Loading...
0625 (BLCK)PERMIT APPLICATION City of La Ouinta Department of Building and Safety This permit becomes void it work not commenced within 180 days from date of issuance, OR, if work has been suspended or abandoned for a period of 180 days. LICENSED CONTRACTORS DECLARATION: I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force iand effect. License Class Lic. Number )ate Contractor _ OWNER -BUILDER DECLARATION: I hereby affirm that I am exempt from the Contractor's License Law for the lollowing reason (Sec. 7031.5, Business and Professions Code: Any city or county which requires a permit to construct, alter, improve. demolish, or repair any structure, prior to its issuance, also requires the applicant for . such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9(commencing with section 7000) of Division 3 of the Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption. Any violation.ot Section 7031.5 by any.applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500.): O 1. as owner of the property, or my employees with wages as their sole compensation,.will do the work, and the . structure is. not intended or offered for sale (Sec. 7044. Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds, or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the. building or i mprovemnt,is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale.). 0 I, as owner of the property,.am exculsively contracting with licensed contractors to construct the project (Sec. . 7044. Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects with a contractor(s) licensed pursuant to the Contractor's License Law.). 0 1 am exempt nnder'Sec. l !B. $ P.C. ( ttached Certificate). - �f"iii jn ,citcx.Y+� Oat Owner WORKERS' COMPENSATION DECLARATION: I hereby affirm that I have a certificate of consent to self -insure, or a certificate of Workers' Compensation Insurance , or a certified copy thereof (Sec. 3800. Lab. C.): - Policy No. Company 0 Certified copy is hereby furnished. O Certified copy is filed with the.City Building Inspection Department or City Department. Date Applicant APPLICTtNAM E,(l', F�Mq i / v .C� / '/1 iNall ADDRESS' 7� ^ �o C'h/I�- 11vA CITY/COM MUNI TYZTATE,ZI P JOB SI`D`RES PACE CITY/JCCOOMMUN ITY/STATE/ZI P BOK PAG PRC C TWN RNG SE S TRACT LOT MOD SB TRACT NAME OWNER NAME (L. F, MI) CONTRACTOR -FIRM NAME ADDRESS CITY/COMMUNITY/STATE/ZIP LICNC ARC/ENG FIRM NAME ' ADDRESS CITY/COMMUNITY/STATE/ZIP PHONE • LICNC USE OF PERMIT SL ZON FSB SSB SSB RSB OFC ZONE ORO • LOT SZ END SIDE CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE: This section need not be completed it the permit is for one hundred ($100) It, less. I certify that in the performance of the work for which this permit is issued. I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. Date Applicant NOTICE TOAPPLICANT: It, after making this. Certificate of Exemption, you should become subject to the Workers' Compensation provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. DIVISION OF INDUSTRIAL. SAFETY PERMIT CERTIFICATION: 0 1 hereby certify that no excavation five (5) or more feet in depth into which a person is required to descend, will be made in connection with work authorized by this permit, and that no building structure, scaffolding, falsework, or Sdemolition or dismantling thereof, will be more than thirty-six (36) feet high. (Chap 3.2, Grp 2. Art 2, Sec 341. Title 8. C.A.C.) . . O'As owner -builder, I will not employ anyone to do work which'would require a permit from the Division of Industrial Safety, as noted above, 'unless such person has a permit to do such work from that division. 0 Division of Industrial Safety Permit No. , Date Applicant CONSTRUCTION LENDING AGENCY: I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). w Lender's Name Lender's Address I certify that I have read this application and state that the above information is correct. I agree to comply with all . city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this county to enter upon the above-mentioned property for inspection purposes. Signature of Applicant or Agent Date CERTIFICATE OF COMPLIANCE AND AUTHORIZATION OF.ENTRY: I certify I have read this application and state that the information given is correct. I agree to comply with all state laws and county ordinances relating to buidling construction, and authorize a' representative of the City of La Ouinta Department of Building and Safety to enter upon the property for which I have applied for this permit for the purpose of making inspections. Signature of Applicant or Agent Print Applicant/Agent Name Date APPUPRMT f * / 21A7' '�1 /SD E p�� r7,Q,a� v ✓F1j �'1 A N. P`• ��./ G!� . ,.. � ��' tri TOTAL i FEE - VALUATION " BLDG. DEPT. NO. OPERATION DATE INSPECTOR NO. OPERATION DATE INSPECTOR Service Entrance 29 BUILDING APPROVALS . 29A Grounding Wire MECHANICAL APPROVALS 1 Set Back Fixtures 31 33• _ Ventilation System 2 Ftgs & Frms 34 Plenums&Ducts 2A Slab Grade 35 '• Furnace,Compart. Y 3 Steel 36 Inlets &.Outlets M 4 Grout Blocks .37 :Combustion. Air 5 Bond Beams 38 Compressor 6' Roof Deck 39 Appl. Clearance 7 Framing 40 Fire'Damper 8 Vents 41 Smoke".Detection Device 9 Garage Fire Wall 42 Commercial Hood 10 Fireplace P:L. ❑ 43 Final 10A fireplace T.O. ❑ NO. ADDITIONAL INFORMATION 11 12 Exterior Lath .Internal Lath 12A Drywall �77/ 13 Finish Grade 1AR`� INSULATION Thick al Value `/" ''V / 7A Walls (Batts) 12B Ceiling (Batts) 12C Ceiling (Blown) 14 Final PLUMBING APPROVALS 15 Ground Plumb 16 Water Piping 17 Rough Plumb 18 Vents 19 Sewage Disposal 20 Sewer 21 Water Heater 22 Water Softener 23 Water Service 24 Gas Test 25 Final SEWAGE SYSTEM SIZE:& LOCATION 26 Power Pole 27 Conduit 28 Service Entrance 29 Wiring 29A Grounding Wire 29B Bonding 30 Fixtures 31 Service 32 Final I ELECTRIC APPROVALS Tank Pit L. Line STREET.'NAME REAR OF PROPERTY -LINE ' CHANGE IN MATL SPEC. ^^ ^"^ ^ " ^'"'^ 6" C.M.U. f'n= 1500psi. Fy= 60000psi #4 @ 24" Vert 0 CL #4 0 24" Horiz 8" C.M.U.. SLD. GROUT f'n= 1504psi, Fy= 60004psi #5 @ 24" Vert 0 Edge #4 @ 24" Horiz 194 HORIZ. AS SHOWN �Q q?,Of ESS/0,,V s Q O ® No. 38239, u° � /v\� ��� of CA0� 10" 2'-9" i RETAINING WALL Scale: 1/2" = 1'-0" nvuciivl..ru•ir G1VV11VGGLlli`IV 111.10. r1Cu W11JV11 74-040 Highway 111 Descr: 3' RETAINING WALL - REVERSE Suite.--L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 (619)773-9373 ------------------------------------------------------7------------------------- RetainPro 3.1(c)1993 File:SMALLJOB.RPF CANTILEVERED RETAINING -------------------------------------------------------------------------------- WALL DESIGN Pg 1 of 2 ---------- SOIL DATA ------------- ------ ADDED VERTICAL LOADS-------- Allowable Bearing = 2,000 psf Axial DL on Stem = 0 plf Active Lateral EFP = 35.0 psf Axial LL on Stem = 0 plf ....Slope Active = 0.0 psf ..Ecc Left of Stem.CL = 0.00 in ..Active Press Limit = 500 psf Surcharge over Toe = 0.0 psf Bkfill Slope(0=level)= 0.0:1 Surcharge over Heel = 0.0 psf Passive Lateral = 350 pcf Using Surcharge to resist Soil Density = 110.0 pcf overturning @ Heel Yes Soil Ht over Toe = 6.0 in @ Toe Yes ------ ADDED LATERAL LOADS.------- -------- ADJACENT FOOTING ---------- Lateral Load Acting Vertical load = 0 plf On Stem Above Soil = 20.00 psf ...Ecc. (Toe side +) = 0.00 in Footing Width (perp) = 0.00 ft Add'l Lateral Load. = 0.0 plf Face Top Stem to Ftg. CL= 0.00 ft ...height to stop = 0.00 ft Ftg. Base Above/Below Soil ...height to start = 0.00 ft At Wall Face [+/-] = 0.00 ft Footing Type Line ---------------------------- WALL & FOOTING DATA ------------------------- Retained Height = 3.50 ft Toe Width. = 2.09 ft Wall Ht. above soil = 5.00 ft Heel Width = 0.67 ft Total Wall Height = 8.50 ft ------- Key Depth = 0.00 in Total Width = 2.76 ft Key Width = 12.00 in Thickness = 12.00 in Key Dist. to Toe = 0.833 ft SUMMARY Pressure @ Toe = 1,072 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning 1.53 :1 Allowable Press. = 2,000 psf Sliding = 2.12 :1 Eccentricity = 8.98 in Allowable Shear = 76.03 psi Resultant Outside Middle Third .1-Way Shear @ Toe = 8.5 psi Note: Pv Not Used -------------------------- for Soil Pres. 1-Way Shear @ Heel ---------------------------- = 0.0 psi ---------------- -------------------------------------------------------------- ----------------------------- SLIDING CHECK ------------------------------ Ftg/Soil Friction = 0.480 Tot Lateral Force*1.5= 622.5 # Soil @ Toe Not Used = 0.00 in (-)Passive Pressure = 393.8 # Factor of Safety = 2.12 (-)Friction = 487.4 # Add'l Force Req'd = 0.0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors)---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 1,496 0 psf Fy = 40,000 psi Mu - Upward = 0 0 ft-# Upward soil pres. used on heel Mu - Downward = 0 11 ft-# -------- Rebar Choices -------- Mu - Design = 1,444 11 ft-# Toe(bot) . Heel(top) One-Way Shear: Mu=Stem! #4 @Not Reqd in Not Reqd in vu = 8.51 0.02 psi #5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85= 76.03 76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00 in #8 @Not Reqd in Not Reqd in Ru = Mu/bd-2 = 0.0 0.0 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio = 0.0000 #10.@Not Reqd in Not Reqd in nvvr�lv�e�1•ir C1Vul1VCCiC11Vl� 11Lle: rrea wilson 1 74-040 Highway 111 4 Descr: 3' RETAINING WALL - REVERSE 0.50 Suite,.L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 115 (619)773-9373 120 RetainPro 1.1(c)1993 File:SMALLJOB.RPF --------------------------------- STEM DESIGN ---------------------------------- 0 (Values shown for concrete stems have been factored) Pg 2 of 2 0.00 I- Descending Stem Sections, Highest @ Left -� Stem Construction Data Highest (use columns from left to right) 0 ------------------------------------------------------------------------- DESIGN HT. ABOVE FTG. = 3.33 0..00 ft WALL TYPE ABOVE HT. Masonry Masonry Thickness (nominal) = 6.00 8.00 in Rebar Size = # 4 # 5 Rebar Spacing = 24.00 24.00 in Rebar Placed at Center Edge 1,150 DESIGNDATA.............. ................................................ 3 fb/Fb + fa/Fa = 0.985 0.927 Lateral Load @ Design Ht = 101 310 # MOMENT..... Actual = 267 849 ft-# Allowable = 271 916 ft-# SHEAR...... Actual = 4.36 5.43 psi Allowable = 19.36 19.36 psi Embedment Length Req'd = 18.00 6.00 Wall Weight = 43.0 78.0 psf Rebar Placed at Depth 'd'= 2.75 5.25 in MASONRYDATA........ ... ................................................ f'm = 1,500 1,500 psi Fs = 24,000 24,000 psi Grouting Part Full Special Inspection No No n : Es / Em = 25.78 25.78 Short Term Increase = 1.00 1.00 CONCRETEDATA............ ................................................ f'c = psi Fy = psi ------------------------- SUMMARY OF FORCES & MOMENTS ---------------------- I- Overturning Moments Resisting Moments -� Origin of Force: ---------------- -------- # ft ft-# # ft ft-# Heel Active Press. = ------ 354 1.50 ---------------- -------------- 532 Soil over Heel = Toe Active Press. _ Soil over Toe = Sloped Soil @ Heel = Adjacent Ftg. Load = Surcharge @ Heel = Surcharge @ Toe = Axial Load on Wall = Load @ Proj. Wall = Averaged Stem Wts. _ Earth Behind Stem = Added Lateral Load = Footing Weight = Key Weight = Vert. Componant of = Active Press. TOTALS = Totals used for Soil 0 0.00 0 415 1,212 --------- --------- Pressure, Pv Not Included= 414 1.38 571 0 1.33 0 0 0.00 6 1,015 1,853 ----- --------- 1,015 1,853 1 2.76 4 -39 0.50 -20 115 1.05 120 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0 0.00 0 100 7.00 700 482 2.38 1,150 3 2.67 8 0 0.00 0 415 1,212 --------- --------- Pressure, Pv Not Included= 414 1.38 571 0 1.33 0 0 0.00 6 1,015 1,853 ----- --------- 1,015 1,853 CHANGE IN MAT'L SPEC. "" "'"'� 6" C.M.U. f�n= 1500psi, Fy= 60000psi #4 0 24" Vert G CL #4 0 24" Horiz 8" C.M.U. f'n= 1500psi, Fy= 60000psi #5 @ 24" Vert @ Edge #4 @ 24" Horiz #d H �ll;� eROF ESSIO�,�� �� P• H 0cLQ R. QZ m ® No. 38239 ta(d qt c/v\\-,� - RETAINING WALL or CAO Scale: 1/2" = t' -a' HOGANCAMP ENGINEERING Title: Frea Wilson 74-040 Highway 111 Descr: 3.0 RETAINING WALL Stiite-L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 (619)773-9373 RetainPro 3.1(c)1993 File:SMALLJOB.RPF -------------------------------------------------------------------------------- CANTILEVERED -------------------------------------------------=------------------------------ RETAINING WALL DESIGN Pg 1 of 2 ---------- SOIL DATA ------------- ------ ADDED VERTICAL LOADS -------- Allowable Bearing = 2,000 psf Axial DL on Stem = 0 plf Active Lateral EFP = 35.0 psf Axial LL on Stem = 0 plf ....Slope Active = 0.0 psf ..Ecc Left of Stem CL = 0.00 in ..Active Press Limit = 500-psf Surcharge over Toe = 0.0 psf Bkfill Slope(0=level)= 0.0:1 Surcharge over Heel = 0.0 psf Passive Lateral = 350 pcf Using Surcharge to resist Soil Density = 110.0 pcf overturning @ Heel Yes Soil Ht over Toe = 6.0 in @ Toe Yes ------ ADDED LATERAL LOADS ------- -------- ADJACENT FOOTING ---------- Lateral Load Acting Vertical load = 0 plf On Stem Above Soil = 20.00 psf ...Ecc. (Toe side +) 0.00 in Footing Width (perp) = 0.00 ft Add'1 Lateral Load = 0.0 plf Face Top Stem to Ftg. CL= 0.00 ft ...height to stop = 0.00 ft Ftg. Base Above/Below Soil ...height to start = 0.00 ft At Wall Face [+/-] = 0.00 ft Footing Type Line ---------------------------- WALL & FOOTING DATA ------------------------- Retained Height = 3.50 ft Toe Width = 0.00 ft Wall Ht. above soil = 5.00 ft Heel Width = 3.00 ft Total Wall Height = 8.50 ft ------- Key Depth = 0.00 in Total Width = 3.00 ft Key Width = 12.00 in Thickness = 12.00 in Key Dist. to Toe = 0.833 ft SUMMARY =------------------------- Pressure @ Toe = 1,690 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning = 2.02 :1 Allowable Press. = 2,000 psf Sliding = 2.99 :1 Eccentricity = 9.63 in Allowable Shear = 76.03 psi Resultant Outside Middle Third 1 -Way Shear @ Toe = 0.0 psi Note: Pv Not Used for Soil Pres. 1 -Way Shear @ Heel = 5.6 psi ----------------------------- SLIDING CHECK ------------------------------ Ftg/Soil Friction 0.480 Tot Lateral Force*1.5= 622.5 # Soil @ Toe.Not Used = 0.00 in (-)Passive Pressure = 393.8 # Factor of Safety = 2.99 (-)Friction = 848.1 # Add'1 Force Req'd = 0.0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors) ---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 2,361 0 psf Fy = 40,000 psi Mu - Upward = 0 0 ft-# Upward soil pres. used on heel Mu - Downward = 0 0 ft-# -------- Rebar Choices -------- Mu - Design = 0 1,444 ft-# Toe(bot) Heel(top) One -Way Shear: Mu=Stem! #4 @Not Reqd in Not Reqd in vu = 0.00 5.57 psi #5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85=- 0.00 76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00 in #8 @Not Reqd in Not Reqd in Ru = Mu/bd"2 = 0.0 0.0 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio = 0.0000 #10 @Not Reqd in Not Reqd in t1VlJtilVl ti11Y G1V1711VGG.tC11V17 1 11.10 . l L eU W 115011 74-040 Highway 111 Descr: 3.0 RETAINING WALL Q Suite -L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 (619)773-9373 RetainPro 3.1(c)1993 File:SMALLJOB.RPF -=------------------------------- STEM DESIGN ---------------------------------- (Values shown for concrete stems have been factored) Pg 2 of 2 I- Descending Stem Sections, Highest @ Left -� Stem Construction Data Highest (use columns from left to right) ------------------------------------------------------------------------- DESIGN HT. ABOVE FTG. = 3.33 0.00 ft WALL TYPE ABOVE HT. Masonry Masonry Thickness (nominal) = 6.00 8.00 in Rebar Size = # 4 # 5 Rebar Spacing = 24.00 24.00 in Rebar Placed at Center Edge DESIGN DATA.............. ................................................ fb/Fb + fa/Fa 0.985 0.927 Lateral Load @ Design Ht = 101 310 # MOMENT..... Actual = 267 849 ft-# Allowable = 271 916 ft-# SHEAR...... Actual = 4.36 8.38 psi Allowable = 19.36 19.36 psi Embedment Length Req'd = 18.00 6.00 Wall Weight = 43.0 58.0 psf Rebar Placed at Depth 'd'= 2.75 5.25 in MASONRYDATA........... ................................................ f'm = 1,500 1,.500 psi Fs = 24,000 24,000 psi Grouting Part Part Special Inspection No 'No n : Es / Em = 25.78 25.78 Short Term Increase = 1.00 1.00. CONCRETE DATA............ ................................................ f'c = psi Fy = psi ------------------------- SUMMARY OF FORCES & MOMENTS ---------------------- I- Overturning Moments Resisting Moments -� Origin of Force: ---------------- -------- # ft ft-# # ft ft-# Heel Active Press. = ------ 354 1.50 --------- 532 --- --- ----- --------- Soil over Heel = 898 1.83 1,647 Toe Active Press. _ -39 .0.50 -20 Soil over Toe = 0 -0.00 0 Sloped Soil @ Heel = 0 0.00 0 Adjacent Ftg. Load = 0 0.00 0 0 0.00 0 Surcharge @ Heel = 0 0.00 0 Surcharge @ Toe = 0 0.00 0 0 0.00 0 Axial Load on Wall = 0 0 0.00 0 Load @ Proj. Wall = 100 7.00 700 Averaged Stem Wts. = 415 0.29 120 Earth Behind Stem = 3 0.58 2 Added Lateral Load = 0 0.00 0 Footing Weight = 450 1.50 675 Key Weight = 0 1.33 0 Vert. Componant of = 0 0.00 0 Active Press. --------- --------- -------- --------- TOTALS = --------- 415 1,212 1,767 2,444 Totals used for Soil Pressure, Pv Not --------- -------- Included= 1,767 --------- 2,444 CHANGE ' IN MATL SPEC. ^^ o"^ "= ^" ^'"'^ 6" C.M.U. f'n= 1500psi. Fy= 60000psi #4 @ 24" Vert @ CL #4 @ 24" Horiz 8" C.M.U., SLD. GROUT f'n= 1500psi, Fy= 60000ps1 #5 @ 24" Vert @ Edge #4 @ 24" Horiz 144 HORIZ. AS SHOWN �o @�Of ESS/ W No. 3823 v TC Jf CAL�t`�R RETAINING WALL Scale: 1/2" = Y-0" RVIJL'91V 1. t11'!t GLVVIIVGL.f(11V LI 111.1=. 1'1=11 W11 JV11 74-040 Highway 111 Descr: 3' RETAINING WALL - REVERSE Suite L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 (619)773-9373 RetainPro 3.1(c)1993 File:SMALLJOB.RPF -------------------------------------------------------------------------------- CANTILEVERED -------------------------------------------------------------------------------- RETAINING,WALL DESIGN Pg 1 of 2 ---------- SOIL DATA ------------- ------ ADDED VERTICAL LOADS-------- Allowable Bearing = 2,000 psf Axial DL on Stem = 0 plf Active Lateral EFP = 35.0 psf Axial LL on Stem = 0 plf ....Slope Active = 0.0 psf ..Ecc Left of Stem.CL = 0.00 in ..Active Press Limit = 500 psf Surcharge over Toe = 0.0 psf Bkfill Slope(0=level)= 0.0:1 Surcharge over Heel = 0.0 psf Passive Lateral = 350 pcf Using Surcharge to resist Soil Density = 110.0 pcf overturning @ Heel Yes Soil Ht over Toe = 6.0 in @ Toe Yes ------ ADDED LATERAL LOADS------- -------- ADJACENT FOOTING---------- Lateral Load Acting Vertical load = 0 plf On Stem Above Soil = 20.00 psf ...Ecc. (Toe side +) = 0.00 in Footing Width (perp) = 0.00 ft Add'1 Lateral Load = 0.0 plf Face Top Stem to Ftg. CL= 0.00 ft ...height to stop = 0.00 ft Ftg. Base Above/Below Soil ...height to start = 0.00 ft. At Wall Face [+/-] = 0.00 ft Footing Type Line ---------------------------- WALL & FOOTING DATA ------------------------- Retained Height = 3.50 ft Toe Width = 2.09 ft Wall Ht. above soil = 5.00 ft Heel Width = 0.67 ft Total Wall Height = 8.50 ft ------- Key Depth = 0.00 in Total Width = 2.76 ft Key Width = 12.00 in Thickness = 12.00 in Key Dist. to Toe = 0.833 ft SUMMARY Pressure @ Toe = 1,072 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning = 1.53 :1 Allowable Press. = 2,000 psf Sliding = 2.12 :1 Eccentricity = 8.98 in Allowable Shear = 76.03 psi Resultant Outside Middle Third 1-Way Shear @ Toe = 8.5 psi Note: Pv Not Used for Soil Pres. 1-Way Shear @ Heel = 0.0 psi ----------------------------- SLIDING CHECK ------------------------------ Ftg/Soil Friction = 0.480 Tot Lateral Force*1.5= 622.5 # Soil @ Toe Not Used = 0.00 in (-)Passive Pressure = 393.8 # Factor of Safety = 2.12 (-)Friction = 487.4 # Add'l Force Req'd = 0.0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors)---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 1,496 0 psf Fy = 40,000 psi Mu - Upward = 0 0 ft-# Upward soil pres. used on heel Mu - Downward = 0 11 ft-# -------- Rebar Choices-------- Mu - Design = 1,444 11 ft-# Toe(bot) Heel(top) One-Way Shear: Mu=Stem! #4 @Not Reqd in Not Reqd in vu = 8.51 0.02 psi #5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85= 76.03 76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00-in #8 @Not Reqd in Not Reqd in Ru = Mu/bd"2 = 0.0 0.0 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio = 0.0000 #10 @Not Reqd in Not Reqd in nv�r�iv�euir niVl�llV�rK11Vl i,ir-ie: rrea wiison 74-040 Highway 111 Descr: 3' RETAINING WALL - REVERSE Suite L-50 Page of Palm Desert, CA 92260 Job #: .'.New.. By:D.A.H. Date: 6/21/94 (619)773-9373 RetainPro 3.1(c)1993 File:SMALLJOB.RPF --------------------------------- STEM DESIGN ----7----------------------------- (Values shown for concrete stems have been factored) Pg 2 of 2 I- Descending Stem Sections, Highest @ Left -� Stem Construction Data Highest (use columns from left to right) : ------------------------------------------------------------- HT. ABOVE FTG. _ .3.33 0.00 ft WALL TYPE ABOVE HT. Masonry Masonry. Thickness (nominal). = 6.00 8.00 in Rebar Size = # 4 # 5 Rebar Spacing = 24.00 24.00 in Rebar Placed at' Center Edge DESIGNDATA.............. ................................................ fb/Fb + fa/Fa = 0.985 0.927 Lateral Load @ Design Ht = 101 310 # MOMENT..... Actual = 267 849 ft-# Allowable = 271 916 ft-# SHEAR...... Actual = 4.36 5.43 psi Allowable = 19.36 19.36 psi Embedment Length Req'd = 18.00 6.00 Wall Weight = 43.0 78.0 psf Rebar Placed at Depth 'd'= 2.75 5.25 in MASONRYDATA............. ................................................ f'm = 1,500 1,500 psi Fs = 24,000 24,000 psi Grouting Part Full Special Inspection No No n : Es / Em = 25.78 25.78 Short Term Increase = 1.00 1.00 CONCRETEDATA............ ................................................ f'c = psi Fy = psi ------------------------- SUMMARY OF FORCES & MOMENTS ---------------------- I- Overturning Moments Resisting Moments -� Origin of Force: ----------------- # .ft ft-# # ft ft-# -------- Heel Active Press. = ------ 354 1.50 --------- 532 ------- ----- --------- Soil over Heel = 1 2.76 4 Toe Active Press. _ -39 0.50 -20 Soil over Toe = 115 1.05 120 Sloped Soil @ Heel = 0 0.00 0 Adjacent Ftg. Load = 0 0.00 0 0 0.00 0 Surcharge @ Heel = 0 0.00 0 Surcharge @ Toe = 0_ 0.00 0 0 0.00 0 Axial Load on Wall 0 0 0.00 0 Load @ Proj. Wall = 100 7.00 700 Averaged Stem Wts. = 482 2.38 1,150 Earth Behind Stem = 3 2.67 8 Added Lateral Load = 0 0.00 0 Footing Weight = 414 1.38 571 Key Weight = 0 1.33 0 Vert. Componant of = 0 0.00 0 Active Press. --------- --------- -------- --------- TOTALS _ --------- 415 1,212 1,015 1,853 Totals used for Soil Pressure, Pv Not --------- -------- Included= 1,015 --------- 1,853 CHANGE IN MAT'L SPEC. ^n o n n ci�� icn n min i^ 6" C.M.U. f'n= 1500psf. Fy= 60000psf #4 @ 24" Vert @ CL #4 @ 24" Horiz 8" C.M.U. f'n= 1500psf, Fy= 60000psf #5 @ 24" Vert @ Edge #4 @ 24" Horiz Q�pf ESS/O C -D No. 38239 � YO? RETAINING WALL Scale: 1/2" = P-0" HOGANCAMP ENGINEERING Title: Fred Wiison 747040,Highway 111 Descr: 3.0 RETAINING WALL Suite L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 (619)773-9373 RetainPro 3.1(c)1993 File:SMALLJOB.RPF -------------------------------------------------------------------------------- CANTILEVERED -------------------------------------------------------------------------------- RETAINING WALL DESIGN Pg 1 of 2 ---------- SOIL DATA ------------- ------ ADDED VERTICAL LOADS -------- Allowable Bearing. = 2,000 psf Axial DL on Stem = 0 plf Active Lateral EFP = 35.0 psf Axial LL on Stem = 0 plf . ..Slope Active = 0.0 psf ...Ecc Left of Stem CL = 0.00 in ..Active Press Limit = 500 psf Surcharge over Toe = 0.0 psf Bkfill Slope(0=level)= 0.0:1 Surcharge over Heel = 0.0 psf Passive Lateral = 350 pcf Using Surcharge to resist Soil Density = 110.0 pcf overturning @ Heel Yes Soil Ht over Toe = 6.0 in @ Toe Yes ------ ADDED LATERAL LOADS ------- --------.ADJACENT FOOTING ---------- Lateral Load Acting Vertical load = 0 plf On Stem Above Soil = 20.00 psf ...Ecc. (Toe side +) = 0.00 in Footing Width (perp) = 0.00 ft Add'l Lateral Load = 0.0 plf Face Top Stem to Ftg. CL= 0.00 ft ...height to stop = 0.00 ft Ftg. Base Above/Below'Soil ...height to start = 0.00 ft At Wall Face [+/-] = 0.00 ft Footing Type Line ---------------------------- WALL & FOOTING DATA ------------------------- Retained Height = 3.50 ft Toe Width = 0.00 ft Wall Ht. above soil = 5.00 ft Heel Width = 3.00 ft Total Wall Height = 8.50 ft ------- Key Depth = 0.00 in Total Width = 3.00 ft Key Width = 12.00 in Thickness = 12.00 in Key Dist. to Toe = 0.833 ft SUMMARY Pressure @ Toe = 11690 psf Factors of Safety: Pressure @ Heel = 0 psf Overturning = 2.02 :1 Allowable Press. = 2,000 psf Sliding = 2.99 :1 Eccentricity = 9.63 in Allowable Shear = 76.03,psi Resultant Outside Middle Third 1 -Way Shear @ Toe = 0.0 psi Note: Pv Not Used for Soil Pres. 1 -Way Shear @ Heel = 5.6 psi ----------------------------- SLIDING CHECK ------------------------------ Ftg/Soil Friction = 0.480 Tot Lateral Force*1.5= 622.5 # Soil @ Toe Not Used = 0.00 in (-)Passive Pressure = 393.8 # Factor of Safety = 2.99 (-)Friction = 848.1 # Add'l Force Req'd = 0.0 # ---------------------------- FOOTING DESIGN ------------------------------ (Using ACI Factors) ---Toe--- --Heel-- f'c = 2,000 psi ACI 9.1 Pressure = 2,361 0 psf Fy = 40,000 psi Mu - Upward = 0 0 ft-## Upward soil pres. used on heel Mu - Downward = 0 0 ft-# -------- Rebar Choices -------- Mu - Design = 0 1,444'ft-# Toe(bot) Heel(top) One -Way Shear: Mu=Stem! #4 @Not Reqd in Not Reqd in vu = 0.00 5.57 psi ##5 @Not Reqd in Not Reqd in vn=2(f'c)1/2*.85= 0.00 76.03 psi #6 @Not Reqd in Not Reqd in Rebar CL To Edge = 3.50 2.50 in #7 @Not Reqd in Not Reqd in Depth to steel = 8.00 9.00 in #8 @Not Reqd in Not Reqd in Ru = Mu/bd-2 = 0.0 0.01 #9 @Not Reqd in Not Reqd in Min. Rebar Ratio = 0.0000 #10 @Not Reqd in Not Reqd in ril1lJL,1Vl.L�1lY Z1V"1VZZA1nU 111.10: rLell Wll6uli 74-040 Highway 111 Descr: 3.0 RETAINING WALL Suite L-50 Page of Palm Desert, CA 92260 Job #: ..New.. By:D.A.H. Date: 6/21/94 (619)773-9373 RetainPro 3.1(c)1993 File:SMALLJOB.RPF --------------------------------- STEM DESIGN ---------------------------------- (Values shownfor concrete stems have been factored) Pg 2 of 2 I- Descending Stem Sections, Highest @ Left -1 Stem Construction Data Highest (use columns from left to right) ------------------------------------------------------------------------- DESIGN HT. ABOVE FTG. = 3.33 0.00 ft WALL TYPE ABOVE HT. Masonry Masonry Thickness (.nominal) = 6.00 8.00 in Rebar Size = # 4 #. 5 Rebar Spacing = 24.00 24.00 in Rebar Placed at Center Edge DESIGN DATA.............. ................................................ fb/Fb + fa/Fa = 0.985 0.927 Lateral Load @ Design Ht = 101 310 # MOMENT..... Actual = 267 849 ft-# Allowable = 271 916 ft-# SHEAR...... Actual = 4.36 8.38 psi Allowable = 19.36 19.36 psi Embedment Length Req'd = 18.00 6.00 Wall Weight = 43.0 58.0 psf Rebar Placed at Depth 'd'= 2.75 5.25 in MASONRY DATA............. ................................................ f'm = 1,500 1,500 psi Fs = 24,000 24,000 psi Grouting Part Part Special Inspection No No n Es / Em = 25.78 25.78 Short Term Increase = 1.00 1.00 CONCRETEDATA............ ................................................ f'c = psi Fy = psi ------------------------- SUMMARY OF FORCES & MOMENTS -------7-------------- I- Overturning Moments Resisting Moments -� Origin of Force: -------- # ft ------ ft-# # ft ft-# ---------------- Heel Active Press. = 354 1.50 --------- 532 ------- ----- --------- Soil over Heel = 898 1.83 1,647 Toe Active Press. _ -39 0.50 -20 Soil over Toe = 0 -0.00 0 Sloped Soil @ Heel = 0 0.00 0 Adjacent Ftg. Load = 0 0.00 0 0 '0.00 0 Surcharge @ Heel = 0 0.00 0 Surcharge @ Toe _ 0 0.00 0 0 0.00 0 Axial Load on Wall = 0 0 0.00 0 Load @ Proj.. Wall = 100 7.00 700 Averaged Stem Wts. = 415 0.29 120 Earth Behind Stem = 3 0.58 2 Added Lateral Load .= 0 0.00 0 Footing Weight = 450 1.50 675 Key Weight = 0 1.33 0 Vert. Componant of = 0 0.00 0 Active Press. --------- --------- -------- --------- TOTALS = 415 1,212 1,767 2,444 --------- Totals used for Soil Pressure, Pv Not --------- -------- Included= 1,767 --------- 2,444