9902-120 (PLBG)LICENSE6 CONTRACTOR DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of
.Clapier 9 (commencing with Section 7000) of Division 3 of the Business and
Professionals Code, and my License is in full force and effect.
License # Lic. Class Exp. Date
697275 C16 C20
Date e'-a•x I Y'Z Signature of Contractor
,, v
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's
License. Law for the following reason:
( .) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec. 7044, Business & Professionals Code).
( ) I, as owner of the property, am exclusively contractuig with lidehsed
Contractors to construct the project (Sec. 7044, Business & Professionals
Code).
( ) I am exempt under Section B&P.C. for this reason
Date Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of .perjury one of the following declarations:
( ) I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
( ). I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued. My workers' compensation insurance carrier & policy no. are:
Carder Policy No.
(This section need not be completed if the permit valuation is for $100.00 or less).
( ) I certify that in the performance of the work for which this permit is issued,
I shall not employ any person in any manner so as to become subject to the
workers' compensation laws of California, and agree that if I should become
subject to the workers' compensation provisioRs:6f"Section 3700•of,the Labor
Cp8e, I shall Iorthyw�ith,compy with ose�p vVisionS.`+
fate;�7.! "Applicant
p
Warning: Failure to secure Workers' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000, in
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorney's fees.
IMPORTANT Application is hereby made to the Director of Building and Safety
for a permit subject to the conditions and restrictions set forth on his
application.
1. Each person upon whose behalf this application is made & each person at
whose request and for whose benefit work is performed under or pursuant to
any permit issued as a result of this applicaton agrees.to, & shall, indemnify
& hold harmless the City -of La Quinta, its officers, agents and employees.
2. Any permit issued as a result of this application becomes null and void if
work is not commenced within 180 days from date of issuance of such
l%1
permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
construction, and hereby authorize representatives of this City to enter upon h
the above-mentioned property for inspectiionn purposes. f.
S�ature Owner/A ent`,�--_... Date°"� f"i2�(
9 ( 9 )-� „ l
L� � r'
BUILDING PERMIT PERMIT #
DATE 2/Z2/99 VALUATION S6.843 f(ff) LOT TRACT
JOB SITE
ADDRESS Se"75 �..5�.Li4 E :RONDO
APN
OWNER
CONTRACTOR DESIGNER / ENGINEER
MICHAEL MI*t
9
30875 CAL LE RONI DO
saW5 PEKEZ RD. fl7A
L.t1 QUiNL'A,• CA 92253
('_*Kt'.HEfiitttl Cr1*`+` CA 922.44
060):124-4942 C:Rf,fd 1635
USE OF PERMIT
SEPTIC iViO DO?vWNT - St:,iAF�st� c.'CV���� x► }tv
V /Al.xi is)i%jw 6,%1$141•L.10 LIS,
01.33TOF CONSTRUCTIaN
6, 3, .41. 1-1 0
F'Gt,7A!k137Nt;f'N�--Sl.:W%E?ft 301-LIOLI-�I..�-.3L3U $.JU.lN1
•
Z
LI ESS Mi[rTME) VETS
s oko
$30t!a .00 y!1
aks
�
Q t1r� .1i .
,RECEIPT
DATEB+YINSPECTOR
4
I
ji.
-5,/
W.
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION,
DATE
INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
Forms & Footings
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck
Exhaust Fans
O.K. to Wrap
F.A.U.
Framing t
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
Final
Final
POOLS - SPAS
BLOCKWALL APPROVALS
Steel
Set Backs
Electric Bond
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final
Gas Piping
PLUMBING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure
Shower Pans
O.K for Finish Plaster
Sewer Lateral
Pool Cover
Sewer Connection -
Encapsulation
Gas Piping
Gas Test
Appliances +
Final
nn
COMMENTS: s79S-
ivy % Q,,, '79cY
r
f
Final
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power, Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
COACHELLA VALLEY WATER DISTRICT
1 -
CASH RECEIPT DETAIL'�4�' ♦e %'e�.
I L.i y
Received From:
Address: r //o "� r �`. (9 4/ 't
/ 7 / -i �to
' Account No. 61 b / G 6 !• 6 9 `J • L/' Lot(s• Trac:7u
Service Address rU f % Gam, �-t— G.A. Code
❑ Meter(s)
❑ Service(s)
❑ Backflow(s)
❑ House Lateral(s)
❑ DetectorCheck(s)
❑ Meter Surcharge
Sanitation Capacity Charge S
❑ W.S.B.F.C.
❑ Temporary Construction Meter
❑ Turn on Charge
❑ Uncollected Account- Name
❑ Inspection Fee - Tract -
Fee -
: ❑ Plan Check Fees Water I Sewer -
Tract -
❑ Bond Payment - A.D. - Bond
❑ Customer Deposit
❑ Other
$
a
l
TOTAL
$ �', oz IL C
Remarks:
❑Copy to:
Cash
Water Service i t
Check
Cashier
Money
Order
CMD -43801189)
a
l
Pop HL ORNIA 92235-2448
(760) 360-7448
(760)321-7448
CUSTOMER'S ORDER
NO.
DATE ORDEQ
011 c
S-6 o
ORDER TAKEN BY
DATE PROMISED 0 A.M.
`p,60
0 P.M,
BILL TOG p �7 _.
S..o G_ t
I ✓H-
'
PHONE
ADDRESS
MECJYAQIIC�
CITY
Dumping Fee per 1000 gal. z
HELPERJ'
JOB NAME ANDC
�LOATIQjV
Il
kWORK
l}iSv
❑CONTRACT
DESCRIPTION OF WORK `�"'�
XTRA
0 E)
Ir
Q r— 'C✓'
� o
Locating / Opening Fee (per hour)
QUANT.
DESCRIPTION OF MATERIAL USED
P CE
AMOUNT
S-6 o
Gallons
`p,60
Pumping Fee per 1000 gal.
�S
r7�
o
1 8
Dumping Fee per 1000 gal. z
Out of Area Fee
Locating / Opening Fee (per hour)
Size System:
A SERVICE CHARGE OF $20 WILL BE DUE
ON ALL RETURNED CHECKS.
18% PER YEAR WILL BE CHARGED ON
PAST DUE ACCOUNTS OVER 30 DAYS.
HOURS
LABOR AMOUNT
TOTAL
MATERIALS
MECHANICS Q
TOTAL
LABOR
HELPERS Q
I hereby a9knowledge'fh-satisfactor
completi" oyttSe abo e describ_edwgrk-�--TA ABOR
TAX
$IGNA7. RE
S/ -/
DATE COMPLETED
;2 A,-� 9 7
TOTAL
?C7
O
NOTICE TO OWNER
Under the California Mechanics Lien Law any contractor, subcontractor, laborer, supplier
or other person who helps to improve. your property, but is not paid for his/her work or
supplies, has a right to enforce a claim against your property. This means that after a court
hearing, your property could be sold gjC'a court officer and the proceeds of the sale used to
satisfy the indebtedness. This can happen even if you have paid your contractor in full it the
subcontractors, laborers or -suppliers remain unpaid.
To preserve thelr"right to file a claim or lien against your property, certain claimants such
as subcontractors or material suppliers are required to provide you with a document entitled.
"Preliminary Notice:' Original (or prime) contractors and laborers for wages do not have to,
provide this notice. A Preliminary Notice is not a lien against your property. Its purpose is to
notify you of persons who may have a right to file a lien against your property if they are not
paid. Generally, the maximum time allowed for filing a claim or lien against your property is
ninety (90) Days after completion of your project.
TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY,
YOU MAY WISH TO TAKE ONE OR MORE OF THE FOLLOWING STEPS:
1) Require that payments be made directly to subcontractors and material suppliers through
a joint control. Any joint control agreement should include the addendum approved by the
Registrar of Contractors.
2) Issue joint checks for payment, made out to both your contractor and subcontractors or
material suppliers Involved in the project. This will help to Insure -that all persons due payment
are actually paid.
3) After UPON making payment on any completed phase of the project, and before making
any further payments, require your contractor to provide you with unconditional lien releases
signed by each material supplier, subcontractor and laborer Involved in that portion of the
work for which payment was made. On projects involving improvements to a single family
residence or a duplex owned by Individuals, the persons_ signing ttte$ejeleases lose the right
to file a claim against your property. In other types of construction this protection may still be
important, but may not be as complete. TO PROTECT YOURSELF UNDER THIS OPTION YOU
MUST BE CERTAIN THAT ALL MATERIAL SUPPLIERS, SUBCONTRACTORS OR LABORERS
HAVE SIGNED.