2006-776 (AR)fi
J ,
9W
P.O. Box 1504
LA QUINTA, CALIFORNIA 92247-15.04
.78,-4.95 CALLS TAMPICO (760) 777-7000
LA QUINTA, CALIFORNIA 92253 FAX (760) 777-710'1
April 12, 2006
Mr. Roper Morris
51-200 Calle Paloma
La Quinta, CA 92253
SUBJECT: MINOR USE PERMIT 2006-776
78-735. CALLE TAMPICO'
Dear Mr. Morris:
Your request for approval of Minor Use Permit 2006=776, .allowing the construction of 'a
casita/guesthouse at 78-735 Calle Tampico in La Quinta, is hereby approved. You may
now contact the Building & Safety Department for your building permit.
Enclosed is the approved original Deed Restriction for this Minor Use Permit. It must be
signed by the owner in front of aNotary Public. The original approved documents are
then to be recorded with the County Recorder, with a,recorded copy given to the City for
our files.
1
The Community Development Department will sign the job card when the recorded copy
'is received, which would provide our clearance to the Building & Safety Department to
issue the building final inspection. Until the recorded copy is received by the Community
Development Department, your Minor Use Permit is not complete and a final inspection
will.not be conducted by the Building & Safety Department.
Should you have any questions, please call me at (760) 777-7125.
Very truly yours,
JAY'*U U
Assistant Planner.
Attachments
c: Building and Safety Department
i ..
4
RECORDING REQUESTED BY:
Mr. Roper Morris I
WHEN RECORDED PLEASE MAIL TO:
- 1
Mr. Roper Morris
51-200 Calle Paloma
La Quinta, CA 92253 ,
COVENANT AND AGREEMENT RESTRICTING THE USE OF THE RESIDENCE AT
78-735 CALLE TAMPICO, LA QUINTA, CALIFORNIA
This Covenant and Agreement are made and executed this 12th day of April by
Mr. Roper Morris, as the recorded owner(s) of the property described herein. The City
of La Quinta, a Municipal Corporation, is hereby made a party to this Agreement for the
.purposes set forth below.
The undersigned hereby certifies that` he/she is the property owner of the
following described real property in the City of La Quinta, County of Riverside, State of
California:
LOT 126; DESERT CLUB TR; APN: 770-144-004, in the City. of La Quinta,
County of Riverside, State of California
In consideration of the City of La Quinta issuing a building permit for certain .
improvements which will be. constructed 'on said property, the undersigned does hereby
covenant and agree to, and1with said City, to restrict the use of said property as follows:
1. The guest house may not be rented nor sold independent of the main single-.
family residence (Minor Use Permit No. 2006-776);
2. No kitchen or cooking facilities shall be constructed in the guest house per the.
provisions of Chapter 9..30.0 30 (RL Zone District) and. 9.60.110 (Guest Houses),
of the La Quinta Municipal Code;.
3. All on-site facilities aye intended for the sole occupancy of the property owner(s),
guests, and caretakers (i.e., a•maid and/or housekeeper, etc.); and,
4. The.. guest house shall be used primarily as a sleeping facility, and shall be .
maintained in accordance with all zoning and other codes as set forth in ,the La
Quinta Municipal Code, as may be amended from time to time.
This Covenant. and A reement shall run with the land and shall be binding
,g 9 upon
future owners, their successors, heirs,, or assigns, and ourselves, and shall continue. in
effect while said accessory building remains on the real property or unless otherwise
released by the ' authority of the City of La Quinta. All leases of said dwelling and/or , .
property shall be subject to this restriction. This Agreement shall ' be entitled to the.
remedy of injunctive relief in
addition of any remedy in law or equity.
This Covenant and Agreement and the provisions hereof are irrevocable, except
by. the written consent of all parties to the agreement, including the City of La' Quinta, a
Municipal Corporation. The City shall have the. right to enforce each and every
provision hereof and the parties agree that the Agreement shall znot be rescinded,
revoked, modified, or othel ise amended or changed, without the expressed written
consent of the City first being obtained.
In the event that thel owners, their heirs, assigns or, successors in interest, shall
fail to perform any ' obligation .hereunder, .they hereby agree to. pay all costs and
expenses incurred by the City of La Quinta in securing. performance; of such obligation,
including attorney's fees.
By: 1.
2
3.. I •
Signature(s) ' Printed Name of all owner(s)
Dated:
X
ougl R. Evans Date
Community Development Director
City of La Quinta
STATE OF CALIFORNIA )
.:COUNTY OF RIVERSIDE ) ss.
�. CITY OF LA QUINTA )
On April 12, 2006 before me, Regenia Hensley, Notary Public, personally
appeared DOUGLAS R. EVANS personally known to me to be the person whose name
is subscribed to the within instrument and acknoWledged to me that he executed the
same in his authorized capacity, and.that by his signature on the instrument the person
or the entity upon behalf of which the person acted,, executed the instrument..
WITNESS my hand and official seal. .(Seal)
REGENIA MENM
Gor ikon • 15214 3.
L442"Ory %W , Cca�t0ail0
REG IA HENSL Y.
Notary Public My COnm.Expre�Oct23.2�8
Commission # 1521423
Expiration: October 23; 2008
t
I
.j
•I
4. a�w
! 78-495 CALLE TAMPICO
f LA QUINTA, CA 92253 n /
I (760).777-7075 d "
APPLICATION 01�CQL`
'� LOOD PLAIN. DEVELOPMENT � _ T PERMIT
BUILDING SITE LOCATION " l Z L FLOOD ZONE "Ao"-'DEPTH.1
L'be
?7prCOMMUNITY- PANEL NUMBER060709 0005 BT C�t.f b. �'�'�-� ..f`i (T� 1 p`K'`� co Map Revised: 8/t 9!1991
APPLICANT INFORMATION SECTION
APPLICANT NAME PoP. o ps �LC
=ADDRESS,
ANT
ESS . y% (00 ( /vL� fCG� OT
L(MAPLINGT THE BUILDING SITE!
DAYTIME TELEPHONE NO.
a—
.7�0 - a-a-�a�
INSTRUCTIONS
1. A Flood -Plain Development Permit is required by'LQMC Section 8.11.0401A). The Applicant should complete the
Applicant Information portion of this application and submit it to the Engineering Depattment along with the
required: documentation noted hereon at the same time the:Precise Grading Plan is submitted to the Building' and
Safety' Department for plan checking.
2. Documentation, required for STEP 1'OF 2 APPROVAL prior to.receivir g clearance for Building Permit issuance
• Copy of the proposed Precise Grading Plan for review and approval containing all information required by
the checklist shown on the back of this application.
3- Documentation required for STEP 2� OF'2 APPROVAL prior to•receiving Flood Plain. Development Permit approval.
Note, this approval occurs after forms for the lowest habitable floor are set and before the Building & Safety
Department authorizes foundation construction.
• Submit a completed FEMA' "Elevation Certificate" form to the Engineering Department.
• Submit 96% relative density soils compaction certification to the Engineering Department.
STEP 1 OF 2 APPROVAL STEP.2 OF 2 APeROVAL
The Precise Grading Plan submitted for this application has been All requirements have been satisfied. This Flood Plain
reviewed and found to contain all data required to satisfy the Development Permit is approved.
requirements of LQMC 8.11 The proposed dwelling is eligible to ;
receive a building permit upon satisf ng all other] Building &
Safety Department requirements. ,
AUTHORIZED SIGNATURE
DATE
La Quinta Engineering Department
1
FILE: Upon Step 2 approval, original goes in "F
i
AUTHORIZED SIGNATURE DATE
La Quinta Engineering Department
Plain Development Permit" file; copy goes. to Applicant
F090 REV -2 7100
r
rf
a
CITY OF LA QUINTA
PUBLIC WORKS DEPARTMENT
LETTER OF TRANSMITTAL
TO: MR. ROPER MORRIS
FROM: ANTHONY COLAROSSI, ASSISTANT ENGINEER I
SUBJECT: FUTURE FEMA FLOOD ZONE APPROVAL STEPS
DATE: 10/11/2005
The following drawing:
Project Name: 78-735 Calle Tampico
PC No.: 05264 Plan Check Date: 10/ 11/05
The second step to the two step process (see lower right comer of the Flood Plain Development
Permit) is to return the following documents to the Public Works Department after setting the forms
prior to pouring concrete so that you can obtain the Lowesi Habitable Elevation:
1. Surveyor or Cavil Engineer Stamped Lowest Habitable Elevation Certificate. (shoot the
form at this location). Note the value must not be lower than the Lowest Habitable
' Elevation shown on the approved plan. ,
2. Certified letter by the Engineer or Soils Engineer indicating The fill has been placed
according to the approved grading plan". '
3. Compaction reportindicating that the building area obtains fills compacted to 95% or
greater based on ASTM D1557.
4. Engineer to Fill out the attached FEMA "ELEVATION CERTIFICATE" (see attached
worksheet and examples)
5. Return the above completed data to the Public Works Department and obtain the
second signature on the Flood Plain Development Permit Form.
If you have any questions, please contact me at 777-7089.
Thank you, . Tony
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0077
NATIONAL FLOOD INSURANCE PROGRAM Expires December 31, 200:
ELEVATION CERTIFICATE
Important: Read the instructions on pages 1 - 7.
SECTION A - PROPERTY OWNER INFORMATION For insurance Company Use:
QI 111 I11A1!^_ AIAlAIC o,c• .,w..r
BUILDING STREET ADDRESS (Including Apt., Unit, Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO.
CITY
STATE
Company
ZIP
PROPERTY DESCRIPTION (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.)
BUILDING.USE (e.g., Residential, Non-residential, Addition, Accessory, etc. Use a Comments area, if necessary.)
LATITUDE/LONGITUDE (OPTIONAL) HORIZONTAL DATUM:
( NAD 1927 L-1 NAD 1983 SOURCE: I�j GPS (Type): _
1_1 USGS Quad Map Other
SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
B4.
- - -- --• • • •• �•• • ���� oo. rLwv I MI. 1:3AJE t-L(WU ELEVATION(S
NUMBER DATE EFFECTIVE/REVISED DATE ZONE(S) '(Zone AO, use depth of flooding)
1310. indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in B9.
(_) FIS Profile 1_1 FIRM 1_1 Community Determined '1_1 Other (Describe):
1311. Indicate the elevation datum used for the BFE in B9: 1_1 NGVD 1929 I—) NAVD'1988 1_1 Other (Describe): _
B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? (_l Yes, �_� No
Designation Date:
SECTION C - BUILDING ELEVATION INFORMATION
V I. oulluing elevations are eased on: (_lConstruction Drawings• . [— Building Under Construction' I-117inished Construction
'A new Elevation Certificate will be required When construction of the building is complete.
02. Building Diagram Number (Select the building diagram most similar to the building for which this certificate is being completed - see
pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.) C
C3. Elevations –Zones Al -A30, AE, AH, A (with BFE), VE, V1 -V30, V (with BFE), AR, ARIA, ARAE, AR/A1-A30, AR/AH, AR/AO
Complete Items C3.a-i below according to the building diagram specified in Item C2. State the datum used. If the datum is different from
the datum used for the BFE in Section B, convert the datum to that used for the BFE. Show field measurements and datum conversion
calculation. Use the space provided or the Comments area of Section D or Section G, as appropriate, to. document the datum conversion.
Datum Conversion/Comments
Elevation reference mark used
fl
❑ a) To of boom Does the elevation reference mark used appear on the FIRM? 1_1 Yes [_I No
lt
p. oor (inGuding basement or enclosure) _
❑ b) Top of next higher floor
ft.(m)
_
❑ c) Bottom of lowest horizontal structural member (V zones only)
ft.(m)
ft.(m)
m
_
❑ d) Attached garage (top of slab)
ft.(m)w
so
❑ e) Lowest elevation of machinery and/or equipment
M
servicing the building (Describe In a Comments area.)
ft.(m)
a =,
—
❑ Lowest adjacent (finished) grade (LAG)
z'.
. ❑ g) Highest adjacent (finished) grade (HAG)
m U)ft.(m)
❑ h) No. of permanent openings (flood vents) within 1 ft. above adjacent grade
❑ i) Total area of all permanent openings (flood vents) in C3.h sq. in. (sq. cm)
J
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information.
I certify that the information in Sections A, B, and C on this certificate represents my best efforts to Interpret the data available.
I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001
(.EKtIFIERS NAME LICENSE NUMBER
,TLE COMPANY NAME
ADDRESS CITY STATE ZIP CODE
SIGNATURE DATE
TELEPHONE
FEMA Form 81-31, January 2003 See reverse side for continuation. Replaces all previous editions
IMPORTANT: In these spaces, copy the corresponding information from Section A. For Insurance Company Use:
BUILDING STREET ADDRESS (Including Apt., Unit, Suite, and/or Bldg. No.) OR P.O. ROUTE AND BOX NO. Policy Number
CITY STATE ZIP CODE Company NAIC Number
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED)
Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building owner.
COMMENTS
1-1 Check here if attachments
SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE)
For Zone AO and Zone A (without BFE), complete Items E1, through E5. If the Elevation Certificate is intended for use as supporting
information for a LOMA or LOMR-F, Section C must be completed.
E1. Building Diagram Number (Select the building diagram most similar to the building for which this certificate is being completed –
see pages 6 and 7. If no diagram accurately represents the building, provide a sketch or photograph.)
E2. The top of the bottom floor (including basement or enclosure) of the building is ��� ft. (m) LL_1 in. (cm) I---1 above or L-1 below
(check one) the highest adjacent grade. (Use natural grade, if available.)
E3. For Building Diagrams 6-8 with openings (see page 7), the next higher floor or elevated floor (elevation b) of the building is
� it
L. (m) �-1._1in. (cm) above the highest adjacent grade. Complete Items C3.h and C3.11 on front of form.
E4. The top of the platform of machinery and/or equipment servicing the building is ��1 ft. (m)1 -moi In. (c m)1-1 above or 1-1 below
(check one) the highest adjacent grade. (Use natural grade, if available.)
E5. For Zone AO only: If no flood depth number Is available, is the top of the bottom floor elevated in accordance with the community's
floodplain management ordinance? L1 Yes 1-1 No 1-1 Unknown The local official must certify this information in Section G _
SECTION F - PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION
The property owner or owner's authorized representative who completes Sections A, B, C (Items C3.h and C3.i only), and E for Zone A
(without a FEMA -issued or community -issued BFE) or Zone AO must sign here. The statements in Sections A, B, C, and E are correct to
•e best of my knowledge.
iOPERTY OWNER'S OR OWNERS AUTHORIZED REPRESENTATNE S NAME
ADDRESS CITY STATE ZIP CODE
SIGNATURE DATE TELEPHONE
COMMENTS
1-1 Check here if attachments
SECTION G - COMMUNITY INFORMATION (OPTIONAL)
The local official who is authorized by law or ordinance to administer.the community's floodplain management ordinance can complete.
Sections A, B, C (or E), and G of this Elevation Certificate. Complete the applicable item(s) and sign below.
GII.1-1 The information in Section C was taken from other documentation that has been signed and embossed by a licensed surveyor,
engineer, or architect who is authorized by state or local law to certify elevation information. (Indicate the source and date of the
elevation data in the Comments area below.)
G2. �� A community official completed Section E for a building located in Zone A (without a FEMA -issued or community -issued BFE) or
Zone AO.
G3. The following information (Items G4 -G9) is provided for community floodplain management purposes.
G4. PERMIT NUMBER G5. DATE PERMIT ISSUED G6. DATE CERTIFICATE OF COMPLIANCE/OCCUPANCY
ISSUED
G7. This permit has been -issued for. 1-1 New Construction 1`1 Substantial Improvement
G8. Elevation of as -built lowest floor (including basement) of the building is: _ ft. (m) Datum:
G9. BFE or (in Zone AO) depth of flooding at the building site is: _ ft. (m) Datum:
LOCAL OFFICIAL'S NAME TITLE
COMMUNITY NAME TELEPHONE
SIGNATURE DATE
)MMENTS
�•••• • • �•••� ,a��ua�y cwo Replaces all. previous editions
ti
CITY.OF LA QUINTA - PUBLIC WORKS/ENGINEERING DEPARTMENT
GREEN SHEET (PUBLIC WORKS CLEARANCE) FOR BUILDING PERMITS
Form updated & effective 8/25/1005
Please DO NOT submit the Green Sheet (Public Works Clearance) Packet to thePublic
Works/Engineering Department until ALL requirements listed below are complete. Incomplete
applications or applications which cannot be processed will be returned to Applicant. Green Sheet
approvals will be forwarded to the Building Department directly by Public Works.
Date:Developer:
Tract No.:Tract Nam
Address(s): 7R 73,5-- Cil
Lot No.(s):
The following are the requirements for Public Works Clearance to authorize issuance of a building
permit from the Building/Safety Department.
CUSTOM HOMES: PROVIDE ITEMS #2, #3, #4 AND #5 BELOW
TRACT HOMES: PROVIDE ITEMS #1, #2, #3, #4 (AS APPLICABLE) AND #6 BELOW
COMMERCIAL BUILDINGS/OTHER: PROVIDE ITEMS 01, #2, #3 AND #5 BELOW
1. Attach Pad Elevation Certificates in compliance with the approved design elevation for
building pad (maximum allowable deviation of +/- 0.1 foot). Pad Elevation Certificates must
be current (within 6 months of current date). If a precise grading plan creates the pad for
approval, please withhold green sheet submittal until a Pad Elevation Certificate can be
provided.
2. Attach geotechnical certification of grading plan compliance.
Attach recorded final map showing proposed building locations are legal lots.
Attach a completed <1 acre per lot or infill project Fugitive Dust Control project information
form, PM10 plan & agreement or provide alternative & valid City approved PM10 plan set
reference. number or hard copy plan. PM10 plans for commercial and residential developments
(beyond 1 lot) are submitted separately with grading plans and are subjeO to additional
requirements.
%, Attach an approved precise grading plan for the building location(s). AO flood -zone
lJ developments will require an approved flood plain development plan. 11J J&)1 L4Nk1, �P
6. Attach an approved rough grading plan for the building location(s).,
I have reviewed and confirmed the requirements listed above as presented and find the improvements
to be sufficiently complete for construction he proposed buildings)/structure(s). on the subject
lot(s). Pursuant to my findin s the above pr e t may be released for building permit issuance.
Recommended by:17J7 Dated: Z��7s(p
Declined for approval for reason(s) as follow(s), please correct and resubmit:
TAPWDEPTSTAFF\Goblc\Grcm Sha, PW Rckase\050824GREEN SHEET COVERd.
City of La Quinta - PM 10 Project Information (<I acre per Lot or Infill Project)* Page 1 of 3
Form updated & effective 8/25/2005
*Expanded PM10 plans for commercial and residential developments > 1 acre are required by the
City of La Quinta.
T:%PWDEP7%STAFFNGoEIcNGrcn Shea PW RcicascN050824MM1 PM 10 PACKET GREEN SHEETA.
Project Information
Project Phase
Project Contractor:
Project Phase
(Check One):
❑ Construction
❑ Demolition
Project Name:
Project Tract
Number:
Lot Number(s):
Anticipated Start Date:
1
Project Street
Address:
�� ��� c Ile 74-;��,- Ped
Anticipated Completion:
Total acres in active
construction (<1 acre per
Lot):
Project Contact
Information
Please Note: Dust control is required 24 hours a day, 7 days a week,
regardless of construction status. Person listed below is responsible for
dust control during business and non- business hours:
.
Name:
7LIZ ! L
Title:
Company Name:
Mailing Address:
City:_
State:
Zip Code:
Primary
Telephone
Number:
_
Fax:
24 Hour
Access/Emergency
Phone:
Cell Phone:
PM 10 Certificate
Number:
*Expanded PM10 plans for commercial and residential developments > 1 acre are required by the
City of La Quinta.
T:%PWDEP7%STAFFNGoEIcNGrcn Shea PW RcicascN050824MM1 PM 10 PACKET GREEN SHEETA.
PM 10 (<l acre per Lot or Infill Project) Fugitive Dust Control Plan Page 2 of 3
Plan updated & effective 812512005
This plan shall take into account applicable SCAQMII Rule 403 regulations. Training maybe obtained by
contacting SCAQMD (Sharon Zamora (909) 396-2183). This plan shall consist of the following action items:.
• WATERING: Continuous watering is required to prevent dust and must occur a minimum of 4
times daily.
Water. shall be applied to dry soils to stop:
• Visible dust emissions over 20% opacity
• Visible dust emissions that travel over 100 feet.
• Water source % inch water meter at front (south) side of pad:
r ,
• EDUCATION: Responsible Dust Control Individual and key personnel shall attend SCAQMD
PM 10 class and obtain PM 10 certificate number prior to construction activity.
• WEATIiER MONITORING: Wind predictions shall be monitored.
• SIGNAGE: Use Coachella Valley Fugitive Dust Control Plan Handbook Construction Site Signage
Guidelines.
i
• TRAFFIC: Construction traffic shall. not be allowed on the pad, unless. absolutely necessary: If
vehicles operate on pad, pad shall be kept firm and moist through hose watering. or. sprinklers:
Fugitive Dust shall be prevented by fencing off site to prevent unauthorized traffic on pad. ' (.15 mph, -
maximum traffic speed).
• PARKING: Parking is, not allowed ori the pad. All vehicles must park on street (at designated areas.
only).
i
• TRACK OUT: Provide 24 hour street cleaning and track out system as approved by City Public
Works Inspector. (No dirt on public or private roads). Track out shall be cleaned up within one.hour
of incident. I
s
• DIRT PILES: Dirt piles shall be limited to 50 cubic yards and built per California Building Code.
grading requirements. Piles Shall be kept moist or covered with tarp material. Larger. dirt piles will
require stockpile or grading per, mit.
• FENCING: Provide PM 10 fencing at. perimeter of public roads and, where applicable. Wood slat
fencing can be installed at rear; of property and return 20 feet on either side if HOA restrictions apply.
Block walls can replace PMIO,fencing during the construction phase.
• EQUIPMENT: Extra hoses and sprinklers shall be maintained on site.
• EXCAVATION MEASURES: All areas to be excavated or graded shall be pre -watered. Water shall
be applied during excavation or grading operations also.
• DUMP TRUCKS: Open top dump trucks.to be wet down, moist and tarped prior to leaving site.
• INACTIVE SITE: Within 10 days of ceasing of activities, re -vegetate or permanently stabilize as
required. o
_City of La Quinta - Site Specific Construction Phase PM 10 Agreement Page 3 of 3
Agreement updated & effective 8125/2005
The signature of the property owner (or authorized representative):
• Shall act as his/her acknowledgement of dust control requirements and their enforceability,
pursuant to AQMD Rules 403 and 403.1;
• Shall constitute and agreement to comply with all project conditions as identified in the
approved dust control plan;
The property owner (or authorized representative):
• Acknowledges that dust control is required 24 hours a day, 7 days a week, throughout the
period of project performance, regardless of project size or status;
• Shall ensure that each and every contractor/subcontractor and all. other persons associated
with the project shall be in continuous compliance with all requirements of the approved dust
control plan;
• Shall take all necessary precautions to minimize dust, even if additional measures beyond
those listed in the dust control plan are necessary;
• Shall authorize representative of the City/County to enter upon the above mentioned property
for inspection and/or abatement purposes; and
• Shall hold harmless the City/County and its representatives from liability for any actions
related to this dust control plan or any City/County initiated abatement activities.
Signature of Prq feVy Owner or Authorized Representative
V47F56 2• /f 1/r c4 --
Printed Name
Title Date
Company
TEST RESULTS
PROJECT NAME: 78-735 Calle Tampico PROJECT NO: 522-6341
LOCATION: La Quinta, California REPORT NO: 06-05-496
Test No. -Date Tested Location Elevation Dry Density % Moisture Relative Maximum
In Place In Place Compaction Density
DATE: May 15, 2006
3.1
4.9
3.1
8.6
9.3
93*
92*
94*
97**
95**
112.0
112.0
112.0
112.0
112.0
Sladden Engineering
House Pads
1
04/20/06
Per Plan PG
101.0
2
04/20/06
Per Plan PG
100.4
3
04/20/06
Per Plan PG
102.5
4
05/05/06
Retest #I & 42 PG
108.1
5
05/05/06
Retest #3 PG •
106.1
now
BPG- Below Pad Grade
PG — Pad Grade
DATE: May 15, 2006
3.1
4.9
3.1
8.6
9.3
93*
92*
94*
97**
95**
112.0
112.0
112.0
112.0
112.0
Sladden Engineering
Q
Sladden Engineering
6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714).523-1369
39-725 Garand Ln., Suite G, Palm Desert,.CA 92211 (760) 772-3893 .Fax (760) 772-3895
May 15, 2006
La Quinta Builders
79-785 Tangelo
La Quinta, California 92253
Project: 78-735 Calle Tampico
Lot 126- Desert Club Tract
La Quinta, California
Subject: Results of In -Place Density Tests -House Pad
Project No. 522-06341
06-05-496
Summarized in this report are the results of in-place density testing performed at the subject site
as.requested along with"pertinent observations. The site is located at 78-735 Calle Tampico in the
City of La Quinta, California. A single-family residence is proposed for the site. It • is our
understanding that the proposed residence will be of relatively lightweight wood -frame
construction.
Site grading included the.placement of engineered fill material generally less than 1 foot in depth
within the building pad area. Grading was performed prior to our arrival at the site.
Field testing was performed on April 20, 2006 through May 05, 2006. Testing indicates that after
reworking areas of low density, a minimum of 95 percent relative compaction was attained in the
area tested. The passing test results indicate compliance with the project specifications at the
tested locations and depths but are no guarantee or warranty of the contractors work.
Field Tests: In-place moisture/density testing was performed using a nuclear density gauge in
accordance with test methods ASTM D 2922 and ASTM D' 3017. A total of 5 tests were
performed. The test results are summarized on the attached data sheet.
Laboratory Tests: The moisture -density relationships for the tested materials were determined in
the laboratory in accordance with test method ASTM D 1557-91. Laboratory test results are
summarized on the attached data sheet.
May 15, 2006 -2- Project No. 522-06341
06-05-496
If there are any .questions regarding this report or the testing summarized herein, please contact
the undersigned.
Respectfully submitted,
SLADDEN ENGINEERING
�L
Brett L. Ander o y
C7 No. C 45339 1.
Principal Engineer � Exp. 9/310M 1
Compaction/hf T Q
Civil-
Copies
IVIt_Copies 4/La Quinta Builders
Sladden Engineering