9610-068 (PLBG)~LICENSED CONTRACTOR DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of
Chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professionals Code, and my License is in full forward effect.
License # Lic. Class Exp ,Date
26 14 C4
Or
Date Signature of Contractor
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's
License Law for the following reason:
( ) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec. 7044, Business & Professionals Code).
( ) I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec. 7044, Business & Professionals
Code).
() I am exempt under Section B&P.C. for this reason
Date Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
( ) I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for. by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
(�) I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, .for the performance of the work for which this
permit is•`_issued� Mylworkers' compensation insurance carrier `Vpojicykno. are:
Carrier Policy No.
(This section need not be completed if the permit valuation is for $100.00 or less).
( ) I certify that in the performance of the work for which this permit is issued,
I shall not employ any person in any manner so as to become subject to the
workers' compensation laws of California, and agree that if I should become
subject to the workers' compensation/provisions of Section 3700�of the Labor
Code, (,'shall forthwith comply with those provisions.
Wate:Al ' } r7(,Applicant tett �ls.�.--•---� �,.
~ r
Warning: Failure to secure Workers' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000, in
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorney's fees.
IMPORTANT Application is hereby made to the Director of Building and Safety
for a permit subject to the conditions and restrictions set forth ori his
application. - . ,
1. Each person upon whose behalf this application is made & each person at
whose request and for whose benefit work is performed under or pursuant to
any permit issued as a result of this applicator agrees to, & shall, indemnity
& hold harmless the City of La Quinta, its officers; agents and employees:
2. Any permit issued as a result of this application becomes null and void if
work is not commenced within 180 days from date of issuance of such
permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
construction, and hereby authorize representatives of this City to enter upon
thefabove-mentioned property'for inspection purposes.
Signature (Owner/Agent) i' -- � ` e Date.�� - % -)-rX61
11 1
BUILDING PERMIT PERMIT# . ' CONTROL#
��� 4231
DATEfyr9 VALUATION LOT TRACT
JOB ADDRESS 5ti- :7 eX'�°6L'NIDA VF+�LAISCO
APN
OWNER
CONTRACTOR/DESIGNER/ENGINEER
r e' EN "� � r P, 1 4
:talo:..,d't�.E�x..,..�,.��:;�ti,e��A'i'��
RClf' S . 5,
A-1 3�? �('..►f?!j Sl�l O+'FC'E,CNC
7"r,461 HIGHWAY i.i I, y"i � !�7
1469 io U1'fLR K,10 z0NC1JQ RD.
111V 11 DFcI+ME.' CA. iQfits
CA 922,10
c+t9.37'i Otii �'
^19)1 29-6975
USE OF PERMIT
K4TU M/.iTE'D 6..`t3:v"f OF CC3.,N. FR0C.fION
2.,250.0ti
F1t,V.NM€NQv`PVt— S.EMFR €()1-tfU(►-449ytF@U $10.00
SUB -TOT i, C0b1SVXt.A;?i0 t SAND PLA?+t CI-ilsM
±X00
OCT 2 2'1996
113
RECEIPT
DATE
BY /
DATE FINALED
IN
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
Forms & Footings
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck
Exhaust Fans
OX to Wrap
F.A.U.
Framing
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wali Insulation
Condensate Lines
Party Wali Firewall
Extedor Lath
Drywall - Int. Lath
Final
Final
BLOCKWALL APPROVALS
POOLS - SPAS
steel
Set Backs
Electric Bond
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final
Gas Piping
PLUMBING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure
Shower Pans
O.K. for Finish Plaster
Sewer Lateral,
Pool Cover
Sewer Connection
Encapsulation
Gas Piping.
Gas Test
Applia
0 0,422
Final
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fbdures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
COMMENTS:
r
L
COACHELLA VALLEY WATER DISTRICT
CASH R�6EIPT DETAIL
Received From:%({ C �'.t
`
-(�
.•�
Date; y ;
_
Address: ! :�..�� {,, i u � �'� (.� ;,�� ; . 1
(` (T ���' � % + 1� '��`
1 � a Y '`r .i..-�
�
Account No: r) ! Lot s) i.}
erg !
Tract
_
4
Service Address " o ' �' .� ! • i ;' C?
G.A. Code
J .
❑ Meter(s)
$
❑ Service(s)
❑ Backfldw(s)
❑ House Lateral(s)
( -
❑ DetectorCheck(s)
❑ Meter Surcharge
7
!
P-Sanitation Capacity Charge
�.
❑ W.S.B.F.C.
❑ Temporary Construction Meter
1
+ ❑ Turn on Charge
i
❑ Uncollected Account - Name
❑ Inspection Fee - Tract -
Fee-
ee-❑
0Plan Check Fees Water I Sewer -
}
Tract --
❑ Bond Payment - A.D. - Bond
j
Assmt.
❑ Customer Deposit
1
❑• Other
TOTAL
Remarks: i ) i !
G1t;b y to:
Cash
{ / l
WaterService' t
Check
`.Y;
t
Cashier
Money-
Order.
6VWD-.438(11189) i
A-1 CESSPOOL SERVICE) INC.
P.O. Box 183
Desert Hot Springs, CA 92240
JOB INVOICE
I
fc-
7
C' '-I nvi cwt (2
QUANT
(619) 329-6875
-PRICE
CUSTOMERS'S ORDER
NO.
DATE ORDERED.
State Lic. #265214
ORDER TAKEN BY
Pumping Fee per 1000 gal.
DAT PROMISED
Z'
.3 TO
BILL
L
Dumping Fee per 1000 gal.
PH-_
:T
A..RE
Out of Area Fee
MEC
1 74reL -7
CITY
HELPER
Locating Opening Fee (per hour)
JOB NAME
MY
Size System:
IAY.WO.K
DESC TO OF WOR
T
I
fc-
7
C' '-I nvi cwt (2
QUANT
DESCRIPTION OF WORK
-PRICE
AMOUNT
Gallons
Pumping Fee per 1000 gal.
L
Dumping Fee per 1000 gal.
Out of Area Fee
Locating Opening Fee (per hour)
Size System:
A SERVICE CHARGE OF $20 WILL BE DUE
ON ALL RETURNED CHECKS.
A'FINANCE CHARGE OF 1.1/2% PER MONTH, 18% PER YEAR WILL BE
CHARGED ON PAST DUE ACCOUNTS OVER 30 DAYS.
OUANT.
LABOR AMOUNT
TOTAL
MATERIALS
MECHANICS @
TOTAL
LABOR
HELPERS @
I hereby ackovdedge the satisfactory
completion of the above described wori: TOTAL LABOR.
TAX
SIGN .RE
DATO&MPLE T
M' 5 Z %
, -
TOTAL
Under the California Mechanics Lien. Law any contractor, subcontractor,
laborer, supplier, or other person who helps to improve your property, but
is not paid for his/her work or hearing, your property could be sold by a
court officer and the proceeds of the sale used to satisfy the indebtedness.
This can happen even if you have paid your contractor in full if the
subcontractors, laborers, or suppliers remain unpaid.
To preserve their right to file a claim or lien against your property, certain
claimants such as subcontractors or material suppliers are required to
provide you with a document entitled "Preliminary Notice". A Preliminary
Notice is not a lien against your property. Its purpose is to notify you of
persons who may have a right to file a lien against your property if they are
not paid. Generally, the maximum time allowed.for filing a claim or lien
against your property is ninety (90) Days after the completion of your project.
TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY,
YOU MAY WISH TO TAKE ONE OR MOREOF THE FOLLOWING STEPS:
1) Require that payments be made directly to subcontractors and material
suppliers through a joint control. Any joint control agreement should include
the addendum approved by the Registrar of Contractors.
2) Issue joint checks for payment, made out to both your contractor and
subcontractors or material suppliers involved in the project. This will insure
that all persons due payment are actually made.
3) After UPON making payment on any completed phase of the project,
and before making any further payments, require your contractor to provide
you with unconditional lien releases signed by each material suppliers,
subcontractor and laborer involved in that portion of the work for which
payment was made. On projects involving improvements to a single family
residence or a duplex owned by individuals, the persons signing these
releases lose the right to file a claim against your property. In other types
of construction this protection may still be important, but may be as
complete. TO PROTECT YOURSELF UNDER THIS OPTION YOU MUST BE
CERTAIN THAT ALL MATERIAL SUPPLIERS, SUBCONTRACTORS OR
LABORERS HAVE SIGNED.