0403-374 (BLDG)LICENSED CONTRACTOR DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of
Chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professionals Code, and my License is in full force and effect.
License # Lic. Class Exp. Date
i7JR2€tfl) 13 �, 0V ,1121
f
Date �' r f f' v�.Signature of Contrac' tor
OWNER -BUILDER -DECLARATION
ION
hereby affirm under penalty of perjury that I am exempt from the Contractor's
License Law for the following reason:
( ) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec. 7044, Business & Professionals Code).
( ) I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec. 7044, Business & Professionals
Code).
( ) I am exempt under Section B&P.C. for this reason
Date Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations: `
() I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
( ) I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued. My workers' compensation insurance carrier & policy no. are:
Carver EXEMPT Policy No.
(This section need not be completed if the permit valuation is for $100.00 or less).
�).A certify that in the performance of the work for which this permit is issued,
I shall not employ any person in any manner so as to become subject to the
workers' compensation laws of California, and agree that if I should become
Subject to the workers' compensation'rrovisions of Section 3700 of the Labor
Code, I shall forthwith comply with`those%provision�/
Date:* Applicant /� !
Warning: Failure to secure Workers' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000, in
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorney's fees.
IMPORTANT Application is hereby made to the Director of Building and Safety
for a permit subject to the conditions and restrictions set forth on his
application.
1. Each person upon whose behalf this application is made & each person at
whose request and for whose benefit work is performed under or pursuant to
any permit issued as a result of this applicaton agrees to, & shall, indemnify
& hold harmless the City of La Quinta, its officers, agents and employees.
2. Any permit issued as a result of this application becomes null and void if
work is not commenced within 180 days from date of issuance of such
permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
construction, and hereby authorize representatives of this City to enter upon
the above-mentioned property' foinspection purposes:-•,,
Signature (Owner/Agent)'r- f =1 Date
BUILDING PERMITf,�,,�
PERMIT#
DATE VALUATION die ro LOT
*
TRACT
JOB SITE ��Ca7ULA
ADDRESS 'a.�e
SS 7 .460 wLE I:.i ,�:
APN _. ...
,
OWNER
CONTRACTOR / DESIGNER / ENGINEER
COVEDEVVIOPWOT
18am"Y HoUn
2214'14, R1DGEtTdOW
P.0. BOX 696
1?PNTA, ANA, Cd',
LA Q#Ub1TA CA
92253
(?60)W.7820 CBIR.
02063
USE OF PERMIT
i00 I,IP. CON480WA11,, 2' iR.", X,1QNO, 6' QAPD91J, 140 LF. 5'
GARDR1I'13iAL.L,, BOTff1 ORCO SYSTEM
6 FT WALL
100,00 LF
5 'F'T. W14. IL
140.00 LF
F.S.MVIATED COST OF COMIRUCrION
COMPLUC` ION IEEE 101.000.418.000
UEM-I CyP AL CONSS.:1; UCT OW AND RLN C -FLECK
$81.00
IMS PRF -RAM FEES
S0,00
Dt�
'2
MAR 51004
CITY OF LA �?I�;I'9YR
FINANCE nc;mr
RECEIPT
DATE
BY
DATE FINALED ' , '
INSPECTOR
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
Forms & Footings
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck
Exhaust Fans
O.K to Wrap
F.A.U.
Framing
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
Final
Final
POOLS - SPAS
BLOCKWALL APPROVALS
steel
Set Backs
Electric Bond
Footings
Main Drain
Bond Bea
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final
Gas Piping
PLUMBING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure
Shower Pans
O.K for Finish Plaster
Sewer Lateral
Pool Cover
Sewer Connection
Encapsulation
Gas Piping
Gas Test
Appliances
Final
COMMENTS:
j /l
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
' TITLE 24 REPORT
Title 24 Report for:
ENSENADA 8 (Complies 4 -Cardinal Directions)
77-640 Calle Temecula
La Quinta, Ca 92253
Project Designer:
Lendel Ventures, Inc. DBA Lench Design Group
P.O. BOX 450
LA QU I NTA, CA 92253-0450
760/564-1866
Report Prepared, By: '
VERNA LENCH
Lendel Ventures, Inc
P.O. Box 450
La Quinta, CA 92253-0450 _
(760) 564-1866
CITY OF LA OUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
D 3•�7oy
Job Number: sr
3.1-1251 oF�icv�
Date:
3/5/2004
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.'
This program developed by Gabel Dodd/EnergySoft, LLC (415) 883-5900.
EnergyPro 3.1 By EnergySoft Job Number: 3.1-1251 User Number: 5454
TABLE OF CONTENTS
Cover Page - 1
Table of Contents 2
Form CF -1 R Certificate of Compliance - 3
Form MF -1 R Mandatory Measures Checklist 7
Form C -2R Computer Method Summary 8
HVAC System Heating and Cooling Loads Summary 12
Room Load Summary 13
RoomHeating*Peak Loads 14
Room Cooling Peak Loads ` 15
EnergyPro 3.1 By EnergySoft Job Number: 3.1-1251 User Number: 5454
Certificate of Compliance: Residential (Part 1 of 2) CF -1 R
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
77-640 Calle Temecula La Quinta
Project Address Building Permit #
Lendel Ventures, Inc (760) 564-1866 Plan Check/Date
Documentation Author Telephone
Computer Performance 15 Field check / Date
Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only
GENERAL INFORMATION
Total Conditioned Floor Area:
1,546 f? Average Ceiling Height: 10.0 ft
Total Conditioned Slab Area:
1,546 ft2
Building Type:
Wood
(check one or more)
Exterior Roof
X❑ Single Family Detached
❑ Addition
❑ Single Family Attached
❑ Existing Building
❑ Multi -Family
❑ Existing Plus Addition
Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor
Number of Dwelling Units:
1.00
Number of Stories:
1 ❑Raised Floor
Component
Type
Frame
Type
Const.
Assembly
U -Value
Location/Comments
(attic, garage, typical, etc.)
R-49 Roof (R.49.2X16.16)
Wood
0.018 .
Exterior Roof
Slab On Grade
n/a
0.756
Exposed Slab w/R-0.0 Perimeter Insulation
Slab On Grade
n/a
0.756
Covered Slab w/R-0.0 Perimeter Insulation
R-13 Wall w/1" EPS
Wood
0.059
Exterior Wall
Solid Wood Door
None
0.387
Exterior Door
R-13 Wall (W.13.2x4.16)
Wood
0.088
Exterior Wall
FENESTRATION
Shadina Devices
Type Orientation
Area
Fenestration
Exterior
Overhang Side Fins
SF
U -Factor
SHGC
Shading
Yes / No
Yes / No
Skylight
20.0
0.70
0.83
None
❑
X❑
❑ X❑
Front
40.0
0.74
0.37
Bug Screen
❑
X❑
❑ X❑
Front
18.0
0.61
0.39
Bug Screen
❑
X❑
❑ X❑
Right
24.0
0.61
0.39
Bug Screen
❑
X❑
❑ X❑
Front
24.0
0.61
0.39
Bug Screen
❑
X❑
❑X❑
Front
10.5
0.46
0.37
Bug Screen
❑
X❑
❑ X❑
Right
10.5
0.46
0.37
Bug Screen
❑
X❑
❑ X❑
Right
24.0
0.60
0.37
Buq ScreenX❑
❑
❑X❑
Right
40.0
0.74
0.37
Bug ScreenX❑
❑
❑X❑
Front
40.0
0.74
0.37
Bug ScreenX❑
❑
❑ X❑
Right
20.0
0.61
0.39
Bug Screen
❑
X❑
❑ X❑
Rear
10.5
0.46
0.37
Bug Screen
❑
Q
❑ a
Run Initiation Time: 03/05/04 10:18:00 Run Code: 1078510680
FEnerqyPro 3.1 By Energ ySoft
User Number: 5454
Job Number: 3.1-1251
Pa e:3 of 17
Certificate of Compliance: Residential (Part 1 of 2) CF -1 R
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
77-640 Calle Temecula La Quinta
Project Address Building Permit #
Lendel Ventures, Inc (760) 564-1866 Plan Check / Date
Documentation Author Telephone
Computer Performance 15 Field Check I Date
Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only
GENERAL INFORMATION
Total Conditioned Floor Area: 1,546 ft2 Average Ceiling Height: 10.0 ft
Total Conditioned Slab Area: '1 -546 ft2
Building Type:
(check one or more)
RI Single Family Detached ❑ Addition
❑ Single Family Attached ❑ Existing Building
❑ Multi -Family ❑ Existing Plus Addition
Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor
Number of Dwelling Units:. 1.00
Number of Stories: 1 ❑ Raised Floor
BUILDING SHELL INSULATION
Const.
Component Frame Assembly Location/Comments
Type Type U -Value (attic, garage, typical, etc.)
FENESTRATION Shadina Devices
Type Orientation
Area
Fenestration
Exterior
Overhang Side Fins
SF
U -Factor
SHGC
Shading
Yes / No
Yes / No
Rear
4.5
0.55
0.38
Bug Screen
❑ x❑
❑ 0
Rear
32.0
0.61
0.39
Bug Screen
❑ x❑
❑ 0
Left
24.0
0.61
0.39
Bug Screen
❑ Q
❑ ❑X
❑❑
El F1
El El
Q
El El
El F-1
El El
El F1
Q
F1 F1
El El
El F-1
El El
El El
Run Initiation Time: 03/05/04 10:18:00 Run Code: 1078510680
EnergyPro 3.1 By EnerqySoft
User Number: 5454
Job Number: 3.1-1251
Pa e:4 of 17
Certificate of Compliance: Residential (Part 2 of 2) CF -1 R
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load.
Distribution
Heating Equipment Minimum Type and Duct or
Type (furnace, heat Efficiency Location Piping Thermostat Location /
pump, etc.) (AFUE/HSPF)(ducts, attic, etc.) R -Value Type Comments
Central Furnace 78% AFUE Ducts in Attic 4.2 Setback HVAC System
Cooling Equipment Minimum
Duct
Type (air conditioner, Efficiency
Location
Duct
Thermostat Location /
heat pump, evap. cooling) (SEER)
(attic, etc.)
R -Value
Type
Comments
Split Air Conditioner 12.0 SEER
Ducts in Attic
42
Sethark
HVAC System
WATER HEATING SYSTEMS
Rated 1
Tank
Energy Facts 1 External
Water Heater Water Heater
System Name Type
Distribution
Type
# in Input
Syst. Btu/hr
Cap.
(gal)
or Recovery Standby Tank Insul.
Efficiency Loss (°/a) R -Value
A.O. SMITH FG13-50-240 Small Gas
Standard
1 38000
50
0.60 n/a n/a
1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input and Recovery Efficiency.
REMARKS
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any
shading feature that is varied is indicated in the Special Features/Remarks section.
Designer or Owner (per Business & Professions Code) Documentation Author
Name:
Title/Firm: Lendel Ventures, Inc. DBA Lench Design Group
Address: P.O. BOX 450
Telephone,/760/564-1866
Lic. #: / �)
Age
Title/Firm:
Address:
Telephone:
(date)
Name: VERNA LENCH
Title/Firm: Lendel Ventures, Inc
Address: P.O. Box 450
La Quinta, CA 92253-0450
Telephone: (760) 564-1866
D
sig a re) (d te)
IEneravPro 3.1 By EnerovSoft User Number. 5454 Job Number: 3.1-1251 Paae:5 of 17 1
AUTHORIZATION FOR USE OF THIS TITLE 24 REPORT ONLY WITH ORIGINAL SIGNATURES.
NO DUPLICATION PERMITTED !
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any
shading feature that is varied is indicated in the Special Features/Remarks section.
Designer or Owner (per Business & Professions Code) Documentation Author
Name:
Title/Firm: Lendel Ventures, Inc. DBA Lench Design Group
Address: P.O. BOX 450
Telephone,/760/564-1866
Lic. #: / �)
Age
Title/Firm:
Address:
Telephone:
(date)
Name: VERNA LENCH
Title/Firm: Lendel Ventures, Inc
Address: P.O. Box 450
La Quinta, CA 92253-0450
Telephone: (760) 564-1866
D
sig a re) (d te)
IEneravPro 3.1 By EnerovSoft User Number. 5454 Job Number: 3.1-1251 Paae:5 of 17 1
Certificate of Compliance: Residential (Addendum) CF -1 R
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
3ased on the adequacy of the special justification and documentation submitted. I Plan Field
The HVAC System "HVAC System" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual.
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R.
Plan
Field
The HVAC System "HVAC System" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide
verifification of the TXV, or measure the Refrigerant Charge and Airflow.
The HVAC System "HVAC System" is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage
performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form.
Run Initiation Time: 0310510410:18:00 Run Code: 1078510680
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number. 3.1-1251 Page:6 of 17
Mandatory Measures Checklist: Residential MF -1 R
NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component specifications for the mandatory measures whether they
are shown elsewhere in the documents or on this checklist only.
DESCRIPTION instructions: Check or initial applicable boxes or enter N/A if not applicable.
DESIGNER
ENFORCEMEN
Building Envelope Measures
'§ 150(a): Minimum R-19 ceiling insulation in wood frame assembly, or equivalent U -value.
❑ § 150(b): Loose fill insulation manufacturers labeled R -Value.
❑X .§ 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does not apply to
exterior mass walls).
'§ 150(d): Minimum R-13 raised floor insulation in framed floors.
❑ § 150(1): Slab edge insulation - water absorption rate <= 0.3%, water vapor transmission rate <= 2.0 perm/inch.
❑X §118: Insulation specified or installed meets insulation quality standards. Indicate type and form.
FXJ §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field fabricated) have label with certified U -Factor, certified SHGC, and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
§150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
§150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards.
® §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1. Masonry and factory -built fireplaces have closable doors, outside air intake with damper and control, and flue
damper and control;
2. No continuous burning gas pilots allowed.
Space Conditioning, Water Heating and Plumbing System Measures
XJ §110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
X❑ §150(h): Heating and/or cooling loads calculated in accordance with ASH RAE, SMACNA or ACCA.
X1 §150(i): Setback thermostat on all applicable heating and/or cooling systems.
FXJ §1500): Pipe and Tank Insulation
1. Storage gas water heaters with less than 0.58 energy factor shall be externally wrapped with R-12.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R4 or greater)
3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16
combined intemal/extemal insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55 degrees F. insulated.
6. Piping insulating between heating source and indirect hot water tank.
X❑ '§150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and
Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed in conditioned space. Openings shall be sealed
with mastic, tape aerosol sealant or other duct- closure system that meets the applicable requirements of UL181, UL181A, or
UL181B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh tape or
tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and
their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with
mastic and drawbands.
2. Exhaust fans systems have back draft or automatic dampers.
3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers.
X] §114: Pool and Spa Heating Systems and Equipment
1. Certified with 78% thermal efficiency, on-off switch, weatherproof instructions, no electric resistance heating, no pilot.
2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas.
3. Pool system has directional inlets and a circulation pump time switch.
X] §115: Gas Fred central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot
light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr)
Lighting Measures
X❑ §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for general
lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an
entrance to the kitchen.
150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt
or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and
recessed ceiling fixtures are IC (insulation cover) approved.
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page:7 of 17
Computer Method Summary (Part 1 of 3) C -2R
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
77-640 Calle Temecula La Quinta
Project Address Building Permit #
Lendel Ventures, Inc (760) 564-1866 Plan Check/Date
Documentation Author Telephone
Computer Performance 15 Field Check/Date
Compliance Method (Package or Computer) Cimate Zone
Source Energy Standard
Use (kBtu/sf-yr) Design
Facing
North Margin
❑
Facing
East Margin
Wall 39 0.059 45 AQ
Wall 31 0.059 a 90
Door 24 0.387 0 go
Facingacing
South Margin
❑
❑
❑
West Margin
Wall 33 0.059 315 90
Wall 84 0.059 0 90
Wall 130 0.059 270 90
4.77 -0.97
4.25 -0.46
3.88 -0.08
4.44 -0.65
Space Heating 3.79
❑
13-13 Wall w/1" FPS Whnle Hnuse
Will 47 0.059 270 qQ
Wall 15 0.059 a 90
Wall 32 0.059 270 go
®®®
Space Cooling 41.41
40.11 1.31
Wall_ 15 0.059 180 90
42.80 -1.39
❑
42.24 -0.83
Wall 47 0.059 90
41.50 -0.09
❑
Domestic Hot Water 15.44
1 13.38 2.06
13.38 2.06
R-13 Wall w/1" EPS Whnle Hnuse
1 13.38 2.06
13.38 2.06
R-13 Wall (W_132x4.16) Whole House
Lyall 47 0.088 _0 90
❑
R-13 Wall (W _132x4.16) Whole House
Totals
Wall fW.11 2x4.16) Whole Hnuse
Dnnr 24 0.387 90 qr)
BUILDING
ElSnlid
COMPLIES
Wall 76 0.059 90 gQ
This C -2R summarizes the results of a four cardinal orientation analysis. The pages that follow describe the front facing North occurence.
This plan has been analyzed with identical features in all orientations.
GENERAL INFORMATION
Conditioned Floor Area: 1,546 Floor Construction Type: ❑X Slab Floor
Building Type: Single Fam Detached
El Raised Floor
Building Front Orientation: All Four Orientations
Number of Dwelling Units: 1.00 Total Conditioned Volume: 15,460
Number of Stories
Slab Floor Area: 1,546
BUILDING ZONE INFORMATION # of Thermostat Vent
Zone Name Floor Area Volume Units Zone Type Type Hgt. Area
HVAC System 1 548 15 460 1 nn rnnditioned Sethnrk -2 n/a
OPAQUE SURFACES Solar
Act. Gains
Type Area U -Val. Azm. Tilt Y / N Form 3 Reference Location / Comments
Rnnf 1,526 0.018 0
yllall 121 0.059 a -90
®
❑
R-49 Roof (R.492X16.16) Whnle Hnuse
R-13 Wall w/1" FPS Whole Hnuse
Wall 39 0.059 45 AQ
Wall 31 0.059 a 90
Door 24 0.387 0 go
❑
❑
❑
R-13 Wall w/1" FPS Whnle Hnuse
R-13 Wall w/1" EPS Whnle House
Solid Wood Door Whole Hnuse
Wall 33 0.059 315 90
Wall 84 0.059 0 90
Wall 130 0.059 270 90
❑
❑
❑
R-13 Wall w/1" EPS Whnle Hnuse
R-13 Wall w/1" EPS Whnle Hnuse
B-13 Wall w/1" EPS Whole Hnuse
Wall 32 0.059 r) 90_
®
❑
13-13 Wall w/1" FPS Whnle Hnuse
Will 47 0.059 270 qQ
Wall 15 0.059 a 90
Wall 32 0.059 270 go
®®®
❑
❑
❑
R-13 Wall w/1" FPS Whnle Hnuse
R-13 Wall w/1" EPS Whole House
R-13 Wall w/1" EPS Whole Hnuse
Wall_ 15 0.059 180 90
®
❑
R-13 Wall w/1" EPS Whnle Hnuse
Wall 47 0.059 90
❑
R-13 Wall w/1" FPS Whnle Hnuse
Wall 480 0.059 180 _9.Q
❑
R-13 Wall w/1" EPS Whnle Hnuse
Wall 45 0.088 90 90
❑
R-13 Wall (W_132x4.16) Whole House
Lyall 47 0.088 _0 90
❑
R-13 Wall (W _132x4.16) Whole House
Wall 179 0.088 go 90ElR-13
Wall fW.11 2x4.16) Whole Hnuse
Dnnr 24 0.387 90 qr)
®
ElSnlid
Wnnd Dnnr Whnle Hnuse
Wall 76 0.059 90 gQ
[X
❑
R-13 Wall w/1" Fps Whnle Hnuse
❑
❑
❑
❑
Run lnitiatwonT*mes 03/05/041018*00 Run Codes 1078510680
EnergyPro 3.1 By Energysoft User Number: 5454 Job Number: 3.1-1251 Page:8 of 17
Computer Method Summary (Part 2 of 3) C -2R
ENSENADA 8 (Complies 4 -Cardinal Directions)
Project Title
Date
3/5/2004
FENESTRATION SURFACES
U- Act. Glazing Type Location/
# Type Area Factor SHGC Azm. Tilt Comments
J_
Skvliaht
Front
(North)
4.0
0.700
n_83
n_0.
2
Skylight
Front
(North)
4.0
0.700
0.83
0
0
3
Skylight
Front
(North)
4.0
0.700
0.83
0
0
4
Skylight
Front
(North)
4.0
0.700
0.83
0
0
5
Skylight
Front
(North)
4.0
0.700
0.83
0
0
6
Window
Front
(North)
40.0
0.740
0.37
0
90
Z
Window
Front
(Northeast)
18.0
0.610
0.39
45
90
8
Window
Right
(Northwest)
24.0
0.610
0.39
315
90
6
Window
Front
(North)
24.0
0.610
0.39
0
90
1Q
Window
Front
(North)
10.5
0.460
0.37
0
90
1
Window
Right
(West)
10.5
0.460
0.37
270
90
12
Window
Right
(West)
12.0
0.600
0.37
270
90
13.
Window
Rigg(West)
Bug
40.0
0.740
0.37
270
gQ
14
Window
Right
(West)
12.0
0.600
0.37
270
90
15
Window
Front
(North)
40.0
0.740
0.37
0
90
16
Window
Right
(West)
20.0
0.610
0.39
270
90
17
Window
Rear
(South)
6.0
0.460
0.37
180
90
18
Window
Rear
(South)
4.5
0.460
0.37
180
90
1,Q
Window
Rear
(South)
4.5
0.550
0.38
180
90
20
Window
Rear
(South)
16.0
0.610
0.39
180
90
21
Window
Rear
(South)
16.0
0.610
0.39
180
90
22
Window
Left
(East)
24.0
0.610
0.39
90
90
Sk)yght - Dual Glaze
Skylight - Dual Glaze
Skylight - Dual Glaze
Skylight - Dual Glaze
Skylight - Dual Glaze
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit•5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Acrylic Block
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Summit 5500 Al DP Low E
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
Whole House
INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin . Right Fin
# Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt. REA Dist. Len. Hgt. Dist. Len. Hgt.
1 None 1.00
2 None 1.00
3 None 1.00
4 None 1.00
5 None 1.00
6 Bug Screen 0.76
7 Bug Screen 0.76
8 Bug Screen 0.76
9 Bug Screen 0.76
10
Bug
Screen
0.76
Ti
Bug
Screen
0.76
12
Bug
Screen
0.76
5.0
2.0
6.0
0.1
6.0
6.0
13
Bug
Screen
0.76
6.7
2.5
6.0
0.1
6.0
6.0
14
Bug
Screen
0.76
5.0
2.0
6.0
0.1
6.0
6.0
15
Bug
Screen
0.76
6.7
2.5
10.0
0.1
10.0
10.0
16
Bug
Screen
0.76
17
Bug
Screen
0.76
18
Bug
Screen
0.76
19
Bug
Screen
0.76
20
Bug
Screen
0.76
Ti
Bug
Screen
0.76
22
Bug
Screen
0.76
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Paae:9 of 17 1
Computer Method Summary (Part 3 of 3) C -2R
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
THERMAL MASS FOR HIGH MASS DESIGN
Area Thick. Heat Inside Location
Type (sf) (in.) Cap. Cond. Form 3 Reference R -Val. Comments
PERIMETER LOSSES
F2 Insulation
Type Length Factor R -Val. Depth Location / Comments
Slab Perimeter 153 0.76 0.0 0 Whole House
Slab Perimeter 30 0.76 0.0 0 Whole House
HVAC SYSTEMS
Heating Equipment
Minimum
Distribution Type
,
Type (furnace, heat
Efficiency
and Location
Duct - Thermostat
Location /
pump, etc.) (AFUE/HSPFXducts/attic,
etc.)
R -Value Type
Comments
Central Furnace
78% AFUE
Ducts in Attic
4.2 Setback
MVAC System
Pipe
Hydronic Piping Pipe
Insul.
System Name Length
Diameter Thick.
Cooling Equipment
Minimum
Duct
Type (air conditioner,
Efficiency
Location
Duct Thermostat
Location /
heat pump, evap. cooling)
(SEER)
(attic, etc,)
R -Value Type
Comments
Split Air Conditioner
12.0 SEER
Ducts in Attic
4.2 Setback
HVAC System
WATER HEATING SYSTEMS
Ratedl Tank
Energy Fact! 1 Tank Insul.
Water Heater
Water Heater Distribution
# in Input Cap.
or Recovery Standby R -Value
System Name
Type _
Type
Syst. (Btu/hr) (gal)
Efficiency Loss (%) Ext.
A.O. SMITH FGR -50-240
Small Gas
Standard
� 1 38.000' 50
0.60 n/a n/a
1 For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency.
Computer Method Summary (Addendum) C -2R
ENSENADA 8 (Compiies 4 -Cardinal Directions) 3/5/2004
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
)ased on the adequacy of the special justification and documentation sunmitted. I Plan Field
The HVAC System "HVAC System" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual.
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form GF -6R.
Plan
Field
The HVAC System "HVAC System" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide
verifification of the TXV, or measure the Refrigerant Charge and Airflow.
The HVAC System "HVAC System" is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage
performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form.
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page:11 of 17 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
ENSENADA 8 (Complies 4 -Cardinal Directions 3/5/2004
SYSTEM NAME FLOOR AREA
HVAC System 1,546
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel
Latent
CFM
I Sensible
1,158
28,353
2,337
806
30,004
0
1,418
1,500
0
0
0
0
0
0
0
0
0
1,418
1 1,500
31,1881 2,3371 33 005
H4DHO42SO6 33,893 1,128 64,000
Total Adjusted System Output 33,893 1,128 64,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am
HEATING SYSTEM PSYCHROMETRICS (Airstream TemDeratures at Time of Heatina Peak) I
26.0 OF 70.0 OF 105.OoF
Outside Air
0 cfm
Heating Coil
70.0 of
COOLING SYSTEM PSYCHROMETRICS
111.0 177.6 of
Outside Air
0 cfm
78.0/62.2 of
0..�. .... n:. M....4,
drstream Temperatures at
78.0 / 62.2 of 55.0 / 53.7 of
Cooling Coil
Supply Air Ducts
105.0 of
ROOMS
70.0 of
I
Supply Air Ducts
55.0/53.7OF
41.2% R.H. ROOMS
78,0 62.2 of
I
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Paae:12 of 17 1
ROOM LOAD SUMMARY
PROJECT NAME
ENSENADA 8 (Complies 4 -Cardinal Directions
DATE
3/5/2004
SYSTEM NAME
HVAC System
FLOOR AREA
1,546
ROOM LOAD SUMMARY -
ROOM COOLING PEAK
COIL COOLING PEAK
COIL HTG. PEAK
ZONE NAME
ROOM NAME
Mult.
CFM
SENSIBLE
LATENT
CFM
SENSIBLE
LATENT
CFM
SENSIBLE
Whole House
Whole House
1
1,158
28,353
2,337
1,158
28,353
2,337
806
30,004
PAGE TOTAL 1 1,158 28,353 2,337 806 30,004
TOTAL 1 1,158 28,353 2,337 806 30,004
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page: 13 of 17
r
ROOM HEATING PEAK LOADS `
IProject Title 4 Date,
ENSENADA 8 (Complies 4 -Cardinal Directions 3/5/2004
Room Information Desicin Conditions -
Room Name - whole House Time of Peak Jan 12 am
Floor Area 1,546 Outdoor Dry Bulb Temperature - 260F
Indoor Dry Bulb Temperature 70 OF -
Conduction Area .0 -Value nJ of ; Btu/hr
Items shown with an asterisk (•r) denote conduction through an interior surface to another room. Page Total: 23 972
Infiltration: 1.00 x 1.064 x 1546 x 10.00 x 0.50 / 66] x 0 = 6 033 -
chedule Air Sensible Area 'Ceiling Height ACH , InT
Fraction
TOTAL HOURLY HEAT LOSS FOR ROOM 30,004
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page: 14 of 17
1526.0
X
X
X
X
X
X
X
X
X
X
XV
x
X
X•
x
x
X
x
x
x
X
X
X
x
X
x
x
x
x
X
X
X
x
X
x
x
X
x
X
0.0184
x
X
X
X
X
X
x
X
-x
X
X
X
X
X
'x
x
X
x
x
X
X
x
X
x
X
X
x
X
x
- X
X
X
x
x
x
X
X
x
X
44.0
=
=
=
=
=
=
=
=
=
=
-
_
_.
_
=
=
=
_
=
=
=
-
-
-
«_
-
-
-
=
=
=
=
=
=
1,235
`
'
_
20.0
0.7000
44.0
616
perimeter = 182.2
44.5
8,108
1,181.3
0.0585
44.0
3,041
120.0
0.7400
44.0
3.907
142.0
0.6100
44.0
3,811
48.0
0.3872
44.0
818
31.5
0.4600
44.0
638
24.0
0,6000
44.0
634
4.5
0.5500
109
271.0
0.0685
loss
-
.r
-
Items shown with an asterisk (•r) denote conduction through an interior surface to another room. Page Total: 23 972
Infiltration: 1.00 x 1.064 x 1546 x 10.00 x 0.50 / 66] x 0 = 6 033 -
chedule Air Sensible Area 'Ceiling Height ACH , InT
Fraction
TOTAL HOURLY HEAT LOSS FOR ROOM 30,004
EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page: 14 of 17
RESIDENTIAL ROOM COOLING LOAD SUMMARY
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
Room Name
Design Indoor Dry Bulb Temperature:
Design Outdoor Dry Bulb Temperature:
Design Temperature Difference:
Conduction
Area U -Value
X
Whole House
780E
112°F
340E
DETD 1
X 51.0
X 34.0
X 30.6
X 34.0
X 34.0
X 30.6
X 34.0
X 34.0
X 34 Q
Btu/hr
1,431
476
2,115
3,019
2,945
569
3
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total 11 622
Shaded Unshaded
Solar Gain Orientation Area SGF Area SGF SC Btu/hr
Sk i ht
(Skylight)
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1 +
(Skylight)
Sk i ht
(Skylight)
Skylight
(Skylight)
Skylight
(Skylight)
Window 2680 2 FR DR
(North)
Window 4046 XO
(Northeast)
Window 4060 XO
(Northwest)
Window 4060 XO
(North)
Window 3036 FO
North
( 0.0
X
x
x
x
X
X
x
x
X
x
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1 +
4.0
X
X
X
X
X
x
x
x
X
X1
152
) X
)x
)x
x
) x
0.954
=
=
=
=
=
=
=
=
-
=1
580
( 0.0
4.0
152
0.954
580
( 0.0
4.0
152
0.954
580
( 0.0
4.0
152)x
0.954
580
( 0.0
4.0
152)
0.954
580
( 0.0
40.0
15)X
0.41
247
( 0.0
18.0
48)X
0.434
375
( 0.0
24.0
48)X
0.434
500
( 0.0
24.0
1
0.434
156
( 0.0
1
15)X
0.41
65
Sched. Page Total a 244
Internal Gain Frac. Area Heat Gain Btu/hr
Li hts 1.00 X 1,546 X 0.50 Watts/sgft x 3.412 Btuh/Watt = 2,638
Occupants 1.00 X 1,546 X 24 Btuh/occ. / 333 sqft/occ. = 1,137
Receptacle 1.00 x 1,546 x 0.00 Wafts/sqft x 3.413 Btuh/Watt = 0
Process 1.00 X 1,546 X 0.00 Wafts/sqft X 3-412 Btuh/Watt = 0
Infiltration: �� x Airs x Area 1.546 x Ceiling
� x ACH / 60] �
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 28,353
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 x 1546 x 155 Btuh/occ. / 333 sgft/occ. = 720
Receptacle 1.00 x 1546 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0
Process 1.00 X 1546 X 0.000 Watts/sgft X 3.41 Btuh/Watt = 0
Infiltration: 1.00 X 4 77 X 154 X 10.00 X 0.50 / 60] 0.00263 = 1 618
chedule Air Latent Area Ceiling Height ACH Inyy
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,337
Ener Pro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page:15 of 17
I
RESIDENTIAL ROOM COOLING LOAD SUMMARY
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Tide Date
Room Name
Design Indoor Dry Bulb Temperature:
Design Outdoor Dry Bulb Temperature:
Design Temperature Difference:
Conduction
Area U -Value
Whole House
780F
112°F
34°F
Btu/hr
734
1. Design Equivalent Temperature Difference (DETD)
Page Total 734
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Shaded Unshaded
Solar Gain Orientation Area SGF Area SGF SC Btu/hr
Window 3036 FO
(West)
Window 2680 2 FR DR
(West)
(West)
Window 2060 SH
(West)
Window 2680 2 FR DR
(North)
Window 4050 XO
(West)
Window 1016 4 FO
(South)
Window 1016 3 FO
(South)
Window 1630 Acrylic Blk
(South)
Window 4040 XO
South
( 0.0x
x
x
X
X
X
x
x
x
1 +
1 +
1 +
1 +
1 +
1 +
1 +
1" +
1 +
1 +
10.5x
X
x
x
X
x
X
X
x
73)X
x
x
X
x
x
0.412
=
=
=
=
=
=
=
=
=
316
( 11.3
0.7
73)x
0.412
91
( 28.1
11.9
73)
0.412
532
( 11.3
0.7
73)x
0.41
91
( 0.0
40.0
15)
0.412
247
( 0.0
20.0
73)
0.434
634
( 0.0
6.0
32)x
0.412
79
( 0.0
4.5
32)
0.412
59
( 0.0X
4.5X
32)x
0.423=
61
( 0.0
16.0
32)
_ _ 0.434
222
Sched.
Page Total 2 333
Internal Gain Frac. Area Heat Gain Btu/hr
Li hts 1.00 X 1,546 x 0.50 Watts/sgft x 3.41 Btuh/Watt = 2,638
Occupants 1.00 x 1,546 x 24 Btuh/OCC. / 333 sgft/occ. = 1,137
Receptacle 1.00 x 1,546 x 0.00 Watts/sgft x 3.413 BtuhlWatt = 0
Process 1.00 x 1,546 x 0.00 Watts/sgft X 3.41 Btuh/Watt = 0
Infiltration: �c� x Air Sensible x Area x Ceiling
x ACH / 60] , z _ �6
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 28,3531
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 546 x 155 Btuh/occ. / 333 sgft/occ. = 720
Receptacle 1.00 x 1546 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0
Process 1.00 x 1546 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0
Infiltration: 1 1.00 x 4 77 x 154 x 10.00 x 0.50 / 60] 0.00263 = 1 618
chedule Air Latent Area Ceiling Height ACH 1n1yy
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,337
Energ Pro 3.1 By Energ Soft User Number: 5454 Job Number: 3.1-1251 Page: 16 of 17
RESIDENTIAL ROOM COOLING LOAD SUMMARY
ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004
Project Title Date
Room Name
Design Indoor Dry Bulb Temperature:
Design Outdoor Dry Bulb Temperature:
Design Temperature Difference:
Whole House
780F
112°F
340E
Conduction Area' U -Value DETD' Btu/hr
X =
X =
X =
X =
X =
X =
X =
X =
X =
1. Design Equivalent Temperature Difference (DETD) Page Total
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Shaded Unshaded
Solar Gain Orientation Area SGF Area SGF SC Btu/hr
Window 4040 X0 (South) ( 0.0 x 1 + 16.0 x 32)x 0.434 = 222
Wenrinw 4()60 X0 (East) ( 0.0 x 1 + 24.0 X 73) x 0.434 = 761
( x + x )x _
( x + x )x =
( x + x -) x =
( x + x )x =
( x + x )x =
( x + x )x =
( X + X )xF----7=
Sched. Page Total ss3
Internal Gain Frac. Area Heat Gain Btu/hr
Li hts 1.00 x 1,546 X 0.50 Watts/sgft x 3.41 Btuh/Waft = 2,638
Occupants 1.00 X 1,546 X 24E Btuh/occ.. / 333 sgft/occ. = 1,137
Receptacle 1.00 x 1,546 X 0-00C Wafts/sqft x 3.413 Btuh/Watt — 0
Process r 1.00 x 1,546 x O-OOC Wafts/sgft x 3.41 Btuh/Waft = 0
Infiltration: I cn� x Airs x Area , x Ceiling� x CHACH / 60] 34 = 4662
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 28353
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 x 1546 X 155 Btuh/occ. / 333.sgft/occ. = 720
Receptacle 1.00 X 1546 X 0.000 Wafts/sqft x 3.41 BtuhlWatt = 0
Process 1.00 x 546 x 0.000 Wafts/sgft x 3.41 Btuh/Watt = 0
Infiltration: Ichedu0ol le x Air ' X Latent Area X Ceiling Height x ACH 50 / 60] QOtON0263 = 1 618
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,337
Energ Pro 3.1 By Energ Soft User Number: 5454 Job Number: 3.1-1251 Page: 17 of 17