0203-348 (RR)LICENSED CONTRACTOR DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of
Chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professionals Code, and my License is in full force and effect.
License # ` Lic. Class
ll,, Exp. Date tt11 ff•� 9
46.07
Date" '' "'��-Signature of Contractor 7�'`/
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's
License Law for the following reason:
( ) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec. 7044, Business & Professionals Code).
( ) I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec. 7044, Business & Professionals
Code).
( ) I am exempt under Section B&P.C. for this reason
Date Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
( ) I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
( ) I have and will maintain workers' compensation insurance, as required by
SYcfion 3700 of the Labor Code, for the performance of the work for which this
permit is issued. My workers' compensation insurance carrier & policy no. are:.
Carrier nA_ 1,110 Policy No. 15.+62"
(This section need not be completed if the permit valuation is for $100.00 or less).
( ). I certify that in the performance of the work for which this permit is issued,
I shall not employ any person in any manner so as to become subject to the
workers' compensation laws of California, and agree that if I should become
subject to the workers' compensation provisions of Section 3700 of the Labor
Code, I shall forthwith comply with those provisions/
Date: p�- - Applicant S24W.4, 44N_� /7
Warning: Failure to secure Workers' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000, in
`'addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorney's fees.
IMPORTANT Application is hereby made to the Director of Building and Safety
for a permit subject to the conditions and restrictions set forth onf his
application. ' t
1. Each person upon whose behalf this application is made & each person ats
whose request and for whose benefit work is performed under or pursuant toy
any permit issued as a result of this applicaton agrees to, & shall, indemnify
& hold harmless the City of La Quinta, its officers, agents and employees..
2. Any permit issued as a result of this application becomes null and void if.
work is not commenced within 180 days from date of issuance of such
permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
construction, and hereby authorize representatives of this City to enter upon
the above-mentioned property for inspection purposes.
Signature (OwnedAgent) Date 5^ � �� ���•-••:
k tYy Vin',
BUILDING PERMIT PERMIT#
DATE V/*AL^^UATION TRACT
pt7LOT
iYa'YIAYr�.1 Nw�'i. vN��p�3°5'RJ etd�:7
JOB SITE
APN
ADDRESS td W.ORM.7,19H E ROAD
�
OWNER
CONTRACTOR / DESIGNER / EN (NEER
c.AaMY SME, ROWU
R0N..ET1,A F.oc R4G
7 9.000 :ir ORNS OE K.ia
LAQiI$wmk CA 92253
QKt1MRAL�.�fT at
V60)3IM-$4137 0BUt 5230
USE OF PERMIT
MOW
15 :' VIATE COST Off (:09TYRUCT€ON
����FLIoCGS
=I ROOF PES
U
SUB -'Eta ' Q2�ST ., °:t'�Q� AIM .t'LA v' CIO=,
.
MAR 2 2 2001 3 P 1:1MM:-IM.111
MOO
RECEIPT
DATE
BY ;.-''
DATE FINALEINSPECTOR
/
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
BUILDING APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
Forms & Footings
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck14 a - - Z
Exhaust Fans
O.K. to Wrap
F.A.U.
Framing
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
Final
Final
BLOCKWALL APPROVALS
Steel
POOLS - SPAS
Set Backs
Electric Bond
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final I
Gas Piping
PLUMBING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure
Shower Pans
O.K for Finish Plaster
Sewer Lateral
Pool Cover
Sewer Connection
Encapsulation
Gas Piping
rjas Test
Appliances
Final
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
COMMENTS:
i
`
d
n
r'
The:R`eroofng Specialists
Tuesday, March 12, 2002
CJ White
79800 Horseshoe Lane-
La Quinta, CA 92253
Ph:.
Re: Re -roofing proposal for the address listed above
Dear CJ,
Thank you. for your interest in Petronella Roofing. Enclosed are the specifications for your roof replacement.
The reliability, quality and professionalism of Petronella Roofing is represented in our twenty successful years in the
roofing industry. We are proud of our -reputation for putting the customer first in every area of our. operations. We feel that -
this attitude is one of the most important contributors to our- success of the customers we serve.
After reviewing the enclosed. information, please call me if you have any questions or need any additional information.
Thank you for the opportunity to bid your project.
Sincerely,
George Petronella. / General Manager
PETRONELLA ROOFING
Corporate office:
2626 Newport Blvd
Costa Mesa, CA 92627
(714) 548-1645 / 714) 548-2617 fax
Desert office:
68314 Kieley Road
Cathedral City, CA 92234
(760) 324-5482 / (760) 32"12 fax
THER�ER'•OtO FING SP E CIA':L.IS TS
Specifications
SCOPE'OF WORK
Furnish all labor, materials, equipment. and services necessary for completion of all roofing and related work as specified in
this document.
QUALITY ASSURANCE
The responsibility for proper installation of all components of the roofing system lies solely with Petronella Roofing. The
contractor shall inform the Owner of any conditions detrimental to the quality construction of the roofing system, and shall
not proceed with the work until the conditions are corrected.
PRINCIPLES OF WORK
Remove from the building and premises existing system. Remove and replace decking as necessary. Install as necessary
sheet metal flashings, pipe and conduit flashings, pitch pans, roof drain fittings andany other related items as necessary for
the proper installation of the roofing system.
STORAGE AND PROTECTION OF MATERIALS
Precautions shall be taken to keep roofing product clean, dry and free of damage.
PUBLIC SAFETY
Materials and equipment must be installed in such a manner as to preclude any danger, disturbance or interference with
normal business operations, or to constitute a fire hazard-
State,
azardState, Local and Federal Fire and' Safety Regulations shall be complied with fully in the performance of the required work.
DEMOLITION
Demolish and completely remove from the building and premises existing roof system or systems, flashing, base flashing7
s and wood blocking. The existing deck shall be exposed and swept away free of all foreign objects (dust, gravel, etc.) prior
to proceeding the new roofing installation. Existing mechanical equipment items, wood equipment. supports, vent pipes,
conduit and ductwork, no longer in service shall be removed entirely from the roof as directed by Owner. Resulting open
penetrations through the roof shall be repaired as required.
Only as much existing roofing shall be removed so that in. the event of a change of weather the exposed decking can be
waterproofed.
MANNER OF DEMOLITION
Demolition work shall be terminated in such a manner as to leave remaining construction straight and clean. Precautions
and methods shall be used so as not to damage or deface the existing facilities.
Disposal of demolished materials: Materials, equipment debris, etc., resulting from the demolition shall be promptly
removed from the.premises. Removed. construction material, equipment and rubbish to be disposed of by contractor.
STRUCTURAL INTEGRITY
The structural integrity of the existing buildings must be maintained at all times, especially during the demolition phases of
the project.
Results expected: The deck surface shall be smooth, clean, free from surface moisture with damage areas repaired prior to
the installation of the Built -Up roof system.
SPECIAL INSTRUCTIONS
1. Grounds to be kept neat, clean washed down daily.
2. All debris hauled, away from jobsite daily.
3. All areas under construction to be marked off with safety cones and construction tape.
4. Hours of Operation: 7:00 a:m: to -4:00 p:m:,. f ve-(5) days- a week.
5. Job staffed with a diligent crew of journeymen roofers.
6. All debris to be handled in trash chutes to dumpsters below.
7. Obtain all necessary permits and inspections to be in accordance with the City.
8. Petronella. Roofing to provide liability and Workmen's Cbmpensation Insurance.
2-
Spec f cations
PITCH AREA
ROOF SYSTEM:. EAGLELITE OR CLAYLITE TILE SPECIFICATION
I. Remove existing roof system down to the wood deck.
2. Underlayment: Provide and install felt underlayment A.S.T.M. #D2626-86 applied in a. single application method
consisting of 1 layer of #30 base sheet underlayment applied in a shingle type fashion fastened every 18" with 1"
annular threaded square headed simplex nails.
3. Tile fastening: All. tiles to be fastened with l I gauge corrosion resistant box nails of sufficient length to penetrate 3/4"
into solid sheeting. All tiles to have.1 fastener per tile and be in strict accordance with factory mutual I-60 requirements
for wind uplift..
4. Roof penetrations and flashings: All roof projections, vents, dormers, chimneys, roof to wall transitions to be
properly flashed. in a double flash method consisting of 1 primary 26 GA flashing integrated into base sheet
underlayment and set in bed of mastic. Secondary 26 GA flashing to be integrated into tiles and sealed. with plastic
cement and all flashings treated with zinc chromate paint to match roof color.
5. Eave Tiles: All eaves and perimeters to have a custom baked enamel drip edge flashing to cover plywood and furring
strip and properly detail eave section of roof. At all eaves before underlayment is applied l strip of Perlite tapered
insulation is installed to taper water flow from roof deck over riser batton. (this is done to eliminate ponding water
and. deterioration in future years).
6. Ridge and barge boards: After underlayment is completed a 2" x 4" ridge board will be installed along all hips and
ridges. All rakes to have 12" x 4" installed face down with 12" x 2" installed on top of 2" x 4" to properly anchor
and secure all rake trim tiles and meet all requirements for factory mutual I-60 requirements for rake tile wind uplift.
7. Field tile application: Provide and install Eaglelite lightweight concrete tile. Eaglelite tiles to be installed in strict
accordance with Eaglelite roof tile specifications meeting all governmental and federal codes. All tiles to be single
fastened. and exposures to be 14" as per manufacturer's specifications. Tile to be manufactured. by Eagle roof tiles
I.C.B.O. report AC07. Installation to conform to U.B.C. 32-12 and Eaglelite roof tiles. Style of tile and color to be
chosen by customer.
8. Ridge and rake tiles: All ridge and rake tiles to be single nailed with 11 d corrosion resistant rails driven into ridge or
hip framing member. All ridge ends to be detailed with a bullnose of cement to finish ridge end. All hip and ridge tiles
to be made watertight by bedding in Portland cement mortar.
GUARANTEE
1. Petronella Roofing will issue a Five (5) year Contractor's "Weathershield" Limited Warranty.
2. Eaglelite will issue a Manufacturer's Lifetime Limited Material Warranty.
3. It is the owner's responsibility to properly maintain roof system. Guidelines and proposed budget for annual
maintenance will be provided upon request.
ROOFING CONTRACT PRICES
Eaglelite Lifetime Limited Material Warranty
All City permits included
FLAT AREA
GS MODIFIED TORCH ROOF SYSTEM (TO MATCH EXISTING)
1. Remove existing roof system down to deck. Roof surface to be thoroughly clean and free of all debris prior to roof
application.
2. ROOF SYSTEM: Install #28 Fiberglass base sheet over entire roof surface and fasten every 12" on center, lapping
side laps 2" and end laps 4". Torch apply one (1) layer GS Flintlastic Modified Bitumen Granulated sheet over entire
surface .with a 4" coverage on all side laps and a 8" coverage on all end laps. Apply granules on all exposed asphalt
seams. Apply double layer at all base flashings and angles at roof transitions.
3. • Replace all flashings for roof penetrations and edge metal with full soldered 24 GA. flashings. All metal to be primed
with asphalt primer prior to contact with asphalt.
Specifications
GUARANTEE
Petronella Roofing will guarantee roof(s) from leaking due to workmanship or materials for FIVE (5) years.
ROOFING CONTRACT PRICES
PITCH AREA
Install Eaglelite or Claylite tile
FLAT AREA
12 Year material warranty
G/S Flintlastic High Performance Modified (Torch to match existing)
TOTAL AMOUNT OF THIS PROPOSAL.......................................................................$
SCHEDULE OF EXTRAS
1. Remove and replace any damaged or deteriorated plywood at $ per sq. ft.
ALL A/C WORK TO BE DONE BY HOME OWNER
PetroneIDa Roofing will offer a 5% "I saw the sign" discount.
Petronellla.Roofing will offer an additional 51/6 discount if contract is signed by 5:00pm, Friday, March 8, 2102.
ii
TERMS
%2 Upon Award of Contract
Balance Upon Completion
4
E
R. E R :6 p F N (3
Tlw
Corporate Office:
2626 Newport Blvd.
Desert Office:
Costa Mesa; CA 92627 68314 Kieley Road
:',9497548-1645/Fdx-949-548-2617 Co CA 92234:
th6cli-cil city,
Licbrite #46:0797,..�.' 760-328-4612!
766-324-5482/Fa)(
-PET�h6NkLLAROOFING hbfeinafte'tcalled ;'Cont'r:ac't8f"and/bff'°Seller", 894ji id" IrovIcldthe 1�ilW
Ind listed labor, materialt . and construction:
:
.:,. Royal ADDNAME-
7
Cathy .8 A SSo
. . I ;..".'.;
DESCRIPTION 00 LA136A, MATERIALS AND Mi§b.-
Petrbbella-Rbofing igries to. furnish all laboi'A material to Perform installation
.-qt,E'akle Lite.Tile ile Torch down' *at per
46cifi6dtimis daite'd March 0'
6o 2002..
Total cost for kagl6 Lite Tile imith Mtth
ing 6drc.h a6wli CdlorjA44i4iiii,,$17j600,,00-
".j..'the Sign" Discount:j:jj4j,
i .4
if '4itifid contract 4 deposit by 5p.juo: Friday'. March 89 2002:....:
$=880.00
Total CoSt . . . . . . . .
d
.::....::...::..$15,840.00
1'*
All AIC work done b H le)
y
Terms
-7
50% up6n.awarA*of*tonttact
40% up"oni
SPECIAL INSTRUCTIONS: hiLI&ONt:
0
l d �. D
C
. TIME
A
FOR STARTING AND cOJMPhE4ti1N*G.
PROJIECf- %AWk shall 0 'fi:00 -days from the date of Sale'. u
all. 6'rhm"cci Within e
otherwise
§hd be' su6tiallpJ�Q nlets specified
.16 �006imitei' ten (10),
�J6 be allowed AS dotaiied In Pat6grdpfi 6oI,,,ih6..T6ff6s, b6�'ditiofig a6� 6— Y working da�§.'wlth additional time
!! . I. �1! ; .. . , !Nofi-
r halt 66 dbfindd 19' W iAWj cO d whet' bhith6 back hereof. SuWahiilil Commencem"brIt of w6fk I
f w cuh'1Nic"16is"J6iIdL' Id su w(
6 1 .4 on 0 -C.y aqY me or
P�l enty, (20) d -1 -1. . , - 31-Y c m Jrk� without .14wiLil excuse; Me ove Us6j *fihiti
6�h-.4A !he* U86 Sped it.) I latiOA-61 the 06166"t'i " I-lb6nib
n b 66 a
crrict TO buI='H,fl b'� s g
d. bt 'sign hl' re d'- *6fi .661ore You .raid Jt, (4 Y0j w4 46titl4i-
0 compieteij filled 16 co
sjackrtowledges.thaE,hl3 last teedihd :. py o} this idi6erribnt;'(3) 6:- 1
ed a � 8lr&cto�, 1h6Iudih'd.A1I Term" wn6e
,,copy,.o 6ldh !
dd" and lAht'llig hais`;lbjd and t6lb* IVb`j
r, Owner" oti 0 fdvi6o � s, CoHdltlbh6 and "Notice to
uFlng 'd 41616 co'Y of 6ver� docu�id`i th�j
THE bUY�A,,'MAY'b n Owner has Signed
h" Ilk, . �HIRD* BUSINESS i
DAY A�tElRzi THE QATE'OF THI§ ThAf4§ACf idN 1§� N&f IFA64 Hk 1i WhifN6--AT'fHEAbbRESsA ' OF . I
ANY.4 IME PRIOR TO MiDWiGHt THE
btJYER PAILS ,-TO,E E CIS - TH18* MidHT.IANb sUbsg "UEN` ABOVE. THE EVENT
T Y ATTtWItS''10.0 AINIc"' YOU THE
'k:6dNthA&Ibh §PAJCL`�,h9,'19WfIiLt[) 76-`-Hk(j6VEh.ALI_ �T IS " toNtNACT AFTER EFFECTIVE bATk 00, i
b%NNEhOh A CO witH THIS CoNtIlAtf,'!
ENA 'H1 Uzi 'fH
Y 1THt RIG T,'fb' It' ''' 'k 6ON
bh �UWIN !Q IRE, RA 0 i6 '14A" ' F hFOh1VIANCE A`ND*0AYMtNf'•6(j
G VE A. E ND
T
C6NfF1Adt6h (SELLER)
PRICE
Joe'Ransen'
j
15,840.00.,
BUYER SIGNATURE
SALESPEbSON
c
UNTFIACTPRIC8--
OX0
-70i
OWNER BUYER SIGNATURE $
-----------------
M P�Ymrf'rr
SA PE SON SIGNATU
rA -0C
00
e�V I
il. . 7,920.
`.i,.
F SALE
DATE 0 z
DATE.OF SALE i$
x'i,