Loading...
0306-327 (RR)LICENSED CONTRACTOR DECLARAT(6N I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date 463UM C39., Ufi13]�kl Date �'�'' � Signature of Contractor � '.-f •i re OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for Sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Cartier YFA TE: iW'AL, Policy No. i 104623-W (This section need not be completed if the permit valuation is for $100.00 or less). ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those, provisions. / Date: f Applicant 1.4AA,...•, II . 4,, ,- Warning:fFalldre to secure Workers Compens tion coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon the above-mentioned property for inspection purposes. /13 ,,Signature (Owner/Agent). +f + A.. !+;� • r� r ,Date 1 i" C !� BUILDING PERMIT PERMIT# f5:�i'1�.•�27 �.. DATE E VALUATION :05 AXLOT TRACT ADDRESS ;S 5. 400 L' oaf lwyx iufnrd'1.G . JOB SITE APN - OWNER CONTRACTOR / DESIGNER / EN (NEER WrA WkZT IJP ` .. F2. ALK—sf'?AMON TA'HRONEU.A R00FING P.°.?.130�t 1$16 ie, -314 *',,'.TMi0" R0, LA QTTlry 19'a CA 922M-1116 C :r�1HEDR.AaXI-ir CA AVIV. e1jI9J},321-� ,82. i.i-1:# 5230 USE OF PERMIT 0YNERM, BU13?3%,0 ltLr•t;.Lit}YSTAi[IMIU { O.�►'�Pf :�USF,:('C71.�1".►t.�'Tiite?:: C�ti1 i•t:T.�1Si A. krrA71ClL.J.��ir4 �►1'�i•it t3A9.L$ATi011 10100 LZ Rp.LLI)OF rf- C)1 U(�:• S S•t1t : 23L.tt4 e D JUN CI Y OF LA QUINTA -F CE DEPT• r� SM-TJIN..: OMVITI RUQ` 014 AND FLM CFEC' < u3�t.4Ct I'M1111 PRE -PAW 1`MA3. MMYT MES DTJE NOW RECEIPT DATES/ i' BY_'�� __•••_�. DATE FINALED INSPECTOR r� INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final BLOCKWALL APPROVALS POOLS - SPAS Steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit . Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles SS.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) COMMENTS: February 18, 2003 PGA West Master Association 55-400 PGA Blvd La Quinta, Ca 92253 Ph: 760.564.3858 Fax: 760.564.2329 RE: Stadium Gatehouse Dear Nancy, Thank you for your interest in Petronella Roofing. Enclosed are the specifications for your roof replacement. The reliability, quality and professionalism of Petronella Roofing is represented in our twenty - two successful years in the roofing industry. We are proud of our reputation for putting the customer first in every area of our operations. We feel that this attitude is one of the most important contributors to our success of the customers we serve. After reviewing the enclosed information, please call me at (760) 324-5482 if you have any questions or need any additional information. .Thank you for the opportunity to bid your project. Sincerely, Gary Rogers Special Services. Corlm 29C Office: 2626 Nkvq ort Blvd. Cpaa Mcsa� CA 92627 (49) 544-1645 / (940):548-2617 fax :,TIIIE RE O OF ING . Desert Office: 68314 Kieley Road Cathedral City, CA 92234 (760) 324-5482 / (760) 328-4612 fax S PE C I A LIS TS -INC. SA"4k440" SCOPE OF WORK Furnish all labor, materials, equipment and services necessary for completion of all roofing and related work as specified in this document. QUALITY ASSURANCE The responsibility . for proper installation of all components of the roofing system lies solely with Petronella Roofing. The contractor shall inform the Owner of any conditions detrimental to the quality construction of the roofing system, and shall not proceed with the work until the conditions are corrected.' PRINCIPLES OF WORK Remove from the building and premises existing system. Remove and replace decking as necessary. 'Install as necessary sheet metal flashings, pipe and conduit flashings, pitch pans, roof drain fittings and any other related items as necessary for the.proper installation of the roofing system. STORAGE AND PROTECTION OF MATERIALS Precautions shall be taken to keep roofing product clean, dry and free of damage. PUBLIC SAFETY Materials and equipment must be installed in such a manner as to preclude any danger, disturbance or interference with normal business operations, or to constitute a fire hazard. State, Local and Federal Fire and Safety Regulations shall be complied with fully in the performance of the required work. DEMOLITION Demolish and completely remove from the building and premises existing roof system or systems, flashing, base flashings and wood blocking. The existing deck shall be exposed and swept away free of all foreign objects (dust, gravel, etc.) prior to proceeding the new roofing installation. Existiiig°mechanical equipment items, wood'. equipment supports, vent pipes, conduit and ductwork; no . longer in service shall be removed entirely from the roof as directed by Owner. Resulting open penetrations through the roof shall be repaired as required. Only as much existingroofing shall be removed so that in the event of a change of weather the exposed decking can be. waterproofed: MANNER OF DEMOLITION Demolition :work shallbe terminated in such a manner as"to leave remaining construction straight and clean. Precautions and methods shall be used so as not to damage or deface the"e'xisting facilities. Disposal of demolished materials: Materials, equipment debris, etc., resulting from the ,demolition shall be promptly removed from the premises. Removed construction material, equipment and rubbish to be disposed of by contractor. . STRUCTURAL INTEGRITY The structural integrity of the existing buildings must be maintained at all times, especially during the.demolition phases of the project. .Results...expected: The deck surface shall be smooth, clean, free from surface moisture with damage areas repaired prior to the installation of the Built -Up roof system. I SPECIAL INSTRUCTIONS 1. Grounds to be kept neat, clean washed down daily. 2. All debris hauled away from jobsite daily. 3. All areas under construction to be marked off with safety cones and construction tape. 4. Hours of Operation: 7:00 a.m. to 4:00 p.m., five (5) days a week. 5. Job staffed with a diligent crew of journeymen roofers. 6. All debris to be handled in trash chutes to dumpsters below. 7. Obtain all necessary permits and inspections to be in accordance with the City. 8. Peironella Roofing to provide liability and Workmen's Compensation Insurance. 1 %" FOAM ROOFING SYSTEM 1. Tear off existing roof system. 2. All loose gravel, dust and residue shall be removed using power vacuum equipment, power sweeper, air blowing, or other suitable means. 3. The roof shall be inspected or tested to determine if moisture is resent within the roof.assembly. If damp insulation is found, the- insulation might be able to be vented through the polyurethane foam or with insulation relief vents. Saturated insulation must be removed and replaced with compatible materials. 4. The existing roof shall be inspected for adhesion between felts, insulation, and deck. Areas of poor adhesion should be fastened. Blisters, buckles, wrinkles, and fishmouths shall be cut and /or fastened. 5. All soft mastic or asphaltic materials that could impede polyurethane adhesion must be removed Remove or refasten all loose base flashing, counter -flashing, and gravel stops as required. 6. All surfaces shall be primed with Evercoat Acrylic primer at the rate of not less than %2 gallon per 100 square feet prior to foam application. POLYURETHANE FOAM APPLICATION (Note) Apply black neoprene primer at the rate of/z gallon per 100 square feet. 1. Application shall be by a contractor approved by the PSI and ECI and' -in accordance with the PSI and ECI application instructions. 2. Substrate shall have sufficient slope to eliminate excessive ponding water. Ponding water is defined as an area of 10.0 square feet or more, which hold in excess of 2 inches of water as measured 72 hours after a rainfall. If the substrate does not have sufficient slope, then ponding water must be eliminated by building in slope by the application of polyurethane foam, channeling, and /or by the proper placement of drains. 3. Weather -Conditions: The foam application shall not proceed during periods of inclement weather. The applicator shall apply foam within the temperature and humidity and. -wind limitations specified by Polythane Systems." Wind barriers should be used if wind conditions could affect the quality of installation. 4. Spray polyurethane foam thickness shall be a minimum of (1.5 inch). The polyurethane foam shall be applied uniformly over the entire surface and the edges shall be feathered to produce smooth transitions: 5. The spray polyurethane foam must be applied in a minimal pass thickness of inch. 6. The spray polyurethane foam shall be -terminated neatly *A minimum of four (4) inches above the roofline at all penetrations (except drains, parapet wall, or building junction). Foamed in place cants shall be smooth and uniform to allow positive drainage. 7. The final sprayed polyurethane foam surface shall be smooth, orange peel, coarse orange peel, or verge of popcorn. Polyurethane foam surfaces termed popcorn or treebark are not acceptable. These areas shall be re -foamed to anacceptable surface. MAINTENACE PROCEDURES 1 � It is tecoimmended that : maintenance procedures, including annual inspections, be established with your contractor for any roofing system to yield maximum value. 3 PRODUCTS POLYURETHANE FOAM 1. The foam shall be Polythane Systems PSI SH200-30RD. 2. Physical properties of cured foam: A. Minimum in-place density is 3.0 lbs/cubic feet. B. Closed cell content is minimum 95%. C. Compressive strength, parallel rise is minimum 47 psi. D. The foam' shall have a flame spread rating of less than 41 when tested according to the procedures outlined in ASTM E-84. SPRAY APPLIED ELASTOMERIC ACRYLIC COATING SYSTEM (EVERCOAT 500/510) 1: The coating shall be the spray applied Everest elastomeric acrylic coating system, manufactured by Everest Coating Incorporated. 2. Physical properties of cured coating system. A. The coating shall have good resistance to ponding water. B. The coating system shall contain no plasticizers. C. The coating system shall contain no migrating fire retardants. D. The coating system shall have a class `B" fire rating over foam on a combustible deck when tested according to the products procedures outlined in ASTM E-108. E. The coating shall remain flexible in temperatures down to below 30 degrees F. F. Elongation, ASTM D-412 is minimum 502%. G. Tensile strength, ASTM D-412 is minimum 279 psi. H. Shore a hardness, ASTM C-661 is minimum 62. I. Reflectivity, ASTM E-97 is minimum 90% EVEREST ELASTOMERIC ACRYLIC COATING SYSTEM (500/510 1. Before the first coat of the system is applied, the installed foam insulation must cure a minimum of 2 hours. 2. When possible, the first coat should be applied the same day as the surface is foamed. If more than 72 hours elapses between application of the foam and the coating application, the foam surface shall be brushed with a stiff bristle broom or mechanically scarified and refoamed prior to application of the coating system. In no case shall the coating be applied over oxidized foam. 3. The coating system shall be sprayed or roller applied in a cross hatch technique without, causing runs or puddles., 4. The coating system shall be evenly applied in at least 2 separate coats'to achieve a total system of 3.0 gallons per 100 square feet (approximately 27 mils, excluding granules) as outlined below. A. First coat of approximately 13.5 mils(approximately 1.5 gallons per 100 square feet). B. Second coat of approximately' 13.5 mils (approximately 1.5 gallons per 100 square feet) with 30 lbs. per 100. square feet of 3M #11 cerami&roofing granules: C. These minimum recommendations for material usage are ideal conditions. The number of gallons per 100 square feet may need to increase due to uneven application, rough surface texture, wind conditions while spraying or other variables. D. Coating shall terminate at least 1 inch above or beyond the edge of applied foam in a neat and uniform manner. E. No coating shall be applied , if weather will not allow . it to dry prior to exposure to precipitation or freezing temperatures. 4 s CLEANING 1. Surfaces not intended to receive foam insulation and/or elastomeric coating materials shall be protected during the application of the system. Should this protection not be effective the respective surfaces shall be restored to their proper conditions. by cleaning, repairing or replacing. All debris from completion of work shall be completely removed from the project site. SHEET METAL 1. Replace all edge perimeter metal with new 24 gauge foam stop metal with 1" rise and 3" vertical face with 3/8" drip and return hemmed edge. Install over. plywood deck and nail with 1 1/2" annular threaded roofing nails at 9" on centers. Double nail all joints and use Sika -Flex elastomeric sealant at all metal joints. 2. Provide all new flashings for roof penetrations. Petronella Roofing will issue a 5 +10 Year "Weathershield" Warranty. H 1 V2" POLYURETHANE FOAM ROOFING SYSTEM Cost................................................................$ .00 1. Disconnect and reconnect a/c and provide new a/c platform- -_ Cost...................................................................$ `-- - - -- GrandTotal...................................... ...................$r ' W,