Loading...
11-0773 (RC) Ste. 110P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: �_ _11-00000773— Property 11-00000773—Property Address: 78134 - CALLE TAMPICO STE 110 APN: 770-020-012- - - Application description: REMODEL - COMMERCIAL Property Zoning: VILLAGE COMMERCIAL Application valuation: . .12000 Tay/ 4� VOICE (760) 777-7012 FAX (760) 777-7011 . BUILDING & SAFETY DEPARTMENT INSPECTIONS (760) 777-7153 BUILDING PERMIT Date: 8/09/11 Owner: HIGHLAND LA QUINTA II LLC 80 S LAKE AVE STE 660 PASADENA, CA 91101 i 72 IF /1 c (� �t I: Contractor: Applicant: Architect or Engineer: CONSTRUCTION ZONE, THE 77799 JACKEL DRIVE, SUIPE B (+,F5,A.0`U11NTA PALM DESERT, CA 92211 r ra1C,`;S?:_:K� (760)772-3585 I /Qr LiC. No.: 740276 --------------------------------------------------------------------------------------------------- LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. Liceose Class: B C cense No.: 740276 Date: �ontractor. L OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_ 1 I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_ 1 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). ( 1 I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: W1 JA .0 LQPERMIT WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ 'I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is. issued. y I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: ' Carrier ULLICO CASUALTY Policy Number UWHA48600009210 I certify that, in the performance of the work for which this permit is issued, I shall not employ any person inany manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section C 3700 of the L boorr�Code, I shall forthwith comply with those provisions. . 11 -ate: 7 �� pplican, x WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1 . Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, . the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of t county to enter upon the above-mentioned property for inspection purposes. a15 te:-��Si ture (Applicant or Agent): D Application Number . . . . . 1 11-00000713 Structure Information Construction Type . . . . . TYPE V, UNPROTECTED Occupancy Type . . . . . . BUSINESS <50 Other struct info . . . . . CODE EDITION 2010 FIRE SPRINKLERS YES OCCUPANT LOAD 41.00 ----------------------------------------------------------------------------- 1ST FLOOR SQUARE FOOTAGE 1718.00 Permit .. . . . . . BUILDING PERMIT' Additional desc . . Permit Fee . . . 135.00 Plan Check Fee 87.75 Issue Date . . . . valuation . . . . 12000 Expiration Date 2/05/12 Qty Unit Charge Per Extension BASE FEE 45.00 10.00 9.0000 THOU BLDG 2,001-25,000 90.00 --------------- -------------------------------------------------------- Special NotesandComments 1718 SF INT. T.I. FOR DANCE STUDIO. 2010 CODES ------------------------------------------------------------------------- Other Fees . . . . . . . . . ACCESSIBILITY PLAN REVIEW 8.77. BLDG STDS ADMIN (SB1473) 1,00 ENERUY REVIEW FEE 8.77 Fee summary Charged Paid Credited ------- ---7--Permit Due ----------------- PermitFee Total 135.00 .00 ..00 135.00 Plan Check Total 87.75 .00 .00 87.75 Other Fee Total 18.54 .00 .00 18.54 Grand Total 241.29 .00 .00 241.29 LQPERAIIT Bin # City of La Quin'ta Building &r Safety, Division -Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (7.60) 777-7012 99� Building Permit Application and Tracking Sheet Permit #P.O. Project Address: Owner's Name:. All, hC4 ZA 0kj)1TA- Z LCC A. P. Number: O Address: SO 44 kq- A Lk- . Legal Description: City, ST, Zip: PA.J,wQA- Contractor: V 6-Telephone: ZIC3�_JV(30 Address: 7 7-7 J-A JQ f)e 13 Project Description: City, ST, Zip: Telephone._o- 3 (-7 2 7 1 I-j1A_C--1A C—(19-cj(L14 I State Lic. 9 : 7((0 Z 7( :, City Lic. #: Arch., Engr., Designer: Address: City, ST, Zip: Telephone: ...... . . . . . . . . . . Construction Type: Occupancy: State Lic. #: Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person: (f c- 1c-- A f f AA Sq. Ft.: 1718 # Stories: #Units: Telephone # of Contact Person: 71.0 - _SG7, 2 21 Estimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE N Submittal Reqld Recld TRACKING PERMIT FEES Plan Sets 3 Plan Check submitto'71Item Amount' Structural CaIcs. Reviewed, ready for corrections 9/79.� Plan Check Deposit Truss Calts. Called Contact Person Plan Check Balance. Title 24 Calcs. pi Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 21" Review, ready for correction CH Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- Review, ready for corrections/issue Developer Impact Fee Planning Approval , I Called Contact Person A.I.P.P Pub. Wks. Appr Date of permit issue School Fees 10 4dPFr Total Permit Fees !Z7.2 7 1.16 . � fRedp" d-44 7/25/// 7118 UW- P.O. Box 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA- ?2253 �r CV R BUILDING' & SAFETY DEPARTMENT (760) 777-7012 FAX (760) 77 7-70 11 To: Greg Butler, Building & Safety Manager To CDD: 7 " 16 -4 From: Les Johnson, Director -Planning Due•Date: 7 oU-) J Permit #: Status: %�T ale- Building lBuilding Plans Approval (This is an approval to issue a Building Permit)' The. Planning Department has . rev,sewed the Building Plans .for the following project: Description:�� Address or General Location: 7- /38 Applicant Contact: 6tZ&3e 7 - 567 - 2 Z! The Planning Department finds that: ❑ . ...these Building Plans do not require Planning Department approval. ...these Building Plans are approved by the Planning Department.- 0 epartment:❑ ...these Buildig Plans requi:-e corrections. Please forward'a copy of the attached corr. ctions to the applicant:. When the corrections are made Upleaseetur them to the Planning Department for review. , Director -Planning recon d JUL 18 2011 city of La Quinta Planning Depcs4rcnt Date a 18 CALLE TAMPICO - SUITE ADDRE SSING THE PLAZA @ CALLE TAMPICO -SHOP BUILDING 1 grouna tio.orplan: B.HOP BUILDING '1 1 scale.: 118' = -1,4, <11 -TITLE 24 REPORT Title 24 Report for: The Plaza @ Calle Tampico' Shop Bldg 2 NW Crnr of Calle Tampico & Desert Club Dr - La Quinta , Ca 92253 Project Designer: Olshan & Associates 811 7th Street #B Santa Monica, Ca 90405-1407 310-394-3132 , Report Prepared By: Yam Chapagain a Fruchtman & Associates, Inc. 12655 Washington Blvd., Ste. 204 Los Angeles, CA 90.066- - (310) 66- (310) 915-6110 CITY OF LA QUINTA. _4 L 18 2011 BUILDING & SAFETY DEPT. i - � Job Number:. ----�. ROVETamp1495 FOR CONSTRUCTION DATE B "1 &166' s Date • �77t-.. 2/12/2008 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.2 by EnergySoft Job Number: Tamp1495 User Number: 4469 t EnergyPro 4.2 by EnergySoft Job Number: Tampl495 User Number: 4469 (PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -11 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE The Plaza @ Calle Tampico Shop Bldg 2 DOCUMENTATION AUTHOR 2/12/2008 PROJECT ADDRESS BUILDING CONDITIONED FLOOR AREA 12,024 Sq.Ft. NW Crnr of Calle Tampico & Desert Club Dr La Quinta BUILDING TYPE PRINCIPAL DESIGNER - ENVELOPE NONRESIDENTIAL HIGH RISE RESIDENTIAL TELEPHONE Building Permit # Olshan & Associates NEW CONSTRUCTION ADDITION 310-394-3132 EXISTING + ADDITION/ALTERATION DOCUMENTATION AUTHOR ❑ F-1 F� 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document TELEPHONE Checked by/Date Fruchtman & Associates, Inc. ENVELOPE COMPLIANCE (310) 915-6110 EnforcememAgency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR DATE OF PLANS 10-12-07 BUILDING CONDITIONED FLOOR AREA 12,024 Sq.Ft. CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION ❑ ❑ R 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE Yam Cha a ain The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with.any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. ❑ ❑ ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. ❑ ❑ R 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ F-1 F� 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Envelo a Compliance Not In The Scope Of Required Forms IS U mittai PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms 1111 s Submittal PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 MECH-5 Required Forms PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE LIC. NO. DATE Fruchtman & Associates Inc I EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page:3 of 28 1 PERFORMANCE CERTIFICATE OF COMPLIANCE 'Part 2 of 3 J PERF -1 PROJECT NAMEDATE The Plaza C@ Calle Tampico Shop Bld 2 r' 2/12/2008 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed ENERGY COMPONENT Design Design Space Heating 0.01 0.01 Space Cooling 437.47 396.19 Indoor Fans 141.02 151.71 Heat Rejection 6.00 0.00 Pumps & Misc. 0.00 0.00 Domestic Hot Water ` 16.36 16.39- Lighting 187.32 187.32 Receptacle Process TOTALS: 869.65 839.05 Percent better than Standard: 3.5% . Compliance, Margin ' [❑spa°aam Popo:ed 0.00°" °0�°•B;a �� Hmf p8lt ., �._ . 'At , `� `.•" 0 30 80 I.90 120 150 1-80 210 240 270 300 330 380 390 420 k61u/-41-y1 - 9 41.28 -10.69 � 0.00 0.00BR 0.00 0.00 910 30.59 process) (: 3.5% excluding • BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones s 180 deq Conditioned Floor Area. Unconditioned Floor Area • Conditioned Footprint Area • Fuel -Type 12,024 sgft. sgft. r sgft. ' 1 0 - 9 12,024 7 Natural Gas Left Elevation Orientation Gross Area Glazing Area Glazing Ratio Front Elevation S 2,456 sgft. 1,123 sgft: 45.7%. Left Elevation (w) 910 sgft. 157 sgft. 17.3% Rear Elevation N 2,456 sgft. , o sgft. 0.0% 'Right Elevation Total Roof (E) 1 910 x,732 .12,023 sgft. sgft. Y sgft. 157 sgft. 1,437 sgft. o sgft. 17.3% - Standard Proposed Lighting Power Density 1.700 wisgft. 1.700 wisgft. .Prescriptive Env. Heat Loss 1,809 eium 2616 Btu/h Prescriptive Env. Heat Gain 208,638 Btwh-F 356,507 Btuih-F Remarks: ` Run Initiation Time: 02/12/08 09:46:53 Run Code: 1202838413 EnergyPro 4.2 by Energysoft 7 . User Number: 4469 Job Number: Tamp1495 � Page:4 of 28 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME The Plaza @ Calle Tampico Shop Bldg 2 DATE 2/12/2008 ZONE INFORMATION - System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. LPD (W/sf)1 Ctrl. .Credits (W/sf)2 Allowed LPD Proc. Area - Tailored Loads (W/S3 (W/S4 (W/sf) PGE -2G SPACE -G 'Retail Sales, Wholesale 2,272 -1.70 PGE -2F SPACE -F Retail Sales, Wholesale 1,622 '1.70 ' PGE -2E SPACE -E Retail Sales, Wholesale 1,622 .- '1.70 ` PGE -2D SPA CE -D Retail Sales, Wholesale 1,622 '1.70 •. PGE -2C SPACE -C Retail Sales, Wholesale 1,622 '1.70 PGE -2B SPACE -B Retail Sales, Wholesale 1,621 ' -1.70C f PGE -2A SPACE -A .. Retail Sales, Wholesale ' 1,644 '1.70 c, y . Notes: 1. See LTG -2-C (items marked with asterisk, see LTG -2 -C by others) 2. See LTG -4-C 3. See LTG -5-C (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. r ` • • The HVAC System "PGE -6T Carrier48HJ " includes an Economizer. This s stem has a cooling output < 75,000 Btuh or a supply cfm < 2500. ' The HVAC System "PGE -6T Carrier48HJ " is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement. The HVAC System "PGE -6T Carrier481-!J " includes Demand Control Ventilation per Standards Section 121. The HVAC System "PGE -5T (Carrier48hj) " is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and r documentation for their use have been provided by the applicant. ' Authorized Signature or Stam ` Run Initiation Time: 02/12/08 09:46:53 - Run Code: 1202838413 EnergyPro 4.2 by EnergySott User Number: 4469 Job Number: Tamp1495 Page:5 of 28 CERTIFICATE OF COMPLIANCE MECH-I-C I PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldci 2 1 2/12/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operatinq and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing ' Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 V of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing Agnew DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btu/hr. -Water-loop Heat Pump Controls Applies to all new waterfoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. . Equipment re uirin acceptance testing EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page:6 of 28 IAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2. Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Coal Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS Central or Single Zone PGE -2G, PGE -2F PGE -2E 2 1 1 Reference on Plans or Specification 112(a) 82%AFUE 82%AFUE 82%AFUE 112(a) 13.0 SEER / 11.0 EER 9.0 EER 9.0 EER 112(b) n/a n/a n/a 112(c), 115(a) n/a n/a n/a 121(b) - Yes Yes. Yes 121 b 568 cfm 405 cfm 405 cfm 121 c No No No 121 c No Yes Yes 121(c), i22(e) Pro rammable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122(f) Auto Auto Auto 122 n/a n/a n/a 123 No 124 R-8.0 R-8.0 - R-8.0 144 a & b n/a n/a n/a 144 a & b 118,080 btuh. 59,040 btuh 59,040 btuh 144 a & b n/a n/a n/a 144 a & b 93,968 btuh 59,565 btuh 59,565 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer Diff. Enth Inte rated Diff. Enth (Integrated) 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k . No ' No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. 'Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page:7 of 28 1 JAIR SYSTEM REQUIREMENTS . Part 1 of 2 MECH-2-Cl PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS Central or Single Zone PGE -2D PGE -2C PGE -26 1 1 1 T-24 MANDATORY MEASURES Section Reference on Plans or Specification Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 112(a) 82% AFUE 82% AFUE 82% AFUE 112(a) 9.0 EER 9.0 EER 9.0 EER 112(b) n/a n/a n/a 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121 b 405 cfm 405 cfm 405 cfm 121 c No No No 121 c Yes Yes Yes 121 c 122(e) Pro rammable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122(f) Auto Auto Auto 122 n/a I n/a n/a 123 No 124 R-8.0 R-8.0 - R-8.0 144 a & b n/a n/a n/a 144 a & b 59,040 btuh 59,040 btuh 59,040 btuh 144 a & b n/a n/a n/a 144 a & b 56,151 btuh 56,144 btuh 56,144 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a Diff. Enth (Integrated) Diff. Enth (Integrated) Diff. Enth (integrated) 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp r Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tampl495 Paae:8 of 28 1 JAIR SYSTEM REQUIREMENTS Part 1 of 2, MECH-2-Cl PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specification ' Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Coal Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. 112(a) 82% AFUE 112(a) 13.0 SEER / 11.0 EER 112(b) n/a 112(c), 115(a) n/a 121(b) Yes 121 b 411 cfm t 121 c No 121 c No 121(c), 122(e) Programmable Switch 122(e) Heating & Cooling Required 122(f) Auto 122 n/a 123 124 1 R-8.0 144 a & b n/a 144 a & b 118,080 btuh 144 a & b n/a 144 a & b 96,350 btuh 144 c Constant Volume 144 c 144 c Yes 144 d No 144 a No Economizer 144 f Constant Tem 144 (f) Constant Temp 144 k No MECHANICAL VENTILATION MECH-3-C PROJECT NAME DATE The Plaza P Calle Tampico Shop Bldg 2 2/12/2008 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121(b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM a0 Ned �fYO � N m ��� T�� °0 W'P XD3 �im� 3 2Cr �� CQ �� 0 InM A ?�� m0� X1077 TjT `�» 3 vim �XD si �.G D v �1 A. 3n3 0 oo Tye' C�00 T` 0 'lao �X aA p 0 C 3 p3X -y0 m. 'pO 03 a F -11 y A D SPACE -G 2,271 0.25 568 568 568 PGE -2G Total 568 568 SPACE -F 1,622 0.25 405 405 405 PGE -2F Total 405 405 SPACE -E 1,621 0.25 405 405 405 ' PGE -2E Total 405 405 SPACE -D 1,622 0.25 405 405 405 PGE -2D Total 405 405 SPACE -C 1,622 0.25 405 405 405 PGE -2C Total 405 405 SPACE -B 1,621 0.25 405 1 405 405 PGE -26 I Total 405 405 SPACE -A 1,644 0.25 411 411 411 PGE -2A Total 411 411 E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes for spaces without fixed seatin . H Required Ventilation Air REO'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). I Must be greater than or equal to H or use Transfer Air column N to make up the difference. J Design Ian supply cfm Fan CFM x 30%; or K Condition area fl. s x 04 cfm/ft. .: or L I Maximum of Columns H, J, K, or 300 cfm M IThis must be less than or equal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Air (column M), column H - M. Ener Pro 4.2 by Ener oft User Number: 4469 Job Number: Tam 1495 Page: 10 of 28 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME The Plaza Calle Tampico Shop Bldg 2 DATE 2/12/20 CHILLER AND TOWER M Y System Type Distribution Type Efficiency Tons PUMPS Condition Status Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Pipina Len th ft Control # HP Type In Plenum Outside Buried Add 1/2" Insulation 1QHW BOILER SUMMA Y Energy Factor or RE I Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input Vol. (Gals.) Condition Status Ext. R -Val. MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Pipina Len th ft Control # HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Oty Output Aux. kW Eff. Outout Efficiency Condition Status Economizer Type PGE -5T (Carrier48hj) packaged DX 4 59,040 5.0 82%AFUE 62,500 13.0 SEER / 11.0 EER New No Economizer PGE -6T (Carrier48HJ) Packaged DX 5 59,040 5.0 82%AFUE 73,000 9.0 EER New Diff. Enth (Integrated) CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. PGE -5T (Carrier48hj) Constant Volume Blow -Through 1,750 1.20 82.5% 100.0% none PGE -6T (Carrier48HJ) Constant Volume Blow -Through 2,400 2.40 84.0% 100.0% none Run Initiation Time: 02/12/08 09:46:53 Run Code: 1202838413 EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page: 11 of 28 ENVELOPE MANDATORY MEASURES 7 PROJECT NAME The Plaza 0 Calle Tampico Shop Blda 2 ENV -MM DATE • 2/12/2008 DESCRIPTION'- - • Designer Enforcement § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply r with the California Quality Standards for insulating material, Title 20, Chapter 4, Article - •.3 , X❑ § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating } and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §117(a) All Exterior Joints and openings in the building that are observable sources of air, ` leakage shall be:caulked, gasketed, weatherstripped or otherwise sealed.. X] § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and • fire doors). ❑ § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not, exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. § 118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have - insulation with an installed R -value of no less than R-13 between framing members. s s M • t EnergyPro By EnergySoft User Number: User Job Number. • Tamp1495 Page: 12 of 28 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldq 2 2/12/2008 7 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls § 122(e) Each space conditioning system shall be installed with one of the following: FXJ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all•others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different . schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or F] § 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the system. �- F_] § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. r. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance . supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: Tampl495 Page: 13 of 28 • f MECHANICAL MANDATORY MEASURES _ Part 2 of 2 MECH-MM , PROJECT NAMEThDATE ' e Plaza @ Calle Tam ico Shop Bld 2 2/12/2008 Description Designer Enforcement Ventilation ' i. ❑X § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans:- lans.-❑ F—]§ 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. ❑ § 122(f) All gravity ventilating systems shall be provided with automatic or, readily accessible manually operated dampers in all openings to the outside, except for combustion air - openings. t § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National , Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or , Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 .. Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the 3 ' person with overall responsibility for the design of the'ventilation system; or ❑ § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or ; remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or ` § 121(f)4 Another method approved by the Commission. Service Water Heating Systems ❑ § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. ` § 113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. r i EnergyPro By EnergySoft User Number: User Job Number: Tamp1495 Page: 14 of 28 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2G 2,272 ENGINEERING CHECKS 11SYSTEM LOAD Number of Systems 2 Heating System Output per System 59,040 Total Output (Btuh) 118,080 Output (Btuh/sqft) 52.0 Cooling System Output per System 62,500 Total Output (Btuh) 125,000 Total Output (Tons) 10.4 Total Output (Btuh/sqft) 55.0 Total Output (sgft/Ton) 218.1 Air System CFM per System 1,750 Airflow (cfm) 3,500 Airflow (cfm/sgft) 1.54 Airflow (cfm/Ton) 336.0 Outside Air (%) 16.2 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent 1, CFM I Sensible 4,170 85,315 14,995 1,354 35,024 0 1,280 525 0 0 568 19,721 6,422 568 26,512 0 0 1,280 525 107,681L:3;:;17 62 586 PGE -5T (Carrier48hj) 93,968 22,625 118,080 5.0 kW Supplemental Electric 0 Total Adjusted System Output 83,968 22,625 118,080 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK177 Aug 2 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 OF 62.7 OF 62.7 OF 94.4 OF 94.4 OF O Supply Air Ducts Outside Air 568 cfm 94.3 of Supply Fan Heating Coil Aux. Heat Coil 3500 cfm ROOMS 69.9 of 70.0 of TOOLING SYSTEM 11.0 / 77.6 of Outside Air 568 cfm 78.4/65.4 of 4.2 Return Air Ducts 83.6 / 67.6 of 83.6 / 67.6 of 58.4 / 57.1 of --&— .", I Supply Fan Cooling Coil 3500 cfm User Number: 4469 Return Air Ducts `5 Job Number: Tampl495 Supply Air Ducts 58.8/57.3OF 51.2% R.H. ROOMS 78.0/65.3OF 15 of 28 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2F 1.622 ENGINEERING CHECKS IFSYSTEM LOAD Number of Systems 1 Heating System Output per System 59,040 Total Output (Btuh) 59,040 Output (Btuh/sgft) 36.4 Cooling System Output per System 73,000 Total Output (Btuh) 73,000 Total Output (Tons) 6.1 Total Output (Btuh/sgft) 45.0 Total Output (sgft/Ton) 266.6 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.48 Airflow (cfm/Ton) 394.5 Outside Air (%) 16.9 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions 26.0 OF 62.5 OF Outside Air 405 cfm Supply Fan 2400 cfm 69.9 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 61,3 9 32 32 905 PGE -6T (Carrier48HJ) 59,565 10,019 59,040 5.0 kW Supplemental Electric 0 Total Adjusted System Output 59,565 10,019 59,040 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 2 m Jan 12 am 62.5 of. 85.6 of 85.6 of Heating Coil Aux. Heat Coil o .... n:. n.. . Supply Air Ducts 85.5 of ROOMS 70.0 of 106.0 / 73.4 of 83.0 167.4 of 83.0 / 67.4 of 59.6 / 58.4 of Supply Air Ducts JJWO Outside Air 405 cfm Supply Fan Cooling Coil 59.9 / 58.5 of 2400 cfm ROOMS 53.6% R.H. ` of 78.0 ! 66.0 of 78.3 66.1 Return Air Ducts EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page: 16 of 28 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2E 1,622 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 59,040 Total Output (Btuh) 59,040 Output (Btuh/sgft) 36.4 Cooling System Output per System 73,000 Total Output (Btuh) 73,000 Total Output (Tons) 6.1 Total Output (Btuh/sgft) 45.0 Total Output (sgft/Ton) 266.6 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.48 Airflow (cfm/Ton) 394.5 Outside Air (%) 16.9 Outside Air (cfm/sgft) 0.25 Note: values above (EATING SYSTE 26.0 OF Outside Air 405 cfm 69.9 OF at ARI conditions 62.5 OF Supply Fan 2400 cfm Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent CFMI Sensible 61,307F 9321 32 905 PGE -6T (Carrier48HJ) 59,565 10,019 59,040 5.0 kW Supplemental Electric 0 Total Adjusted System OutputSs,565 10,019 59,040 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 2 pm Jan 12 am tream Temperatures at Time of Heatina Peak) 62.50E ®1 85.60F ® 85.6 OF Heating Coil Aux. Heat Coil K Return Air Ducts 4 Supply Air Ducts 85.5 OF ROOMS 70.0 OF I 106.0 / 73.4 OF 83.0 / 67.4 OF 83.0 / 67.4 OF 59.6 / 58.4 OF O F Supply Air Ducts Outside Air 405 cfm Supply Fan Cooling Coil 59.9 / 58.5 OF 2400 cfm 53.6% R.H. ROOMS 78.3/66.1 0 F 78.0 ! 66.0 OF Return Air Ducts EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamol495 Paae:17 of 28 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2D 1.622 Number of Systems 1 Heating System Output per System 59,040 Total Output (Btuh) 59,040 Output (Btuh/sqft) 36.4 Cooling System Output per System 73,000 Total Output (Btuh) 73,000 Total Output (Tons) 6.1 Total Output (Btuh/sgft) 45.0 Total Output (sgft/Ton) 266.6 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.48 Airflow (cfm/Ton) 394.5 Outside Air (%) 16.9 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 58,0061 12,3651 PGE -6T (Carrier48HJ) 56,151 13,619 59,040 5.0 kW Supplemental Electric 0 Total Adjusted System Output 56,151 13,619 59,040 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 of 62.5 of 62.5 of 85.6 °F 85.6 of O Supply Air Ducts Outside Air 405 cfm 85.5 of Supply Fan Heating Coil Aux. Heat Coil 2400 cfm ROOMS 69.9 of 70.0 of Return Air Ducts I DOLING SYSTEM PSYCHROMETRICS (Airstream Temoeratures at Time of Coolina Peak) 12.0 / 77.9 of 84.0169A of 84.0 / 69.4 of 62.0 / 60.8 of Outside Air O 405 cfm Supply Fan 2400 cfm 78.3/67.5 of Cooling Coil h Return Air Ducts `i Supply Air Ducts 62.3/60.9OF 58.3% R.H. ROOMS 78.0 / 67.4 of EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page: 18 of 28 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2C 1,622 ENGINEERING CHECKS IFSYSTEM LOAD Number of Systems 1 Heating System Output per System 59,040 Total Output (Btuh) 59,040 Output (Btuh/sgft) 36.4 Cooling System Output per System 73,000 Total Output (Btuh) 73,000 Total Output (Tons) 6.1 Total Output (Btuh/sgft) 45.0 Total Output (sgftlron) 266.6 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.48 Airflow (cfm/Ton) 394.5 Outside Air (%) 16.9 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I CFM I Sensible 2,504 41,985 10,703 885 14,628 0 630 0 219 0 405 14,557 1,665 405 18,947 0 630 0 219 57,88 12 369 34 014 PGE -6T (Carrier48HJ) 56,144 13,621 59,040 5.0 kW Supplemental Electric 0 Total Adjusted System Output5s,1aa 13,621 5s,oao (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pml Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 OF 62.5 OF 62.5 OF 85.6°F 85.6 OF O Supply Air Ducts Outside Air 405 cfm 85.5 of Supply Fan Heating Coil Aux. Heat Coil 2400 cfm ROOMS 69.9 OF 70.0 of 12.0 / 77.9 of Outside �� 405 cfm 78.3/67.5 ° F 4.2 Return Air Ducts 84.0 / 69.4 of 84.0 / 69.4 of 62.0 / 60.8 of Supply Fan , Cooling Coil 2400 cfm User Number: 4469 Return Air Ducts Job Number: Tamp1495 Supply Air Ducts 62.2 / 60.9 of 58.3% R.H. ROOMS 78.0 / 67.4 of 19 of 28 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME J FLOOR AREA PGE -2B 1 621 ENGINEERING CHECKS IFSYSTEM LDAD Number of Systems 1 Heating System Output per System 59,040 Total Output (Btuh) 59,040 Output (Btuh/sgft) 1 36.4 Cooling System Output per System 73,000 Total Output (Btuh) 73,000 Total Output (Tons) 6.1 Total Output (Btuh/sgft) 45.0 Total Output (sgftrron) 266.5 Air System CFM per System 2,400 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.48 Airflow (cfm/Ton) 394.5 Outside Air (%) 16.9 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel CFM I Sensible 2,502 41,973 10,699 885 14,628 0 630 219 0 0 405 14,550 1,668 405 18,939 0 0 6301 219 57,862=T2 366 34 005 PGE -6T (Carrier48HJ) 56,144 13,618 59,040 5.0 kW Supplemental Electric 0 Total Adjusted System Output56,144 13,618 59,040 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 m Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 OF 62.5 OF 62.50F 85.60F 85.6 OF O Supply Air Ducts Outside Air 405 cfm o Supply Fan Heating Coil Aux. Heat Coil 85.5 F 2400 cfm ROOMS 69.9 of 70.0 of OE 0� 1E{ Return Air Ducts I 12.0 / 77.9 of Outside Air 405 cfm 78.3/67.5 of 4.2 84.0 / 69.4 of 84.0 / 69.4 of 62.0 / 60.8 of --&— .01 1 Supply Fan Cooling Coil 2400 cfm User Number: 4469 Return Air Ducts Job Number: Tampl Supply Air Ducts 62.2/60.9OF 58.3% R.H. ROOMS 78.0 / 67.4 of of 28 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2A 1,644 ENGINEERING CHECKS lrqVqTFM t OAF Number of Systems 2 Heating System Output per System 59,040 Total Output (Btuh) 118,080 Output (Btuh/sqft) 71.8 Cooling System Output per System 62,500 Total Output (Btuh) 125,000 Total Output (Tons) 10.4 Total Output (Btuh/sqft) 76.0 Total Output (sgft/Ton) 157.8 Air System CFM per System 1,750 Airflow (cfm) 3,500 Airflow (cfm/sgft) 2.13 Airflow (cfm/Ton) 336.0 Outside Air (%) 11.7 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions 26.0 of 64.7 of Outside Air 411 cfm Supply Fan 3500 cfm 69.9 of 64.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1 2,6941 61,7191 10,8501 0 411 14,316 6,710 0 926 77,8951 17 560 PGE -5T (Carrier48hj) 96,350 16,645 118,080 5.0 kW Supplemental Electric 0 Total Adjusted System Output gs,35o 16,645 118,080 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 pm Jan 12 am -earn Temperatures at Time of Heatina Peak) QR d OF — QR d OP Heating Coil Aux. Heat Coil 11.0 / 77.6 of 82.1 / 65.7 of Outside Air O 411 cfm Supply Fai 3500 cfm 78.2/63.9 of h Return Air Ducts '� lirstream Temperatures at Time 82.1 / 65.7 of M 56.2 / 54.9 of Cooling Coil h Return Air Ducts 11 Supply Air Ducts 96.3 of ROOMS 70.0 of Supply Air Ducts 56.5 / 55.0 of 46.3% R.H. ROOMS 78.0 ( 63.8 of 1 EnergyPro 4.2 by EnergySoft User Number: 4469 Job Number: Tamp1495 Page:21 of 28 1 ROOM LOAD SUMMARY PROJECT NAME The Plaza @ Calle Tampico Shop Bldg 2 DATE 2/12/2008 SYSTEM NAME PGE -2G FLOOR AREA 2,272 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE SPACE -G RETAIL FLOOR -G 1 4,309 88,152 14,995 4,170 85,315 14,995 1,354 35,024 PAGE TOTAL 1 4,170 85,315 14,995 1,354 35,024 TOTAL 4,170 85,315 14,995 1,354 35,024 EnergyPro By EnergySoff User Number: User Job Number: Tamp1495 Page:22 of 28 ROOM LOAD SUMMARY PROJECT NAME DATE The Plaza @ Calle Tampico Shop Bldg 2 2/12/2008 SYSTEM NAME FLOOR AREA PGE -2F 1,622 ZONE NAME I ROOM NAME IMult. I CFM I SENSIBLE1 LATENT I CFM ISENSIBLE1 LATENT CFM SENSIBLE RETAIL FLOOR -F SPACE -F 1 2,499 48,080 10,703 2,491 47,914 10,703 819 13,549 �I PAGE TOTAL 1 2,491 47,914 10,703 819 13,549 TOTAL 2,491 47,914 10,703 819 13,549 EnergyPro By EnergySoft User Number: User Job Number: Tamp1495 Page:23 of 28 ROOM LOAD SUMMARY PROJECT NAME The Plaza @ Calle Tampico Shop Bldg 2 DATE 2/12/2008 SYSTEM NAME PGE -2E FLOOR AREA 1,622 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE SPACE -E RETAIL FLOOR -E 1 2,499 48,080 10,703 2,491 47,914 10,703 819 13,549 r PAGE TOTAL 1 2,491 47,914 10,703 819 13,549 TOTAL 1 2,491 47,914 10,703 819 13,549 EnergyPro By EnergySoft User Number: User Job Number: Tamp1495 Page:24 of 28 ROOM LOAD SUMMARY PROJECT NAME The Plaza @ Calle Tampico Shop Bldg 2 DATE 2/12/2008 SYSTEM NAME PGE-2D FLOOR AREA 1,622 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE SPACE-D RETAIL FLOOR-D 1 2,750 46,078 10,703 2,511 42,071 10,703 890 14,708 PAGE TOTAL 1 2,511 42,071 10,703 890 14,708 TOTAL 1 2,511 42,071F 10,703 F 890 14,708 EnergyPro By EnergySoft User Number: User Job Number: Tamp1495 _ , Page:25 of 28 ROOM LOAD SUMMARY PROJECT NAME The Plaza ,@ Calle Tampico Shop Bldg 2 DATE 2/12/2008 SYSTEM NAME PGE -2C FLOOR AREA 1,622 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE SPACE -C RETAIL FLOOR -C 1 2,661 44,632 10,703 2,504 41,985 10,703 885 14,628 PAGE TOTAL 1 2,504 41,985F 10,703 885 14,628 TOTAL 2,504 41,985 10,703 885 14,628 EnergyPro By EnergySoft User Number: User Job Number: Tamp1495 Page:26 of 28 ROOM LOAD SUMMARY PROJECT NAME The Plaza @ Calle Tampico Shop Bldg 2 DATE 2/12/2008 SYSTEM NAME PGE -2B FLOOR AREA 1,621 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE SPACE -B RETAIL FLOOR -B 1 2,660 44,619 10,699 2,502 41,973 10,699 885 14,628 PAGE TOTAL 2,502 41,973 10,699 885 14,628 TOTAL 1 2,502 41,973 10,699 885 14,628 EnergyPro By EnergySoft User Number: User Job Number: Tamp1495 Page:27 of 28 r ROOM LOAD SUMMARY I PROJECT NAME The Plaza @ Calle Tampico Shop Bldg 2 DATE 2/12/2008 SYSTEM NAME PGE -2A FLOOR AREA 1,644 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. v CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE SPACE -A RETAIL FLOOR -A 1 2,707 62,006 10,850 2,694 61,719 10,850 1,045 29,268 PAGE TOTAL 1 2,694 61,716 10,850 1,045 29,268 TOTAL 1 2,694 61,716 10,850 1,045 29,268 EnergyPro . By EnergySoff User Number: User Job Number: Tamp1495 Page:28 of 28