Loading...
04-3778 (SFD). � u��tt' BUILDING & SAFETY DEPARTMENT DX (760).777-7012. IFORNIA 92253 INSPECTION REQUESTS (760) 777-7153. z5 511 i I CAL MPICO FAX (760) 7774011 trjkA, I CITY or LA QUINITA BUILDING PERMIT FIN CE DEP T_ Application Number :04-00:003.778 0*03778 Date 7/29/04 Property Address . . . . . . 5-72-95—PENINSULA APN: 762 -15.0 -009 - Application description . . . DWELLING -.SINGLE FAMILY DETACHED Property Zoning . . . . . ... LOW DENSITY RESIDENTIAL --Application valuation'. 408599 Owner Contractor ---`----------------------------- -- -------- BELLA OCEANA LTD PARTNERSHIP -JACOB , S HOMES INC, PETER' 1354 BELLA OCEANA VISTA P.O.-BOX 692 PACIFIC PALISADES CA 90272' LA.QVINTA CA 92253 (760) 777-9921. WCC-: EXEMPT WC: EXEMPT 04/30/05 CSLB: 799499. 04./30/05 CCC:- B -------------------------- ---------7-7- Structure Information -=-----------------=----- -----Construction ConstructionType TYPE V - NON -RATED Occupancy Type . . . . . DWELLG/LODGING/CONG <=10 Flood Zone . . . . . NON -AO FLOOD ZONE Other struct inf6 CODE EDITION 2001 CBC BEDROOMS' 4.00 - FIRE :_-.SPRINKLERS_: NO: _ ------ -- GARAGE SQ FTG 1025.00 PATIO SQ FTG 1642.00. NUMBER OF -UNITS 1.00 -------------- FIRST FLOOR SQ.FTG 4538.00 -------------------------------- Permit . . . . . . . BUILDING --------------------- PERMIT Additional desc Permit Fee . . . . 1-721.00 Plan Check Fee 1118:65'- -Issue Date . . . 4/05/04 Valuation - 408599 Qty Unit Charge Per'. 'Extension BASE FEE 639.50 309.00 3.5000 THOU ------------------------------------------------------------------------------ BLDG' 100,001-500,000, 10-81.50 Permit . . ... . . MECHANICAL Additional desc Permit Fee 13.9.00 Plan Check Fee, 34.75 Issue Date Valuation 0 Qty Unit Charge Per Extension P.O. Box 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 BUILDING & SAFETY DEPARTMENT mwivau0n fvUMDer:yIt - 7 1 Applicant: Applicant's Mailing Address: VOICE (760) 7774012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: -% • Z,9, O Lf Architect or Engineer: Architect or Engineer's Address: Lic. No.: BUILDING PERMIT DECLARATIONS LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class License No. 9 pip - iY1 Date 0 3 U l Contractor_ OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractors' State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish; or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).): U I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself or through his or her own employees, provided that the improvements are not intended or offered for sale: If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). U I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). U I am exempt under Sec. , BA P.C. for this reason Date Owner WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. _ I have and will maintain workers' compensation insurance, as required by Section 3700 of the. Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Cartier ' Policy Number I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those prov' ns Date Applicant WARNING: FAILURE TO SECURE WORKERS' COM ENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lenders Name Lenders Address APPLICANT ACKNOWLEDGEMENT ,IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit -issued as a result of this application, the owner, and the applicant, each agrees to, and shall, defend, indemnity and hold harmless the City of La Ouinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the abAinfa correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and herebyauthorize representatives of this con above-mentioned property for inspection purposes. Date ighature (Applicant or Agent): Page 2 Application Number . . . . .04-00003778 Date 7/29/04 Qty Unit Charge Per Extension BASE. FEE 15.00 4.00 9.0000 EA MECH FURNACE <=100K .36.00 4.00 9.0000 EA MECH B/C <=3HP/100K BTU 36.00 7.00 6.5000 EA MECH VENT.FAN 45.50 1.00 6.5000 EA MECH EXHAUST HOOD 6.50 ---------------------------------------------------------------------------- PermitELEC-NEW RESIDENTIAL Additional desc . Permit Fee 209.33 Plan Check Fee 52.33 Issue Date . . . Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 4538.00 .0350 ELEC NEW RES - 1 OR 2 FAMILY 158.83. 1025.00 .0200. ELEC GARAGE OR NON-RESIDENTIAL "20.50 1.00 15.0000.EA ELEC TEMPORARY POWER POLE 15.00,,1• Permit . . . . . PLUMBING Additional desc . Permit: Eee:.-=•:...:. . - 301._5.0::..:. __�zPlan__:Check__Ebe:._._-.•-= 75..3.8_ .... . Issue Date Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 37.00.E 6.0000 EA PLB FIXTURE 222.00 1.00 15.0000 EA PLB,BUILDING SEWER 15.00 2.00 7.5000 EA PLB WATER HEATER/VENT 15..00 1.00 3.0000 EA PLB WATER INST/ALT/REP 3.0'0 1:00 9.0000 EA PLB_LAWN SPRINKLER SYSTEM! 9.00 10.00 .7500 EA PLB GAS PIPE >=5 7.50 1.00 15.0000 EA PLB GAS METER 15.00 Permit GRADING PERMIT Additional desc . Permit Fee . . . . .15.00 Plan Check Fee .00 Issue Date . . . . Valuation 0 Qty Unit Charge Per Extension BASE,FEE 15.00 _ Special Notes and Comments_ ------------ - ------ 4538 S.F. SFD -`PERMIT DOES'NOT INCLUDE _ Page 3 Application Number 04-00003778 Date 7/29/04 Special Notes and Comments BLOCK WALLS OR POOL/SPA. Other Fees .. . . . . ART IN PUBLIC PLACES -RES 521.49 DIF COMMUNITY CENTERS.RES 97.00 DIF CIVIC CENTER.- RES 366..00 ENERGY REVIEW FEE 111.87 DIF FIRE PROTECTION -RES 97.00 GRADING PLAN CHECK FES .00 DIF LIBRARIES - RES 225.00 - DIF PARK MAINT FAC - RES 5.00 DIF PARKS/REC - RES 502.00 STRONG MOTION (SMI) - RES 40.85-1 DIF STREET MAINT FAC -RES 15.00 DIF TRANSPORTATION - RES 1098.00, Fee summary Charged Paid Credited Due Permit Fee Total 2385.83 .00 .CO 2385.83 Plan Check Total 12.8.1.11 1000.00 C0 281.11. Other Fee Total,.. _ :. _._.30.7-9.,.21_. .;___;..:._. .,-0:0,:,•. ...-..:: c0-.... Grand Total .6746.15 1000'.00 C0 5746.15 Coachella Valley Unified School District Y. P.O. Boz 847, Thermal, CA 92274 (760) 398-5909 — Fax (760) 398-1224. Project Name: This Box For District Use Only DEVELOPER FEES PATE) AREA: AMOUNT LEVEL ONE AMOUNT: LEVELTWOAMOUNT: MITIGATION AMOUNT: COMM/IND. AMOUNT: nATF.- RFr.F.TPT- C14F7K N- INITIAI.O CERTIFICATE OF COMPLIANCE (California Education Code 17620) Private home PGA West Date August 2, 2004 Owner's Name: ..,_.,Bella Ocean-, _• �. y_-= _ �> Phone No. Project Address: _ -57--295 Peninsula LAne La Quinta;CA 1 SFD APN: 762-150-009 Tract Lot #'s: ' Type of Development: Residential X Total Square Feet of Building Are A Certification of Applicant/Owners: The person signing cc under penalty of perjury and further represents that he/she is Dated: August 2, 2004 Signature: Commercial Industrial 4538 sq. ft. above information is corre.:t and makes this statement ;ign on behalf of the owneiVdeveloper. ******************************s*******1***************_****************. SCHOOL DISTRICT'S REQUIREMENTS FOR THE ABOVE PROJECT HAVE BEEN OR WILL BE SATISFIED IN ACCORDANCE WITH ONE OF THE FOLLOWING: (CIRCLE ONE) Education Code Gov. Code Project Agreement Existing Note: Number of Sq.Ft. 4538 Amount per Sq.Ft. $ 2.68 Amount Collected $12,161.84 Building Permit Application Completed: Yes/No By: Carey M. Carlson, Asst. Supt., Business Services Certificate issued by: Elvira Mattson, Office Technician Signature: `Ol Not Subject to Fee NOTICE OF 90 DAY PERIOD FOR PROTEST OF FEES AND STATEMENT OF FEES Section 66020 of the Government Code asserted by Assembly Bill 3081, effective January 1, 1997, requires that this Diszrict provide (1) a written notice to the project appellant, at the time of payment of school fees, mitigation payment or other exactions ("Fees"), of the 90 -day period to protest the imposition of these Fees and (2) the amount of the fees. Therefore, in accordance with section 66020 of the Government code and other applicable law, this Notice shall serve to advise you that the 90 -day protest period in regard to such Fees or the validity thereof, commences with the payment of the fees or performance of any other requirements as described in section 66020 of the Government code. Additionally, the amount of the fees imposed is as herein set forth, whether payable at this time or in whole or in part prior to issuance of a Certificate of Occupancy. As in the latter, the 90 days starts on the date hereof. This Certificate of Compliance is valid for thirty (30) days from the date of issuance. Extension will be granted only for good cause, as determined by the School District, and up to three (3) such extensions maybe granted. At such time as this Certificate expires, if a building permit has not been issued for the project that is the subject of this Certificate, the owner will be reimbursed all fees that were paid to obtain this Certificate of Compliance. PENINSULA PARK ADRC 55675 TURNBERRY WAY LA QUINTA, CA 92253 , 'June 8, 2004 Peter Jacobs - Peter Jacobs Homes , 54-995 Shoal Creek La Quinta, CA 92253 Re: Compliance Statement for Custom Residence on Lot 16 Dear Peter, ' The Peninsula Park Architectural Committee hasreviewed the custom hone you submitted for review on Lot 16 and find that the home is in compliance with our Architectural Guidelines, we are therefore issuing this Compliance Statement. We request that any change or alteration of material, exterior appearance, color or texture be submitted to the Architecture Committee for its approval. We request that you make yourself familiar with and comply with our schedule for inspections in the Architectural Guidelines. • Sincerey Ate. . r • F Michael J. Begley Peninsula Park Architectural Design Review Committee r f CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTINGj(Page 1 of 7) CF -4R G0 5-' Project Title Date Project. Address'' Builder ane Builder Contact Telephone HERS Rater Twtwnhnn. Street Address:S�- Copies to: Builder, HERS'Provider Plan Number Sample rcup Number Sample House Number HERS Providet: City/State/Zip: HERS RATER COMPLIANCE STATEMENT The house was:91 Tested ❑Approved as part of sample testing, but was not tested As the HERS rater providing diagnostic testing and field verification, I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or pfatform returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLL4JKCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) l*asured 9alues Test Leakage Flow in CFM If fan flow is calculated as 400c8n/ton x number of tons enter calculated value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) Check Box for Pass or Fail (Pass --6% or less) ❑ PXs Fail THERMOSTATIC EXPANSION VALVE (I7 I Yes ❑ No Thermostatic Expansion Valve is installed and Access is provided for inspection Yes is a pass _ ___IM ..__ MIN__REQUIREMENTS:.FORDUCTDESIGN-COMPL-IANCE'CREDIT `" " ---- 1 ❑ Yes ❑ No ACCA Manual D Design requirements have been met (rater ha.; verified that actual installation matches values in CF -1R and design on plan. 2. ❑ Yes ❑ No Compliance Forms TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -1R.' 11 Pass Fail Measured Fan Flow = Yes for both 1 and 2 is a Pass Pass Fail August 2001 A-16 A CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING :(Page I of 7 CF4R Project Title Date Project Address -l ' Builder ane Builder Contact Telephone Plan Number.. ..Firm: Street Address: Copies to: Builder, HERS Provider Sample Group Number Sample HOCSe Number HERS Provider: City/State/Zip: HRS -RATER COMPLIANCE STATEMENT The house was: Tested ❑ Approved as part of sample testing, but was not tested As the HERS rater providing diagnostic testing and field verifications I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or platform returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured ' -values Test Leakage Flow in CFM If fan flow is calculated as 400cfm/ton x number of tons enter calculated - value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) = Lj! O Check Box for Pass or Fail (Pass=6% or less) Q Pass Fail THERMOSTATIC EXPANSION VALVE (TXV) R Yes ❑ No Thermostatic Expansion Valve is installed and Access is Provided forinspection Yes is a pass —...MItiIMUM-REQ-UIREMENTS, FOR DUCT-DESIGN-COMPL-Lh NCE -CREDIT 1 ❑ Yes ❑ No ACCA Manual D Design requirements have been met (rater has verified that actual installation matches values in CF -1R and design on plan, Pays -----Fail -- 2' ❑ Yes ❑ No ' . TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF-lR { Measured Fan Flow = 13 Yes for both, l and 2 is a pass Pass Fail Compliance Forms August 2001 A-16 -7CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING (Page 1 of T) CF4R Project Title Date 4 �� Project Address Builder Contact Telephone HERS Rater Certifying ..Firm: Street Address: Copies to: Builder, HERS Provider Builder ame Plan Number Sample Group Number Sample House Number HERS Provider: _�,�`� ���j,// �% City/State/Zip: HERS RATER COMPLIANCE STATEMENT The house was: Tested ❑ Approved as part of sample testing, but was not tested As the HERS rater providing diagnostic testing and field verification) I certify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form. The installer has provided a copy of CF -6R (Installation Certificate. Distribution system is fully ducted (i.e., does not use building cavities as plenums or pla:form returns in lieu of ducts) Where cloth backed, rubber adhesive duct tape is installed, mastic and dmwbands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. !� MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) t Duct Pressurization Test Results (CFM @ 25 Pa) Measured values Test Leakage Flow in CFM If fan flow is calculated as 400cfin/ton x number of tons enter calculated value here If fan flow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) _ Check Box for Pass or Fail (Pass --6% or less) 13 Pass Fail I THERMOSTATIC EXPANSION VALVE (TXV) Yes ❑ No Thermostatic Expansion Valve is installed and Access is provided for inspection ar❑ Yes is a pass ❑ MINIMUM REQUIREMENTS.FOR DUCT DESIGN COMPLIANCE CREDIT P Fail l' ❑ Yes ❑ No ACCA Manual D Design requirements have been met (rater has: verified that actual installation matches values in CF -1R and design on plan. 2' ❑ Yes ❑ No TXV is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -IR .... { Measured Fan Flow = 13 13 Yes for both 1 and 2 is a Pas, Pass Fail Compliance Forms August 2001 A-16 c CERTIFICATE OF FIELD VERIFICATION AND, DIAGNOSTIC TESTING (Pi414 sge I of CF4R Project Title Date Project Address Builder NAMO Builder Contact Telephone Plan Number HERS ter Tele hone Sample Group Number ` Certifying Signature ate Sample HoLse Number Firm: HERS Provider: Street Address: City/State/Zip: Copies to: Builder, HERS Provider HERS RATER COMPLIANCE STATEMENT The house was: Tested 13Approved as part of sample testing; but was not tested As the HERS rater providing diagnostic testing and field verification) I certify that the houses. identified on this form with the diagnostic tested compliance requirements as checked on this form. comply The installer has provided a'copy of CF -6R (Installation Certificate. , Distribution system is fully ducted (i.e., does not use building cavities as plenums,or pl'3tform ietums in lieu of ducts) Where cloth. backed, rubber adhesive duct tape is installed, mastic and drawbands are used in combination with cloth backed, rubber adhesive duct tapeto seal leaks at duct connections AM MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIAJWCE CREDIT uct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) ' Duct Pressurization Test Results (CFM @ 25 Pa) Measured 4alues Test Leakage Flow in CFM If fan flow is calculated as 400cfin/ton x number of tons enter calculated value here If fawflow is measured enter measured value here Leakage Percentage (100 x Test Leakage/Fan Flow) _J Check Box for Pass or Fail (Pass=6% or less) ❑ Pass Fail THERMOSTATIC EXPANSION VALVE4 Yes ❑ No Thermostatic Expansion Valve is installed and Access is provided for inspection 13 Yes is a pass Pi - ❑ ass Fart - MINIMUM -REQUIREMENTS: -FOR DUCT -DE SIGN_COMPLUA_NCE CItEDTT 1' ❑ Yes ❑ No ACCA Manual D Design requirements have been met (rater hay verified that actual installation matches values in CF -IR and design on plan. 2' 13 Yes ❑ No ' TX is installed or Fan flow has been verified. If no TXV, verified fan flow matches design from CF -1R { Measured Fan Flow = Yes for both 1 and 2 is a Pars Pass Fall Compliance Forms August 2001 A-16 171 STO M1,00111 POMM111 UVI consulting group, inc. x ` October 26, 2004 t Ken Bills1r. Y Peter Jacobs Homes +- 54995 Shoal Creek` La Quinta, CA 92253 } _ Re. r Peninsula Park (Plan I) _ r __Shearwall and holdown field fix at plan I - GECG.Job N6.60212-308 ti 'Gear Nr. Bills;— Pursuant to your request regarding the above captioned project, we submit the following:. As an alternate to shear wall type 10 (length=20') at the'side of the garage, see attachment sheet 2; where the shear wall can be revised to a type ,12 (IengtFi=14') with a Simpson HTT22 holdown at - - - each end,per detail 20/SD 1. _ - In addition; at locations where the alternate H1722 retrofit holdown cannot be installed, an exterior Simpson MST strap per attachment sheet 3 may be -utilized. - Note:`Please,verify the above with the building department prior to construction.:" i If you'have any questions please do not hesitate to contact this office. - - _ Sincerely, GOUVIS ENGINEERING CONSULTING GROUP; INC. j Cliff jHattar, P.E. Director, Field Oper O Q OFESSI Attachments (2 �`�L�P. y ��'- - r 630 _ CALIF0ps, 949.752.1612 - G1, fax 949.7515321 4400 Campus Drive` - - Newport Beach; CA -92660 - Palm Springs; CA- Pleasanton; CAS ` Sacramento, CA Salt Lake City, UT - `Ho Chi Minh City, Vietnam L NO- � p — cS M ZIX9 1N07 ('9-1 000i=:A) rd� SIG 11 1 h I. 2 1/16" WIDE x 126A. STRAP (M5T45 OR EQUAL). 2. 1/2"4) W/ 41/4" EMBEDMENT. (SEE TABLE). 3. 16d COMMON NAILS U5E 0.1(o24)x 2.1/2" NAILS. (5EE TABLE). ^ 4. USE 4x4 POST MIN. 4 5. REPAIR GONG. SPALLING, IF OCCURS, W/ HIGH STRENGTH GONG. MIX. 6. MIN. (2) #4 DOWELS EMBEDED 4 1/2" IN GONG. 5 3 NOTES: + I ALL METALS EXPOSED TO WEATHER OR EARTH SHALL BE OALVANIZED TREATED AND 6 PROTEGED A6AIN5T CORROSION. Z ALL BOLTS TO CONCRETE ARE: HILTI KWIK BOLT U, OR RAM5ET RED HEAD WEDGE ANCHOR, OR SIMP50N TITEN HD CONCRETE SCREW ANCHORS. IGBO# 4621, 13-12 AND E5R 1056 RESPECTIVELY. REFER TO IGBO AND MFR. 5PEG5. FOR INSTALLATION PROCEDURES. m O MIN. CONCRETE 5TRENOTH f 'c = 2000ps I. — O m ~ O OVERALL LENGTH OF STRAP TO STRAP # OF BOLTS # OF NAILS BE SPECIFIED BASED ON SITE CONDITION, BY CONTRACTOR, STHDIO 2 (23) NAILS SIMPSON "MST" STRAP (OR STHD14 3 (32) NAILS EQUAL) MAY BE USED IF LENGTH 15 ADEQUATE. 1 I X r -OR M1551 NC- HOLI:CAN ,m PLACES WHERE HTT.22 HOLDOWN FIX CANNOT BE APPLIED FF 12 07-21=2004 '15-:49 FROM-MDS'CONSULTIM 7607714073. T-02 P.002/002. . F-783 1 N E E R f I I SURVEYORS 5 •21., N I ly 21 du,2004 .. City of La Quinta y Public Works / Engineering Department 78-495 Calle Tampico La Quinta, CA 92253 Rough Grading Verification ' TR 28522 PeninsuWark We have checked the area referenced below -and, find it to be in substantialconm forance 'the approved rough grading plan. lot ilf 18 Plan; Hev. 482.5 481:3 Acs -Built Hey. 482.5 481.4 Variafiort `t 0 +0.1, AStonley. Mo pF ESS/ R.C.E. 20596 Q� ' Expires 9/30/05 0 iaesss oor�er. �, `" No. 20596 m Exp. 9-30=05 9TF OF CALF Stanley C. Morse 78.900 Avenue 47 ,VOICE: 760.771.4017 - Gary W. Dakich Seita 208 FAX: 760.771.4077 1.R."Skip"Schultz. to GOOD, CA 92252 EMAIL: mdt6geie1s8,edaces e16ng.asl t - «f. i rANDrS �- INSPECTION INC. PO BOX 13766 PALM DESERT, CA 92255 SPECIAL INSPECTION DAILY REPORT OFFICE/FAX 909.769.9717 PAGER 760.776.3339 TYPE OF INSPECTION PERFORMED _ ° .SUPPLIER DATE STEPPE SLUMP TIME IN MIXER LOCATION PHYSICAL ADDRESS PERMIT NUMBER sn pem WELDERS NAME JOB NAME to \ V 1 OF STRUCTURE o� en o n vcl_ Par - A Ljz , ARCHITECT ENGIN ER GENERAL CONTRACTOR SUB CNTRACT e DESCRIPT15N WORK INSPECTED SAMPLE INFORMATION .SUPPLIER TICKET NUMBER MIX NUMBER TIME SAMPLED AIR TEMP STEPPE SLUMP TIME IN MIXER LOCATION WELDING INFORMATION PROCESS WELDERS NAME �',.. � V � `.�. � � •_ • to \ V 1 �' MOW t i r. , II I HEREBY CERTIFY THAT I HAVE INSPECTED ALL OF THE ABOVE REPORTED WORK, UNLESS OTHERWISE NOTED, AND TO THE BEST OF MY ABILITY I HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED PLANS, SPECIFICATIONS 8 APPLICABLE BUILDING LAWS. Lo ' J NSPECTORSSIGNATIJ INSPECTORS CERTIFICATION AGENCY AND NUMBER SAMPLE INFORMATION .SUPPLIER TICKET NUMBER MIX NUMBER TIME SAMPLED AIR TEMP STEPPE SLUMP TIME IN MIXER LOCATION WELDING INFORMATION PROCESS WELDERS NAME CERTIFYING AGENCY AND CERTIFICATION NUMBER I HEREBY CERTIFY THAT I HAVE INSPECTED ALL OF THE ABOVE REPORTED WORK, UNLESS OTHERWISE NOTED, AND TO THE BEST OF MY ABILITY I HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED PLANS, SPECIFICATIONS 8 APPLICABLE BUILDING LAWS. Lo ' J NSPECTORSSIGNATIJ INSPECTORS CERTIFICATION AGENCY AND NUMBER I. (1) CONT. #4'T45. 2.. ADDITIONAL REBAR PER PLAN ® TOP 6 BOTTOM, NOTE: REFER TO DETAIL I/SDI FOR INFORMATION NOT SHOWN HERE. z I. 4X4 POST, U.N.O. SEE PLAN I 2. STRAP, SEE TABLE 5. EMBEDMENT 15. FROM GOLD i JOINT AT NOH -MONO POUR 2 s FOUNDATION" SY5TEM5: NOTES: USE SIMPSON SET EPDXY-.TIE O REDHEAD EPCON A7 ADHESIVE SYSTEM. APPROVALS: ICBO #5560 6. CITY OF L.A. R.R. #2527q 4 #2557q REFER Ti IGBO AND MANUFACTURER'S 3 i I SPECS. FOR INSTALLATION u a . : r��� �� PROCEDURES. 13/4 a SPECIAL INSPECTION 15 MIN.. a REQUIRED. DURING ALL INSTALLATION -` MIN. CONC. fN_GONG. STRENGTH MISSIN ' ;REPI.� rt EMBEDMENT HOL " NN . HTT22'... 5 100 WD2A,H05A HD(6A/HM5A `8" 15" HD6A/HIP A DBL. STRAP HDO6 OR ND HDIOA HDIOA 7/6" 15" c - 25Q0 Psi ADEQUATE SIZE WASHER REOV. WHEN ANCHOR BOLT SIZE 15 SMALLER THAN HOLE IN HOLDOWN. GONTRAGTOR'SHALL SPECIFY OVERALL LENGTH OF ANCHOR. FOR OTHER HOLDOWNS NOT >. LISTED IN TABLE ABV.. 4ur/OR HOLDOW 577 APS ARE: ALL PA'S, ALL HPA'S ERE, CONOTHER TACT 60UVIS EN6'.6. PAHD42, MPAHD, HPAD22, HPAHD22-2P, 6ROUP OF COMPANIES FOR 5THDIO AND 5THDI4 FOR SPECIFIC FIX nrl1nr VETA I L Tri_�K I. OVERSIZED HOLE OR HOLE I 3 GREATER THAN 1/16" OVER 1 BOLT DIAMETER f A c 12" MIN 2)_ HPAH022-2F 2) HPA55 2) 5THDI4 _ D5100 TITLE 24 REPORT - Title 24 Report for: Peninsula Park Plan #1 PGA West ` LaQuinta, CA 92253 Project Designer: BBG Architects 20371 Irvine Ave. Suite 120 Santa Ann Heights; CA 92707-5651 (714) 434-4885 Report Prepared By: CJ Mcfadden BREEZE AIR CONDITIONING 75-145 ST. CHARLES PLACE PALM DESERT, CA 92211 (760)'346-0855 CITY OF LA QUINTA BUILDING & SAFETY DEPT. Job Numbe : APPROVED FOR CONSTRUPO DAT BY Date: 10/5/2004 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. Thi:, program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: User Number: 3665 yY � n t' � t Certificate of CornMiance: Residential (Part 1 of 2) CF -1 R Peninsula Park Plan #1 10/5/2004 Project Title Date PGA West LaQuinta Project Address ^- Building Permit # BREEZE AIR CONDITIONING (760) 346-0855. Plan ChIeck-/-Date -" -- - - Documentation Author Telephone Computer Performance 15 Field Check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION Total Conditioned Floor Area: 3,904 ft2 Average Ceiling Height: 10.9 ft Total Conditioned Slab Area: 3,904 ft2 Building Type: 0.028 (check one or more) Wood 0 Single Family Detached ❑ Addition ❑ Single Family Attached ❑ Existing Building ❑ Multi -Family ❑ Existing Plus Addition Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor Number of Dwelling Units: 1.00 Number of Stories: 1 ❑ Raised Floor Component R-38 Roof (R.38.2x14.16) W-1 Wall (W.21.2x6.16) W-2 Wall (W.21.2x6.16) Slab On Grade Slab On Grade Solid Wood Door FENESTRATION Const. Frame Assembly Location/Comments Type U -Value (attic, garage, typical, etc.) Wood 0.028 Exterior Roof Wood 0.057 Exterior Wall Wood 0.057 Exterior Wall n/a 0.756 Exposed Slab w/R-0.0 Perimeter Insulation n/a 0.756 Covered Slab w/R-0.0 Perimeter Insulaton Wood 0.387 Exterior Door Shading Devices Type Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Left 96.8 0.55 0.30 Bug Screen ❑ X❑ ❑ X❑ Left 3.0 0.40 0.35 Bug Screen ❑ X❑ ❑ X❑ Rear 160.0 0.80 0.59 Bug Screen ❑ X❑ ❑ X❑ Rear 79.0 0.40 0.35 Bug Screen ❑ F ❑X❑ Left 19.5 1.19 0.68 Bug Screen ❑ •Q ❑ X❑ Rear 29.3 1.19 0.68 Bug Screen ❑ X❑ ❑ X❑ Rear 39.0 0.40 0.35 Bug Screen X❑ ❑ ❑ X❑ Right 29.4 0.55 0.30 Bug Screen X❑ ❑ ❑ 191 Front 104.0 0.80 0.59 .Bug Screen ❑. X❑. _ _❑__Q . . Front 16.0 0.40 0.35 Bug Screen ❑ X❑ ❑ X❑ Right 54.8 0.40 0.35 Bug Screen ❑ X❑ ❑ X❑ Right 128.0 0.80 0.59 Bug Screen -191 ❑ ❑X❑ Run Initiation Time: 10/05/04 15:36:46 Run Code: 1097015806 Ener Pro 3.1 By Ener Soft User Number: 3665 Job Number: Page: 3 of 27 Certificate of Compliance: Residential (Part 2, of 2) CF -1 R Peninsula Park Plan #1' 10/5/2004 Project Title Date HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water. Heating Systems, except Desig;o Heating Load. Distribution Heating Equipment Minimum Type and Duct or Type (furnace, heat Efficiency Location Piping Thermostat 'Location/ . pump, etc.) (AFUE/HSPF) (ducts, attic, etc.) R -Value Type Conments Cantral Furnas 80% AFUE Ducts in Attic 4.2 Setback HVAC -1 (Sleeping) rentral Furnace 80% AFUE Ducts in Attic 42 Sethack HVAC -2-(1,; tha . - - Central Furnace 80% AFUE Ducts in Attic 4.2 Setback HVAC -3 (Living) t Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type Comments Split Air Conditioner 14 0 SFER Ducts in Attir. 49 Sethark HVAC -1 (Slee Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 r Setback HVAC -3 (Living) WATER HEATING SYSTEMS Rated 1 Tank Energy Facts 1 External Water Heater Water Heater Distribution # in Input Cap. or Recovers Standby Tank Insul. System Name Type Type Syst. Btu/hr (gal) Efficiency Loss (%) R -Value A.O. SMITH FPS -50-224 Small Gas Recirc/Time+Temp Z 43.000 so 0.60 n/a• n/a 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, lis: energy factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building. features and performance specifications needed to comply with Tiltle 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires iinstaller testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Documentation Author Name: Name: CJ Mcfadden Title/Firm: BBG Architects Title/Firm: BREEZE AIR CONDITIONING Address: 20371 Irvine Ave. Suite 120 Address: 75-145 ST. CHARLES PLACE Santa Ann Heights, CA 92707-5651 PALM DESERT, CA 92219 Telephone: (714) 434-4885. Telephone: (760) 346-0855 LIC. #: (signature) Enforcement Agency Name: Title/Firm: Address: Telephone: icy 5 oq (date) (signature) (dat ) lEnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:4 of 27 1 IJ Certificate of Compliance: Residential (Addendum)-- ---GF--1-R Peninsula Park Plan #1 10/5/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Plan Field The HVAC System "HVAC -1 (Sleeping)" must meet all CEC Criteria for a Zonally Controlled system serving only Sleeping Areas. The HVAC System "HVAC -1 (Sleeping)' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -2 (Setback)' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -3 (Living)' must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. The HVAC System "HVAC -3 (Living)' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R. I Plan I Field The HVAC System "HVAC -1 (Sleeping)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -1 (Sleeping)' is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -2 (Setback)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -2 (Setback)' is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -3 (Living)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 (Living)' is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. Run Initiation Time: 10/05/04 15:36:46 Run Code: 1097015806 EnergyPro 3.1 By EnergySoft ' User Number: 3665 Job Number: Page:5 of 27 Mandatory Measures Checklist: Residential (Page -1 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable. CESIGNER ENFORCEMENT Building Envelope Measures ❑X I150(a): Minimum R-19 ceiling insulation. ❑ §150(b): Loose fill insulation manufacturer's labeled R -Value. § 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does ❑*§150(c): not apply to exterior mass walls). - - - -° - - - ❑'§150(d): Minimum R-13 raised floor insulation in framed floors or equivalent. §150(1): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no ❑ greater than 2.0 perm/inch. §118: Insulation specified or installed meets insulation quality standards. Indicate type and form. ®§116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. ❑ § 150(g): Vapor barriers mandatory in Climate Zones 14 and .16 only. ❑§150(0: Special infiltration barrier installed to comply with Section 151 meets Commission quality standards. IXI §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures ❑X § 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. ❑ § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. ❑§150(i): Setback thermostat on all applicable heating and/or cooling systems. §1500): Pipe and Tank Insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined internal/external insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55 degrees F. insulated. 6. Piping insulating between heating source and indirect hot water tank. EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: --Page:6 of 27-- . Mandatory Measures Checklist: Residential (Page 2 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach ,ised. Items marked with an asterisk (") may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) !❑'§150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in i conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL181, UL181A, or UL181B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such a tape is used in combination with mastic and drawbands. 4. Exhaust fan systems have back draft or automatic dampers. 5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually operated dampers. i 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. ❑ 114: Pool and Spa Heating Systems and Equipment 1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating, and no pilot. 2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas. a. At least 36" of pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. §115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot<'150 Btu/hr) _ ❑ §118 (f): Cool Roof material meet specified criteria Lighting Measures © §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an entrance to the kitchen. a§150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. 3.1 By EnergySoft User Number: 3665 Job Number: Page:? of 27 Computer Method Summary (Pa -t 1 of 3) C -2R Peninsula Park Plan #1 10/5/2004 Project Title Date PGA West LaQuinta Project Address Building Permit # BREEZE AIR CONDITIONING (760) 346-0855 Documentation Author Telephone Plan Check/Date Computer Performance 15 Field Check/Date Compliance Method (Package or Computer) Cimate Zone Source Energy Standard Use (kBtu/sf-yr) Design Space Heating 2.89 Facing North Margin LJ Facing East Margin Wall- 20_ 0.0.5.7_ 0_ 9.0_ Facing South Margin Vent Facing West Margin 2.87 0.02 3.34 -0.45 3.77 -0.88 3.44 -0.55 Space Cooling 33.40 29.64 3.76 .H-VAC=(Sleeping) 30.71 2.69 x_4,560 28.91 4.5+0 Sleeping 31.73 1.67 Domestic Hot Water 7.30 7.85 -0.55 x.,354 7.85 -0.55 -035_ 7.85 -0.55 -Setback- 7.85 -0.55 40.36 3.24 41.90 1.69 40.53 3.016 43.02 0.57 Totals 43.59 _LuingStat_ -2 -nLa -W--J Wall_(_W_2L2x6.16) ZO.NF 9 This C -2R describes the front facing North occurrence of a four cardinal orientation analysis. Features are identical in all crientations. Total Conditioned Floor Area: 3,904 ft 2 Building Type: Single Fam Detached Floor Construction Type: ❑ Raised Floor ❑X Slab Floor Building Front Orientation: All Four Orientations Total Fenestration Area: 19.4% Number of Dwelling Units: 1.00 Total Conditioned Volume: 42,699 ft 3 Number of Stories: 1 Total Conditioned Slab Area: 3,904 ft 2 BUILDING ZONE INFORMATION LJ # of Wall- 20_ 0.0.5.7_ 0_ 9.0_ Thermostat Vent Zone Name Floor Area Volume Units Zone Type Type Hgt. Area .H-VAC=(Sleeping) ----J_400 . x_4,560 -0-36_ Sleeping _SleepingStat_ Roof_ x-354 -028_ -345 • 0_ 1dVAC2(Setback) x.,354 1.5,.029 -035_ Conditioned- -Setback- 2 -nla -HVAC-3_(Living) 1 115.0 x.3,110 -0-29_ I iving _LuingStat_ -2 -nLa OPAQUE SURFACES Solar Act. Gains Type Area U -Val. Azm. Tilt Y / N Form 3 Reference Location / Comments Roof- x,400 O 028_ 340 0 LJ R-38_Roof-(R3.8 2x14 1F;) ZONF 1 Wall- 20_ 0.0.5.7_ 0_ 9.0_ ❑ -W-1-Wall(W.212x616) 20.NE_1 Wall_ 1.25_ 0_057_ 0 90_ ❑ al_1L-2_Wall_(W.21.2x6_t6.) ZO.NE_1 Wall_ 607 0.057 -90-90 ❑ W- -WalL(_1N-21.2x616.) ZONE 1 Wall- -229 --0-057- 180 90 ❑ W--J-WzIL(W_21-2x616.) ZONE 1 Roof_ x-354 -028_ -345 • 0_ ❑ --38Roof-(R38.2x]4 1.6) ZONE 9 Wall- 239 -0-057- 0 90 ❑ M/ -2 -Wal _2]_2x616) ZONF .Door- 21 -0.187- 0_ 90 ❑ -solid-Wood-Door ZONE 2 Wall_ 52 0_0.57_ 9.0_ 9.0_ ❑ -W--J Wall_(_W_2L2x6.16) ZO.NF 9 Wall- 35 -0-05.7- 9.0 9.0 W2Wall_(W 2]..2x6..16) ZONF 2 Wall_ 94 -0-0 5 7- X80 90 Axl ❑ W1 Wall_(W_21..2x616.) ZONF 2 -Wall _221 ---0-057- 370 90 ❑ W--I-WaIL(W 9 16) ZONF 2 Roof- 1.150 0-028_ _345 0 ❑R38Boot(R 38.2x_1_A 1Al ZONE Wall- --153 0.057 0 9.0 ❑ W1 WaIL(W 212x616) ZONE 3 _W_ _all_ 126 0 057 08Q 90 W-1 W;1l (W_21_2x616) ZONE 3 Wall- _ 49 0 0.57_ -27_0 90 VAL-l-WaIL(W_91_2x616.) ZONES ❑ ❑ ❑ ❑ F1 n ❑ ❑ ❑ ❑ ❑❑ Run Initiation Time: 10/05/04 15:36:46 Run Code: 109701 806 3.1 By EnergySoft User Number: 3665 Page:8 of 27 Computer Method Summary (Part 2 of 3) C -2R Peninsula Park Plan #1 10/5/2004 Project Title Date FENESTRATION SURFACES # Type Area U- Factor SHGC Act. Azm. Glazing Type Tilt Location/ Comments _L Window-Le.8 (East)- _29_4- _0.-55.0_ _0_3.0 90_ -9Q Neetw.00d_GJazing ZQNP 1 2 Window Left (East) 8.0 0.550 0.30 90 90 Fleetwood Glazing ZONE 1 3 Window Left (East)_ 8.0 0.550 0.30 90 90 Fleetwood Glazing ZONE 1 4 Window Left (East) 29.4 0.550 0.30 90 90 Fleetwood Glazing ZONE 1 5 Window Left (East) 3.0 0.400 0.35 90 90 Fleetwood Glazing ZONE 1 6 Window Left (East) 22.0 0.550 0.30 90 90 Fleetwood Glazing ZONE 1 7 Window Rear (South) 40.0 Q$000.59 1$Q Fleetwood Glazing ZONE 1 8 Window Rear (South) 40.0 0.800 0.59 180 90 Fleetwood Glazing ZONE 1 9 Window Rear (South) 20.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 1 10 Window Left (East) 19.5 1,190 0.68 90 90 Default Single Metal Tinted ZONE 2 11 Window Rear (South) 29.3 1.190 0.68 180 90 Default Single Metal Tinted ZONE 2 12 Window Rear South 39.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 2 13 Window Ria.ht (West). 29.4 0-550 0 30 -2.7_0_ 9Q Fieetwood-Glazing ZONE 2 14 Window Front (North) 64.0 0.800 0.59 0 90 Fleetwood Glazinq ZONE 3 15 Window Front (North) 16.0 0.400 0.35 0 90 Fleetwood Glazing ZONE 3 16 Window Front (North) 40.0 0.800 0.59 0 90 Fleetwood Glazinq ZONE 3 17 Window Rear (South) 40.0 0.800 0.59 180 90 Fleetwood Glazing ZONE 3 18 Window Rear (South) 40.0 0.800 0.59 180 90 Fleetwood Glazing ZONE 3 19 Window Rear (South)�2 .0 0.400 0.35 180 90 Fleetwood Glazing ZONE -3 - - 20 Window Rear (South) 39.0 0.400 0.35 180 90 Fleetwood Glazing ZONE 3 21 Window Right (West) 22.8 0.400 0.35 270 90 Fleetwood Glazing ZONE 3 22. Window Right (West)- 64.0 0.800 0.59 270 90 Fleetwood Glazing ZONE 3 23 Window Right (West) 16.0 0.400 0.35 270 90 Fleetwood Glazing ZONE 3 24 Window Right (West) 64.0 0.800 0.59 270 90 Fleetwood Glazing ZONE 3 25 Window Right (West) 16.0 0.400 0.35 270 90 Fleetwood Glazing ZONE 3 INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt. RExt. Dist. Len. Hgt. Dist. Len. Hgt. 1 Bug Screen 0.76 2 Bug Screen 0.76 3 Bug Screen 0.76 4 Buq Screen 0.76 5 � Screen 0.76 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9 Bug Screen 0.76 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Bug Screen 0.76 6.5 6.0 8.0 0.1 8.0 8.0 13 Bug Screen 0.76 5.5 2.7 10.0 0.1 10.0 10.0 14 Bug Screen 0.76 15 Bug Screen 0.76 16 Bug Screen 0.76 17 Bug Screen 0.76 18 Bug Screen 0.76 19 Bug Screen 0.76 20 Bug Screen 0.76 21 Bug Screen 0.76 22 Bug Screen 0.76 8.0 8.0 10.0 0.1 10.0 10.0 23 Bug Screen 0.76 24 Bug Screen 0.76 8.0 8.0 10.0 0.1 10.0 10.0 25 Bug Screen 0.76 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Paoe:9 of 27 1 I Comauter Method Summary (Part 3 of 3) C -2R Peninsula Park Plan #1 10/5/2004 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Location Type, (sq (in.) Cap. Cond. Form 3 Reference R -Val. Comments PERIMETER LOSSES Type Length F2 Factor Insulation R -Val. Depth Location / Comments Sla_tLPeri er 14 0.76 0 Q 0 ZONE 1 Slab-Bedmeter 97- Q.M —0-0 0 ZONE 1 Slab Perimeter _$0,M 80%AFUE 04 0 ZONE 2 Slab-P-erimeter 9fi QJ -6 —0-0. 0 Z-ON.E-2 Slab-Re-rimeter 10 0.76 --OQ 0 ZONE HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (air Conditioner, Type (furnace, heat Efficiency and Location Duct Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type Comments Central Furnace 80%AFUE Ducts in Attic 4.2 Setback HVAC -1 (Sleeping) Central Furnace 80%AFUE Ducts in Attic 4.2 Setback HVAC -2 (Setback) Central Furnace 80%AFUE Ducts in Attic 4.2 -Setback HVF.C-3-(L-iving) - — --- - Hydronic Piping Pipe Pipe Insul. System Name Length Diameter Thick. Cooling Equipment Minimum Duct Type (air Conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments Splitaplit Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVA -C-1 (Sleeping) Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -2 (Setback) Split Air Conditioner 14.0 SEER Ducts in Attic 4.2 Setback HVAC -3 (Living_) WATER HEATING SYSTEMS Ratedl Tank , Energy Fact? 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Reccvery Standby R -Value System Name Type Type Syst. (Btu/hr) (gam Efficiency Loss (%) ' Ext. A.O.. SMITH FPS -50-224 Small Gas Recirc/Time+Temp_ 2 43,000 50 0.60) n/a n/a For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.,_ For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. REMARKS Computer Method Summary (Part 3 of 3) C -2R Peninsula Park Plan #1 10/5/2004 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Localon Type (so (in.) Cap. Cond. Form 3 Reference R -Val. Comments PERIMETER LOSSES F2 Insulation Type Length Factor. R -Val. Depth Location / Comments Slab Perimeter 90 0.76 �0. � ZONE 3 HVAC SYSTEMS Heating Equipment Minimum Distribution Type Type (furnace, heat Efficiency and Location Duct Thermostat LocFtion / pump, etc.) (AFUE/HSPF)(ducts/attic, etc.) R -Value Type Comments Hydronic Piping pipe Pipe InsuL System Name Length Diameter Thick Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat ' Loc2tion / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments WATER HEATING SYSTEMS Rated' Tank Energy Fact! Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type Type, Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. REMARKS EnergyPro 3.1 By EnergySoft _ _ User Number: 3665 Job Number: Paae:11 of 27 1 Computer Method Summary (Addendum) C -2R Peninsula Park Plan #1 10/5/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These iter -is require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Plan Field The HVAC System "HVAC -1 (Sleeping)" must meet all CEC Criteria for a Zonally Controlled system serving only Sle=ping Areas. The HVAC System "HVAC -1 (Sleeping)' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -2 (Setback)' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. The HVAC System "HVAC -3 (Living)' must meet all CEC Criteria for a Zonally Controlled system serving only Living Areas. The HVAC System "HVAC -3 (Living)' includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on &form CF -6R. I Plan I Field The HVAC System "HVAC -1 (Sleeping)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS -ater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -1 (Sleeping)' is using reduced duct leakage to comply and must have diagnostic site testhg of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Foam. The HVAC System "HVAC -2 (Setback)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -2 (Setback)' is using reduced duct leakage to comply and must have diagnostic site testing�of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. The HVAC System "HVAC -3 (Living)' includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must.provid_ _ verification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC -3 (Living)' is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 12 of 27 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME Peninsula Park Plan #1 DATE 10/5/200 COMPONENT DESCRIPTION _ 1 T I DESCRIPTION 4MING ASSEMBLY NAME ASSEMBLY W-1 Wall .21.2x6.16 Floor stucco 2 Membrane, Vapor -Permeable Felt 3 Plywood TYPE one) Wall 5 Gypsum or Plaster Board w(check W 7 Ceiling / Roof 8 260 0 H 0 FRAMING MATERIAL Wap�j 0.680 23.11 7.56 0 Z FRAMING % 15 % Framing % 1 $ TOTAL HC 3 7 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Cell.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Ceil.) 1 T I SUBTOTA R -VALUE DESCRIPTION 4MING OUTSIDE SURFACE AIR FILM 1 stucco 2 Membrane, Vapor -Permeable Felt 3 Plywood 4 Insulation, Mineral Fiber, R-21 5 Gypsum or Plaster Board 6 0.31 7 0.37 8 260 9 0.68 INSIDE SURFACE AIR FILM SUBTOTA R -VALUE THICK- NESS (in.) 4MING ❑ ❑ ❑ ❑X ❑ El El 0.170 0.875 0.010 0.375 5.500 0.625 0.465 21.000 5.445 0.562 SUBTOTA R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.175 0.175 0.060 0.060 0.4651 0.465 21.000 5.445 0.562 0.562 0.31 2631 0.37 0.98 260 0.26 0.68 0.680 0.680 23.11 7.56 Rc Rf A *HEAT CAPACITY (Optional) WALL WEIGBT (lbs/st) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) 846 0.20 1.69 006 0.35 0.02 1 06 0.29 0.31 2631 0.37 0.98 260 0.26 0.68 1 $ TOTAL HC 3 7 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0433 X 0.85 + 0.1323 X 0.15 = 0.057 1 / Rc 1 - (Fr -/6 /100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Paae:13 of 27 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE Peninsula Park Plan #1 10/5/2004 COMPONENT DESCRIPTION DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM ASSEMBLY NAME W_2 Wall W.21.2x6.16 Gypsum or Plaster Board 2 Insulation, Mineral Fiber, R-21 ASSEMBLY Floor Gypsum or Plaster Board 4 TYPELU X Wall (check one) 5 w Ceiling / Roof 0.68 o FRAMING MATERIAL Wood 8 N 9 O= Z FRAMING % 15 %o Framing /o 0.680 22.98 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10% (16" o.c. Floor/Ceil.) SKETCH OF ASSEMBLY 7% (24" o.c. Floor/Cell.) 7.81 SUBTOTA R -VALUE DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM 1 Gypsum or Plaster Board 2 Insulation, Mineral Fiber, R-21 3 Gypsum or Plaster Board 4 0.37 5 260 6 0.68 7 8 9 INSIDE SURFACE AIR FILM SUBTOTA R -VALUE THICK- NESS (in.) FRAMING ❑ © ❑ El El El 0.170 0.625 5.500 0.625 5.445 0.562 0.562 0.37 0.98 260 . 0.26 SUBTOTA R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.5621 0.562 21.000 5.445 0.562 0.562 0.37 0.98 260 . 0.26 0.68 ASSEMBLY U -VALUE 0.680 0.680 22.98 7.42 Rc Rf s F 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/stl) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) [ 0.0435 X 0.85 ] 2.60 0.26 0.68 2.63 0.37 0.98 260 . 0.26 0.68 ASSEMBLY U -VALUE 7.81 TOTAL HC 2.3 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the frerning members. [ 0.0435 X 0.85 ] + ' [ 0.1348 X 0.15 = 0.057 1 / Rc 1 - (Fr% / 100) 1 / Rf Fr% / 100 ASSEMBLY U -VALUE 3.1 By EnergySoft User Number: 3665 Job Number: Pabe:14 of 27 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #1 10/5/2004 SYSTEM NAME FLOOR AREA HVAC -1 (Sleeping) 1,400 EATING S' 24.0 OF 0 Outs 105 cfm 69.5 OF TOOLING SYS 14.1 / 80.3 OF Outside Air 105 cfm 78.7/65.2 °F EnerovPro 3.1 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK 11COILHTG.PEAK CFM ISensible Latent I I CFM I Sensible 1,506 29,365 3,942 517 21,231 0 1,468 1,062 105 4,015 2,218 105 5,159 0 0 1,468 1,062 36,317 6,160 28,513 HVAC EQUIPMENT SELECTION HS26-060/G40UH60C-110 (5) 45,956 6,387 89,400 Total Adjusted System Output 45,956 6,387 89,400 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am 'SYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 67.10F 108.5 OF 108.5 OF Supply Air Ducts Heating Coil Supply Fan 108.0 OF 2000 cfm ROOMS 70.0 OF —E Return Air Ducts I M PSYCH irstream T 80.5 / 66.1 OF User Number. 3665 watures at Time of Cooling Peak) 59.3 / 57.9 OF 59.3 / 57.9 OF 0 Supply Air Ducts Cooling Coil Supply Fan 59.9/58.1 of 2000 cfm 49.8% R.H. ROOMS 78.0 / 65.0 OF h Return Air Ducts 'I Job Number: Page: 15 of 27 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #1 10/5/2004 SYSTEM NAME FLOOR AREA HVAC -2 Setback 1,354 ENGINEERING CHECKS USYSTEM LOAD Number of Systems 1 Heating System Output per System 89,400 Total Output (Btuh) 89,400 Output (Btuh/sqft) 66.0 Cooling System Output per System 58,500 Total Output (Btuh) 58,500 Total Output (Tons) 4.9 Total Output (Btuh/sqft) 43.2 Total Output (sgft/Ton) 277.7 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.48 Airflow (cfmrron) 410.3 Outside Air (%) 5.1 Outside Air (cfm/sqft) 0.08 Note: values above given at ARI conditions :ATING SYSTEM PSYCHROMETRICS 24.0 of 67.3 of Outside Air 102 cfm 69.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING FEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 31,546 6,142 HS26-060/G40UH60C-110 (5) 45,881 6,369 89,400 Total Adjusted System Output 45,881 6,369 89,400 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Aug 2 pm I Jan 12 am irstream Tel rj 108.7 OF Heating Coil Supply Fan 2000 cfm 108.7 of —� Supply Air -Ducts -- --� 108.3 of ROOMS 70.0 of �% Return Air Ducts 4 (COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolinq Peak) I 114.1 / 80.3 of Outside �� 102 cfm 78.6/65.1 of 80.4 / 66.0 of 0 59.1/57.70F Supply Fa 2000 cfm Cooling Coil 59.1 / 57.7 of Supply Air Ducts Fan 59.7/58.0 OF 49.6% R.H. ROOMS 78.0 / 64.9 of 1% Return Air Ducts 'I EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 16 of 27 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Peninsula Park Plan #1 10/5/2004 SYSTEM NAME FLOOR AREA HVAC -3 (Living) 1,150 FNC.INFFRIN(. CHECKS SYSTFM LOAD Number of Systems 1 Heating System Output per System 89,400 Total Output (Btuh) 89,400 Output (Btuh/sqft) 77.7 Cooling System Output per System 58,500 Total Output (Btuh) 58,500 Total Output (Tons) 4.9 Total Output (Btuh/sqft) 50.9 Total Output (sgftrTon) 235.9 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.74 Airflow (cfm/Ton) 410.3 Outside Air (%) 4.3 Outside Air (cfm/sqft) 0.08 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,736 34,434 3,439 658 27,145 0 1,722 1,357 0 0 86 3,287 1,914 86 4,225 0 0 1,722 1,357 41,165 5,353 34,084 HS26-060/G40UH60C-110 (5) 46,397 5,584 89,400 Total Adjusted System Output 46,397 5,584 89,400 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am to I INN JTJ I tM F'SYk;HKUMt I KII:S (Airstream Temperatures at Time of Heating Peak) 24.0 of 67.4 of 108.8 of 108.8 of 11 Supply Air Ducts Outside Air 86 cfm Heating Coil Supply Fan 108.2 of 2000 cfm ROOMS 69.4 of 70.0 of Return Air Ducts ` I COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 114.1 / 80.3 of 80.3 / 65.7 of 58.8 / 57.4 of 58.8 / 57.4 of Supply Air Ducts Outside Air O 86 cfm Cooling Coil Supply Fan 59.6 / 57.7 of 2000 cfm 48.8% R.H. ROOMS 78.8/64.9 of 78.0/64.6OF cc C R t A' D t rn I ` I D-. ur uc s--- EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Paae:17 of 27 ROOM LOAD SUMMARY --- - -- PROJECT NAME DATE Peninsula Park Plan #1 10/5/2004 SYSTEM NAME FLOOR AREA HVAC -1 (Sleeping) 1,400 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 1 Master/Bed3 1 1,506 29,365 3,942 1,506 29,365 3,942 517 21,231 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page:18 of 27 ROOM LOAD SUMMARY - - -- PROJECT NAME Peninsula Park Plan #1 DATE 10/5/2004 SYSTEM NAME HVAC -2 Setback FLOOR AREA 1,354 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 2 KITCH/DINNIN/BED2 1 1,274 25,138 3,978 1,274 25,138 3,978 424 17,519 PAGE TOTAL 1,274 25,138 3,978 424 17,519 TOTAL 1,274 25,138 3,978 424 17,519 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 19 of 27 WA I ROOM LOAD SUMMARY PROJECT NAME Peninsula Park Plan #1 DATE 10/5/2004 SYSTEM NAME HVAC-3(Living) FLOOR AREA 1,150 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE ZONE 3 GREAT ROOM 1 1,736 34,434 3,439 1,736 34,434 3,439 658 27,145 V PAGE TOTAL 1 1,736 34,434 ii 3,439 658 ' . 27,145. TOTAL 1,736 34,434 ` 3,439 1 658 27,145 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page:20 of 27 ROOM HEATING PEAK LOADS Project Title Date Peninsula Park Plan #1 10/5/2004 Room Information Desicin Conditions Room Name Master/Bed3 Time of Peak -" - -- -----Jan-1 2 am- —" Floor Area 1,400 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value dT of Btu/hr 1400.0 x x x X X x x x X X x X X x X X x X X X x x X X X x X X x x x X X X X X x x X 0.0280 X X X x X x x x x X X x X X x X X X X X x x x x X x x X X X x X x x X x X X X 46.0 847.2 0.0566 46.0 125.0 0.0572 46.0 96.8 0.5500 46.0 23.0 0.4000 46.0 80.0 0.8000 46.0 perimeter= 111.0 45.5 I Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 15 206 Infiltration: L 1.001X 1.080 X 1 400 X 10.40 X 60] x 46 = 6 025 Schedule Air Sensible Area Ceiling Height ACH Cd Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 21,231 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 21 of 27 ROOM HEATING PEAK LOADS Project Title Date Peninsula Park Plan #1 10/5/2004 Room Information Design Conditions Room Name KITCH/DINNIN/BED2 Time of Peak Jan 12 am Floor Area 1,354 Outdoor Dry Bulb Temperature 24°F Indoor Dry Bulb Temperature 70 OF Conduction '�T OF Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 11 299 Infiltration: [ 1.001X 1.080 x 1 354 x 11.10 x 0.50 / 60] x 46 = 6 220 Schedule Air Sensible Area Ceiling Height ACH ILT Fraction . TOTAL HOURLY HEAT LOSS FOR ROOM 17,519 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 22 of 27 1354.0 x x x x X X X x x X x x x x x x X x X x X x x x x x x X X X x x x X x x X X X 0.0280 X x x x x X X X x x X X x x X X x X x x x X x x X X x x x X X X x X X x x x x 46.0 = = = = = = _ _ = = = = = = = = = = = = 273.7 0.0572 46.0 21.3 0.3872 46.0 366.8 0.0566 46.0 48.8 1.1900 46.0 39.0 0.4000 46.0 29.4 0.5.500 46.0 perimeter = 74.0 45.5 Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 11 299 Infiltration: [ 1.001X 1.080 x 1 354 x 11.10 x 0.50 / 60] x 46 = 6 220 Schedule Air Sensible Area Ceiling Height ACH ILT Fraction . TOTAL HOURLY HEAT LOSS FOR ROOM 17,519 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 22 of 27 ROOM HEATING PEAK LOADS Project Title Date Peninsula Park Plan #1 10/5/2004 Room Information Desi n Conditions Room Name GREAT ROOM Time of Peak Jan 12 am Floor Area 1,150 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 70°F Conduction Area U -Value AT of Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 21 720 Infiltration: [ 1.00 1 x 1.080 x 1 150 x 11.40 x 0.50 / 60 x 46 = 5425 Schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 27,145 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 23 of 27 1150.0 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 0.0280 x x • x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x X x x x x 46.0 -- 698.2 0.0566 46.0 312.0 0.8000 46.0 129.8 0.4000 46.0 perimeter = 100.0 45.5 _. - - Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 21 720 Infiltration: [ 1.00 1 x 1.080 x 1 150 x 11.40 x 0.50 / 60 x 46 = 5425 Schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 27,145 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 23 of 27 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #1 10/5/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Master/Bed3 - - - -- - 780F -- 1150F 370F Conduction Area U -Value DETD 1 Btu/hr X (East) 56.0 = 2,196 X 2 CsmntWdws 4 35.6 = 1,708 X (South) 35.6 = 255 X 0.334 37.0 = 1,970 X 73)X, 37.0 = 340 X 29.4 37.0 = 2.368 X X X 1. Design Equivalent Temperature Difference (DETD) Page Total 8 836 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr (2) CsmntWdws (1) (East) Csmn (East) CsmntWdw 3 (East) 2 CsmntWdws 4 (East) FxdGlsWdw (5) (2 CsmntWdw (6 (East) (East) FrnchDr 7 (South) FrnchDr 8 _(South) (4) FxdGISWdws (9) (South) 0.334 195 ( 0.0 X x x x X x x x x X 15 + + + + + + + + + + 29.4 X x x x x x X . x X X 73 ) X. x x X x )X 0.334 = = = = _ = = = = = 717 _ - --�.-.... ( 0.0 1 8.0 73)x 0.334 195 ( 0.0 1 8.0 73)X, 0.334 195 ( 0.0 1 29.4 73) 0.334 717 (-0.0 1 3.0 73) --0.390 0.334 - - - --85 ( 0.0 1 22.0 73)X 536 ( 0.0 15 40.0 32) 0.657 841 ( 0.0 1 40.0 32)x 0.657 841 ( 0.0 1 20.0 32) 0.390 249 (I Sched. Page Total a 37s Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,400 x 0.500 Watts/sqft x 3.41 J BtuVfWatt = 2,389 Occupants 1.00 X 1,400 X 250 Btuh/occ. / 200 sgftFocc. = 1,750 Receptacle 1.00 x 1,400 x 1.500 Watts/sqft x 3.413 BtuV VVatt = 7,167 Process 1.00 x 1,400 x 0.000 Watts/sqft x 3.41��Btu-h/Watt = 0 Infiltration: 00 x $0 x 1.490 x oAo x 0_50 / 60] t 37J = 847 Schedule Air Sensible Area Ceiling Height ACH nJ Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 29,3651 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occu ants 1.00 x 1 400 x 200 Btuh/OCC. / 200 sgftAocc. = 1 400 Receptacle 1.00 X 1 400 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Process 1.00 x 1 400 X 0.000 Watts/sqft x 3.41 Btu hMatt-- - A Infiltration: 1 1.00 x 4 nt X 1 40 X Heigh X 60] -\W = 2542 Schedule Alr Latent Area Ceiling Height ACH pyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,942 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 24 of 27 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #1 10/5/2004 Project Title Date Room Name KITCH/DINNIN/BED2 Design Indoor Dry Bulb Temperature: 7800F Design Outdoor Dry Bulb Temperature: 115 F Design Temperature Difference: 370F Conduction R-38 Roof R.38.2x14.16 W-2 Wall (W.21.2x6.16) olid Wood Door 1 Wall W.21.2x6.16 Default Single Metal Tinted Fleetwood Glazin Fleetwood Glazing Area U -Value X X X X X X X X DETD 1 = = = = = = Btulhr 56.0 2,123 35.6 557 35.6 294 35.6 739 37.0 2.149 37.0 577 1 37.01 598 X X 1. Design Equivalent Temperature Difference (DETD) Page Total 7 038 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr FxdSiteBlt (10) East ( 0.0 x 1 + 19.5 x 73)X 0.757 = 1,078 -XdSitet3lt( 11 South ( 0.0 x 1 + 29.3 x 32 ) x 0.757 = 710 FAGlsWdw 12 (South) ( 39.0 x 1 + 0.0 x 32)x 0.390 = 228 (2 CsmntWdws (13) West ( 29.4 x 1 + 0.0 x 73) x 0.334 = 147 ( x + x )a = ( x + x )x = ( x + x )z = ( x + x )z - ( x + x )_ Sched. Page Total 2163 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,354 x 0.500 Watts/sqft x 3.413 BtuhlWatt = 2,311 Occupants 1.00 x 1,354 x 250 Btuh/occ. / 200 sgft/occ. = 1,692 Receptacle 1.00 x 1,354 x 1.500 Watts/sqft x 3.413 Btuh/Watt = 6,932 Process 1.00 x 1,354 x ��0.000 Watts/sqft x 3.41 Btuh/Watt = 00 Infiltration: [ QO x $0 x 5_4 x . u 1_ o x 0 50 -/ 60] • - 37-- -=-- t-- 5.O - Schedule Air Sensible Area Ceiling Height ACH L\T Fraction ,TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 25,138 Sched. Latent Gain; Frac. Area Heat Gain Btu/hr Occupants 1.00 x 1 354 x 200 Btuh/occ. / 200 sg1t/occ. = 1 354 Receptacle 1.00 x 1 354 x 0.000 Watts/sgft x 3.41 Btuh/Watt o Process 1.00 x 1 354 x 0.000 Watts/sqft x 3.41 Btuh/Watt = 0 Infiltration:-' 1.0o x 4 840 x 1 354 x 11.10 x 0.50 / 60] 0.00433 = 2 624 Schedule Air Latent Area Ceiling Height ACH . Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,978 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 25 of 27 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #1 10/5/2004 Project Tide Date Room.Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: GREAT ROOM 78°F 115°F 37°F Conduction Area U -Value CETD-' ­- -Btu/hr-- -- X X X X X X X X X 56.0 = = = = = = = = = 1,803 35.6 1,407 37.0 9,235 37.0 1,921 4 FxdGlsWdws 19 (South) FXdGISWdW 20 (South) FxdGlsWdw 21 (West) (3) FrnchDr 22) (West) (� FxdGlsWdws (23) West 1. Design Equivalent Temperature Difference (DETD) Page Total Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC () FrnchDrs (14) (North) (.3LadG.IsWdws (15) (North) FrnchDr 16 (North) FrnchDr 17 (South) FrnchDr (18) (South) 4 FxdGlsWdws 19 (South) FXdGISWdW 20 (South) FxdGlsWdw 21 (West) (3) FrnchDr 22) (West) (� FxdGlsWdws (23) West ( 0.0x x x x x 1 + + + + + + + + + + 64.0x x x X X 15)x x x x ( 0.0x 1 16.0X 15)x ( 0.0x 1 40.0x 15)x ( 0.0x 1 40.0x 32)x ( 0.0x 1 40.0X 32)x ( 0.0 1 20.0 32)X ( 0.0 1 39.0 32) ( 0.0 1 22.8 73) ( 63.2 15 0.8 73) ( 0.0x 1 16.0X 73)x 14 367 Btu/hr 631 94 394 841 841 249 486 648 ____661 = 455 Sched. Page Total 5 300 Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,150 x 0.500 Watts/sqft x 3.413 Btuh/Watt = 1,962 Occupants 1.00 X 1,150 X 250 Btuh/OCC. / 200 sgftrocc. = 1,438 Receptacle 1.00 x 1,150 x 1.500 Watts/sgft x 3.413 BtuhNVatt = 5,887 Process 1.00 x 1,150 x 0.000 Watts/sqft x 3.413Btuhh Watt = 0 Infiltration: C QO x 80 x ,150 x 1 40 x 0_50 / 60] E -3Z = 1 Schedule Air Sensible Area Ceiling Height ACH L\T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 34434 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1 150 x 200 Btuh/OCC. / 200 sgft.occ. = 1 150 Receptacle 1.00 X 1 150 x 0.000 Watts/sgft X 3.41 Btuh[Watt = 0 Process 1.00 X 1 150 X 0.000 Watts/sgft X 3.41 Btub/Watt = 0 Infiltration: 1.0o x 4840 x F 1.15 X 11.40 X 0.50 / 60] O.00433 = 2 289 chedule Air Latent Area Ceiling Height ACH pyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,439 EnergyPro 3.1 By EnergySoft User Number: 3665 Job Number: Page: 26 of 27 RESIDENTIAL ROOM COOLING LOAD SUMMARY Peninsula Park Plan #1 10/5/2004 Project Title Date Room Name GREAT ROOM Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction Area U -Value X 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Solar Gain Orientation Area SGF (3 FrnchDrs 24 (West) ( 63.2 x 1 + (3)-tdG.IsW-dws-(25.) (West) ( 0.0 x 1 + ( x + ( x + ( x + ( x + ( x + ( x + ( x + ( x + -780F 115°F 370E C -ETD 1 Btu/hr X = X = X = X = X. - =-------- _ X = X = X = X = Page Total I o Unshaded Area x x x x x x x x x SGF ))c )x )x )x )x )x )x )x SC = = = = = = = = = Btu/hr 0.8 73)X 0.657 661 16.0 73 0.390 455 Sched. P2ge Total Internal Gain Frac. Area Heat Gain Btu/hr Lights 1.00 x 1,150 x 0.500 Watts/sgft x 3.41 BtuhlWatt = 1,962 Occupants 1.00 x 1,150 x 250 Btuh/occ. / 200 sgftrocc. = 1,438 Receptacle 1.00 x 1,150 x 1.500 Watts/sgft x 3.413 BtuhlWatt = 5,887 Process 1.00 x 1,150 x 0.000 Watt�ts/—sgftt�x 3.413�BtuhlWatt = 0 Infiltration: E 1_oo x080 x 1,150 x 11Ao x [:::o -ol / 60] E::: -37J Schedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 34,434 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 1 150 x 200 Btuh/occ. / 200 sgfWocc. = 1 150 Receptacle 1.00 x 1 150 x 0.000 Watts/sqft x 3.41 Btu i/Watt = 0 Process 1.00 x 1 150 x 0.000 Watts/sgft x 3.41 Btu -t/Watt = 0 Infiltration: 1.00 x 4 840 x 1 150 x 11.40 x 0.50 / 60] 0.0]433 = 2 289 Schedule Air Latent Area Ceiling Height ACH QW . Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,439 EnergyPro 3.1 By EnergySoft User Number. 3665 Job Number: Page: 27 of 27