002336 (SFD)Building
Address
Owner
Mailing
Address
City
Tity,,,, 4 4aabtm
51--755 Ammida iii=
Zip ITel.
P.O. BOX 1504
78-105 CALLE ESTADO
LA QUINTA, CALIFORNIA 92253
1 .
Contractor
aooress I
Sam
City lZip Tel.
State Lic. I City
& Classif. $Z 317340 Lic. # 655
Arch., Engr.,
Designer
Address Tel.
City IZip I State I
Lic. #
LICENSED CONTRACTOR'S DECLARATION
I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions Code, and my license is in full force and
effect. .
SIGNATURE DATE
OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for the following
reason: (Sec. 7031.5,Business and Professions Code: Any city or county which requires a
permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also
requires the applicant for such permit to file a signed statement that he is licensed pursuant to
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of
Division 3 of the Business and Professions Cade, or that. he is exempt therefrom,' and the basis
for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars ($500).
❑ I, as owner of the property, or my employees with wages as their sole compensation, will
do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and
Professions Code: The Contractor's License Law does not apply to an owner of property who
builds or improves thereon and who does such work himself or through his own employees,
provided that such improvements are not intended or offered for sale. If, however, the building
or improvement is sold within one year of completion, the owner -builder will have the burden
of proving that he did not build or improve for. the purpose of sale.)
0 I, as owner of the property, am exclusively contracting with licensed contractors to con-
struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law --
does not apply to an owner of property who builds or improves thereon, and who contracts for
such projects with a contractor(s) licensed pursuant to the Contractor's License Law.)
❑ 1 am exempt under Sec. B. & P.C. for this reason
Date Owner
WORKERS' COMPENSATION DECLARATION
I hereby affirm that I have a certificate of consent to self -insure, or a certificate of
Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.)
Policy No. Company
❑ Copy is filed with the city. ❑ Certified copy is hereby furnished.
CERTIFICATE OF EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars ($100) valuation
or less.)
I certify that in the performance of thg work for which this permit is issued, I shall not
employ any person in any manner so as to become subject to the Workers' Compensation
Laws of California.
Date Owrier
NOTICE TO APPLICANT: If, after making this Certificate of Exemption you should become
subject to the Workers' Compensation provisions of the Labor Code, you must forthwith
comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the
work for which this permit is issued. (Sec. 3097, Civil Code.)
Lender's Name
Lender's Address
This is a building permit when properly filled out, signed and validated, and is subject to
expiration it work thereunder is suspended for 180 days.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives -of this city to enter the above-
mentioned property for inspection purposes.
Signature of applicant Date
Mailing Address
City, Stale, Zip
HARD COPY
No. 002336
BUILDING: TYPE CONST. OCC. GRP.
A.P. Number 774-151-013
Legal Description lot 1 PU? 300
Project Description S ri? farauv l -.13 7
ti's 1321 No.
Sq. Ft. 432 stories
No. s
Size Stories - Units
New ❑A koxAdd 6" Alter ❑ Repair ❑ Demolition ❑
Estimated Valuation 66,$.00
PERMIT AMOUNT
Plan Chk. Dep.
Plan Chk. Bal. 44.Jd
Const. . UXU
Mech. 37.W
Electrical 62.Ul
Plumbing 97.00
S.M.I. 4.90
Grading 20.00
Driveway Enc. 20.00
Infrastructure 1,073. rs
TOTAL 1,905.41 1,65!1.41
REMARKS
i VirFix.j .�.✓F*J LykV� iG s:w'w,wa►i' krv'i r. w..,r. w .aawr.+
ZONE: BY:
Minimum Setback Distances:
Front Setback from Center Line
Rear Setback from Rear Prop. Line
Side Street Setback from Center Line
Side Setback from.Property Line
FINAL DATE INSPECTOR
Issued by: Date 4�-22-5— Permit
Validated by:
Validation:
A542.2 4 28 1655,41 U
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
1ST FL.. SO. FT. ® $
UNITS
&4LA8 GRADE O/
ROUGH PLUMB.
OC
BONDING
YARD SPKLR SYSTEM
2ND FL. SO. FT. @
FORMS
C9 yam/
R SEP CC
ROUGH WIRING
MOBILEHOME SVC.
BAR SINK
POR. SQ. FT. ®
GAS (ROUGH)
METER LOOP
GAR. SQ. FT. ®
POWER OUTLET
ROOF DRAINS
GAS (FINAL)
TEMP. POLE
DRAINAGE PIPING
CAR P. I SQ. FT. ®
GROUT
WATER HEATER
WALL SQ. FT. ®
L,�IFINAL INSF''P-
DRINKING FOUNTAIN
SO. FT. ®
WATER SYSTEM
URINAL
ESTIMATED CONSTRUCTION VALUATION $
=$
WATER PIPING
NOTE: Not to be used as property tax valuation
�1
FINAL INSP. 2 5�
U
FLOOR DRAIN
MECHANICAL FEES
WATER SOFTENER
VENT SYSTEM FAN EVAP.COOL HOOD
SIGN
WASHER(AUTO)(DISH)
APPLIANCE DRYER
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
LAUNDRYTRAY
AIR HANDLING UNIT CFM
FIRE ZONE ROOFING
KITCHEN SINK
ABSORPTION SYSTEM. B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET'
COMPRESSOR HP
POLE, TEM/PERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER B.T.U.
SQ. FT. ® c
BATH TUB
LATHING G
SQ. FT. ® c
WATER HEATER
MAX. HEATER OUTPUT, B.T.U.
SO. FT. RESID ® 11/4 c
SEWAGE DISPOSAL
SQ.FT.GAR ® 3/ac
HOUSE SEWER
FINISH GRADING
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FEE
OBL
TOTAL FEES
MICRO FEE
MECH.FEE PL.CK.FEE
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR
SETBACK
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL. AREA
&4LA8 GRADE O/
ROUGH PLUMB.
OC
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
C9 yam/
R SEP CC
ROUGH WIRING
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH)
METER LOOP
HEATING (FINAL)
OTHER APPJEQUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
L,�IFINAL INSF''P-
BOND BEAM
WATER SYSTEM
GRADING
cu. yd.
$ plus x$
=$
LUMBER GR.
�1
FINAL INSP. 2 5�
U
. RAMING
`
INAL INSP. ,}
7G/4/ HOOFING
�9
REMARKS:
4^
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING G
MESH
INSULATIONISOUND
FINISH GRADING
L/"/ --FINAL INSPECTIONO'1 if
CERT. OCC.
FENCE FINAL
INSPECTOR'S SIGNATURES/INITIALS,
GARDEN WALL FINAL
IE4D
o
2 rO
H BERMUDA DUNES r
RANCHO MIRAGE
INDIAN WELLS H
PALM DESERT
,P LA OUINTA
110 INDIO ti
Desert Sands Unified School District
82-879 HIGHWAY 111 • INDIO, CALIFORNIA 92201-5678 • (619) 347.8631
April 24, 1986
City of La Quinta
Department of Community Development
78-105 Calle Estado
La Qui'nta, CA 92253
Re: Lot 1, Avenida Diaz, La Quinta
Gentlemen:
The developer of the above referenced lot
has mitigated its impacts on our overcrowded schools by payment
of the amount of $628 per unit to be applied to the cost of
district educational facilities made necessary by such new
development.
Sincerely,
,.L -�.
John D. Brooks
Assistant Superintendent
Business Services
JDB/crm
0
0
H
0
U
w
m
COUNTY OF RIVERSIDE, ENVIRONMENTAL HEALTH SERVICES DIVISION
PERMIT APPLICATION FOR A SUBSURFACE SEWAGE DISPOSAL SYSTEM
pplicant: Submit this form with four copies of a scaled plot plan (1-20 scale) drawn to
ounty specifications required on the attached check list. A non-refundable filing fee of
30 is required when the application is submitted. Check must be made payable to the
ounty of Riverside
Building Department Application Log #
Name (Owner, Agent,
Contractor, Etc.)
Mailing Address
,
,
/
State
Zip Code
Date
*The above information must be verified
*Job Property Address
*City or unity I *Legal Description of Prpty. (Lot,
PM, TR)
*Assessor's Parcel
No.
Water Agency
Use of
I
Lot
Size
Initial
Or -Weil-
SFD, MH Site
Planning Case
Prep Etc.
# l�� �S (
7
�� X
��
WQCB Clearance reqd.
C V , t'D
7
-
,i 6
Soils feasibility report reqd.
x
rz i
0
z
0
H
H
w
L
Type of System: No. of Bedrooms) (1) Septic Tank Soil Rate Required
Existing New Addition Replacement i rJ Gals. (`
(2) Leach line sq. ft. Sidewall allowance jInstall Line(s) Leach bed
(Bottom trench area) ft. -rock/ Sq. Ft. Ft. Long; �, Ft. wide Sq. -Ft. of
per rrunhing,ft. with Min. inches rock bottom
N/A C J below drain lines - area
Leach lines/bed-special design (3) Pit Diamet�qr No. Pit Seepage Pit total depth '" /k
for slope`Appldcable '` 6' EjA Pits BI I
N/A Overburden factor /C( Max. allowable depth
This application isc-appfor the design of a subsurface disposal s, -stem as
indicated on the accompanied plot plan using the requirements set forth in Section B above.
A building permit is necessary for the installation of the above -designed system.
(1) Septic tank and sewer lines must be 50' from any wells��' ''�f NR Ll!
(2) Leach lines must be 100' min. from any wells including exp •si=on area
(3) Seepage pits must. be 150' min. from any wells including expansion area I/V
Signature of Health Official ' Date
RECEIPT NO. xJ 7 2 `l •, / j Issued by Date t.
District: Riverside C 7 Indio CVJ�-Hemet C 7 Perris C J Rancho Calif. [ ] Blythe[ ]
Distribution: WHITE -Office file YELLOW -Applicant PINK -Bldg. Dept. GOLDENROD -Pending File
DOH SAN 122 (Rev. 2/86)
Signature of Applicant
Date
*The above information must be verified
from Building Application
STAFF USE -
DO NOT WRITE
BELOW THIS LINE
Initial
Date
Certification of Existing S.D. System
reqd. Yes[
7
No L,/]�
WQCB Clearance reqd.
Yes[
7
NoC/�
Soils feasibility report reqd.
Yes[
]
�
NoC/7
ff
I
Detailed boring report reqd.
Yes
J
NoF-I
zDetailed contour plot plans reqd.
Yes[
7
NoCfT
0
_
Staff Specialist approval reqd.
Yes[
]
No[/] Lot
Inspection
Date
w
Soils/boring report by
Proj' #
-
Date
/
Soils Map Page 1 I I ISoil Type
Approved by
AW/l
/
Date Y �S
r
x
rz i
0
z
0
H
H
w
L
Type of System: No. of Bedrooms) (1) Septic Tank Soil Rate Required
Existing New Addition Replacement i rJ Gals. (`
(2) Leach line sq. ft. Sidewall allowance jInstall Line(s) Leach bed
(Bottom trench area) ft. -rock/ Sq. Ft. Ft. Long; �, Ft. wide Sq. -Ft. of
per rrunhing,ft. with Min. inches rock bottom
N/A C J below drain lines - area
Leach lines/bed-special design (3) Pit Diamet�qr No. Pit Seepage Pit total depth '" /k
for slope`Appldcable '` 6' EjA Pits BI I
N/A Overburden factor /C( Max. allowable depth
This application isc-appfor the design of a subsurface disposal s, -stem as
indicated on the accompanied plot plan using the requirements set forth in Section B above.
A building permit is necessary for the installation of the above -designed system.
(1) Septic tank and sewer lines must be 50' from any wells��' ''�f NR Ll!
(2) Leach lines must be 100' min. from any wells including exp •si=on area
(3) Seepage pits must. be 150' min. from any wells including expansion area I/V
Signature of Health Official ' Date
RECEIPT NO. xJ 7 2 `l •, / j Issued by Date t.
District: Riverside C 7 Indio CVJ�-Hemet C 7 Perris C J Rancho Calif. [ ] Blythe[ ]
Distribution: WHITE -Office file YELLOW -Applicant PINK -Bldg. Dept. GOLDENROD -Pending File
DOH SAN 122 (Rev. 2/86)
r,
058:10 R2 3/28/84 VH/dr
PZ 4 I/ _Foo
Foie: DA✓� GR/M/KfiTT
COMPLIANCE CHECKLIST
For Low -Rise Residential Buildings
(except hotels and motels)
Attachment 0
Form 2
(Revised 3/84)
Climate Zones 2, 4. 6, and 8-15
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
'Total Floor Area. . . . . . . . . 1321 ft2
1. Slab -on -Ground; Perimeter /Soft.. 0epthin. . . R. p - 4-
2. Raised Floor R -Value.. . . . . . . R- o Co
3. Ceiling Insulation or Construction Assembly . . . R-= p
Attic, Percent of Roof Over Conditioned Space /040% . ft2
4. Wall Insulation or Construction Assembly, . . . . . . R-
Glazing; Total f Floor Area Single Double Trlple
S. North -Facing. ,t.s.
ft 2 ft 2 ft2 t
6. East -Facing ft *ft
ftft p
7. South -Facing. ft22#:ft2 _e5
8. West -Facing . . . ft2 a2 ft2 ft
29. Skylight. . ft ft #—Z
ft c
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . .3o SC . . . . . . . . . . . . . =1
b. South . . . . . . . . . . . . . . . C
C. West . . . . . . ... . . . . . . SC .
d. North. . . . . . . . . . . . . SC . . . . . . . . . . . . . o
e. Skylight. . . . D SC . . . . . . . . . . . . . o
11. Horizontal South Overhang Length. . . . 2 ft . . . . . . . . .
12. Movable Insulation. S Floor Area. O Z . . . . . . . . .
13. Infiltration (indicate Standard, Medium 07=9t)
14. Thermal Mass
Exterior Wall Thermal Mass
Area, Heat Capacity. R -Value . . . . . . . — ft 2, HC. R- — —
Interior Thermal Mass
Area, Heat Capatltyt R.Value 332 ft2, /,A HC, R. 3/ 'V- /0
HVAC System**
15.
Gas Furnace without Refrigeration•Cooiing
(Seasonal Efficiency). . . . . . .
. . . . ... . SE —
16.
Heat Pump (Energy Efficiency Ratio). . . .
. . . . . . . . =E ER
17.
Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency Ratio. . . . . .
. . . SE - SEER —
18.
Active Solar (Net Solar Fraction, %). . . . .
. . . %NSF
19.
Zonally Controlled Electric ,
Resistance Space Heating . . . . . . . . . .
. . . (Yes/No) -
Domestic Water Heating••
20. Solar With Gas Backup (Net Solar Fraction, %) . . . . . . . . . — S11SF
21. Other Water Heating (Describe type)
Point System Compliance Total. . . . . . . . . . .i�_�_
*Lhecklistitems; not a point system measure.
"Attach documentation for efficiencies and NSF.
O5B:10' 0 3/28/84 VH/dr
/1AN3Do
Fo/�Dave C�,e/MMA�T
COMPLIANCE CHECKLIST
For Low -Rise Residential Buildings
(except hotels and motels)
Attachment D
Form 2
(Revised 3/84)
Climate Zones 2. 4, 6, and 8-15
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
*Total Floor Area .. . . . . . . . 1321 ft2
1. Slab -on -Ground; Perimeter /So ft.. Depth 1n. . . . . . . R.:,=
2. Raised Floor R -Value.. ... . . ... . . . R. o 0
3. Ceiling Insulation or Construction Assembly . . . . . . . .
Attic. Percent of Roof Over Conditioned Space /oo % . /3 z/ ft
4. Wali Insulation or Construction Assembly. . . . . . . R.- -�
Glazing; Total % Floor Area Single Double Tri le
S. North -Facing. , 9 S /2 ftZ ft2 O ftZ f ¢
6. East -Facing 3. o : =ft2 ft2 tt2 1_
7. South -Facing. 3. / % �2 ft2 ft2 ft2
8. West -Facing 5.5 % .7 2 ft2 ft2 ft2 - 12
9. Skylight. . . o % ft ft ft p
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . . . • 30 Sc . . . . . . . . . . . -/
b. South . . . . . . . . . . . . . . . .3oC . . . . . . . . .
c. West . . . . . . ... . . . . . 3a SC .. . . . . . . . . �_
d. North. . . . . . . . . . . . . . . -3 SC . . . . . . . . . . . . . D
e. Skylight .. . . D SC . . . . . . . . . . . . . o
11. Horizontal South Overhang Length. . . . 2 tt . . . . . . . . . . o
12. Movable Insulation,' % Floor Area. off' . . . . . . . . . . .
13. Infiltration (indicate Standard, Medium 0r-7rgTit) ,
14. Thermal Mass
Exterior Wall Thermal Mass
Area. Heat Capacity. R -Value . . . . . . ftZ, . HC, R.
Interior Thermal Mass
-Area, Heat Capacityt R -Value . . . . . . 3 3 2 ft2. /o./ HC, R __;.� -k10
HVAC System**
15.
Gas Furnace without Refrigeration• Cooling
(Seasonal Efficiency). . . . . .
. . . . .'. SE
16.
Heat Pump (Energy Efficiency Ratio) . . . . .
. . . . . . . _E ER
17.
Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal,
Energy Efficiency Ratio. . . . .
. . . 75 SE 9.-/ SEER f 9
18.
Active Solar (Net Solar Fraction. %). . . . .
. . . . . . . %NSF
19.
Zonally Controlled Electric
Resistance Space Heating . . . . . . . . . .
. . . (Yes/No)
Domestic Water Heatino••
20. Solar With Gas Backup (Net Solar Fraction. :) . . . . . . . . %NSF
21. Other Water Heating (Describe type)
Point System Compliance Total . . . . . . . . . . . . . . . `- 2
*(;hecklistitems; not a point system measure.
"Attach documentation for efficiencies and NSF.
P�Pare� �y • ✓��
,.lune 20, /986
056:10 R2 3/28/84 VH/dr
.300 .�[ Attachment D
Foie : Da✓e �7/�mmG/� Form 2
COMPLIANCE CHECKLIST
For Lor -Rise Residential Buildings
(except hotels and motels)
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
*Total Floor Area. . . . . . . . . /-42/ft2
1. Slab -on -Ground; Perimeter /50 ft.. Depth in. . . R -_g-
2. Raised Floor R -Value. .. . . . . . R- o
]. Ceiling Insulation or Construction Assembly . . . . . . . . R -
Attic. Percent of Roof Over Conditioned Space % . . . . . . / ftZ
4. Mall Insulation or Construction Assembly. . . . . . . . . . R -1L
Glazing; Total % Floor Area Stngle Double Triple
5. NortMFacing. .9 S o ft2 /� ft2Ift26. East -Facing ft2 2ft2T. South -Facing. S ft ftft8. Wst•facing . rb ft2 ft2ft29. Skylight. . -�% ft ftft �•
10. Shading Coefficient
(excluding overhang)
a. East . . . . . .... . . . .. . .e30 SC =1�
b. South . . . . . . . . . . . . . .C
c. West . . . . . . . ... . . . . . . A.-IS
C . . . . . . . . . . . . .
d. North . . . . . . . . . . . . . .C . . . . . . . . . . . . .
e. Skylight. . . . . . . . . . . . �_SC . . . . . . . . . .
11. Horizontal South Overhang Length. . . . -_eft . . . . . . . . . . .
12. Movable Insulation. % Floor Area. f _g
11. Infiltration (indicate Standard. M�dtum o g t)
.4. Thermal Mass
Exterior Wall Thermal Mass
Area. Heat Capacity. R -Value . . . . . . . ft2, HC. R -
Interior Thermal Mass
Area. Neat Capacity, R -Value 332 ft2, 104 -HC. R- 3 / t�
NVAC System"
15. Gas Furnace without Refrigeration•Cooling
(Seasonal Efficiency)• . . . . . . . . . . . SE
16. Heat Pump (Energy EfficiencyRatio) . . . . . . . . . . . . EER
17. Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency Ratio . . . .. . . . . . . . . SE 8 SEER O
18. Active Solar (Net Solar Fraction. %). . . . . . . . . . . . . %NSF
19. Zonally Controlled Electric,
Resistance Space Heating . . . . . . . . . . . . . (Yes/No)
Domestic Water Heating**
20. Solar With Gas Backup (Net Solar Fraction. %) . . . . . . . . %fiSF —
21. Other Water Heating (Describe type)
Point System Compliance Total. . . . . . . . . . . . . 3
*Checklist tems; not a point system measure.
**Attach documentation for efficiencies and NSF. a
e
M
✓une 20, /986
058:10 02 7/28/84 VH/dr
Al 3oo
COMPLIANCE CHECKLIST
For Low -Rise Residential Buildings
(except hotels and motels)
Attachment D
Form 2
(Revised 3/84)
Climate 'Zones 2. 4. 6. and 8-15
Step 1: Enter on the form the values for each measure from your building plan
Glazing; Total % Floor Area Single Double Triple
S. North -Facing. . 9 % o ft / � ft2 ft2 f 4
6. East -Facing . ft2 ft2 ft2 _Q
7. South -Facing. % ft ft ft
8. West -Facing % ft2 ft2 ft2
9. Skylight. . . . _QHS ft ft ft �-
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . . . i30 SC . . . . . . . . . . . . . _.[_
b. South . . . . . . . . . . . . . .L
c. West . . . . . . . ... . . . . . SC .
d. North . . . . . . . . . . . . . . SC . . . . . . . . . . . .
e. Skylight. . . . . . . . . . . �_SC . . . . . . . . .
11. Horizontal South �Overhang Length. . . . _eft . . . . . . . . . .
12. Movable Insulation. % Floor Area. .��% . . . . . . . . . . . . . Q
13. Infiltration (indicate Standard. Rediva or TT9Ft) �L
14. Thermal Mass
Exterior Wall Thermal Mass
Area, Heat Capacity. R•Value . . . . . . . ft2. HC. R• r
Interior Thermal Mass
Area, Heat Capacity, R -Value ..... 332 ft2. 12,4_,HC. R..3/ t_a
MVAC System**
15. Gas Furnace without Refrigeration Cooling
(Seasonal Efficiency). . . . . . . . . . . . SE r
16. Heat Pump (Energy Efficiency Ratio) . . . . . . . . . . . . . EER
17. Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency RatioSE 8_SEER O
18. Active Solar (Net Solar Fraction, %)� . . . %NSF
19. Zonally Controlled Electric,
Resistance Space Heating . . . . . . . . . . . . . (Yes/No)
T
Domestic Water Heating"
20. Solar With Gas Backup (Net Solar Fraction. ;) . . . . . . . . %NSF
21. Other Water Heating (Describe type)
Point System Compliance Total. . . . . . . . . . . . 3
*F.hecklistItems; not a point system measure.
**Attach documentation for efficiencies and NS.
:. IL
and specifications sheet.
Step
2: Enter points on this page while working through
the point system
Building Shell
Measure
Points
*Total Floor Area.
. . . . . . /3 2/ft2
1.
Slab -on -Ground; Perimeter /50 ft., Depth in.
R•_$.
:-
2.
Raised Floor A-Value.R•
o
3.
Ceiling Insulation or Construction*Assembly
Attic. Percent of Roof Over Conditioned Space %
R -
. . . . . . / ft2
4.
Wall Insulation or Construction Assembly. . . ... .
. . . . . . R•�_
Glazing; Total % Floor Area Single Double Triple
S. North -Facing. . 9 % o ft / � ft2 ft2 f 4
6. East -Facing . ft2 ft2 ft2 _Q
7. South -Facing. % ft ft ft
8. West -Facing % ft2 ft2 ft2
9. Skylight. . . . _QHS ft ft ft �-
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . . . i30 SC . . . . . . . . . . . . . _.[_
b. South . . . . . . . . . . . . . .L
c. West . . . . . . . ... . . . . . SC .
d. North . . . . . . . . . . . . . . SC . . . . . . . . . . . .
e. Skylight. . . . . . . . . . . �_SC . . . . . . . . .
11. Horizontal South �Overhang Length. . . . _eft . . . . . . . . . .
12. Movable Insulation. % Floor Area. .��% . . . . . . . . . . . . . Q
13. Infiltration (indicate Standard. Rediva or TT9Ft) �L
14. Thermal Mass
Exterior Wall Thermal Mass
Area, Heat Capacity. R•Value . . . . . . . ft2. HC. R• r
Interior Thermal Mass
Area, Heat Capacity, R -Value ..... 332 ft2. 12,4_,HC. R..3/ t_a
MVAC System**
15. Gas Furnace without Refrigeration Cooling
(Seasonal Efficiency). . . . . . . . . . . . SE r
16. Heat Pump (Energy Efficiency Ratio) . . . . . . . . . . . . . EER
17. Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency RatioSE 8_SEER O
18. Active Solar (Net Solar Fraction, %)� . . . %NSF
19. Zonally Controlled Electric,
Resistance Space Heating . . . . . . . . . . . . . (Yes/No)
T
Domestic Water Heating"
20. Solar With Gas Backup (Net Solar Fraction. ;) . . . . . . . . %NSF
21. Other Water Heating (Describe type)
Point System Compliance Total. . . . . . . . . . . . 3
*F.hecklistItems; not a point system measure.
**Attach documentation for efficiencies and NS.
:. IL
9
,./une 20, 1,791
058:10 R2 3/28/84 VH/dr
f`4 N Soo
Foie : Dave' C7r1rnrno-#
79- 700 Came/back
ver�l�4�it dunes. G'i
COMPLIANCE CHECKLIST
For Low -Rise Residential Buildings
(except hotels and motels)
Attachment 0
Form 2
(Revised 3/84)
Climate Zones 2. 4, 6. and 8-15
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
*Total Floor Area. . . . . . . . . /32/ft2
1. Slab -on -Ground; Perimeter /SD ft.. Depth in. . . . . R ca
2. Raised Floor R -Value.. . . . . . . . . . . R- o
3. Ceiling Insulation or Construction Assembly . . . . . . . . R -
Attic. Percent of Roof Over Conditioned Space S . . . . . . // ft2
4. Wall Insulation or Construction Assembly. . . . . . . . . . . .
Glazing; Total Z Floor Area Single Double Triple
S. North -Facing. . . 0 9 f o ft2 /iZ ft2 ft2 44-
6. East -Facing ft2 ft2 ft2
7. South -Facing. : IZ ft2 �ft2 ft2
8. West -Facing 3 ft2 ft2 ft
9. Skylight. . . . g -Z ft2 ft2 ft2 p
10. Shading Coefficient
(excluding overhang)
a. East X30 SC =L
b. South. . . . C
c. West . . . . . . . ... . . SC . . . . . . . . . . . . .
A—
d. North. . . . . . . . . . . . SC . . . . . . . . . _0—
t. Skylight .. . . . . . . . . O SC . . . . . . . . . .
11. Horizontal South Overhang Length. . . . _eft . . . . . . . . . . .
12. Movable Insulation. f Floor Area. Medi .Z _ 9�
13. Infiltration (indicate Standard, m or T'i T'o _L
14. Thermal Mass
Exterior Wall Thermal Mass
Area, Heat Capacity. R -Value . . . . . . ft2. HC, R -
Interior Thermal Mass
Area, Heat Capacity, R -Value ..... 33-Z ft2. Lej/ HC. R. 3 / -tom
HVAC System**
15. Gas Furnace without Refrigeration•Cooling
(Seasonal Efficiency). . . . . . . . . . . .
16. Heat Pump (Energy Efficiency Ratio) .. . . . . . . . . . . . .
17. Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency Ratio . . .. . . . . . . . . SE
18. Active Solar (Net Solar Fraction, f) . . . . . . . . . . . . .
19. Zonally Controlled Electric
Resistance Space Heating . . . . . . . . . . . . . (Yes/No)
Domestic Water Heating•*
20. Solar With Gas Backup (Net Solar Fraction, f.) . . . . . .. .
21. Other Water Heating (Describe type)
Point System Compliance Total . . . . . . . . . . . . . . .
*Checklistitems; not a point system measure.
*Attach documentation for efficiencies and NSF.
i
SE
EER
&ZZ SEER O
ZNSF
I;NSF —�
-3
056:10 02 3/28/84 VH/dr
PLAN 400
Fo 1e : De7ve, 6.-117?rna7�'
Attachment 0
Form 2
(Revised 3/84)
Climate Zones 2, 4. 6, and 6-15
COMPLIANCE CHECKLIST
For Low -Rise Residential Buildings
(except hotels and octelt)
3
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
•Total Floor Area -./425ft2
1. Slab -on -Ground; Perimeter 172 ft., Depth* in.
2. Raised Floor R -Value. . . ... . R- _0
3. Ceiling Insulation or ConstructionAssembly R -
Attic. Percent of Roof Over Conditioned Space/00% ft2
4. Wall Insulation or Construction Assembly. . . . . . . . . . . .
Glazing; Total % Floor Area Single Double Triple
5. North -Facing. i ft2 Q ft2 O ft2
6. East -Facing ft2 Zft
ft2 ft2
7. South -Facing. S ft2ft2 ft2
B. West -Facing . ft22 ft2
9. Skylight. . . . �S ft ft ft � ,
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . . . .30 SC . . . . . . . . . . . . .
b. South . . . . . . . . . . . . . . . C . . . . . . . . . . . . .
c. West . . . . . . . . . . . . . . . SC . . . . . . . . . . . . .
d. North . . . . . . . . . . . . . . . SC . . . . . . . . . . .
e. Skylight . . . . . . . . . . . . . _SSC . . . . . . . . . . . —_
11. Horizontal South Overhang Length. . . .ft . . . . . . . . . . . . .
12. Movable Insulation, f Floor Area. . -4—.% . . . . . . . . . . . . .
13. Infiltration (indicate Standard. Medium 07 1T6t) 1_
14. Thermal Mass
Exterior Wall Thermal Mass
Area. Heat Capacity. R -Value . . . . . . . ft2. HC. R -
Interior Thermal Mass
Area, Heat Capacity. R -Value . . . . . . 38 7 ft2. /O./ HC. R. . 3 f /o
HVAC System**
15. Gas Furnace without Refrigeration Cooling
(Seasonal Efficiency). . . . . . . . . . . . .
16. Heat Pump (Energy Efficiency Ratio) . . . . . . . . . . .
17. Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency Ratio SSE
18. Active Solar (Net Solar Fraction,
19. Zonally Controlled Electric,
Resistance Space Heating . . . . . . . . . . . . . (Yes/No)
Domestic Water Neeting••
20. Solar With Gas Backup (Net Solar Fraction, S) . . . . . . . . .
21. Other Water Heating (Describe type)
Point System Compliance Total . . . . . . . . . . . . . . .
SE
E ER
_SEER
%NSF
%14 SF -
-3
*Checklist Gems; not a point system measure.
4
**Attach documentation for efficiencies and NSF. •.�
4
N
058:10 R2 3/28/84 VH/dr
Al 400
Foie: Dove 6,-ir7wma7�4
COMPLIANCE CHECKLIST
For Low -Rise Residential Buildings
(except hotels and motels)
Attachment D
Form 2
(Revised 3/84)
Climate Zones 2, 4, 6, and 8-15
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
notal Floor Area. . 14,,25ft2
1. Slab -on -Ground; Perimeter /7a ft., Depth in. . . . . . R:'
2. Raised Floor R -Value. . . ... . . . . . . R- O 0
3. Ceiling Insulation or Construction Assembly . . . . . .
Attic, Percent of Roof Over Conditioned Space /00% . . . . . . ft2
4. Wall Insulation or Construction Assembly. . . . . . . . . . . .
Glazing; Total S Floor Area Single Double Triple
S. North -Facing. 0% ft2 a ft2 O ft2- i
6. East -Facing =S ft -0 ft ft
7. South -Facing. . Z, S ft2 �ft2 ft2
8. West -Facing ft ft ft
9. Skylight. . . -�_S ft2 ft ft zk
p
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . .30 Sc
D. South. L .
c. Best . . . . . . . . . . . . . Sc .
d. North. SC . . . . . . . . . O
e. Skylight SC . . . . . . . . . _0
11. Horizontal South Overhang Length. . . eft . . . . . . . . . . . . _0
12. Movable Insulation, S Floor Area. O S . . . . . . . . . . . . . 0_
13. Infiltration (indicate Standard, Medium o—r- "9 t)
14. Thermal Mass
Exterior Wall Thermal Mass
Area. Heat Capacity, R -Value . . . . . . . ft2, _ HC, R -
Interior Thermal Mass
-Area. Heat Capacity, R -Value . . . . . . 38 7 ft2, /O./ HC, R- . 3 f /Q
HVAC System**
15.
Gas Furnace without Refrigeration. Cooling
(Seasonal Efficiency) ... . . . . .
. . . . ... . SE �—
16.
Heat Pump (Energy Efficiency Ratio) . . . . .
. . . . . . . —E ER
17.
Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency Ratio . . . .. . . . . .
. . . �SE
18.
Active Solar (Net Solar Fraction, S) . . . . .
_SEER
, . . , , . %NSF
19.
Zonally Controlled Electric
Resistance Space Heating . . . . . . . . . .
. (Yes/No)
Domestic Water Heating -
20. Solar With Gas Backup (Net Solar Fraction, S) . . . . . . . . _USF —
21. 'Other Water Heating (Describe type) —
Point System Compliance Total . . . . . . . . . . . . . . . —3 -
*Checklist itams; not a point system measure.
"Attach documentation for efficiencies and NSF.
058:10 R2 3/28/84 VH/dr
01_4 IV 400
F,o�e: Dove 6rimina7�'
COMPLIANCE CHECKLIST
For low -Rise Residential Buildings
(except hotels and motels)
Attachment 0
Form 2
(Revised 3/84)
Climate Zones 2, 4. 6. and 8-15
Step 1: Enter on the form the values for each measure from your building plan
and specifications sheet.
Step 2: Enter points on this page while working through the point system
Building Shell Measure Points
*Total Floor Area . . . : .�
. . . . . . . . . . . . 14251t2
1. Slab -on -Ground; Perimeter /72 ft., Depth In. . . . . . . t
2. Raised Floor R -Value
3. Ceiling Insulation or Construction.
Attic. Percent of Roof Over Conditioned Space/DOS . . . . . .t2
4. Nall Insulation or Construction Assembly. . . . . . . . . . . .
Glazing; Total f Floor Area Single DoubleTriple
S. North•Facing.S ft2 d ft2 0 ft2 t g
6. East -facing ft2Zft2 ft2
7. South -Facing. . S ft2 ft2 ft2
8. West•Facing ft2ft2 ft2
9. Skylight. . . . . �_% ft2 ft2 ft2
10. Shading Coefficient
(excluding overhang)
a. East . . . . . . . . . . . . . . 030 SC . . . . . . . . . . . .
b. South . . . . . . . . . . . . . . .C . . . . . . .
c. West C .
d. .North. SC .
e. Skylight. . . . . . . . . �_SC . . . . . . . . . . . . .
11. Horizontal South �Overhang Length. . . ft . . . . . . . . . . . .
12. Movable Insulation, % Floor Area. . . . . . . . . . . . . . .
13. Infiltration (indicate Standard. Medium or Tight) 1_
14. Thermal Mass
Exterior Wall Thermal Mass
Area. Heat Capacity. R•Value . . . . . . ft2. HC. R -
Interior Thermal Mass
Area. Heat Capacity, R -Value . . . . . . . 7 ft2. /D./ HC. R. . 3 f /O
HVAC System**
15. Gas Furnace without Refrigeration. Cool Ing
(Seasonal Efficiency). . . . . . . . . . . SE
16. Heat Pump (Energy Efficiency Ratio). . . . . . . . . . . EER
17. Gas Furnace with Refrigeration Cooling
Seasonal Efficiency and Seasonal
Energy Efficiency Ratio . . .. . . . . . . . . SSE &2_SEER O
18. Active Solar (Net Solar Fraction, S) . . . . . . . %NSF
19. Zonally Controlled Electric,
Resistance Space Heating . . . . . . . . . . . . . (Yes/No)
Domestic Water Heating••
20. Solar With Gas Backup (Net Solar Fraction, %) . . . .. . . USF —
21. Other Water Heating (Describe type) —
Point System Compliance Total . . . . . . . . . . . . . . . — 3
*Cgecklist tems; not a point system measure.
"Attach documentation for efficiencies and NSF. "
h9 11�' ��