9604-013 (PLBG)- y
LICENSED CONTRACTOR DECLARATION
I jnei affirm under penalty of perjury that I am licensed under provisions of
Chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professionals Code, and my License,is in full force and effect.
License # Lic. Class Exp. Date
AB
ate Signature of Contract"
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's
License Law for the following reason:
( ) I, as owner of the property, or my employees with wages as their.sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec. 7044, Business & Professionals Code).
( ) I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec. 7044, Business & Professionals
Code).
O I am exempt under Section B&P.C. for this reason
Date Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
N I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for .the
performance of the work for which this permit is issued.
( ) I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor. Code, for the performance of the work for which this
permit is &66th. My.Yworkers' compensation insurance carriea:i&-5policy no: are:
Cartier T Policy No.
(This section need not be completed if the permit valuation is for $100.00 or less).
( ) I certify that in the performance of the work for which this permit is issued;
I shall not employ any person in any manner so as to become subject 4o the
workers' compensation laws of California, and agree that if I should become
subject to the workers' compensation provisions of Section 3700 of the Labor
(***tate:'
ode, I shy I forthwith comply with those provisions'.,'
� Date: Vii' . Z /i(m Applicants r R,.r fi' .Mr,
Warning:. Failure to secure,•W fters' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000,_in
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code interest and attorney's fees.
IMPORTANT Application is hereby made to the Director of Building and Safety
for a permit subject to the conditions and -restrictions set forth on .his
application.
1. Each person upon whose behalf this application is made & each person at
whose request and for whose benefit work is performed under or pursuant to
any permit issued as a result of this applicaton agrees to, & shall, indemnify
& hold harmless the City of La Quinta, its officers, agents and employees.
2. Any permit issued as a result of thisapplication becomes null and void if
work is not commenced within 180 days, from 'date of issuance of such
permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
construction, and hereby authorize representatives of this City to enter upon
theabove-mentionedproperty for inspection purposes.
/Signature (Owner/Agent)'" r;/ IVIV:' K/;;r - ""' Date � `
, , - I - /
PERM T# °°NT
BUILDING PERMIT R°`#
��t�u� a�r..>� 3055
DATE t «%em VALUATION � � � LOT, TRACT
JOB SITE
ADDRESS $2-259 AV 2LAKII1+�)AJt6RVIZ APN i7:s-%U i�>Si2G
OWNER CONTRACTOR/DESIGNER/ENGINEER
i2159 AVENIDA jU:-U., - 3.1150 C„ tVNl)LE'der000 R7
LA(+?.AN'1'ACA 922 i (r'Allili01 41,C31Y, CA 91044
0111# 762
USE OF PERMIT
.EN 1i'rTAT "ED C Ory"t'.C3'ir,°
1':Cl�il)iNCb:f�f s--86W�'12 101-00040-000 $0.00
:i,9)liil4. o
l3�nr,COINTI rniX"IMNAN:E P:INCHECK $14_00
%� S .CCK -I'.A113 FEES $0.00
RECEIPT DATE BY DATE FINALED INSPECTOR
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
Forms & Footings
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck
Exhaust Fans
O.K to Wrap
F.A.U.
Framing
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
Final
Final
POOLS - SPAS
BLOCKWALL APPROVALS
Steel
Set Backs
Electric Bond
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final
Gas Piping
PLUMBING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure
Shower Pans
O.K. for Finish Plaster
Sewer Lateral
Pool Cover
Sewer Connection
Encapsulation
Gas Piping
Gas Test
Appliances
Q
Final
COMMENTS:
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
I
1 0 copy to:
Cash Water Service
Check
)914 yl
Money C's
hie,—
Order CVWD- 438 (11189)
COACHELLA VALLEY WATER DISTRICT
CASH RECEIPT DETAIL
q�,
Received Fr
Address: 0S Q -is q
/"�N C-1
I, (.-.k _j LA 0, Q Lk I
Date:
Account ( '
ccount No.
-
Lot(s) Tract
Service Address
G.A.Code
0 Meter(s)
0 Service(s)
0 Backflow(s)
0 House Lateral(s)
0 Detector Check(s)
0 Meter Surcharge
t4anitatlon Capacity Charge
0 W.S.B.F.C.
0 Temporary Construction Meter
0 Turn on Charge
0 Uncollected Account - Name
0 Inspection Fee - Tract -
Fee -
0 Plan Check Fees Water I Sewer -
Tract -
0 Bond Payment - A.D. --Bond
Assmt.
0 Customer Deposit
0 Other
TOTAL
Remarks:
I
1 0 copy to:
Cash Water Service
Check
)914 yl
Money C's
hie,—
Order CVWD- 438 (11189)
HAMMER PUMPING INC. JOB INVOICE
P.O. Box 2448
CATHEDRAL CITY, CALIFORNIA 92235-2448
IC101 OCA 7AA4
%—.—I --- i ---
(619) 321-7448
PRICE
CUSTOMER'S ORDER NO.
DATE ORDERED
Ll - t/ — 6
Gallons
ORDER TAKEN BY
DATE PROMISED ❑ A.M.
Pumping Fee per 1000 gal.
�S'i
d
❑ P.M.
BILL TO
/ � � _ (�
�
PHONE
ADDRESS
Dumping Fee per 1000 gal. )
ME/C NIC r
CITY
HE PER /
JOB NAME AND LOCATION
@'DAY WORK
DESCRIPTION OF WORK
'/�'�"
CONTRACT
❑ EXTRA
Size System:
DESCRIPTION OF MATERIAL USED
PRICE
AMOUNT
/QUANT.
/ ,
Gallons
Pumping Fee per 1000 gal.
�S'i
d
DOD
Dumping Fee per 1000 gal. )
Out of Area Fee
Locating / Opening Fee (per hour)
Size System:
A SERVICE CHARGE OF $20 WILL BE DUE
ON ALL RETURNED CHECKS.
A FINANCE CHARGE OF 11/2% PER MONTH, 18% PER YEAR
WILL BE CHARGED ON PAST DUE ACCOUNTS OVER 30 DAYS.
HOURS
LABOR AMOUNT
TOTAL
MATERIALS
MECHANICS @
HELPERS Q
TOTAL
LABOR
I hereby acknowledge the satisfactory
completion of the above described work:
TOTAL LABOR
TAX
SIGNATUREDATE
COMPLETED
L( 2�6
TOTAL
NOTICE TO OWNER
Under the California Mechanics Lien Law any contractor,,subcontractor, laborer, supplier
or other person who helps to improve your property, but is not .paid for his/her work or
supplies, has a right to enforce a claim against your property. This means that after a court
hearing, your property could be sold by a court officer and the proceeds of the sale used to
satisfy the indebtedness. This can happen even if you have paid your contractor in full if the
subcontractors, laborers or suppliers remain unpaid.
To preserve their right to file a claim or lien against your property, certain claimants such
as subcontractors or material suppliers are required to provide you with a document entitled
"Preliminary Notice." Original (or prime) contractors and laborers for wages do not have to
provide this notice. A Preliminary Notice is not a lien against your property. Its purpose is to
notify you of persons who may have a right to file a lien against your property if they are not
paid. Generally, the maximum time allowed for filing a claim or lien against your property is
ninety (90) Days'after completion of your project.
tO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY,
YOU MAY WISH TO TAKE ONE OR MORE OF THE FOLLOWING STEPS:
1) Require that payments be made directly to subcontractors and material suppliers through
a joint control. Any joint con0ol agreement should include the addendum approved by the
Registrar of Contractors.
2) Issue joint chocks for payment, made out to both your contractor and subcontractors or
material suppliers Involved in the project. This will help to insure that all persons due payment
are actually paid.
3) After UPON making payment on any completed phase of the project, and before making
any further payments, require your contractor to provide you with unconditional lien releases
signed by each material supplier,'subcontractor and laborer involved in that portion of the
work for which payment was made. On projects involving improvements to a single family
residence or a duplex owned by Individuals, the persons signing these releases lose the right
to file a claim against your property. In other types of construction this protection may still be
important, but may not be as complete. TO PROTECT YOURSELF UNDER THIS OPTION YOU
MUST BE CERTAIN THAT ALL MATERIAL SUPPLIERS, SUBCONTRACTORS OR LABORERS
HAVE SIGNED.