Pass Fail A-16 CERTIFICATE OF FIELD VERIFICATION AND DIACIVOSTIC TESTING (Pt*ge 1 of CF4R Date —' BU 1.111111; Name Builder 00 0 Contact �, , , n j Telephone ----- ---0...6.......,E Date Firm: Street Address:/-��_ ?►. Copies to: Builder, HERS Provider `L ' Plan Number Sample Group Number Sample House Number HERS Provider: City/State/Zip: HERS RATER COMPLIANCE STATEMENT The house was: � Tested ❑ Approved as art of s p ample testing, but was not tested As the HERS rater providing diagnostic testing and field verification, I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or platform returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth' backed, rubber adhesive duct tape to seal leaks at duct connections. ot MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duet Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured values If fan flow is calculated as 400cfin/ton xnumbestof� enter Cage Flow in CFM value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) Check Box for Pass or Fail (Pass --6% or less) I Fail C THERMOSTATIC EXPANSION VALVE (TXV) Yes ❑ No Thermostatic Expansion Valve is installed and Aebess is Provided for inspection Yes is a pass ❑ MINIMUM 12EQUIREIyIENTS.EOR D.UCT..D.ESIGN COMPLIANCE CREDIT 1. ❑ Yes ❑ No ACCA Manual D Design requirements have been met (rater has verified that actual installation matches values in CF -1R and design on plan. 11 Fail ?' ❑ Yes ❑ No. TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -1R. f) Measured Fan Flow = ❑ ❑ Yes for both 1 and 2 is a Pass Pass Fall Compliance Forms August 2001. A-16 s- GOUVIS ENGINEERING CONSULTING GROUP, INC. A Structural Engineering Company Structural Job -site Observation Project: 11-4s t ) I -A. 1�-->A N>-)< Engineer: 1-4 AC;M '' Visit Purpose: Job No. Date: ;© Walk thru with compliance letter: YesA No ❑ New ❑ Rewalk) ❑ Clarifications & Field fixes: Yes ❑ No ❑ New ❑ Rewalk ❑ ❑ Address homeowner issues & concerns: Yes ❑ No ❑ New ❑ Rewalk ❑ ❑ Other: At the time of our visit, work had progressed to the point of: Lot number Plan type & Elevation _ 'Foundation Trenched (Rebar&Hardware Installed) ❑ ❑ ❑ ❑ Foundation Poured ❑ ❑ ❑ ❑ '.First Floor Sheathing ❑ ❑ ❑ ❑ Roof Sheathing ❑ ❑ ❑ ❑ Final Framing with Correction ❑ ❑ ❑ ❑ Roofing Material Stacked and Loaded `4 ❑ ❑ ❑ Exterior Walls Covered ❑ ❑ ❑ ❑ Interior Walls Covered ❑ ❑ ❑ ❑ Insulation Installed ❑ ❑ ❑ ❑ Final Framing Pick-ups Completed �� ❑ ❑ ❑ Per our visit: `a r Please note: Our findings and recommendations are provided to help increase the conformity of�h,e:structures with approved plans and correspondence. Be advised that changes should be verified wi `sbuildin department, our findings shall not be construed, as authorizing any back charges. / Site observation was made only to check ggne'raconformance with approved plans and correspondence. Refer to the attached walk-thru lists to be addressed by the construction personnel Field fix letters will be sent from our office to be applied No visual deficiencies observed 5 The content of these observations is understood to be an expression of professional opinion by this engineer that is based on his or her best knowledge, information and belief. As such, it consists of neither a guarantee nor a warrantee expressed or implied. Field Superintendent (Yellow copy) '���Date` Time in: Pi'. ©tl . E Time Out: >ON If you have any questions please contact this office. 4400 Campus Drive, Newport Beach, California 92660 - (949) 752-1612 - FAX (949) 752-5321 2150 EastTahquitz Canyon, Suite 9 - Palm Springs, California 92262 - (760) 323-5090 - FAX (760) 325-2863 .. ,. r . GOUVIS,ENGINEERING CONSULTING GROUP, INC. - r A Structural Engineering Company QATE: , PAGE I -OF PROJECT NAME: t4s JOB #: _�f �LOT # 1 �. ( ,�/ / PLAN # . j' „(l. C I jNT NAME: NOTES: i���( _ r - (...PERSONNEL S Gt If ❑INTERIOR ❑`EXTERIOR " ❑ FOUNDATION ❑ROQF1;NERIOR!&`EXTERIORQNLY ,IRE WALKS ❑ FL00_RbSHEATHING (JFK .1 t:4. Ilk, 4. ISM Superintendent Name O kN � 1� Z �y�Signat Jre Time In A( ni n Time Out X19;15© 3iyu 4400 Campus Drive •Newport Beach, :California 92660 • (949) 752=1612 • FAX (949) 752-5321 2150 EastTahquitz Canyon, Suite 9 • Palm Springs,�California9,2 • (760) 323-5090 • FAX (760) 325-2863 Field Office :<,Pleasanton (5 10) 206-9159 !■®®■®■I®■�!�■■f�i■I�/■■�1®■■■■■■iii■�7® ®®:■■ii®■■■!��#�■���1�■1��■�■■lei■!��®■ �i■■■■■■�■®lair■��®■■®■■©■■■■■■■i�. not installed. Install item as shown on the approved plans. InstallationItem •t completeCemplete installationof • on •• • • • . I® not • -. Unable to •- • • Condition different than plans.'Need field fix.. qbptP-CtjFie'1d pe ration §'D'qpt. @'Newport Beac i,��,ext 237 Superintendent Name O kN � 1� Z �y�Signat Jre Time In A( ni n Time Out X19;15© 3iyu 4400 Campus Drive •Newport Beach, :California 92660 • (949) 752=1612 • FAX (949) 752-5321 2150 EastTahquitz Canyon, Suite 9 • Palm Springs,�California9,2 • (760) 323-5090 • FAX (760) 325-2863 Field Office :<,Pleasanton (5 10) 206-9159 GOUVISENGINEERING CONSULTING GROUP,INC.' A Structural _Fngineering Company 0 PAGE v1 U OF PROJECT NAME: LOT # PLAN# CLIENT NAME— A A(` _ NOTES:W.T. PERSONNE.. "A :'[]INTERIOR- 01EXTERIOR 017PA,'O'A'TION E]Ro6F,k -0141 iIWTERIOR�,g EXTERIOR _Y 0 RE -WALKS 0 FLOOR SHEATHING ALK,- Signature ' Superintendent Name -Time In %r) W Time ' Out .4400 Campus Drive • Newport Beach; a 92660 • (949) 752-1612 - FAX (949) 7552 532 2150 East Tahquitz. Canyon, Suite 9' * Pahn S'pripgs, California 92262 - (760) 323-5090 - FAX ('760) 325-2863 Field Office" Pleasazriton(5� 10)--206-9159 WFM ft M" CMM: now W-1911FAIEN", RMFOOMME SON, 91fien EMN 9020 a No NO WHE IN F, BMW Now R10- Own so Nomom ����y��� NNE"0 Item not installed. Instal; item as shown on the approved plans. NNEInstallation not 'C*ompletet7��?mlpete installation of it3m as shown on the approved plans. ENEItem Unableodetermin not visible. te if iteg,'Mag installedlVerify installation. EME , .. ALK,- Signature ' Superintendent Name -Time In %r) W Time ' Out .4400 Campus Drive • Newport Beach; a 92660 • (949) 752-1612 - FAX (949) 7552 532 2150 East Tahquitz. Canyon, Suite 9' * Pahn S'pripgs, California 92262 - (760) 323-5090 - FAX ('760) 325-2863 Field Office" Pleasazriton(5� 10)--206-9159 GOUVIS ENGINEERING CONSULTING GROUP, INC. A Structural Engineering Company �. Structural,Job-site Observation Project: Job No.`,. 7ly �� / •' ' Engineer: i t �3 ' f ++'� ` ! I �' Date: _ r _0` N-- l Visit Purpose: , ! �r'ry Walk thr with complia6 eIJA_ 4+ (Q No tNew D' ` Rewalk ❑ /. l fir' ❑, Clarifcations & Field fixes.,, Yes•❑ _– —i1 •No ❑---_Z_._New ❑-^ ' Rewalk'El -'----- --J I, . A . ❑ Address homeowner issues & concerns: Yes ❑ 1 JNo,❑ New O� i Rewalk ❑ ` ❑Other: If At the time of our visit,•work had"progressJto the ,point of: Lot number Plan type & Elevations ✓1 r Foundation Trenched (Rebar & Hardware Installed) ❑ ❑ .s ❑ ❑ ❑ r , Foundation Poured ❑ ❑s" ❑ ❑ ❑ r !rl- First Floor Sheathing + t ❑ �,`❑ . ❑ ` ❑ 11 Roof Sheathing" ❑ r: ❑ ❑ � ❑ ❑ !C Final Framing with Correction %; ❑ f ❑ ❑ ❑ ❑ ,t Roofing Material Stacked and Loaded i� �❑/ ❑ -,U ❑ ❑ Exterior Walls Covered ❑ ❑ p r ❑ ❑ + Interior Walls Covered > t r ' ❑' - ' •�❑ ❑ ❑' l ❑ Insulation Installed % ❑ i❑ j ❑ `�- � p ❑" ' !- Final Framing Pick-ups Completed ❑' ❑ ❑ ❑ ❑ Per our'visit. l Refer to the attached walk-thru lists to be addressed by the construction personnel k v\ f ❑� Field`fix letters will be sent from our office to be applied--- No ppliedNo visual deficiencies observed - Please,note: Our findin's and,reco,mmendations are provided tor�eip increase the conformity of the structures with approved plans and correspondence. Be advised that changes should be verified with building department, our findings shall not be construed, as authorizing any back charges. AV Site observation was made only to check general conformance with approved pians and -correspondence. , The content of these observations is understood to be an expression of professional opinion by'this engineer that is based on his or her best knowledge, information and belief. As such, it consists of neither a guarantee nor a warrantee expressed or implied(, Field Superintendent (Yellow copy) ! - Date ' / Time in: 1 r•, , rte") r Time Out: h:' :+,r•� t ,, 6: i �� r _ ;1 �► If you have any questions please contact this office. 4400 Campus Drive, Newport Beach, California 92660 • (949) 752-1612 - FAX (949) 752-5321 2150 East Tahquitz Canyon, Suite 9 • Palm Springs, California 92262 • (760) 323-5090 - FAX (760) 325-2863 Del-) ON' AI DI(V ff� �> I , , --r 5� A- - TANDWS INSPECTION INC.. PO BOX 13766 PALM DESERT, CA 92255 SPECIAL INSPECTION DAILY REPORT OFFICE/FAX 909.769.9717 PAGER 760.776.3339 TYPE OF INSPECTION PERFORMED �J(.�I-1 SAMPLE INFORMATION SUPPLIER TICKET NUMBER PHYSICAL ADDRESS i _ i � /4 �u1�j14 PE � RMIT NUMBER J08 NAME a o/ \\ N S U L A ^ e k v TYPE OF STRUCTURE \ ARCHITECT tV 0 e 1 e- CW -9t 1 T4 ENGINEER v j S�•C,•J, � l GENERAL CO TOR p rt-� C o �S � L elle; _V\ SUB CONTRACTQR� � - `l,(,,J9 F{771 DESCRIPTION OF WORK INSPECTED P& T(A R eS l �S Zo a te. A =S • ce, Y -G sc Sf Ackp CaJ� ct-i Lc I I SAMPLE INFORMATION SUPPLIER TICKET NUMBER MIX NUMBER AIR TEMP SAMPLE SLUMP TIME IN MIXER SAMPLED TEMP LOCATION WELDING INFORMATION PROCESS �= _ C, A cc) WELDERS NAME CERTIFYING AGENCY AND CERTIFICATION NUMBER Z W-�5 I 3- 3Lib 12- I HEREBY CERTIFY THAT I HAVE INSPECTED ALL OF THE ABOVE REPORTED WORK, UNLESS OTHERWISE NOTED, AND TO THE BEST OF MY ABILITY 1 HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED PLANS, SPECIFICATIONS & APPLICABLE BUILWNG LAWS. CC: INSPECTORS SIGNATURE � O G -g� � INSPECTORS CERTIFICATION AGENCY AND NUMBER I , TITLE 24 REPORT I Title 24 Report for: Peninsula Park Plan #3 PGA West LaQuinta, CA 92253 # dpi/ -6 "to mp-affis **4104ato tv. Project Designer: Hove Design Alliance Architects 240 Newport Center Drive, Suite #205 Newport Beach, CA 92660- (949) 760-0812 Report Prepared By: < CJ Mcfadden BREEZE AIR CONDITIONING 75-145 ST. CHARLES PLACE PALM DESERT, CA 92211 (760) 346-0855 Job Number: Date: CITY OF LA QUINTA BUILDING & SAFETY M-., APPROVED FM M� I A' CTIO'N rum,fia�- a.. 11 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is 0i i authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. x_ w. I EnergyPro 3.1 Job Number: User Number: 3665 57%3S!5 �-W-fwluSt�� aFfll�.I[eP� Certificate of Compliance: Residential (Part 1 of 2) CF -1 R Peninsula Park Plan #3 W-2 Wall (W.21.24.16) 5/14/2004 • Project Title Exterior Wall Date PGA West LaQuinta 0.057 Exterior Wall Project Address n/a Building Permit # BREEZE AIR CONDITIONING (760) 346-0855 Plan Check/ Date Documentation Author Telephone 0.756 Computer Performance 15 Field Check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION 0.31 Bug Screen Total Conditioned Floor Area: 5,163 ft2 Average Ceiling Height: 11.7 ft Total Conditioned Slab Area: 5,163 ft2 72.0 Building Type: 0.59 Bug Screen (check one or more) x❑ ❑ x❑ X❑ Single Family Detached ❑ Addition 0.40 ❑ Single Family Attached ❑ Existing Building ❑ ❑ Multi -Family ❑ Existing Plus Addition Right Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor Number of Dwelling Units: 1.00 ❑X❑ Number of Stories: 1 ❑ Raised Floor Component Const. Frame Assembly Location/Comments Type U -Value (attic, garage, typical, etc.) R-38 Roof (R.38.2xl4.16) Wood 0.028 Exterior Roof W-2 Wall (W.21.24.16) Wood 0.057 Exterior Wall W-1 Wall (W.21.24.16) Wood 0.057 Exterior Wall Slab On Grade n/a 0.756 Exposed Slab w/R-0.0 Perimeter Insulation Slab On Grade n/a 0.756 Covered Slab w/R-0.0 Perimeter Insulation Solid Wood Door Wood 0.387 Exterior Door FENESTRATION Shading Devices Type Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Skylight 20.0 0.80 0.43 None ❑ x❑ ❑ x❑ Left 75.1 0.54 0.31 Bug Screen ❑ x❑ ❑ X❑ Rear 72.0 0.80 0.59 Bug Screen ❑ x❑ ❑ x❑ Rear 204.0 0.40 0.35 Bug Screen ❑ x❑ ❑ x❑ Right 108.6 0.40 0.35 Bug Screen ❑X❑ ❑ x❑ Right 57.5 0.54 0.31 Bug Screen ❑ x❑ ❑ X❑ Front 16.0 0.54 0.31 Bug Screen ❑X❑ ❑X❑ Front 67.0 0.40 0.35 Bug Screen ❑ x❑ ❑ X❑ Left 66.0 0.40 0.35 Bug Screen ❑ X❑ ❑X❑ Rear 123.0 0.40 0.35 Bug ScreenX❑ ❑ ❑ X❑ Rear 96.0 0.80 0.59 Bug Screen x❑ ❑ ❑ X❑ Left 60.0 0.54 0.33 Bug Screen ❑ X❑ ❑ X❑ Run Initiation Time: 05/14/04 10:57:39 Run Code: 1084557459 Ener Pro 3.1 By Ener Soft User Number: 3665 Job Number: Pa e:3 of 34 Certificate of Compliance: Residential (Part 1 of 2) CF -1 R Peninsula Park Plan #3 Exterior 5/14/2004 Project Title SF Date • PGA West LaQuinta Shading Yes / No Project Address Left Building Permit # BREEZE AIR CONDITIONING (760) 346-0855 Plan Check/Date Documentation Author Telephone ❑ x❑ Computer Performance 15 Field Check I Date Compliance Method (Package or.Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION Bug Screen ❑ x❑ Total Conditioned Floor Area: 5,163 ft2 Average Ceiling Height: 11.7 ft Total Conditioned Slab Area: 5,163 ft2 Building Type: ❑ ❑ ❑ ❑ (check one or more) Single Family Detached ❑ Addition ❑ Single Family Attached ❑ Existing Building ❑ Multi -Family ❑ Existing Plus Addition Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor Number of Dwelling Units: 1.00 Number of Stories: 1 ❑ Raised Floor .• E BUILDING SHELL INSULATION Const. Component Frame Assembly Location/Comments Type Type U -Value (attic, garage, typical, etc.) FENESTRATION Shading Devices Type Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Left 24.0 0.80 0.59 Bug Screen ❑ x❑ ❑X❑ Front 30.0 0.55 0.30 Bug Screen ❑ x❑ ❑ X❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Run Initiation Time: 05/14/04 10:57:39 Run Code: 1084557459 Ener Pro 3.1 By Ener Soft User Number: 3665 Job Number: Pa e:4 of 34 COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Documentation Author Name: Title/Firm: Hove Design Alliance Architects Address: 240 Newport Center Drive, Suite #205 Newport Beach, CA 92660 Telephone: (949) 760-0812 Lic. #: (signature) (date) Enforcement Agency Name: Title/Firm: Address: • Telephone: Name: CJ Mcfadden Title/Firm: BREEZE AIR CONDITIONING Address: 75-145 ST. CHARLES PLACE PALM DESERT, CA 92211 Telephone: (760) 346-0855 (signature) (date) IEnergyPro 3.1 By EnergvSoft User Number: 3665 Job Number: Paae:5 of 34 1 Certificate of Compliance: Residential (Part 2 of 2) CF -1 R Peninsula Park Plan #3 5/14/2004 • Project Title Date HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load. Distribution Heating Equipment Minimum Type and Duct or Type (furnace, heat Efficiency Location Piping Thermostat Location / pump, etc.) (AFUE/HSPF) (ducts, attic, etc.) R -Value Type Comments Central Furnace 80% AFUE Ducts in Attic 42 Setback HVAC -1 Central Furnace 80% AFUE Ducts in Attic 42 Central Furnace 80% AFUE Ducts in Attic 4.2 Setback HVAC -2A & 2R Setback HVAC -3 Central Furnar-P 80% AFUE Ducts in Attic 4.2 Setback HVAC -4 Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type Comments Split Air Conditioner 14.0 SEER Ducts in Attic 42 Sethack HVAC -1 Split Air Conditioner 14.0 SEER Ducts in Attic 42 Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAr:_2A P. 2R Setback HVAC -3 Setback HVAC -4 WATER HEATING SYSTEMS Rated 1 Tank Energy Facts 1 External Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby Tank Insul. System Name Type Type Syst. Btu/hr (gal) Efficiency Loss (%) R -Value • A.O. SMITH FPS -50-224 Small Gas Recirc/Temp 2 43,000 50 0.60 n/a n/a 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Documentation Author Name: Title/Firm: Hove Design Alliance Architects Address: 240 Newport Center Drive, Suite #205 Newport Beach, CA 92660 Telephone: (949) 760-0812 Lic. #: (signature) (date) Enforcement Agency Name: Title/Firm: Address: • Telephone: Name: CJ Mcfadden Title/Firm: BREEZE AIR CONDITIONING Address: 75-145 ST. CHARLES PLACE PALM DESERT, CA 92211 Telephone: (760) 346-0855 (signature) (date) IEnergyPro 3.1 By EnergvSoft User Number: 3665 Job Number: Paae:5 of 34 1 Certificate of Compliance: Residential (Addendum) CF -1 R Peninsula Park Plan #3 5/14/2004 • Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies F based on the adequacy of the special justification and documentation submitted. Plan Field The HVAC System "HVAC -1 " must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -1 " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -2A & 2B " must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. The HVAC System "HVAC -2A & 2B " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -3 " must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -3 " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -4 " must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -4 " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -611. I Plan I Field The HVAC System "HVAC -1 " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -1 " is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -2A & 2B " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provid verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 " is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -4 " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -4 " is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. Run Initiation Time: 05/14/04 10:57:39 Run Code: 1084557459 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:6 of 34 Is • Mandatory Measures Checklist: Residential (Page 1 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (") may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Building Envelope Measures ❑X "§150(a): Minimum R-19 ceiling insulation. §150(b): Loose fill insulation manufacturer's labeled R -Value. Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does o§150(c): not apply to exterior mass walls). [—]*§150(d): Minimum R-13 raised floor insulation in framed floors or equivalent. ❑§ 150(1): Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 perm/inch. §118: Insulation specified or installed meets insulation quality standards. Indicate type and form. ® §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. § 150(8): Vapor barriers mandatory in Climate Zones 14 and 16 only. § 150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards. ❑X §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures 0 § 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. F] § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. § 150(i): Setback thermostat on all applicable heating and/or cooling systems. FX §1500): Pipe and Tank Insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined internal/extemal insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55 degrees F. insulated. 6. Piping insulating between heating source and indirect hot water tank. EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:7 of 34 • r� Mandatory Measures Checklist: Residential (Page 2 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (") may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or Initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) I150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL181, UL181A, or UL181 B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or Flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such a tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers. 5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually operated dampers. 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. ❑ § 114: Pool and Spa Heating Systems and Equipment 1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating, and no pilot. 2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas. a. At least 36" of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. a§115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) ❑ §118 (f): Cool Roof material meet specified criteria Lighting Measures © §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an entrance to the kitchen. §150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. 3.1 By EnergySoft User Number: 3665 Job Number: Page:B of 34 Computer Method Summary (Part 1 of 3) C -2R Peninsula Park Plan #3 5/14/2004 Project Title Date PGA West LaQuinta Project AddressBuilding Permit # BREEZE AIR CONDITIONING (760) 346-0855 Documentation Author Telephone Plan Check/Date Computer Performance 15 Field Check/Date Compliance Method (Package or Computer) Cimate Zone Source Energy Standard Use (kBtu/sf-yr) Design Space Heating 3.31 Facing North Margin # of Facing East Margin Vent Facing South Margin Floor Area Facing West Margin 2.99 0.33 3.50 -0.19 4.01 -0.69 3.37 -0.05 Space Cooling 34.14 28.74 5.40 -2 -n/a 28.61 5.53 ? 723 27.50 6.64 -LhdngS2at- 29.67 4.47 Domestic Hot Water 5.52 6.28 -0.76 7,.030 _0 14_ Sleeping_ 6.28 -0.76 2 -nLa 6.28 -0.76 625 6.28 -0.76 38.01 4.97 38.39 4.58 37.79 5.19 39.32 3.66 Totals 42.98 ❑ Type Area U -Val. Azm. This C -2R describes the front facing North occurrence of a four cardinal orientation analysis. Features are identical in all orientations. Total Conditioned Floor Area: 5,163 ft 2 Building Type: Single Fam Detached Floor Construction Type: ❑ Raised Floor 0 Slab Floor Building Front Orientation: All Four Orientations Total Fenestration Area: 19.7% Number of Dwelling Units: 1.00 Total Conditioned Volume: 60,379 ft 3 Number of Stories: 1 Total Conditioned Slab Area: 5,163 ft2 BUILDING ZONE INFORMATION # of Thermostat Vent Zone Name Floor Area Volume Units Zone Type Type Hgt. Area 1iVAC-1 1 076076 11 826 nn 21 Sleeping- -SleepingStat_ -2 -n/a I IY9C_2a &26 ? 723 35 39944 _0.53- 1 wing -LhdngS2at- 2 -n/a Roof- 2,719 0.028 34.1; 740 7,.030 _0 14_ Sleeping_ -Sleeping.St� at 2 -nLa •HVAr_3 JiVAC-4 625 6,125 0.12_ Sleeping SleeoingStat _nLa OPAQUE SURFACES Act. Solar Gains -Nall_ 116 --D 057 - 0 -9R ❑ Type Area U -Val. Azm. Tilt Y / N Form 3 Reference Location / Comments _Solid-Woodi.00r ZONE 9 0 Rope- 1,959 0.028 _345 0 LJ R-38_�_ Roof (R 38 2x14 16) 70N 1 -Nall_ 60 _0-057 o ____,go_ l ❑ W-2 Wall (W 21 2x6 16) ZONE 1 -Nall_ 70 0.0.57 _90 9Q ❑ VV -1 Wall 21 9x616) ZONE 1 -Nall 129 0 057 180 90 ❑ W-1 Wall (W?1 2x6 1 ZONE 1 -Wall 540 0,9.57 -270 90 ❑ W-1 Wall (W 21 2x6 16) 70N 1 Roof- 2,719 0.028 34.1; ❑ R-38 Roof (R 38 9,14 16) ZONE 2 -Nall_ 198 0 Q57- 90 ❑ W-1 Wall (W 21 2x6_161 70NF 2 .Door_ 48 --O-a87 0 90 ❑ Solid Wood Dnor 70NF;' -Nall_ 116 --D 057 - 0 -9R ❑ W--9 Wall ON 91 2x6 16) ZONE 2 Door- 24 -U.82 0 90_ ❑ _Solid-Woodi.00r ZONE 9 -Nall 309 0_0.5Z 90 90 ❑ W-1 Wall (W 91_2x6_16) ZON 2 MCall- 422 0.057 180 9Q l ❑ W-1 Wall (W 21 2x6 16) ZONE 2 _wall- 232 ---D-057- _27.0 9.0_ ❑ W-1 Wall (W.21 2x6 16) ZONE 2 RooL- 740 0.028 _345_ 0_ ❑ .RR38_Roof (R 38 2x14 16) ZONE 3 Wall 210 OQ57- 90 ❑ W-2 Wall mm 7x6 16) 70NF 3 Wall 322 OQ57 ----9D- 90 ❑ W-1 Wall (W 21 2x6 16) ZONE 3 -Nall- 65 X7_0 90 ��p� ❑ W-2 Wall (Vy 21 2_x6 161 70NF 3 --D-057- RQ_Qf- 629 0.09.8 -345 0 TIN ❑ R-38 Roof (R_38 2x14.16) 70NF 4 -Nall- X90_ 0.057 a 9Q rLynJ� - ❑ Vw-� Wall (W 21 2x616) 70NF 4 -Wall _235_ _0_057 91) 9.0 - ❑ W-1 Wall (W 21 2x6 16) 70NF 4 -Nall_ 16 0.957 lap _90_ -W-1 Wall ON 21 2x6 16) ZONE 4 -Nall- 60 0 Q5Z 084. ❑ W-2 Wall (W 21 2x6 16) 70NF= 4 _90 Wall 204 0.0.57 270 90 ❑ W-1 Wall (W 212x6 161 70N 4 -A(all 55 0.057- X70 90_ ❑❑ W-2 Wall (W 21 2x6 16) 70NF 4 ❑ F-1 F-1 L1 L1 Run InitiationTime: 05114/04 10:57:39 C • 1084557459 3.1 By EnergySoft User Number. 3665 Page:9 of 34 Computer Method Summary (Part 2 of 3) C -2R Peninsula Park Plan #3 5/14/2004 Project Title Date FENESTRATION SURFACES U- Act. Glazing Type Location/ # Type Area Factor SHGC Azm. Tilt Comments 1 Skylight Front_(RortW 4-0_ x_8.0.0_ 0.43 _3A5_ 0. Bfistolite_Skylite ZONE 1 2 dight Front (North) 4.0 0.800 0.43 345 0 Bristolite Skvlite ZONE 1 3 Skylight Front (North) 4.0 0.800 0.43 345 0 Bristolite Skylite ZONE 1 4 Skylight Front (North) 4.0 0.800 0.43 345 0 Bristolite Skylite ZONE 1 5 Window Left (East) 10.0 0.540 0.31 90 90 Fleetwood Glazing ZONE 1 6 Window Left (East) 10.0 0.540 0.31 90 90 Fleetwood Glazing ZONE 1 7 Window Rear (South) 48.0 0.800 0.59 180 90 Default Double Metal Tinted ZONE 1 8 Window Rear (South) 9.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 1 6 Window Rear (Soul) 240 0.400 0.35 180 90 Fleetwood Glazing ZONE 1 10 Window Rear (South) 24.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 1 11 Window Right (West) 24.0 0.400 0.35 270 90 Fleetwood Glazing ZONE 1 12 Window Right (West) 24.0 0.400 0.35 270 90 Fleetwood Glazing ZONE 1 13 Window Right (Wesa 10.0 0.540 0.31 _ 270 90 Fleetwood Glazing ZONE 1 14 Window Right (West) 10.0 0.540 0.31 270 90 Fleetwood Glazing ZONE 1 15 Window Right (West) 10.0 0.540 0.31 270 90 Fleetwood Glazing ZONE 1 16 dight Front (North) 4.0 0.800 0.43 345 0 Bristolite Skylite ZONE 2 17 Window Front (North) 6.0 0.540 0.31 0 90 Fleetwood Glazing ZONE 2 18 Window Front (North) 2.0 0.400 0.35 0 90 Fleetwood Glazing ZONE 2 19 Window Front (North) 50.0 0.400 0.35 0 90 Fleetwood Glazing ZONE 2 20 Window Left (East) 36.0 0.400 0.35 90 90 Fleetwood Glazing ZONE 2 21 Window Left (East) 30.0 0.400 0.35 90 90 Fleetwood Glazing ZONE 2 22 Window Rear (South) 36.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 23 Window Rear (South) 36.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 24 Window Rear (South) 48.0 0.800 0.59 180 90 Default Double Metal Tinted ZONE 2 25 Window Rear (South) 9.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 26 Window Rear (South) 30.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 27 Window Rear (South) 30.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 Window Rear (South) 30.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 •28 29 Window Rear (South) 48.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt. REA Dist. Len. Hgt. Dist. Len. Hgt. 1 None 1.00 2 None 1.00 3 None 1.00 4 None 1.00 5 Bug Screen 0.76 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9 Bug Screen 0.76 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Bug Screen 0.76 13 Bug Screen 0.76 14 Bug Screen 0.76 15 Bug Screen 0.76 16 None 1.00 17 Bug Screen 0.76 18 Bug Screen 0.76 19 Bug Screen 0.76 20 Bug Screen 0.76 21 Bug Screen 0.76 22 Bug Screen 0.76 23 Bug Screen 0.76 8.0 4.5 8.0 0.1 8.0 8.0 24 Bug Screen 0.76 8.0 6.0 8.0 0.1 8.0 8.0 25 Bug Screen 0.76 26 Bug Screen 0.76 27 Bug Screen 0.76 Bug Screen 0.76 •28 29 Bug Screen 0.76 8.0 6.0 8.0 0.1 8.0 8.0 Run Initiation Tim : 05/14/04 10:57: C • 1084557459 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Paw 10 of 34 Comouter Method Summary (Part 2 of 3) C -2R Peninsula Park Plan #3 5/14/2004 • Project Title Window Overhanq Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Date 30 FENESTRATION SURFACES 0.76 8.0 6.0 8.0 0.1 8.0 8.0 31 Bug Screen 0.76 32 Bug Screen 0.76 U- 8.0 0.1 8.0 8.0 Act. Glazing Type Location/ # Type 34 Bug Screen Area Factor SHGC Azm. Tilt Comments _30 Window Rea.L--kS_wAW -ABA -0 800 0.59 180 qn Default Double Metal Tinted ZONE 2 31 Window Rear (South) 12.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 32 Window Rear (South) 39.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 33 Window Right (West) 19.5 0.400 0.35 270 90 Fleetwood Glazing ZONE 2 34 Window Right (West) 41.1 0.400 0.35 270 90 Fleetwood Glazing ZONE 2 35 Window Right (West) 15.0 0.540 0.31 270 90 Fleetwood Glazing ZONE 2 3M Window Left (East)_ 30.0 0.540 0.33 90 90 Fleetwood Glazing ZONE 3 37 Window Left (East) 24.0 0.800 0.59 90 90 Default Double Metal Tinted ZONE 3 38 Window Left (East) 30.0 0.540 0.33 so 90 Fleetwood Glazing ZONE 3 32 Window Front (North) 10.0 0.540 0.31 0 90 Fleetwood Glazing ZONE 4 40 Window Front (North) 15.0 0.550 0.30 0 90 Fleetwood Glazing ZONE 4 41 Window Front (North) 15.0 0.400 0.35 0 90 Fleetwood Glazing ZONE 4 92 Wjndow Front (North) 15 0- Q_55Q 0.30 0 90 F1eehMood_Glazing ZONE 4 43 Window Left (East) 13.8 0.540 0.31 90 90 Fleetwood Glazing ZONE 4 44 Window Left (East) 41.3 0.540 0.31 90 90 Fleetwood Glazing ZONE 4 45 Window Rear (South) 24.0 0.800 0.59 180 90 Default Double Metal Tinted ZONE 4 46 Window Riqht (West) 12.5 0.540 0.31 270 90 Fleetwood Glazinq ZONE 4 INTERIOR AND EXTERIOR SHADING Window Overhanq Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt. REA Dist. Len. Hgt. Dist. Len. Hgt. 30 Bug Screen 0.76 8.0 6.0 8.0 0.1 8.0 8.0 31 Bug Screen 0.76 32 Bug Screen 0.76 6.5 6.0 8.0 0.1 8.0 8.0 33 Bug Screen 0.76 34 Bug Screen 0.76 35 Bug Screen 0.76 36 Bug Screen 0.76 37 Bug Screen 0.76 38 Bug Screen 0.76 39 Bug Screen 0.76 40 Bug Screen 0.76 41 Bug Screen 0.76 42 Bug Screen 0.76 43 Bug Screen 0.76 44 Bug Screen 0.76 45 Bug Screen 0.76 46 Bug Screen 0.76 • Run Initiation Time: 05/14/0410.57.39 Run Code: 1084557459 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 11 of 34 Computer Method Summary (Part 3 of 3) C -2R Peninsula Park Plan #3 5/14/2004 40 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Type (so (in.) Cap. Inside Location Cond. Form 3 Reference R -Val. Comments PERIMETER LOSSES Type (furnace, heat Efficiency and Location Duct Thermostat F2 Insulation etc.) R -Value Type Type Length Factor R -Val. Depth Location / Comments Slab Perimeter 10 0.76 0.0 0 ZONE 1 Slab- erimeter 77 0.76 0.0 0 ZONE 1 Slab Perimeter 18 0.76 0.0 0 ZONE 2 $Lab Perimeter 159 0.76 0.0 0 ZONE 2 SlabPeiimeter 7 0.76 0.0 0 ZONE 3 HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiency and Location Duct Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type Comments Central Furnace 80%AFUE Ducts in Attic 4.2 Setback HVAC -1 Central Furnace 80%AFUE Ducts in Attic 4.2 Setback HVAC -2A & 2B Central Furnace 80%AFUE Ducts in Attic 4.2 Setback HVAC -3 Central Furnace 80%AFUE Ducts in Attic 4.2 Setback HVAC -4 Hydronic Piping Pipe Pipe Insul. System Name Length Diameter Thick. Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -1 Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -2A & 2B Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -3 Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -4 WATER HEATING SYSTEMS Ratedl Tank Energy Fact! 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. A.O. SMITH FPS -50-224 Small Gas Recirc/Temp 2 43 000 50 0.60 n/a n/a 1 For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. Run Initiation Time: 0511410410:57:39 Run Code: 1084557459 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 12 of 34 Computer Method Summary (Part 3 of 3) C -2R Peninsula Park Plan #3 5/14/2004 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Location Type (sf) (in.) Cap. Cond. Form 3 Reference R -Val. Comments PERIMETER LOSSES F2 Insulation Type Length Factor R -Val. Depth Location / Comments Slab Perimeter 60 0.76 0.0 0 ZONE 3 -Slab-Perimeter 1Q JU6 --O-Q _0- ZONE 4 Slab Perimeter 8Q 0.76 0.0 0 ZONE 4 HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiency and Location Duct Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type Comments • Hydronic Piping Pipe Pipe Insul. System Name Length Diameter Thick. Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments WATER HEATING SYSTEMS Rated Tank Energy Fact! 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. REMARKS 0 Computer Method Summary (Addendum) C -2R Peninsula Park Plan #3 5/14/2004 • Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the iustification, and may refect a building or design that otherwise complies E 0 based on the adequacy of the special justification and documentation submitted. Plan Field The HVAC System "HVAC -1 " must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -1 " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -2A & 2B " must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. The HVAC System "HVAC -2A & 2B " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -3 " must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -3 " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -4 " must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -4 " includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R. I Plan I Field The HVAC System "HVAC -1 " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -1 " is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -2A & 2B " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provid verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 " is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -4 " includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -4 " is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. Run Initiation Time: 05/14/0410:57:39 Run Code: 1084557459 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 14 of 34 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 (PROJECT NAME • Peninsula Park Plan #3 DATE 5/14/2004 COMPONENT DESCRIPTION DESCRIPTION 4MING OUTSIDE SURFACE AIR FILM 1 Gypsum or Plaster Board 2 Insulation, Mineral Fiber, R-21 3 Gypsum or Plaster Board 4 0.37 5 ASSEMBLY NAME W-2 Wall .21.2x6.16 0.68 7 8 1 - (Fr% / 100) ASSEMBLY Floor 1 / Rf INSIDE SURFACE AIR FILM 0.680 22.98 TYPE (check one) X Wall W a W Ceiling/ Roof 0 FRAMING MATERIAL Wood Fes- 0 p ? ° FRAMING /0 15 �o Do Framing 15% (16" o.c. Wall) 12% (24" o.c. Wall) f. 10% (16" o.c. Floor/Ceil.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) SUBTOTAI R -VALUE DESCRIPTION 4MING OUTSIDE SURFACE AIR FILM 1 Gypsum or Plaster Board 2 Insulation, Mineral Fiber, R-21 3 Gypsum or Plaster Board 4 0.37 5 2.60 6 0.68 7 8 1 - (Fr% / 100) 9 1 / Rf INSIDE SURFACE AIR FILM SUBTOTAI R -VALUE THICK- NESS (in.) 4MING ❑ © ❑ El El El 0.170 0.625 5.500 0.625 5.445 0.562 0.562 0.37 0.98 2.60 0.26 SUBTOTAI R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.5621 0.562 21.000 5.445 0.562 0.562 0.37 0.98 2.60 0.26 0.68 1 / Rc 1 - (Fr% / 100) 1 / Rf 0.680 0.680 22.98 7.42 Kc KT *HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) 2.60 0.26 0.68 2.63 0.37 0.98 2.60 0.26 0.68 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE 7.81 TOTAL HC 2.3 *NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0435 0.85 ] + r -1X 0.13481 X L 0.15 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE I EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 15 of 34 1 DROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE Peninsula Park Plan #3 1 5/14/2004 COMPONENT DESCRIPTION DESCRIPTION FRAMI 0.170 OUTSIDE SURFACE AIR FILM 0.175 1 Stucco ❑ 2 Membrane, Vapor -Permeable Felt 21.000 3 ASSEMBLY NAME W-1 Wall .21.2x6.16 4 Insulation, Mineral Fiber, R-21 0.37 5 Gypsum or Plaster Board ASSEMBLY Floor 0.680 7 23.11 TYPE (check one) X Wall W p W Ceiling I Roof INSIDE SURFACE AIR FILM 0 FRAMING MATERIAL Wood p Z FRAMING % 15 % Framing % 15% (16" o.c. Wall) 12% (24" O.C. Wall) 10% (16" o.c. Floor/Cell.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) SUBTOTAL R -VALUE DESCRIPTION FRAMI 0.170 OUTSIDE SURFACE AIR FILM 0.175 1 Stucco ❑ 2 Membrane, Vapor -Permeable Felt 21.000 3 Plywood 0.562 4 Insulation, Mineral Fiber, R-21 0.37 5 Gypsum or Plaster Board 0.26 6 0.680 7 23.11 7.56 8 9 INSIDE SURFACE AIR FILM SUBTOTAL R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.175 0.175 0.060 0.060 0.465 0.465 21.000 5.445 0.562 0.562 0.31 2.631 0.37 0.98 2.60 0.26 0.68 0.680 0.680 23.11 7.56 KC KT 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) [ 0.0433 X 0.85 ] 8.46 0.20 1.69 0.06 0.35 0.02 1.06 0.29 0.31 2.631 0.37 0.98 2.60 0.26 0.68 14.81 TOTAL HC 3.7 •NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0433 X 0.85 ] + [ 0.1323 X L 0.15 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 16 of 34 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #3 5/14/2004 • SYSTEM NAME FLOOR AREA HVAC -1 1,075 Number of Systems 1 Heating System Output per System 89,400 Total Output (Btuh) 89,400 Output (Btuh/sqft) 83.2 Cooling System Output per System 58,500 Total Output (Btuh) 58,500 Total Output (Tons) 4.9 Total Output (Btuh/sqft) 54.4 Total Output (sgft/Ton) 220.5 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.86 Airflow (cfm/Ton) 410.3 Outside Air (%) 4.0 Outside Air (cfm/sqft) 0.08 Note: values above given at ARI conditions 24.0 OF Outside Air 81 cfm 69.6 OF 114.1 / 80.3 OF Outside Air 81 cfm 78.6/64.6 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,264 25,804 3,140 424 17,724 0 1,290 886 0 0 8 3,090 1,850 81 3,968 0 0 1,290 886 31474 4,990 HS26-060/G40UH60C-110 (5) 46,493 5,215 Total Adjusted System Output 46,493 5,215 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm 67.8 OF ■ 109.2 OF Heating Coil Supply Fan 2000 cfm n 23,465 89,400 89,400 Jan 12 am 109.2 OF Supply Air Ducts 108.7 OF ROOMS 70.0 OF �% Return Air Ducts `i 80.0/65.3OF . 58.5/57.10 F 0 Cooling Coil Supply Fan 2000 cfm 58.5 / 57.1 OF Supply Air Ducts 59.1 / 57.3 of 48.0% R.H. ROOMS 78.0/64.4°F h Return Air Ducts `S EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 17 of 34 MVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #3 5/14/2004 • SYSTEM NAME FLOOR AREA HVAC -2A & 2B 2,723 HEATING SYSTEM PSYCHROMETRICS (Airsi Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 3,088 59,839 8,904 1,056 43,404 0 2,992 2,170 0 0 204 7,806 4,215 204 10,031 0 0 2,992 2,170 73,6301 13,119 HS26-060/G40UH60C-110 (5) 91,299 13,581 Total Adjusted System Output 91,2991 13,581 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Aug 2 pm Temperatures at 24.0 of 67.2 OF ■ 108.6 OF Outside Air 204 cfm 69.5 of 114.1/80.30F Outside Air 204 cfm 78.7/65.3 of Heating Coil Supply Fan 4000 cfm 57 776 178,800 178,800 Jan 12 am 108.6 of Supply Air Ducts 108.1 of ROOMS 70.0 of k Return Air Ducts `i 80.5 / 66.2 OF ■ 59.4 / 58.0 OF Cooling Coil Supply Fa 4000 cfm 59.4 / 58.0 OF Supply Air Ducts Fan 60.1 / 58.2 of 50.3% R.H. ROOMS 78.0 / 65.1 of h Return Air Ducts `i EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:18of 34 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #3 5/14/2004 • SYSTEM NAME FLOOR AREA HVAC -3 740 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 1 Heating System Output per System 36,000 Total Output (Btuh) 36,000 Output (Btuh/sgft) 48.6 Cooling System Output per System 24,000 Total Output (Btuh) 24,000 Total Output (Tons) 2.0 Total Output (Btuh/sqft) 32.4 Total Output (sqf rron) 370.0 Air System CFM per System 800 Airflow (cfm) 800 Airflow (cfm/sqft) 1.08 Airflow (cfm/Ton) 400.0 Outside Air (%) 6.9 Outside Air (cfm/sgft) 0.08 Note: values above oiven at ARI conditions 24.0 of 0 Outs 56 cfm 69.4 of 114.1 / 80.3 OF >— Outsidey 56 cfm 78.9/65.4 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 796 15,355 1,968 270 10,847 0 768 542 0 0 56 2,110 1,150 56 2,718 0 0 768 542 19,000 3,118 14 650 HS26-024/G40UH24A-045X (2) 19,079 2,556 36,000 Total Adjusted System Output 19 079 2,556 36,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am 66.2 of . 107.9 of Heating Coil 81.3 / 66.5 of Supply Fan 800 cfm 107.9 of Supply Air Ducts 107.3 of ROOMS 70.0 of k Return Air Ducts 4 59.2 / 57.8 of Cooling Coil Supply Fa 800 cfm 59.2 / 57.8 of Supply Air Ducts Fan 60.1 / 58.2 of 50.2% R.H. ROOMS 78.0/65.1OF o,.a..... A:. n.. 4 - EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page: 19 of 34 1 0 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #3 5/14/2004 SYSTEM NAME FLOOR AREA HVAC -4 625 Number of Systems 1 Heating System Output per System 36,000 Total Output (Btuh) 36,000 Output (Btuh/sgft) 57.6 Cooling System Output per System 24,000 Total Output (Btuh) 24,000 Total Output (Tons) 2.0 Total Output (Btuh/sgft) 38.4 Total Output (sgft/Ton) 312.5 Air System CFM per System 800 Airflow (cfm) 800 Airflow (cfm/sqft) 1.28 Airflow (cfm/Ton) 400.0 Outside Air (%) 5.9 Outside Air (cfm/sqft) 0.08 Note: values above given at ARI conditions 24.0 OF Outside Air 47 cfm 69.2 OF 114.1 / 80.3 OF Outside Air 47 cfm 78.9/64.9 °F ,,� Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent CFM I Sensible 76 15,192 1,694 331 13,401 0 760 670 0 0 47 1,782 1,042 47 2,289 0 0 760 670 18,494 2,736 HS26-024/G40UH24A-045X (2) 19,272 2,153 Total Adjusted System Output 19 272 2,153 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Aug 2 pm 66.6 OF ■ 108.3 OF Heating Coil 0 Supply Fan 800 cfm 36,000 36,000 Jan 12 am 108.3 OF Supply Air Ducts 107.5 OF ROOMS 70.0 OF >% Return Air Ducts `{ Temoeratures at Time of Coo 80.9 / 65.9 OF . 58.6 / 57.2 OF Cooling Coil Supply Fa 800 cfm 58.6 / 57.2 OF Supply Air Ducts Fan 59.5 / 57.5 OF 48.7% R.H. ROOMS 78.0/64.6°F h Return Air Ducts `S EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 20 of 34 r- 48 ROOM LOAD SUMMARY PROJECT NAME Peninsula Park Plan #3 DATE 5/14/2004 SYSTEM NAME d' HVAC -1 FLOOR AREA 1,075 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 1 MASTER SUITE 1 1,264 25,804 3,140 1,264 25,804 3,140 424 17,724 PAGE TOTAL 1 1,264 25,804 3,140 424 17,724 TOTAL 1 1,264 25,804 3,140 424 17,724 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page:21 of 34 r-7 L_J • ROOM LOAD SUMMARY PROJECT NAME Peninsula Park Plan #3 DATE 5/14/2004 SYSTEM NAME HVAC -2A & 2B FLOOR AREA 2,723 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 2 LIVING AREA 1 3,088 59,839 8,904 3,088 59,839 8,904 1,056 43,404 PAGE TOTAL 1 3,088 59,839 8,904 1,056 43,404 TOTAL 1 3,088 59,839 8,904 1,056 43,404 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number. Page: 22 of 34 ROOM LOAD SUMMARY PROJECT NAME DATE Peninsula Park Plan #3 5/14/2004 • SYSTEM NAME FLOOR AREA HVAC -3 740 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 3 BEDROOM 2 1 796 15,355 1,968 796 15,355 1,968 270 10,847 PAGE TOTAL 1 796 15,355 1,968 IL 270 10,847 TOTAL 1 796 15,355 1,968 270 10,847 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:23 of 34 ROOM LOAD SUMMARY EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page: 24 of 34 PROJECT NAME Peninsula Park Plan #3 DATE 5/14/2004 . SYSTEM NAME HVAC -4 FLOOR AREA 625 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 4 GUEST SUITE 1 761 15,192 1,694 761 15,192 1,694 331 13,401 . PAGE TOTAL 1 761 15,192 1,694 331 13,401 TOTAL 1 761 15,192 1,694 331 13,401 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number. Page: 24 of 34 ROOM HEATING PEAK LOADS Project Title Date • Peninsula Park Plan #3 5/14/2004 Room Information Desi n Conditions Room Name MASTER SUITE Time of Peak Jan 12 am Floor Area 1,075 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr • 1,059.0 x x X X X x X x x X X X x X X X x X X X X X X X X x X X X X X X X x X X x x X 0.0280 X x x x x X X X x X X X X X X X X X X X X X X X X x x X X X X X X X X X X X X • 46.0 = = = = = = = = = — = = = = = 1,364 16.0 0.8000 46.0 589 60.0 0.0572 46.0 158 699.0 0.0566 46.0 1,821 50.0 0.5400 46.0 1.242 48.0 0.8000 46.0 1,766 105.0 0.4000 46.0 1,932 perimeter = 87.0 45.5 3,958 items shown with an astensK () denote conduction through an intenor surtace to another room. Page Total: 12,831 Infiltration: r 1.00 1 X 1.080 X 1 075 X 11.00 x 60] X 46 = 4 894 schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 17,724 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 25 of 34 is ROOM HEATING PEAK LOADS Project Title Date Peninsula Park Plan #3 5/14/2004 Room Information Desi n Conditions Room Name LIVING AREA Time of Peak Jan 12 am Floor Area 2,723 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value AT OF Btu/hr 2,719.0 4.0 1,211.4 21.0 448.6 72.0 116.0 96.0 perimeter- 177.0 0.0280 0.8000 0.0566 0.5400 0.4000 0.3872 0.0572 0.8000 Items shown with an asterisk (f') denote conduction through an interior surface to another room. Infiltration: II 1.001X 1.080 x 2 723 x 13.00 x 60] x chedule Air Sensible Area Calling Height ACH Fraction HOURLY HEAT LOSS FOR ROOM x X X x X x x X X X X X X x X X X X X X x x X X X x X X X X X x X X x x X X X 46.0 = = = = = = = = = = = = = 3,503 46.0 147 46.0 3,155 46.0 522 46.0 8.254 46.0 1,282 46.0 305 46.0 3,533 45.5 8,054 Page Total: 46 AT 2s 755 14649 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:26 of 34 0 ROOM HEATING PEAK LOADS Project Title Date Peninsula Park Plan #3 15/14/2004 Room Information Desicin Conditions Room Name BEDROOM 2 Time of Peak Jan 12 am Floor Area 740 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr 740.0 x X X x x X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 0.0280 X X X X X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 46.0 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 953 275.0 0.0572 46.0 724 322.0 0.0566 46.0 839 60.0 0.5400 46.0 1490 24.0 0.8000 46.0 883 perimeter = 67.0 45.5 3,048 items snown with an astensK (-r) aenote conauction through an interior sunace to another room. Page Total: 7,938 Infiltration: 1.001X 1.080 x 740 x 9.50 x 60] x 46 = 2 909 chedule Air Sensible Area Ceiling Height ACH DT Fraction EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 27 of 34 9 ROOM HEATING PEAK LOADS Project Title Date Peninsula Park Plan #3 5/14/2004 Room Information Desicin Conditions Room Name GUEST SUITE Time of Peak Jan 12 am Floor Area 625 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr 625.0 x X X X x x X x x X X x x x X X X X X X X X x x X x x X X X x x X X x X X x x 0.0280 X X X x X X x x x X x x X X x X X x X x x x x x X X X x X X X X x x X X X x X 46.0 = = = = = = = = = = = = = = = = = = 805 645.4 0.0566 46.0 1,681 77.6 0.5400 46.0 1,928 30.0 0.5500 46.0 759 15.0 0.4000 46.0 276 24.0 0.8000 46.0 883 115.0 0.0572 46.0 303 perimeter = 93.0 45.5 4,232 Items shown with an asterisk (*)) denote conduction through an interior surface to another room. Page Total: 10,866 Infiltration: 1 1.001 x 1.080 x 625 x 9.80 x 60] x 46 = 2 535 chedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 28 of 34 1 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #3 5/14/2004 • Project Title Date • u Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction R-38 Roof R.38.2x14.16 Bristolite Sk lite -2 Wall .21.24.16 -1 Wall .21.2x6.16 Fleetwood Glazing Default Double Metal Tinted . Fleetwood Glazing Area U -Value X 1 0.02801 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Solar Gain Orientation Area SGF Bristolite Skylight 1 (Skylight) Bristolite-Wight (9) (Skylight) Bristolite Skylight6),(Skylight) 1 Bristolite Skylight 4 (Skylight) Vert.Sldr (5) (East) Vert.Sldr 6 (East) 2 FrnchDr 7 South FxdGlsWdw 8 Abv. (South) FXdGISWdW 9 (South) FXdGIsWdW 10 South ( 0.0 X X X x x x x x x x 1 + + + + + + + + + + ( 0.0 1 ( 0.0 1 ( 0.0 1 ( 0.0 1 ( 0.0 1 ( 0.0 1 ( 0.0 1 ( 0.0 1 ( 0.0 1 MASTER SUITE 78°F 115°F 37°F DETD1 56.0 37.0 35.6 35.6 37.0 37.0 37.0 Btu/hr 1,661 474 122 1,409 999 = 1 421 = 1554 7 639 Btu/hr 301 301 301 301 252 252 1,009 112 = 299 299 Sched. Page Total 3 425 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 X 1,075 X 0.500 Watts/sgft x 3.41 Btuh/Watt = 1,834 Occupants 1.00 X 1,075 X 250 Btuh/OCc. / 200 sgft/occ. = 1,344 Receptacle 1.00 x 1,075 x 1.500 Watts/sqft x 3.413 Btuh/Watt = 5,503 Process 1.00x 1,075 X 0.000 Watts�/sgftt x 3.41 Btuh/Watt = 0 Infiltration: � 1.00 x[=8 - x 1 975 x oo x � 5oj / 60] _ E=1936) Schedule Air Sensible Area Ceiling Height ACH �T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 25,804 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 1 075 X 200 Btuh/OCC. / 200 sgft/occ. = 1 075 Receptacle 1.00 x 1 075 X 0.000 Watts/sqft X 3.41 Btuh/Watt = 0 Process 1.00 X 1 075 X 0.000 Watts/sgft x 3.41 Btuh/Watt = 0 Infiltration: 1.00 x 4 840 x 1 07 x Heigh x 60] 0.00433 = 2 065 "`--- chedule Air Latent Area Ceiling Height ACH DW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,140 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 29 of 34 Page Total Unshaded Area SGF SC 4.0 x 152) X 0.494 4.0 X 152)x 0.494 4.0 X 152)x 0.494 4.0 x 152)x 0.494 10.0 x 73)x 0.345 10.0 X 73)X 0.345 48.0 X 32) X 0.657 9.0 X 32)X 0.390 24.0 X 32) x 0.390 24.0 X 32) x 0.390 Btu/hr 1,661 474 122 1,409 999 = 1 421 = 1554 7 639 Btu/hr 301 301 301 301 252 252 1,009 112 = 299 299 Sched. Page Total 3 425 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 X 1,075 X 0.500 Watts/sgft x 3.41 Btuh/Watt = 1,834 Occupants 1.00 X 1,075 X 250 Btuh/OCc. / 200 sgft/occ. = 1,344 Receptacle 1.00 x 1,075 x 1.500 Watts/sqft x 3.413 Btuh/Watt = 5,503 Process 1.00x 1,075 X 0.000 Watts�/sgftt x 3.41 Btuh/Watt = 0 Infiltration: � 1.00 x[=8 - x 1 975 x oo x � 5oj / 60] _ E=1936) Schedule Air Sensible Area Ceiling Height ACH �T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 25,804 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 1 075 X 200 Btuh/OCC. / 200 sgft/occ. = 1 075 Receptacle 1.00 x 1 075 X 0.000 Watts/sqft X 3.41 Btuh/Watt = 0 Process 1.00 X 1 075 X 0.000 Watts/sgft x 3.41 Btuh/Watt = 0 Infiltration: 1.00 x 4 840 x 1 07 x Heigh x 60] 0.00433 = 2 065 "`--- chedule Air Latent Area Ceiling Height ACH DW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,140 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 29 of 34 0 • E RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #3 5/14/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction Area U -Value MASTER SUITE 78°F 115°F 37°F 1. Design Equivalent Temperature Difference (DETD) Page Total Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Btu/hr Solar Gain Orientation Area SGF Area SGF SC Btu/hr FxdGlsWdw 11 (West) dG1sWdw ( (West) Vert.Sldr 13 (West) Vert.Sldr 14 (West) Vert.Sldr (15) (West) 683 ( 0.0 1 24.0 73 0.390 683 ( 0.0 ( 0.0 X x x x x X x X x 1 + + + + + + + + + + 24.0 X X X X X X X X x X 73 ) X ) x ) X x )X )X )x )x )x 0.390 = = = = = = = 683 ( 0.0 1 24.0 73 0.390 683 ( 0.0 1 10.0 73 0.345 252 ( 0.0 1 10.0 73)x 0.345 252 ( 0.0 1 10.0 73) 0.345 252 ( ( ( ( (—x— Sched. Page Total 2121 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,075 X 0.500 Watts/sgft x 3.41 Btuh/Watt = 1,834 Occupants 1.00 X 1,075 X 250 Btuh/OCC. / 200 sgft/occ. = 1,344 Receptacle 1.00 x 1,075 x 1.500 Watts/sgft x 3.413 BtuhlWatt = 5,503 Process 1.00 X 1,075 x 0.000 Watts/sgft X 3.412 Btuh/Watt = 0 Infiltration: 091 x x QZ5 x � x E]pJ / 60] 0 = chedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 25,804 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1 075 x 200 Btuh/occ. / 200 sgft/occ. = 1 075 Receptacle 1.00 X 1 075 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Process 1.00 x 1 075 x 0.000 Watts/sgft x 3.41 Btuh/Watt = Infiltration: 1.00 x 4840 x 1 075 x 11.00 x 0.50 / 60] 0.00433 = 2 065 —Schedule Air Latent Area Ceiling Height ACH ZSW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,140 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: . Page: 30 of 34 E • • RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #3 5/14/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: LIVING AREA 78°F 115°F 37°F Conduction Area U -Value DETD 1 Btu/hr -38 Roof R.38.2x14.16 Bristolite Skylite 1 Wall .21.2x6.16 Fleetwood Glazing Fleetwood Glazing Solid Wood Door -2 Wall .21.24.16 Default Double Metal Tinted X X X X X X X X 56.0 = = = = = = = 4,264 37.0 118 35.6 2,442 37.0 420 37.0 6,639 35.6 993 35.6 236 37.0 (South) X 1. Design Equivalent Temperature Difference (DETD) Page Total 17 954 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr Bristolite Skylight 16 (Skylight) V-rt.Sldr (17) (North) FxdGlsWdw 18 Abv. North FxdSiteBlt 19 (North) FxdSiteBlt (20) (East) FXdGISWdW 21 (East) FxdSiteBlt 22 (South) FxdGlsWdw 23 (South) 2 FrnchDr (24) (South) FXdGISWdW 25 Abv. South ( 0.0 X x x x X x X X x 1 + + + + + + + + + + 4.0 X X X X X x X x x 152) X ) X x X ) x 0.494 = = = = = = = = 301 ( 0.0x 1 6.0X 15)x 0.345= 31 ( 0.0 1 2.0 15 0.390 12 ( 0.0 1 50.0 15)x 0.390 292 ( 0.0 1 36.0 73) 0.390 1,024 ( 0.0 1 30.0 73)X 0.390 853 ( 0.0 1 36.0 32) 0.390 449 ( 36.0 1 0.0 32)X 0.390 210 ( 48.0 1 0.0 32), 0.657- 473 ( 0.0 1 9.0 32 0.390 112 Sched. Page Total 3 757 Internal Gain Frac. Area Heat Gain Btu/hr Li hts 1.00 x 2,723 X 0.500 Watts/sgft X 3.41 Btuh/Watt = 4,647 Occupants 1.00 X 2,723 X 250 Btuh/occ. / 200 sgft/occ. = 3,404 Receptacle 1.00 x 2,723 x 1.500 Watts/sqft x 3.413 Btuh/Watt = 13,940 Process 1.00 X 2,723 X 0.000 Watts/sqft X 3.412 Btuh/Waft = 0 Infiltration:1.00 x � �_ x �2.Z23J x _tof _ x 50 / 60] 0 = Schedule Air Sensible Area Ceiling Height ACH z -\T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 59,839 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 2 723 x 200 Btuh/occ. / 200 sgft/occ. = 2 723 Receptacle 1.00 x 2 723 x 0.000 Watts/sgft X 3.41 Btuh/Waft = o Process (� 1.00 X 2 723 X 0.000 Watts/sgft X 3.41 Btuh/Watt = o Infiltration: I 1.00 x 4 840 x 2 723 x 13.00 x 0.50 / 60] 1 0.00433 = 6 181 chedule Air Latent Area Ceiling Height ACH �W Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 8,904 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 31 of 34 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #3 5/14/2004 • Project Title Date L� • Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction 1. Design Equivalent Temperature Difference (DETD) Area U -Value X LIVING AREA 780E 115°F 37°F Page Total Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr FxdGlsWdw 26 (South) F-xdGI,Wcdi (27) (South) FxdGlsWdw 28 (South) FxdGlsWdw 29 (South) (2)FrnchDr (30) (South) FxdGlsWdw 31 Abv. (South) FxdGlsWdw 32 (South) FxdGlsWdw 33 (West) FASiteBlt 34 (West) VertSldr. 35 est ( 0.0 X1 X X x X X x x X x + + + + + + + + + 30.0 x X X x x x x X X x 32)X ) x x X x 0.390 = = = = = = = = _ = 374 ( 0.0 1 30.0 32 0.390 374 ( 0.0 - 1 30.0 32)X 0.390 374 ( 48.0 1 0.0 32)x 0.390 281 ( 48.0 1 0.0 32) 0.657 473 ( 0.0 1 12.0 32)X 0.390 150 ( 39.0 1 0.0 32)x 0.390 228 ( 0.0 1 19.5 73) 0.390 555 ( 0.0 1 41.1 73)x 0.390 1,169 ( 0.01 1,9+ 15.0 73) 0.345 378 Sched. Page Total a 355 Internal Gain Frac. Area Heat Gain Btu/hr Li hts 1.00 x 2,723 x 0.500 Watts/sgft X 3.41 Btuh/Watt = 4.647 Occupants 1.00 X 2,723 X 250 Btuh/occ. / 200 sgft/occ. = 3,404 Receptacle 1.00 x 2,723 x 1.500 Wafts/sgft x 3.413 BtuhlWaft = 13,940 Process 1.00 x 2,723 x 0.000 Wafts/sgft x 3.412 BtuhlWaft = 0 Infiltration: 1.0o x x x L� x / 60] 0 = 11,783 chedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 59,8391 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 2 723 x 200 Btuh/occ. / 200 sgft/occ. = 2 723 Receptacle 1.00 x 2 723 x 0.000 Watts/sgft X 3.41 Btuh/Watt = o Process 1.00 x 2 723 x 0.000 Watts/sqft x 3.41 Btuh/Waft = 0 Infiltration: 1.00 x 4840 x 2 72 x Heigh x 60] 0.00433 = 6 181 chedule Air Latent Area Ceiling Height ACH LAW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 8,904 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 32 of 34 0 40 • RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #3 5/14/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction IR -38 Roof (R.38.2xl4.16) Area U -Value X 1 0.02801 BEDROOM 2 780E 115°F 370 DETD1 X 56.0 X 35.6 X 35.6 X 37.0 X 37.0 X X X X 1. Design Equivalent Temperature Difference (DETD) Page Total Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF Sc Horiz.Sldr 36 (East) ( 0.0 x 1 + 30.0 x 73)x 0.367 Frnchnr ( East ( 0.0 x 1 + 24.0 X 73) x 0.657 Horiz.Sldr 38 (East) ( 0.0 x 1 + 30.0 x 73)x 0.367 ( x + x )x ( X + X )x ( x + X )x ( x + x )x ( X + X )x ( X + X )X ( x + x )X Btu/hr 1,160 560 649 1,199 710 4 279 Btu/hr 805 1,151 805 Sched. Page Total 2 Iso Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 X 740 X 0.500 Watts/sgft x 3.41 Btuh/Watt = 1,263 Occupants 1.00 X 740 X 250 Btuh/OCC. / 200 sgft/occ. = 925 Receptacle 1.00 x 740 x 1.500 Watts/sgft x 3.413 Btuh/Waft = 3,788 Process 1.00 x 740 x 0.000 Wafts�/sgfttx 13.41 Bt�uhlWaft = 0 Infiltration: �eh a Q0 x le A —uSensix x Area Ceiling x �H w/ 60] L T = Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 15,355 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 740 X 200 Btuh/OCC. / 200 sgft/occ. = 740 Receptacle 1.00 x 740 x 0.000 Wafts/sgft x 3.41 Btuh/Waft = 0 Process r 1.00 x 740 x 0.000 Watts/sgft x 3.41 Btuh/Waft = 0 Infiltration: I 1.00 x 4840 x 74 x 9.50 x 0.50 /601 1 0.00433 = 1 228 chedule Air Latent Area Ceiling Height ACH QW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 1,968 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 33 of 34 9 <0 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #3 5/14/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction R-38 Roof R.38.2x14.16 -1 Wall .21.2x6.16 Fleetwood Glazing Fleetwood Glazing Fleetwood Glazing Default Double Metal Tinted -2 Wall .21.2x6.16 Area U -Value GUEST SUITE 780E 115°F 370 DETD1 X 56.0 X 35.6 X 37.0 X 37.0 X 37.0 X 37.0 X 35.6 X X Btu/hr 980 1,301 1,550 610 222 = 710 = 234 1. Design Equivalent Temperature Difference (DETD) Page Total 5 609 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr Vert.Sldr 39 (North) CsmntWdw (4 (North) FxdGlsWdw 41 (North) CsmntWdw 42 (North) Vert.Sldr (43) (East) (3)Vert.Sldr 44 (East) FrnchDr 45 (South) Vert.Sldr 46 (West) 75 ( 0.0 1 15.0 ( 0.0 X1 X x x X X x x X X + + + + + + + + + + 10.0 X X X X x X X X X x 15) X ) X x )X )X 0.345 = = = = = = = = = = 52 ( 0.0 1 15.0 15 0.334 75 ( 0.0 1 15.0 15)x 0.390 88 ( 0.0 1 15.0 15)x 0.334 75 ( 0.0 1 13.8 73) 0.345 348 ( 0.0 1 41.3 73)X 0.345 1,040 ( 0.0 1 24.0 32)X 0.657 504 ( 0.0 1 12.5 73)x 0.345 315 ( (I Sched. Page Total 2 as7 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 625 x 0.500 Watts/sgft X 3.41 BtuhlWatt = 1,067 Occupants 1.00 X 625 X 250 Btuh/occ. / 200 sgft/OCc. = 781 Receptacle 1.00 x 625 x 1.500 Watts/sqft X 3.413 BtuhlWatt = 3,200 Process 1.00 x 625 x 0.000 Watts/sgft x 3.41 BtuhlWatt = 0 Infiltration: �� x x x x r 0 / 60] [=�= Schedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 15192 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 625 x 200 Btuh/OCC. / 200 sgft/occ. = 625 Receptacle 1.00 X 625 x 0.000 Watts/sgft x 3.41 Btuh/Watt = 0 Process 1.00 X 625 X 0.000 Watts/sgft X 3.41 Btuh/Watt = o Infiltration: 1.00 x 4840 tent x Area 62 x Ceiling Height t x ACH 60] 0.00433 = 1 069 chedule Air LaDW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 1,694 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 34 of 34