City-Wide Striping Project No. 2012-07EThe Desert Sun
750 N Gene Autry Trail
Palm Springs, CA 92262
760-778-4578 / Fax 760-778-4731
State Of California ss:
County of Riverside
Advertiser:
Certificate
CITY OF LA QUINTA
78495 CALLE TAMPICO
LA QUINTA , CA 92253
Order# 0002388510
I am over the age of 18 years old, a citizen of
the United States and not a party to, or have
interest in this matter. I hereby certify that the
attached advertisement appeared in said
newspaper (set in type not smaller than non
pariel) in each and entire issue of said
newspaper and not in any supplement thereof
on the following dates, to wit:
Newspaper: The Desert Sun
9/6/2017 9/13/2017
I acknowledge that I am a principal clerk of the
printer of The Desert Sun, printed and
published weekly in the City of Palm Springs,
County of Riverside, State of California. The
Desert Sun was adjudicated a Newspaper of
general circulation on March 24, 1988 by the
Superior Court of the County of Riverside,
State of California Case No. 191236.
I declare under penalty of perjury that the
foregoing is true and correct. Executed on
this 13th day of SEPTEMBER, 2017 in Palm
Springs, Califo
secrION 1100
INVITATION Project
To Bio
PAUEMrNTct No. 2012-07E
GENT PLAN
FISCAL YEAR 015 2017 PHASE 3
SEALED BIDS will be received by
CITY-WIDE tySTRIPING
f
City Clerk located at 78-495 Clle Tampico, La Quinta,
(City)
f mja, the Office22ofthe11,00 A.M. on Thursday, September 21, 2017 at whirh�timelth California,
pub) until
opened and read for performing work as Follows:.
The proposed project consists of furnishing and refreshing striping on major ar-
pllhritalher saincidental the
City of La Write, arterial,
arterial,
facitiesnecesryand to
complete the Improvements. Additional work Includes new striping on $faxing
Star, the addition of a bike lane on Miles Avenue, refreshing and adding new
along
striping
Washington to ron age Road, and striping new yellow edge stripes
9 project work and •incidental items to complete
the project shall be performed In accordance with the plans, specifications, and
other provisions of the contract. Ali of the above Improvements are to be con-
structed in a workmantlke manner, leaving the entire project in a neat and pre-
sentable condition. Refer to Sections 3000 and 4000 for more information.
This project shall be completed wlthie 30 working days from the date specified
in the Notice to Proceed. Time for the commencement and completion of the
work is important, and Is to be of the essence of the Contract. The sucessful
following 'Notice of Award".
bidder should plan to order any long lead time equipment items immediately
A pre-bid conference is scheduled for I:00 P.M., Tuesday, September 12, 2017 in
the Public Works conference room at City of La Quinta, City Hall located at 78-
495 Calle Tampico, La Quinta, California 92253.
Complete sets of -the bidding documents may be purchased online at:
www -plan itplan roa m.com
IMPORTANT; If you are not on the plan holders list through Plank Planroom
you will not receive addendums. It is the responsibility of the bidder to ensure
that they are placed on the plan holders Ilst.
Bidding procedures are prescribed In the Project Specifications. Bids shall be
executed upon the forms bound and made a part of said Specifications. Bid se-
camount urity In an amount riot less than ten percent (10%) of the total bid dollar
hmittednd withneach rng to bid. athe guarantydtoibeiforfeited should requiredider,bIf
sawarded the contract, fail to enter into the same, or fails to furnish in a timely
manner the bonds and/or proof of insurance. The City reserves the right to re-
ject any or all bids, and to waive any irregularities in the bids. aid log sheets can
be found at httpAAeemelaquintaca.govlbusinessrdesien-and•developmentkid-o
n -jabs.
Pursuant to the provisions of California Labor Code Section 6707, each bid sub-
mitted in response to this Invitation to Bid shall contain, as a bid item, adequate
sheeting, shoring, and bracing, or equivalent method, for the protection of life
and limb In trenches and open excavation, which shall conform to applicable
safety orders. By listing this sum, the bidder warrants that its action does not
sur consultants.)rty to -the City, is consultants, and their employees, agents, and
Pursuant to Section 1770, .et. seq., of the California Labor Code, the successful
bidder shall pay not Jess than the prevailing rate of per diem wages as deter-
mined by the Director of the California Department- of Industrial Relations.
These wage rates are available from the California Department of Industrial Re-
lations' internet website at httreetwvw.dir.c .gov.
Pursuant to Section 1725.5 of the California Labor Code. no contractor or sub-
contractor may be awarded a contract for public work on a public works project
unless registered with the Department of industrial Relations at the time the
contract Fs awarded. Corrtractors and subcontractors may find additional infor-
mation for registering at the Department of Industrial Relations website et http
://www.dir.ca.gov/Public-Works/PublicWorks.htmi.
Pursuant to Labor Code section 1771.1, ho contractor or sul7Coetractor may be
fisted on a bid proposal for a public works project submitted on or after March
1, 2015 unless registered with the Department of Industrial Relations, Ferther-
more, al! bidders and contractors are hereby notified that no contractor or sub-
nrartor mksrdor after
1, for
rfulion4public worproject unlesrgisterdwth the Department
Relations.
Pursuant to Labor Code section 1771.4, all bidders are hereby notified that this
project is subject to compliance monitoring and enforcement by the Depart-
ment of Industrial Relations_
Pursuant to 58854, all contractors and subcontractors must furnish electronic
certified payroll records directly to the Labor Commissioner (aka Division of .La-
bor Standards Enforcement). ,411 contractors and subcontractors must also pro-
vide a copy and proof to the City of online' submittal within 2 days of online
submission.
Pursuant to Public Contract Code Section 22300, for monies earned by the Con-
tractor and withheld by -the City to ensure the performance of the Contract, the
Contractor may, at its option, choose to substitute securities meeting the re-
quirements of said Public Contract Code Section 22300.
All bidders shall be licensed under the provisions of Chapter 9, Division 3 of the
Business and Professions Code of the State of California to do the type of work
contemplated in the project, in accordance with provisions of California Public
Contract Code Section 3300, the CHy has determined that the General Contrac-
tor shall -possess a valid Class A (General Contractor) and/or C32. (Parking and
Highway Improvement Contractor), at the time that the hid is submitted.
Subcontractors shall possess valid, suitable licenses For the work they will pep
fform.
Pallure to possess the specified license(s) shall render the bid as non-
e
The successful bidder will be required to furnish a Labor and Materials bond in
the amount equal to one hundred percent (100%) of the Contract price, as well
as a Fait) -Fu! Performance Bond,, in the amount equal to one hundred percent
(100%) of the Contract price.
Each bidder shall submit with its bid a statement, setting forth its experience on
the forms included in the Bid
Proposal.
Tele
ones
not be available
natedhtime willlnot be accepted. tBidders and their uthorizeo bidders. Bid forms receivd agentsafter tare invhe it -
for the opening of bids.
ed to attend.
Nobidder may withdraw its bid for a period of sixty (60) days after the date set
Approved By:
Bryan
McKinney, CmEngineer
City
Published By:Cerk
-_
Susan Maywis
Pu bliehed: 9/6.19/13, 2017
Date: