Loading...
13-0618 (RR)P.O. BOX 1504 '_ 78-495 CALLE TAMPICO J LA QUINTA;-CALIFORNIA 92253 Application Number: Property Address: APN: Application description Property Zoning: Application valuation: Applicant: 13-00000618 51360 AVENIDA VALLEJO 773-084-006-19 -00000'0- RE-ROOF COVE RESIDENTIAL 7755 Architect or Engineer: LICENSED CONTRACTOR'S DECLARATION BUILDING & SAFETY DEPARTMENT BUILDING PERMIT 1 hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class: B C39 Lice n e No.: 235717 Dat- ` l� 'Contrac- OWNER -BUILDER DECLARATION ' 1 hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by - any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or.offered for sale (Sec. 7044, Business and Professions Code: The _ . Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). - (_ 1 I, as owner of the property, am.exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contractsfor the projects with a contractors) licensed pursuant to the Contractors' State License Law.). ( 1 I am exempt under Sec.' , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING. AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT Owner: DONALD STONE 51360 AVENIDA VALLEJO LA QUINTA, CA 92253 (760)000-0000 '✓ `' VOICE (760) 777-7012 FAX (760) 777-7011 Contractor: WESTERN PACIFIC ROOFING COR 3462 LA CAMPANA WAY PALM SPRINGS, CA 92262 (760)416-5877 Lic. No.: 235717 ----------------------------- WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. - My workers' compensation insurance carrier and policy number are: Carrier ARCH INS Policy Number 'ZAWC19275500 I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section !�L/J337700 of the Labor Code, I shall forthwith , mply wit hos// rovisions. Date: -� Applicalit- - WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE.IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL_ PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. • APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1 . Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this. application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. 'I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby 34thorize representatives of this /cou county to enter upon the above-mentioned property for ' sp tion pyrp ses. Date / C Q -Signature (Applicant or Agent" �� INSPECTIONS (760) 777-7153 Date: 5/16/13 ' ice. y; • � .. .- -• .. - Application Number... 13-00000618'. . Permit . ... RE -ROOF : Additional desc Permit -Fee-_ . ' 4'1. 44 Plan Check Fee 00 Issue,Date Valuation 0 Expiration Date 11/12/13 - Qty. Unit Charge per, '-. Extension' BASE -.FEE 30.00 1'.00-:•' 11.'4400 .EA MISC RE --ROOF, ADDL, 1000 SF - 11,.44- ------------------ - - Special Notes and Comments • REROOF WITH.LIGHT-WEIGHT DOVE WHITE.• •.TILE [CRRCc 0850-,00141 2010 CALIFORNIA ENERGY .CODE.. --',Other',Fees. . ...BLDG.STDS•,ADMIN (SB1473), 1.00 ' Fee summary Charged Paid.. Credited Due y Permit Fee Total 41.44' .'00 :: 00 41.44 Plan Check Total 00: 00 :00 .00 Other•Fee Total 1.00 00.' .00 -1:00 Grand Total" •42.44 00 .00 42.44 LQPEnl IT .. ... -. .. , Bin. # Crty of 1.Q Quin' to Building a Safety Division P.O. Box 1504,78-495 Calle Tampico La.Quinta, CA 92253 -:(760) 777-7012- Building Permit Application' and Tracking Sheet Permit # j - l �� Project Address: 1 -340 r7K— U4 J Owner's Name:. L r1 A P. Number. Address: . Legal Description: City, ST, Zip: Contractor: �� ku ` Imo �� ^ Telephone: + N1, MMMA; 1 MIM Address: 3c(6 Z V�j'�` Project Description: city, ST, zip: P� �w. r, r CA— 4 2ZGZ . Telephone: 7( 0— 1 : s / State Lic. #: 231- 71-7 . City Lic. #; ' Arch., Engr., Designer. Address: City., ST. Zip: Telephone: Construction Type: , Occupancy: State Lic. #: Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person: Sq. Ft.; #Stories: # Units: Telephone* of Contact Person: Estimated Value of Project: 7 J^ APPLICANT: 150 NOT WRITE BELOW THIS UNE # Submittal Req'd Rec'd TRACMG PERMIT FEES Plan Sets Plan Check submitted Item 'Amount Strgctural Calcs. Reviewed, ready for corrections Plan Check Deposit. • . Truss Calcs. Called Contact Person Plan Check Balance Title 24 Cales. Plans picked up Construction Flood plain plan Plans resubmitted.'. Mechanical Grading plan 2`! Review, ready for correction0mue Electrical Subcontector List Called Contact Person Plumbing Grant Deed Pians picked up MIL H.OAL Approval Plans resubmitted Grading IN HOUSE:- 'i6 Review; ready for correcdonsPissae Developer Impact Fee Planning Approval. Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit Issue School Fees Total Permit Fees . Prescriptive Certificate of Compliance: Residential Reroof CF -1 R-ALT-ReRoof Project Address: Climate Zone Permit # I ROOFING PRODUCTS (COOL ROOFS) §151(812 When the area of exterior roof surface to be replaced exceeds 50% of the existing roof area, or 1,000 ff, whichever is less, the new roofing area must meet the roofing product "Cool Roof" requirements of§152(b)1Hi, 152(b)1Hii, or 152(b)1Hiil. Check applicable alternative or exception below if the roof alteration is exempt from the roofing product "Cool Roof' requirements:: ❑ Cool roofs not required in Climates Zones 1-12,14, and 16 with a low sloped roof pitch (lessor 2:12 pitch). ❑ Cool roofs not required in Climates Zones 1-9, and 16 with a steep -sloped roofs (greater pitch than 2:12) and.product weight less than 5/Ibdit2. Alteratives to §152(b)1Hi and §152(b)Hii, Steep -slope roof (pitch> 2:12) ❑ Insulation with a thermal resistance of at least 0.85 hr-ft2•`FBtu.or at least a 3/4 inch air -space is added to the roof deck over an attic; or ❑ Existing ducts in the attic are insulated and sealed according to §151(010; or ❑ In climate zones 10, 12 and 13, with 1 ft2 of free ventilation area of attic ventilation for every 150 ft2 of. attic floor area, and where at least 30 percent of the free ventilation area is within 2 feet vertical distance of the roof ridge; or ❑ Building has at least R-30 ceiling insulation; or ❑ Building has radiant barrier in the attic meeting the requirements of §151(f)2; or ❑ Building has no ducts in the attic; or ❑ In climate zones 10, 11, 13 and 14, R-3 or greater roof deck insulation above vented attic. Exception to §152(b)1Hiii, Low -slope roof ( pitch <_ 2:12) ❑ Building has no ducts in the attic. Other Exceptions ❑ Roofing area is covered by building integrated; photovoltaic panels and solar thermal panels are exempt from the Cool Roof criteria ❑ Roof constructions that have thermal mass over the roof membrane with at least 25 Ib/ft2 are exempt from the Cool Roof criteria. NOTE: If any one of the alternatives or exception is checked the Aged Solar Reflectance and r• `•�-•-•'•� •• • J • •tee•/ •+• • •.+� op+Y�wauec. ✓U live fill ICU/C UCIUW. requirements for r= . CRRC Product ID.Number --- • • • • Roof Slope S 2:12 > 2:12 Product Weight < 5lb/ft2 >- 51b/ft2 Product Type 2 Aged Solar Reflectance3'4 Thermal Emittance SR15 -'Do1'1 ❑ ❑ ❑ ❑4 Date: �G /J Address: �c... ��.. License: Z 3 T- 7 1-7 City/State/Zip: .c & S /in J /�-- 2ZG L ❑ ❑ ❑ ❑ ❑4 Note: if no CRRC-1 label is available, this compliance method cannot be used, use the Performance Approach to show compliance, 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www coolroofs org/nroducts/search oho 2. Indicate the type of product isbeing used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p;,,w - 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance. 4. Check box if the Aged Reflectance is a cak:ulated value using the equation above. 1 5. Calculate the SRI value by using the SRI- Worksheet at httDYAvww.enerovca.aov/title24/ and enter the resulting value in the SRI Column above and attach acopy of the SRI- Worksheet to the CF -1 R. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other 11— „ , cyvn tv, ll IC. llwkdmny k;unuactur snap comprere ana suDm/r the cF-6R-ENV-01 for final inspection. Declaration Statement • I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is accurate and complete. • 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Parts 1 and 6 of the California Code of Regulations. Name: ake Signature: (/l/• Company: 4 u r � � Date: �G /J Address: �c... ��.. License: Z 3 T- 7 1-7 City/State/Zip: .c & S /in J /�-- 2ZG L Phone: J -F71 rur assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300. j04/22/H13 14:49 7603208912 WESTERN PACIFIC ROOF PAGE 02/09' WEST ERN PACIFIC ;Roofing Corporation ✓ + Lic:#235717 April. 22,�64 � 9 Don Stone ' 51360 Ave. Valejo La Quinta, CA 92253 Cubjpc±: 51360 Avenida Valejo, La Quinta, CA 92253' Installatiion,of 30 year shingle roof system. Dear Mr: Stone: ' T Thank you for the opportunity to submit a proposal for the re -roofing, at the above, referenced property. We are pleased to submit our proposal for the work as described below. The scope of work and associated costs areas follows: GENERAL` This proposal and contract is made between .Western Pacific -Roofing Corp. (Contractor) and the... person (s) or entity -named `above (Owner). Unless. expressly stated tCthc contrary, the contractor shall be responsible for performing the following: -, DESCRIPTION A. The general conditions of this standard construction contract -shall forma part of these rce and effort as though repeated herein. - specifications with the same fo, B. The Contractor shall furnish .all labor, materials, equipment, permits, contractor's licenses and insurance certifications to perform all operations required as specified. The contractor shall. provide labor and material customarily included in work of the same nature to give a Quality, complete job. C. If any unforeseen or unexpected -conditions are encountered during the,,work, and the conditions adversely affect, the cost or•progress of the work, the contractor.. will notify the owner immediately, and the owner will. negotiate a written: change -order to resolve the unexpaeted`condition be it .for an increase or decrease to the contract amount:.. D. The Contractor shall occupy, use; and permit others to use the premises only for the purpose of completing the work to be performed under this contract with the Owner. Contractor is.to be given allI reasonable set-up and *staging areas. Due to the limited access, some driveNAays or parking areas may be blocked during this construction process. 3462 La Cai-npana Way • Palm Springs, CA 92262 • (760) 416-5877 • Fax (76 0) 320-891.2 Aww.Wesfpa.craof.coni • E -trail: -,vprcps@westpacroof.co.m - x;04/22/,2013 14:49 760320H12 WESTERN PACIFIC ROOF PAGE 03/0911, Don Stone April'2, 2013 Page 2 E. Contractor's scope of, work shall not include the identification, detection, abatement, encapsulation or removal'.of asbestos or'similar hazardous su4stancc§' including mold, 7 mildew and infestation of rodents. If Contractor encounters.any such. products; materials:or conditions in: the. course of performing . its work, or if such hazardous materials 'are 4 crico::.ntered'eby any other firm-peri:orrning work at the jobsite.and contractor determines that such materials ' present a hazard to . its employees, contractor shall have the right to discontinue its work and remove its employees from. the jobsite' until .such. ,products or matcxials,,_and any .bazards connected therewith, are located,and'abated, encapsulated -or ' • removed, of it is determined that no hazard exists ( as the case may .require),asid contractor shall. receive an extension of time to complete its work hereunder and compensation. for delays 'encountered as a result of such situati.on� and correction. Due to the -possibility of mold, mildew and rodents being present before, during or after our work; Contractor?s scope of work shall not include the identification, detection or the removal of mold, mildew and rodents. Owner agrees to hold Contractor harmless, and shall `i.ndemnify Contractor harmless for any mold or rodent related claims in the future. F,. if a dispute shall` arise between Contractor and Owner with. respect to" any matters or questions arising out of or relating to this contract or the breach thereof, such dispute shall. be decided by arbitration administered by and in accordance with the Construction Industry`A.rbitration liules of the American Arbitration Association.. or .through such arbitration procedures as the .''parties may . agree. This contract shall. be specifically enforceable. under. the prevailing arbitration law. The award rendered by -..the arbitrators shall be final, and judgment may be entered upon it., in any Court having 'jurisdiction thereof.. >w G. Should suit be brought to enforce or. interpret any part of this Agreement, the "prevailing party" shall be entitled to recover, • as an element . of costs of suit and. not as damages, reasonable attorneys' fees to be fixed by the Court. The "prevailing party" shall be,entided to recover its.costs of suit, regardless of whether such: suit proceeds to final judgment. ,. SURFACE PREPARA'T'ION i A. Remove. existing roof systems down to the' substrate. /any material so finely affixed that r repeated attdmpts to remove itcoulddamage the substrate will be left in place. B. Install new.periinefer edge metal. (Unpainted) •'C. Damaged plywood will be replaced at a rate of $35.00 per sheet or portion thereof and billed separately as a change -order. INSTALLATION OF A.'30-Y.EAR SHINGLE ROOF SYSTEM 'A. Install one layer of #30 felt mechanically fastened B. install 30 -year shingles.(Color to be White) C. install new flashings at penetrations , D..InstaR Crown -ridge. E. Paint jacks to match shingles. w F. Install polyurethane foam and coating systema on rear flat deck. ~ .• ;04/22/2013 ,14:49 7603208912 WESTERN PACIFIC ROOF -PAGE 04/09 Aon Stone ' April 22, 2013 Page 3 _ CONTRACT .AMOUNT: 57,755.00 (Seven Thousand Seven Hundred_Fifty Five Dollars) NOTE #1: This proposal is .for the! installation of White shingles. If a different color is desired., there will be an additional cost for Tittle 24 compliant shingles. EXCLUSIONS: No iteins will be supplied nor work performed that is not specifically stated herein. PAYMENTTERMS. A "Ten Percent (10%) deposit upon approval of the contract. Twice - monthly payments tinti.l completion of contract. Invoices to be paid with 10 days of receipt. No retei.-2,uon to be held. Any remaining balance due following completion to be paid within 15 days of receipt of the invoice. WARRANTi Y A Five (5) year labor and material warranty will be issued by Western Pacific Roofing upon, completion of the roof and. final payment: is received. Contractor's work will be warranted by Contractor in accordance witb its standard warranty, which is made a part of this'proposal and contract and incorporated by reference. ,A, copy of the Contractor's standard warranty is'attache& or, if not, will be furnished upon request: Contractor SHALL NOT BE LIABLE pOR SPECIAL,' INCIDENTAL OR•CONSEQUENTIAL DAMAGES. The acceptance of this proposal by the Customer signifies his. agreement that this warranty shall he and is the exclusive remedy against" Contractor for all defects in worknanship furnished by Contractor. f; The price quoted has'been structured to reflect standards we assume are mutually desired: quality installation, service reliability .and long-term'performance. The price may be subject to change 15 days fiord .the date of this proposal. NOTICE TO OWNER Contractors are required by law to be licensed and regulated by the Contractor's State License Board. Any questions concerning a contract may be referred to the,Registrar, Contractor's State License Board, P.O.. Box 26000, Sacramento, CA 95826 or call 1-800-321-CSLB or. CSLB.CA.GOVfor more information. LAW RFQUTRES ANYONE WHO CONTRACTS TO DO CONSTRUCTION WORD TO BE L'10ENSFD.BY THE CONTRACTORS STATE LICENSE BOARD IN THE .LICENSE CATEGORY IN WHICH THE CONTRACTOR IS COIN(; TO -BE WORKING IF TkTE TOTAL PRICE OF THE JOB IS $500 OR. MORE (INCLUDING LABOR AND MATERL4,LS). ._04/22/2013 14:49- 7603208912 WESTERN PACIFIC ROOF PAGE 05/09 Don Stone. April 22, 201.3 Page 4. r "LICENSED CONTRACTO.RS'ARE REGULATED BY LAWS DESIGNED TO PROTECT THE pUBLiC. iF YOU CONTRACT WITH SO.MEONEJ WHO DOES NOT HAVE A LiCENSE, THE CONTRACTORS STATE i ICENSF, BOARD MAY BE UNABLE TO ASSIST YOU WiTH A COMPLAINT. YOUR ONLY REMEDY AGAINST AN UNLICENSED CONTRACTOR MAY -BE IN CIVIL COURT, AND, YOU MAY BE LIABLE FOR DAMAGES .ARISING OUT OF AN,Y INJURIES TO •THE CONTRACTOR. OR HIS OR HER EMPLOYEES. "YOU MAY CONTACT THE CONTRACTORS STA'T'E LICENSE BOARD TO FIND , OUT IF THIS CONTRACTOR HAS'A . VALID LICENSE. THE BOARD RAS -COMPLETE INFORMATION ON THE HISTORY OF LICENSED CONTRACTORS, • INCLUDING. ANY POSSIBLE SUSPENSIONS, REVOCATIONS, JUDGMENTS, AND CITATIONS. THE BOARD HAS OF'F'ICES THROUGHOUT_ CALIFORNIA. PLEASE CHECK THE GOVERNMENT PAGES OF THE WHITE PAGES .FOR THE OFFICE' NEAREST ` YOU: OR CALL, 1-500-321-CSLB OR ..WWW.CSLB.CA.G0V FOR MORE INFORMATION". ACKNOWLEDGMENT: Owner acknowledges. that he/shehas read and received a .legible. copy of this agrcement including all terms and standard provisions before any work is performed and. that he/she has .read•and received a legible copy of every other document that owner has signed during this negotiation. Uwe hereby acknowledge under, the penalty of perjury that TAve am/are the legal :i owners and am/are authorized to sign this contract as an agent of the legal owner. "� ACCEPTANCE: The above prices, specifications and conditions are satisfactory and are hereby y accepted-You'are authorized to.do the work as specified. Payment will be as outlined above. You, the buyer may cancel this transaction at any time prior to midnight of the third business day after the dair ot this transaction. See the attached Notice of Cancellation; for an explanation of this right. Owner has the right to require contractor to have a performance and payment bond at Owner's expense. 4 See other attached documents. DON STONE WESTERN'PACIFIC ROOFING, CORP. • Contractors License # 235717 weer or Owner's Agent Ronald R. Winkle ,_A,pril 22, 2013 Date nate WESTERN PACWIC ROOFING HAS THE RIGITT TO RESCIND THIS CONTRACT WITHIN FIFTEEN DAYS OF ACCEPTANCE. THIS AUREEMEN T IS NOT BINDING UNTIL ACCEPTED BY THE OFFICE MANAGEMENT AT 3462 LA CAMPANA WAY, PAi..M SPRINGS, .Cn 92262. NO CHANGES OR Ann1TIONS TO THIS AGREEMENT SHALL BE EFFECTiVE 1W71, APPROVED BY WESTERN PACIFiCR'IANAGEN T. MANAGERS ArCF.PTANCE: DATE / ERPACIFIC WTC r iO4/221/2013 14:,49 7803208912 t WESTERN PACIFIC'ROOF WESTERN PACIFIC ROOFING CORPORATION NOTICE OF RIGHT TO CANCEL PAGE 06/09 Notice of Cancellation Transaction Date:'_,�_ (Date . Contract sign'ed) You may cancel this transaction, without penalty or obligation, within three busi"ess* days from th'e above date. If you cancel, any property traded. in,'a ny payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by.the.§eder of your'ca'ncellation notice, and any security interest arising out of the transaction wild be canceled. If you cancel; you must make available to the seller at your residence, in substantially as'good condition. as when recti -Cd, arty roods delivered toybu under -this contract or sale, or you may, if you Wish, comply with -the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. If you do make goods available to the seller and the seller does not pick themeup witbin 20 days I of the'date of your notice of cancellation, you may return or dispose of the goods without further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so soon, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or, deliver d'signed. and dated copy of thiscaTicellation notice, or any other written notice. or send a telegram to., not later than midnight of the third business day (excluding Sundays and holidays) after the date of this transaction: .If contracted with the Palm Springs Office: If contracted with the Palmdale Office: WesternTacific Roofing Corporation Western Pacific Roofing qorporation .3462 La Campana Way 2229 East Avenue Q - Palm Springs, CA 92262 Palmdale, CA. 93350 Name Address� City, St, Zip I hereby received this -notice I hereby cancel this transaction. X X uyer's si&mature) (Buyer7s Signature) Signature) Date Date In the event of an, emergency the right to cancel may. be waived. %,WESTERN PACIFrC ,04/22/2013 14:49- 7603208912 WESTERN PACIFIC ROOF PAGE 07/09 CALIFORNIA CONTRACTORS STATE LiCENSE BOARD REQUIRED ATTACHMENTS NOTICE TO OWNER nder the California Mechanic's Lien Law, any contractor, subcontractor, laborer, supplier or other person -or entity who helps to prove your property, but is not paid for his or her work or supplies, has a right to place a lien on your home, land or property where • work was performed and to sue you in court to obtain payment, is mean that after a court hearing, your home, land, and property could be sold by a court officer and the proceeds of the sale used to isfy what you owe. This can happen even if you have paid your contractor in full if the contractor's subcontractors, laborers, or )pliers remain unpaid. preserve their rights to file a claim or lien against to file a claim or lien against your property, certain claimants such as )contractors or material suppliers are each required to provide you with a document called a "Preliminary Notice". Contractors and Corers who contract with owners directly do not have to provide such a notice since .you are aware of their existence as an owner. A :liminary notice is not a lien against your property. Its purpose is to notify you of persons or entities that may have a right to file a lien tinst your property if they are not paid. In order to perfect their lien rights, a contractor, subcontractor, supplier, or laborer must file iinst your property. Generally, the maximum .time allowed for filing a mechanics' lien against your property is 90 days after ►stantial completion of your project. TO INSURE EXTRA PROTECTION FOR YOURSELF AND YOUR PROPERTY, YOU MAY WISH. TO TAKE ONE OR MORE OF THE FOLLOWING STEPS: Require that your contractor supply you with a payment and performance bond (not a license bond), which provides that the bonding company will either complete the project or pay damages up to the amount of the bond. This payment and performance bond as well as a copy of the construction contract should be filed with the county recorder for your further protection. The payment -and performance bond will usually cost from I to 5 percent of the contract amount depending on the contractor's bonding ability. If a contractor cannot obtain such bonding, it may indicate his or her financial incapacity. Require that payments be made directly to subcontractors and material suppliers through a joint control. Funding services may be available, for a fee, in your area which will establish voucher or other means of payment to your contractor. Theses services may also .provide you with lien waivers and other forms of protection, Any joint control agreement should include the addendum approved by the registrar. Issue joint checks for payment, made out to both your contractor and subcontractors or material suppliers involved in the project. The joint checks should be made payable to the persons or entities which send preliminary notices to you. Those persons or entities have indicated that they may have lien rights on your property, therefore you need to protect yourself. This will help to insure that all persons due payments are actually paid. Upon making payment oil any completed phase of the project, and before making any further payments, require your contractor to provide you With unconditional "Waiver and'Release" forms signed by each material supplier, subcontractor, and laborer involved in that portion of the work for which payment was made. The statutory lien releases are set forth in exact language in Section 3262 of the Civil Code, Most stationery stores will sell the "Waiver and Release" forms if your contractor does not have them. The material suppliers, subcontractors, and laborers that you obtain releases from are those persons or entities who have filed preliminary notices with you. if you are not certain of the material suppliers, subcontractors, and laborers working on your project, you may obtain a list from your contractor. On projects involving improvements to.a single-family residence or a duplex owned by individuals, the persons signing these releases lose the right to file a mechanics' lieu against your property. in other types of construction, t1lis..protection .may still be important. but may not be as complete. To protect yourself under this option, you must be certain that all material sgppliers, subcontractors, and laborers have signed the "Waiver and Release" form. if a mechanics' lien has been riled against your property, it can only be voluntarily released by a recorded "Release of Mechanics' Lien" signed by the persons or entity that filed the mechanics' lien against your property unless the lawsuit to enforce the lien was not timely filed. You should consult an attorney if a lien is filed against -your property. " /y�y� WESTERN PACIFIC �f P . N✓alnt <'nq�nrvrtlnn 04/22/2013 14:49•. 7603208912 WESTERN. PACIFIC ROOF PAGE, 08/09 WHAT YOU-SHOULD KNOW ABOUT, YOUR Rr-ROOFING PROJECT -1. The approximate start date is: The time to conlpleteyouur project is'approximately- . l' ''week (s).This Schedule may change due to inclement .weather, prior commitments an,d,unforeseen .events. Should the schedule _ date change to an earlier, or later date, we will contact youfor approval. c ?. We will not be responsible for any damage occurring prior'tothe installation of your new hoof system. By acknowledging the . approximate start date you understand ,here may be rain and inclement weather prior. to Western Pacific Roofing starting your; project. If inclement weather occurs we-suggest you make arrangements for temporary repairs asnecessaryto prevent any damage. You agree Western, l 6fic Roofing will not be held responsible for any damage that occurs prior to-the installation of you new roof system. I Open: beari� ceilings. If your project has open beam ceilings; dust; dirt and debris will likely come .through.to the interior of your residen.c'e, during re= roofing. There are no .precautions to fake on the exterior, of the building to prevent.thi.s from. 'happening. It is, your, responsibility to cover you interior with plastic sh.eetillg or, cover cloths to prevent damage Atlover-hangs or open and exposed soffits, where your existing wood' is ''/z" or less plywood, shi.plap or tongue & .groove sheathing, .m...aterial fasteners_ wilt-'most likely. protrude (blow-out) through to the underside and could "cause splintering of., = the 'boards. Building codes and material manufacturer's require a minimum of 3/a" penetration into or.through'the sheathing to-prevent normal wind .blow-off. If this is the case w.i.th your exterior roof overhangs, -any .resulting damage will . be' j unavoidable and many, repair is your responsibility. 'We must adhere to;. these requirements to insure proper,'material installation anal long-term `performance o'f your new roof system.. 4. �Re-roofing operations are at-times noisy and cause some unavoidable vibrations.. You 'may want' to check-.around your home to make sure any of your valuables that may possibly be dislodged from. walls, shelves or ceilings ,are ' removed during this roofing process. " ,04122/2013 14:49 7603208912 WESTERN PACIFIC ROOF PAGE 09/09 WFIA.T YOU SHOULD KNOW ABOUT YOUR RE -ROOFING PROJECT, continued. 6. i, ;Skylights: Most existing skylights require 'temporary. removal during the re -- roofing process. Care will be' taken while'removing the skylights, however, damage, . may occur to the` interior finish depending on the original installation. No repair to the interior will be made—Any repair work required is the owner's responsibility. Debris will fall through.the op6ings when the skylights are removed. We suggest covering the area beneath the skylights with plastic sheeting or cover cloths, New taller curbs may be necessary: Bare wood may visible from inside the unit. 7: The proposal and, contract are basedupon the roof condition and roof top. •, components on the date of the originalroof inspection an.d"p.r.oposal date. 8. Please contact Ron. Winkle at Western Pacific Roofing prior to signing your, ~ contract. I will give you an approximate start date. If this is agreeable, please add the start date to the -line on. page 1, sign, and then fax' or mail. this notice back to Western Pacific Roofing with the approved contract. ; Please keep one copy for your records.' Thank you: , S i4Katqre PnntName /3 Title Date Address: 51.360 Avenida Valejo� City: La Quinta, CA Zip:_92253 WESTERN VACTFIC it [ . cemn. r.rror;n 2nd copy-Departiment/to'be sent'to -City, Mgr.. with disposition:, ',4th ,copy -Reporting Party SERVICE REQUEST_ h. T0: 'ROUTINE: FROM: Q'u..f cur URGENT:. ' DATE: (CJ —' 170::RB4UFSTED FOLIAW-UP COMMUNITY DEVELOPMti3JT.<- . BUILDING. . Construction during prohibited'hours". . Construction of w/o a .pe tdt Excess debris on construction site,. cess `blowing sand Dilapidated or a structure Fire damaged:s c ENGINEEkING/STRmS Missing or damaged street sign Malfunctioning traffic signal Malfunctioning street light Pothole or other street repair, Debris on the roadway Faded striping or other traffic markings Obstruction to sight -distance along roadway Drainage problem Unsafe traffic ,condition . PLANNING Establishment. of illegal use Establishment of illegal sign . COMMUNITY SAFETY ; ANIMAL CONTROL- hoose dogs). Barking dog (s) Trapped or contained animals) Dead animal(s) Animal bite CODE ENFORCEMENT : Trash problem Debris on lot :.. Weeds on lot . Abandoned/,junk vehicles) Mechanical work on cars in residential area,::' Lack of business license:` .SAFETY . Fire hazard Need for .sheriff „ LAL Location of problem: 0 O d US• G l S 1 R 1 N B o4 ( .A P_ lAJ LA. I & E& 4L Ad A3 6.e E A% ;:tA j0p d% �� .. fA/� / G• Descr pti/o�n (if necessary)•: _ANb• T T . -d , i., i, a � E 61 u e t I- (r -C, •�-,. iii X0.1`vi;, ,t I. �E C, ti& ej 6wEorrr LINTt C At6101,1 ���04�i2f. Disposition of problem: Staff Signature: Date: ; 1st dopy-Depu-tment 3rd copy-�City Manager ` 2nd copy-Departiment/to'be sent'to -City, Mgr.. with disposition:, ',4th ,copy -Reporting Party