BMCH2016-0142S a�
VOICE (760) 777-7125
78-495 CALLE TAMPICO 4
FAX (760) 777-7011
LA QUINTA, CALIFORNIA 92253 COMMUNITY DEVELOPMENT DEPARTMENT INSPECTIONS (760) 777-7153
BUILDING PERMIT
Date: 6/1/.2016
Application Number: BMCH2O16-0142 Owner:
Property Address: •51290 AVENIDA BERMUDAS BANK OF THE DESERT NATL ASSN
APN: 770151001 915 HIGHLAND POINTE 350
Application Description: RABID BANK / HVAC CHANGE OUT ROSEVILLE, CA 92253
Property Zoning:
Application Valuation: $28,000.(30
Applicant: Contractor:
ACCO ENGINEERED SYSTEMS INC ACCO ENGINEERED SYSTEMS INC
6265 SAN FERNANDO ROAD 6265 SAN FERNANDO ROAD
GLENDALE, CA 91201 GLENDALE, CA 91201
-----------------------------------------
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my License is in full force and effect.
License Class: C-4 C20 C36 C38 C10 B A cense No.: 12 6
Dat ef r Contractor:'
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's State
License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any
city or county that requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for the permit to file a
signed statement that he or she is licensed pursuant to the provisions of the
Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division
3 of the Business and Professions Code) or that he or she is exempt therefrom and the
basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a
permit subjects the applicant to a civil penalty of not more than five hundred dollars
($500).:
( ) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for sale.
(Sec. 7044, Business and Professions Code: The Contractors' State License Law does not
apply to an owner of property who builds or improves thereon, and who does the Nork
himself or her through his or her own employees, provided that the improvements
are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner -builder will have the burden of proving that
he or she did not build or improve for the purpose of sale.).
(_) I, as owner of the property, am exclusively contracting with licensed contractors
to construct the project. (Sec. 7044, Business and Professions Code: The Contractors'
State License Law does not apply to an owner of property who builds or improves
thereon, and who contracts for the projects with a contractor(s) licensed pursuant to
the Contractors' State License Law.).
(_) I am exempt under Sec. . B.&P.C. for this reason
Date:
Owner:
'CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for
the performance of the work for which this permit -is issued (Sec. 3097, Civ. C.).
Lender's
Lender's
(818)244-6571
Llc. No.: 120696
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the performance
of the ,Wk for which this permit is issued.
I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which this permit
is issued. My workers' compensation insurance carrier and policy number are:
Carrier: _ Polity Number: _
I certify that in the performance of the work for which this permit is issued, I
shall not employ any person in any manner so as to become subject to the workers'
compensation laws of California, and agree that, if I.should become subject to the
workers' compensation provisions of Section 37 0 of the Labor ode, I shall fo ith
comply it these provisions.
C /Date:W1 1'0 Aoolicant:
WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL,
AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO
ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF
COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE,
INTEREST, AND ATTORNEY'S FEES.
APPLICANT ACKNOWLEDGEMENT
IMPORTANT: Application is hereby made to the Building Official for a permit subject to
the conditions and restrictions set forth on this application.
1. Each person upon whose behalf this application is made, each person at whose
request and for whose benefit work is performed under or pursuant to any permit
issued as a result of this application , the owner, and the applicant, each agrees to, and
shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and
employees for any act or omission related to the work being performed under or
following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is
not commenced within 180 days from date of issuance of such permit, or cessation of
work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives of 4cityter upoVthe
above-ment• n property for inspection purposes.
r
Date: Llo Signature (Applicant or Agen
DESCRIPTION
FINANCIAL INFORMATION
ACCOUNT QTY AMOUNT r
PAID
PAID DATE
BSAS SB1473 FEE
101-0000-20306
0 $2.00
$0.00
PAID BY
METHOD'
RECEIPT #
CHECK #
CLTD BY
Total Paid for BUILDING STANDARDS ADMINISTRATION BSA: $2.00 $0.00
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
HVAC CHANGEOUT - SPLIT -SYSTEM
101-0000-42402
0
$217.56
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
HVAC CHANGEOUT - SPLIT -SYSTEM PC
101-0000-42600
0
$108.78
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
Total Paid for CHANGEOUT: $326.34 $0.00
DESCRIPTION
ACCOUNT.
QTY
AMOUNT
PAID
PAID DATE
PERMIT ISSUANCE
101-0000-42404
0
$91.85
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
Total Paid for PERMIT ISSUANCE: $91.85 $0.00 '
TOTALS:0•
Description: RABO BANK / HVAC CHANGE OUT
Type: MECHANICAL Subtype: Status: ON HOLD
Applied: 5/3/2016 RSE
Approved:
Parcel No: 770151001 Site Address: 51290 AVENIDA BERMUDAS LA QUINTA,CA 92253
Subdivision: Block: 10 Lot:2
Issued:
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning:
Finaled:
Valuation: $28,000.00 Occupancy Type: Construction Type:
Expired:
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details: CHANGE OUT (2) 13SEER/80AFUE SPLIT SYSTEMS AND (1)DUCTLESS SPLIT.
[2013 ENERGY) CARBON MONOXIDE ALARM(S) TO BE INSTALLED PRIOR TO FINAL INSPECTION. 2013 CALIFORNIA BUILDING CODES.
ADDITIONAL SITES
Printed: Wednesday, June 01, 2016 10:23:05 AM 1 of 2
SYSTEMS
CONDITIONS
CONTACTS
NAME TYPE
NAME
ADDRESSI
CITY
STATE
ZIP PHONE FAX EMAIL
APPLICANT
ACCO ENGINEERED SYSTEMS INC
6265 SAN FERNANDO
ROAD
GLENDALE
CA
91201
CONTRACTOR
ACCO ENGINEERED SYSTEMS INC
6265 SAN FERNANDO
ROAD
GLENDALE
CA
91201
OWNER
BANK OF THE DESERT NATL ASSN
1915 HIGHLAND POINTE
350
ROSEVILLE
CA
92253
Printed: Wednesday, June 01, 2016 10:23:05 AM 1 of 2
SYSTEMS
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
CLTD
BY
BSAS SB1473 FEE
101-0000-20306
0
$2.00
$0.00
Total Paid for BUILDING STANDARDS ADMINISTRATION $2.00 $0.00
BSA:
HVACCHANGEOUT-
101-0000-42402
0
•$217.56
$0.00
SPLIT -SYSTEM
HVAC CHANGEOUT -
101-0000-42600
0
$108.78
$0.00
SPLIT -SYSTEM PC
Total Paid for CHANGEOUT: $326.34 $0.00
PERMIT ISSUANCE
101-0000-42404
0
$91.85 1
$0.00
Total Paid for PERMIT ISSUANCE: $91.85 $0.00
TOTALS:i i 00
INSPECTIONS
PARENT PROJECTS
BOND INFORMATION
ATTACHMENTS
Printed: Wednesday, June 01, 2016 10:23:05 AM 2 of 2
SYSTEMS
J I H l t Ut• UALIt•UMIN
MECHANICAL SYSTEMS
CEC-NRCC-MCH-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
^A. CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
Mechanical Systems (Page 1 of 4)
Project Name: p /t BOB /tt� K Date Prepared: 05/17/2016
B. MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included)
For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual
Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
YES
NO
Form/Worksheet #
Title
l� •
❑
NRCC-MCH-01-E (Part 1 of 3)
Certificate of Compliance, Declaration. Required on plans for all submittals.
QUI
❑
NRCC-MCH-01-E (Part 2 of 3)
Certificate of Compliance, Required Acceptance Tests (MCH -02A to 11A). Required on plans for all submittals.
MCH -04A
❑
NRCC-MCH-01-E (Part 3 of 3)
Certificate of Compliance, Required Acceptance Tests (MCH -12A to 18A). Required on plans where applicable.
MCH -08A
❑
NRCC-MCH-02-E (Part 1 of 2)
Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans.
Equipment
❑
INRCC-MCH-02-E (Part 2 of 2)
Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenserwater
systems. It is optional on plans.
❑
�1
NRCC-MCH-03-E
Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. Itis
optional on plans.
❑
IN
NRCC-MCH-07-E (Part 1 of 2)
Power Consumption of Fans. Required on plans where applicable
❑
C4
NRCC-MCH-07-E (Part 2 of 2)
JPower Consumption of Fans, Declaration. Required on plans where applicable
C. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
Test Performed By:
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVACsystems. The designer is required to check the applicable boxes for all
acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.
Installing Contractor:
The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or.installation for which they are responsible.
Enforcement Agency:
Plancheck — The NRCC-MCH-01-E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked.
Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
Test Description
MCH -02A
MCH -03A
MCH -04A
MCH -05A
MCH -06A
MCH -07A
MCH -08A
MCH -09A
MCH -10A
MCH -11A
Equipment
# of
Outdoor
Single Zone
Air
Economizer
Demand
Supply Fan
Valve Leakage
Supply Water
Hydronic
Automatic
Requiring Testing
units
Air
Unitary
Distribution
Controls
Control
VAV
Test
Temp. Reset
System
Demand Shed
or Verification
Ducts
Ventilation
Variable Flow
Control
(DCV)
Control
CU/FC - 1 &2
2
❑
❑
❑
❑
❑
❑
❑
❑
.CU/FC - 3
1
❑
❑
❑
❑
❑
. ❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑.
❑
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
MECHANICAL SYSTEMS
M.
CEC-NRCC-MCH-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
A. CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
Mechanical Systems (Page 2 of 4)
Project Name: Date Prepared:
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
❑
❑
❑
❑
❑
01
❑
❑
❑
. ❑
Installing Contractor:
❑
❑
a
❑
❑
❑
❑
❑
❑
❑
Ploncheck — The NRCC-MCH-01 - E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked.
❑
❑
❑
❑.
❑
❑
❑
❑
❑
❑
MECHANICAL HVAC ACCEPTANCE FORMS (check box for required forms)
Test Performed By:
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptop ce tests for HVAC systems.
The designer is required to check the applicable boxes for all
acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the some type that requires o test, list the equipment description and the number of systems:
Installing Contractor:
The contractor who installed the equipment is responsible to either conduct the acceptance test them self or have a qualified
entity run the test for them.
If more than one person has
responsibility for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
The following tests require a
Enforcement Agency:
Ploncheck — The NRCC-MCH-01 - E form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked.
Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
Test Description
MCH -12A
MCH -13A
MCH -14A
MCH -15A
MCFI-16A
MCH -17A
MCH -18A
Equipment
#i of
Fault Detection &
Automatic Fault
Distributed Energy
Thermal Energy
Supply Air
Condenser Water
ECMS
Requiring Testing
units
Diagnostics for DX
Detection &
Storage DX AC
Storage (TES)
Temperature Reset
Reset Controls
or Verification
Units
Diagnostics for Air &
Systems
Systems
Controls
Zone
CU/FC - 1 &2
❑
❑
❑
❑
❑
❑
❑
CU/FC - 3
❑
❑
o
❑
❑
❑
❑
❑
o
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
MECHANICAL SYSTEMS,
CEC-NRCC-MCH-01-E Revised 05115 CALIFORNIA ENERGY COMMISSION"`�'
A. CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
Mechanical Systems (Page 3 of 4)
Project Name: n /t BOB A N K Date Prepared: 05/17/2016
5/1 7/201G
May 2015
MECHANICAL SYSTEMS
CEC-NRCC-MCH•01-E Revised 05115 CALIFORNIA ENERGY COMN41SSION
A. CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
Mechanical Systems (Page 4 of 4)
IProject Name: RABOBANK I Date Prepared: 05/17/2016 I
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: RACHAEL SCHELLEY
Documentation Author Signature:
cor"pany:. ACCO ENGINEERED SYSTEMS
signature Date: 05/24/2016
Address: 265 MCCORMICK AVE.
CEA/HERS Certification identification (if applicable):
City/State/Zip: COSTA MESA / CA / 92626
Phone: 714/ 352-2226 ext. 183
RESPONSIBLE PERSON'S DECLARATION STATEMENT j
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. 1 am eligible under Division 3 of the Busiriess and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is requ' to be included with the documentation the builder provides to the
building owner at occupancy.
Responsible Designer Name: JUSTIN KIRCHART
Responsible Designer Si nate
company: ACCO ENGINEERED SYSTEMS -
Date signed: 05/24/20 6
Address: 265 MCCORMICK AVE.
License: M33976
City/State/Zip: COSTA MESA / CA/92626
Phone: 714/ 352-2226 ext. 120
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
HVAC SYSTEM REQUIREMENTS
.�
CEC-NRCC-MCH-02-E Revised 05/15 'CALIFORNIA ENERGY COMMISSION' -�-
CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Dry System Requirements (Page 1 of 3)
Project Name: RABOBANKDate Prepared: 05/17/2016
A. Equipment Tags and System Description'
CU/FC-1 &2
CU/FC-3
B. MANDATORY MEASURES
Heating Equipment Efficiency3
Cooling Equipment Efficiency3
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leakage AHUs
Ventilation
Demand Control Ventilations
Occupant Sensor Ventilation Control6
Shutoff and Reset Controls
Out Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
C. PRESCRIPTIVE MEASURES
T-24 Sections
Reference to the Requirements in the Contract Documents2
110.1 or 110.2(a) 80% 4.11 COP
110.1 or 110.2(a) 13 SEER 19 SEER
110.2(b), 110.2(c) YES YES
110.2(d) N/A N/A
110.2(f) N/A N/A
120.1(b) (E)0.15 CFM/FT2 N/A
120.1(c)4 N/A N/A
120.1(c)5,'120.2(e)3 N/A N/A'
120.2(e) YES YES
120.2(f) N/A N/A
120.2(g) N/A N/A
120.2(h) N/A N/A
120.2(i) N/A N/A
120.4 N/A N/A
Equipment is sized in conformance with 140.4(a & b) @, , @N Y/N
140.4 (a & b) lTl�'�
Supply Fan Pressure Control 140.4(c) N/A N/A
Simultaneous Heat/Cools 140.4(d) N/A N/A
Economizer 140.4(e) N/A N/A
Heat and Cool Air Supply Reset 140.4(f) N/A N/A
Electric Resistance Heating' 140.4(g) N/A N/A
Duct Leakage Sealing and Testing.10 140.4(1) N/A N/A
Notes:
1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units
with common requirements can be grouped together.
2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system.
3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency
requirements are applicable (e.g. full- and part -load) include all. Where appliance standards apply (110.1), identify where
equipment is required to be listed per Title 201601 et seq.
4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central
unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the
plans and specifications. Multiple zone central air systems must also provide a MCH -03-E form.
5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the
sequence of operation.
6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and
the sequence of operation
7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).
For all systems.identify the specification for the thermostats and time clocks.(if applicable).
8. Identify where the heating, cooling and deodbond airflows are scheduled for this system. Include a'reference to the
specification of the zone controls. Provide a MCH -03-E form.
9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies.
10. If duct leakage sealing and testing is required, a MCH -04-A form must be submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS
t"GI .
�Fof�.•
CEC-NRCC-A4CH-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Wet System Requirements (Page 3 of 3)
Project Name: RABOBANK ePrepare` 05/17/2016 .
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: RACHAEL SCHELLEY
Documentation Author Signature:
Company: ACCO ENGINEERED SYSTEMS
Signature Date: 05/24/2016
Address: 2655 MCCORMICK AVE.
CEA/HERS certification Identification (if applicable):
City/State/zip: COSTA MESA / CA / 92626
phone: 714/ 325-2226 ext. 183
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. I am eligible under Division 3 of the Business and Prcfessions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement'
agency for approval with this building permit application.
S. I will ensure that a completed signed copy of this Certificate of Compliance shall be made availa with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I under a d that a completed signed copy of this
Certificate of Compliance is required to be included with the documentation the builder pro the building owner at occupancy.
Responsible Designer Name: JUSTIN KIRCHART
Responsible Designer Signat e:
Company: ACCO ENGINEERED SYSTEMS
Date Signed: 05/24/20 6
Address: 265 MCCORMICK AVE.
License: M33976
City/State/Zip: COSTA MESA / CA / 92626
phone' '714/ 325-2226 ext. 120
CA Building Energy Efficiency Standards,- 2013 Nonresidential Compliance May 2015
Iain #
City of La Q uin to
Building 8t" Safety Division
.78-495 Calle Tampico
La Quinta, CA 92253 - (760) 777-7012
19 -1- Building Permit Application and Tracking Sheet
Permit #
L I b-10
Project Address: S 12 %V tU i {1 Z, mmu-4
Owner's Name: 6ti
A. P. Number:
Address:
Legal Description:
City, ST, Zip:
Contractor: 1 i
W
Tel'e'phone:minim
Address: `lrj SMS% � A4WI S
• Project Description:
City, ST, Zip:lCM � A ?,D �
t" (2STou Sy I
le h o
Telephone: P l8
!
l S
e� 1
t v
State Lic. # :(`> (�
City Lic. #:
Arch., Engr., Designer:
Address:
City, ST, Zip:
Telephone:
'.
...............�...(:...:::....::.
C on s[ructi on Type: Occupancy:
P Occu Y•
State to Lic. #:
Project tYPa (circle one): New Add'n Alter Repair air De mo
Name of Contact Person: '1/
Sq. Ft.:
#Stories:
# Units:
Telepphone# of Contact Person: &/,p a 1 R' Estimated Value of Project: 2A too , v" o
wL)LU A!E)ACE�[��jL�UILc-'AP�CANT: DO NOT WRITE BELOW THIS LINE
#
Submittal
Req'd
Recd
TRACKING
PERMIT FEES
Plan Sets
Plan Check submitted
Item
Amount
Structural Cates.
Reviewed, ready for corrections
Plan Check Deposit
Truss Cates.
Called Contact Person
Plan Check Balance
Title 24 Cates.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2"" Review, ready for corrections/issue
Electrical
Subcontactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
'"! Review; ready for corrections/issue
Developer Impact Fee
Planning Approval
Called Contact Person
A.I.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees,
Total Permit Fees
t.:w