BSOL2015-0120VOICE (760) 777-7125 aw
78-495 CALLE TAMPICO 4
LA QUINTA, CALIFORNIA 92253 FAX (760) 777-7011
COMMUNITY DEVELOPMENT DEPARTMENT INSPECTIONS (760) 777-7153
'r
BUILDING PERMIT
Date: 8/17/2015
Application Number: BSOL2015-0 Owner:
Property Address: 60629 LACE CT RICHARD HIRSCH
APN: 764330067 60629 LACE LEAF CT
Application Description: 10.07kW PV R t LA QUINTA, CA 92253
Property Zoning:
Application Valuation: $22,254.701P AUG 17 2015
Applicant: Contractor:
CITY OF LA QUINTA
SOLARCITY CORPORATION COMMUNITY C�cVELOPMENT DEPARTMENT SOLARCITY CORPORATION
3055 CLEARVIEW WAY 3055 CLEARVIEW WAY
ATTN ZOE STEELE ATTN ZOE STEELE
SAN MATEO, CA 94402 SAN MATEO, CA 94402
(650)963-5630
Llc. No.: 888104
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter
9 (commencing with Section 7000) of Division 3 of the Busin s and Professions Code,
and my License is in full force and effect.
Lice n lass: C4 B C A Lice a No - 881
CDateContractor—wrl
r:
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt fro4e Contractor's State
License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any
city or county that requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for the permit to file a
signed statement that he or she is licensed pursuant to the provisions of the
Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3
of the Business and Professions Code) or that he or she is exempt therefrom and the
basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a
permit subjects the applicant to a civil penalty of not more than five hundred dollars
($500).:
(_) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for sale.
(Sec. 7044, Business and Professions Code: The Contractors' State License Law does not
apply to an owner of property who builds or improves thereon, and who does the work
himself or herself through his or her own employees, provided that the improvements
are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner -builder will have the burden of proving that
he or she did not build or improve for the purpose of sale.).
(_) I, as owner of the property, am exclusively contracting with licensed contractors
to construct the project. (Sec. 7044, Business and Professions Code: The Contractors'
State License Law does not apply to an owner of property who builds or improves
thereon, and who contracts for the projects with a contractor(s) licensed pursuant to
the Contractors' State License Law.).
(_) I am exempt under Sec. B.&P.C. for this reason
Date:
Owner:
CONSTRUCTION LENDING AGENCY
I hereby affirm under penalty of perjury that there is a construction lending agency for
the performance of the work for which this permit is issued (Sec. 3097, Civ. C.).
Lender's Na
Lender's Address
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
_ I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which this permit
is issued. My workers' compensation insurance carrier and policy number are:
Carrier: _ Policy Number:
_ I certify that in the performance of the work for which this permit is issued, I
shall not employ any person in any manner so as to become subject to the workers'
compensation laws of California, and agree t ould JTcome subject to the
workers' compensation provisions of Sec&37. L r Code, I shall forthwith
comply hos provisions.
Date: Applicant
WARNING: FAILURE TO SECURE WORKERS' COMPENSATIONO ERAGE IS UNLAWFUL,
AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES D CIVIL FINES UP TO
ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF
COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE,
INTEREST, AND ATTORNEY'S FEES.
APPLICANT ACKNOWLEDGEMENT
IMPORTANT: Application is hereby made to the Building Official for a permit subject to
the conditions and restrictions set forth on this application.
1. Each person upon whose behalf this application is made, each person at whose
request and for whose benefit work is performed under or pursuant to any permit
issued as a result of this application , the owner, and the applicant, each agrees to, and
shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and
employees for any act or omission related to the work being performed under or
following issuance of this permit. ; , �
2. Any permit issued as a result of this application becomes null and void if work is
not commenced within 180 days from date of issuance of such permit, or cessation of
work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and sta 4 ws rel ing to building
construction, and hereby authorize representatives of ' ' y to nter on the above -
me *erlynspection purposes.
rDate:Signature (Applicant or Agen
INFORMATION
DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE
BSAS SB1473 FEE 101-0000-20306 0 $1.00 $0.00
PAID BY METHOD RECEIPT # CHECK # CLTD BY
Total Paid forBU1LDING STANDARDS ADMINISTRATION BSA $1.00 $0.00
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
PV SYSTEM - ARRAY, FIRST 20
101-0000-42403
0
$24.17
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
PV SYSTEM - ARRAY, FIRST 20 PC
101-0000-42600
0
$24.17
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
Total Paid for ELECTRICAL: $48.34 $0.00
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
PERMIT ISSUANCE
101-0000-42404
0
$91.85
$0.00
PAID BY
METHOD
RECEIPT #
CHECK #
CLTD BY
Total Paid for PERMIT ISSUANCE: $91.85 $0.00
TOTALS:• ••
Description: 10.07kW PV SYSTEM - (38) 265W PANELS/(2) INVERTER
Type: SOLAR
Subtype: Status: APPROVED
Applied: 8/4/2015 EVA
Approved: 8/14/2015 LUR
Parcel No: 764330067 Site Address: 60629 LACE LEAF CT CT LA QUINTA,CA 92253
Subdivision: TR 30023-1
Block: Lot: 116
Issued:_
Lot Sq Ft: 0
Building Sq Ft: 0 Zoning:
Finaled:
Valuation: $22,254.70
Occupancy Type: Construction Type:
Expired:
No. Buildings: 0
No. Stories: 0 No. Unites: 0
E-MAIL
Details: 10.7kW SOLAR ARRAY- (38) 265W KYOCERA PANELS W/ (2) PVI -3.6 -S -US -U -Z -A INVERTERS 1530SF]
2013 CALIFORNIA ELECTRICAL
CODE.
SENT ELENA AN EMAIL. PERMIT IS READY.TO BE ISSUED.
FINANCIAL INFORMATION
Printed: Monday, August 17, 2015 11:59:12 AM 1 of 2 CR? srsreMs
ADDITIONAL
CHRONOLOGY
CHRONOLOGY TYPE STAFF NAME
ACTION DATE
COMPLETION DATE
NOTES
E-MAIL
LUIS URIBE
8/14/2015
8/14/2015
SENT ELENA AN EMAIL. PERMIT IS READY.TO BE ISSUED.
CONDITIONS
CONTACTS
NAME TYPE
NAME
ADDRESSI
CITY STATE
ZIP
PHONE FAX EMAIL
APPLICANT
SOLARCITY CORPORATION
3055 CLEARVIEW WAY
SAN MATEO CA
94402
mplasse@solarcity.com
CONTRACTOR
SOLARCITY CORPORATION
3055 CLEARVIEW WAY
SAN MATEO CA
94402
mplasse@solarcity.com
OWNER
RICHARD HIRSCH
60629 LACE LEAF CT
I LA QUINTA CA
92253
FINANCIAL INFORMATION
Printed: Monday, August 17, 2015 11:59:12 AM 1 of 2 CR? srsreMs
INSPECTIONS
SEQID INSPECTION TYPE INSPECTOR SCHEDULED COMPLETED
DATE DATE
- RESULT REMARKS NOTES
SOLAR FINAL" BLD
CLTD
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
BY
BSAS SB1473 FEE
101-0000-20306
0
$1.00
$0.00
Total Paid forBUILDING STANDARDS ADMINISTRATION
$1.00 $0.00
BSA:
PV SYSTEM - ARRAY,
101-0000-42403
0
$24.17
$0.00
FIRST 20
PV SYSTEM - ARRAY,
101-0000-42600
0
$24.17
$0.00
FIRST 20 PC
Total Paid for ELECTRICAL: $48.34 $0.00
PERMIT ISSUANCE
101-0000-42404 1
0
$91.85
$0.00
Total Paid for PERMIT ISSUANCE: $91.85 $0.00
TOTALS:0•
INSPECTIONS
SEQID INSPECTION TYPE INSPECTOR SCHEDULED COMPLETED
DATE DATE
- RESULT REMARKS NOTES
SOLAR FINAL" BLD
REVIEW TYPEI REVIEWER I SENT DATE ( DUE DATE I RETURNDATEED ( STATUS I REMARKS I NOTES
INON-STRUCTURAL- I LUIS URIBE I 8/4/2015 I 8/11/2015 I 8/14/2015 I APPROVED I I
1 WK
BOND INFORMATION
Printed: Monday, August 17, 2015 11:59:12 AM 2 of 2 ��W YSTEMS
=,IllSOlarClt
y
July 18, 2015
Project/Job # 9223992
RE: COVER LETTER
Project: Hirsch Residence
60629 Lace Leaf Ct
La Quinta, CA 92253
To Whom It May Concern,
Digitally signed by Abe De Vera
Date: 2015.07.19 06:31:55
-07'00'
Version #48.2
A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was based on
site observations and the design criteria listed below:
Design Criteria:
- Applicable Codes = 2013 CBC, ASCE 7-10, and 2012 NDS
- Risk Category = II
- Wind Speed = 110 mph, Exposure Category C
- Ground/Roof Snow Load = 0 psf
- MP1: Roof DL = 14 psf, Roof LL = 20 psf
- MP2: Roof DL = 14 psf, Roof LL = 20 psf
On the above referenced project, the components of the structural roof framing impacted by the installation of the PV assembly have
been reviewed. After this review it has been determined that the existing structure is adequate to withstand the applicable roof dead
load, PV assembly load, and live/snow loads indicated in the design criteria above.
The structural roof framing and the rew attachments that directly support the gravity loading and wind uplift loading from PV modules
have been reviewed and determined to meet or exceed structural strength requirements of the 2013 CBC.
Please contact me with any questions or concerns regarding this project.
Sincerely,
Abe De Vera, P.E.
Professional Engineer
Main: 888.765.2489, x7526
email: adevera@solarcity.com
3055 Clearview Way Sar. Mateo, CA 94402 T (650) 638-1028 (888) SOL -CITY F (650) 638-1029 solarcity.com
AZ ROC 243771. CA CS1.8 888104. CO E 8041. CT HIC 0632778. DC HIC 71101486, DC HIS 71101488• HI CT -28770. MA HIC 168572, MD MHIC 128948. NJ 13VH06160600,
09 CCB 880498. PA 077343. TX TDL R 27008, wA GCL: SOL.ARC'91907. 0 2013 SolnrCity. All rights reserved.
,,.."SolarQt
PV System Structural
Design Software
PROJECT INFORMATION & TABLE OF CONTENTS
07.18.2015
Version #48.2
Project Name:
Hirsch Residence
AHJ:
La Quetta
Job Number:
9223992
Building Code:
2013 CBC
Customer Name:
Hirsch, Jonni
Based On:
IRC 2012 / IBC 2012
Address:
60629 Lace Leaf Ct
ASCE Code:
ASCE 7-10
City/State:
La Quinta, CA
Risk Category:
II
Zip Code
92253
Upgrades Req'd?
No
Latitude / Longitude:
33.608275-116.235372
Stamp Req'd?
Yes
SC Office:
I Thousand Palms
I PV Designer:
I DAI Yin
Cover Letter 1
Project Information, Table Of Contents, & Vicinity Map 2
Seismic Considerations 3
Structure Analysis (Loading Summary and Member Check) 4
Hardware Design (PV System Assembly) 5
60629 Lace Leaf Ct, La Quinta, CA 92253
Latitude: 33.608275, Longitude:-116.235372, Exposure Category: C
SEISMIC CONSIDERATIONS
Seismic sign Criteria(per USGS
Seismic Design Code
Area
ASCE 7-10
IBC Sect. 3404.4
Latitude
33.6083 - -
3 sf 2,019 lbs
Longitude
Total Weight of PV System
-116.2354
2,019 lbs
SRA at Short Period
SS
1.515
USGS
SRA at is Period
S,
0.600
USGS
Soil Site Class
651 sf 8.5 psf 5 531 lbs
D
`IBC_1613.5.2_
Seismic Desi n Category
SDC
D
USGS
Seismic Check Required (Ss;,--
0.4q & SDC >_D?
Yes
IBC 1613.1
ALTERATION LATERAL DESIGN 10% EXCEPTION CHECK
Weight of Proposed PV System
Sum Area of MPs with PV
Area
Dead Load Weight
IBC Sect. 3404.4
PV System Weight
673 sf
3 sf 2,019 lbs
Roof
Total Weight of PV System
W(PV)
2,019 lbs
Ceiling
Weight of Roof on Existing Building
Sum Area of MPs with PV
W�Pv�/ W�07��
1654 sf
IBC Sect. 3404.4
Portion of Roof Weight
Area Dead Load Weight
Roof
1 654 sf 14.0 psf 23 152 lbs
Ceiling
1,654 sf 5.0 psf 8,269 lbs
Interior Walls (Top Half)
Exterior Walls o Hal
651 sf 5.0 psf 3,253 lbs
651 sf 8.5 psf 5 531 lbs
Net Weight of Roof Under PV
W(exist)
I 40,204 lbs
Check % Increase of Roof Weight / Seismic Shear Load
% Increase of DCR of Lateral
Force Resisting stem
W�Pv�/ W�07��
5.0%
Increase Seismic Shear Load < 10% -> OK
IBC Sect. 3404.4
Note: Seismic base shear is directly proportional to roof weight.
STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP1
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (Is) pg; Ce=0.9, Ci=1.1, I5=1.0
Member Desi n Summa(per NDS
Governing Load Comb CD CL + CL - CF Cr
D 0.9 1.00 1 0.95 1 1.5 1.15
Member Properties Summary
mary
MP1
Roof Pitch
Horizontal Member Spans
Overhang 1.16 ft
Rafter Pro erties
Actual W 1.50"
Roof System Proerties
San 1
7.80 ft
Actual D
3.50"
Number of Spans (w/o Overhang)
3
San 2
6.26 ft
Nominal
Yes
Roofing Material
Spanish Tile Roof
San 3
5.11 ft
A
5.25 in A2
Re -Roof
No
San 4
D + Lr
Sx
3.06 in A3
Plywood Sheathing
Yes
San 5
24.2 psf
I
5.36 in.^4
Board Sheathing
None
Total Span
20.33 ft
TL Defi'n Limit
120
Vaulted Ceiling
No
PV 1 Start
2.33 ft
Wood Species
DF
Ceiling Finish
1/2" Gypsum Board
PV 1 End
14.92 ft
Wood Grade
#2
Rafter Sloe
180
PV 2 Start
Fb
900 psi
Rafter Spacing
24" O.C.
PV 2 End
F„
180 psi
Top Lat Bracing
Full
PV 3 Start
E
1600000 psi
Bot Lat Bracing
At Supports
PV 3 End
Emin
580000 psi
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (Is) pg; Ce=0.9, Ci=1.1, I5=1.0
Member Desi n Summa(per NDS
Governing Load Comb CD CL + CL - CF Cr
D 0.9 1.00 1 0.95 1 1.5 1.15
Member Loading
mary
Maximum
Roof Pitch
4/12 Initial
Pitch Adjust
Non -PV Areas
PV Areas
Roof Dead Load
DL 14.0 psf
x 1.05
14.7 psf
14.7 psf
PV Dead Load
PV -DL 9.0 psf
x 1.05
D
9.5 psf
Roof Live Load
RLL 20.0 psf
x 1.00
20.0 psf
Total Load Deflection
Live/Snow Load
LL/SL 1,2
0.31
D + Lr
Total Load(Governing LC
I TL 1
1 14.7 Psf 1
24.2 psf
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (Is) pg; Ce=0.9, Ci=1.1, I5=1.0
Member Desi n Summa(per NDS
Governing Load Comb CD CL + CL - CF Cr
D 0.9 1.00 1 0.95 1 1.5 1.15
Member Anal sis Results Summary
Maximum
Max Demand
@ 1.6cation Capacitv
DCR
Load Combo
Shear Stress
50 psi
1.2 ft. 162 psi
0.31
D
Bending + Stress
860 psi
4.4 ft. 1397 psi
0.62
D
Bending - Stress
-1086 psi
9.0 ft. -1327 psi
0.82
D
Total Load Deflection
0.26 in. 386
4.7 ft. 0.82 in. 120
0.31
D + Lr
CALCULATION WOESI WWIND LOADS = MP1
Mounting Plane Information
Roofing Material
K=
Spanish Tile Roof
Table 30.3-1
PV System.Type
Krt
SolarCitSleekMounVm
_Section 26.8
Section 26.6-1
Spanning Vents
V
No
Fig. 26.5-1A
Standoff Attachment Hardware
Velocity Pressure
SMTile
_Section 26.7 _
Roof Slope
180
Fig. 30.4-2A/B/C-5A/B
Rafter pacing
h
24" O.C.
Section 26.2
Framing Type Direction
Y -Y Rafters
T -allow
Pur I _in Spacing
X-X.Purlins.Only
NA
DCR
Tile Reveal
Tile Roofs Only
14"
Tile Attachment System_
_Tile Roofs Only
SM Tile
Standing Seam[Trap Spacing
SM Seam Only
NA
Wind Design Criteria
Wind Design Code
K=
ASCE 7-10
Table 30.3-1
Wind Design Method
Krt
Partially/Fully Enclosed Method
_Section 26.8
Section 26.6-1
Basic Wind Speed
V
110 mph
Fig. 26.5-1A
Exposure Category
Velocity Pressure
C
_Section 26.7 _
Roof Style
Gable Roof
Fig. 30.4-2A/B/C-5A/B
Mean Roof Height
h
15 ft
Section 26.2
Wind Pressure Calculation Coefficients
Wind Pressure Exposure
K=
0.85
Table 30.3-1
Topographic Factor
Wind Directionality Factor
Krt
1.00
0.85
_Section 26.8
Section 26.6-1
16.0 psf
Importance Factor
I
NA
Not -Staggered
Velocity Pressure
qh
qh = 0.00256 (Kz) (Kzt) (Rd—) (V^2) 22.4 psf
Equation 30.3-1
Wind Pressure
Ext. Pressure Coefficient U GC
-0.88 Fig. 30.4-2A/B/C-5A/B
Ext. Pressure Coefficient Down GC w
0.45 Fig. 30.4-2A/B/C-5A/B
Design Wind Pressure P
p = qh (GC) Equation 30.4-1
Wind Pressure U
-19.6 psf -
Wind Pressure Down
16.0 psf
ALLOWABLE STANDOFF_ SPACINGS
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Landscape
72"
39"
Max Allowable Cantilever
Landscape_
24"
NA
Standoff Configuration
Landscape
Not -Staggered
Max Standoff Tributary. Area
Trib
19 sf
PV Assembly Dead Load
W -PV
3.0 psf
Net Wind -Uplift at Standoff
T -actual
-195 lbs
Uplift Capacity of Standoff
T -allow
446 lbs
Standoff Demand Ca aci
DCR
43.8%
X -Direction
Y -Direction
Max Allowable Standoff Spacings
Portrait
48"
65"
Max Allowable Cantilever
Portrait
19"
NA
Standoff Configuration
Portrait
Not -Staggered
Max Standoff Tributa.ry_Area—
Trib
22 sf
PV Assembly Dead Load
W -PV
3.0 psf
Net -Wind Uplift at Standoff_ _
T -actual_
-219 lbs
Uplift Capacity of Standoff
T -allow
446 lbs
Standoff Demand/Capacity
DCR
49.0%
STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP2
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) pg; Ce=0.91 Ct=1.1, I5=1.0
Member Desi n Summa(per NDS
Governing Load Comb CD CL + CL - CF Cr
D 0.9 1.00 1 0.96 1 1.5 1.15
Member Properties Summary
mary
Maximum
MP2
Horizontal Member Spans
Overhang 1.16 ft
Rafter Pro erties
Actual W 1.50"
Roof System
Properties
San 1
5.25 ft
Actual D
3.50"
Number of Spans (w/o Overhang) 3
San 2
6.58 ft
Nominal
Yes
Roofing Material
Spanish Tile Roof
San 3
5.33 ft
A
5.25 in A2
Re -Roof
No
San 4
Total Load Deflection
S.
3.06 in.^3
Plywood Sheathing
Yes
San 5
24.2 Psf
I
5.36 in A4
Board Sheathing
None
Total Span
18.32 ft
TL DefiPn Limit
120
Vaulted Ceiling
No
PV 1 Start
3.00 ft
Wood Species
DF
Ceiling Finish
1/2" Gypsum Board
PV 1 End
15.58 ft
Wood Grade
#2
Rafter Sloe
180
PV 2 Start
Fb 1
900 psi
Rafter Spacing
24" O.C.
PV 2 End
I F„
180 psi
Top Lat Bracing
Full
PV 3 Start
E
1600000 psi
Bot Lat Bracing
I At Supports
PV 3 End
Emig
580000 psi
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) pg; Ce=0.91 Ct=1.1, I5=1.0
Member Desi n Summa(per NDS
Governing Load Comb CD CL + CL - CF Cr
D 0.9 1.00 1 0.96 1 1.5 1.15
Member Loading
mary
Maximum
Roof Pitch
4/12 Initial
Pitch Adjust
Non -PV Areas
PV Areas
Roof Dead Load
DL 14.0 psf
x 1.05
14.7 psf
14.7 psf
PV Dead Load
PV -DL 9.0 psf
x 1.05
9.4 ft.
9.5 psf
Roof Live Load
RLL 20.0 psf
x 1.00
20.0 psf
12.7 ft.
Live/Snow Load
LL/SL 1,2
D
Total Load Deflection
0.07 in. 1239
Total Load(Governing LC
I TL 1
0.10
14.7 psf 1
24.2 Psf
Notes: 1. ps = Cs*pf; Cs -roof, Cs -pv per ASCE 7 [Figure 7-2] 2. pf = 0.7 (Ce) (CO (IS) pg; Ce=0.91 Ct=1.1, I5=1.0
Member Desi n Summa(per NDS
Governing Load Comb CD CL + CL - CF Cr
D 0.9 1.00 1 0.96 1 1.5 1.15
Member Anal sis Results Summary
Maximum
Max Demand
@ Location
Capacity
DCR
Load Combo
Shear Stress
38 psi
1.2 ft.
162 psi
0.23
D + Lr
Bending + Stress
389 psi
9.4 ft.
1397 psi
0.28
D
Bending - Stress
-637 psi
12.7 ft.
-1345 psi
0.47
D
Total Load Deflection
0.07 in. 1239
9.4 ft.
0.69 in. 120
0.10
D
[CALCULATION OFTDESI:GM 11WIND=00ADS=MP2
Mounting Plane Information
Roofing Material
KZ
Spanish Tile Roof
Table 30.3-1
PV System Type -
Krt
SolarCity SleekMountrm
Section 26.8
Section 26.6-1
Spanning Vents
V
No
Fig. 26.5-1A
Standoff Attachment Hardware
Velocity Pressure
M Til
26.7
Roof Slope
180
_Section
Fig. 30.4-2A/B/C-5A/B
Rafter_Spacing
h
24" O.C.
Section 26.2
Framing Type Direction
Y -Y Rafters
T -allow
Purlin Spacing _
_X -X Purlins Only
NA
DCR
Tile Reveal
Tile Roofs Only
14"
Tile Attachment System _
Tile Roofs Only
SM Tile
Standing Seam/Trap Spacing
SM Seam Only
NA
Wind Design Criteria
Wind Design Code
KZ
ASCE 7-10
Table 30.3-1
Wind Design Method -
Krt
Partially/Fully_ Enclosed. Method_
Section 26.8
Section 26.6-1
Basic Wind Speed
V
110 mph
Fig. 26.5-1A
Exposure Category =
Velocity Pressure
C
26.7
Roof Style
Gable Roof
_Section
Fig. 30.4-2A/B/C-5A/B
Mean Roof Height
h
15 ft
Section 26.2
Wind Pressure Calculation Coefficients
Wind Pressure Exposure
KZ
0.85
Table 30.3-1
Topographic Factor
Wind Directionality Factor
Krt
1.00
0.85
Section 26.8
Section 26.6-1
Kd
Im ortance Factor
I
NA
Not -Staggered
Velocity Pressure
qh
qh = 0.00256 (Kz) (Kzt) (Kd) (V^2)
22.4 psf
Equation 30.3-1
Wind. Pressure
Ext. Pressure Coefficient U G
-0.88 Fig. 30.4-2A/B/C-5A/B
Ext. Pressure Coefficient Down G „,n
0.45 Rg. 30.4-2A/B/C-5A/B
Design Wind Pressure p
p = qh (G ) Equation 30.4-1
Wind Pressure U
Wind Pressure Down
-19.6 psf
16.0 psf
ALLOWABLE STANDOFF SPACINGS
X -Direction
Y -Direction
Max Allowable Standoff Spacin
Landscape
72"
39"
Max Allowable Cantilever.
Landscape_
24"
NA
Standoff Configuration
Landscape
Not -Staggered
Max Standoff Tributary Area
Trib_ _ _
19 sf
PV Assembly Dead Load
W -PV
3.0 psf
Net Wind.Upliftat Standoff�-----�-allow
actual__. _
-19516s
Uplift Capacity of Standoff
T -allow
446 lbs
Standoff Demand Ca aci
DCR
43.8%
X -Direction
Y -Direction
Max Allowable Standoff Spacing
Portrait
48"
65"
Max Allowable. Cantilever
Portrait
'Portrait
19"
NA
Standoff Configuration
Not -Staggered
Max Standoff Tributary_Area _
Trib
22 sf
PV Assembly Dead Load
W -PV
3.0 psf
Net Wind Uplift at Standoff
Tactual
-219 lbs
Uplift Capacity of Standoff
T -allow
446 lbs
Standoff Demand Ca aci
DCR
49.0%
Bin .#
City. Of La Quinta
Buftg 8r Safety Dhwbn
P.O. Box 1504,78-495 Calle Tampico
[.a.Quinta, C4 92253.:(760) 777-7012
D 1'2- 0 Building Permit Application and Tracking Sheet
Permit #
i6 SOL ZO 15 -
Project Address:
Owner's Name:.
A. P. Number.
Address:
Legal Description:
City, ST, Zip: La Qu.inta, CA
Contractor Solar City
Telephone:
Project Description: roof mou11s
!sola
Address: 3055 Clearview
city, ST, zip: San Mateo; C
inverter(s)..
Telephone: 650-638-1028
ja
State Lia # : 888104 Lie',#;
Arch,Eng., Designer
Address:
City., ST, Zip:
Telephone:
State Lia M
Name of Contact Pmson: Elena Loya
Construction Type:. Occupancy:
Project type (circle one): New Add'n Alter Repair Demo
Sq. Ft.:#Stories. # Unitp:
Telephone # of Contact Person: (442.)256-1134
Estimated Value of Project
APPLICANT: DO NOT WRITE BELOW THIS UNE
N
Submittal
Recta
Recd
TRACMG
PERNrYFEES
Plan Sets
Pian Check submitted
Item Amount
Structural Calca.
Reviewed, ready for corrections
Plan Check Deposit. .
Truss Cala.
Called Contact Person
Plan Check Balance
Title 24 Calls.
Plana picked up
Construction
Flood plain plan
Plans resubmitted..
mechanical
Giadlag plan
V Review, ready for correctionVissue
Electrical
Subeoatactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S bLL
ILOAL Approval
Plans resubmitted
Grading
IN ROUSE:-
''" Review; ready for correctionsAssue
Developer Impact Fee
Planning Approval.
Called Contact Pawn
Pub. Wks. Appr
Date of permit issue
School Fees
[Total Permit Fees