Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
0308-326 (SFD)
LICENSED CONTRACTOR DECLARATION [-hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date 692234• f r' «, f +� /3 112( Date Signature of Contractor t OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the Work, end the Siluuiula is riot intondod or offored for sale (Sec. 7044; Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section , B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation .insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carrier ST.AI% FUND . Policy No. 044.02 4014314 (This section need not be completed if the permit valuation is for $100.00 or less). ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree thatifI should become subject to the workers' compensation provisions of Sectio 3700 of the Labor Code, I shall forthwith comply with those prov�ris. /Date: ✓ • �!.-•• _ Applicant;aR ze Warning: Failure to secure Workers' Compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws'relating to the building construction, and hereby authorize representatives of this City to enter upon the above-mentioned property for inspection purposes. i 'Signature (Owner/Agent) Date^'} 1<1 BUILDING PERMIT PERMIT# /// DATE ' _, / VALUATION LOT TRACT „ I,%t/tS,CIO 4 w0651 JOB SITE ADDRESS �i9��X��s�i1lTGtaZ:1Oii APN OWNER CONTRACTOR / DESIGNER / EN INFER QUARRY P.A1401 LLC C & 0 CON811'. UCTtoA1' 58.553QUARRY RA14CHR.C3AD 965NORM PSA:'='rV0yL.Ufs13UP, I:A Q7,. ITA . CA 92253 lid?1..,tilti!`D CA 91786 (909)982-9965 M6 35:19 ,�;,•i1 USE OF PERMIT . G.- SINGLEFAIVUY.T.M SYD,- 4106 SP I',FZ1f)1 rNCA LOT 4 P,F.> Y41T DOE--, IAACLUDE SLO"It: WALLSIPOOL OR VA, 2001 COC. CUSTOM CONSTRUCTION 4;106,00 S PORCHIPATIO 430.00 Sir C.l.AliAtlMAM T 566.00 ;#F ,ST. A' 1) COW OF CCMfUUC' ON 343,WWW PERMIT PRE 9UMMAR-Y CON19'1`RUCT 014 FEE 101-000-418-000 $1,493.50 PLAN C;HP.VC [`DPS: 101-000-4339-31£1 $i,221.36 FYP DEPOSIT 101,.000__4r39_31U -$1,000,00 109CHANICAI,FIXE. 101-000- 21-021-000l: JCT+IJ.0 AL it:�%Z 101-00� -420-0011 ir4:. PI,UMHfM0 YKE 101-.000-4105 -000 'S201.50 S TR(YRQ,NIi3`f'ION PEE• - PT -,31 D '101-00U-241-000 534:36 CIPA.>DING FEE, 101-000-423-000 $15.08 DWELOPPER IMPACT FEZ W05-00 .ART IN PUBLIC PLACES - °R S1E 270-000-44.5-0100 $355.4? .T� S' co, "C11.014 AXSMPUX 1CHEX Q $6,;,14.2.22 -$11000100 LESS 11MEE-PAW ATAS r MAR 26 200 ' I?� RMULIES DU OW CITY OF LA QUINTA FINANCE DEPT. RECEIPT DATEyT y f^ J/ i �, BY•�� DATE FINALED INSPECTOR INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs _ 11 _ Underground Ducts Forms & Footings q _ Ducts Slab Grade Return Air Steel Combustion Air Roof Deck j Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wali Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final BLOCKWALL APPROVALS POOLS - SPAS steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines _ Heater Final Water Piping Plumbing Top Out �/ �/ _ 7_ Q q Plumbing Final Equipment Enclosure Shower Pans OX for Finish Plaster Sewer Lateral Sewer Connection Gas Piping _ /Z% Pool Cover Encapsulation Gas Test Appliances Final Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) COMMENTS: CITYOF LA QUINTA BUILDING -A SAFETY DEPARTMENT OF ! 777-7012 "'INSpEC1TION REQUEST LINE 777-7153 -.... , Owner QUA-2Rx=:RANCH LLC Contractor C & G CONSTRUCTION Permit Number 0308-326 POST ON JOB IN CONSPICUOUS PLACE INSPECTOR MUST SIGN ALL APPLICABLE SPACES - JOB ADDRESS 58-553 QUARRY RANCH ROAD SFD- 4106 SF RESIDENCE, LOT 4 PERMIT DOES i NOT INCLUDE BLOCK WALLS/POOL OR SPA. 200; CBC. t TYPE OF INSPECTION DATE INSPP, TEMPORARY POWER _ SETBACKS U/G PLUMBING / WASTE U/G ELECTRICAL / GROUNDING FOOTINGS / STEEL 9 6p 414 1 CONCRETE SLAB I DO NOT POUR CONCRETE UNTI AB VE SIGNED ROOF NAIL / PRE -ROOF OKAY TO WRAP jZ i7 b FRAMING COMBINATION ROUGH ELECTRIC ROUGH PLUMBING o ROUGH MECHANICAL INSULATION Act S •OS COVER NO WORK UN I L.ABOVSIGNED INTERIOR GYP. BD. DRYWALL Z EXTERIOR LATH 13 GAS TEST SEPTIC ABANDONMENT SEWER CONNECTION ! SEPTIC / GREASE INTERCEPTOR MASONRY INSPECTIONS f FOOTINGS / STEEL BOND BEAM i POOL / SPA / WATER FEATURE INSPECTIONS PRE-GUNITE / SETBACKS U/G PLUMBING U/G GAS U/G ELECTRICAL PRE -PLASTER (ALARMS/ BARRIERS), FINAL INSPECTIONS 1 TEMP. USE OF PERMANENT POWER i ELECTRICAL PLUMBING I MECHANICAL PUBLIC WORKS DEPARTMENT f COMMUNITY DEVELOPMENT DEPT. FINAL / JOB COMPLETED I ABOVE APPROVALS DO NOT INCLUDE RIGHT TO TURN ON UTILITIES OR OCCUPY BUILDING CERTIFICATE OF COMPLIANCE J�1Ft�sc Desert Sands Unified School District 47950'Dune Palms Road ¢ BERMUDA DUNES Date 3/26/04 La Quettaf 92CA 253 - V) RANCHO MIRAGE (Z INDIAN WELLS 760 1-851 5 PALM DESERT No. 25737 77�� LA QUINTA � •.QINDIO y� 0 Owner Quarry Ranch,LLC APN # 766-060-002 Address 1...58-553, Quar y Ranch-Rd-� Jurisdiction La Quinto City - La Quinta • - Zip 92253" Permit # 0308-326. F Tract # 30651 Study Area Type Single Family Residence No. of Units 1 Lot # No. Street S.F. Lot # No. Street S.F. Unit 1 4 58553 Quarry Ranch 4106 Unit 6 Unit 2 Unit 7 , i Unit 3 Unit 8 Unit 4 Unit 9 Unit 5 Unit 10 Comments , { At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patios/walkways, residential additions under 500 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooking, eating or sanitation) or replacement mobile homes. It has been determined that the above-named owner is "exempt from paying school fees at this time due to the following reason: EXEMPTION NOT APPLICABLE This certifies,that school facility fees imposed pursuant to Education Code Section 17620 and Government Code 65995 Et Seq. in the amount of $2.24 X 4,106 S.F. or $9,197.4 have been paid for the property listed aboye and that building permits and/or Certificates of Occupancy for this square footage in this proposed projectmay now be issued. Fees P¢iid;By CC/Pacific Western Bank-Mike Reed Check No. 209400 _ , Name on the check Telephone 909-816-7634 • Funding Residential By Drporis Wilson Superintendent' ; Fee collected /exempted by Yolanda Garcia. Payment. Recd $9,197.44 Over/Under Signature NOTICE: Pursuant to Government Code Section 66020(d)(1), this will serve to notify you that the 90 tlay aroval period -n which you may protest the fees or other payment identified above will begin to run from the date on which the building or installation permif&thoject is issued, or from the date on which those amounts are paid to the District(s) or to another public entity authorized to collect them on the Distil6fayi;Sgtialf, whchever is earlier. NOTICE: This Document NOT VALID if Dupl`ted Embossed Original - jauittiing Department/Applicant Copy - Applicant/ReceO`Z4- y Accounting �r RECORDING REQUESTED BY: Fidelity National Title Company Escrow No. 5534 -CAH Title Order No. 9771087 When Recorded Mail,Document and Tax Statement To: Mr. Robert E. Geddes 15452 Bayside Lane Huntington Beach, CA 92647 020-015 ®®C W2®�2-3L®�69 03/01/2002 08:004 Fee:13.00 Page 1 of 3 Doc T Tax Paid Recorded in Cfficial Records County of Riverside Gary 1_ • Orso Assessori County Clerk $ Recoi-dew I lilill iiiiii 1111 11ilil 111ii 111ii iiiiii ill iiiii 11il Iiii L. M $ U PAGE SIZE DA "Co. NOCOR SMF misc. 0 A R L COPY LONG REFUND NCHG EXAM NT DEED .,ter , r,-1 -- ufyc rvn nc,-Unvcn a vac The undersigned grantor(s) declare(s) Documentary transfer tax is $7,700.00 [ X I computed on full value of property conveyed, or [ I computed on full value less value of liens or encumbrances remaining at time of sale, [ I Unincorporated Area City of La Quinta LT AG FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, La Quina Ranch, a California General Partnership _ hereby GRANT(S) to Quarry Ranch, LLC the following described real property in the City of La Quinta County of Riverside, State of California: SEE EXHIBIT ONE ATTACHED HERETO AND MADE A PART HEREOF DATEDs February 27, 2002 STATE OF CALIFORNIA COUNTY OF Riverside ON 2-28-02 before me, Catherine A. Hammons personally appeared Richard J. Meyer -------------------- ------------------------------- personally known to me (-or provis o4-5-a1+douso) to be the person(s).'whose name(is/ a subscribed to the within instrument and` acknow edged to me tha�Ee)she/they executed the same in is er/their authorized capacity(ies), and that byis/ er/their signature(s) on the instrument the person(s), or the entity --upon behalf of which the person(s) acted, executed the instr ment.' Witness my hand "nd offj ial sal. Signature La Qui w Richard J. Meyer, General 'artner C '�� • ��♦31•its?,�, MAIL TAX STATEMENTS AS DIRECTED ABOVE FD -213 (Rev 7/96) GRANT DEED `'. nl. a Government Code 27361.7 I certify under the penalty of perjury that the notary seal on this document read as follows: Name of Notary: Catherine A. Hammons Date Commission Expires: 04/15/04 County where bond is Filed: RIVERSIDE Commission No.: 1258348 Manufacturer/Vendor No.: NNA1 Place of execu o - Newport Beach Date - March 1, 2002 FIDELITY NAT NAL TITLE COMPANY IIIUIIIIVIIItlllllglllllllllllllllllflllllllllllllll /2002 /< Order No. 9771087 - A EXHIBIT "ONE" Those portions of the North one-half of Section 29, Township 6. South, Range .7 East, San Bernardino Meridian, in the City of'La Quinta, County of Riverside, State of California, according to the official plat of said land filed in the District Land Office, Icing Southerly of the land described in- that certain -deed to the United States of America, re.:orded July 28, 1966 as Instrument/File No. 77234 of Official Records, in the office of the County Recorder of said County. Excepting therefrom that portion included Within Tract No. 27728, as per map recorded in Book 249, Pages) -1 through 13 of Maps, in the office of said County Reorder. The hereinabove described property being more particularly described as fallows: Beginning at the Easterly one-quarter corner of said Section 29; thence along the Southerly line of said North one-half of Section 29 South 88° 08' 50" West 3674.O9 feet to the most Southeasterly corner of said Tract No. 27728; thence leaving said Southerly line, along the boundary line of said tract through the following courses: North 00° 20' 13" West 441.64 feet; thence North 890 38' 32" East 1032.28 feet; thence North 850 38' 07" East 972.07 feet; thence North 00° 20' 13" West 990.81 feet to an angl3 point in said boundary line and a point hereinafter referred to as Point "A"; thence North 89° 39' 47" East 668.45 feet to the beginning of a tangent curve concave Northerly and having a radius of .1030.00 feet; thence along said curve Easterly 396.56 feet through a central angle of 220 03' 34" to the Southerly line of said land described in the deed to the. United States of America; thence leaving said boundary line of Tract No. 2772$, along said Southerly line South 630 00' 13" East 265.26 feet to the beginning of a :arigent curve therein concave Southerly and having a radius of 1590.00 feet; thence along said curve and Southerly line Southeasterly 466.81 feet through a central angle of 160 49' 17" to the Easterly line of said Section 29; thence along said Easterly line South 00+° 20' 13" East 1017.99 feet to the point of beginning. IAgNI�INI�IhIII��IINqIWINIIpNNu � `°��'"` w _ WEI-PEI STRUCTURAL ENGINEERS, INC. Structural/Seismic/Forensic- q ` .93.1 W. Holt Blvd., Suite D4, Ontario, CA 91762 Tel: (909) 937-0122 Fax: (909) 937-0120 _ Marcli 15, 2004 ` - To: Ms. Molly, Goecke, . MAI-West = 620 Newport Center, Dr., #120 Newport Beach, CA 92660 Fax: 049-717-3080 _ ` Re: Review roof truss calculations for Muir Villa at the Quarry Ranch Project - - (S.FR.)" at the Quarry of La Quinta, La Quinta, CA. WPSE Job No.: 3050MUIR 58-553 w�2`T >-D -. Dear Ms.. Goecke,: Per your request, we have reviewed truss calculations prepared for the captioned S.F.R. by Structural Components (Mitek Industries) stamped and signed by Robert Anderson dated 3/9/04. No exceptions are taken. - _Thank you and appreciate the continued opportunity to provide service to your ; organization: Sincerely, r y WEI PEI STRUCTURAL ENGINEERS, INC. - Wei Pei, P.E:, S.E. ��FESSIONq� - ; President _. 0 32 LLJ (_ J =Y: CITY OF LA QUINTA_BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION _ DATE B a - _ We can not control earthquakes, but we are able to handle them better. _ , CERTIFICATE OF FIELD_VERIFICATION &..DUGNOSTLC TESTING (Page I of 2) CF4R Project Address I Lot 41 Builder / Installer Name _ 58-553 Quarry Ranch Rd. / La Quinta / CA / 92253 Ram Development Builder / Installer Contact Telephone Plan Number Glenn Eckstrom NULL Lot 4 , HERS Rater Telephone- Sample Group Number Michael Willeef6rd =-CIHIElEIR(S®-ID 7608363789 -O #C-GNMW 263496 Compliance Method (Prescriptive) Climate Zone 15 Certifying Signature ate Sample House Number- Lot 4 i Firm HERS Provider Guthy - Renker CIHIE(EIR(SO Address i City/State/Zip 41Y=550 -Eclectic palm Desert /CA /92260- — - Copies to: BUILDER, HERS PROVEDERAND-BUII,DING_DEPARTMENT HERS RATER COMPLIANCE STATEMENT This house was: ✓ Tested As the HERS rater providing diagnostic testing and field verification Lcertify that the houses identified on this form comply with the diagnostic tested compliance requirements as checked on this form ✓ The installer has provided a copy of CF -6R (Installation Certificate). f a . 'l! ✓ Distribution system is fully ducted (.i.e.idoe�s of use building,cavities`as plenums or'platform returns in lieu of ducts). ti t ✓ Where cloth backed, rubber adhesive duct -tape is installed, mastic.and drawbands are used'in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections:�_� �( MINIMUM REQUIREMEr Duct Diagnostic Leakage Testi System # 1 FOR DUCT LEAKAGE REDUCTION -COMPLIANCE CREDIT Results (Maximum 6% Duct Leakage) Duct Pressurization Test Results (CFM @ 25 Pa) Measured Values Test Leakage Flow in CFM 40 If fan flow is calculated as 400cfin/ton x number of tons enter calculated value here If fan flow is measured enter measured value here Leakage Percentage (100 x Tested Leakage /Fan Flow) = 5.0 Check Box for Pass or Fail (Pass --6% or less) System # 2 Duct Pressurization Test Results (CFM @ 25 Pa). Measured Values Test Leakage Flow;in CFM— ;68' If fan flow is.calculated as'400efm/to6 x number of tons enter calculated value }fere , If favi flow is measured enter measured value here Leakage Percentage (100 x Tested Leakage / Fan Flow) = 4.8 Check Box for Pass or Fail (Pass --6% or less) ✓ Pass ❑ Fail ✓ Pass ❑ Fail Residential Compliance Forms Generated by CIH(EIEIRIS© http://www.CHEERS.org August 2001 'System # 3 `. ... Duct°Pressurization Test Results(GFM @ 2.5 Pa) Measured Values • = Test Leakage Flow in CFM 102 "If'fan•flow is calculated as-400cfm%ton x number oftons enter calculated value -here ' If fan flow is measured enter measured value here ' Leakage Percentage (100 x Tested Leakage / Fan Flow) .= 5.1 k - = CheekBox_fbrPass_or-.EaiI_(Pa§s=6%o-or--less) ✓ Pass 0 Fail System # 4 ` Duct Pressurization Test Results (CFM @ 25 Pa) • Measured Values ' Test Leakage Flow in CFM 96 " ` If fan flow is calculated as 400cfm/ton x number of tons enter calculated value here ' If fan flow is measured,enter measured value here • c'' Leakage Percentage (100 z Tested,Leaakage / Fan Flow) _ 4.8 Check Box -for Pass or,Fail (Pass=6 /o or less) Pass 0 Fail • ✓THERMOSTATIC EXPANSION VALVEt(T ,,� , . � _ ' • System# 1 ✓ Yes 0 No Thermostatic Expansion Valve_�s installed and Ac�oe�s is provided for '✓ Pass Cl Fail inspectionl ? System # 2 ✓ Yes ❑ No�.icxpansion Valve is installed d Access is provided for ✓ Pass 0 Fail inspection. ��� •-,�.......-� ]System # 3 * ✓ Yes 0! ❑ No _ Thermostat cExpansion Valve is installed d Access is provided far ✓ Pass 0 Fail �' ._ ' • inspection. System # 4 z ,}� j . ✓ Yes r , 0 No Thermostatic -Expansion Valve is installed and Access is provided for ✓ Pass 0 Fail • �, inspection. i 6 ` • _ %_ Residential Compliance Forms ' Generated by CJHJEJEJRJS® http://www.CHEERS.org August 2001 CERTIFICATE OF FIELD VERIFICATION& DIAGNOSTIC • TESTING(age 2 of 2) CF-4It Project. Address I Lot 4 I 58-553 Quarry Ranch Rd. / La_Quinta / CA / 92253 =Builder / Installer Name 'tam Development ` 'System # 3 `. ... Duct°Pressurization Test Results(GFM @ 2.5 Pa) Measured Values • = Test Leakage Flow in CFM 102 "If'fan•flow is calculated as-400cfm%ton x number oftons enter calculated value -here ' If fan flow is measured enter measured value here ' Leakage Percentage (100 x Tested Leakage / Fan Flow) .= 5.1 k - = CheekBox_fbrPass_or-.EaiI_(Pa§s=6%o-or--less) ✓ Pass 0 Fail System # 4 ` Duct Pressurization Test Results (CFM @ 25 Pa) • Measured Values ' Test Leakage Flow in CFM 96 " ` If fan flow is calculated as 400cfm/ton x number of tons enter calculated value here ' If fan flow is measured,enter measured value here • c'' Leakage Percentage (100 z Tested,Leaakage / Fan Flow) _ 4.8 Check Box -for Pass or,Fail (Pass=6 /o or less) Pass 0 Fail • ✓THERMOSTATIC EXPANSION VALVEt(T ,,� , . � _ ' • System# 1 ✓ Yes 0 No Thermostatic Expansion Valve_�s installed and Ac�oe�s is provided for '✓ Pass Cl Fail inspectionl ? System # 2 ✓ Yes ❑ No�.icxpansion Valve is installed d Access is provided for ✓ Pass 0 Fail inspection. ��� •-,�.......-� ]System # 3 * ✓ Yes 0! ❑ No _ Thermostat cExpansion Valve is installed d Access is provided far ✓ Pass 0 Fail �' ._ ' • inspection. System # 4 z ,}� j . ✓ Yes r , 0 No Thermostatic -Expansion Valve is installed and Access is provided for ✓ Pass 0 Fail • �, inspection. i 6 ` • _ %_ Residential Compliance Forms ' Generated by CJHJEJEJRJS® http://www.CHEERS.org August 2001 S 0 L • DATA 401-C College Avenue Santa Rosa, CA 95401 707 • 545-4440 • -ax 545-4447 ti e-mail• infoUsoldata.com bill mattinson • sarah pernula• sean plikuhn Project:. � Muir Villa Revised location: Lot 4 Quarry Ranch, La Quinta job number: 230807 designer: MAI - Marsh & Associates, Inc. date: 12/12/03 Title 24 Energy Compliance Documentation � Method of Compliance: Performance Method using Micropas6 version 6.01. This project is in compliance with the 2001 edition of the California Residential Energy Standards when built as documented in this submittal. Scope of Analysis: Revisions account for all Plan Check Comments, a smaller conditioned floor area and R-6 ductwork. The project is a new residence. Specific Requirements: (must also conform to all applicable Mandatory Measures or- Form MF -1) CLIMATE ZONE: 15 INSULATION: R-38 office ceilings and R-30 typical ceilings; R-21 at 2X6 walls; no slab edge insulation is required. SPACE HEATING: Gas fired central furnace with a minimum 80% AFUE DUCTS: All ducts R-6.0 and all supply located in the attic. AIR CONDITIONING: 12.0 SEER minimum WATER HEATING: Two 65 gallon certified gas units with Energy Factors of 0.62 The system includes a recirculation pump with temperature controls to regulate pump operation. R-4 pipe insulation must be installed at .all recirculating hot water mains in addition to the first five.feet from the water heater. THERMAL MASS: Slab floors 60 GLAZING: Pella wood framed windows and doors with LowE glazing. CEC Defaul* metal framed skylight. Actual performance valises of installed fenestration must meet or be less than the following: Type Fraise U -factor SHGC operable wood Ot39 0.28 fixed wood Q32 0.30 SGD wood 0.38 0.25 swing doors wood C.34 0.23 skylight metal C.94 0.73 Note: All fenestration must be properly labeled with NFRC or CEC Default -U -values and SHGCs. ' CITY OF LA QUINTA APPROuE�D FOR CO DATE, B 03d�'' C�_q7�_ C 9 60 1 rAr a i ,SOL* DATA' 401-C College Avenue Santa Rosa, CA 95401 16 707 * 545-4440 • fax 545-4447 e -n. ail.- info@soldata.com j bill mattinson * sarah pernula* sean plikuhn Residential Plan Check Energy Corrections date: December 12, 2003 to: City of.La Quinta from: Sarah Pernula, Sol*Data Energy Consulting project address: 58553 Quarry Ranch Road description: 4106 sq.ft SFD applicant: C & G Construction plan check #: 0308-326 J Section. G — Energy Efficiency il. Form MF -1R has been completed and is pages 6, 7 and 8 of the Energy CalculationE. 2. .Duct locations and duct insulation R -value. Duct insulation must be R-6.0 per Title :24 Energy calculations. See mech sheets for duct location. 3. Areas and orientations of glazing of plans (Glazing Calculations Table on Sheet A2.1 a) now match energy calculations (CF -1R pages 1, 2 and 3 and C -2R, pages 11 and 12), floor plan and. portion 8 Window & Shutter Elevations on Sheet 10.1. 4. Conditioned floor area as listed in energy calcs (CF -1R page 1 and C -2R page 9) naw matches area as shown on Sheet A0.1, General Notes, M. (4106 sf). 5. See Glazing Calculations Table on Sheet A2.la for area of glazing, U -factors and Energy Calculation Fenestration Number reference. 6. same as Section — D Mechanical 1). Zonal control details. a) see mech sheets for HVAC location b) see mech sheets for thermostat location c) see mech sheets for supply ducts & register locations d) see mech sheets for return ducts & register locations l responses to Note: The entry and laundry do qualify as being parrof the sleeping zone based on the definition of Habitable Room on page 8-18 of the Residential Manual and the dfiscussion of serving non - habitable rooms Example 8-6 on page 8-19 of the Residential Manual. The entry nonclosable opening is a the junction of Hall 019 and Hall 024, on the same plane as glazing K and -the washer and dryer, where the doorway is 4' x 9.5' or 38 sf. Laundry and Hall 019 are served_ in the master suite zone per preliminary mechanical plans. 7. Floor coverings are now noted in each room on Sheet A2.la as well as Room Finish Schedule on Sheet Ai0.1. Credit is taken for slab on grade floors with hard surface coverings such as--leramic tile and quarry tile are listed in the energy calcs (CF -1R page 3 and C -2R page 13). 8.- Glazing products manufacturer's cut sheets are located in energy calculation document after the zonal control pages from the Residential Manual and before the GAMA documentation for the furnaces. They are for Pella windows, sliding doors and swing doors. The skylight does not have NFF_C documentation. 9. See elec sheets for fluorescent general -lighting in kitchen. General lighting in kitcl_ens must be energy efficient (fluorescent). This is a Mandatory Requirement. 12/12/03 plan check #:0308-326 Sol*Data Energy Consulting (707) 545-4440 Page.1 of 2 10. See elec sheets for fluorescent lighting in rooms containing a. shower or bathtub. Lighting in the room containing a shower or bathtub must be energy efficient (fluorescent). This is a Mandatory Requirement. There is an alternative to the bathroom lighting requirement when efficient lighting isi, installed, at other locations in the house. 12/12/03 plan check #:0308-326 Sol*Data Energy Consulting (707) 545-4440, Page 2 of 2 TABLE'OF CONTENTS TOC Project Title...'....... Muir Villa Revised Date..12/12/03 14:35:03. Project Address........ Lot 4 Quarry Ranch ******* --------------------- La Quinta *v6.01*' I I Documentation Author... Sarah Pernula ******* I Building Permit # I, SOL*DATA' I 1 401-C College Avenue'' I Plan CEeck / Date.I Santa Rosa, CA 95401 ` 1707-545-4440 y 1 Field Check/ Date;1 Climate Zone.`........... 15 --------------------- Compliance Method...... MICROPAS6 x6.01 for 2001 Standards by Enercomp, Inc. ___________________________________________________________ 1 MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -TOC 1 1 User#-MP0817" User-SOL*DATA Run-Villa'3"Revised 1 t TABLE OF CONTENTS• ----------------- Report Page FORM CF=1R............ 1 FORM MF -1R .................. 6 FORM C -2R ................. 9 FORM C -3R ................ 16 f HVAC SIZING ............... 17 • CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title .......... Muir Villa Revised Date..12/12:/03 14:35:03 Project Address........ Lot 4 Quarry Ranch ******* --------------------- La Quinta *v6.01* I I Documentation Author... Sarah Pernula ******* I Building Permit # I SOL*DATA I I 401-C College Avenue I Plan Check / Date I Santa Rosa, CA .95401 I I 707-545-4440 I Field Check/ Date I Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc. ------------------------------- I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM CF -1R I I ---------=--------------------------------------------------------------------- User#-MP0817 User-SOL*DATA. Run -Villa 3 Revised GENERAL INFORMATION ------------------- Conditioned Floor Area..... 4106 sf Building Type........:..... Single Family Detached Construction Type ......... New Building Front Orientation. Front Facing 15 deg (N) r Number of Dwelling Units... 1 Number of Stories.......... 1 Floor Construction Type.... Slab On Grade Glazing Percentage...,:....,. 21.5 % of floor -area Average Glazing U -factor... 0.37 Btu/hr-sf-F Average Glazing SHGC....... 0.3 Average Ceiling Height..... 12.3 ft BUILDING SHELL INSULATION Component Frame Cavity Sheathing Total Assembly Type Type R -value R -value R -value U -factor Location/Comments 'Wall Wood R-21 R-n/a R-21 0.059 2X6 typical- ypicalRoof Roof Wood R-30 R-n/a' R=30 0.031 typical SlabEdge None R-0 R-0 F2=0.760 edge to exteri Wall Wood R-13 R-0 R-13 0.082 to garage P Roof Wood R-38 R-n/a R-38 0.024 offices attic . SlabEdge None R-0 R-0 F2=0.510 edge gar/util Door None R-0 R-0 R-0 0.330 to garage to utility room Wall None R-0 R-0 R-0 20.000 non -closable opening Wall WoodR-0 R-0 R-0 0.293 dividing wall FENESTRATION Over - Area U-, Interior Exterior hang/ Orientation (sf) Factor SHGC Shading Shading Fins -------------------= Skylight ----- ------ --------------------- Horz 11.1 0.940 0.730 None -------------- None ----- None Door Front (N) 40.0 0.340 0.230 Standard Standard None Window Front (N) 22.0 0.320. 0.340 Standard Standard None Window Front (N) 16.5 0.390 0.300 Standard Standard None ` CERTIFICATE OF ------------------------------------------------------------------------------- COMPLIANCE: RESIDENTIAL Page 2 CF -1R ------------------------------------------------------------------------------- Project Title.......:.. Muir Villa Revised Date..12/12'03 14':35:03 MICROPAS6 x6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM CF -1R I -------------------------------------=----------------------------------------- User#-MP0817 User-SOL*DATA Run -Villa 3 Revised FENESTRATION ------------ Over- Area. U- Interior Exterior hang'/ Orientation (sf) Factor SHGC Shading Shading Fins -------------------- Window Front (N) ----- 1.8. ------ 0.320 ------ 0.340 --------------- Standard -------------- Standard_ ----- None Window Front (N) 11.0 0.390 0.300 Standard Standard None, Window Front (N) 16.5 0.390 0.300 Standard Standard None Window Front (N) 16.5 0.390 0.300 Standard Standard None Window Front (N) 4.0 0.320 0.340 Standard Standard None Window Front (N) 4.0 0.320 0.340 Standard Standard. None Window Front (NE) 17.0 0.320 0.340 Standard Standard None Window Left (E) 76.0 0.320 0.340 Standard Standard None Window Left (E) 4.0 0.320 0.340 Standard Standard None Window Left (E) 16.5 0.390 0.300 Standard Standard None Window Left (E) 4.0. 0.320 0.340 Standard Standarc None Window Left (E) 4.0 0.320 0.340 Standard Standard None Window Left (E)• 11.0 0.390 0.300 Standard Standard None Window Left (E) 11.0 0.390 0.300 Standard Standard None, Window Left (E) 4.0 0.320 0.340 Standard Standard None Window •Left (E) 4.0 0.320 0.340 Standard Standard None Window Left (SE) 12.0 0.320 0.340 Standard Standard None Window Left (SE) 22.0 0.390 0.300 Standard Standard None. Window Back (S) 1.8 0.320 0.340 Standard Standard None Door Back (S) 96.0 0.380 0.250 Standard Standard None Door Back (S) 40.0 0.340 0.'230 Standard Standard None Window Back (S) 16.5 0.390 0.300 Standard Standard None Window Back (S) 16.5 0.390 0.300 Standard Standard None .Window Back (S) 9.0 0.320 0.340 Standard Standard None Window Back (S) 9.0. 0.320 0.340 Standard Standard None Window Back (S) 12.0 0.320 0.340 Standard Standard None Window Back (S) 22.0 0.390 0.300 Standard Standard None Window Back (S) 22.0 0.390 0.300 Standard Standa_d None Window Back (S) 16.5 0.390 0.300 Standard Standa-d. None Door Back (S) 40.0 0.340 0.230 Standard Standa_d -None Window Back (S) 16.5 0.390 0.300 Standard Standard None Door Back (S) 40.0 0.340 0.230 Standard Standard None Window Back (SW) 12.0 0.320 0.340 Standard Standard None Window Back (SW) 22.0 0.390 0.300 Standard Standard None Window Right (W) 12.0 0.320 0'.340 Standard Standard None Window Right (W) 22.0 0.390 0.300 Standard Standard None Window Right (W) 16:5 0.390 0.300 Standard Standard None 'Window Right -(W) 16.5 0.390 0.300 Standard Standard None Window Right (W) 4.0 0.320 0.340 Standard Standard None Window Right (W) 4.0 0.320 0.340 Standard Standard None Window Right (W) 16:5 0.390 0.300 Standard Standard None Window Right (W) 16.5 0.390 0.300 Standard Standard None Window Right (W) 16.5 0.390 0.300 Standard Standard None Window Right (NW) .12.0 0.320 0.340 Standard Standard None CERTIFICATE OF COMPLIANCE: RESIDENTIAL ------------------------------------------------------------------------------- Page 3 CF -1R Project Title.......... Muir Villa Revised Date..12/12103 14:35:03 I' MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM CF' -1R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised FENESTRATION ------------ Over- Area U- Interior Exterior hang/ Orientation (sf) Factor SHGC Shading., Shading Fins } Window Right (NW)' 22.0 0.390 0.300iStandard• Standard None Window Left (E) 1.8 0.320 0.340 Standard Standard None SLAB SURFACES ------------- Area Slab Type (sf) Standard Slab 1164 Standard Slab 415 THERMAL MASS Area Thickness Type Exposed (sf) ..Ain) Location/Comments SlabOnGrade Yes, 163 3.5 024 hall ceramic SlabOnGrade Yes 29 3.5 034 powder ceramic SlabOnGrade Yes 116 3.5 037 hall ceramic SlabOnGrade Yes 79 3.5, 039 bathroom ceramic SlabOnGrade Yes, 27 3.5 040 toilet ceramic SlabOnGrade Yes 27 3.5 044 shower ceramic SlabOnGrade No 741 3.5. covered slab SlabOnGrade Yes 19 3.5 007 toilet ceramic SlabOnGrade Yes 120 3.5 010 bathroom ce=amic SlabOnGrade Yes 22 3.5 013 shower ceramic SlabOnGrade Yes 22 3.5 015 toilet ceramic SlabOnGrade Yes 78 3.5 019 hall ceramic SlabOnGrade Yes 91 3.5 020 entry quarry SlabOnGrade Yes 125 3.5 023 utility ceramic SlabOnGrade No 808 3:5 covered slab HVAC SYSTEMS Refrigerant ------------ Tested ACCA Equipment Minimum Charge and Duct Duct Duct Manual Thermostat Type Efficiency Airflow Location R -value Leakage D Type ------------------------ Furnace 0.800 ------- AFUE ------------------ n/a Attic R-6 ------- ------ No Po ---------- LivingSta ACSplitTXV 12.00 SEER Yes Attic R-6 No - No LivingSta Furnace 0.800 AFUE n/a Attic R-6 No No LivingSta . ACSplitTXV 12.00 SEER Yes Attic R-6 No :.lo LivingSta Furnace 0.800 AFUE - n/a Attic- R-6 -No 90 SleepingS ' CERTIFICATE 0'F COMPLIANCE: RESIDENTIAL' Page 4 CF-1R --------------------------------=---------------------------------------------- ------------------------------------------------------------------------------- Project Title.....:.... Muir Villa Revised Date..12/12,'03 14:35:03 I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM CF -1R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised ------------------------------------------------------------------------------- HVAC SYSTEMS WATER HEATING SYSTEMS Number Tank External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gale R -value ------=----- ----------- ------------------- ---------=---- ------ ---------- Storage Gas Recirc/Temp 2 0.62 65 R- n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a Zonally Controlled HVAC System. This building incorporates a High Mass Design. This building incorporates non-standard Duct R -value. This building incorporates either Tested Refrigerant Charge and Airflow (RCA) or a Thermostatic Expansion Valve (TXV) on the specified air conditioning system(s). This.building incorporates non-standard Water Heating System HERS REQUIRED VERIFICATION *** Items in -this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -6R installation certificate. *** This building incorporates either Tested Refrigerant Charge and _airflow (RCA) or a Thermostatic Expansion.Valve (TXV) on the specified air conditioning system(s). If a cooling system is not installed, then HERS verification is not necessary for the RCA or TXV. Refrigerant Tested ACCA Equipment Minimum Charge and Duct Duct' Duct Manual Thermostat Type Efficiency Airflow Location R -value Leakage D Type ACSplitTXV 12.00 SEER Yes Attic R-6 No No SleepingS Furnace 0.800 AFUE n/a Attic R-6 No No SleepingS ACSplitTXV, 12:00 SEER Yes Attic R-6 No No SleepingS WATER HEATING SYSTEMS Number Tank External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gale R -value ------=----- ----------- ------------------- ---------=---- ------ ---------- Storage Gas Recirc/Temp 2 0.62 65 R- n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a Zonally Controlled HVAC System. This building incorporates a High Mass Design. This building incorporates non-standard Duct R -value. This building incorporates either Tested Refrigerant Charge and Airflow (RCA) or a Thermostatic Expansion Valve (TXV) on the specified air conditioning system(s). This.building incorporates non-standard Water Heating System HERS REQUIRED VERIFICATION *** Items in -this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -6R installation certificate. *** This building incorporates either Tested Refrigerant Charge and _airflow (RCA) or a Thermostatic Expansion.Valve (TXV) on the specified air conditioning system(s). If a cooling system is not installed, then HERS verification is not necessary for the RCA or TXV. CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF -1R Project Title........... Muir Villa Revis"ed Date..12/12,'03 14:35:03 I •MICROPAS6 v6.01. File-MUIRREVF Wth-CTZ15S92 Program -FORM CF -1R I User#-MP0817. User-SOL*DATA Run -Villa 3 Revised el REMARKS COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title724, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall' design responsibility. When this certificate of comp -fiance is submitted for a single building plan to be built in multiple orientations, any "shading feature that is varied is indicated in the Special Features Modeling Assumptions section." DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Paul Anderson Name.... Sarah Pernula Company. Marsh & s-sociates, Inc. Company. SOL*DATA Address. 620 Ne port) Ctr br..120 Address. 401-C College Avenues Newpo Bealch, CA 92660 Santa Rosa, -CA 954,01 Phone... 949 17-3077 �7 Phone... 707-54.5-4440 License. !i Signed.. _ `7i (lJ '�j Signed.. (date) date)' ENFORCEMENT AGENCY' Name — '. Title... ' Agency.. Phone... Signed.. (date) a I MANDATORY MEASURES'CHECKLIST: RESIDENTIAL Page 6 MF -1R Project Title.......... Muir Villa Revised Date..12/12,'03 14:35:03 Project Address.:...... Lot 4 Quarry Ranch ******* --------------------- La Quinta *v6.01* I I Documentation Author... Sarah Pernula ******* I Building Permit #,.I SOL*DATA I I 401-C College Avenue I Plan Check / Date I Santa Rosa, CA 95401 I I 707-545-4440 1 Field Check/ Date I Climate Zone........... 15 -------- ------------ Compliance Method...... MICROPAS6 v6.01 for 2001.Standards'by Enercomp; Inc.. MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM ME -1R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by' all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only.. BUILDING.ENVELOPE MEASURES Design- Enforce- er ment .*150(a): Minimum R-19 ceiling insulation. 150(b)': Loose fill insulation manufacturer's labeled R -Value. *150(c): Minimum R-13 wall insulation in wood framed walls or _na_ equivalent U -factor in metal frame walls (does not apply to exterior mass walls). *150(d):_ Minimum R-13 raised floor insulation in framed floors. 150(1): Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 perm/inch. 118: Insulation specified or.installed meets insulation quality _na_ standards. Indicate type and (form. 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2.'Fenestration products (except field fabricated) have label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. 150(g): Vapor barriers mandatory'in Climate Zones 14 and 16 only,. 150(f): Special infiltration barrier installed to comply with _na_ Sec. 151 meets Commission quality standards. 150(e): Installation of Fireplaces, Decorative Gas Appliances _na_ and Gas Logs 1. Masonry and factory -built -fireplaces have: a. Closeable metal or glass door MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 7 MF -1R ------------------------------------------------------------------------------- Project Title.......... Muir Villa Revised Date..12/12.'03 14:35:03 ------------------------------------------------------------------------------- I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM MF --1R I User#7MP0817 User-SOL*DATA Run -Villa 3 Revised I ------------------------------------------------------------------------------- b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning"gas pilots allowed. SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES -------------------------------------------------------------- Design- Enforce- er. ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. 150(1): Setback thermostat on all applicable heating and/or cooling systems. 150(j): Pipe and Tank insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance. of R-12 or greater. 2. First 5 feet of pipes closest to water heater tank, non - recirculating systems, insulated (R-4 or greater). 3. -Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have -R-12 external insulation or R-16 combined internal/external insulation. 4. All buried or exposed piping insulated in recirculating sections of.hot water system. 5. Cooling system piping below 55 degrees insulated. 6. Piping insulated between heating source and indirect. hot water tank. *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and in- sulated, to meet the requirements of the 1998 CMC sections 601, 603, and 604, and standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system that meets the applicable requirements of UL181, UL181A, or UL181B. If mastic or tape is used to seal openLngs greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be -sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combinaticn with, mastic and drawbands. 2. Exhaust fan systems have backdraft or automatic dampers. 3. Gravity.ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. 114: Pool and Spa Heating Systems and Equipment 1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 8 MF -1R Project Title.......... Muir Villa Revised Date..12/12;03 14:35:03 ------------------------------------------------------------------------=------- ------------------------------------------------------------------------------- MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM MF -1R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised I ------------------------------------------------------------------------------- resistance heating and no pilot light. 2. System is installed with: a. At least,36 inches of pipe between filter and heater, for future solar heating. b. Cover for outdoor'pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr). LIGHTING MEASURES ----------------- Design- Enforce- er ment 150(k)l: Luminaires for general lighting in kitchens shall have lamps with an.efficacy of 40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an entrance to the kitchen. 150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40. lumens/watt or greater switched at the entrance to the room or one of the alternatives to this requirement allowed in Sec. 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. COMPUTER METHOD SUMMARY Page 9 C=2R Project Title.......... Muir Villa Revised Date...12/12:103 14:35:03 Project Address........ Lot 4 Quarry Ranch ******* --------------------- La'Quinta *v6.01* I I Documentation Author.'.. Sarah Pernula ******* I Building Permit # I SOL*DATA I I 401-C College Avenue I Plan Check / Date 1, Santa Rosa, CA 95401 I I 707-545-4440 1 Field Check/ Date I Climate Zone:........... 15 --------------------- Compliance Method...... MICROPAS6.v6.01 for 2.001 Standards by Enercomp, Inc. I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM C -2R I 1 User#-MP0817 User-SOL*DATA Run -Villa 3 ------------------------------------------------------------------------------- Revised 1 = MICROPAS6 ENERGY USE SUMMARY = "Energy Use ---------------------------- Standard Proposed Compliance = _ (kBtu/sf-yr) Design Design Marg_n = = Space Heating.......... 3.75 3.32 0.43 = - Space Cooling ........... 39.36 37.73 1.53 = _ Water Heating. ....... 6.94 7.58• -0.664 = = Total 50.05 48.63 1.42 = *** Building complies with Computer Performance **} GENERAL INFORMATION Conditioned Floor Area..... 4106 sf Building Type...... Single Family Detached Construction Type ......... New Building Front Orientation. Front Facing 15 deg (N) Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... ReducedYear Floor Construction Type.... Slab On Grade Number of Building Zones.... 4 Conditioned Volume........: 50471 cf Slab -On -Grade Area......... 4106 sf Glazing Percentage......... 21.5 % of floor area Average Glazing U -factor..., 0.37 Btu/hr-sf-F Average Glazing SHGC....... 0.3 Average Ceiling Height..... 12.3 ft COMPUTER METHOD -SUMMARY Page 10 C -2R Project Title ........... Muir Villa Revised Date..12/1203 14:35:03 I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ.15S92 Program -FORM C -2R User#-MP0817 User-SOL*DATA Run -Villa 3 Revised ----------------------------------------------------------------------------- BUILDING ZONE INFORMATION Floor ------------------------- # of Vent Vent Air Area Volume Dwell Cond- Thermostat Height Area Leakage Zone Type '(sf) (cf) Units itioned Type (ft) (sf)• Credit 1LVGDNGK Living 1164 17000 0.50 Yes LivingStat 2.0 Standard No 20FFICES Living 1182 11820 .0.50 Yes LivingStat 2.0 Standard No 3ENTRYMS Sleeping 1285 15425 0.00 Yes SleepingStat 2.0 Standard No* 4GUEST Sleeping 475 6226 0.00 Yes SleepingStat 2.0 Standard No OPAQUE SURFACES Area U- Insul --------------- Act Solar Form 3 location/' Surface (sf) factor R-val Azm Tilt Gains Reference Comments 1LVGDNGK 1 Wall 276 0.059 21 15 90 Yes None 2X6 typical 2 Wall 388 0.059 21 105 90 Yes None 3 Wall 60 0.059 21 150 90 Yes None 4 Wall 430 0.059 21 195 90 Yes None 5 Wall 60 0.059 21 240 90 Yes None 6 Wall 242 0.059 21 285 90 Yes None 7 Wall 60 0.059 21 330 90 Yes None 8 Roof 1164 0.031 30 n/a 0 Yes None typical 20FFICES 10 Wall 104 0.059 21 15 90 Yes None 11 Wall 130 0.082 13 15. 90 No W.13.GARAGE to garage 12 Wall 104 0.059 21 105 90 Yes None 13 Wall 68 0.059.21 195 90 Yes None 14 Wall 371 0.•059 21 285 90 Yes None 15 Roof 1182 '0.024 38 n/a 0 Yes None offices attic 3ENTRYMS 18 Wall 436 0.059 21' 15 90 Yes None 19 Wall 156 0.082 13 15 90 No W.13.GARAGE 20 Door 24 0.330 0 15 90 No None to garage 21 Wall 68 0.059 21 60 90 Yes None 22 Wall 556 0.059 21 105 90 Yes None 23 Wall 514 0.059 21 .195 90 Yes None 24 Wall 309 0.05921 285 90 Yes None 25 Roof 1274 0.031 30 n/a 0 Yes None 4GUEST 28 Wall 259 0.059 21 15 90 Yes None 29 Wall 192 0.059 21 .105 90 Yes None 30 Wall 125 0.059 21 195 90 Yes None 31 Wall 164 0.059 21 285 90 Yes None COMPUTER METHOD SUMMARY Page 11 C -2R -----------------------------------------------------------=------------------- ------------------------------------------------------------------------------- Project Title.......... Muir Villa Revised Date..12/12,.'03 14:35:03 I MICROPAS6 x6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM C -2R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised I ------------------------------------------------------------------------------- OPAQUE SURFACES Area U- Insul Act Solar Form 3 Lccation/ Surface (sf) factor R-val Azm Tilt Gains Reference Ccmments -------------- ------ ----- ---- --- ---- ----------------- ---------------- 32 Door 20 0.330 0 285 90 Yes None 33 Roof 475 0.031 30 n/a 0 Yes None PERIMETER LOSSES ---------------- Length F2 Insul Solar Surface (ft) Factor R -vat Gains Location/Comments. 1LVGDNGK 9 S1abEdge 140 0.760 R-0 No edge .to exteri 20FFICES 16 S1abEdge 77 0.760 R-0 No 17 S1abEdge 13 0.510 R-0 No 'edge gar/util 3ENTRYMS 26 S1abEdge 152 0.760 R-0 No 27 S1abEdge 18 0.510, R-0 No 4GUEST 34 S1abEdge 65 0.760 R-0 No FENESTRATION SURFACES --------------------- Area U- Act Exterior Shade Interior Shade Orientation (sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC ---------------------- ----- ----- ----- --- -------------------------------- 1LVGDNGK 2 Door Front (N) 40.0 0.340.0.230 15 90 Standard/0.76 Standard/0.68 3 Window Front (N) 22.0 0.320 0.340 15 90 Standard/0.76 Standard/0.68 21 Window Left (SE) 12.0 0.320 0.340 150 90 Standard/0.76 Standard/0.68 22 Window Left (SE) 22.0 0.390 0.300 150 90 Standard/0.76 Standard/0.68 23 Window Back (S) 1.8 0.320 0.340 195, 90 Standard/0..76 Standard/0.68 24 Door Back (S) 96.0 0.380 0.250 195 90 Standard/0.76 Standard/0.68 25 Door Back (S) 40.0 0.340 0.230 i95 90 Standard/0.76 Standard/0.68 26 Window Back (S). 16.5 0.390" 0.300 195 90 Standard/0.76 Standard/0.68 27 Window Back (S) 16.5 0.390 0.300 195 90 Standard/0.76 Standard/0.68 28 Window Back (S) 9.0 0.320 0.340 195 90 Standard/0.76 Standard/0.68 29 Window Back (S) 9.0 0.320 0.340. 195 90 Standard/0.76 Standard/0.68 30 Window Back (S) 12.0 0.320 0.340 195 90 Standard/0.76 Standard/0.68 .31 Window Back (S) 22.0 0.390 0.300 195 90 Standard/0.76 8tandard/0.68 37 Window Back (SW) 12.0 0.320 0.340 240 90 Standard/0.76 Standard/0.68 38 Window Back (SW) 22.0 0.390 0.300 240 90 Standard/0.76 Standard/0.68 39 Window Right (W) 12.0 0.320 0.340 285 90 Standard/0.76 Standard/0.68 40 Window Right (W) 22.0 0.390 0.300 285 90 Standard/0.76 Standard/0.68 48 Window Right (NW) 12.0 0.320 0.340 330 90 Standard/0.7E Standard/0.68 49 Window Right (NW) 22.0 0.390 0.300 330 90 Standard/0.7E Standard/0.68 20FFICES COMPUTER METHOD SUMMARY Page 12 C -2R Project Title.......... Muir Villa Revised Date..12/12.03 14:35:03 ------------------------------------------------------------------------------- I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM C -2R I User#-MP0817 User-SOL*DATA. Run -Villa 3 Revised ------------------------------------------------------------------------------- FENESTRATION SURFACES Area U- Act Exterior Shade Interior Shade Orientation (sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC -----------=--- ------ ----- ----- ----- --- ---- -------------- -------------- 4 Window Front (N) 16.5 0.390 0.300 15 90 Standard/0.76 St.andard/0.68 12 Window Left (E) 76.0 0.320 0.340 105 90 Standard/0.76 Standard/0.68 32 Window Back (S) 22.0 0.390 0.300 195 90 Standard/0.76 Standard/0.68 41 Window Right (W) 16.5 0.390 0.300 285 90 Standard/0.76 Standard/0.68 42 Window Right (W) 16.5 0.390 0.300 285 90 Standard/0.76 S=andard/0.68 43 Window Right (W) 4.0 0.320 0.340285 90 Standard/0.76 S-=andard/0.68 44 Window Right (W) 4.0 0.320 0.340 285 90 Standard/0.76 Sr-andard/0.68 45 Window Right (W) 16.5 0.390 0.300 285 90 Standard/0.76 Standard/0.68 46 Window Right (W) 16.5 0.390 0.300 285 90 Standard/0.76 Standard/0.68 3ENTRYMS 1 Skylight Horz 11.1 0.940 0.730 15 0 None/l None/l 5 Window Front (N) 1.8 0.320 0.340 15 90 Standard/0.76 Standard/0.68 6 Window Front (N) 11.0 0.390 0.300 15 90 Standard/0.76 :standard/0.68 11 Window Front (NE) 17.0 0.320 0.340. 60 90 Standard/0.76 Standard/0.68 13 Window Left (E) 4.0 0.320 0.340 105 90 Standard/0.76 Standard/0.68 14 Window Left (E) 16.5 0.390 0.300 105 90 Standard/0.76 Standard/0.68 15 Window Left (E) 4.0 0.320 0.340 105 90 Standard/0.76 3tandard/0.68 16 Window Left (E) 4.0 0.320 0.340 105 90 Standard/0.76 Standard/0.68 17 Window Left (E) 11.0 0.390 0.300 105 90 Standard/0.76 Standard/0.68 18 Window Left (E) 11.0 0.390 0.300 105 90 Standard/0..76 Standard/0.68 33 Window Back (S) 16.5 0.390 0.30.0 195 90 Standard/0.76 Standard/0.68 34 Door. Back (S) 40.0 0.340 0.230 195 90 Standard/0.76 Standard/0.68 35 Window Back (S) 16.5 0.390 0.300 195 90 Standard/0.76 Standard/0.68 36 Door Back (S) 40.0 0.340 0.230 195 90 Standard/0.76 Standard/0.68 50 Window' Left (E) 1.8 0.320 0.340 105 90 Standard/0.76 Standard/0.68 4GUEST 7 Window Front (N) 16.5 0.390 0.300 15 90 Standard/0.76 Standard/0.68 8 Window Front (N) 16.5 0.390 0.300 15 90 Standard/0.76 Standard/0.68 9 Window Front (N) 4.0 0.320 0.340 15 90 Standard/0.76 Standard/0.68 10 Window Front (N) 4.0 0.320 0.340 15 90 Standard/0.76 Standard/0.68 19•Window Left (E) 4.0. 0.320 0.340 105 90 Standard/0.76 Standard/0.68 20 Window Left (E) 4.0 0.320 0.340 105 90 Standard/0.76 Standard/0.68 47 Window Right (W) 16.5 0.390 0.300 285 90 Standard/0.76 Standard/0.68 INTER -ZONE SURFACES ------------------- Area Insul Form 3 Surface (sf) U -factor R-val Reference Location:Comments 20FFICES/3ENTRYMS 1 Wall 40 20.000 R-0 NONE non -closable opening 2 Wall 352 0.293 R-0 NONE dividing -wall 3 Door 20 0.330 R-0 None to utility room COMPUTER METHOD SUMMARY Page.13 C -2R Project Title.......... Muir Villa Revised Date -12/12103 14:35:03 I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM C -?R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised I -------------------------------------------------------------------------=---- SLAB SURFACES ------------- Area Slab Type (sf) 1LVGDNGK Standard Slab, 1164 4GUEST Standard Slab 475 THERMAL MASS ------------ Area Thick Heat Conduct- Surface Mass Type (sf) (in) Cap ivity UIMC R -value Locatior./Comments 20FFICES 1 SlabOnGrade 163 3.5 28.0 0.98 4.60 R-0.0 024 hall ceramic 2 SlabOnGrade 29 3.5 28.0 0.98 4.60 R-0.0 034 powder ceramic 3 SlabOnGrade 116 3.5 28:0 0.98 4.60 R-0.0 037 hall ceramic 4 SlabOnGrade' 79 3.5 28.0 0.98 4.60 R-0.0 039 bathroom ceramic 5 SlabOnGrade 27 3.5 28.0 0.98 4.60 R-0.0 040 toilet ceramic 6 SlabOnGrade 27 3.5 28.0 0.98 4.60 R-0.0 044 shower ceramic 7 SlabOnGrade 741 3.5 28.0 0.98 1.80 R-2.0 covered slab 3ENTRYMS 8 SlabOnGrade 19 3.5 28.0 0.98 4.60 R-0.0. 007 toilet ceramic 9 SlabOnGrade 120 3.5 28.0 0.98 4.60 R-0.0 010 bathroom ceramic 10 SlabOnGrade 22 3.5 28.0 0.98 4.60 R-0.0 013 shower ceramic 11 SlabOnGrade 22 3.5 28.0 0.98 4.60 R-0.0 015 toilet ceramic. 12 SlabOnGrade 78 3.5 28.0 0.98 4.60 R-0.0 019 hal_ ceramic 13.S1abOnGrade 91 3.5 28.0 '0.98 4.60 R-0.0 020 entry quarry 14 SlabOnGrade 125 3.5 28.0 0.98 4.60 R-0.0 023 utility ceramic 15 SlabOnGrade 808 3.5 28.0 0.98 1.80 R-2.0 covered.slab HVAC SYSTEMS ------------ Refrigerant Tested ACCA System Minimum Charge.'and Duct Duct Duct Manual Duct Type Efficiency Airflow Location R -value Leakage D Eff 1LVGDNGK Furnace 0.800 AFUE n/a Attic R-6 No No 0.770 ACSplitTXV 12.00 SEER Yes Attic R-6 No No 0.626 20FFICES Furnace 0.800 AFUE n/a Attic R-6 No No 0.770 ACSplitTXV 12.00 SEER Yes Attic R-6 No No 0.626 3ENTRYMS Furnace 0.800 AFUE n/a Attic R-6 No No 0.770 ACSplitTXV 12.00 SEER Yes Attic R-6 No No 0.626 4GUEST Furnace 0.800 AFUE n/a Attic R-6 No No 0.770 COMPUTER METHOD SUMMARY Page 14' C -2R Project Title....::.... Muir Villa Revised Date..12/12:/03 14:35:03 I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM C -2R I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised ------------------------------------------------------------------------------- System Minimum Type Efficiency ------------------------ ACSplitTXV 12.00 SEER HVAC SYSTEMS ------------- Refrigerant Tested ACCA Charge and, Duct Duct Duct Manual Duct Airflow Location R -value Leakage D Eff ------------------------------------------- ---- Yes Attic ' R-6 No No 0.626 WATER HEATING SYSTEMS --------------------- Number Tank External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gal) R -value 1 Storage Gas Recirc/Temp 2 0.62 65 R- n/a. SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in.this section.should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** ***,verified during plan check and field inspection... *** This building incorporates a Zonally Controlled HVAC System. This building incorporates a High Mass Design. This building incorporates non-standard Duct R -value. This building incorporates either Tested Refrigerant Charge and F.irflow.(RCA) or a Thermostatic Expansion Valve (TXV) on the specified air conditioning system(s). This building incorporates non-standard Water Heating System HERS REQUIRED VERIFICATION -------------------------- *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -6R installation certificate. *** This building incorporates either Tested Refrigerant Charge and Airflow (RCA) or a Thermostatic Expansion Valve (TXV) on the specified air conditioning system(s). If a cooling system is not installed, then HERS verification is not necessary for the"RCA or TXV. CONSTRUCTION ASSEMBLY ---------------- Page 16 3R Project Title..:....... Muir Villa Revised Date..12/12.'03 14:35:03 I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -FORM 3R I -User#-MP0817 User-SOL*DATA Run -Villa ------------------------------------------ 3 Revised --------------------------- --------------------------------- Parallel Path Method I Reference Name W.13.GARAGE 1 I Description .... Wall R-13 2x4 36oc I. I Type ........... Wall I I R -Value ........ 13Hr-sf-F/Btu I I Framing I I Material ..... FIR.2X4 I Type ......... Wood I I Description .. 2x4 fir I I Spacing ...... 16 inches on center I I Framing Frac.. 0.15 --------------------------------- Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavi --y Frame Name Description R-VaLue R-Value ----------------------------------------------------- 0. FILM.IN.WLL Inside air film: heat sideways ------------------ 0.68 0.68 2. GYP.0.50 0.50 in gypsum or plaster board 0.45 0.45 3c. BATT.R13 R-13 batt insul (cavity = 3.5 in) 13.00 --" 3f. FIR.2X4 2x4 fir -- 3.46 • 4. GYP.0.50 .0.50 in gypsum or plaster board 0..45 0.45 I. FILM.IN:WLL Inside air film: heat sideways 0.68 0'.68 Total Unadjusted R -Values. 15.26 5.72 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total' U -Factor: (1 / 15.26 x 0,.85) + (1 / 5.72 x 0.15) = 0.082 Btu/hr-sf-F Total R -Value: 1 / 0.082 = 12.21 hr-sf-F/Btu• HVAC SIZING Page 17 HVAC Project Title.......... Muir Villa Revised Date..12/12,'03 14:35:03 Project Address......... Lot 4 Quarry Ranch ******* ------=-------------- La Quinta *v6.01* 1 I Documentation Author... Sarah Pernula ******* 1 Building Permit # I SOL*DATA I 401-C College Avenue 1 Plan Check / Date I Santa Rosa-, CA 95401 1 1 707-545-4440 I Field Check/ Date I Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -HVAC S=ZING 1 I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised 1 GENERAL INFORMATION Floor Area ................. 4106 sf Volume ..................... 50471 cf Front Orientation ........... Front Facing 15 deg CN) Sizing Location............ LA QUINTA Latitude............ ..... 33.8 degrees Winter Outside Design...... 321F Winter.Inside'Design....... 70 F Summer Outside Design...... 112 F "Summer Inside Design....... 78 F Summer Range ............... 34 F Interior Shading Used...... No Exterior Shading Used...... No Overhang Shading Used...... No Latent Load Fraction....... 0.20 HEATING AND COOLING LOAD SUMMARY Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, soil sizing, availability of equipment, oversizing safety margin, etc., must also be, considered. It is the HVAC designer's responsibility to zonsider• all factors when selecting the HVAC equipment. Heating Cooling' Description (Btuh) (Btuh) Opaque Conduction and Solar...... 29814 16460 Glazing Conduction................ 12324 11027 Glazing Solar .................... n/a 15533 Infiltration ..................... 26651 17637 Internal'Gain.................... n/a 2100 Ducts...... .................... 6879 6276 Sensible Load.................... 75669 690=6 Latent Load ...................... n/a 138C7 Minimum Total Load 75669 828;3 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, soil sizing, availability of equipment, oversizing safety margin, etc., must also be, considered. It is the HVAC designer's responsibility to zonsider• all factors when selecting the HVAC equipment. HVAC SIZING Page 18 HVAC Project Title.......... Muir Villa Revised Date.:12/12/03 14:35:03. MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -HVAC SIZING I I User#-MP0817 User-SOL*DATA Run -Villa 3 Revised I HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE '1LVGDNGK' Floor Area..... ...... ........ 1164 sf Volume... ...................... 17000 cf. Heating Cooling Description (Btuh) (Btuh) Opaque Conduction and Solar...... 8814 .4829 Glazing Conduction ............... 5777 5169- 169Glazing GlazingSolar ..................... n/a 572& Infiltration... ... ... .... 8977 5941 Internal Gain................ .. n/a 105C Ducts ............................ 2357 2272 Sensible Load .................... 25924 2498E Latent Load ...................... n/a 4998 Minimum Zone Load 25924 29985 ZONE 120FFICES' Floor Area.. ..................... 1182 sf Volume............ 11820 cf Heating Cooling Description (Btuh) (Btuh) Opaque Conduction and Solar...... 5408 30C3 Glazing Conduction ............... 2570 23CO Glazing Solar .................... n/a 45`0 Infiltration:. ................. 6242 41_1 Internal Gain............ .... n/a 1050 Ducts......, ..................... 1422 1503 Sensible.Load..:................. 15641 16536 Latent Load........... ......... n/a 33D7 Minimum Zone Load 15641 19844 i HVAC SIZING 475 sf Page 19 HVAC Project Title.......... Muir Villa Revised ------------------------------------------------------------------------------- 6226 cf Date..12/12/03 14:35:03 I MICROPAS6 v6.01 File-MUIRREVF Wth-CTZ15S92 Program -HVAC SIZING 1 I User#-MP0817 User-SOL*DATA ------------------------------------------------------------------------------- Run -Villa 3 Revised ZONE '3ENTRYMS' (Btuh) ----------- Opaque Conduction and Solar...... Floor Area ....................... 1285 sf Glazing Conduction.. ............ Volume ........................... 15425 cf Glazing Solar ................. n/a Heating Cooling Description (Btuh) (Btuh) Opaque Conduction and Solar...... 11247 6211 Glazing Conduction.......... ... 3049 2728 Glazing Solar. ....... ......... n/a 4364 Infiltration ..................... 8145 5390 Internal Gain. ................. n/a 0 Ducts ............................ 2244 1869 Sensible Load...... ............ 24686 20563 Latent Load........ n/a 4113 Minimum Zone Load 24686 24675 ZONE '4GUEST' Floor Area ....................... 475 sf Volume ........................... 6226 cf Heating Coolinc_ Description --------------------------------- (Btuh) ----------- (Btuh) ----------- Opaque Conduction and Solar...... 4346 2418 Glazing Conduction.. ............ 928 830 Glazing Solar ................. n/a 893 Infiltration..... ......... 3288 2175 Internal Gain......... ......... n/a 0 Ducts ............................ 856 632 Sensible Load .............:...... 9417 6999 Latent Load ................... n/a 1390 Minimum Zone Load 9417 8339 i • The vapor barrier shall be overlapped six inches minimum at joi;lts and shall extend ' over the top of pier footings. j The vapor barrier should be rated as 1.0 perm or less. The -edges of the vapor barrier should be turned up a minimum of four inches at the stem wall. - • Penetrations, in the vapor barrier should be no larger than necessary to fit piers, beam supports, plumbing and other penetrations. • The vapor barrier must be shown on the plans and installed. Studies show that moisture conditions found in crawl spaces that have. minimal ventilation do not appear to be a significant problem for most building sites provided that the crawl- space floors are covered by an appropriate vapor barrier and other precautions are taken. The Energy Commission urges building officials to carefully evaluate each application of this insulating technique in conjunction with reduced /entilation because of'. i the potential for adverse effects of surface water on crawl -space insulation that could negate the energy savings predicted by the procedure, 8.7 Zonal �o�ntrol An energy compliance credit is provided for zoned heating and air-conditioning systems, which save energ b roviding.selective conditioning for only.those areas_ ta_b use :1 that are occupied A house having a east two zones ivmg an mg with separate thermostats controlling temperatures in the zones, and with a maximum non -closeable o ening ,of 40 square feet may qualify for this compliance credit. ie equipmen may consist o one air -con ionmg system or the ivmg areas an anofler system for sleeping areas or a single system with zoning capabilities, set to turn off the sleeping. areas in the daytime'and the living area.unit turned off at night. (See Figure 8-4).. ZONE, SPACE CONDITIONING is a space or group of spaces wiilhin a building with . sufficiently similar comfort conditioning requirements so that comfort conditions as g101(b)) specified in 144(b)3 or 150(h), as applicable, can be maintained ttroughout the zone by a single controlling device. i . . I Res Hential Manuel August 2001 8-17 ; Figure 8-4- Zonal Zone #1 zone #2 ControllExample (Living zone) (Slee Ing zone) i Temperature Sensors:-----.... Individual air temperature D LR i Heating ,and/or cooling sensors In each zonej MBR source (typical) required In each habital room. Zone #4 (Livin zone) �.l K a o - - -.. . ® tic "Habitable Rooms" within - --- _ .._ __-... W W zone: Each has a source of FAM ®: 0 spaca heating :-DEN E BR and/or cooling. Zone #3 (Living zone) Nonclosable Openings: Maximum value of W permitted = 40/H feet, where H = Floor-to-celling height In feet Note: Although multiple thermally distinct living and/or sleeping zones may exist in a residence, the correct way to model zonal control credit requires only twc zones: one living zone and one sleeping zone. All separate living zone components must be modeled as one single living zone, and.the same must be done for sleeping zones. 'I k. are nique i and stallation re uirements that must be met in order fo? OThere alcontroltoquali under the Standards. The fo owing steps must ataken for the ding to-show compliance with the Standards under this exceptional method: Tern erature ensors Each thermal zone, including a living zone and a sleeping zone, shall have individua alr temperature sensors. Habitable Rooms. ach habitable room in each zone shall have a sourca of space heating and/or cooling (if zonal credit for cooling is desired) such as forced air supply ' registers or individual conditioning units. Habitable rooms shall not include bathrooms, laundry, halls and/or dressing rooms. Noncloseable O enings. The total noncloseable opening area between adjacent living ._ an seeping thermal zones (i.e., halls, stairwells or other openings) shell be less than or - equal to 40 square feet. All remaining zonas boundary areas shall be separated by - . permanent floor to ceiling walls and/or fully solid operable doors capabb of restricting free air movement when in the closed position. Setback Thermostats. ach zone shall be controlled by a central autoruatic dual setback. ; t ermostat that can control the conditioning equipment and maintain pr--set temperatures for varying time periods in each zone independent of the other. 1. Each zone must have automatic dual setback control for heating, end setup control 'for cooling if cooling, is provided. i 2. Thermostat locations in each zone must provide accurate temperature readings of. the typical condition in that zone. 3. The control may be switched from heating to cooling mode manuelly. 4. The control must be programmable by the occupant. i 8-18 August 2001 Residential Manual ' 5 For residences using have two-stage heating which incorporates a recovery'ramp of other logic that will minimize electric resistance heating. 'i ' ' E22tz_om must be served by a return air register located � within Return air oompe�are no - ' 'zone.`2. shall bemanufactured and installed mo.that when they are clomed. � ' no measurable a*rflo nt0hermQ�h»n� ---- �- - ` �l The system must be designedto operate within the equipment nonuhant 4. � a zone ia& when the zone is being ^ ---~~�~d.~~ No --------- amount ~' supply air "=`vvup , ` unconditioned or space ---- � ~~~~~p�" pn�perair flows hnthe .. ' -,_-- `- 5. Systems that allow's6pply protected against short cycling_and excessive temperatures of -:he space -conditioning equipment, include_—necessary._-controls f= efficient, safe and quiet operation Q"=="o^. |n- the living and sleeping-....~ with ~z" ` nyob»m oon�und�n�omoondboU�n�omo�vh�horeno� - ---'--'''''~ . n�m��mapooen)beinduded onwhichever zone they �nomomtou�adto � geographically �g e6othnoom|ooa�ednnor` bedrooms)? - - ' `- ` ' Answer' . Yea For computer modeling, include the square hootaoeofany cv'indirectly' conditioned wbhthe c�oeo ~ —'----- Question , | have two HVAC systems end nt to take zonal nonbn| credit. C3n ` theroturn' 'rfor ` both zones --- located .'^ the hallway (living zo*w' ' Answer ` No * unconditionedween zone and the I ___-~~ necessary to (1) have the return air for each zone within that' zone, and (2) limit any non -closeable openings between the two Z:)nes to 40 square feet or less. ' Unless these.criteria, in addition to the other criteria listed in this Chapter can be met, credit for a zonally controlled system cannot be taken. N� N�� ��mmm� ° ' - ~~ 0��0�N ° ` ` °�m mw��mw m�x���v���N�N��N��� �� ��N�� � `Hm�e�t00��� ` �__ �� . . Hydronkzheating isthe use of- hot water system as a heat VN 8-5 and show simple schematics illustrating some ofthe �� ^=.pu°*xs.nonyoronxt-nemungmyohem�Ahydronu'heodngny�omcono���nf�ve` parts. ~ The device, usually the water heater. ^Ahoot delivery device ` August 2001 NMWMARRI� Archite_cLieries 5/8 Clear IG -3 mm �Iass 0'55 0.54 0.50 0.49 50 53., (ja em�ent 2t,,IT/VIhsulShieldIG-3mmgla---:) _r70397� 0.37 rO_2_8P) 0.30' _44 j 46 enil..... --------- u-IShield HA IG 5/8 Ins -3 mm glass 0.43 ... . ...................... .0:4 1.7, w M6 ral 0.28 0.30 44, 1 46� m n.t n ba r's) 5/8 InsulShield IG -5 mm Bro-n-ze/4 mm Low -E. 0.47 0.46 0.2T' 0.,2 5 33 28�� 'A= 24" x 48" '5/8" InsulShield IG -5 mm Gray/4 mm Low -E 0.47 o.46' 0.26� 0.25 30 13=4&" x 60" .5/8 InsulShield I.G-5,rnrn Green/4 mm'Low-E 0.47 0.46 - 0.29 0.28 40 4Q Architect Series 5/8 Clear IG -3 mm glass 0.�5 0.54 '0.54 .0.53 55 51' Clad Casement 5/8" InsulShield IG73 mm glass . ...... . 0.39' ... .......... 0.36 --- 0.30 0.32. 48, 51 (Vent) (with- rern6Vable 5/8 InsulShield HA IG -3 mm glass 0.42, 0.40 ',0 .31 0.3 . 2 -48 5 1. or no muritin. 5/8". lnsulShi�ld IG-5.!nrn-Bronze/4'rnm_ Low7E 0.46 0.45 0.29, 36 31 - bars), A= 24".x 48" 5/8 InsulShield IG -5 mm Gray/4-mm Low7E 0.46 045- 0.28 0.2E- 33 26. B= 30" x 60" 5/87 InsulShield.IG-5 mm GreenXirn-m Low -E 0.46 '0.45 0.31. -'O.K�' 44 44 . Architect Series 5/8" Clear I.G-3 mm glass ."�b.50 0.50' 0.49 0.49 50 53'-� Wood Casement 5/8 " InsulShiefd IG -3 mm glass 0.34 0. 33 0.28- 0.29 -7-1 44 416 (Vent) (with integral 5/8." InsulShield HA-IG-3.mm gl�ass '0.38 '037 0.28 0.30 44' Muntin bars) 5/8",InsulShield.IG-5-mm Bronze/4 nirn'Low�'E -0.42 0.42 -0.27 0.25 33 �28 A= 24" x 48" B 30" x 60" - 5/8" InsulShield IG -5 �nrn Gray/4 mm LoW-E .............. . .... ... 0.42 ......... 0.42 .. . ....... .. ... ....... 0.25 0.24- -0 4 5/8 lnsulShield,IG-5 mm' Green/4 mm Low -E ..0.42 OA2 0.281, 0.23 40. 40 Architect Series 5/9 Clear IG -3 mm �Iass 0.50 0.50 0.53 0; 58 55 Wood Casement '(Vent) 5/8" InsulShield 1,G-3 mrii glass 0.34 0'.32 0.30 0.31' 48 51 (w6 removable 5/8 InsulShield HA IG -3 rnrn glass 0.38 0.37 uO J- O.M 48� 51 J . ............ .. . ..... . or no muntin 5/8 InsulShield IG-5,:mm Bronze/4 mrn-Low-E 0.42 .0.41 .0.29 1 0. 2 6, 36 31 bars). . . . . ... . .................... ............ . ..... . ........... .. A 24" x 48" 5M InsulSh.ield IG-5,mm Gray/4 mm Low -E 0.42 0.42 0.27 0.1-96 -33 2.6 B= 30"'x 60" 5/8 InsulShield IG -5 mm Greeln/4,mm Low -E 0.42 0.41, 0.30, '0_30- 44 44 - Architect Series 5/8 Clear IG -3 ri�irn glass 0.50 0.50 b.55, 0.52 57 57. asemen r/8 ield 1&-3 mm gl�' % rO:32 0.31 C' 0. 3 0') 0.31 50,' 50 Fixe Wg ...... ......... . wi integral r a 5/8 16su[Shield HA IG -3 mm glass O�.!6. 0.36 '0.31 1 031 50 50 -hiuntin baN *A= 5/8.' InsulShield IG -5 mm Bronze/4 mm Low -E. 0.41 0.41' . .. ..... ........ 0.29�1 026 38-�t:- 3**0- 48' x 48- 5/8 InsulShield IG75 rnm Gray/4 mm,Low-E 0.41 0.41 10.28 0 25' 34 -26. B= 48" x 72 . ... ..... . ........... �b ... . ......... ..... . . ... . ................. . .... 5/8" InsulShield IG -5 rn�n-Green/4 rnm Low -E 0.41., 0.41 0.31 0.29 46 43 Series 5/8" Clear IG -3 mm glass, 0.50 0.50 0.60 1 0-57 63 64� ,Architect WoodCasement (Fixed) - 5./8" InsulShield IG-3.mm glass - . . ....... 0.31 ... . .. ........... 0.30, .. ...... ............. . 0.33 034 .. ........ .... ....... . .. 56 56 (with remo*'vabl,e -3 rnm 5/8 InsulSkield HA IG lass 5 0.33, 0,3� 56 Y 56 or no muntin 5/8 InsulShield IG -5 mm Bronze/4,mm Low -E 0.41 0.4b' 0.32 D28 42 34, 'bars) A= -48 " x 48 ------- -- - --- 5/8." InsulShield IG -5 mm Gray/4.mm Low -- 0.40 0.30 'OL28 38 29 5/8 " InsylShield IG -5 mm Green/4 mm Lm - -0.34 C-32 51 48.- B= 48" x 72 0.40. 1. High Altitude InsulShield IG (designated as HA) and other InsulShield IG with tinted glass are air-filled: Sound Transmission Class and Outdoor -Indoor Trans' mu' sion Cass ,t _ri+' "4 _r . -3{��F.3i, '�'� , MzLMO.vi'2'u:� f S : ,� '1 . -1iv"" t"��F}l d'.J'�.3 . :FRAME SIZE WO.' "/c1Oil MISSION VA KA 'I 26 .- - vJ �.MWtE.✓:F'+ 9+ is i!;. :v : 4_'y*bT' h 3 C Arc rte 'Series® 5/8" Clear IG -3 mm glass 0 45: 0.39 38 ad with integral . ---_-_.___ _.-.-_-.._. ....-- -'- , muntin rs) . _ /8r InsulShield IG' -3 mm g ass 0.34 - 0.23 - 34 �. " x 82" '' 5/8" InsulShield HA IG -3 mm glass, 0.36 - 0.23 -. 34 'Architect Series" 5/86 Clear IG 3 mm glass 0.46 • * = -A.43 - 43 Clad (with removable or. -'-'- -- - = ---- - -- -- --- - -- . -_- no muntin bars) • 5/8 InsulShield IG -3 mm glass` ' '. 0.33 - ,'0.24' -�- - 38 - A=38" x 82" 5/8" InsulShield HA IG -3 mm,glass 0:36 - 0.25 - 38 Architect Series* 5/8" Clear I6-3'mm glass 0.46 - 0.39 . - 39 - Wood (with integral --•- _--------- - -- - muntin bars)' 5/8" InsulShield IG -3 mm glass ., : 0.33 - 0.23, - 34 A=38" x 82"' 5/8" InsulShield HA IG -3 mm glass'- 0.36 . - 0.23 - 34 Architect Series® 5/8 Clear IG 3 mm glass ' " 0.46 = 0.43' -, 43 � Wood (with removable = -'- -' - --- --- 5/8' InsulShield IG 3 mm glass. --- 0.33 -- '--='---- - 0:25- -' = --� t..-._ ._.. _ ) or no muntin bars) - 38 s . A=38" x 82" 5/8" InsulShield HA.IG-3 mm glass 0.36 - ' 0.25 - "38 - Designer Series® Clad ,SMARTSASH WSYSTEM A=38" x 82" 3 mm Clear with 3; mni Clear DGP '' 0.45.. - 0.45 - 45 t 3 mm Clear with 3 mm: Low -E DGP .0.36 - 0.42 - 42 =' t' R 3 mm Bronze with 3 mm Clear DGP. - 0.45 - 0:37; - 34' 1mm Bronze with mm Low -E DGP "0.36 - 0:34 - ,' 32 3 mm Gray with 3 mm Clear DGP 0.45 - 0:36 - 31 3 mm Gray with 3 mm Low -E DGP 0:36 - 0,33 - 29 i e r SMARTSASH III.SYSTEM 5/8" InsulShield IG with13 mm -Clear DGP 0.28.'' ` -.} 0,24 - 36 r 5/8" InsulShield 1G -.with 3 mm Low -E 0:25. - 0.23 - 33 -. ProLine" Clad' ' A=38" x 82" 3/4" Clear IG with 3 mm glass0,44 0.45` - 46 - with Grilles -Between -the -Glass 0.44 - 0.43 43 I 3/4" InsulShield IG with -3 mm glass 0.31 ' - 0.25 - '40 with Grilles=Between-the Glass' 6.31 - - 0.24 = 38 1. High Altitude InsulShield IG (designated as HA) and other InsulShield IG with tinted glass are air-filled: Sound Transmission Class and Outdoor -Indoor Trans' mu' sion Cass ,t _ri+' "4 _r . -3{��F.3i, '�'� , MzLMO.vi'2'u:� f S : ,� '1 . -1iv"" t"��F}l d'.J'�.3 . :FRAME SIZE '['��.1 1 ` '� i fs dit(19i N „j x'p4Y'''s- 1 }�i' G:ZINSRTEM " -p,,R� 4'�� `fRAING _ 29 KA 'I 26 Architect Series" Clad 71-1/4" x 81-1/2° (Inactive/active) (with integral muntin bars) 5/8" Clear Tempered IG 36"•x 81-1/2" (Single) - ' '.30 ' 27 3 mm Glass Architect Series" Clad (with removable or no muntim 71.1/4" x 81=1/2'" (Inactive/Active)with . 31 .26 36" x 81-1/2" (Single) bars) 31 _ 25 . - - Designer'Series" Clad (with removable or no muntin bars) ; 71-1/4 x 81-1/2" (Inactive/Active) , --=- ------ ,-=- 36" x 81-1/2 1 ,,3 'mm Clear Tempered Prime and 3_ mm Clear Tempered DGP 34 . ' - 34 . . • . 27• 26 -- 1. High Altitude Insulshield IG (designated as HA) and other InsulShield IG with tinted glass are air-filled.. Sound Transmission Class and Outdoor -Indoor; Transmission .Class § �'• �'� � �^" a i s. ���.'.k �7,�t�t�"i'�,.4 .,'� J n ," `.�'� ,:n'Wi .a - �'rr,.'������5 „ gong.IL� ���',J,'J`i��K"�+ �� PR.k DUCT} ON ��� -� 7?ANSMISSION mm CleatTempered Prime and rchite . eries® 5/8" ClearlG-3 mm glass.. 0.51 0.51 0.42 0.40 41 41 Clad (with integral mm Clear Tempered DGP, muntm)barsj < 5/8" Insulshield IG 3 mm glass 0 38 0.380,25 0.4C 36 36 B,=, 72" x 96" 5/8" InsulShield'HA 1G-3 mm "glass ' 0:42 • 0.42 ' 0.25 0.25 36 � 36' s` i, Architect, Series® Clad (with removable or; 5/8 Clear IG -3. mm glass = 0 59 0.51 0.48 0 45 47 47 no muntin bars), 5/8" insulShield®, I6-3 mm glass s 0.37, 0'.37 0.27.-' 0.28 °,42 : 42 A' = 72" x. 82 ° ' N B = 72" x 96" '5/8"•lnsulShield HA IG -3 mm glass. 0.40 0.40, 0.27. 0:20 '. x 42 �i. 42 Designer Series° SMARTSASH II SYSTEM " Clad A = 72 ` x 82'' 3 mm'Clear with 3 mm.Clear DGP ° 0.50- 0.50'48 ` 0 4-5 48 ' I 48 B 72"_x 96" ' - 3 mm Clear with 3 mm.Low-E DGP i 0.41 0.41 0.45 0:43 ' 44 y 45 ' ..3 mm Bronze with 3 rrm Clear,DGP 0.50 0.50 0.40 0:38; 36 29y, 3 mm Bronze with 3.mm Low -E DGP' 0.41 •0.49. 0.37' 0:30 33 27- 3 mm Gray with 3 mm Clear-DGP '3.mm 0.50 0.50 0.39_-, 0._3 ' 33 I . 25 t r 3 -mm Gray with Low-E:DGP 0.41 0.41 0.35 0..0 30 23 SMARTSASH 1II SYSTEM 41 5/8" InsulShield'IG with 3 mm Clear DGP 0:T2� '0.31 - 0.25 O.25 39. 38. 'w 5/8",InsulShieldlG WS3,mm Low DGP 0.29 ., 0 29 • : 0.24, 0.24 35 35` SMARTSASH:1" INSULATING GLASS •z. ' 1 "Clear IGL4 mm Glasse 0.51 0.51. 0.48 , 0.46 48 �,: ' 48, 1 " Insulshield IG -4 mm Glass ,, . 0.37.. '''0:36 'y. 0:27 027 42 42 1. High Altitude Insulshield IG (designated as HA) and other InsulShield IG with tinted glass are air-filled.. Sound Transmission Class and Outdoor -Indoor; Transmission .Class § �'• �'� � �^" a i s. ���.'.k �7,�t�t�"i'�,.4 .,'� J n ," `.�'� ,:n'Wi .a - �'rr,.'������5 „ gong.IL� ���',J,'J`i��K"�+ �� �� ��°y�I_.=.ra, mm CleatTempered Prime and '31 25 DESIGNER•SERIES3 71-1/4",z8'1'.-1/2" (Fixed/Vent), CLAD3 mm Clear Tempered DGP, r October 2002 SECTION 1- GAS FURNACES Page 75 STANDARD FOOTNOTES: I. Electronic Ignition 2. Electro -Mechanical Vent Damper(s) specified by the Fumace Mfr.. 3. Power Combustion or Power Vent 4. Condensing Type 5. Direct Vent (Includes Venting and Combustion Air Systems). 6. Single Package Unit (Combination Heating/Cooling). # Rating Voluntarily revised since last directory. + Rating revised by program since last directory. Heat Cap Eae AFUE Heat Cap Eac AFUE MBTUH kWh/yr % MBTUH kWh/yr % Model Configur- Foot Input PE Ef Model Configur- Foot Input PE Ef Number ation Notes MBTUH Watts MMBTU/yr Number ation Notes MBTUH Watts, MMBTU/yr THE TRANE COMPANY, UNITARY PRODUCTS GROUP #TDX08OR942V• DH 1,3,4,5,7 80.0 74 79 581 64.9 92.5 Trade Name: XE90 #TDX08OR942W* DH 1,3,4,5,7 80.0 74 79 581 64.9 92.5 #TDX100R948V• DH 1,3,4,5,7 100.0 93 64 833 80.1 93.0 NATURAL OR PROPANE GAS NON -WEATHERIZED #TDX100R948W DH 1,3,4,5,7 100.0 93 64 833 80.1 93.0 #TUC040C924B* U H 1,3,4,7 40.0 37 78 326 33.7 92.1 #TUX10OR948V* U H 1,3,4,5,7 100.0 93 68 823 80.2 93.0 #TDX040C924C• DH 1,3,4,5,7 40.0 38 74 335 34.1 91.0 #TUX100R948W* U H1,3,4,5,7 100.0 93 68 823 80.2 93.0 #TUX040C924C• U H1,3,4,5,7 40.0 38 75 346 33.7 92.1 #TDX120R960V* DH 1,3,4,5,7 120.0 111 801,073 113.0 92.5 #TDC040C924B• DH 1,3,4,7 40.0 38 79 326 34.1 91.0 # TDX 1 20R960W* DH 1,3,4,5,7 120.0 111 801,073 113.0 92.5 #TUX060C936C* U H 1,3,4,5,7 60.0 56 74 544 50.3 92.1 #TUX120R960V* U H 1,3,4,5,7 120.0 112 66 1,107 111.3 92.5 #TDC060C936B• DH 1,3,4,7 60.0 56 80 499 51.1 91.0 #TUX120R960W* U H 1,3,4,5,7 120.0 112 661,107 111.3 92.5. #TUC060C936B• U H 1,3,4,7 60.0 56 84 487 50.5 92.1 Additional Footnotes # TDX060C936C• D H 1,3,4,5,7 60.0 56 90 512 51.0 91.0 7. The 10th character in the model number may change to show a mechanical # TUC080C942B* U H 1,3,4,7 80.0 74 86 668 67.2 92.1 or electrical accessorythat does not affect performance. P #TDX08OC942C* DH 1,3,4,5,7 80.0 74 86 796 76.0 91.0 #TDC080C942B• DH 1,3,4,7 80.0 74 110 821 67.5 91.0 Trade Name: XR80 #TUX080C942C* U H1,3,4,5,7 80.0 75 93 664 67.3 92.1 #TUX08OC960C• U H 1,3,4,5,7 80.0 76 75 860 66.5 92.1 NATttRAi.ORPROP NF AC NON -WEATHERIZED #TUCI0OC960B• U H 1,3,4,7 100.0 93 53 914 83.7 92.1 #TDD040C924F• DH 1,3,7 40.0 31 71 440 39.4 78.0 #TUX10OC960C• U H1,3,4,5,7 100.0 93 55 919 83.7 92.1 #TUD040C930K• U H1,3,7 40.0 32 72 559 37.9 80.0 #TDC10OC948B• DH 1,3,4,7 100.0 93 78 820 85.1 91.0 #TUD040C924K• U H1,3,7 40.0 32 76 424 38.4 80.0 #TUCIOOC948B• U H1,3,4,7 100.0 94 48 960 101.0 92.1 #TUD06OC936K• U H1,3,7 60.0 47 71 769 57.0 80.0 #TUX10OC948C• U H1,3,4,5,7 100.0 94 70 929 101.1 92.1 #TUD060C924K* U H1,3,7 66.0 47 77 611 57.7 80.0 #TDXIOOC948C* DH 1,3,4,5,7 100.0 94 70 955 101.0 91.0 #TDD060C924F* DH 1,3,7 60.0 48 70 575 57.8 80.0 #TDX120C960C* DH 1,3,4,5,7 120.0 112 731,164 118.9 91.0 #TDD060C936F• DH 1,3,7 60.0 48 73 912 56.4 80.0 #TDC120C960B• DH 1,3,4,7 120.0112 801,161 119.091.0 #TUD080C960K* U H1,3,7 80.0 63 701,191 75.1 80.0 #TUC120C960B• U H1,3,4,7 120.0 113 701,262 117.2 92.1 #TUD080C936K• U H1,3,7 80.0 63 771,007 76.0 80.0 #TUX120C960C* U H1,3,4,5,7 120.0 113 841,320 117.0 92.1 #TUD080C924K* U H1,3`7 80.0 ,64 77'.564 77.9 80.0 Additional Footnotbs # TUD08OC948K* U H 1,3,7 80.0 64 78 984 76.1 80.0 # TDD080C945F* DH 1,3,7 80.0 64 79 822 76.8 80.0 7. The 12th character in the model number shall be a number from 0 to 9. #TDDO8OC936F• DH 1,3,7 80.0 64 79 837 76.7 80.0 #TUD10OC960K• U H1,3,7 100.0 79 501,096 95.6 80.0 Trade Name: XL80 #TUD10OC936K* U H 1,3,7 100.0 79 79 972 96.2 80.0 NATURAL OR PROPANE GAS NON -WEATHERIZED #TUD10OC948K• U H 1,3,7 100.0 79 811,186 95.3 80.0 #TDD040R924F* DH 1,3,7 40.0 32 77 380 36.7 80.0 #TUD10OC972K• U H1,3,7 100.0 80 601,414 94.3.80.0 #TUD040R924K• U H1,3,7 40.0 32 95 426 36.8 80.0 #TUD10OC945K• U H1,3,7 100.0 80 761,162 95.4 80.0 # TDD060R936Ff- . ' DH 1,3,7 60.0 47 82 704 54.6 8 .0 : # TDD10OC945F• #TDD10OC948F• #TDD10OC954F• DH 1,3,7 DH 1,3,7 DH 1,3,7 100.0 100.0 100.0 80 80 81 79 1,168 95.3 80.0 801,149 95.4 80.0 78 1,010 96.0 80.0 TLTD06OR936K• U H13,7 60.0 47 99 761 54.1 80.0 # 8K• U H 1,3,7 80.0 63 78 871 73. #TUD080R936K* U H 1,3,7 80.0 63 102 778 72.8 80.0 #TUD120C954K• U H 1,3,7 120.0 96 701.447 114.2 80.0 #TDD080R936F• DH 1,3,7 80.0 64 76 803 72.9 80.0 #TUD120C960K• U H1,3,7 120.0 96 751,429 114.2 80.0 #TDD10OR945F• DH 1,3,7 106.0 79 59 723 94.5 80.0 #TDD120C954F• DH 1,3,7 120.0 96 831,452 114.1 80.0 #TDD10OR948F• DH 1,3,7 100.0 79 831,000 92.1 80.0 #TDD120C960F* DH 1,3,7 120.0 96 851,461 114.1 80.0 #TUDIOOR936K U H1,3, # TUD 140C960K* U H1,3,7 140.0 111 851,614 133.5 80.0 #TUD10OR948K• U H 1,3,7 100.0 79 105 975 91. 80.0 #TDD140C960F• DH 1,3,7 140.0 113 771,444 134.2 80.0 #TUD100R961K• U H 1,3,7 100.0 80 731,118 91.80.0 Additional Footnotes #TUDI0OR960K• U H 1,3,7 100.0 80 741,180 90. 80.0 7, The 12th character in the model number shall be a number from 0 to 9. D OOR960F• DH 1,3,7 0.0 8 8 . .0 # TUD120R960K• U H 1,3,7 120.0 95 63 1,214 109.9 80.0 Trade Name: XR90 # TUD120R954K• U H 1,3,7 120.0 95 701,243 109.7 80.0 # D12OR96OF• DH 1.IL un n o6 R7 1"z�,pgp NATURAL OR PROPANE GAS NON -WEATHERIZED #TUD140R960K• U'- H 1.3.7 ^140.0 l I2 81 1.264 0; #TDX040C924D• #TUX04OC924D* DH 1,3,4,5,7 U H 1,3,4,5,7 40.0 40.0 38 38 74 335 34.1 91.0 75 346 33.7 92.1 # D140R960F* DH 1,3;7 140.0 113 74 1,264 128.3 80.0 Additional Footnotes#TDX060C936D• #TUX060C936D• U H 1,3,4,5,7 60.0 56 74 544 50.3 92.1 DH 1,3,4,5,7 60.0 56 90 512 51.0 91.0 7. The 12th character in the model number shall be a number from 0 to 9. # TDX080C942D• D H 1,3,4,5,7 80.0 74 86 796 76.0 91.0 Trade Name: XL90 #TUX080C942D• U H1,3,4,5,7 80.0 75 93 664 67.3 92.1 #TUX080C960D• U H 1,3,4,5,7 80.0 76 75 860 66.5 92.1 NATURAL OR PROPANEGAS'NON-WEATHERIZED #TUX10OC960D• U H1,3,4,5,7 100.0 93 55 919 83.7 92.1 #TDX06OR936V* DH 1,3,4,5,7 60.0 55 41 529 48.5 92.0 #TUX10OC948D* U 1-I 1,3,4,5,7 100.0 94 70 929 101.1 92.1 #TDX660R936W DH 1,3,4,5,7 60.0 55 41 529 48.5 92.1 #TDX100C948D* DH 1,3,4,5,7 100.0 94 70 955 101.0 91.0 #TUX060R936V• U H1,3,4,5,7 60.0 56 54 568 48.0 93.0 #TDX120C960D• DH 1,3,4,5,7 120.0 112 73 1,164 118.9 91.0 #TUX060R936W* U H1,3,4,5,7 60.0 56 54 568 48.0 93.0 #TUX120C960D• U H1,3,4,5,7 120.0 113 841,320 117.0 92.1 #TUX080R942V* U H 1,3,4,5,7 80.0 73 79 535 65.0 92.5 Additional Footnotes . #TUX08OR942W U H 1,3,4,5,7 80.0 73 79 535 65.0 92.5 7_ The 12th character in the model number shall be a number from 0 to 9. STANDARD FOOTNOTES: I. Electronic Ignition 2. Electro -Mechanical Vent Damper(s) specified by the Fumace Mfr.. 3. Power Combustion or Power Vent 4. Condensing Type 5. Direct Vent (Includes Venting and Combustion Air Systems). 6. Single Package Unit (Combination Heating/Cooling). # Rating Voluntarily revised since last directory. + Rating revised by program since last directory. Page 158 SECTION 1 - GAS WATER HEATERS October 2002 Rated Rated Ist HrQstorage 1st Hr Storage J Model Foot Ratio Vol• opalecoveryMode; FootRating, Energy Vol• InputRecovery Number Notes Gals Gals, -Put ffcy. s6 Number Notes Gals. Faetor Gals. MBTUN Effey. */, BRADFORD WHITE CORPORATION M-140T••CX-12 73 :54 40 38.0 76 NATURAL GAS M-1-40T**CX-13 1 73 .54 40 38.0 76 M-1-504S•*'N-I1 I 92 .55 50 50.0 76 M-1-403S**CX-12 73 .56 40 40.0 76 _ .. M-4-504S•*!N-10 92 .56 50 50.0 77 M-4-4035**CX-13 1 73 .58 40 40.0 77 M-II-5045**'N-10 92 .56 50 50.0 77 M-II40S**CX-13 1 73 .58 40 40.0 76 M 4-504S••'N-11 1 92 .57 50 _ 50.0 77 M-4-404T••CX-13 1 75 :.58 40 50.0 77 M-II-504S•**N-11 1 92 .57 50 50.0 77 M-I403T"CX-12 78 56 40 40.0 77 DH1504T***EN10 95 .53 48 50.0 77 M-I403T**CX-13 1 78 .58 40 40.0 77 MIXR504T••*N-10 103 .53 48 65.0 76 M-1140T**CX-12 78 .59 40 40.0 78 *•* M-1140T*•CX-13 1 78 .60 40 40.0 '78 { M-II-TWSOT N-10 3,S 105 .65 48 � 6 0 80 I , DH165T**•EN10 11 .51 65 5.0 76 M-4-403T•*CX-12 78 .63 40 40.0., 82 DH175S•**EN10 I24 '.5075 6 .0 77 M-4-403T*•CX-13 1 78 .64 40 40.0 82 126 .50 65 5.0 7g Was M-I-50L6LX=10 85 .56 48 38.0. 77 M-I-50L6LX-l1 1 85 .58 48 38.0 78 M-1-65T'**N-10 126 .5 65 65.0 78 M-4-50S**CX-Il 1 85. .62. 50 36.0 78 M-I-65T•"N-11 1 126 .51 65 65.0 78 M-4-50S**CX-12 85 .62 50. 36.0 80 M-II-TW65T***N-.1 3,5 129 .62 65 65. 80 M-I-TW50L**CX-10 3,5 85 .63 48 37.5 80 M-I-75S**•N-10 138 50 75 75.0 76 M-I-TWSOL**CX-11 1,3,5 85 .64 48 37.5 80 , M-I-75S***N-12 138 .50 75 75.0 76 M-I404T**CX-12 86 .55 40 48.0 77 M-2-XR75S***N-10 138 .51 75 75.0 76 M-1-503**CX-10 86 .55 50 40.0 77 M4-75S***N-10 138 .51 .75 75.0 76 M-I404T**CX-13 1 86 .56 40 48.0 76 M-4-75S*•*N-12 138 .51 75 75.0 76 M4404T*•CX-12 86 .57 40 50.0` 77 M-11-TW75T*••N-10 3,5 145 .64 75 75.0 80 M-4-503**CX-10 86 .57 50 40.0 77 PROPANE GAS M-II404T**CX-12 86 .57 40 48.0 77 M-I-MS30T6LX-I0 2 51. .57 30 30.0 76 M-II-404T**CX-13 1 86 .58 40 48.0 .77 M-4-30T•*CX-11 52 .61 30 32.0 79 DS150S••*CX-I0 4 91 .56 50 40.0 80 Was 58 M2XR504T**CX-11 1 91 .56 48 63.0 76 M-I-MS40T6LX-10 2 54 .56 40 30.0 76 DS150S••*CX-11 1,4. 91 .59 50 40.0 80 M-I-30S**CX-10 54 .57 30 30.0 76 M-I-5045**CX-10 92 .54 50 48.0. 76 1 M-I-MH30T6LX-10 2 56 .57 30 32.0 76 M-I-504S**CX-11 1 92' .55 50 50.0 76 M-1-30T**CX-10 58 .58 30. 32.0 76 M-4-5045**CX-10 92 .56 50 50.0 77: M-4-30T*•CX-10 58 .60 30 32.0 78 M-II-5045**CX-10 92 .56 50 50.0 77 M-1-MH40T6LX-10 2 60 .54 40 34.0 76 M-4-5045**CX-11 1 92 .57 50 50.0 77 M4403S!!CX-12 65 .57 40 40.0 76 M-II-504S**CX-11 1 92 .57 50 50.0 77 Was 73 DH1504T***CX10 95 .53 50 48.0: 77 + M -I 4035•'CX-13 I 65 57 40 40.0 76 M1XR504T*•CX-10 103 .53 48 63.0 76 - Was 73 M-II-TW50T•*CX-10 3,5 105 .65 48 63.0 80 M-11405**CX-12 65 .57 40 40.0 76 Was 73 DH165T***CX10 116 .51 .65 55.0 76,, M-1-303T*!CX-10 67. .57 29 40.0 77 DH175S***CX10 124 .50 75 57.0 77 M-1-303T**CX- I 1 1 67 .58 29 40.0 77 MIXROT*•*X-10 126 .50 65 65.0 78 M4-303T**CX-10 67 .59 29 40.0 78 Was .53 M-440T**CX-1l 1 67 .59 .40 34.0 79 M-I-65T•*CX-10 126 .50 65 65.0 78 M-II-30T'•CX-10 67 .59 29 40.0 78 Was .53M-1-65T•*CX-11 1 126 .51 65 65.0. 78 M-4-303T••CX-II 1 67 .60 29 40.0 78 M-II-TW65T**CX-10 3,5 129 .62 65 65.0 80 M440T**CX-10 67 .60 40 34.0 79 ; M-I-75S*•CX-10 138 .50 75 75.0 76 M-11-30T**CX-11 1 67 .60 29 40.0 78 M-1-755**CX-12 138: 50 75 75:0 76 M-4-40S*•CX-I0 68 .55 40 34.0 76 M-2-XR75S*'CX-8 13& 51 75 75.0 76 M-1-XR403S''CX-10 70 55 38 40.0 76 M-4-75S*•CX-10 139 .51 75 75.0 76 DS140S••*CX-10 4 71 .58 40 36.0 80 M-4-755••CX-12 138 .51 75 75.0 76 DS140S'••CX-11 1,4 71 .59 40 36.0 80 M-II-TW75T**CX-10 3,5 145 .64 75 73.0 80 # M-1-TW40L••CX-12 3,5 72 .62 40 37.5 80 M-I-TW40L*•CX-13 1,3,5. 72 :64 40 37.5 80 j Standard Footnotes: # . 1. Heat traps. 2. Manufactured (Mobile) Home Model. ; 3. Power Combustion or Power Vent 4. Direct Vent. 5. Electronic Ignition (No Standing Pilot). # Rating Voluntarily revised since last directory. + Rating revised by program since last directory.