Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
06-1785 (RER) Title 24
TITLE 24 REPORT Title 24 Report for:. SANDRA YOUNG'S RESIDEN 78-815 VIA CARMEL (CA Sl ) CITY OF -LA OUIiV1' LA QUINTA; CA BUILDING & SAF q 'DEPT' I i APPROVED ��® FOR CONST J ' R CTION 3 DA . El Project Designer: ' . rt GLS GROUP 74-854 •VELIE WAY STE. #8 `5 PALM DESERT, CA 92260 • .(760) 340-3528 ' y Report Prepared By: Adriana -Gil 74-854 Velie Way Ste. #8 e Palm Desert; CA 92260 { (760) 404-7917 f h ' • • - [ Job Number: t" ADY432-0406` . 3 Date: MAY 0 2 2006 4/20/2006 ' t 7 The EnergyPro computes program has been used to perform the calculations sumrnarized in this compliance report. This program has'approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.1 by EnergySoft Job Number: ADY432-0406 User Number: 5553 i TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form CF -1 R Certificate of Compliance 3 Form MF -1 R Mandatory Measures Summary 7 HVAC System Heating and Cooling Loads Summary 19 ' r Y. Certificate Of Compliance : Residential (Part 1 of 4) ; CFI R _SANDRA-YQUNG_S-R- ESIDFNCE 4120/2046 Project Title - Date 18-815_\4A CARMEL_(CAS1_T�-LA_QULf�LTA r ' Project Address Adhana- i.l (760) 404-7917 Documentation Author ,- _ «{ -Telephone _Eneer_�q�rL'to y, . "' 15 C I M th d Building Permit # ,l Plan Check/Date Field Check/Date . J ` t omp i ce e o ; Climate Zone ❑New ❑Neper ❑New HNew 1:1 ' D1 -A8 - -a WHO I F HOSE TDV Energy Use Standard Proposed Compliance; _09_A6 WHIOLE-HOUSE New____' _0.9=A6 1NROLEliOU.SE r' New ' _0.9 A6 \UR0LE_HOIIES (kBtu/sf-yrj Design Design Margin , ❑ Space Heating " 2.05 1, 90 0.15 Space Cooling . 71.40 67.53 , ' . 3.87 ' • Fans ' • 10.78 11-36' . -497 'Domestic Hot Water 17.80 17:00. 0.80 ' Pumps 0.00 0.00 0.00 i Totals 102.03 98.19 3.84 ❑ r Percent better than Standard: '3.8% .. ., • v� ❑ BUILDING COMPLIES -'HERS VERIFICATION RE UIRED 1 • 1 i . ! Building Type: J Single Family` . ❑ Addition y Total Conditioned Floor Area: 1,017 ft 2 • I] Multi Family ❑Existing + Add/Alt Existing Floor Area: ' ' : n/a ft2 . Building Front Orientation:.• (S)180 deg ' Raised Floor Area: k ;0 ft2 Fuel Type:: ' A Natural Gas Slab on Grade Area: + 1,017 ft2 Fenestration: Average Ceiling Height: 10.0 ft Area: 330 ft2 .,;Avg. U: 0.34 Number of Dwelling, Units: 1.00 Ratio: 32.4%._1 , Avg. SHGC: : 0.28 Number of Stories: = BUILDING ZONE INFORMATION'F { # of Thermostat "Vent Zone Name Floor Area Volume', Units Zone Type Type Hgt. Area _LialAC_SpULSystem 1 n17 t0_M X00_ Conditioned'- -Setback_ Condition , OPAQUE SURFACES . • Insulation Act.. .,, ,Gains Type, Frame R Area U -Fac. Cav: Cont. Azm. • Tilt.' Y / N . Status JA IV Reference Location / Comments _Roof_ Wood- _�1 017 --0-02-6- _R_38_ -R=0_0_ _0_-18 `� 1Na� Wood_ 25_5"-0_069-•Rt21_-R_0_Q_t8.0 9.0 Door_ None_ ' 24_ _0.5.00 -None_ _R=0.0_ _t8.0 -9.0I _ 1175_- -0_0.69_ _Re21_ _R=0_0_ _27.0_ 9.0 _Wall_ V.Vood---1-75---O-069--R--2J--R--O-O---270--90 Wall_ Wood -41.6 _0_Q62 _R21 __R=0.0• ' 0-9.0-1x- _Wall- Vitood_ ' 302 _0.0.6.0 -R-21 x=00_' 90 9.0 .Wall- Wood_ 3.0_ -0_069_ -R:21 X0_0 _225_-9b � X (Xblew XI ❑New ❑Neper ❑New HNew 1:1 ' D1 -A8 - -a WHO I F HOSE D9 -A6' ' YV1i01EJj.OU�E - • 28A4 WHQLE_H01lSE • r ' _0.9=A6 WIiOLEJiOL-S.E _09_A6 WHIOLE-HOUSE New____' _0.9=A6 1NROLEliOU.SE r' New ' _0.9 A6 \UR0LE_HOIIES ❑ ❑ ❑ ❑ r .. ., • v� ❑ ❑ • 1 i . ! ❑ ❑ K r' EnergyPro 4.1 by Energy Run Initiation Time: 04 User Number: 5553 ' 20106 10:17:35 a Run C6de:.1145553 " Job Number:'ADY432-0406 Page:3 of 9 l: Certificate Of Compliance: Residential (Part 2 of 4) CF -1 R SANDRA YOUNG'S RESIDENCE 4/20/2006 Project Title Date FENESTRATION SURFACES True Cond. Location/ # Type Area U -Factor' SHGCz Azm. Tilt Stat. Glazing Type Comments 1_-N_indow_Ront-(S)_ 2 Window Front (S) 64.0_ -0-340-NERC _D28 NERC X80_ 69.3 0.340 NFRC 0_28 NFRC 180 _90_ Neer BE=R_.ILLVAnyL1ow E . 90 New BETTER BILT Vinyl low E -w-ROLE-HOUSE WHOLE HOUSE 3 Window Front (S) 45.3 0.340 NFRC 0_28 NFRC 180 90 New BETTER BILT Vinyl low E WHOLE HOUSE 4 Window Left � 45.3 0.340 NFRC 0_28 NFRC 270 90 New BETTER BILT Vinyl low E WHOLE HOUSE 5 Window Left W 45.3 0.340 NFRC 0_28 NFRC 270 90 New BETTER BILT Vinyl low E WHOLE HOUSE. 6 Window Rear (N)_ 2.2 0.340 NFRC 0_28 NFRC 0 90 New BETTER BILT Vinyl low E WHOLE HOUSE 7 Window Rear (N9 2.2 0.340 NFRC 0.28 NFRC 0_ 90 New BETTER BILT Vinyl low E WHOLE HOUSE 8 Window Rear (N) 2.2 0.340 NFRC 0.28 NFRC 0 90 New BETTER BILT Vinyl low E WHOLE HOUSE 9 Window Rear (N)_ 10.0 0.340 NFRC 0_28 NFRC_ 0 90 New BETTER BILT Vinyl low E WHOLE HOUSE 10 Window Rear (N) 10.0 0.340 NFRC 0.28 NFRC 0 90 New BETTER BILT Vinyl low E WHOLE HOUSE 11 12 Window Window Rear Front (N) (SW) 13.5 20.0 0.340 NFRC 0_28 NFRC 0.340 NFRC 0_28 NFRC 0 225 90 New 90 New BETTER BILT Vinyl low E BETTER BILT Vinyl low E WHOLE HOUSE WHOLE HOUSE 1. Indicate source either from NFRC or Table 116A. 2. Indicate source either from NFRC or Table 1168. INTERIOR AND EXTERIOR SHADING Window # Exterior Shade Type SHGC Hgt. Wd. Overhang Len. Hgt. LEA. REA Left Fin Right Fin Dist. Len. Hgt. Dist. Len. Hgt. 1 Bug Screen 0.76 8.0 8.0 2.0 0.1 2.0 2.0 2 Bug Screen 0.76 8.0 8.7 2.0 0.1 2.0 2.0 3 Bug Screen 0.76 8.0 5.7 2.0 0.1 2.0 2.0 4 Bug Screen 0.76 _8_0 5.7 _2_Q -0-1 2Q 20 5 Bug Screen 0.76 8.0 5.7 2.0 0.1 2.0 2.0 _ 6 Bug Screen 0.76 1.5 1.5 2.0 0.1 2.Q 2.0. 7 Bug Screen 0.76 1.5 1.5 2.0 0.1 2.0 2.0 8 Bug Screen 0.76 1.5 1.5 2.0 0.1 2.0 2.0 9 Bug Screen 0.76 5.0 2.0 2.0 0.1 2.0 2.0 _ 10 Bug Screen 0.76 5.0 2.0 2.0 0.1 2.0 2.0 _ 11 Bug Screen 0.76 4.5 3.0 2.0 0.1 2.0 2.0 12 Bug Screen 0.76 5.0 4.0 _'2. 0 0.1 2.0 2.0 THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Condition Location/ Type (sf) (in.) Cap. Cond. R -Val. JA IV Reference Status Comments PERIMETER LOSSES Insulation Condition Location/ Type Length R -Val. Location JA IV Reference Status Comments Slab Perimeter 153 None No Insulation 26-A1 New WHOLE HOUSE Run Initiation Time: 04/20/0610:17:35 Run Code: 1145553455 EnergyPro 4.1 by EnergySoft User Number. 5553 Job Number ADY432-0406 Page:4 of 9 COMPLIANCE STATEMENT., ; This certificate of compliance lists the building features and specifications Aeeded to comply with Title 24, Parts 1 and 6 of the California Code of ' Regulations, and the administrative regulations to implement thern.This certificate has been signed by the individual with overall design responsibility. The u ned recognizes that compliance using duct design, duct sealing, verification of refrigerant charge and TXVs, insulation installation quality, + a�ildinenvelope sealing require installer testing and certification and field verification by an approved HERS rater. eO ner (per Business & Profe {ons ode a ; ' �p��'. ) Documentation Author c Name: _ _ ` `=jE� 1 +� Name: ` Title/Firm: GLS GROUP , t Title/Firm: Adriana Gil Address: '-74-854 VELIE WAY STE. #8 '' Address: . 74-854 Velie Way Ste. #8 ~ PALM DESERT, CA 92260 Palm Desert, CA 92260 w Telephone: 760 340-3528 Telephon (76M:404 -7911T UILULIC. #: �% r (signature (date) (signature) (date), Enforcement kgency -. Name: Title/Firm: 71t Address: Telephone:r �f , : (signature/stamp) (date) Ruin Iniflitti, 16 10059*46 -Run Code* 1145555986 EnergyPro 4.1 by EnergySoft User Number: 5553 Job Number: ADY432-0406 Pace:5 of 9 Certificate Of Compliance. ResidentiaUl;, (Part 3 of 4) °' CF -1R • ; SANDRA YOUNG'S RESIDENCE : ` 4/20/2006 Project Title } ` Date HVAC SYSTEMS,., ` Heating r Minimum Cooling Minimum Condition 11 Thermostat'. ' Location Type Eff - - Type Eff Status '' Type •, -; HVAC Split System Central Furnace 80% AFUE Split Air Conditioner 13.0 SEER' New Setback HVAC DISTRIBUTION f Duct . Duct Condition Ducts Location Heating,' .. ^t Cooling Location R -Value Status ' Tested? HVAC Split System Ducted " Ducted Attic 6.0... New . Noa , Hydronic Piping pe Pipe Pi -' Insul. System Name Length Diameter Thick. ` ' 4 K WATER HEATING'SYSTEMS « Ratedl- Tank _ - Energy Standbyl Tank Insul.' - Water Heater # in 'Input-' Cap. Condition', factor Loss R -Value System Name Type Distribution, ti Syst. (Btu/hr) •(gal) :Status ,or RE 1 (%) Ext. Standard gas 40 gal. Small Gas No Pipe Insulation 1 43,000 40 New 0.60 _ n/a +' n/a Multi -Family Central Water Heating Details '` t Hot Water Pump +' Hot Water Piping Length (�_ Add 1/2" Control # . HP Type In Plenum Outside Buried Insulation , " 1 For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. ; - For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. ' + For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. ' REMARKS - ! " COMPLIANCE STATEMENT., ; This certificate of compliance lists the building features and specifications Aeeded to comply with Title 24, Parts 1 and 6 of the California Code of ' Regulations, and the administrative regulations to implement thern.This certificate has been signed by the individual with overall design responsibility. The u ned recognizes that compliance using duct design, duct sealing, verification of refrigerant charge and TXVs, insulation installation quality, + a�ildinenvelope sealing require installer testing and certification and field verification by an approved HERS rater. eO ner (per Business & Profe {ons ode a ; ' �p��'. ) Documentation Author c Name: _ _ ` `=jE� 1 +� Name: ` Title/Firm: GLS GROUP , t Title/Firm: Adriana Gil Address: '-74-854 VELIE WAY STE. #8 '' Address: . 74-854 Velie Way Ste. #8 ~ PALM DESERT, CA 92260 Palm Desert, CA 92260 w Telephone: 760 340-3528 Telephon (76M:404 -7911T UILULIC. #: �% r (signature (date) (signature) (date), Enforcement kgency -. Name: Title/Firm: 71t Address: Telephone:r �f , : (signature/stamp) (date) Ruin Iniflitti, 16 10059*46 -Run Code* 1145555986 EnergyPro 4.1 by EnergySoft User Number: 5553 Job Number: ADY432-0406 Pace:5 of 9 Certificate Of Compliance : Residential (Part 4 of 4) CF -1 R SANDRA YOUNG'S RESIDENCE 4/20/2006 Project Title Date Special Features and Modeling Assumptions The local enforcement agency should pay special attention to the items specified in this checklist These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the ouvyua�y Wu1C spe%Oal Jusuutaudn anu uucumeniacwn suomnied. Plan Field The Roof "R-38 Roof (R.38.2x14.24)" includes credit for a Radiant Barrier installed per Section 3.3.3 of the Residential Manual. HERS Required Verification " Items in this section require field testing and/or verification by a certified home energy rater under the supervision of a CEC- eA uetae .. :a moo. . r=r _� . -rrrto anu. WF EF. CauwR o1e4"nmrt vus au muss ue reported on the CF -4K installation certificate. Plan Field The HVAC System "HVAC Split System " incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve. The Cooling System "YORK H4DH0301P3HUA053 U&H" includes credit for a 11.5 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. EnergyPro 4.1 by EnergySoft User Number. 5553 Job Number: ADY432-0406 Pane:6 of 9 Mandatory Measures Summary: Residential (Page 1 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent • compliance requirements from the Certificate of Compliance supercede the items marked with an asterisk (') below. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when completed or check NIA if not ENFORCE - DESCRIPTION. applicable. NIA DESIGNER MENT Building Envelope Measures R § 150(a): Minimum R-19 in wood ceiling insulation or equivalent U -factor in metal frame'ceiling. § 150(b): Loose fill insulation manufacturers labeled R -Value: § 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls). ` § 150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor. § 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: a. cosable metal or glass door covering the entire opening of the firebox b. outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed. § 150(t): Air retarding wrap installed to comply witt§ 151 meets requirements specified in the ACM Residential Manual. § 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. § 150(1): Slab edge insulation - water absorption rate for the insulation alone without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 permAnch. ' § 118: Insulation specified or installed meets insulation installation quality standards. Indicate type and include CF -6R Form: § 116-17: Fenestration Products, Exterior Doors, and Infiltration/Exfiltration Controls. 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. 2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. Space Conditioning, Water Heating and Plumbing System Measures ❑ 0 ❑' ❑ a ❑ ❑ Ex] ❑ © ❑ ❑ ❑ a ❑ ❑ a ❑ El ❑ ❑ a ❑ ❑ a ❑ ❑ ,.. ❑ ❑ N ❑ ❑ a ❑ ❑ R ❑ ❑ R ❑ § 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission. ❑ ❑X ❑ § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA. ❑ ❑X ❑ § 150(i): Setback thermostat on all applicable heating and/or cooling systems. ❑ ❑X ❑ § 1500): Water system pipe and tank insulation and cooling systems line insulation. 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with ❑ ❑X ❑ insulation having an installed thermal resistance of R-12 or greater. 2. Back-up tanks for solar systems, unfired storage tanks, or other indirect hot water tanks have R-12 external © ❑ ❑ insulation or R-16 internal insulation and indicated on the exterior of the tank showing the R -value. 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes cosest to water heater tank, non -recirculating systems, and entire ® ❑ ❑ length of recirculating sections of hot water pipes shall be insulated to Table 1508. 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source © ❑ ❑ and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. 4. Steam hydronic heating systems or hot water systems > 15 psi, meet requirements of Table 123-A. ® ❑ ❑ - 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment ❑ ❑X ❑ maintenance, and wind. r 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed ® E] EJ entirety in conditioned space. 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation. ❑X ❑ ❑ EnergyPro 4.1 by EnergySoft User Number: 5553 Job Number: ADY432-0406 Page:7 of 9 Mandatory Measures Summary: Residential (Page 2 of.2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contairi these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supercede the items marked with an asterisk (') below. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. Instructions: Check or initial applicable boxes when completed or check NIA if not DESCRIPTION ENFORCE - applicable. NIA DESIGNER MENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) 'r ' § 150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, ❑ Q ❑ 605, and Standard 6-5; supply -air and retumair ducts and plenums are insulated to a minumum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 114 inch, the combination of mastic and either mesh or tape shall be used. ' 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than ❑ X❑ ❑ .sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. 3. Joints and seams of dud systems and their components shall not be sealed with cloth back rubber adhesive ❑ X❑ ❑ dud tapes unless such tape is used in combination with mastic and draw bands. 4. Exhaust fan systems have back draft or automatic dampers. ❑ ® •' ❑ 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operating ❑ © ❑ dampers. 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment ❑ X❑ ❑ maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water a retardant and provides shielding from solar radiation that can cause degradation of the material. q 7. Flexible duds cannot have porous inner cores. ❑ © ❑ § 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the © ❑ ❑ heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36" of pipe between'filter and heater for future solar heating. I�1 Q ❑ ❑ b. Cover for outdoor pools or outdoor spas. © ❑ ❑ 3. Pool system has directional inlets and a circulation pump time switch. X❑ ❑ ❑ § 115: Gas fired fan -type central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously ❑ FAI ❑ burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btufhr) § 118 (i): Cool Roof material meets specified criteria ❑X ❑ ❑ Lighting Measures § 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table ❑ . ® ❑ 150-C, and do not contain a medium screw base socket (E241E26). Ballasts for lamps 13 Watts or greater are electric and have an output frequency no less than 20 kHz. § 150(k)1: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, ❑ Q , ❑ luminaire has factory installed HID ballast. § 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50% of the Wattage, as determined * ❑ X❑ ❑ in Section 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, - provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires. § 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires. ❑ Q ❑ OR are controlled by an occupant sensor(s) certfied to comply with Section 119(d). § 150(k)4: Permanently installed luminaires located other than in kichens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft) OR are controlled by a dimmer switch OR are ❑ X❑ 11controlled by an occupant sensor that complies with Section 1`19(d) that does not tum on automatically or have an always on option. § 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are ❑ X❑ ❑ certified to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals. i § 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the ❑ ❑X ❑ same lot shall be high efficacy luminaires (not including lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d). § 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sections 130, 132, and 147. In� I tN ❑' ❑ Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Section 130, 131, and 146. § 150(k)8: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or more ' ® ❑ . ❑ dwelling units shall be high efficacy luminaires OR are controlled by occupant sensor(s) certified to comply with Section 119(d). EnergyPro4.1 by EnergySoft User Number: 5553 Job Number: ADY432-0406 Page:8 of 9 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY :1 PROJECT NAME SANDRA YOUNG'S RESIDENCE SYSTEM NAME HVAC Sdit Svstem Number of Systems 1 Heating System Output per System 53,000 Total Output (Stuh) 53,000 Output (Btuh/sgft) 52.1 Cooling System Output per System 30,400 Total Output (Stuh) 30,400 Total Output (Tons) 2.5 Total Output (Stuh/sgft) 29.9 Total Output (sgft/Ton) 401.4 Air System CFM per System 1,000 Airflow (cfm) 1,000 Airflow (cfm/sgft) 0.98 Airflow (cf nrron) 394.7 Outside Air (%) 0.0 Outside Air (cfm/sgft) 0.00 Note: values above given at ARI conditions 26.0 of 67.9 of Outside Air 0 Cfm Supply Fan 1000 Cfm 67.9 of 11.0 / 77.6 of Outside Air 0 Cfm 78.2/65.3 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 4/20/2006 FLOOR AREA 1,017 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,045 16,337 2,146 394 19,113 0 2,353 2,233 0 0 0 0 0 0 0 0 0 2,3531 2,233 21,044 27146 23,579 YORK H4DH030/P3HUA053 U&H 20,343 6,974 53,000 Total Adjusted System Output20,343 6,97a 53,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Aug 2 pm I Jan 12 am 67.9 of 117.7 of Heating Coil s 78.2 / 65.3 of 78.2 / 65.4 of h Return Air Ducts `S 59.1 / 58.1 of Supply Fan Cooling Coil 1000 cfm h Return Air Ducts 4 Supply Air Ducts 115.6 of ROOMS 70.0 of I Supply Air Ducts 61.3 / 58.9 of 54.5% R.H. ROOMS 76.0 / 64.6 of I EnergyPro 4.1 by EnergySoft User Number. 5553 Job Number: ADY432-0406 Page:g of 9 TITLE 24 REPORT Title 24 Report for: SANDRA YOUNG'S RESIDENCE 78-815 VIA CARMEL (STUDIO) LA QUINTA, CA Project Designer: GLS. GROUP 74-854 VELIE WAY STE. #8 PALM DESERT, CA 92260 (760) 340-3528 CITY OF LA QUINTA BUILDING & SAFETY DEPT. Report Prepared B . APPRO E FOR CONSTR CTION Adriana Gil A 1 G� 74-854 Velie Way Ste. -Palm Desert, CA 92260 (760) 404-7917 Job Number: ADY442-0506 CITY OF : , t 'UINTA �. BUILDING Fa�% TY DEFT. JED ORPCON` 6 �,uCTION FOR Ry . DATE _ Date: 5/24/2006 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.1 by EnergySoft Job Number. ADY442-0506 User Number. 5553 1 rl ` � i y � ! .. Certificate Of Compliance: Residential (Part 1 of 3) CF -1 R _SANDRA YQUNG_S_RE.SI.D-E.NC.F WHOLE_HQU.SE 09-A21 5/_2412006 Project Title WF10LE HOUSE .0.9-A2] Date 18-815_V1A CARMEL(S_T_UDJO�-LA Q.IIINTA Project Address Building Permit # Adriana-Gil (760) 404-7917 Documentation Author Telephone Plan Check/Date pli�ny Field Check/Date ePro- d Climate Z5 a TDV Energ Use Standard Proposed Compliance (kBtu/sf-yrr Design Design Margin Space Heating 3.39 2.69 0.69 Space Cooling 70.92 70.41 0.51 Fans 10.70 10.58 0.12 Domestic Hot Water 0.00 0.00 0.00 Pumps 0.00 0.00 0.00_ Totals 85.00 83.68 1.32 Percent better than Standard: 1.6% Building Type: (XJ Single Family ❑ Multi Family Building Front Orientation: Fuel Type: Fenestration: n Addition ❑ Existing + Add/Alt (S)180 deg Natural Gas Area: 64 ft2 Avg. U: 0.34 Ratio: 20.6% Avg. SHGC: 0.28 BUILDING ZONE INFORMATION Zone Name Floor Area Volume OPAQUE SURFACES Insulation Act. Type Frame Area Ll -Fac. Cay. Cont. Azm. Tilt Roof_ Wood- _0.026_ -R--38- _R=OB -0_ x.8 Va11_ Wood_ 98_ -0-07Z R-1.3_ -R-4_5 1.8D_ 90 -Wall_ Wood_ M _0_072 R-1.3_ _Rm4.5- -2Z0_ 90 _Wall_ Wood- X62 -0_072 _R-1.3_ _R-4.5_ _0__9.0 Total Conditioned Floor Area Existing Floor Area: Raised Floor Area: Slab on Grade Area: Average Ceiling Height: Number of Dwelling Units: Number of Stories: # of Thermostat Units Zone Type Type Gains Condition Y / N Status JA IV Reference 310 ft2 n/a ft2 0 ft2 310 ft2 10.0 ft 0.09 Vent Hgt. Area Location / Comments _01-A8 WHOLE_HQU.SE 09-A21 WHOLEJiQU.BE _Q9=A2] WF10LE HOUSE .0.9-A2] MHOLE1i0-USE EnergyPro 4.1 by EnergySoft User Number. 5553 Job Number. ADY442-0506 Paae:3 of 8 Certificate Of Compliance : Residential (Part 2 of 3) CF -1 R SANDRA YOUNG'S RESIDENCE 5/24/2006 Project Title Date FENESTRATION SURFACES True Cond. Location/ # Type Area U -Factor' SHGC2 Azm. Tilt Stat. Glazing Type Comments -I— Wjndow--E[ont—(.S.)_ _6_4_0_ 0 -340 -NERC 0.28 —NERC X82 —90- Ne -w B.E-TERB]LLVjnyJJow E WH_OL1-101 I_SE 1. Indicate source either from NFRC or Table 116A. 2. Indicate source either from NFRC or Table 1168. INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Right Fin # Exterior Shade Type SHGC Hgt. Wd. Len. Hgt. LEA REA Dist. Len. Hgt. Dist. Len. Hgt. 1 Bug Screen 0.76 8.0 8.0 2.0 0.1 2.0 2.0 THERMAL MASS FOR HIGH MASS DESIGN Area Thick. Heat Inside Condition Location/ Type (sf) (in.) Cap. Cond. R -Val. JA IV Reference Status Comments PERIMETER LOSSES Insulation Condition Location/ Type Length 'R -Val. Location JA IV Reference Status Comments Slab Perimeter 52 None No Insulation 26-A1 New WHOLE HOUSE Run Initiation Time: 0512410.6 11:48:16 Run Code: 1148496496 EnergyPro 4.1 by EnergySoft User Number: 5553 Job Number: ADY442-0506 Page•4 of 8 Certificate•Of Compliance : Residential (Part'3 of 3) CF -1 R SANDRA YOUNG'S RESIDENCE 5/24/2006 Project Title Date ' HVAC SYSTEMS Heating_ Minimum. Cooling Minimum " Condition Thermostat Location Type Eff Type, Eff Status Type Multi -Family Central Water Heating Details Hot Water Pump' Hot Water Piping Len t9 h (ft)_ Add 1/2" Control # HP Type In Plenum Outside Buried Insulation t 1 For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. ZEMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts1 and 6 of the California Code of Regulations, and the administrative regulations to implement them.This certificate has been signed by the individual with overall design responsibility. The undersigned recognizes that compliance using duct design, duct sealing, verification of refrigerant charge and TXVs, insulation installation quality, and building nve a sealing require installer testing and certification and field verification by an approved HERS rater. Designer o caner per Business & Professions Code) Documentation Author` Name: Name: Title/Finn: GLS GROUP 'Title/Firm: Adriana Gil Address: 74-854 VELIE WAY STE. #8 Address: 74-854 Velie Way Ste. #8 PALM DESERT. CA 92260 Palm Desert, CA 92260 Telephone: 40-3528e epho e: 60 404-7917 Lic. #: v (signatu (date) (signature) (date) Enforcement Agency Name: Title/Firm: ' Address: Telephone: HVAC DISTRIBUTION . Duct Duct , Condition Ducts Location Heating Cooling Location R -Value Status Tested? Hydronic Piping Pipe Pipe Insul. System Name Length Diameter Thick. WATER HEATING SYSTEMS Rated l -Tank Energy Standbys Tank tnsul. Water Heater. # in Input Cap. Condition Factor Loss R -Value System Name Type Distribution Syst. Btu/hr ga 1) Status or RE 1 (%) Ext. Multi -Family Central Water Heating Details Hot Water Pump' Hot Water Piping Len t9 h (ft)_ Add 1/2" Control # HP Type In Plenum Outside Buried Insulation t 1 For small gas storage (rated input <= 75000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency. ZEMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts1 and 6 of the California Code of Regulations, and the administrative regulations to implement them.This certificate has been signed by the individual with overall design responsibility. The undersigned recognizes that compliance using duct design, duct sealing, verification of refrigerant charge and TXVs, insulation installation quality, and building nve a sealing require installer testing and certification and field verification by an approved HERS rater. Designer o caner per Business & Professions Code) Documentation Author` Name: Name: Title/Finn: GLS GROUP 'Title/Firm: Adriana Gil Address: 74-854 VELIE WAY STE. #8 Address: 74-854 Velie Way Ste. #8 PALM DESERT. CA 92260 Palm Desert, CA 92260 Telephone: 40-3528e epho e: 60 404-7917 Lic. #: v (signatu (date) (signature) (date) Enforcement Agency Name: Title/Firm: ' Address: Telephone: 0 l r 0 Mandatory Measures Summary: Residential (Page 1 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supercede the items marked with an asterisk (') below. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes when completed or check NIA if not ❑ Q ENFORCE - applicable. NIA DESIGNER MENT Building Envelope Measures ❑ Q ❑ § 150(a): Minimum R-19 in wood ceiling insulation or equivalent U -factor in metal frame ceiling. ❑ ❑X ❑ § 150(b): Loose fill insulation manufacturer's labeled R -Value: © ❑ ❑ § 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not ❑ ❑X ❑ apply to exterior mass walls). © ❑ ❑ § 150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor. ® ❑ ❑ § 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs. 1. Masonry and factory -built fireplaces have: ® ❑ ❑ a. closable metal or glass door covering the entire opening of the firebox ❑ ❑X ❑ b. outside air intake with damper and control, flue damper and control ❑ ❑X ❑ 2. No continuous burning gas pilot lights allowed. ❑ ❑X ❑ § 150(f): Air retarding wrap installed to comply with§ 151 meets requirements specified in the ACM Residential Manual. ❑ ❑X ❑ § 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. ❑ ❑X ❑ § 150(1): Slab edge insulation - water absorption rate for the insulation alone without facings no greater than 0.3%, water vapor FX1 ❑ ❑ permeance rate no greater than 2.0 perm/inch. ® ❑ ❑ § 118: Insulation specified or installed meets insulation installation quality standards. Indicate type and ❑ ❑X El CF -6R Form: 0 ❑ ❑ § 116-17: Fenestration Products, Exterior Doors, and lnfittration/Exfiltration Controls. Page:6 of 8 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. ❑ ❑X ❑ 2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification. ❑ ❑X ❑ 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. ❑ ❑X ❑ Space Conditioning, Water Heating and Plumbing System Measures § 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission. ❑ Q . ❑ § 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE; SMACNA or ACCA. ❑ ❑X ❑ § 150(i): Setback thermostat on all applicable heating and/or cooling systems. ❑ Q ❑ § 1500): Water system pipe and tank insulation and cooling systems line insulation. 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with _ ❑ 0 ❑ insulation having an installed thermal resistance of R-12 or greater. 2. Back-up tanks for solar systems, unfired storage tanks, or other indirect hot water tanks have R-12 external © ❑ ❑ insulation or R-16 internal insulation and indicated on the exterior of the tank showing the R -value. 3. The following piping is insulated according to Table 150 -AIB or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire ® ❑ ❑ length of recirculating sections of hot water pipes shall be insulated to Table 150B. 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source © ❑ ❑ and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. 4. Steam hydronic heating systems or hot water systems > 15 psi, meet requirements of Table 123-A. ❑ ❑ 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment ❑ ❑X ❑ maintenance, and wind. Y 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed ® ❑ ❑ entirely in conditioned space. 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation. 0 ❑ ❑ EnergyPro 4.1 by EnergySoft I User Number. 5553 Job Number. ADY442-0506 Page:6 of 8 Mandatory'Measures Summary: Residential . (Page 2 of 2) MF -1 R NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supercede the items marked with an asterisk (") below. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. DESCRIPTION Instructions: Check or initial applicable boxes when completed or check NIA if not ENFORCE - applicable. NIA DESIGNER MENT Space Conditioning, Water Heating and Plumbing System Measures: (continued) § 150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, ❑ o ❑ 605, and Standard 6-5; supply -air and retum-air ducts and plenums are insulated to a minumum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than ❑ X❑ ❑ sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. 3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive ❑ Q ❑ duct tapes unless such tape is used in combination with mastic and draw bands. 4. Exhaust fan systems have back draft or automatic dampers. ❑ © ❑ 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operating ❑ © ❑ dampers. 6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment ❑ © ❑ maintenance, and wind. Cellular foam Insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. 7. Flexible ducts cannot have porous inner cores. ❑ ® ❑ § 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the © ❑ ❑ heater, weatherproof operating instructions, no electric resistance heating and no pilot light. 2. System is installed with: a. At least 36" of pipe between filter and heater for future solar heating. ® ❑ ❑ b. Cover for outdoor pools or outdoor spas. ❑ ❑ 3. Pool system has directional inlets and a circulation pump time switch. Y ❑ ❑ § 115: Gas fired fan -type central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously ❑ O ❑ burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) § 118 (i): Cool Roof material meets specified criteria U11.1 ❑ ❑ Lighting Measures § 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table ❑ © ❑ . 150-C, and do not contain a medium screw base socket (E24/E26). Ballasts for lamps 13 Watts or greater are electric and have an output frequency no less than 20 kHz. § 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, ❑ 0 ❑ luminaire has factory installed HID ballast. § 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50% of the Wattage, as determined ❑ X❑ ❑ in Section 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires. § 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires. ❑ Q ❑ OR are controlled by an occupant sensor(s) certfied to comply with Section 119(d). § 150(k)4: Permanently installed luminaires located other than in kichens, bathrooms,garages, laundry rooms, and utility rooms be high efficacy luminaires (except closets less than 70 ft) OR are controlled by a dimmer switch OR are El FX El controlled by an occupant sensor that complies with Section 1'19(d) that does not tum on automatically or have an always on option. 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are ❑ Q El§ certified to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals. § 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the ❑ ❑X ❑ same lot shall be high efficacy luminaires (not including lighting around swimming poolstwater features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d).` § 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sections 130, 132, and 147. ® ❑ ❑ Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Section 130, 131, and 146. § 150(k)8: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or more ® ❑ ❑ dwelling units shall be high efficacy luminaires OR are controlled by occupant sensor(s) certified to comply with Section 119(d). EnergyPro 4.1 by EnergySoft User Number. 5553 Job Number. ADY442-0506 Page:7 of 8 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE SANDRA YOUNG'S RESIDENCE 5/24/2006 SYSTEM NAME FLOOR AREA HVAC Existing stem 310 Number of Systems COIL HTG. Heating System Output per System CFM Total Output (Btuh) 0 Output (Btuh/sgft) Cooling System Output per System 0 Total Output (Btuh) 0 Total Output (Tons) 0 Total Output (Stuh/sgft) 0 Total Output (sgftrron) 0 Air System CFM per System 1,059 Airflow (cfm) Airflow (cfm/sgft) Airflow (cf nrron) Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 26.0 of ), 0 Outside Air 0 drn 70.0 OF GS 70.0 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD Heating Coil COIL COOLING PEAK COIL HTG. 1,210 Sensible Latent CFM t3'EAKCFM Sen 288 6,447 1,210 132 5,616 0 1,059 656 0 0 0 0 0 0 0 0 0 1,059 656 8,5641 1,210 6,929 Total Adjusted System Output (Adjusted for Peak Design Conditions) J 177-1 TIME OF SYSTEM PEAK Aug 2m Jan 12 am h Return Air Ducts 4 Supply Air Ducts 110.0 of ROOMS 70.0 of 111.0/77.6OF 76.0/61.7OF 55.0/53.8oF Supply Air Ducts Outside Air 0 cfm Cooling Coil 555.0 / 53.8 of 44.4% R.H. ROOMS 76.0/61.70F 76.0/61.7OF Return Air Ducts EnergyPro 4.1 by EnergySoft User Number: 5553 Job Number. ADY442-0506 Paoe:8 of 8 INSTALLATION CERTIFICATE (Page 3 of 12 CF -6R Site Address ermit Number 78-815 Via Carmel, La Quinta Duct Location (attic:etc.) An ns a a ion ce tcate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required). After completion of final inspection, a copy must be provided.to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). , HVAC SYSTEMS: Heating Equipment Equip Type (pkg. heat um CEC Certified Mfr. Name and Model Number # of Identical Systems Efficiency (AFUE, etc.)' >_ CF -IR value Duct Location (attic:etc.) Duct or Piping R -Value Heating Load Btu/hr Heating Capacity (Btu/hr SPLIT SYSTEM YORK LY8S080B16UHIIB 1 80% ATTIC R-6 80,000 SPLIT SYSTEM YORK H2RD042506B . 1 13 SEER ATTIC R-6 42,000 Cooling Equipment Equip Type (pkg. heat um CEC Certified Mfr. Name and Model Number # of Identical Systems Efficiency (SEER or EER)' > CF -1R value Duct Location attic, etc. Duct R -Value Cooling Load (Btu/hr) Cooling Capacity (Btu/hr SPLIT SYSTEM YORK H2RD042506B . 1 13 SEER ATTIC R-6 42,000 .1. > symbol reads greater than or equal to what is indicated on the CF -IR value. Include both SEER and EER if compliance credit for high EER air conditioner is claimed. ✓0 I, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF -IR) submitted for compliance with the Energy Efficiency Standards for residential building, and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6,) where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Paul's Air Conditioning & Heating Company Signature: Date: Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY Residential Compliance Forms April 2005 INSTALLER COMPLANCE STATEMENT FOR DUCT LEAKAGE INSTALLER COMPLIANCE STATEMENT The building was: ✓ ❑Tested at Final ✓ ❑Tested at Rough -in INSTALLER VISUAL INSPECTION AT FINAL CONSTRUCTION STAGE: - ❑ Remove at least one supply and one return registers, and verify that the spaces between the register boot and the interior finishing wall are properly sealed. ❑ If the house rough -in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. ❑ Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used ❑ New Distribution system is fully ducted (i.e., does not use building cavities as plenums or platforms returns in lieu of ducts). ✓ ❑.DUCT LEAKAGE REDUC T IOP: ' Proeedurec for field verification and diannn.ctir tvctinv of air dictrikilinn cvctamc aro availahlo in RAd-W Annnndiv Af'e 3 NEW CONSTRUCTION: ` INSTALLATION CERTIFICATE (Page 4 of 12 CF -6R Duct Pressurization Test Results (CFM @ 25 Pa) • Site Address LOT 4-51805 VIA ROBLADALA QUINTA, CA ermrt um er . • INSTALLER COMPLANCE STATEMENT FOR DUCT LEAKAGE INSTALLER COMPLIANCE STATEMENT The building was: ✓ ❑Tested at Final ✓ ❑Tested at Rough -in INSTALLER VISUAL INSPECTION AT FINAL CONSTRUCTION STAGE: - ❑ Remove at least one supply and one return registers, and verify that the spaces between the register boot and the interior finishing wall are properly sealed. ❑ If the house rough -in duct leakage test was conducted without an air handler installed, inspect the connection points between the air handler and the supply and return plenums to verify that the connection points are properly sealed. ❑ Inspect all joints to ensure that no cloth backed rubber adhesive duct tape is used ❑ New Distribution system is fully ducted (i.e., does not use building cavities as plenums or platforms returns in lieu of ducts). ✓ ❑.DUCT LEAKAGE REDUC T IOP: ' Proeedurec for field verification and diannn.ctir tvctinv of air dictrikilinn cvctamc aro availahlo in RAd-W Annnndiv Af'e 3 NEW CONSTRUCTION: ` Paul's Air Conditioning & Heating Company Duct Pressurization Test Results (CFM @ 25 Pa) Measured, rl • Values ;o__ 1 Enter Tested Leakage Flow in CFM: 68 �, ." ; ,,;'.'i�_ Fan Flow: Calculated (Normal: ✓: ❑ Cooling ✓ ❑ Heating) or ✓ ❑ Measured 2 If Fan Flow is Calculated as 400 cfm/ton x number of tons or as 21.7 cfm/(kBtu/hr) x Heating Capacity in Thousands of Btu/hr output, enter total calculated or measured fan flow in CFM here: 1600 ✓ ✓ Pass if Leakage Percentage< 6% for Final or:5 4% at Rough -in ❑ Pass 0 Fail 3 [100 x 68 (Line # 1) / 1600 (Line # 2)]] - 4.2 ALTERNATIONS: Duct System and/or HVAC Equipment Chan a -Out 4 Enter Tested Leakage Flow in CFM from Pre -Test of Existing Duct System Prior to Duct f ,: j* ` •'�.° System Alterations and/or Equiptrient Change -Out. 5 Enter Tested Leakage Flow in CFM from Final Test of New System or Altered Duct "' t •_ ' ;„ ' "+� System for Duct System Alteration and/or Equipment Change -Out. 6 Enter Reduction in Leakage for Altered Duct System (Line # 4 Minus. (Line # 5Applicable) � (I,' ) (L,' )] — (Only if 7 Enter Tested Leakage Flow in CFM to Outside (Only if Applicable) ✓ ✓ 8 Entire NewDuct System — Pass if Leakage Percentage:5 6% for Final El Pass El Fail [100 x L_ (Line # 5)L, • . (Line # 2)]] TEST OR VERIFICATION STANDARDS: For Altered Duct System and/or HVAC Equipment Change -Out -Use one of the followin four Test or Vei ification Standards for compliance: ✓ ✓ 9 Pass if Leakage Percentage:5 15%. [100 x [_ (Line # 5) / ' (Line # 2)]] ❑ Pass 0 Fail 10 Pass if Leakage to Outside Percentage:5 10% [100 x (Line # 7) / (Line # 2)]] ❑ Pass ❑ Fail. 11 Pass if Leakage Reduction Percentage > 60% [100 x (Line # 6) / (Line # 4)]] 0 Pass ❑ Fail and Verification by Smoke Test and Visual Inspection 12 Pass if Sealing of all Accessible Leaks and Verification by Smoke Test and Visual Inspection 0 Pass ❑ Fail Pass if One of Lines # 9 through # 12 Pass',` , # t?* rJ ❑ Pass ❑ Fail ✓ El I, the undersigned, verify that the above diagnostic test results were performed in conformance with the requirements for compliance credit. I, the undersigned, also certify that the newly installed or retrofit Air -Distribution System Ducts, Plenums and Fans comply with Mandatory requirements specified in Section 150 (m) of the 2005 Building Energy Efficiency standards. Installing Subcontractor (Co. Name) OR General . , Contractor (Co. Name) OR Owner Paul's Air Conditioning & Heating Company Signature: Date: Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page I of 8) CF -4R Project Address / / / 3 "UI Om C4,1-e+'fq 6, akio Builder Name. . /4� kv rlil/'l-, Builder ContactTelephone /" 1(t::Y. Kick, 1113-18to Plan Number - HE, Rater �q+ Telephone l>rf5 L� siN95oo 9fS-L7yy Sample GroupNumber Values Compliance ethod(Pres6ripti>A Climate Zone - Certifying Signature Date Sample House Number Firm HERS Provider S%treet Address: 0 �309 e ) Cyy/State/Zip: Gat-rt,edr-l• G,17 G/1- �ILL3� Copies to: BUILDER, HERS PROVIDER AND BUILDING DEPARTMENT KERS RATER COMPLIANCE STATEMENT The house was: ✓Tested ✓ ❑ Approved as part of sample testing, but was not tested As the HERS rater p ding diagnostic .testing and field verification, I certify that the house identified on this form complies with the diagnostic tested compliance requirements as checked ✓ on this form. The HERS rater must check and verify that the new distribution system is fully ducted and correct tape is used before a CF -4R may be released on every tested building. The HERS _ rater must not release the CF -4R until a properly completed and signed CF -6R has been received for the sample and tested buildings. ❑ The installer. has provided a copy of CF -6R (Installation Certificate). ❑ New Distribution system is fully ducted (i.e., does not use building cavities as plenums or platform returns in lieu of ducts). ❑ New systems where cloth backed, rubber adhesive duct tape is installed, mastic and draw bands are used in combination with cloth backed, rubber adhesive duct tape to seal leaks at duct connections. ✓ ❑ MINIMUM REQUIREMENTS FOR DUCT LEAKAGE REDUCTION COMPLIANCE CREDIT Procedures for field verification and diagnostic testing of air distribution systems are available in RACM, Appendix RC4.3. 'Duct Diagnostic Leakage Testing Results NEW CONSTRUCTION: Duct Pressurization Test Results (CFM @ 25 Pa) Measured Values 1 Enter Tested Leakage Flow in CFM:65( 11'.. a 2 Fan Flow: Calculated (Nominal: ✓ ❑ Cooling ✓'❑ Heating) or ✓ ❑ Measured ' 1 Enter Total Fan Flow in CFM: t, ✓ ✓ 3 Pass if Leakage Percentage <_.6% [ 100 x Lj�V (Line # 1) (Line # 2)]] Z Ai�-?ass ❑ Fail ALTERATIONS: Duct System and/or HVAC Equipment Change -Out Enter Tested Leakage Flow in CFM from CF -6R: Pre -Test of Existing Duct System Prior to 4 Duct System Alteration and/or Equipment Change -Out. r ' Enter Tested Leakage Flow in CFM: Final Test of New Duct System or Altered Duct System g Y Y » '" yy. T.. ',.'�-N .. 5 for Duct System Alteration and/or Equipment Chan e -Out. ' ' y .' Enter Reduction in Leakage for Altered Duct System r(Line # 4) Minus (Line # 5)] :' f, 6 (Only if Applicable) .7 Enter Tested Leakage Flow in CFM to Outside (Only if Applicable) ✓ ✓ S Entire New Duct System - Pass if Leakage Percentage. _5 6% ❑Pass ❑Fail 100 x Line # 5 / Line # 2 TEST OR VERIFICATION. STANDARDS: For Altered Duct System and/or HVAC Equipment Change -Out + ✓ ✓ Use one of the following four Test or Verification Standards for corn liance: 9 Pass if Leakage Percentage <_ 15% [100 x (Line # 5) / (Line # 2)]] ❑ Pass ❑ Fail 10 Pass if Leakage to Outside Percentage <_ 10% [100 x [ (Line # 7) / (Line # 2)]] ❑ Pass ❑ Fail Pass if Leakage Reduction Percentage >_ 60% [100 x (Line # 6) / (Line # 4)]] 110 and Verification by Smoke Test and Visual Inspection' Pass ❑ Fail 12 Pass if Sealing of all Accessible Leaks and Verification by Smoke Test and Visual Inspection - ❑ Pas ❑ Fail Pass if One of Lines # 9 through # 12 pass 11 �� Pass ❑ .Fail Residential. Compliance Forms April 2005 09/28!2006 10:15 7607750078 SALAZARDRYWALL PAGE 01/01 INSULATION CERTIFICATE 1C-1 Site Address Permit Numbir 7881.5 VIA CARMEA . RANCHO LA UTNTA Number and Street �city RiV.ERSIDE County Subdivision Lot Number Aesclription of Instaiiation J. ROOF Mmorial _ Thick»Gm9 (inches) Brand Name Thermal Resistance (R -Value) 2. CEILING Batt or Blanket Typc BA!'TS .- _ Braad Name JOHNS'MArTVTLLR Thiclumss (inches) 12 Thermal .Resistance (R-Vahre) R-38 Loose Fill Type Brand Contractor's min installed weip*00- lb Minim,rin tbicooss inches Mnnailteturer's installed ucigbt per square foot to achieve Thenal Resistance (R-Voluc) 3, .EXTERfOR WALL Franc Type A. Cavity insulation Materiel Thidmebw (inches) A Extorior Foln SbatNunl Material Thickness (inches) 4. RAISED FLOOR Material Thickness (inches) wOQT) 1'tAT3ROLA9S 5,25 5. SLAB FLOORIPERTMETER Material Thicknm (ittdws) Perimeter.insnlationDcplh(tedecs) 6. FOUND.AT.iON WALL, lRand Nauut JOHNS MANVILLE Thermal Resistmnce (R -Value) R-19 Brand Nana Thermal Resita ancc (R•Valuc) Arend Name 7b.z rtal Rcsistome (R -Value) Brand Natne 1"hermal Reiistance (R -Vali) Materiel Brand Natue Thicintess (inchen) 'fhemtal Resistanee (R -Value) Declaration I hereby certify tha: the above insulation was installed in the building at the above locations in conformance with the current l perp F.frciency Standards icor residential buildings (Title 24, Part 6, Cttlifomia Code of Regulations) as indicated on the Certificate of Compliance, where applicable, ow 2 iic3A TAvt M TNstn,Arrow M Item OF. Sig(1atrme, T)= lwwgina Suk,.Introctor (Co. Name) OR' General Contractor (Co. Nmne) OR Owner lletn vs Signature, Dow TnF;Wlirrg Subcontractor (C), Ntunc) M G•eneral.Conlfactnr (Co. Nanw) OR Owner Ilcm ba 90grurturc, T -We hrtrtolling Subcontract(w (Co. Nome) OR ovicral Crntirauor (Ca. iurm) OR Orcgter Courpliance Porins Avgaet 2001 A•36