Loading...
0403-374 (BLDG)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date i7JR2€tfl) 13 �, 0V ,1121 f Date �' r f f' v�.Signature of Contrac' tor OWNER -BUILDER -DECLARATION ION hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business & Professionals Code). ( ) I am exempt under Section B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ` () I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ( ) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carver EXEMPT Policy No. (This section need not be completed if the permit valuation is for $100.00 or less). �).A certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become Subject to the workers' compensation'rrovisions of Section 3700 of the Labor Code, I shall forthwith comply with`those%provision�/ Date:* Applicant /� ! Warning: Failure to secure Workers' Compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made & each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon the above-mentioned property' foinspection purposes:-•,, Signature (Owner/Agent)'r- f =1 Date BUILDING PERMITf,�,,� PERMIT# DATE VALUATION die ro LOT * TRACT JOB SITE ��Ca7ULA ADDRESS 'a.�e SS 7 .460 wLE I:.i ,�: APN _. ... , OWNER CONTRACTOR / DESIGNER / ENGINEER COVEDEVVIOPWOT 18am"Y HoUn 2214'14, R1DGEtTdOW P.0. BOX 696 1?PNTA, ANA, Cd', LA Q#Ub1TA CA 92253 (?60)W.7820 CBIR. 02063 USE OF PERMIT i00 I,IP. CON480WA11,, 2' iR.", X,1QNO, 6' QAPD91J, 140 LF. 5' GARDR1I'13iAL.L,, BOTff1 ORCO SYSTEM 6 FT WALL 100,00 LF 5 'F'T. W14. IL 140.00 LF F.S.MVIATED COST OF COMIRUCrION COMPLUC` ION IEEE 101.000.418.000 UEM-I CyP AL CONSS.:1; UCT OW AND RLN C -FLECK $81.00 IMS PRF -RAM FEES S0,00 Dt� '2 MAR 51004 CITY OF LA �?I�;I'9YR FINANCE nc;mr RECEIPT DATE BY DATE FINALED ' , ' INSPECTOR INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final POOLS - SPAS BLOCKWALL APPROVALS steel Set Backs Electric Bond Footings Main Drain Bond Bea Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final COMMENTS: j /l Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) ' TITLE 24 REPORT Title 24 Report for: ENSENADA 8 (Complies 4 -Cardinal Directions) 77-640 Calle Temecula La Quinta, Ca 92253 Project Designer: Lendel Ventures, Inc. DBA Lench Design Group P.O. BOX 450 LA QU I NTA, CA 92253-0450 760/564-1866 Report Prepared, By: ' VERNA LENCH Lendel Ventures, Inc P.O. Box 450 La Quinta, CA 92253-0450 _ (760) 564-1866 CITY OF LA OUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION D 3•�7oy Job Number: sr 3.1-1251 oF�icv� Date: 3/5/2004 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.' This program developed by Gabel Dodd/EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: 3.1-1251 User Number: 5454 TABLE OF CONTENTS Cover Page - 1 Table of Contents 2 Form CF -1 R Certificate of Compliance - 3 Form MF -1 R Mandatory Measures Checklist 7 Form C -2R Computer Method Summary 8 HVAC System Heating and Cooling Loads Summary 12 Room Load Summary 13 RoomHeating*Peak Loads 14 Room Cooling Peak Loads ` 15 EnergyPro 3.1 By EnergySoft Job Number: 3.1-1251 User Number: 5454 Certificate of Compliance: Residential (Part 1 of 2) CF -1 R ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date 77-640 Calle Temecula La Quinta Project Address Building Permit # Lendel Ventures, Inc (760) 564-1866 Plan Check/Date Documentation Author Telephone Computer Performance 15 Field check / Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION Total Conditioned Floor Area: 1,546 f? Average Ceiling Height: 10.0 ft Total Conditioned Slab Area: 1,546 ft2 Building Type: Wood (check one or more) Exterior Roof X❑ Single Family Detached ❑ Addition ❑ Single Family Attached ❑ Existing Building ❑ Multi -Family ❑ Existing Plus Addition Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor Number of Dwelling Units: 1.00 Number of Stories: 1 ❑Raised Floor Component Type Frame Type Const. Assembly U -Value Location/Comments (attic, garage, typical, etc.) R-49 Roof (R.49.2X16.16) Wood 0.018 . Exterior Roof Slab On Grade n/a 0.756 Exposed Slab w/R-0.0 Perimeter Insulation Slab On Grade n/a 0.756 Covered Slab w/R-0.0 Perimeter Insulation R-13 Wall w/1" EPS Wood 0.059 Exterior Wall Solid Wood Door None 0.387 Exterior Door R-13 Wall (W.13.2x4.16) Wood 0.088 Exterior Wall FENESTRATION Shadina Devices Type Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Skylight 20.0 0.70 0.83 None ❑ X❑ ❑ X❑ Front 40.0 0.74 0.37 Bug Screen ❑ X❑ ❑ X❑ Front 18.0 0.61 0.39 Bug Screen ❑ X❑ ❑ X❑ Right 24.0 0.61 0.39 Bug Screen ❑ X❑ ❑ X❑ Front 24.0 0.61 0.39 Bug Screen ❑ X❑ ❑X❑ Front 10.5 0.46 0.37 Bug Screen ❑ X❑ ❑ X❑ Right 10.5 0.46 0.37 Bug Screen ❑ X❑ ❑ X❑ Right 24.0 0.60 0.37 Buq ScreenX❑ ❑ ❑X❑ Right 40.0 0.74 0.37 Bug ScreenX❑ ❑ ❑X❑ Front 40.0 0.74 0.37 Bug ScreenX❑ ❑ ❑ X❑ Right 20.0 0.61 0.39 Bug Screen ❑ X❑ ❑ X❑ Rear 10.5 0.46 0.37 Bug Screen ❑ Q ❑ a Run Initiation Time: 03/05/04 10:18:00 Run Code: 1078510680 FEnerqyPro 3.1 By Energ ySoft User Number: 5454 Job Number: 3.1-1251 Pa e:3 of 17 Certificate of Compliance: Residential (Part 1 of 2) CF -1 R ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date 77-640 Calle Temecula La Quinta Project Address Building Permit # Lendel Ventures, Inc (760) 564-1866 Plan Check / Date Documentation Author Telephone Computer Performance 15 Field Check I Date Compliance Method (Package or Computer) Climate Zone Enforcement Agency Use Only GENERAL INFORMATION Total Conditioned Floor Area: 1,546 ft2 Average Ceiling Height: 10.0 ft Total Conditioned Slab Area: '1 -546 ft2 Building Type: (check one or more) RI Single Family Detached ❑ Addition ❑ Single Family Attached ❑ Existing Building ❑ Multi -Family ❑ Existing Plus Addition Front Orientation: All Four Orientations Floor Construction Type: ® Slab Floor Number of Dwelling Units:. 1.00 Number of Stories: 1 ❑ Raised Floor BUILDING SHELL INSULATION Const. Component Frame Assembly Location/Comments Type Type U -Value (attic, garage, typical, etc.) FENESTRATION Shadina Devices Type Orientation Area Fenestration Exterior Overhang Side Fins SF U -Factor SHGC Shading Yes / No Yes / No Rear 4.5 0.55 0.38 Bug Screen ❑ x❑ ❑ 0 Rear 32.0 0.61 0.39 Bug Screen ❑ x❑ ❑ 0 Left 24.0 0.61 0.39 Bug Screen ❑ Q ❑ ❑X ❑❑ El F1 El El Q El El El F-1 El El El F1 Q F1 F1 El El El F-1 El El El El Run Initiation Time: 03/05/04 10:18:00 Run Code: 1078510680 EnergyPro 3.1 By EnerqySoft User Number: 5454 Job Number: 3.1-1251 Pa e:4 of 17 Certificate of Compliance: Residential (Part 2 of 2) CF -1 R ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load. Distribution Heating Equipment Minimum Type and Duct or Type (furnace, heat Efficiency Location Piping Thermostat Location / pump, etc.) (AFUE/HSPF)(ducts, attic, etc.) R -Value Type Comments Central Furnace 78% AFUE Ducts in Attic 4.2 Setback HVAC System Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type Comments Split Air Conditioner 12.0 SEER Ducts in Attic 42 Sethark HVAC System WATER HEATING SYSTEMS Rated 1 Tank Energy Facts 1 External Water Heater Water Heater System Name Type Distribution Type # in Input Syst. Btu/hr Cap. (gal) or Recovery Standby Tank Insul. Efficiency Loss (°/a) R -Value A.O. SMITH FG13-50-240 Small Gas Standard 1 38000 50 0.60 n/a n/a 1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Recovery Efficiency. REMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features/Remarks section. Designer or Owner (per Business & Professions Code) Documentation Author Name: Title/Firm: Lendel Ventures, Inc. DBA Lench Design Group Address: P.O. BOX 450 Telephone,/760/564-1866 Lic. #: / �) Age Title/Firm: Address: Telephone: (date) Name: VERNA LENCH Title/Firm: Lendel Ventures, Inc Address: P.O. Box 450 La Quinta, CA 92253-0450 Telephone: (760) 564-1866 D sig a re) (d te) IEneravPro 3.1 By EnerovSoft User Number. 5454 Job Number: 3.1-1251 Paae:5 of 17 1 AUTHORIZATION FOR USE OF THIS TITLE 24 REPORT ONLY WITH ORIGINAL SIGNATURES. NO DUPLICATION PERMITTED ! COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features/Remarks section. Designer or Owner (per Business & Professions Code) Documentation Author Name: Title/Firm: Lendel Ventures, Inc. DBA Lench Design Group Address: P.O. BOX 450 Telephone,/760/564-1866 Lic. #: / �) Age Title/Firm: Address: Telephone: (date) Name: VERNA LENCH Title/Firm: Lendel Ventures, Inc Address: P.O. Box 450 La Quinta, CA 92253-0450 Telephone: (760) 564-1866 D sig a re) (d te) IEneravPro 3.1 By EnerovSoft User Number. 5454 Job Number: 3.1-1251 Paae:5 of 17 1 Certificate of Compliance: Residential (Addendum) CF -1 R ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies 3ased on the adequacy of the special justification and documentation submitted. I Plan Field The HVAC System "HVAC System" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R. Plan Field The HVAC System "HVAC System" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verifification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC System" is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. Run Initiation Time: 0310510410:18:00 Run Code: 1078510680 EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number. 3.1-1251 Page:6 of 17 Mandatory Measures Checklist: Residential MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION instructions: Check or initial applicable boxes or enter N/A if not applicable. DESIGNER ENFORCEMEN Building Envelope Measures '§ 150(a): Minimum R-19 ceiling insulation in wood frame assembly, or equivalent U -value. ❑ § 150(b): Loose fill insulation manufacturers labeled R -Value. ❑X .§ 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does not apply to exterior mass walls). '§ 150(d): Minimum R-13 raised floor insulation in framed floors. ❑ § 150(1): Slab edge insulation - water absorption rate <= 0.3%, water vapor transmission rate <= 2.0 perm/inch. ❑X §118: Insulation specified or installed meets insulation quality standards. Indicate type and form. FXJ §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U -Factor, certified SHGC, and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. §150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards. ® §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have closable doors, outside air intake with damper and control, and flue damper and control; 2. No continuous burning gas pilots allowed. Space Conditioning, Water Heating and Plumbing System Measures XJ §110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. X❑ §150(h): Heating and/or cooling loads calculated in accordance with ASH RAE, SMACNA or ACCA. X1 §150(i): Setback thermostat on all applicable heating and/or cooling systems. FXJ §1500): Pipe and Tank Insulation 1. Storage gas water heaters with less than 0.58 energy factor shall be externally wrapped with R-12. 2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R4 or greater) 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 combined intemal/extemal insulation. 4. All buried or exposed piping insulated in recirculating sections of hot water systems. 5. Cooling system piping below 55 degrees F. insulated. 6. Piping insulating between heating source and indirect hot water tank. X❑ '§150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601, 603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed in conditioned space. Openings shall be sealed with mastic, tape aerosol sealant or other duct- closure system that meets the applicable requirements of UL181, UL181A, or UL181B. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh tape or tape shall be used. Building cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and drawbands. 2. Exhaust fans systems have back draft or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. X] §114: Pool and Spa Heating Systems and Equipment 1. Certified with 78% thermal efficiency, on-off switch, weatherproof instructions, no electric resistance heating, no pilot. 2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or spas. 3. Pool system has directional inlets and a circulation pump time switch. X] §115: Gas Fred central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) Lighting Measures X❑ §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting control panel at an entrance to the kitchen. 150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved. EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page:7 of 17 Computer Method Summary (Part 1 of 3) C -2R ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date 77-640 Calle Temecula La Quinta Project Address Building Permit # Lendel Ventures, Inc (760) 564-1866 Plan Check/Date Documentation Author Telephone Computer Performance 15 Field Check/Date Compliance Method (Package or Computer) Cimate Zone Source Energy Standard Use (kBtu/sf-yr) Design Facing North Margin ❑ Facing East Margin Wall 39 0.059 45 AQ Wall 31 0.059 a 90 Door 24 0.387 0 go Facingacing South Margin ❑ ❑ ❑ West Margin Wall 33 0.059 315 90 Wall 84 0.059 0 90 Wall 130 0.059 270 90 4.77 -0.97 4.25 -0.46 3.88 -0.08 4.44 -0.65 Space Heating 3.79 ❑ 13-13 Wall w/1" FPS Whnle Hnuse Will 47 0.059 270 qQ Wall 15 0.059 a 90 Wall 32 0.059 270 go ®®® Space Cooling 41.41 40.11 1.31 Wall_ 15 0.059 180 90 42.80 -1.39 ❑ 42.24 -0.83 Wall 47 0.059 90 41.50 -0.09 ❑ Domestic Hot Water 15.44 1 13.38 2.06 13.38 2.06 R-13 Wall w/1" EPS Whnle Hnuse 1 13.38 2.06 13.38 2.06 R-13 Wall (W_132x4.16) Whole House Lyall 47 0.088 _0 90 ❑ R-13 Wall (W _132x4.16) Whole House Totals Wall fW.11 2x4.16) Whole Hnuse Dnnr 24 0.387 90 qr) BUILDING ElSnlid COMPLIES Wall 76 0.059 90 gQ This C -2R summarizes the results of a four cardinal orientation analysis. The pages that follow describe the front facing North occurence. This plan has been analyzed with identical features in all orientations. GENERAL INFORMATION Conditioned Floor Area: 1,546 Floor Construction Type: ❑X Slab Floor Building Type: Single Fam Detached El Raised Floor Building Front Orientation: All Four Orientations Number of Dwelling Units: 1.00 Total Conditioned Volume: 15,460 Number of Stories Slab Floor Area: 1,546 BUILDING ZONE INFORMATION # of Thermostat Vent Zone Name Floor Area Volume Units Zone Type Type Hgt. Area HVAC System 1 548 15 460 1 nn rnnditioned Sethnrk -2 n/a OPAQUE SURFACES Solar Act. Gains Type Area U -Val. Azm. Tilt Y / N Form 3 Reference Location / Comments Rnnf 1,526 0.018 0 yllall 121 0.059 a -90 ® ❑ R-49 Roof (R.492X16.16) Whnle Hnuse R-13 Wall w/1" FPS Whole Hnuse Wall 39 0.059 45 AQ Wall 31 0.059 a 90 Door 24 0.387 0 go ❑ ❑ ❑ R-13 Wall w/1" FPS Whnle Hnuse R-13 Wall w/1" EPS Whnle House Solid Wood Door Whole Hnuse Wall 33 0.059 315 90 Wall 84 0.059 0 90 Wall 130 0.059 270 90 ❑ ❑ ❑ R-13 Wall w/1" EPS Whnle Hnuse R-13 Wall w/1" EPS Whnle Hnuse B-13 Wall w/1" EPS Whole Hnuse Wall 32 0.059 r) 90_ ® ❑ 13-13 Wall w/1" FPS Whnle Hnuse Will 47 0.059 270 qQ Wall 15 0.059 a 90 Wall 32 0.059 270 go ®®® ❑ ❑ ❑ R-13 Wall w/1" FPS Whnle Hnuse R-13 Wall w/1" EPS Whole House R-13 Wall w/1" EPS Whole Hnuse Wall_ 15 0.059 180 90 ® ❑ R-13 Wall w/1" EPS Whnle Hnuse Wall 47 0.059 90 ❑ R-13 Wall w/1" FPS Whnle Hnuse Wall 480 0.059 180 _9.Q ❑ R-13 Wall w/1" EPS Whnle Hnuse Wall 45 0.088 90 90 ❑ R-13 Wall (W_132x4.16) Whole House Lyall 47 0.088 _0 90 ❑ R-13 Wall (W _132x4.16) Whole House Wall 179 0.088 go 90ElR-13 Wall fW.11 2x4.16) Whole Hnuse Dnnr 24 0.387 90 qr) ® ElSnlid Wnnd Dnnr Whnle Hnuse Wall 76 0.059 90 gQ [X ❑ R-13 Wall w/1" Fps Whnle Hnuse ❑ ❑ ❑ ❑ Run lnitiatwonT*mes 03/05/041018*00 Run Codes 1078510680 EnergyPro 3.1 By Energysoft User Number: 5454 Job Number: 3.1-1251 Page:8 of 17 Computer Method Summary (Part 2 of 3) C -2R ENSENADA 8 (Complies 4 -Cardinal Directions) Project Title Date 3/5/2004 FENESTRATION SURFACES U- Act. Glazing Type Location/ # Type Area Factor SHGC Azm. Tilt Comments J_ Skvliaht Front (North) 4.0 0.700 n_83 n_0. 2 Skylight Front (North) 4.0 0.700 0.83 0 0 3 Skylight Front (North) 4.0 0.700 0.83 0 0 4 Skylight Front (North) 4.0 0.700 0.83 0 0 5 Skylight Front (North) 4.0 0.700 0.83 0 0 6 Window Front (North) 40.0 0.740 0.37 0 90 Z Window Front (Northeast) 18.0 0.610 0.39 45 90 8 Window Right (Northwest) 24.0 0.610 0.39 315 90 6 Window Front (North) 24.0 0.610 0.39 0 90 1Q Window Front (North) 10.5 0.460 0.37 0 90 1 Window Right (West) 10.5 0.460 0.37 270 90 12 Window Right (West) 12.0 0.600 0.37 270 90 13. Window Rigg(West) Bug 40.0 0.740 0.37 270 gQ 14 Window Right (West) 12.0 0.600 0.37 270 90 15 Window Front (North) 40.0 0.740 0.37 0 90 16 Window Right (West) 20.0 0.610 0.39 270 90 17 Window Rear (South) 6.0 0.460 0.37 180 90 18 Window Rear (South) 4.5 0.460 0.37 180 90 1,Q Window Rear (South) 4.5 0.550 0.38 180 90 20 Window Rear (South) 16.0 0.610 0.39 180 90 21 Window Rear (South) 16.0 0.610 0.39 180 90 22 Window Left (East) 24.0 0.610 0.39 90 90 Sk)yght - Dual Glaze Skylight - Dual Glaze Skylight - Dual Glaze Skylight - Dual Glaze Skylight - Dual Glaze Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit•5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Acrylic Block Summit 5500 Al DP Low E Summit 5500 Al DP Low E Summit 5500 Al DP Low E Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House Whole House INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin . Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LExt. REA Dist. Len. Hgt. Dist. Len. Hgt. 1 None 1.00 2 None 1.00 3 None 1.00 4 None 1.00 5 None 1.00 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9 Bug Screen 0.76 10 Bug Screen 0.76 Ti Bug Screen 0.76 12 Bug Screen 0.76 5.0 2.0 6.0 0.1 6.0 6.0 13 Bug Screen 0.76 6.7 2.5 6.0 0.1 6.0 6.0 14 Bug Screen 0.76 5.0 2.0 6.0 0.1 6.0 6.0 15 Bug Screen 0.76 6.7 2.5 10.0 0.1 10.0 10.0 16 Bug Screen 0.76 17 Bug Screen 0.76 18 Bug Screen 0.76 19 Bug Screen 0.76 20 Bug Screen 0.76 Ti Bug Screen 0.76 22 Bug Screen 0.76 EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Paae:9 of 17 1 Computer Method Summary (Part 3 of 3) C -2R ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Location Type (sf) (in.) Cap. Cond. Form 3 Reference R -Val. Comments PERIMETER LOSSES F2 Insulation Type Length Factor R -Val. Depth Location / Comments Slab Perimeter 153 0.76 0.0 0 Whole House Slab Perimeter 30 0.76 0.0 0 Whole House HVAC SYSTEMS Heating Equipment Minimum Distribution Type , Type (furnace, heat Efficiency and Location Duct - Thermostat Location / pump, etc.) (AFUE/HSPFXducts/attic, etc.) R -Value Type Comments Central Furnace 78% AFUE Ducts in Attic 4.2 Setback MVAC System Pipe Hydronic Piping Pipe Insul. System Name Length Diameter Thick. Cooling Equipment Minimum Duct Type (air conditioner, Efficiency Location Duct Thermostat Location / heat pump, evap. cooling) (SEER) (attic, etc,) R -Value Type Comments Split Air Conditioner 12.0 SEER Ducts in Attic 4.2 Setback HVAC System WATER HEATING SYSTEMS Ratedl Tank Energy Fact! 1 Tank Insul. Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value System Name Type _ Type Syst. (Btu/hr) (gal) Efficiency Loss (%) Ext. A.O. SMITH FGR -50-240 Small Gas Standard � 1 38.000' 50 0.60 n/a n/a 1 For small gas storage (rated input — 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. Computer Method Summary (Addendum) C -2R ENSENADA 8 (Compiies 4 -Cardinal Directions) 3/5/2004 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies )ased on the adequacy of the special justification and documentation sunmitted. I Plan Field The HVAC System "HVAC System" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual. HERS Required Verification These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form GF -6R. Plan Field The HVAC System "HVAC System" includes Refrigerant Charge and Airflow Credit (or a TXV). A certified HERS rater must provide verifification of the TXV, or measure the Refrigerant Charge and Airflow. The HVAC System "HVAC System" is using reduced duct leakage to comply and must have diagnostic site testing of duct leakage performed by a certified HERS Rater. The results of the diagnostic testing must be reported on a CF -6R Form. EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page:11 of 17 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE ENSENADA 8 (Complies 4 -Cardinal Directions 3/5/2004 SYSTEM NAME FLOOR AREA HVAC System 1,546 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,158 28,353 2,337 806 30,004 0 1,418 1,500 0 0 0 0 0 0 0 0 0 1,418 1 1,500 31,1881 2,3371 33 005 H4DHO42SO6 33,893 1,128 64,000 Total Adjusted System Output 33,893 1,128 64,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am HEATING SYSTEM PSYCHROMETRICS (Airstream TemDeratures at Time of Heatina Peak) I 26.0 OF 70.0 OF 105.OoF Outside Air 0 cfm Heating Coil 70.0 of COOLING SYSTEM PSYCHROMETRICS 111.0 177.6 of Outside Air 0 cfm 78.0/62.2 of 0..�. .... n:. M....4, drstream Temperatures at 78.0 / 62.2 of 55.0 / 53.7 of Cooling Coil Supply Air Ducts 105.0 of ROOMS 70.0 of I Supply Air Ducts 55.0/53.7OF 41.2% R.H. ROOMS 78,0 62.2 of I EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Paae:12 of 17 1 ROOM LOAD SUMMARY PROJECT NAME ENSENADA 8 (Complies 4 -Cardinal Directions DATE 3/5/2004 SYSTEM NAME HVAC System FLOOR AREA 1,546 ROOM LOAD SUMMARY - ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Whole House Whole House 1 1,158 28,353 2,337 1,158 28,353 2,337 806 30,004 PAGE TOTAL 1 1,158 28,353 2,337 806 30,004 TOTAL 1 1,158 28,353 2,337 806 30,004 EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page: 13 of 17 r ROOM HEATING PEAK LOADS ` IProject Title 4 Date, ENSENADA 8 (Complies 4 -Cardinal Directions 3/5/2004 Room Information Desicin Conditions - Room Name - whole House Time of Peak Jan 12 am Floor Area 1,546 Outdoor Dry Bulb Temperature - 260F Indoor Dry Bulb Temperature 70 OF - Conduction Area .0 -Value nJ of ; Btu/hr Items shown with an asterisk (•r) denote conduction through an interior surface to another room. Page Total: 23 972 Infiltration: 1.00 x 1.064 x 1546 x 10.00 x 0.50 / 66] x 0 = 6 033 - chedule Air Sensible Area 'Ceiling Height ACH , InT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 30,004 EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page: 14 of 17 1526.0 X X X X X X X X X X XV x X X• x x X x x x X X X x X x x x x X X X x X x x X x X 0.0184 x X X X X X x X -x X X X X X 'x x X x x X X x X x X X x X x - X X X x x x X X x X 44.0 = = = = = = = = = = - _ _. _ = = = _ = = = - - - «_ - - - = = = = = = 1,235 ` ' _ 20.0 0.7000 44.0 616 perimeter = 182.2 44.5 8,108 1,181.3 0.0585 44.0 3,041 120.0 0.7400 44.0 3.907 142.0 0.6100 44.0 3,811 48.0 0.3872 44.0 818 31.5 0.4600 44.0 638 24.0 0,6000 44.0 634 4.5 0.5500 109 271.0 0.0685 loss - .r - Items shown with an asterisk (•r) denote conduction through an interior surface to another room. Page Total: 23 972 Infiltration: 1.00 x 1.064 x 1546 x 10.00 x 0.50 / 66] x 0 = 6 033 - chedule Air Sensible Area 'Ceiling Height ACH , InT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 30,004 EnergyPro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page: 14 of 17 RESIDENTIAL ROOM COOLING LOAD SUMMARY ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction Area U -Value X Whole House 780E 112°F 340E DETD 1 X 51.0 X 34.0 X 30.6 X 34.0 X 34.0 X 30.6 X 34.0 X 34.0 X 34 Q Btu/hr 1,431 476 2,115 3,019 2,945 569 3 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total 11 622 Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr Sk i ht (Skylight) 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + (Skylight) Sk i ht (Skylight) Skylight (Skylight) Skylight (Skylight) Window 2680 2 FR DR (North) Window 4046 XO (Northeast) Window 4060 XO (Northwest) Window 4060 XO (North) Window 3036 FO North ( 0.0 X x x x X X x x X x 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 4.0 X X X X X x x x X X1 152 ) X )x )x x ) x 0.954 = = = = = = = = - =1 580 ( 0.0 4.0 152 0.954 580 ( 0.0 4.0 152 0.954 580 ( 0.0 4.0 152)x 0.954 580 ( 0.0 4.0 152) 0.954 580 ( 0.0 40.0 15)X 0.41 247 ( 0.0 18.0 48)X 0.434 375 ( 0.0 24.0 48)X 0.434 500 ( 0.0 24.0 1 0.434 156 ( 0.0 1 15)X 0.41 65 Sched. Page Total a 244 Internal Gain Frac. Area Heat Gain Btu/hr Li hts 1.00 X 1,546 X 0.50 Watts/sgft x 3.412 Btuh/Watt = 2,638 Occupants 1.00 X 1,546 X 24 Btuh/occ. / 333 sqft/occ. = 1,137 Receptacle 1.00 x 1,546 x 0.00 Wafts/sqft x 3.413 Btuh/Watt = 0 Process 1.00 X 1,546 X 0.00 Wafts/sqft X 3-412 Btuh/Watt = 0 Infiltration: �� x Airs x Area 1.546 x Ceiling � x ACH / 60] � Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 28,353 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 1546 x 155 Btuh/occ. / 333 sgft/occ. = 720 Receptacle 1.00 x 1546 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Process 1.00 X 1546 X 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Infiltration: 1.00 X 4 77 X 154 X 10.00 X 0.50 / 60] 0.00263 = 1 618 chedule Air Latent Area Ceiling Height ACH Inyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,337 Ener Pro 3.1 By EnergySoft User Number: 5454 Job Number: 3.1-1251 Page:15 of 17 I RESIDENTIAL ROOM COOLING LOAD SUMMARY ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Tide Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Conduction Area U -Value Whole House 780F 112°F 34°F Btu/hr 734 1. Design Equivalent Temperature Difference (DETD) Page Total 734 Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr Window 3036 FO (West) Window 2680 2 FR DR (West) (West) Window 2060 SH (West) Window 2680 2 FR DR (North) Window 4050 XO (West) Window 1016 4 FO (South) Window 1016 3 FO (South) Window 1630 Acrylic Blk (South) Window 4040 XO South ( 0.0x x x X X X x x x 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1" + 1 + 1 + 10.5x X x x X x X X x 73)X x x X x x 0.412 = = = = = = = = = 316 ( 11.3 0.7 73)x 0.412 91 ( 28.1 11.9 73) 0.412 532 ( 11.3 0.7 73)x 0.41 91 ( 0.0 40.0 15) 0.412 247 ( 0.0 20.0 73) 0.434 634 ( 0.0 6.0 32)x 0.412 79 ( 0.0 4.5 32) 0.412 59 ( 0.0X 4.5X 32)x 0.423= 61 ( 0.0 16.0 32) _ _ 0.434 222 Sched. Page Total 2 333 Internal Gain Frac. Area Heat Gain Btu/hr Li hts 1.00 X 1,546 x 0.50 Watts/sgft x 3.41 Btuh/Watt = 2,638 Occupants 1.00 x 1,546 x 24 Btuh/OCC. / 333 sgft/occ. = 1,137 Receptacle 1.00 x 1,546 x 0.00 Watts/sgft x 3.413 BtuhlWatt = 0 Process 1.00 x 1,546 x 0.00 Watts/sgft X 3.41 Btuh/Watt = 0 Infiltration: �c� x Air Sensible x Area x Ceiling x ACH / 60] , z _ �6 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 28,3531 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 546 x 155 Btuh/occ. / 333 sgft/occ. = 720 Receptacle 1.00 x 1546 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Process 1.00 x 1546 x 0.000 Watts/sgft X 3.41 Btuh/Watt = 0 Infiltration: 1 1.00 x 4 77 x 154 x 10.00 x 0.50 / 60] 0.00263 = 1 618 chedule Air Latent Area Ceiling Height ACH 1n1yy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,337 Energ Pro 3.1 By Energ Soft User Number: 5454 Job Number: 3.1-1251 Page: 16 of 17 RESIDENTIAL ROOM COOLING LOAD SUMMARY ENSENADA 8 (Complies 4 -Cardinal Directions) 3/5/2004 Project Title Date Room Name Design Indoor Dry Bulb Temperature: Design Outdoor Dry Bulb Temperature: Design Temperature Difference: Whole House 780F 112°F 340E Conduction Area' U -Value DETD' Btu/hr X = X = X = X = X = X = X = X = X = 1. Design Equivalent Temperature Difference (DETD) Page Total Items shown with an asterisk (') denote conduction through an interior surface to another room. Shaded Unshaded Solar Gain Orientation Area SGF Area SGF SC Btu/hr Window 4040 X0 (South) ( 0.0 x 1 + 16.0 x 32)x 0.434 = 222 Wenrinw 4()60 X0 (East) ( 0.0 x 1 + 24.0 X 73) x 0.434 = 761 ( x + x )x _ ( x + x )x = ( x + x -) x = ( x + x )x = ( x + x )x = ( x + x )x = ( X + X )xF----7= Sched. Page Total ss3 Internal Gain Frac. Area Heat Gain Btu/hr Li hts 1.00 x 1,546 X 0.50 Watts/sgft x 3.41 Btuh/Waft = 2,638 Occupants 1.00 X 1,546 X 24E Btuh/occ.. / 333 sgft/occ. = 1,137 Receptacle 1.00 x 1,546 X 0-00C Wafts/sqft x 3.413 Btuh/Watt — 0 Process r 1.00 x 1,546 x O-OOC Wafts/sgft x 3.41 Btuh/Waft = 0 Infiltration: I cn� x Airs x Area , x Ceiling� x CHACH / 60] 34 = 4662 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 28353 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 1546 X 155 Btuh/occ. / 333.sgft/occ. = 720 Receptacle 1.00 X 1546 X 0.000 Wafts/sqft x 3.41 BtuhlWatt = 0 Process 1.00 x 546 x 0.000 Wafts/sgft x 3.41 Btuh/Watt = 0 Infiltration: Ichedu0ol le x Air ' X Latent Area X Ceiling Height x ACH 50 / 60] QOtON0263 = 1 618 Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2,337 Energ Pro 3.1 By Energ Soft User Number: 5454 Job Number: 3.1-1251 Page: 17 of 17