Loading...
9511-065 (PLBG)N LICENSED CONTRACTOR DECLARATION I - .. Qy1LU11141 I hereby affirm that I am licensed under provisions of Chapter 9 (commencing With DATE . 127 519T VALUATION ZDI., 1A-'*.tM LOT Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. 684563 A 1129/96 55B SITE ADDRESS 51-095 AVENIDA .BALL EJO License # LIC. Class— ---% Exp. Date r I -OWNER CONTRACTOR Date j, -,..j SSig nature of Contractor 40, L_ 4_1 I. Al DENBOER ENGIN1130"RIVO &CONST. OWNER -BUILDER DECLARAI(ph MS. UNIDA ROTHSrErN 68175 BE RROS COURT I hereby affirm that I am exempt from the': Contractor's License Law for the .51095 AVENIDA VALLEJO CATHEDRAL CM` CA 92234 following reason: LA QU[NTA CA 97.243 (619)327w=0 CI L# 351n 1, as owner of the property, or. my employees with wages as -their sole compensation, will do the work, and the structure is not intended or offered for DESIGNER/ENGINEER sale (Sec..7044, Business & Professionals Code). USE OF PERNPLUM01NIG 1, as- owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 1044, Business & Professionals Code). ( ) I am exempt under Section B&P.C. for this reason SEWER CONNIECT Date Signature of Owner WORKER'S COMPENSATION DECLARATION FEE DESCRIPTION I hereby affirm under penalty of perjury one of the following declarations: CONIRACT AMOM 11724.00 LS I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers'. compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier.& policy no. are: Carrier 'qCarr 14MM Policy No. 110A44n ESTIMATED COST OF CONSTRUCTION (This section need not be completed if the permit valuation is for $100.00 or less). PERMIT FEE SUMMARY I certify that in the Performance of the work for which this permit is issued, PLUMBING FF -E "" SEWFR 101-00.0-419-000 $X00 I I S" not employ any person n any manner so as to become ...J— + to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Date: 1:2 J:?JaApplicant - 4 Warning. Failure to secure Workers' Compensation coverage is unlawful and shall subject an,!employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this,aliplication is made & each person at whose reqijest and for whose benefit work is,performed under or pursuant to any permit issued as a result of this application agrees to, &.shall, indemnify ,,,.& hold harmless the City of 6_41. WIts officers,. -agents and employees. 1 2. Any permit issued as a result of this application becomes null and void if ww' ork is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. .1 certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this Cd' y to enter upon the above-mentioned property, for inspection purg6se6� ,6S_S1, -Date Signature (Owner/Agek)W 04�11 ae e,_,_ , 0 / RECEIPT -7 I PERMIT I TAW'tT 773-062-024 SUB-110TAL CONSIRUC110N AND PLAN CHECK LESS PRE -PAIL? FEES TOTAL PERMIT FEF-% DUE NOW DATE BY DATE FINJ 2,724.00 *30.00 $0.00 530.00 OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR . BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final BLOCKWALL APPROVALS POOLS -'SPAS steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) COMMENTS: /I AMMER PUMPING INC. JOB INVOICE P.O. Box 2448 CATHEDRAL CITY, CALIFORNIA 92235-2448 Ir -11101 2CA_7AA0 1-1 - - iw (619) 321-7448 CUSTOMER'S ORDER NO. DATE ORDERED j -A 13 - � C 10 O Gallons ORDER TAKEN BY DATE PROMISED 0 A.M. Do O Pumping Fee per 1000 gal. 0 P.M. BILL TO 3, PHONE ADDRESS MECICtt (✓ Cw.0 CITY HELPER )B NA LOCATION ` % 0"DAY WORK 'jr/ t4 ' 1i L CRIPTION OF WORK 0 CONTRACT 0 EXTRA Locating / Opening Fee (per hour) ,UANT. DESCRIPTION OF MATERIAL USED PRICE AMOUNT 10 O Gallons Do O Pumping Fee per 1000 gal. Q Dumping Fee per 1000 gal. Out of Area Fee Locating / Opening Fee (per hour) Size System: A SERVICE CHARGE OF $20 WILL BE DUE ON ALL RETURNED CHECKS. A FINANCE CHARGE OF 11/2% PER MONTH, 18% PER YEAR WILL BE CHARGED ON PAST DUE ACCOUNTS OVER 30 DAYS. HOURS LABOR AMOUNT TOTAL MATERIALS MECHANICS Q HELPERS Q TOTAL LABOR I hereby acknowledge the satisfactory TOTAL LABOR completion of the above described work: TAX SIGNATURE '4;w DATE COMPLETED AJ 7(o TOTAL 1 _ H(MC E Vo OTMn Under the California Mechanics Lien Law any contractor, subcontractor, labor`S'Upplier or other person who helps to improve your property, but is not paid for his/her work or supplies, has a rignt to enforce a claim against your property. This means that after a court hearing, your property could be sold by a court officer and the proceeds of the sale used fo satisfy the indebteJness. This can happen even if you have paid your contractor in full if the subcontractors, laborers or suppliers remain unpaid. To preserve their right to file a claim or lien against your property, certain claimant -s such as subcontractors or material suppliers are required to provide::you with a docufnententitled "Preliminary Notice." Original (or prime) contractors and IaborerN ,entages'do not.lhave to provide this notice. A Preliminary Notice is not a lien against y60r Its purpdsie is to notify you of persons who may have a right to file a lien against your property if #flee are not paid. Generally, the maximum time allowed for filing a claim or lien against your property is ninety (90) Days after'completion of your project. TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY, YOU MAY WISH TO TAKE ONE OR MORE OF THE FOLLOWING STEPS: J� 1) Require that payments be made directly to subcontractors and material suppliers through a joint control. Any joint control agreement should include the addendum approved by the Registrar of Contractors. 2) Issue joint checks for payment, made out to both your contractor and subcontractors. or material suppliers involved in the project. This will help to insure that all persons due payment are actually paid. 3) After UPON making payment on any completed phase of the project, and before making any further payments, require your contractor to provide you with unconditional lien releases signed by each material supplier, subcontractor and laborer involved in that portion of the work for which payment was made. On projects involving improvements to a single family residence or a duplex owned by individuals, the persons signing these releases lose the right to file a claim against your property. In other types of construction this protection may still be important, but may not be as complete. TO PROTECT. YOURSELF UNDER THIS OPTION YOU MUST BE CERTAIN THAT ALL MATERIAL SUPPLIERS, SUBCONTRACTORS OR LABORERS HAVE SIGNED. J,- TRI=STAR CONSTRUCTION P.O. BOX 542 CATHEDRAL CITY, CA. 92235 ph. (61.9)- fax. 6].9) fax. (619) 321-7798 TO; CITY OF LA QUINTA RE:.vl-;7�� PER MY AGREEMENT WITH TRI -STAR CONSTRUCTION I WILL.RE-SEED OR OTHERWISE COMPLETE'MY YARD AFTER THE INSTALLATION OF THE SEWER. THANK 'YOU , signature please p�-'iiit ,name