Loading...
14-0313 (MECH)J P.O. BOX 1504 78-495 CALLE TAMPICO _ :t. LA QUINTA, CALIFORNIA 92253 Application Number: 14`=0-0.0-00 X13 Property Address: 791.6.5 --COYOTE CREEK APN: 772-030-031-37 -25429 Application description: MECHANICAL Property Zoning: LOW DENSITY RESIDENTIAL Application valuation: . 9545 Applicant: Tit�p 4.4 " BUILDING & SAFETY DEPARTMENT BUILDING PERMIT Architect oc Engineer: 3 t r OF LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and ProfessionalsCod and my License is in full force and effect. License Class: C20 6 .6e1rn— No.: y5IZ6115 / OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State'License Law for the following reason (Sec. 7031.5. Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_ 1 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). C (_ 1 I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT Owner: DENISE CLARK 79165 COYOTE CREEK LA QUINTA, CA 92253 ( Contractor: HYDES 42949 MADIO STREET INDIO, CA 92201 (760)360-2202 Lic. No.: 906115 VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 3/25/14 ------- - ---------- WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier NORGUARD INS Policy Number CEWC468841 I certify that, in the performance of the work for which this permit is issued, I shall not employ any _ person in any manner so as to become subject to the workers' compensation laws of California, "`— and agree that, if I should become subject to the workers' compensation provisions of Section _ X3700 of,;he Labor Code, I shall forthwith gof jy * those provisions. WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1 . Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and'void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this county to enter uthe above-mentioned property for inspeptiV pqp6os s. D^ ale: '1-ig i (Applicant or Agar 1:�; Application Number . . . . . 14-00000313 LQPERMIT Permit . . . MECHANICAL 2013 Additional desc . Permit Fee 83.42 Plan Check Fee .00 Issue Date . . . . Valuation . . . . 0 Expiration Date 9/21/14 Qty Unit. Charge Per Extension 1.00 35.7500 EA MECH FURNACE 35.75 1.00 11.9200 EA MECH APPL REP/ALT 11.92 1.00 35.7500 EA MECH CONDENSER/COMP 35.75 ---------------------------------------------------------------------------- Special Notes and Comments HVAC FURNACE, & COIL CHANGE OUT - 13 SEER/78% AFUE SPLIT SYSTEM [2010 ENERGY] CARBON MONOXIDE ALARM(S) TO BE INSTALLED PRIOR TO FINAL INSPECTION. 2013 CBC. ---------------------------------------------------------------------------- Other Fees . . . . . . . . BLDG STDS ADMIN .(SB1473) 1.00 PERMIT ISSUANCE M/P/E 90.57 PLAN CHECK, MECHANICAL 52.43 Fee summary Charged Paid Credited --------------------------- Due ------------------------------ Permit Fee Total 83.42 .00 .00 83.42 Plan Check Total .00 .00 00 ..00 Other.Fee Total 144.00 .00 .00 144.00 Grand Total 227.42 .00 .00 227.42 LQPERMIT Bin #CIV of La Quinta . Building 8c Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet • Permit # �' ✓ Project Addr,ess:• c1 - G.O O & Y2 Z Owner's Name: e m l 5 -Q— A. P. Number: Address: 7% '- S L p o Q Gree l Legal Description: City, sT, 4: !r+ ZZ s3 //`` rr II Contractor. ey rl {f cl:; a- �^T- S A /14;' Telephone::1-6/0— -6/6``Address:- Lf Z t g I c1,05 ProjectDesaiption: qq Address:- IZOC4 City, ST, Zip: O A Z.Z, d I Telephone: 6o State Lie. # : q 0& j. City Lic. #: . z'1. Arch., FAgr-, Designer: Address: City, ST, Zip: Telephone: Consaiw ion Type: Occupancy: State Lie. #: Projed type (circle one): New Add'n Alter Repair • Demo Name of Contact Person �% -Z� �-(>'1 �l Sq. Ft.: # Stories: # Units: Telephone # of Contact Person:. Estimated Value of Project " APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Reed - Reed TRACKING. PERMTr FEES Pian Sets Plan Check submitted Item Amount Structural Cala. Reviewed, ready for corrections Plan check Deposit 'truss Cala. Called Contact Person Plan Check Balance Energy Cala. Plans bicked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan' Y' Review, ready for correciionsiissue Electrical Subcontactor List Called Contact Person Plumbing Grant Dead Plans picked up SJ&L H.O.A. Approval Plans resubmitted Grading IN HOUSE:- j"' Review, ready for correetionAmme Developer -Impact Fee Planning Approval Called Contact Person A.U.P. Pub. Wks. Appr Date of permit issue School Fen Total Permit Fees -260-Z Simplified Prescriptive Certificate of Compliance: 2008 Residential HVAC Alterations CF-lR-ALT-HVAC Climate Zones 10 - 15 Site Address: Enforcement Agency: Date: Permit #: 79-165 Coyote Creek La Quinta, CA 92253 City of La Quinta Mar 25, 2014 Duct insulation Conditioned Floor Equipment Type1 List Minimum Efficiency2 requirement Area Thermostat ❑ Package Unit ® Furnace ® Indoor Coil ®AFUE 7A% ® SEER 13.0 ❑ COP [3HSPF [3 R 6 PCZ 10-13) Served by system ®Setback If not already present, must be ®Condensing Unit 13 EER [3R gCZ 14-15)Resistance 1600 sf installed) ❑ Other 1. Equipment type: Choose the equipment being installed; if more than one system, use another CF-IR-ACT-HVAC for each system. 2. Minimum Equipment Efficiencies: 13 SEER, 78% AFUE, 7.7HSPF for typical residential systems. HERS VERIFICATION SUMMARY Listed below are FOUR HVAC alteration Options. The installer decides what work is being done and picks one of the appropriate Options. Each Option lists the HERS measures that must be conducted. A copy of the forms shall Ie left on site for final inspection and a copy given to the homeowner. At final, the inspector verifies that the work listed on this form was in fact the work completed by the installer. The inspector also verifies that each appropriate CF-6R and registered CF-4R forms (no hand filled CF-4Rs allowed) are filled out and signed.Beginning October i, 2010, a registered copy of the CF-111 and CF-611 shall also be on site for final inspection. ® 1. HVAC Changeout Required Forms: . All HVAC Equipment CF-6R forms: MECH-04, MECH-2I-HERS and (for split systems) MECH-25-HERS replaced CF-4R forms: MECH-21 and (for split systems) MECH-25 . Condenser Coil and /or . Indoor Coil and /or CF-6R forms: MECH-04, MECH-2I-HERS and (for split systems) MECH-25-HERS . Furnace CF-4R forms: MECH-21 and (for split systems) MECH-25 For Split Systems: Duct leakage < 15 percent; RC, CCA <_ 300 CFM/ton (Minimum Air Flow Requirement), TMAH Exempted from duct leakage testing if: ❑ 1. Duct system was documented to have been previously sealed and confirmed through HERS verification, or ❑ 2. Duct systems with less than 40 linear feet in unconditioned space, or []-3. Existing duct systems are constructed, insulated or sealed with asbestos [14. The system will not be Ducted (ie. Ductless Mini-Split System) (Also Exempt from Refrigerant Charge) ❑ 2. New HVAC System Required Forms: . Cut in or Changeout"with CF-6R'forms:,MECH=04 MECH 2O.-HERS, and (for split systems) MECH-22-HERS, and new ducts: (all new . MECH-25-HERS `� ducting and all new ` CF-4R forms: MECH-20, and (for split systems) MECH-22,,jand MECH-25" . equipment) For Split Systems: Duct leakage < 6,percent; RC, CCA >_ 350:CFM/ton, FWD, TMAH, STMS, and eithe.rHSPP or PSPP. For Packaged Units:,'Duct.leakage < 6 percent ❑ 3. New Ducts with/or without Required Forms: Replacement . Includes replacing or installing all new ducting and/or outdoor condensing unit CF-6R forms: MECH-04, MECH-20-HERS, and (for split systems) MECH-25-HERS and/or indoor coil and/or furnace.. No or some CF-411 forms: MECH-20 and (for split systems) MECH-25 equipment changed. For Split Systems: Duct leakage.< 6 percent; RC, CCA > 300 CFM/ton, TMAH For Packaged Units: Duct leakage < 6 percent ❑ 4. New Ducting over 40 feet Required Forms: . Includes adding or replacing more than 40 CF-6R forms: MECH-04, MECH-2I-HERS linear feet of duct in unconditioned space. CF-4R forms: MECH-21 For split system or packaged units: Duct leakage < 15 percent ❑ EXCEPTION: Existing duct systems constructed, insulated or sealed with asbestos. Contractor (Documentation Author's /Responsible Designer's Declaration Statement) • I certify that this Certificate of Compliance documentation is accurate and complete. • I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the design identified on this Certificate of Compliance. • I certify that the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24, Parts 1 and 6 of the California Code of Regulations.. • The design features identified on this Certificate of Compliance are consistent with the information documented on other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with the permit application. Name: Mark Hyde Signature: Mark Hyde Company: CERTIFIED COMFORT SYSTEMS INC Date: Mar 25, 2014 Address: 42-949 MADIO STREET License: 906115 City/State/Zip: INDIO / CA / 92201 Phone: (760) 360-2202 ^--^^^^^��- ^^^�^^��� _. �_ «. n,�oim:mo• '>n1a/n'2/9S 11:40:48 HERS Provider: Ca10ERTS, Inc. I CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING CF-411-MECH-21 Duct Leakage Test — Existing Duct System (Page i of 2) Site Address: 79-165 Coyote Creek, La Quinta CA 92253 (System Enforcement Agency: Permit Number: 1� City of La Quinta 12-1292 :nter the Duct System Name or Identification/Tag: System 1 anter the Duct System Location or Area Served: Whole House Vote: Submit one Installation Certificate for each duct system that must demonstrate compliance in the lwelling. This installation certificate is required for compliance for alterations and additions in existing dwellings to I soace conditioning systems and duct systems. Vote: For existing dwellings, a completely new or replacement duct system can also include existing parts of he original duct system (e.g., register boots, air handler, coil, plenums, etc.) if those parts are accessible ind they can be sealed. For a completely new or replacement duct system installed in an existing dwelling, Ise the Installation Certificate titled "Duct Leakage Test - Completely New or Replacement Duct System. " Duct Leakage Diagnostic Test - existing duct system Select one compliance method from the following four choices. ❑ 1. Measured leakage less than 15% of fan flow ❑ 2. Measured leakage to outside less than 10% of Fan Flow ❑ 3. Reduce leakage by 60% and conduct smoke and fix all leaks 4 ❑ 4. Fix all accessible leaks using smoke and HERS rater verify i Note: (One oflOptions.1, 2, or 3 must be attempted, before.utilizing Option,4.), r Determine7rbminal Fan Flow using one of 'the following three calculation methods.g ` 1/ 13Cooling system method: Size 41condenser in Tons I x400 = CFM ✓ ❑ Heating system method: 21.7 x_ Output Capacity in Thousands of Btu/hr = _ CFM F ✓ `airflow_ RA3.3 ❑ Measured system using airflow test_ procedures: CFM • _ Option i used then: 1 Allowed leakage = Fan Flow x 0.15 = _ CFM Actual Leakage _ _ CFM , Pass if Leakage Actual is less than Allowed Pass ❑ Fail Option 2 used then: 2 Allowed leakage = Fan Flow x 0.10 = _CFM Actual Leakage to outside = _ CFM Pass if Leakage Actual is less than Allowed Pass Fail Option 3 used then: Initial leakage prior to start of work = _ CFM Final leakage after sealing all accessible leaks using smoke test = _ CFM 3 Initial leakage _ - Final leakage _ = Leakage reduction _ CFM ((Leakage reduction _ / Initial leakage _) x 100% _ % Reduction Pass if % Reduction >= 60% Pass c3 Fail Option 4 used then: 4 All accessible leaks repaired using smoke test. HERS rater must verify (No sampling). Pass if all accessible leaks have been repaired using smoke 0 Pass ❑ Fail . . ;P 7 ,ppWit Reg: 212-A0060741A-M2100001A-M21A Registration Date/Time: 2012/11/08 15:08:34 HERS Provider: Ca10ERTS, Inc. 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING CF-4111-MECH-21 Duct Leakage Test - Existing Duct System (Page 2 of 2) Site Address: 79-165 Coyote Creek, La Quinta CA 92253 (System Enforcement Agency: Permit Number: 1) City of La Quinta 12-1292 ❑ Outside air (OA) ducts for Central Fan Integrated (CFI) ventilation systems, shall not be sealed/taped off during duct leakage testing. CFI OA ducts that utilize controlled motorized dampers, that open only when OA ventilation is required to meet ASHRAE Standard 62.2, and close when OA ventilation is not required, may be configured to twh..e_ closed position during duct leakage testing. ❑ All suply and return register boots must be sealed;.to the'dryWall if smoke test is utilized for. compliance - applies;,to duct leakage. compliance option 3 (leakage. reductlonrby.60%) and option 4,(fix all°accessible leaks) clescribed above; ❑ New duct installations°cannot utllrze building cavities asfplenurns oriplatform returns in lieu of ducts. I ❑ Mastic and draw bands must be used`in combination with cloth. backed rubber adhesive duct -tape to seal leaks at all new duct connections. DECLARATION STATEMENT • I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is true and correct. . I am the certified HERS rater who performed the verification services identified and reported on this certificate (responsible rater). • The installed feature, material, component, or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance (CF -1R) approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF -6R), signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance (CF -111) approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate (CF -611) Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) CERTIFIED COMFORT SYSTEMS INC Responsible Person's Name: CSLB License: Mark Hyde 190611S HERS Provider Data Registry Information Sample Group # (if applicable): 354738 ❑ tested/verified dwelling ® not-tested/verified dwelling in a HERS sample group HERS Rater Information CalCERTS Certificate # CC1-1798703796 HERS Rater Company Name: Desert H.E.R.S. Raters Responsible Rater's Name: Responsible Rater's Signature: Michael Hyde Michael Hyde Responsible Rater's Certification Number w/ this HERS Provider: Date Signed: 9/27/2012 CC2005602 Reg: 212-A0060741A-M2100001A-M21A Registration Date/Time: 2012/11/08 15:08:34 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification - Standard Measurement Procedure (Page 1 of SJ Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 City of La Quinta 12-1292 Note: If installation of a Charge Indicator Display (CID) is utilized as an alternative to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECH-25 Certificate) should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH and STMS are not required for compliance, when a CID is utilized for compliance. As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional form(s) for any additional systems in the dwelling as applicable. Temperature Measurement Access Holes (TMAH) and Saturation Temperature Measurement Sensors (STMS) Procedures for installing TMAH are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is required for compliance, TMAH are also required for compliance. STMS are only required for completely new or replacement space -conditioning systems that utilize prescriptive compliance method. TMAH - Access Holes in Supply and Return Plenums of Air Handler System Name or Identification/Tag System 1 System Location or Area Served Whole House 1 ❑ Yes ❑ No 5/16 inch (8 mm) access hole upstream of evaporative coil in the return plenum and labeled according to Figure in Section RA3.2.2.2.2. 2 ❑ Yes ❑ No 5/16 inch (8 mm) access hole downstream of evaporative coil in the supply plenum and labeled according to Figure in Section RA3.2.2.2.2. Yes to 1 and 2 is a pass. Enter Pass or Faill ✓ ❑ Pass ✓ ❑ Fail STMS - Sensor, onithe. Evaporator Coil System Name or Identification/Tag' j The sensor is factory installed, or field installed according to manufacturer's The sensor is factory installed, or1field installed according to manufacturer.'s 3 ❑ Yes❑ No" specifications, or Winstalled by methods/specifications approved 6y,the Executive Director. Director..-� ,. 1 .fil i<i r The sensor wwire is terminated.with a standard mini plug suitable for connection to a 4 ElYes p No ., digital thermometer. The -sensor mini plug is accessible to the installingaeclinictan i, _, and the HERS rater without changing the airflow through the condenser coil and the HERS rater without changing the airflow through the condenser coil 5 []Yes - , ❑ No When attached to a digital thermometer, the sensor provides an indication of the saturation temperature of the coil. saturation temperature of the coil. Yes to 3, 4, and 5 is a pass. Enter N/A if STMS are not ✓ [IN/A ✓ [IPass ✓ ❑ Fail applicable. Otherwise enter Pass or Fail STMS - Sensor on the Condenser Coil System Name or Identification/Tag System 1 The sensor is factory installed, or field installed according to manufacturer's 6 ❑ Yes ❑ No specifications, or is installed by methods/specifications approved by the Executive Director. The sensor wire is terminated with a standard mini plug suitable for connection to a 7 ❑ Yes ❑ No digital thermometer. The sensor mini plug is accessible to the installing technician and the HERS rater without changing the airflow through the condenser coil 8 ❑ Yes ❑ No When attached to a digital thermometer, the sensor provides an indication of the saturation temperature of the coil. Yes to 6, 7, and 8 is a pass. Enter N/A if STMS are not ® N/A ✓ ❑ Pass ✓ ❑ Fail applicable. Otherwise enter Pass or Fail Reg: 212-A0060741A-M2500001A-M25A Registration Date/Time: 2012/11/08 15:10:29 HERS Provider: Ca10ERTS, Inc. 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING CF-411-MECH-25 Refrigerant Charge Verification - Standard Measurement Procedure (Page 2 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 1 City of La QL 1 12-1292 Standard Charge Measurement Procedure (for use if outdoor air dry-bulb is above 55°F) Procedures for determining Refrigerant Charge using the Standard Charge Measurement Procedure are available in Reference Residential Appendix RA3.2. As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional form(s) for any additional systems in the dwelling as applicable. • The system should be installed and charged in accordance with the manufacturer's specifications before starting this procedure. • The system must meet minimum airflow requirements as prerequisite for a valid refrigerant charge test. • If outdoor air dry-bulb is 55°F or below, the installer must use the Alternate Charge Measurement Procedure. Space Conditioning Systems System Name or Identification/Tag System 1 (must be re -calibrated monthly) Date of Thermocouple, Calibration t( k } J System Location or Area Served Whole House Outdoor Unit Serial # Outdoor Unit Make Outdoor Unit Model Nominal Cooling Capacity Btu/hr Date of Verification callbratlon OT ulagnostic instruments Date of Refrigerant Gauge Calibration R /p�System 1 (must be re -calibrated monthly) Date of Thermocouple, Calibration t( k } J (in st be re -calibrated monthly) Measured TemperaturesJ-11F) J r ,a 1 `�'"I I i Cf: 1 ,t A" I 1 i System Name or Identification/Tag R /p�System 1 Supply (evaporator leaving)°air dry-bulb temperature (Tsupply, db) 1 Return (evaporator`entering) air dry-bulb temperature (Treturn, db) Return (evaporator entering) air wet -bulb temperature (Treturn, wb) i Evaporator saturation temperature (Tevaporator, sat) Condensor saturation temperature (Tcondensor, sat) Suction line temperature (Tsuction) Liquid Line Temperature (Tliquid) Condenser (entering) air dry-bulb temperature (Tcondenser, db) I " ;1 Reg: 212-A0060741A-M2500001A-M25A Registration Date/Time: 2012/11/08 15:10:29 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 INSTALLATION CERTIFICATE CF-4R-MECH-25 Refrigerant Charge Verification - Standard Measurement Procedure (Page 3 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 1 City of La Quinta 12-1292 Minimum Airflow Requirement Temperature Split Method Calculations for determining Minimum Airflow Requirement for Refrigerant Charge Verification. The temperature split method is specified in Reference Residential Appendix RA3.2. System Name or Identification/Tag Calculate: Actual Temperature Split = Treturn, db - Tsupply,db Target Temperature Split from Table RA3.2-3 using Treturn, wb and Treturn, db Calculate difference: Actual Temperature Split - Target Temperature Split = Passes if difference is between -4°F and +4°F or, upon remeasurement, if between -4°F and -100°F Enter Pass or Fail Note: Temperature Split Method Calculation is not necessary if actual Cooling Coil Airflow is verified using one of the airflow measurement procedures specified in Reference Residential Appendix RA3.3. If actual cooling coil airflow is measured, the value must be equal to or greater than the Calculated Minimum Airflow Requirement in the table below. Calculated Minimum Airflow Requirement (CFM) = Nominal Cooling Capacity (ton) X 300 (cfm/ton) System Name or Iiieritification/Tag f. = "l """`� " �? Calculated Minimum Airflow Requirement (CFM) ,• Measured Airflow using RA3 3 proced,u6s (CFM) Passes if measured airflow is greater than or equal to the calculated minimum airflow requirement. Enter Pass or Fail Superheat Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for fixed orifice metering device systems System Name or Identification/Tag Calculate: Actual Superheat = Tsuction - Tevaporator, sat Target Superheat from Table RA3.2-2 using Treturn, wb and Tcondenser, db Calculate difference: Actual Superheat - Target Superheat = System passes if difference is between -6°F and +6°F Enter Pass or Fail Reg: 212-A0060741A-M2500001A-M25A Registration Date/Time: 2012/11/08 15:10:29 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 INSTALLATION CERTIFICATE CF-4R-MECH-25 Refrigerant Charge Verification - Standard Measurement Procedure (Page 4 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 City of La Quint a 12-1292 Subcooling Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve (TXV) and electronic expansion valve (EXV) systems. System Name or Identification/Tag Calculate: Actual Subcooling = Tcondenser, sat - Tliquid Target Subcooling specified by manufacturer Calculate difference: Actual Subcooling - Target Subcooling = System passes if difference is between ��- ,y......>.�:, �. - :,.r ; d.;, �,.a;,..-�,�..:. -4°F and +4°F f W- a'"r Enter Pass or Fail Metering Device Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve (TXV) and electronic expansion valve (EXV) systems. System Name or Identification/Tag -.! `. , Calculate: Actual Superheat •' k Tsuction - T evaporator sat f, z :;_..: . Enter=allowable superheat range fromY manufacturers specifications: or use range between'3°F and 26°F jf.manufactarer s specification is not available), - - --...,.�,,......: _. ..... .,.�._._: -. • -.mom. ��- ,y......>.�:, �. - :,.r ; d.;, �,.a;,..-�,�..:. System passeskif act''ual superheat is withiritfhea_ allowable superheat rangeas� f W- a'"r Reg: 212-A0060741A-M2500001A-M25A Registration Date/Time: 2012/11/08 15:10:29 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 INSTALLATION CERTIFICATE CF-41R-MECH-25 Refrigerant Charge Verification - Standard Measurement Procedure (Page 5 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 1 City of La Quinta 12-1292 Standard Charge Measurement Summary: System shall pass both refrigerant charge criteria, metering device criteria (if applicable), and minimum cooling coil airflow criteria based on measurements taken concurrently during system operation. If corrective actions were taken, all applicable verification criteria must be re -measured and/or recalculated. System Name or Identification/Tag System 1 190611S HERS Provider Data Registry Information Sample Group # (if applicable): 354738 System meets all refrigerant charge and airflow ® not-tested/verified dwelling in la HERS sample group requirements. HERS Rater Company Name: Desert H.E.R.S. Raters Responsible Rater's Name: Responsible Rater's Signature: Enter Pass or Fail Michael Hyde Responsible Rater's Certification Number w/ this HERS Provider: Date Signed: 9/27/2012 CC2005602 N DECLARATION STATEMENT; . I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate (responsible rater). • The installed feature, material, component, or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance (CF -1R) approved by the local enforcement agency. . The information reported on applicable sections of the Installation Certificate(s) (CF -611), signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance (CF -111) approved by the enforcement aaencv. Builder or Installer information as shown on the Installation Certificate (CF -6R) Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) CERTIFIED COMFORT SYSTEMS INC Responsible Person's Name: CSLB License: Mark Hyde 190611S HERS Provider Data Registry Information Sample Group # (if applicable): 354738 ❑ tested/verified dwelling ® not-tested/verified dwelling in la HERS sample group HERS Rater Information CaICERTS Certificate # CC1-1798703796 HERS Rater Company Name: Desert H.E.R.S. Raters Responsible Rater's Name: Responsible Rater's Signature: Michael Hyde Michael Hyde Responsible Rater's Certification Number w/ this HERS Provider: Date Signed: 9/27/2012 CC2005602 Reg: 212-A0060741A-M2500001A-M25A Registration Date/Time: 2012/11/08 15:10:29 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 I INSTALLATION CERTIFICATE CF-6R-MECH-04 Space Conditioning Systems, Ducts and Fans (Page 1 of 2) Site Address: 79-165 Coyote Creek, La Quinta CA 92253 (System Enforcement Agency: Permit Number: 1) City of La Quinta 12-1292 Space Conditioning Systems Heating Equipment Equip Type (package- heat pump) CEC Certified Mfr. Name and Model Number ARI Reference Number2 # of Identical Systems Efficiency (AFUE, etc.)1, 3 (>=CF-iR value)4 Duct Location (attic, crawl- space, etc.) Duct R -value Heating Load (kBtu/hr) Heating Capacity (kBtu/hr) Split Furnace american standard aud2c100b9v5vba ARI 1 80 HSPF Attic R-4.2 80 100 kBtu heat pump) CEC Certified Mfr. Name and Model Number Reference Number2 Identical Systems (>=CF -1R value)4 space, etc.) Duct R -value Load (kBtu/hr) Capacity (kBtu/hr) Split A/C f american standard w� 4a7a50495978e1000a E 458 r -- { 16 SEER— 13 I-, /� ;Attic 7- �,• r R -4.Z w f'r �-7 / 44 ,. 46 kBtu f1 JEER Coolin0 EDuiDment 1. it project is new construction, see I-ootnotes to stanaaras tame 151-v ana tame 111-c ror auct ceiling alternative compliance. 2. ARI Reference Number can be found by entering the equipment model number at http://www.aridirectory.orglarilac.php# 3. Listed efficiency on this page must be greater than or equal ( ?) to the value shown on the CF -IR form. 4. When CF -1R is reference it is also applicable to the CF -1R, CF -IR -AA or CF -IR -ALT ALL BOXES MUST BE CHECKED TO BE A VALID FORM ® §110-§113: HVAC equipment is certified by the California Energy Commission. ® §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA, or ACCA. ® §150(i): Setback Thermostat on all applicable heating and/or cooling systems meet the requirements of §112(c). ® §150(j)2: Pipe insulation for cooling system refrigerant suction, chilled water and brine lines meets minimum requirements of Table 150-B and includes a vapor retardant or is enclosed entirely in conditioned space. r f; Reg: 212-A0060741A-M0400001A-0000 Registration Date/Time: 2012/11/02 17:59:09 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 Efficiency Duct Equip Type (package ARI # of (SEER and EER) 1,3 Location (attic, crawl- Cooling Cooling heat pump) CEC Certified Mfr. Name and Model Number Reference Number2 Identical Systems (>=CF -1R value)4 space, etc.) Duct R -value Load (kBtu/hr) Capacity (kBtu/hr) Split A/C f american standard w� 4a7a50495978e1000a E 458 r -- { 16 SEER— 13 I-, /� ;Attic 7- �,• r R -4.Z w f'r �-7 / 44 ,. 46 kBtu f1 JEER 1. it project is new construction, see I-ootnotes to stanaaras tame 151-v ana tame 111-c ror auct ceiling alternative compliance. 2. ARI Reference Number can be found by entering the equipment model number at http://www.aridirectory.orglarilac.php# 3. Listed efficiency on this page must be greater than or equal ( ?) to the value shown on the CF -IR form. 4. When CF -1R is reference it is also applicable to the CF -1R, CF -IR -AA or CF -IR -ALT ALL BOXES MUST BE CHECKED TO BE A VALID FORM ® §110-§113: HVAC equipment is certified by the California Energy Commission. ® §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA, or ACCA. ® §150(i): Setback Thermostat on all applicable heating and/or cooling systems meet the requirements of §112(c). ® §150(j)2: Pipe insulation for cooling system refrigerant suction, chilled water and brine lines meets minimum requirements of Table 150-B and includes a vapor retardant or is enclosed entirely in conditioned space. r f; Reg: 212-A0060741A-M0400001A-0000 Registration Date/Time: 2012/11/02 17:59:09 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-MECH-04 Space Conditioning Systems, Ducts and Fans (Page 2 of 2) Site Address: 79-165 Coyote Creek, La Quinta CA 92253 (System Enforcement Agency: Permit Number: 1) City of La Quinta 12-1292 Ducts and Fans §150(m): Duct and Fans ❑ 1. All air -distribution system ducts and plenums installed, sealed and insulated to meet the requirements of CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used; and ❑ 1. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. ❑ 2D. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. ❑ 7. Exhaust fan systems have back draft or automatic dampers. ❑ 8. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. ❑ Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. ❑ 10. Flexible.ducts cannot have porous inner. cores. DECLARATION STATEMENT • I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is true and correct. • I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction, or an authorized representative of the person responsible for construction (responsible person). . I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) conforms to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcement agency. . I reviewed a copy of the Certificate of Compliance (CF -11R) form approved by the enforcement agency that identifies the specific requirements for the installation. I certify that the requirements detailed on the CF -111 that apply to the installation have been met. • I will ensure that a completed, signed copy of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Installation Certificate is required to be included with the documentation the builder provides to the building owner at occupancy. Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) CERTIFIED COMFORT SYSTEMS INC Responsible Person's Name: Responsible Person's Signature: Mark Hyde Mark Hyde CSLB License: Date Signed: 110/22/2012 Position With Company (Title): 906115 Reg: 212-A0060741A-M0400001A-0000 Registration Date/Time: 2012/11/02 17:59:09 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-MECH-2I-HERS Duct Leakage Test — Existing Duct System (Page 1 of 2) Site Address: 79-165 Coyote Creek, La Quinta CA 92253 (System Enforcement Agency: Permit Number: 1) City of La Quinta 12-1292 Enter the Duct System Name or Identification/Tag: System 1 Enter the Duct System Location or Area Served: Whole House Note: Submit one Installation Certificate for each duct system that must demonstrate compliance in the dwelling. This installation certificate is required for compliance for alterations and additions in existing dwellings to space conditioning systems and duct systems. Note: For existing dwellings, a completely new or replacement duct system can also include existing parts of the original duct system (e.g., register boots, air handler, coil, plenums, etc.) if those parts are accessible and they can be sealed. For a completely new or replacement duct system installed in an existing dwelling, use the Installation Certificate titled "Duct Leakage Test - Completely New or Replacement Duct System. " Duct Leakage Diagnostic Test - existing duct system Select one compliance method from the following four choices. ® 1. Measured leakage less than 15% of fan flow ❑ 2. Measured leakage to outside less than 10% of Fan Flow ❑ 3. Reduce leakage by 60% and conduct smoke and fix all leaks ❑ 4. Fix all accessible leaks using smoke and HERS rater verify Note: (One of Options 1, 2 or 3 must be attempted before utilizing, Option 4.)_ Determine nominal Fan Flow using one ofthe following three calculation methods.// ✓ ® Cooling system method: Size of condenser in Tons 14 x 400 = 11600 - CFM v ✓ z , � ❑Heating system method 21.7 Output Cal ty in usands of Btu/h. = _ CFM ✓ ❑ Measured system airflow using RA3.3 airflow -test procedures: -/CFM Option 1 used then: 1 Allowed leakage = Fan Airflow i 1600 x 0.15 = 240 CFM Actual Leakage = 234 CFM Pass if Actual Leakage is less than Allowed leakage Pass Fail Option 2 used then: 2 Allowed leakage = Fan Airflow _ x 0.10 = _ CFM Actual Leakage to outside = _ CFM Pass if Actual leakage to outside is less than Allowed leakage Pass Fail Option 3 used then: Initial leakage prior to start of work = _ CFM Final leakage after sealing all accessible leaks using smoke test = _ CFM 3 Initial leakage _ - Final leakage _ = Leakage reduction CFM ((Leakage reduction _ / Initial leakage _) x 100% _ % Reduction Pass if % Reduction >= 60% aPassoFail Option 4 used then: 4 All accessible leaks repaired using smoke test. HERS rater must verify (No Sampling). Pass if all accessible leaks have been repaired using smoke Pass Fail 0 Reg: 212-A0060741A-M2100001A-0000 Registration Date/Time: 2012/11/02 17:45:53 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 INSTALLATION CERTIFICATE CF-6R-MECH-2I-HERS Duct Leakage Test — Existing Duct System (Page 2 of 2) Site Address: 79-165 Coyote Creek, La Quinta CA 92253 (System Enforcement Agency: Permit Number: 1) City of La Quinta 12-1292 ® Outside air (OA) ducts for Central Fan Integrated (CFI) ventilation systems, shall not be sealed/taped off during duct leakage testing. CFI OA ducts that utilize controlled motorized dampers, that open only when OA ventilation is required to meet ASHRAE Standard 62.2, and close when OA ventilation is not required, may be configured to the closed position during duct leakage testing. ® All supply and return register'boots must be sealed to the drywall if smoke test is utilized for compliance — applies(to duct leakage compliance option 3 (leakage reduction by 60%) and option 4,(fix all accessible leaks) described above: 7 -�" �. ® New duct'installations,cannot utilize building lities'aslplenums�orplatformTeturns in lieu of ducts.'f� ® Mastic and draw bands must be used in combination with cloth backed rubber adhesive duct tape to seal leaks at all new duct connections DECLARATION STATEMENT . I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is true and correct. . I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction, or an authorized representative of the person responsible for construction (responsible person). . I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) conforms to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcement agency. . I understand that a HERS rater will check the installation to verify compliance, and that that if such checking identifies defects, I am required to take corrective action at my expense. I understand that Energy Commission and HERS provider representatives will also perform quality assurance checking of installations, including those approved as part of a sample group but not checked by a HERS rater, and if those installations fail to meet the requirements of such quality assurance checking, the required corrective action and additional checking/testing of other installations in that HERS sample group will be performed at my expense. . I reviewed a copy of the Certificate of Compliance (CF -1R) form approved by the enforcement agency that identifies the specific requirements for the installation. I certify that the requirements detailed on the CF -SR that apply to the installation have been met. . I will ensure that a completed, signed copy of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Installation Certificate is required to be included with the documentation the builder provides to the building owner at occupancy. I will ensure that all Installation Certificates will come from a HERS provider data registry for multiple orientation alternatives, and beginning October 1, 2010, for all low-rise residential buildings. Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) CERTIFIED COMFORT SYSTEMS INC Responsible Person's Name: Responsible Person's Signature: Mark Hyde Mark Hyde CSLB License: 906115 Date Signed: 10/22/2012 Position With Company (Title): Is this installation monitored by a Third Party Quality Name of TPQCP (if applicable): Control Program (TPQCP)? p Yes O No Reg: 212-A0060741A-M2100001A-0000 Registration Date/Time: 2012/11/02 17:45:53 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms March 2010 INSTALLATION CERTIFICATE* CF-6R-MECH-2S-HERS Refrigerant Charge Verification - Standard Measurement Procedure (Page 1 of S) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 1 City of La Quin ta 12-1292 Note: If installation of a Charge Indicator Display (CID) is utilized as an alternative to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECH-25 Certificate) should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH and STMS are not required for compliance, when a CID is utilized for compliance. As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional form(s) for any additional systems in the dwelling as applicable. Temperature Measurement Access Holes (TMAH) and Saturation Temperature Measurement Sensors (STMS) Procedures for installing TMAH are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is required for compliance, TMAH are also required for compliance. STMS are only required for completely new or replacement space -conditioning systems that utilize prescriptive compliance method. TMAH - Access Holes in Supply and Return Plenums of Air Handler System Name or Identification/Tag System i System Location or Area Served Whole House 1 ® Yes ❑ No 5/16 inch (8 mm) access hole upstream of evaporative coil in the return plenum and labeled according to Figure in Section RA3.2.2.2.2. 2 ® Yes p No 5/16 inch (8 mm) access hole downstream of evaporative coil in the supply plenum and labeled according to Figure in Section RA3.2.2.2.2. Yes to 1 and 2 is a pass. Enter Pass or Faill ✓ ® Pass ✓ p Fail STMS - Sensor on the Evaporator Coil System Name or Identification/Tag'S / j�j System 1 ° f d / 3 ❑ Yes p NP J The sensor is factory installed, or field installed according to manufacturer's specifications, or is'installed by methods/specifications approved by the Executive Director. It �+ �•, 4 p Yes ,rf , '`p No7 The sensor wire is terminated with a standard mini plug suitable for connection to a r digital therrrfbmeter -,The sensor mini plug is accessible to the installing `technician and the HERS rater without changing the airflow through the condenser coil .. 5 ❑ Yes 1 ❑ No IThe sensor measures the saturation temperature of the coil within 1.3 degrees F Yes to 3, 4, and 5 is a pass. Enter N/A if STMS are not applicable. Otherwise enter Pass or, Fail ✓ ®N/A ✓ ❑Pass ✓ ❑Fail STMS - Sensor on the Condenser Coil System Name or Identification/Tag I System i The sensor is factory installed, or field installed according to manufacturer's 6 ❑ Yes ❑ No specifications, or is installed by methods/specifications approved by the Executive Director. The sensor wire is terminated with a standard mini plug suitable for connection to a 7 ❑ Yes ❑ No digital thermometer. The sensor mini plug is accessible to the installing technician and the HERS rater without changing the airflow through the condenser coil 8 1 ❑ Yes I No IThe sensor measures the saturation temperature of the coil within 1.3 degrees F Yes to 6, 7, and 8 is a pass. Enter N/A if STMS are not M N/A ✓ p Pass ✓ ❑ Fail applicable. Otherwise enter Pass or Fail C' Reg: 212-A0060741A-M2500001A-0000 Registration Date/Time: 2012/11/02 17:44:45 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification - Standard Measurement Procedure (Page 2 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 City of La Quinta 12-1292 Standard Charge Measurement Procedure (for use if outdoor air dry-bulb is above 55°F) Procedures for determining Refrigerant Charge using the Standard Charge Measurement Procedure are available in Reference Residential Appendix RA3.2. As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional form(s) for any additional systems in the dwelling as applicable. • The system should be installed and charged in accordance with the manufacturer's specifications before starting this procedure. • The system must meet minimum airflow requirements as prerequisite for a valid refrigerant charge test. • If outdoor air dry-bulb is 55°F or below, the installer must use the Alternate Charge Measurement Procedure. Space Conditioning Systems System Name or Identification/Tag System 1 (must be re -calibrated monthly) Date of Th rmocouple,Calibration % v 10/22/2012 System Location or Area Served Whole House � v Outdoor Unit Serial # 12292w842f Outdoor Unit Make american standard Outdoor Unit Model 4a7aS049e100ab Nominal Cooling Capacity Btu/hr 48000 Date of Verification 10/22/2012 Calibration of Diagnostic Instruments Date of Refrigerant Gauge Calibration 10/22/2012 (must be re -calibrated monthly) Date of Th rmocouple,Calibration % v 10/22/2012 (must be re -calibrated monthly) • r � v Measured Temperatures (1F) / r A / -''I' ! r't_ I N. % IN System Name or Identification/Tag System 1 , T Supply (evaporator leaving) air dry-bulb temperature (Tsupply, db) Return (evaporator entering) air dry-bulb temperature (Treturn, db) Return (evaporator entering) air wet -bulb temperature (Treturn, wb) Evaporator saturation temperature 44 (Tevaporator, sat) Condensor saturation temperature 101 (Tcondensor, sat) Suction line temperature (Tsuction) 56 Liquid Line Temperature (Tliquid) 90 Condenser (entering) air dry-bulb 89 temperature (T condenser, db) } Reg: 212-A0060741A-M2SOOOOIA-0000 Registration Date/Time: 2012/11/02 17:44:45 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification - Standard Measurement Procedure (Page 3 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 City of La Quinta 12-1292 Minimum Airflow Requirement Temperature Split Method Calculations for determining Minimum Airflow Requirement for Refrigerant Charge Verification. The temperature split method is specified in Reference Residential Appendix RA3.2. System Name or Identification/Tag System 1 Calculate: Actual Temperature Split = Treturn, db - Tsupply, db Target Temperature Split from Table RA3.2-3 using Treturn, wb and Treturn, db Calculate difference: Actual Temperature Split - Target Temperature Split = Passes if difference is between -3°F and +3°F or, upon remeasurement, if between -3°F and -100°F Enter Pass or Fail Note: Temperature Split Method Calculation is not necessary if actual Cooling Coil Airflow is verified using one of the airflow measurement procedures specified in Reference Residential Appendix RA3.3. If actual cooling coil airflow is measured, the value must be equal to or greater than the Calculated Minimum Airflow Requirement in the table below. Calculated Minimum Airflow Requirement (CFM) = Nominal Cooling Capacity (ton) X 300 (cfm/ton) -.r System Name or Identification/Tagj yy) - System i % 1 Calculated Minimum Airflow Requirement (CFM) 1200 Measured •Airflow,using RA3'.3 procedures (CFM)4 1350 Passes if measured airflow is greater than or equal to the calculated minimum airflow PASS requirement. Enter Pass or Fail Superheat Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for fixed orifice metering device systems System Name or Identification/Tag System 1 Calculate: Actual Superheat = Tsuction - Tevaporator, sat Target Superheat from Table RA3.2-2 using Treturn, wb and Tcondenser, db Calculate difference: Actual Superheat - Target Superheat = System passes if difference is between -5°F and +5°F Enter Pass or Fail Reg: 212-A0060741A-M2500001A-0000 Registration Date/Time: 2012/11/02 17:44:45 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS tefrigerant Charge Verification - Standard Measurement Procedure (Page 4 of 5; Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 1 City of La Quinta 12-1292 Subcooling Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve (TXV) and electronic expansion valve (EXV) systems. System Name or Identification/Tag System 1 Calculate: Actual Subcooling = 11.0 Tcondenser, sat - Tliquid Target Subcooling specified by manufacturer 8 Calculate difference: 3 Actual Subcooling - Target Subcooling = System passes if difference is between -3°F and +3°F PASS Enter Pass or Fail Metering Device Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve (TXV) and electronic expansion valve (EXV) systems. System Name or Identification/Tag System 1 Calculate: Actual Superheat = 12.0 Tsuction - Tevaporator, sat Enter allowable superheat range from manufacturer's specifications (or use range 4-25 between 4°F and 250F if manufacturer's specification is not available) System passes.if actual'superheat is-withinthe' ' /7 PASS allowable superheat range f J Enter Pass or Fail Reg: 212-A0060741A-M2500001A-0000 Registration Date/Time: 2012/11/02 17:44:45 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-MECH-25-HERS Refrigerant Charge Verification - Standard Measurement Procedure (Page 5 of 5) Site Address: Enforcement Agency: Permit Number: 79-165 Coyote Creek, La Quinta CA 92253 1 City of La Quinta 12-1292 Standard Charge Measurement Summary: System shall pass both refrigerant charge criteria, metering device criteria (if applicable), and minimum cooling coil airflow criteria based on measurements taken concurrently during system operation. If corrective actions were taken, all applicable verification criteria must be re -measured and/or recalculated. System Name or Identification/Tag System 1 CSLB License: 906115 Date Signed: 10/22/2012 Position With Company (Title): System meets all refrigerant charge and airflow Name of TPQCP (if applicable): Control Program (TPQCP)? ❑ Yes ❑ No requirements. PASS Enter Pass or Fail DECLARATION STATEMENT • I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is true and correct. • I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction, or an authorized representative of the person responsible for construction (responsible person). • I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) conforms to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcement agency. • I understand that a HERS rater will check the installation to verify compliance, and that that if such checking identifies defects, I am required to take corrective action at my expense. I understand that Energy Commission and HERS provider representatives will also perform quality assurance checking of installations, including those approved as part of a sample group but not checked by a HERS rater, and if those installations fail to meet the requirements of such quality assurance checking, the required corrective action and additional checking/testing of other installations in that HERS sample group will be performed at my expense. • I reviewed a copy of the Certificate of Compliance (CF -IR) form approved by the enforcement agency that identifies the specific requirements for the installation. I certify that the requirements detailed on the CF -111 that apply to the installation have been met. • I will ensure that a completed, signed copy of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Installation Certificate is required to be included with the documentation the builder provides to the building owner at occupancy. I will ensure that all Installation Certificates will come from a HERS provider data registry for multiple orientation alternatives, and beginning October 1, 2010, for all low-rise residential buildings. Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) CERTIFIED COMFORT SYSTEMS INC Responsible Person's Name: Responsible Person's Signature: Mark Hyde Mark Hyde CSLB License: 906115 Date Signed: 10/22/2012 Position With Company (Title): Is this installation monitored by a Third Party Quality Name of TPQCP (if applicable): Control Program (TPQCP)? ❑ Yes ❑ No Reg: 212-A0060741A-M2500001A-0000 Registration Date/Time: 2012/11/02 17:44:45 HERS Provider: CalCERTS, Inc. 2008 Residential Compliance Forms August 2009