Loading...
MUP 2004-571P.O. Boa 1504 LA QUINTA, CALIFORNIA 92247-1504 78-495 CALLE TAMPICO (760) 777-7000 LA QUINTA, CALIFORNIA 92.253 FAX (760) 777-7101 sk'k7,7= ck° December 20, 2004 Tom Scheefer Alpha Omega Communications 42-829 Cook Street, Suite 104 Palm Desert, CA 92211 SUBJECT: MINOR USE PERMIT 2004-571 (TEMPORARY CONSTRUCTION TRAILER) Dear Mr. Scheefer: The Community. Development. Department has reviewed your request to establish a construction trailer at 52-758, Claret Cove -(Lot 14 of Tract2861 1 /APN: 770-290-026) of. Tradition. Golf::Cl.u.b. and has approved it; subject to the following conditions: 1. Obtain an: electrical. permit from. the, Building Department for temporary power. 2. Provide restroom.facilitieS.to accommodate personnel.. 3. Mounted on the exterior of the trailer close to the front door shall be a written notice providing emergency personnel your 24-hour emergency phone number they can call in case problems arise that need your prompt attention (i.e., minimum 1 " high letters). 4. Install one 2A1OBC fire extinguisher inside the trailer by the front exit door. 5. This permit is valid for a period of 6 months from the date of this letter. Removal of the construction trailer is required within 30 days of completion of the project unless a time extension is applied for and granted by this Department. The Community Development Director may extend the permit for another six-month period if construction activities are still occurring. 6. Dust control measures shall be employed if construction parking is allowed adjacent to the trailer. Such measures may include watering the site regularly or laying .gravel. in the area for parking. 7.- Trailer skirting shall be installed within 30 days if the trailer is mounted above finished grade level. Temporary landscaping is not required .to screen the trailer if skirts are installed and the immediate area around the trailer is kept clean and free of construction debris. i 8. The City may elect to add Conditions to this application request to mitigate any problems that arise not previously addressed herein. This decision may be appealed to the Planning Commission by anyone provided they submit the necessary paperwork and filing fee of $175.00 with this office within 15 days of approval of this permit. Should you have any questions or need additional information please do not hesitate to contact me directly at (760) 777-7068. Sincerely, MARTIN ZA= Associate Planner C: Building & Safety Department File MUP 04-471 AlphaOmegaTempConstTrail.doc