BWFE2015-023878-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
T,iht^F44"
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT
VOICE (760) 777-7125
FAX (760) 777-7011
INSPECTIONS (760) 777-7153
Date: 7/8/2015
Application Number:
BWFE2015-0238
Owner:
Property Address:
53365 HUMBOLDT BLVD
EQUESTRIAN LIFE
APN:
767700014
53 SOARI NG BIRD CT'
00
Application Description:
MADISON / EQUESTRIAN LIFE / EXTERIOR/INTERIOR WALLS/COMBO
LAS VEGAS, NV 89135
e�E
Property Zoning:
Application Valuation:
$15,000.00
C C7
Om T
Applicant:
Contractor:
(-
z QQ
QUINN ENTERPRISES INC
QUINN ENTERPRISES INCo
o
17992 COWAN
17992 COWAN
$ v
ciI
IRVINE, CA 92614
IRVINE, CA 92614
A
C
(714)785-3885
Llc. No.: 725864
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Business and Professions Code,
and my License is in full force and ellec�l
License Class: B License No.: 7258.4'x.
Date:-- Contra Contra r:
OWNER -BUILD DECLARATION
I hereby affirm under penalty of perjury that I m exempt from the Contractor's State
License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any
city or county that requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for the permit to file a
signed statement that he or she is licensed pursuant to the provisions of the
Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3
of the Business and Professions Code) or that he or she is exempt therefrom and the
basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a
permit subjects the applicant to a civil penalty of not more than five hundred dollars
($500).:
(1 I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for sale.
(Sec. 7044, Business and Professions Code: The Contractors' State License Law -does not
apply to an owner of property who builds or improves thereon, and who does the work
himself or herself through his or her own employees, provided that the improvements
are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner -builder will have the burden of proving that
he or she did not build or improve for the purpose of sale.). -
(_) I, as owner of the property, am exclusively contracting with licensed contractors
to construct the project. (Sec. 7044, Business and Professions Code: The Contractors'
State License Law does not apply to an owner of property who builds or improves
thereon, and who contracts for the projects with a contractor(s) licensed pursuant to
the Contractors' State License Law.).
( ) I am exempt under Sec. ' B.&P.C. for this reason
Date:
Owner:
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for
the performance of.the work for which this permit is issued•(Sec. 3097, Civ. C.).
Lender's Name:
Lender's
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the performance
f tork for which this permit is issued.
I have and will maintain workers' compensation insurance, as required by
Secti 700 of the Labor Code, for the performance of the work for which this permit
is iss d. My workers' compensation insurance carrier and policy number are:
Carrier:- Policy Number:
I certify that in the performance of the work for which this permit is issued,
shall not employ any person in any \anner so as to become subject to the workers'
compensation laws of California, and gree that, if I should become subject to the
workers' compensation provisions of S coon 3700 of the Labor Code, I shall forthwith
comply with those provisions.
C j
Date: 1 7 Applica t:
WARNING: FAILURE TO SECURE WORKERS' COPENSATION COVERAGE IS UNLAWFUL,
AND SHALL SUBJECT AN EMPLOYER TO CRIMIN L PENALTIES AND CIVIL FINES UP TO
ONE HUNDRED THOUSAND DOLLARS ($100,00 IN ADDITION TO THE COST OF
COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE,
INTEREST, AND ATTORNEY'S FEES.
APPLICANT ACKNOWLEDGEMENT
IMPORTANT: Application is hereby made to the Building Official for a permit subject to
the conditions and restrictions set forth on this application.
1. Each person upon whose behalf this application is made, each person at whose
request and for whose benefit work is performed under or pursuant to any permit
issued as a.result of this application, the owner, and the applicant, each agrees to, and
shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and
employees for any act or omission related to the work being performed under or
following issuance of this permit.
2. Any permit issued as a result of this application becomes null and void if work is
not commenced within 180 days from date of issuance of such permit, or cessation of
work for 180 days will subject permit to cancellation.
I certify that I have read this application and state at the above information is correct.
I agree to comply with all city and county ordinancENand state laws relating to building
construction, and hereby authorize representatives o t is city to enter upon the
mentioned.property for inspection purposes.
Date: 7 " r� Signature (Applicant or Ag�t) -
DESCRIPTION-
FINANCIAL INFORMATION
ACCOUNT:
QTY AMOUNT PAID . PAID DATE
BSAS SB1473 FEE
101-0000-20306
0 $1.00 $0.00
PAID BY
METHOD
RECEIPT # CHECK # CLTD BY
Total Paid for BUILDING STANDARDS ADMINISTRATION'BSA $1.00 $0.00
DESCRIPTION =
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
WALL/FENCE - EA ADDITIONAL 50 LF
101-0000-42404
0
$101.50
$0.00
PAID BY,
'METHOD
RECEIPT #
CHECK #
CLTD BY
DESCRIPTION
ACCOUNT
QTY
AMOUNT -
PAID
PAID DATE
WALL/FENCE - FIRST 100 LF
101-0000-42404
0
$47.86
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
• CLTD BY
DESCRIPTION,
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
WALL/FENCE - FIRST 100 LF PC
101-0000-42600
0
$60.91
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
Total Paid forFENCE OR FREESTANDING WALL- $210.27 $0.00
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE.
RET WALL <=12 - EA ADD 50 LF
101-0000-42404
0
$14.50
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
RET WALL <=12 - FIRST 100 LF
101-0000-42404
0
$47.86
$0.00
PAID BY
METHOD :
RECEIPT #
CHECK #
CLTD BY
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
RET WALL <=12 - FIRST 100 LF PC
101-0000-42600
0
$60.91
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
Total Paid forRETAINING WALL- $123.27 $0.00
TOTALS:00
Description: MADISON / EQUESTRIAN LIFE / EXTERIOR/INTERIOR WALLS/COMBO
Type: WALL/FENCE Subtype: Status: UNDER REVIEW.
Applied: 7/8/2015 SKH
Approved:
Parcel No: 767700014 Site Address: 53365 HUMBOLDT BLVD LA QUINTA,CA 92253
Subdivision: TR 33076-2 Block: Lot: 62
Issued:
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning:
Finaled:
Valuation: $15,000.00 Occupancy Type: Construction Type:
Expired:
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details: 118LF OF 6' GARDEN 18" RETAINING( INSIDE NORTH PL/FRONT YARD) AND 288LF OF 6' GARDEN WALL (INSIDE SOUTH PL) AND 21LF
OF W -EQUIPMENT WALLS (NORHT AND SOUTH SIDE YARDS) [PROTO II SPECIFICATIONS] PRECISION CONCRETE BLOCK SHALL BE
COVERED WITH STUCCO, PAINT, OR TEXTURED COATING WHERE VISIBLE FROM OUTSIDE THE PROPERTY. 2013 CALIFORNIA BUILDING
CODES.
ADDITIONAL SITES
CHRONOLOGY
CONDITIONS
Printed: Wednesday, July 08, 2015 2:07:53 PM 1 of 3
SYSTEMS
Printed: Wednesday, July 08, 2015 2:07:53 PM
2of3
r7SYSTEMS
INSPECTIONS
SEQID
INSPECTION TYPE
CLTD
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
FINAL"
BLD
BY
WALL/FENCE - EA
101-0000-42404
0
$101.50
$0.00
ADDITIONAL 50 LF
WALL/FENCE - FIRST
101-0000-42404
0
$47.86
$O.OQ
100 LF
WALL/FENCE - FIRST
101-0000-42600
0
$60.91
$0.00
100 LF PC
Total Paid for FENCE OR FREESTANDING WALL $210.27 $0.00
RET WALL <=12 - EA
101-0000-42404
0
$14.50
$0.00
ADD 50 LF
RET WALL <=12 -FIRST
101-0000-42404
0
$47.86
$0.00
100 LF
RET WALL <=12 - FIRST
101-0000-42600
0
$60.91
$0.00
100 LF PC
Total Paid for RETAINING WALL $123.27 $0.00
TOTALS:0-
Printed: Wednesday, July 08, 2015 2:07:53 PM
2of3
r7SYSTEMS
INSPECTIONS
SEQID
INSPECTION TYPE
INSPECTOR
SCHEDULED
DATE
COMPLETED
DATE
RESULT
REMARKS.
NOTES
BOND BEAM
BLD
FINAL"
BLD
FOOTINGS
BLD
Printed: Wednesday, July 08, 2015 2:07:53 PM
2of3
r7SYSTEMS
Bin #
City of La Quinta -
Building 81• Safety Division
P.O. Box 1504, 78-495 Calle Tampico
La Quinta, CA 92253 - (760) 777-7012.
Building Permit Application and Tracking Sheet
Permit #
!Project Address: 5rn 1 f
Owner's Name: _ \AQLS G Ll
A. P. Number:
Address: S3 S:-1Gn R -I W CS 1& Q� GT
Legal Description: 1JQW -i o (M
City, ST, Zip:
Contractor. T
VYl
hone•
Telephone:
Address: 'S p 1y /` nRjL y
Project Description:
��_ y�
City, ST, Zip: FAL-cN {iYjotr2 Cil - 9-,1-776
Q1� \(L kjs/
Telephone-.74�iS-3
l
9 �
State Lic. # : -%
City Lic. #; i (19 13
Arch., Engr., Designer: M� ,CQ 5V1 ave
Address: - vU CEJ
City, ST, Zip: -ALOl0 2Z0
G
Telephone:7l-
>
Constructi n TY P e: Occupancy: Q 5
State Lic. #
Project type (circle r le ne )• e Add'n Alter Repairat
r Demo
iQ,q.. a--
\Name of Contact Person: MC�f=
Sq. Ft.:
# Stories:
# Units:
Telephone # of Contact Person:
Estimated Value of Project:
APPLICANT: DO NOT WRITE BELOW THIS LINE
#
i
Submittal
Req'd
Recd
TRACKING
PERMIT FEES
Plan Sets
Plan Check submitted
Item
Amount
Structural Calcs.
Reviewed, ready for corrections
Plan Check Deposit
Truss Calcs.
Called Contact Person
Plan Check Balance
Title 24 Cates.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2ad Review, ready for corrections/issue
Electrical
Subcontactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
'"' Review, ready for corrections/issue
Developer Impact Fee
Planning Approval
Called Contact Person
A.I.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees
1
1
I
6
t
6' (T-4' TO W-41 PROTO II EXPOSURE C TRENCH FOOTING - NO RETAINING
CAP BLOCK=
PER SHEET C
FOR SIDEYARD RETURN w
WALLS WHERE DRAINAGE x
} SWALE OCCURS, INSTALL
1 DRAINAGE BLOCK AT
SWALE AT GRADE. I _
FINISHED
O.: S
. /Z
• w S 4055,,
d.
TF OF CAL1F�
THESE DRAWINGS/CALCULATI
DESIGN CRITERIA (PER 2013 CBC)
1. ALLOWABLE SOIL BEARING
PRESSURE = 1000 PSF MIN.
Z. ALLOWABLE SOIL PASSIVE
PRESSURE = 150 PCF MIN.
3. SEE SHEET B AND SHEET C
PRIOR TO START OF
CONSTRUCTION.
6" SEE SHEET C FOR BEARING
PLATE SIZE.
PROTO 11 ROD EMBEDDED INTO FOOTING AS
SHOWN. POST TENSION (PT) RODS TO OCCUR
WITHIN t 8" OF CONVENTIONAL REINFORCING.
j ONLY GROUT CELLS WITH CONVENTIONAL
11 REINFORCING WITHIN CONVENTIONAL CMU HEIGHT.
(� PROTO II FENCE WALL
HORIZONTAL JOINT REINFORCING TOP
2 COURSES BELOW PLATE AND AT
24" O.C. BELOW
GROUT CELLS SOLID 3" ABOVE VERTICAL
fl REINFORCING
I� VERTICAL REINF, 'X' BARS
1 #4 CONTINUOUS IN 8"
DEEP SOLID GROUTE9
• BOND BEAM..
;SETBACK
PER
MR i OR I �; R�lm V�_,
TRENCH DEPTH AT TOP OF 2:1 SLOPE
SETBACK -FACE
FENCE WALL SCHEDULE AT LEVEL SOIL
OF FOOTING TO
TRENCH FOOTING
H
MAX
DESIGN WIND
EXP MPH
6" CONY.
CMU HEIGHT
CENTERED
'X' REBAR
6" PROTO
II HEIGHT
PT ROD
SPACING
'D'
MIN.
12"
C AT 100_
2'=0"
#4 AT 40" O.C'
`n
. #4 CONT, .0NUILDING & SAFETY DEPT
7'-4"
C AT 110-
Q_ N
CONTINUOS CONS INTA, CA
�- w
a o
......... ........._
... C AT 120..._
y SEALED ON $
5'-0" TO JOB ,N, BER
DATE B 9.155
8�>�14 CONT.
C AT 100
12`-.0"
#4 AT 32" O.0
6'-07
6'-0"
2'-5"
8'-0"
C AT 110
ENGR
-.
--
--.
JAC
CAT120
.$ "
._SCOTT
_
PACKAGE
SHEET
INC • s^.�<.
C AT 100 _._.
2''-8"_.
#4 AT 24" O.0 :
6'-,0"
6'-0»
2'�7"
8'-8"
CAT 110
--
--
__
--
C AT 120
--
--
--
--
--
C AT 100
3'<-g^
#4 AT 24" O.0
6 Q„< .:
6 _0”
2*_•t0,
9'-4"
C AT 110
--
-
--
--
-
C AT 120
__
--
--
--
--
CAP BLOCK=
PER SHEET C
FOR SIDEYARD RETURN w
WALLS WHERE DRAINAGE x
} SWALE OCCURS, INSTALL
1 DRAINAGE BLOCK AT
SWALE AT GRADE. I _
FINISHED
O.: S
. /Z
• w S 4055,,
d.
TF OF CAL1F�
THESE DRAWINGS/CALCULATI
DESIGN CRITERIA (PER 2013 CBC)
1. ALLOWABLE SOIL BEARING
PRESSURE = 1000 PSF MIN.
Z. ALLOWABLE SOIL PASSIVE
PRESSURE = 150 PCF MIN.
3. SEE SHEET B AND SHEET C
PRIOR TO START OF
CONSTRUCTION.
6" SEE SHEET C FOR BEARING
PLATE SIZE.
PROTO 11 ROD EMBEDDED INTO FOOTING AS
SHOWN. POST TENSION (PT) RODS TO OCCUR
WITHIN t 8" OF CONVENTIONAL REINFORCING.
j ONLY GROUT CELLS WITH CONVENTIONAL
11 REINFORCING WITHIN CONVENTIONAL CMU HEIGHT.
(� PROTO II FENCE WALL
HORIZONTAL JOINT REINFORCING TOP
2 COURSES BELOW PLATE AND AT
24" O.C. BELOW
GROUT CELLS SOLID 3" ABOVE VERTICAL
fl REINFORCING
I� VERTICAL REINF, 'X' BARS
1 #4 CONTINUOUS IN 8"
DEEP SOLID GROUTE9
• BOND BEAM..
;SETBACK
PER
MR i OR I �; R�lm V�_,
TRENCH DEPTH AT TOP OF 2:1 SLOPE
SETBACK -FACE
ADDED DEPTH OF
OF FOOTING TO
TRENCH FOOTING
TOP OF SLOPE
36"
0"
30"
3".
12"
12"
3"
17"
I
,.
� 2
_Lo
c� N I
" - -I 1
Uj w J
o
. _ MAX
Z
r Q
W o _ Eo. Q
: CIZ_Y OF LA QUINTA
NF,V y
.
n
`n
. #4 CONT, .0NUILDING & SAFETY DEPT
o = o
\ AND BOTT ° M;. ilk p SOV' : TO- II S:.. NDARD
Q_ N
CONTINUOS CONS INTA, CA
�- w
a o
TRENCH F OTING CON T(�UC: t TN
y SEALED ON $
5'-0" TO JOB ,N, BER
DATE B 9.155
8�>�14 CONT.
DAYLIGHT MIN, -
-utA DRAWN
m
rn
n C e 14-115-8964 TMH
CARUSO g
s->"`a3m"s PROTO-II TM WALL SYSTEMS
�,a�ai=
DATE
ENGR
TURLEY
ems' WWW.PROT02.COM
08.19.2014.
JAC
Fl,
.$ "
._SCOTT
e@�@i@ 41800 CASCADES COURT TEMECULA. CA 92591
ATTN: GARY OTTo
PACKAGE
SHEET
INC • s^.�<.
PH® (951) 694-3793 — goryollo®proloii.com
(MAY ONLY BE INSTALLED BY APMVEO AND CERDCCD INSTALLERS)
S2.1
WWW-C(SOZ.com IE
4'• 6'.. AIA 8• THICK POST-TENSIONEO MASONRY WALLS
ARE CONSIDEREO PRELIMINARY -NOT FOR CONSTRUCTIDN
OR RECOROING UNLESS THE STRUCTURAL ENGINEER OF RECORD'S SEAL IS AFFIXED 1jITH, WRITTEN SIGNATURE.
* GEAERAL STRUCTURAL NOTES
1. SOIL SHALL BE FIRM AND COMPACTED PRIOR TO'PLACEMENT OF CONCRETE. PRIOR TO FOUNDATION EXCAVATION, USER SHALL
VERIFY THAT SITE SOILS CONDITIONS MEET OR EXCEED AN ALLOWABLE PASSIVE BEARING PRESSURE OF 150 PSF/FT (SOIL
.CLASS 4 OR BETTER AS DEFINED BY THE CBC) STARTING AT THE TOP OF GRADE(I.E. NO TOP SOILS ARE NEGLECTED FOR
PASSIVE) AND A MINIMUM ALLOWABLE BEARING PRESSURE OF 1000 PSF.
2. FOOTINGS TO BE LEVEL. IF GROUND SLOPES THE FOOTING SHALL BE STEPPED. EACH STEP SHOULD BE PROPER HEIGHT TO FIT
BLOCK TYPE USED. ALL EXCAVATIONS SHOULD BE CLEAN AND CONTAIN NO LOOSE EARTH OR FOREIGN MATTER.
3. SEE SHEET A FOR EXPOSURE, WIND SPEED, POST TENSIONED ROD SPACING, FOOTING SIZES, ETC. USER IS RESPONSIBLE TO
VERIFY REQUIREMENTS WITH BUILDING DEPARTMENT' AND OWNER. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE
APPROVED SITE PLAN AND APPLICABLE CODE OR JURISDICTION REQUIREMENTS.
4. SOIL BELOW FOUNDATIONS SHALL BE WELL DRAINED AND NON -EXPANSIVE. USE CONCRETE WITH A MIN. STRENGTH OF 2,500 PSI
- TYPE 11 CEMENT (TYPE V WHERE REQUIRED BY OWNER, SOILS ENGINEER OR JURISDICTION). CONCRETE SHALL BE A MIN. OF
48 HOURS OLD PRIOR TO FINAL TENSIONING. ALL CONCRETE SHALL BE THOROUGHLY CONSOLIDATED BY SUITABLE MEANS
DURING PLACEMENT.
5. LAP REINFORCING STEEL: LAP = 24" FOR #4 BARS IN MASONRY AND 32" FOR #4 BARS IN CONCRETE.
6. CONCRETE MASONRY UNITS SHALL COMPLY WITH ASTM C-90 AND BE 2,000 PSI MIN. (F -M DESIGN CRITERIA FOR BLOCK IS
BASED ON 2000 PSI). BLOCK SHALL BEA MIN OF 7 DAYS OLD PRIOR TO ROD TENSIONING. STANDARD HEAD AND BED JOINT
BLOCKS WITH MORTAR MAY BE USED OR INTERLOCKING BLOCKS MAY BE USED. BLOCKS SHALL BE LAID IN RUNNING BOND.
7. MORTAR SHALL BE TYPE S, 2000 PSI MIN. MORTAR MUST BE A MIN. Of 4 HOURS OLD PRIOR TO INITIAL TENSIONING AND 24
HOURS OLD PRIOR TO FINAL TENSIONING. GROUT SHALL BE 2000 PSI PER THE LATEST EDITION OF ACI 530 MECHANICALLY
VIBRATE GROUT IMMEDIATELY AFTER PLACEMENT.
8. FIRST MASONRY COURSE -MAY BE SET IN FRESH CONCRETE FOOTING.
9. REINFORCING REBAR SHALL CONFORM TO ASTM A641; Fy = 60,000 PSI.
,I O. PROTO-11 HARDWARE IS DEFINED AS: TENSION RODS, BEARING PLATES, COUPLERS, NUTS, ALL THREADS, DIRECT TENSION
INDICATORS (A DIRECT TENSION INDICATOR (DTI) IS A COMPRESSIBLE WASHER) AND PLASTIC SADDLES. ALL OF THIS ,HARDWARE
SHALL BE SUPPLIED BY ONLY AN APPROVED PROTO-11 LICENSEE TO THE CERTIFIED INSTALLER. POST TENSION RODS SHALL BE
7/16" DIAMETER WITH 1/2" ROLL THREADS CONFORMING TO ASTM A641 (FY = 60000 PSI) AND HAVE STEEL CHEMISTRY SO
THAT BENDING AND THREADING CAN BE ACCOMPLISHED WITHOUT DAMAGE TO THE POST TENSION ROD. AREA OF POST' TENSION
ROD = .1503 SQUARE INCHES. BEARING PLATES ARE 1/4" THICK (Fy=50 KSI) SEE SHEET C FOR DIMENSIONS. 1/2" COUPLERS
PER ASTM A563 GRADE A, AND THE COUPLER MUST FULLY ENGAGE THE UPPER AND LOWER ROD, FULLY ENGAGED IS DEFINED
AS 1/2" MIN. INTO COUPLER. 1/2" NUTS ARE TO BE GRADE 8, PER ASTM A325. 1/2" ALL THREADS PER ASTM A307, GRADE
60. DIRECT TENSION INDICATOR (DTI - COMPRESSIBLE WASHER) IS MANUFACTURED PER ASTM F959. PLASTIC REBAR SADDLES
ARE NON-STRUCTURAL.
11. HORIZONTAL JOINT REINFORCING SHALL BE 9 GAGE DIAMETER WIRE AND PLACED PER SHEET A AND CONFORM TO ASTM A82
LADDER TYPE, 9 GAGE DIAMETER. LAP JOINT REINFORCING ONE FULL CROSS SQUARE (6" MINIMUM LAP).
12. IN LIEU OF FULL HEIGHT RODS, CONTRACTOR MAY USE SHORTER RODS, 1/2" COUPLERS AND STRAIGHT RODS THREADED BOTH
ENDS FOR ADDITIONAL LIFTS. RODS SHALL HAVE A MIN. OF 3" V HOOK, WITH 1/2•• NUT AT END OF TENSION ROD WHERE
EMBEDDED IN FOOTING.
13. VERTICAL CONTROL JOINTS TO BE PLACED AT MAX. 36' O.C. IN ALL NON -STUCCOED WALLS AND 20' ON CENTER IN STUCCOED
WALLS WITH CLEAN VERTICAL BREAK OF ALL MATERIALS. POST TENSION ROD SHALL OCCUR WITHIN 12" OF END OF WALL AND
12" EACH SIDE OF CONTROL JOINT.
14. NO COUPLERS MAY OCCUR DIRECTLY BELOW AND IN CONTACT WITH THE BEARING PLATE. NO BOND BEAM BLOCK MAY BE USED
AT PLATE/TENSION LOCATION.
15. TENSION RODS MAY BE STABBED INTO WET CONCRETE OR TIED IN PLACE AT CONTRACTOR' OPTION.
16. A PROTO-11 DTI (COMPRESSIBLE WASHER) SHALL BE INSTALLED AT EVERY TENSION ROD BETWEEN THE BEARING PLATE AND NUT
WITH THE OTI "TABS" FACING UP AGAINST THE BOTTOM OF'THE NUT. THE SPECIAL DEPUTY INSPECTION. REQUIRED AT TIME OF
FINAL TENSIONING BY A DEPUTY INSPECTOR SHALL VERIFY FINAL TENSIONING TO 6,000 POUNDS BY 1 OF 2 METHODS; METHOD
1; VISUAL INSPECTION OF DIRECT TENSION INDICATOR (DTI), TABS FACING UP AND COLLAPSED AGAINST NUT WITH NO LIGHT
LEAKAGE BETWEEN THE PROTO-11 DTI AND BOTTOM OF NUT. METHOD 2: USE OF A CALIBRATED TORQUE WRENCH TORQUED TO
55 FT -LBS. (DTI MUST STILL BE PLACED WITH METHOD 2. NO VISUAL INSPECTION OF DTI REQUIRED WHEN USING METHOD 2).
INSPECTOR SHALL OBSERVE THE USE OF THREAD LUBRICANT, THE POSITION OF PLATE ON BLOCK, AND INTEGRITY OF MORTAR
JOINTS, AND PROVIDE A SIGNED REPORT TO ALL REQUIRED PARTIES. PROTO 11 MASONRY DESIGN IS BASED ON THIS SPECIAL
INSPECTION.
17. POST TENSION ROD SPACING TOLERANCE IS t8" BUT THE NUMBER OF RODS FOR A GIVEN LENGTH OF WALL MUST REMAIN
THE SAME.
18. SEISMIC DESIGN CRITERIA: Ss=2.0, SI=0.749 SOIL CLASS=D (ASSUMED), RISK CATEGORY 1.
19. ALL CONVENTIONALLY REINFORCED MASONRY DESIGNS ARE BASED ON FULL STRESSES AND REQUIRE INSPECTION. FOUNDATION
INSPECTION PRIOR TO PLACEMENT OF CONCRETE INCLUDES: FOOTING STEEL LOCATION AND GRADE, AND SIZE/DEPTH OF FOUNDATION
AND CLEANLINESS Of :F NOA.TION. F MASONRY APRE-GROUT INSPECTION SHALL BE PERFORMED. THE PRE -GROUT INSPECTION
INCLUDES: VERIFICATION f THE CATION OF STRUCTURAL ELEMENTS, GRADE OF NFf1RCEMktdT ANR""0 AND
QUALITY F MA AL ON .: SED FOR CONFORMANCE WITH CONSTRUCTION DOC MEI ►� AptSIT �{LA
SPECIAL SPEC 0 S QUIREp BY JURISDICTION Q� ARD
/ 14-115-91b5
ACKING �
RAWN
-15-:96
BUIL/n�DING &A
6A
,NCR
08,19.2014
JAC
P
SHEET
S2.1
FOR COfi�# THI
V� Off.GC_'
SEALED ON.
S 40 5' rn
OATE
Lum
a
CARUSO8
s;Zo?ms
���
PROT i
WWW PR0{ T0022$C0M
TRUGT.�P
TURLEY
sT •. \Qs
9JE
r1 SCOTT
;r
INC.
k
Or J
6g M e
41800 CASCADES COURT iEMECULA,.CA 92591•
A.M. GARY OTTO
PH# 694-3793
Fp(;?.
OF CA��
www.ctsoz.com
€ � I.
(951) — garyollo6protoii.com
(WAY TINT. DE INSTALLED BY APPRDYED AND.CER TFIED. INSTALLERS)
/ 14-115-91b5
ACKING �
RAWN
-15-:96
TMH
6A
,NCR
08,19.2014
JAC
PACKAGE
SHEET
S2.1
B
THESE ORAVANGS/CALCULATIONS ARE CONSIDERED PRELIMINARY -NOT FOR r CONSTRUCTION OR RECORDING UNLESS THE STRUCTURAL ENGINEER OF RECORD'S SEAL IS AFFIXED VATH WRITTEN SIGNATURE.
3aIllVN015 N311RA Hlu103XUIV SI 1V3S 5.080338 30 03NIJN3 IMUOMS 3H1 SS31Nf1 ONI180038
So N 0 al
J ION- A I ad 038301SNOD MV
'I
A
J
%
sa aano5rn .03no2N3i'-ISod OW .0 CNr B .0
(SN37rn1VISrn0NI 031JUM OM/ 03AOSddv A8 Q711rIkl$ 3y Ai!4 AV")
All.,
c c�.
•� YY
' '
30 3003 3H1 IV 033V1d 38 01 S31Vld 1331S
W07'20S)�'MMM
1.9x„4x•4/l:ll OlOad dnnis „9 '0
N9%Z/l 4x„4/1:I1 0108d „9 '3
V
wolaJL'001WJ06 - ULC -469 (IS6)
0110 N11V
��"����
83
n
:S3ZIS 31V1d 13315 'it
133HS.
3OVH9V
AM
t65Z6 V0 'V1f133W31 1af109 S30V0SVD 0081>
;��o�o
�
?
.L Loos
x�,Iiln I. 3
'8
a
OOH 'inN 83AOO A13131MOD '008 O1NO ,d(13„
btOZ 61.20
w0�'ZOJ OLId'MMM
'M0138 .3„ * .9. S31ON
83d SOOHAN OMl 30 3NO A8 03MUN00
ONV OVOI S8l 000'9 38 01 NOISN31 YvAININ
aDN3
'S8V1 3181SdV1100
' "� II.01021d
aS
0
4
osnalvo
T
o;
'Z
Wl,
b968 -S1_
_:1VC!
w
V80
N `JNIHOV`
,y.�6��P
N0 031V3S
cf I _.
ls'► CI�1vt6 'S' S K:t::,...1(rri
'S3118Vd
031SI1 Ol 1HOd38 0313idW03 V 30IA08d Ol
80133dSNl A1f1d30 1V103dS '3AOBV 0310N SOOK13VI
OMI 3Hl 30 3NO A8 03Wa0383d ONINOISN31 30
N01133dSNl Aind30 1VI03dS 3AVH Ism 8311VISNI '0
'038If1038 Si I10 30 NOI133dSNl ivnsK ON 'S81-13
SS Ol 03(10801 SI IIVM 148UN03 11IM. 80133dSNl
A1nd30 'OOHAN HON3W 360801 ONisn 31
,inN 30 lNO1108 ONV SBVI 3H1 N33M138 SNV31
1H011 ON HIM 03SdV1i00 SI 110 3H1 MUN03
O1 (10H1314 LLO 3H1 ONISn N3HM N01103dSNl ivnsiA
V A803H3d 11Ud 80133dSNl kind3O 1V103dS 3
'8 133HS NO 31ON 1V83N30
33S 'OOHIM HON38M 3(10801 ONISn A 008
NO 030Vid 38 Ism fills in 'sei-i3 SS Ol sinN
3(10801 'HON38M 3f10801 031V8911VO V 30 3sn
A8 03A31HOV 38 AVNI 3f10801 inN 30 N01133dSNl
'SBVI 30 N01103dSN1 ivnstA Ol 31VN8311V SV '8
'03A31H3V N338 SVH inN 30 3nO801
83d08d N3HM (110 ONV inN 30 W01108 N33M138
S3SSVd 1HOIi ON) 3SdV1100 1IM SOV1 '1 (1N 30
W01108 1SNIVOV do 30V3 01fi0HS RO 803 S8V1
"008 NOISN31 HOV3 IV 03sn 38 01 LLO II 0108d I
N:
SNOUV301 31V1d
ONI8V38 IV NO018 WV38 ON08 3sn lON 00 71
S301S 338H1
NO All(13 S8V38 31V1d 3Hl 1VHl OS 1133 3Hl
30 3003 3H1 IV 033V1d 38 01 S31Vld 1331S
1.9x„4x•4/l:ll OlOad dnnis „9 '0
N9%Z/l 4x„4/1:I1 0108d „9 '3
„9x„Z/1 Zx•4/l:ll 0108d dMIS j '8
„9xa£x,L/ l :11 0108d „4 'V
:S3ZIS 31V1d 13315 'it
'M0138 113HS 33V3 ON3 80 83M 831N33 'Ol.
ON13H03N138 1NIOf IVINOZ180H snonNI1NO3
'6
'008 ONV 31Vid
83AO3 Ol RIS 103wns 30 N3018 dV3
'8
'8VAOA Hi1M 31V1d ONV
OOH 'inN 83AOO A13131MOD '008 O1NO ,d(13„
A131VIOYMl 'NVI80w H11M N3018 dV3 1113
1
'M0138 .3„ * .9. S31ON
83d SOOHAN OMl 30 3NO A8 03MUN00
ONV OVOI S8l 000'9 38 01 NOISN31 YvAININ
'9 .
'S8V1 3181SdV1100
'S
31V1d d01 9NIHV38
4
'(110) 801VOlONI NOISN31 133810
T
1f1N
'Z
'008 NOISN31 1SOd
l
1 N A
,W .S;
IIVM 11 0108d :10 d01
Va0 3S3H1
lbws,'
m
�Q
11
3
E'
s•
)
I
6" (T-0 TO 9'-4') PROTO II EXPOSURE C TRENCH FOOTING - MINOR RETAINAGE
E.
X
FENCE WALL SCHEDULE AT LEVEL SOIL
BLOCK PER -
a�
'H'
MAX ..
DESIGN WIND
EXP MPH
6" CONY.
CMU HEIGHT
CENTERED
'X' REBAR
6" PROTO II
HEIGHT
PT ROD
SPACING
'D'
MIN.
�w
Z
C AT 100
2'-0"'
#4 AT 32" O.C.
5-4"
81-0'`
SURCHARGE - SEE
7'-4"
C AT 110
SHEET
='=
w
0
FOR
MORE INFO.
C AT .120
Q=
a
fi$a<�6
o 'r
V)
.
www.c tsaz.corn
C AT 100
2'-0'.'
#4 AT 32" O.C.
6'=0''
6'-0"
2'-10`
8'-0"
C AT 110
--
--
--
--
--
C AT 120
-
--
--
--
--
C AT 106
2'_8"
#4 AT 24" O.C.
6'-0"
6'-0"
2`-11"`
8'-8"
C AT 110
C AT 120
--
--
--
--
--
C AT 100
#4 AT 16" O.C.
6`_6"
9'-4"
C AT 110
--
--
--
--
--
C AT 120
--
E.
X
CAP
BLOCK PER -
a�
GROUT CELLS SOLID 3" ABOVE
a~
SHEET C
NOTE:
o�
FINISHED
GRADE 4:1-
�w
Z
w
MAX
SLOPE. NO
FOR SIDEYARD RETURN WALLS
=
SURCHARGE - SEE
4J
0
o
SHEET
B, NOTE 20
w
0
FOR
MORE INFO.
=
U
Q=
a
fi$a<�6
o 'r
V)
.
www.c tsaz.corn
w
4'::6',..Mq Irl. ft DOSE -trust ip uASOMRr NAl S
THESE DRAWINGS/CALCULATIONS ARE CONSIDERED PRELIMINARY -NOT FOR CONSTRUCTION
:
UNLESS THE STRUCTURAL ENGINEER OF RECORD'S SEAL IS AFnxEO WITH WRITTEN SIGNATURE.
1Z
N
E.
3/4" OPEN GRADED_!
GRAVEL BACKFILL
GEOFABRIC WRAP
4" DIA. SCHEDUI-40
PERFORATED PVC iPE
WITH 1% MIN.. GRA
TO h9'PRO�' .0 ET
12"
DESIGN CRITERIA (PER 2013 CBC):
1. ALLOWABLE SOIL BEARING
PRESSURE = 1000 PSF MIN.
2. ALLOWABLE SOIL PASSIVE
PRESSURE = 150 PCF MIN.
3. ACTIVE PRESSURE = 30 PCF
MAX
4. SEE SHEET B AND SHEET C
PRIOR TO START OF
CONSTRUCTION.
SEE SHEET C FOR BEARING
PLATE SIZE.
PROTO II ROD EMBEDDED INTO FOOTING AS
SHOWN. POST TENSION (PT) RODS TO OCCUR
WITHIN t 8" OF CONVENTIONAL REINFORCING.
ONLY GROUT CELLS WITH CONVENTIONAL
REINFORCING WITHIN CONVENTIONAL CMU HEIGHT,
PROTO II FENCE WALL.
HORIZONTAL JOINT REINFORCING TOP
X
AT
24" O.C. BELOW
a�
GROUT CELLS SOLID 3" ABOVE
a~
�Z
NOTE:
o�
o�
1 #4 CONTINUOUS IN 8" DEEP
�w
Z
I w
IF AVAILABLE FOR FURTHER INFO.
VERTICAL REINF. 'X' BARS
FOR SIDEYARD RETURN WALLS
w
o rn
WHERE DRAINAGE SWALE OCCURS,
2"0 WEEP HOLES AT
INSTALL DRAINAGE BLOCK AT
0 U
SWALE AT GRADE.
L\1
U
@��8�
41800 GA>SCAQCS��AiRT�7TXT C7T C$t!ix,.
ATTN GARY 0110 PACKAGE SHEET
3/4" OPEN GRADED_!
GRAVEL BACKFILL
GEOFABRIC WRAP
4" DIA. SCHEDUI-40
PERFORATED PVC iPE
WITH 1% MIN.. GRA
TO h9'PRO�' .0 ET
12"
DESIGN CRITERIA (PER 2013 CBC):
1. ALLOWABLE SOIL BEARING
PRESSURE = 1000 PSF MIN.
2. ALLOWABLE SOIL PASSIVE
PRESSURE = 150 PCF MIN.
3. ACTIVE PRESSURE = 30 PCF
MAX
4. SEE SHEET B AND SHEET C
PRIOR TO START OF
CONSTRUCTION.
SEE SHEET C FOR BEARING
PLATE SIZE.
PROTO II ROD EMBEDDED INTO FOOTING AS
SHOWN. POST TENSION (PT) RODS TO OCCUR
WITHIN t 8" OF CONVENTIONAL REINFORCING.
ONLY GROUT CELLS WITH CONVENTIONAL
REINFORCING WITHIN CONVENTIONAL CMU HEIGHT,
PROTO II FENCE WALL.
HORIZONTAL JOINT REINFORCING TOP
2 COURSES BELOW PLATE AND
AT
24" O.C. BELOW
1
GROUT CELLS SOLID 3" ABOVE
MAX ZN
RETAINED HEIGHT
NOTE:
3'
DRAINAGE SHOWN ARE MINIMUM
1 #4 CONTINUOUS IN 8" DEEP
REOUIREMENTS. SEE SOILS REPORT
SOLID GROUTED BOND BEAM.
IF AVAILABLE FOR FURTHER INFO.
VERTICAL REINF. 'X' BARS
FOR SIDEYARD RETURN WALLS
w
o rn
WHERE DRAINAGE SWALE OCCURS,
2"0 WEEP HOLES AT
INSTALL DRAINAGE BLOCK AT
6'-0" O.C. AS ALTERNATE
SWALE AT GRADE.
TO PERFORATED PIPE
,.
z
SETBACK - FACE
OF FOOTING - TO
TOP OF. SLOPE
ADDED DEPTH
OF TRENCH
FOOTING
V-
1
MAX ZN
---12"
ui o Li
3'
0
W
\- CONTINUOUS
w0U
#4 CONT. TOP
8 19 14 CONT
/ /
AND BOTTOM.
F77-0 4 `moo --
ADDED DEPTH OF FOOTING AT
TOP OF 2:1 SLOPE
SETBACK - FACE
OF FOOTING - TO
TOP OF. SLOPE
ADDED DEPTH
OF TRENCH
FOOTING
36`
2"
30"
4"
---12"
13^.
3'
18"
1AN
- �� Q U'A' QUI , CADARD
o: E spa
rr
aL;l � i SAF ' DEPT.
JQB Nt MABER
�• ' o �.
SEALED ON "
\- CONTINUOUS
5'a-0 TQ
Cl NCRE1iE yf i � PUS rl 9155
m
S.40 5 z
8 19 14 CONT
/ /
TR 4 G, # DRAWN
TRENCH FOOTI G f10, �+? 1 115-89 4 TMH
w
o rn
CARUSOR''
8
e2>
P Q�3� , ATE.. ENGR
M. ,
W W: F 2 $1J 2Q� JAC
ST Q �.
A'UCTV� ��'
TURLEY
SCOTT'
,.
@��8�
41800 GA>SCAQCS��AiRT�7TXT C7T C$t!ix,.
ATTN GARY 0110 PACKAGE SHEET
9TH �F
OF CAV
INC.
fi$a<�6
PH# (951}'651-3193 gcx:yollo�iii*olds. /�
I~Ar al,ir. (tC w,'AlUp Gr ap,RovFo'l ao CCa"Mt S3.1 A
.
www.c tsaz.corn
�� �,;
» ..
4'::6',..Mq Irl. ft DOSE -trust ip uASOMRr NAl S
THESE DRAWINGS/CALCULATIONS ARE CONSIDERED PRELIMINARY -NOT FOR CONSTRUCTION
OR RECORDING
UNLESS THE STRUCTURAL ENGINEER OF RECORD'S SEAL IS AFnxEO WITH WRITTEN SIGNATURE.
I
w
GENERAL STRUCTURAL NOTES
1. SOIL SHALL BE FIRM AND. COMPACTED PRIOR TO'PLACEMENT OF CONCRETE. PRIOR TO FOUNDATION EXCAVATION, USER SHALL
VERIFY THAT SITE SOILS CONDITIONS MEET OR EXCEED AN ALLOWABLE PASSIVE BEARING PRESSURE OF 150 PSF/FT (SOIL TYPES
SW, SP, GW, OR GP) STARTING AT THE TOP OF GRADE(I.E. NO TOP SOILS ARE NEGLECTED FOR PASSIVE) AND A MINIMUM
ALLOWABLE BEARING PRESSURE OF 1000 PSF.
2. FOOTINGS TO BE LEVEL. IF GROUND SLOPES THE FOOTING SHALL BE STEPPED. EACH STEP SHOULD BE PROPER HEIGHT TO FIT
BLOCK TYPE USED. ALL EXCAVATIONS SHOULD BE CLEAN AND CONTAIN NO LOOSE EARTH OR FOREIGN MATTER.
3. SEE SHEET A FOR EXPOSURE, WIND SPEED, POST TENSIONED ROD SPACING, FOOTING SIZES, ETC. USER IS RESPONSIBLE TO VERIFY
REQUIREMENTS WITH BUILDING DEPARTMENT AND OWNER. ALL WORK IS TO BE PERFORMED IN. ACCORDANCE WITH THE APPROVED
SITE PLAN AND APPLICABLE CODE OR JURISDICTION REQUIREMENTS.
4. SOIL BELOW FOUNDATIONS SHALL BE WELL DRAINED AND NON -EXPANSIVE. USE CONCRETE WITH A MIN, STRENGTH OF 2,500 PSI —
TYPE 11 CEMENT (TYPE V WERE REQUIRED BY OWNER, SOILS ENGINEER OR JURISDICTION). CONCRETE SHALL BE A MIN. OF 48
HOURS OLD PRIOR TO FINAL TENSIONING. ALL CONCRETE SHALL BE THOROUGHLY CONSOLIDATED BY SUITABLE MEANS DURING
PLACEMENT.
5. LAP REINFORCING STEEL: • LAP = 24" FOR #4 BARS IN MASONRY AND 32" FOR #4 BARS IN CONCRETE.
6. CONCRETE MASONRY UNITS SHALL COMPLY WITH ASTM C-90 AND BE 2,000 PSI MIN. (F -M DESIGN CRITERIA FOR BLOCK IS BASED
ON 2000 PSI), BLOCK SHALL BE A MIN OF 7 DAYS OLD PRIOR TO ROD TENSIONING, STANDARD HEAD AND BED JOINT BLOCKS WITH
MORTAR MAY BE' USED OR INTERLOCKING BLOCKS MAY BE USED. BLOCKING TO BE' LAID IN RUNNING BOND.
7. MORTAR SHALL BE TYPE S. 2000 PSI MIN. MORTAR MUST BE A MIN. OF 4 HOURS OLD PRIOR TO INITIAL TENSIONING AND 24
HOURS OLD PRIOR TO FINAL TENSIONING. GROUT SHALL BE 2000 PSI PER THE LATEST EDITION OF ACI 530. MECHANICALLY VIBRATE
GROUT IMMEDIATELY AFTER PLACEMENT.
8. FIRST MASONRY COURSE MAY BE SET IN FRESH CONCRETE FOOTING.
9. REINFORCING REBAR SHALL CONFORM TO ASTM A641; Fy = 60,000 PSI.
10. PROTO-1I HARDWARE IS DEFINED AS: TENSION RODS, BEARING PLATES, COUPLERS, NUTS, ALL THREADS. DIRECT TENSION
INDICATORS (A DIRECT TENSION INDICATOR (DTI) IS A COMPRESSIBLE WASHER) AND PLASTIC SADDLES. ALL OF THIS HARDWARE
SHALL BE SUPPLIED BY ONLY AN APPROVED PROTO-11 LICENSEE TO THE CERTIFIED INSTALLER. POST TENSION RODS SHALL BE
1/16" DIAMETER WITH 1/2" ROLL THREADS CONFORMING TO ASTM A641 (FY = 60000 PSI) AND HAVE STEEL CHEMISTRY SO THAT
BENDING AND THREADING CAN.BE ACCOMPLISHED WITHOUT DAMAGE TO THE POST TENSION ROD. AREA OF POST TENSION ROD =
.1503 SQUARE INCHES. BEARING PLATES ARE 1/4" THICK (Fy=50 KSI) SEE SHEET C FOR DIMENSIONS. 1/2" COUPLERS PER ASTM
A563 GRADE A. AND THE COUPLER MUST FULLY ENGAGE THE UPPER AND LOWER ROD, FULLY ENGAGED IS DEFINED AS 1/2" MIN.
INTO COUPLER. 1/2" NUTS ARE TO BE GRADE 8, PER ASTM A325. 1/2" ALL THREADS PER ASTM A307, GRADE 60. DIRECT TENSION
INDICATOR (DTI - COMPRESSIBLE WASHER) IS MANUFACTURED PER ASTM F959. PLASTIC REBAR SADDLES ARE NON-STRUCTURAL.
11. HORIZONTAL JOINT REINFORCING SHALL BE 9 GAGE DIAMETER WIRE AND PLACED PER SHEET A AND CONFORM TO ASTM A82
LADDER TYPE, 9 GAGE DIAMETER. LAP JOINT REINFORCING ONE FULL CROSS SQUARE (6" MINIMUM LAP).
12. IN LIEU OF FULL HEIGHT RODS, CONTRACTOR MAY USE SHORTER RODS, 1/2" COUPLERS AND STRAIGHT RODS THREADED BOTH ENDS
FOR ADDITIONAL LIFTS. RODS SHALL HAVE A MIN. OF 3" 'L' HOOK, WITH 1/2" NUT AT END OF TENSION ROD WHERE EMBEDDED IN
FOOTING.
13. VERTICAL CONTROL JOINTS TO BE PLACED AT MAX. 36' O.C. IN ALL NON—STUCCOED WALLS AND 20' ON CENTER IN STUCCOED
WALLS WITH CLEAN VERTICAL BREAK OF ALL MATERIALS. POST TENSION ROD SHALL OCCUR WITHIN 12" OF END OF WALL AND 12"
EACH SIDE OF CONTROL JOINT.
14. NO COUPLERS MAY OCCUR DIRECTLY BELOW AND IN CONTACT WITH THE BEARING PLATE. NO BOND BEAM BLOCK MAY BE USED AT
PLATE/TENSION LOCATION.
15. TENSION RODS MAY BE STABBED INTO WET CONCRETE OR TIED IN PLACE AT CONTRACTOR OPTION.
16. A. PROTO—II DTI (COMPRESSIBLE WASHER) SHALL BE INSTALLED AT .EVERY TENSION ROD BETWEEN THE BEARING PLATE AND NUT
WITH THE DTI "TABS" FACING UP AGAINST THE BOTTOM OF THE NUT. THE SPECIAL DEPUTY INSPECTION REQUIRED AT TIME OF FINAL
TENSIONING BY A DEPUTY INSPECTOR SHALL VERIFY FINAL TENSIONING TO 6,000 POUNDS BY 1 OF 2 METHODS; METHOD 1; VISUAL
INSPECTION OF DIRECT TENSION INDICATOR (DTI), TABS FACING UP AND COLLAPSED AGAINST NUT WITH NO LIGHT LEAKAGE BETWEEN
THE PROTO-11 DTI AND BOTTOM OF NUT. METHOD 2: USE OF A CALIBRATED TORQUE WRENCH TORQUED TO 55 FT—LBS. (DTI MUST
STILL BE PLACED WITH METHOD 2. NO VISUAL INSPECTION OF DTI REQUIRED WHEN USING METHOD 2). INSPECTOR SHALL OBSERVE
THE USE OF THREAD LUBRICANT, THE POSITION OF PLATE ON BLOCK, AND INTEGRITY OF MORTAR JOINTS, AND PROVIDE A SIGNED
REPORT TO ALL REQUIRED PARTIES. PROTO it MASONRY DESIGN IS BASED ON THIS SPECIAL INSPECTION.
17. POST TENSION ROD SPACING TOLERANCE IS t8" BUT THE NUMBER OF RODS FOR A GIVEN LENGTH OF WALL MUST REMAIN THE
SAME.
18. ALL CONVENTIONALLY REINFORCED MASONRY DESIGNS ARE BASED ON FULL' STRESSES AND REQUIRE INSPECTION. FOUNDATION INSPECTION
PRIOR TO PLACEMENT Of CONCRETE INCLUDES: FOOTING STEEL LOCATION AND GRADE, AND SIZE/DEPTH OF FOUNDATION AND CLEANLINESS
OF FOUNDATION. FOR MASONRY A PRE—GROUT INSPECTION SHALL BE PERFORMED. THE PRE—GROUT INSPECTION INCLUDES: VERIFICATION OF
THE LOCATION OF STRUCTURAL ELEMENTS, GRADE OF REINFORCEMENT AND OVERALL WORKMANSHIP AND QUALITY OP MATERIALS BEING
USED FOR CONFORMANCE WITH CONSTRUCTION DOCUMENTS. ADDITIONAL SPECIAL INSPECTIONS AS REQUIRED BY JURISDICTION,
19. SEISMIC DESIGN CRITERIA: s=2.0, ;:S
RETAINING WALLS. PER CB $ECTI. ` 1803. 49 SOIL CLASS=O (ASSUMED), RISK CATEGORY I. NO DYNAMIC LOAD APPLIED TO
'5.12(1)
20. NO SURCHARGES :WITHIN 6 "` .WAIL ARE ALLOWED. SURCHARGES INCLUDE, BUT ARE NOT LIMITED T0, HOUSE'EOUNDATIONS
DRIVEWAYVENC .FENCE LLS 6 0' Of FACE OF WALL AND SOIL BACKFILL OVER 4:1 SLOPE.
PROTO II STANDARD
IAAAA• 1 �
s
IS AFFIXEDITHTH WRITTEN SIGNATURE
0 1ES
,i Lr %F .
'. FY
j• SO
Bui!__7ii ", c
J.2 2
SEALED ON
AF
1
w. S 40 5 m
01014
E° ;0i 8
CARUSO
g mos
„TURLEYVV,PALLN.
PROTO
re
�tlC? R� �P
�
-SCOTT
j w@0@o@
[Tm.wnu
41800 CASCADES ! TaLY
OF CALIF
INC
fig. §6e�
ATTNf•.OTTOq
PHI (951) 694-3o>K
'
www•CISOZ.com
a wu A Fnd
oo ..
(NAY ONLY BE INSTALLED ICY APAfKNETI'Al CLir101RYZS LENS)
s',. 6% AND E'. T100t POS r-iFJI5r6vLD uASON'Alyq
THESE ORAWINGS/CALCULATIONS ARE CONSIDERED PRELIMINARY -NOT FOR CONSTRUCTION
OR RECORDING
UNLESS THE STRUCTURAL ENGINEER OF RECORD'S S.Q
IAAAA• 1 �
s
IS AFFIXEDITHTH WRITTEN SIGNATURE
(5)
(9)
(10) .......
r .. S4)5.,
W ,
K
`nT,9 �IJCTU�
TF OF CAL
THESE DRAWINGS/CALCUL
KEY NOTES:
1. POST TENSION ROD.
2. NUT.
3, DIRECT TENSION INDICATOR (DTI).
4. BEARING TOP PLATE.
5. COLLAPSIBLE TABS.
6. MINIMUM TENSION TO BE 6,000 LBS LOAD AND
CONFIRMED BY ONE OF TWO METHODS PER
NOTES "B" & "C" BELOW.
7. FILL CAP BLOCK WITH MORTAR. IMMEDIATELY
"FLIP" ONTO ROD. COMPLETELY COVER NUT, ROD
AND PLATE WITH MORTAR.
8. CAP BLOCK OF SUFFICIENT SIZE TO COVER
PLATE AND ROD.
9. CONTINUOUS HORIZONTAL JOINT REINFORCING.
10. CENTER WEB OR END FACE SHELL BELOW.
11. STEEL PLATE SIZES:
A. 4" PROTO II: 1/4"x3"x6"
B. 4" SLUMP PROTO 11:1/4"x2 1/2"x6"
C. 6" PROTO 11:1/4"x4 1/2"x6"
D. 6" SLUMP PROTO IIsi/4"x4"x6"
STEEL PLATES TO BE PLACED AT THE EDGE OF
THE CELL SO THAT THE PLATE BEARS FULLY ON
THREE SIDES.
12. DO NOT USE BOND BEAM BLOCK AT BEARING
PLATE LOCATIONS.
NOTES:
A. PROTO II DTI TO BE USED AT EACH TENSION ROD.
TABS FOR DTI SHOULD FACE UP AGAINST BOTTOM
OF NUT. TABS WILL COLLAPSE (NO LIGHT PASSES
BETWEEN BOTTOM OF NUT AND DTI) WHEN.PROPER
TORQUE OF NUT HAS BEEN ACHIEVED.
B. AS ALTERNATE TO VISUAL INSPECTION OF TABS,
INSPECTION OF NUT TORQUE MAY BE ACHIEVED BY
USE OF A CALIBRATED TORQUE WRENCH. TORQUE
NUTS TO 55 FT—LBS. DTI STILL MUST BE PLACED ON
ROD IF USING TORQUE WRENCH METHOD. SEE
GENERAL NOTE ON SHEET B.
C. SPECIAL DEPUTY INSPECTOR WILL PERFORM A
VISUAL INSPECTION WHEN USING THE DTI METHOD TO
CONFIRM THE DTI IS COLLAPSED WITH NO LIGHT
LEAKS BETWEEN THE TABS AND BOTTOM OF NUT.
IF USING TORQUE WRENCH METHOD, DEPUTY
INSPECTOR WILL CONFIRM WALL IS TORQUED TO 55
FT—LBS. NO VISUAL INSPECTION OF DTI IS REQUIRED.
D. INSTALLER MUST HAVE SPECIAL DEPUTY INSPECTION
OF TENSIONING PERFORMED BY ONE OF THE TWO
METHODS NOTED ABOVE. SPECIAL DEPUTY INSPECTOR
TO PROVIDE A COMPLETED REPORT TO LISTED
PARTIES.
CIF6y C)IF LA CUM IIATA 41
mit-1-li G & SAFMIT
`3 A
�'
:�c 6 ri91
ovll=iiO B nTum E
�;I- SEALED ON
F"OR C.C}1 CSU 115=11:55,
TRACKING ,
DRAWN
:., '
T
@
14-1 8964
TMH
CARUSO
^=e s
W1RIV0 6*l >` c9
�.�
^^!�"t'2�i'
ENGR
TURLEY
JAC
Q
!! SCOTT
+ `
@@e@@@
41&DO CASCADES COURT TEMECULA CA 92 )1
PACKAGE
SHEET
INC.
n
�,
fi $
3
1 k�
ATTN GARY OTTO
PHy (951) 604-.179.1— gapotloRprolon c
(MAY ONLY DE L4 IALL(O'DY CERTnED
S3.1
WWw.ctsoz.com
a v
�lvlH'." +
AW,106 O'ANd WS1AL=)'
C. B. AND E' 9101 Mt-noSib$O, MASONRY .WALLS
ARE CONSIDERED PRELIMINARY -NOT FOR CONSTRUCTION OR RECORDING UNLESS THE STRUCTURAL ENGINEER OF RECORDS SEAL IS AFFIXED WITH WRITTEN SIGNATURE