0303-019 (AR)LICENSED CONTRACTOR DECLARATION
I hereby affirm under penalty of perjury that I am licensed under provisions of
Chapter 9 (commencing with Section 7000) of Division 3 of the Business and
Professionals Code, and my License is in full force and effect.
License # Lic. Class Exp. Date
5 04 1 6 BII;l;C
Signature of Contractor
OWNER -BUILDER DECLARATION
I hereby affirm under penalty of perjury that I am exempt from the Contractor's
License Law for the following reason:
( ) I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec. 7044, Business & Professionals Code).
( ) I, as own&, of the property, am exclusively contracting with licensed
contractors to construct the project (Sec. 7044, Business & Professionals
Code).
( ) I am exempt under Section B&P.C. for this reason
Date 'Signature of Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm 'under penalty of perjury one of the following declarations:
. ( ) I have and will maintain a certificate of consent to self -insure for workers'
compensation, as provided for by Section 3700 -of the Labor Code, for the
Performance of the work for which this permit is issued.
( ) I have and will maintain workers' compensation insurance, as required by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is' issued. My workers' compensation insurance carrier & policy no. are:
CarrierNIT .. F-I�AID. Policy No. IS.7t3377 02
(This section need not be completed if the permit valuation is for $100.00 or less).
( ). I certify that.in the performance of the work for which this permit is issued,
I shall not employ any person in any manner so as to become subject to the
workers' compensation laws of California, and agree that if I should become
subject to the workers' compensation provisions of Section 3700 of the Labor
/Code, I sh II forthwith comply with those, provisions.
Date: M Applicant
Warning: Failure to secure Workers' Compensation coverage is unlawful and
shall subject an employer to criminal penalties and civil fines up to $100,000, in
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorney's fees.
IMPORTANT Application is hereby, made to the Director of Building and Safety
for a, permit subject to the conditions and restrictions set forth on his
application.
1. Each person'upon whose behalf this application is made & each person at
whose request and for whose benefit work is performed under or pursuant to
any permit issued as a result of this applicaton agrees to, & shall, indemnify
& hold harmless the City of La Quinta, its officers, agents and employees.
2. Any permit issued as a result of this application becomes null and void if
work is not commenced within 180 days from date of issuance of such
permit, or cessation of work for 180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply with all City, and State laws relating to the building
construction, and hereby authorize representatives of this City to enter upon
the above-mentioned property for inspection purposes.
,/Signature (Owner/Agent .• Date' �C X-3
.•::� Y_.
BUILDING PERMIT PERMIT#
4
0303 -OV)
DATE VALUATION LOT TRACT
202
JOB SITE ry�Y y; aR♦�
ADDRESSR-7 Jk�L7�rt�d�AJAI�lt3EE`j"d�
APN
OWNER
CONTRACTOR/DESIGNER/EN (NEER
DAM &lilaIM MAW
78.875 IYUff" DO., MAR.
ISO BOX' 2'5 v*
7 � Qlt't `A aA Y1253
PALM M DESE T f0A 92260
(760)345-2030 ► RL4 4001
^
USE OF PERMIT
MMFIM4....+4:C31 TION
bJ 5f? ADDITION PXro. APPROVED RT A WS.
ADDITION 24.Ott UIQ
MU FKPI� ti nW&1R1IT
PJAN CHECK PER 1014001-43.9-318 01,44
CON-11-";1RUCT1r,ka PER, 101-000-41,"00, . X33.00
MEC HAINICAL FUM 101K()00,4Z1.000
CTRICAL M 101-001.410-000,. �aii.uC1
ELECTRICAL
;1't'1Z:ON0.U4TION ".41.1Z1MID $.so
Ij
MAR 05 7003
CITY OF LA QUINTA
FINANCE DEPT.
ST)B-1WAC C0NW,ft:CSCT1(W AND PI".4 CDEC'
1+05.9
TOTAL FERIKU YrX1% D0111 HOW
RECEIPT
DATE %�BY
r TE ED^
NSPEC
INSPECTION RECORD
xi
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
BUILDING
APPROVALS
MECHANICAL APPROVALS
Set Backs
Underground Ducts
Forms & Footings
. p
Ducts
Slab Grade
Return Air
Steel
Combustion Air
Roof Deck
Exhaust Fans
O.K.'to Wrap
F.A.U.
Framing
Compressor
--Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans 8 Controls
Party Wali Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
_ V
Final
BLOCKWAr- L APPR VALS
Final
POOLS - SPAS
steel
Set Backs
Electric Bond
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final
Gas Piping
PLUMBING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping
Plumbing Final
Plumbing Top Out
Equipment Enclosure
Shower Pans
O.K. for Finish Plaster
Sewer Lateral
Pool Cover
Sewer Connection
Encapsulation
Gas Piping
Gas Test
Appliances
Final
Final
Utility Notice (Gas)
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
Final
Utility Notice (Perm)
COMMENTS:,, J
n
10
Bir, City of La Quinta
Building 8t Safery Division
P.O. Box 1504, 78-495 Calle Tampico
Permit . e7^ La
7^La Quinra, G4 92253 - (760) 777-7012
19 /) Building Permit Application and Tracking Sheet
Project Address:? fl. 8 % �V�iC.E i ) wner•s Name: v ` � .� (` S
A. P. Number:
O `�
4ddr 4 c
Legal Description: 17,
' % ` O Z
Cin. ST. Zip: s
Contractor: G
4 H c
elephone:
i Address:Q
Project Description: l ��� ` roK
City. ST. Zip: t,, c
Telephone: 3
_(� (1 6 6
State Lic. v :
Arch.. Ener.. Designer:
Cir• Lic. =:
Address:
City. ST. Zip:
Telephone:
Construction Type: Occupancy:
State Lic. _:
Project n•pe (circle one): Nc%% Add'n Alter Repair Demo
Name of Contact Person:
�%
Sq. Ft.: Zy
= Stories:
a Units:
' Tclenhone s of Contact Person: —
Estimated Value of Proiect O O U
APPLICANT: DO NOT WRITE BELOW THIS LINE
p
I Submittal
I Req'd
Recd
TRACKING
PERMIT FEES
2
Plan Sets
Plan Check submitted
ZY
Itcm
Amount
Structural Calcs.
Reviewed. ready for corrections
Plan Check Deposit
Truss Calcs.
Called Contact Person
Plan Check Balance
Title 23 Calcs.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
O
Grading plan
_" Review. ready for correctionsAssue
Electrical
Subcontactor List
Called Contact Person
Plumhing
Grant Deed
Plans picked up
S.M.1.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
'"i Review. riady for correctio ss e
Y
Developer Impact Fee
Planning Approval
Called Contact Person (d► i S•
j
A.1.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees
Comments
At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patios/walkways, residential additions under
500 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooking, eating or sanitation) or replacement mobile
homes. It has been determined that the above-named owner is exempt from paying school fees at this time due to the following reason:
Residential Addition 500 Sq Feet or Less
EXEMPT
This certifies that school facility fees imposed pursuant to
Education Code Section 17620 and Government Code 65995 Et Seq.
in the amount of $0.00 X 24 S.F. or $0.00 have been paid for the property listed above and that
building permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued.
Fees Paid By Exempt - Ben Nance Check No. -
Name on the check Telephone
Funding Exempt
By Dr. Doris Wilson
Superintendent
Fee collected /exempted b Sharon McG%il r $o.00
/ ,, / Payment Recd Over/Under
Signature
NOTICE: Pursuant to Government Co Section 66020( is will serve to notify you that the 90 -day approval period in which you may protest the fees or
other payment identified above will b in to run from the date on which the building or installation permit for this project is issued, or from the date on which
those amounts are paid to the Distri (s) or to another public entity authorized to collect them on the District('s) behalf, whichever is earlier.
NOTICE: This Document NOT VALID if Duplicated
Embossed Original - Building DepartmenUApplicant Copy - ApplicanUReceipt Copy - Accounting
I
44N
aakTr4o=
Lake La Quinta
73-320 E1 Paseo
Palm Desert, CA. 92261
7607568-0349 Phone
760-346-4349 Fax
2/5/03
David & Beth Shaw
78875 Dulce Del Mar
LaQuinta, CA, 92253
Dear David & Beth,
This Letter is to inform you the Architectural Committee has reviewed and approved
your architectural request form on 1/30/03.
Sincerely,
Craig
Chairman
TOO In 6666M09L YVd 9V:CT aaA c0/50/ZO
f
REGISTERED INSPECTOR'S WEEKLY REPORT
JON TANDY
37630 Medjool Ave.
Palm Desert, CA 92211
Office (760) 772-7192
Fax (760) 772-7193
Pager (760) 776-3338
L4. .I- •
TYPE OF
INSPECTION
PERFORMED
❑ REINFORCED CONCRETE
❑ POST TENSIONED CONCRETE
❑ REINFORCED MASONRY
❑ STRUCT. STEEL ASSEMBLY
❑ ASPHALT
❑ FIRE PROOFING
❑
❑ OTHER �� X
JOB LOCATIONI
I � /\ MR P- LA ,'
Vl'�t1PrERl�y,T
REPORT SEQUENCE N0.
^V
TVPbOF Ulf�j`URE C a . _ i .Y CS •
.YP..Qi"" Vv •..� �7V{/ VV��
`�/]
I J
0
( I 03
DAY OF WEEK
MATERIAL DESCRIPTION
ARCHITECT
IP
NRS. CHARGED
Cal
• l
ENGINEER
ASSISTANTS
HRS. CHARGED
INSPECTION
DATE
GENERAL
CONTRACTOR
SUB
CONTRACTOR
" o
W < < n U WAA.
US c� S�
S
oK ��M►C�
S�n,�.c�wAtl .
COPY SENT TO CLIENT ❑.
CONTINVED ON NEXT PAGE ❑
PAGE OF
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE INSPECTED TO THE BEST OF M`'
KNOWLEDGE ALL OF THE ABOVE REPORTED WORK UNLESS OTHERWISE
NOTED. I HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED
PLANS. SPECIFICATIONS. AND APPLICABLE SECTIONS OF THE
GOVERNING BUILDING LAWS.
S GN� o� URE OF REGISTERED SPECTO
� 3 � ?
DATE REPORT REGISTER NUMRFR
eol-
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page I of 3) CF -1R
SuaW REStDE,ac,E �l lug 03
Project Title Date
GOT' ao i- _ E4 Q v i N't-A t CA
PAddress Building Permit #
M
Documentation Author Telephone Plan Check / Date
P4 c" (9E IS Field Check / Date
Compliance Method (Package or Computer) Climate Zone n orccmen[ Agency use Only
GENERAL INFORMATION
Total Conditioned Floor Area. ft' Average Ceiling Height: a ft
Conditioned Slab Floor Area fe
Building Type: Single Family �_ Addition
(check one or more) Multi -Family Existing -Plus -Addition
Front Orientation: North / Southast West / All Orientations
(input front orientation in degrees from True North and circle one)
Number of Stories _L_
Number of Dwelling Units:
Floor Construction Type: <Eb5iaised Floor (circle one or both)
RADIANT BARRIER (required in climate zones 2, 4, 8-15) Required for this submittal_ yes ono
BUILDING ENVELOPE INSULATION
Component
Type
Frame Type
wd = wood
stl = steel
Cavity Sheathing Total R- Assembly Location/Comments
Insulation Insulation Value' U -Factor (attic, garage, typical, etc.)
R -Value R -Value
Wall
ID000
2l bM U "
Wall
Left
Roof
Rear I
Q - 36
Roof
Right
Floor
Right
Floor
Skylight
Slab Edge
1 For prescriptive compliance. Total R -Value and Assembly U -Factor are not required for a wood -framed wall that meets cavity R -value
insulation requirements for the Prescriptive Package.
FENESTRATION
Shading Devices
Fenestration
#/T e/Pos.
Orien- Area Fenestration Fenestration Exterior Overhangs/
tation (fe) U -Factor SHGC Shading Att. Fins
Front
Front
Left
Left
Rear I
UJ
Rear
Right
1 Li 4k
Right
Skylight
Skylight
ova
Noil0ntil
a3 8 dvnrl dd
AA
1-44vs v JNlcrins
Compliance Forms August 2001 N-LmnoV1
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 2 of 3) CF -1R
Project Title Date
HVAC SYSTEMS
Note: Input hydronic or combined hydronic data under Water Heating Systems, except Design Heating Load.
Distribution
Heating Equipment Minimum Type and Duct or Heat Pump
Type (furnace, heat Efficiency Location Piping Thermostat Configuration
pump, etc.) (AFUE or HSPF) (ducts, attic, etc.) R -Value Type (split or package)
E�1S'f
Cooling Equipment Minimum IDuct Heat Pump
Type (air conditioner, Efficiency Location Duct Thermostat Configuration
heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type (split or package)
C -.f tc..T
SEALED DUCTS and TXVs (or Alternative Measures)
❑ Sealed Ducts (all climate zones)
(Installer testing and certification and HERS rater field verification required)
❑ TXVs, readily accessible (climate zones 2 and 8-15 only)
(Installer testing and certification and HERS Rater or field verification required)
❑ Refrigerant Charge/Air Flow (climate zones 2 and 8-15 only)
(Installer testing and certification and HERS Rater or field verification required)
OR
❑ Alternative to Sealed Ducts and TXVs (see Package C or D Alternative Package Features for Project Climate Zone)
Climate Zone Window SHGC Window U -Factor SEER Heating
WATER HEATING SYSTEMS
Energy' External
Rated' Tank Factor or Tank
Water Heater Distribution Number Input (kW Capacity Recovery Standby' Insulation
Type Type in System or Btu/hr) (gallons) Efficiency Loss (%) R -Value
C4e.r
1. For small gas storage water heaters (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance, and heat pump water heaters, list Energy
Factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list rated input and recovery efficiencies.
SPECIAL FEATURES (add extra sheets if necessary). Package C and D: TXVs, Sealed Ducts, Radiant
Barriers (see installation requirements for radiant barriers in Section 8.13 of the 2001 Residential Manual).
Package C: thermal mass (thermal mass type, covering, thickness, and description).
'pC R.EMoU t1i 1, ' -I fbI STI IJ u isiJl V Utt
Compliance Forms August 2001 A-3
,J
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 3 of 3) CF -1R
GV�Aw 2.Es In VJ3 ck - '�-1 ( a L 0 d
Project Title Date
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance specifications needed to comply with
Title 24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement
them. This certificate has been signed by the individual with overall design responsibility. When this certificate
of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that
is varied is indicated in the Special Features/Remarks section. The undersigned recognize that compliance using
duct sealing and TXVs requires installer testing and certification and field verification by an approved HERS
rater.
Designer or Owner (per Business and Professions Code)
Name:
Title/Firm
Address:
Telephone:
Lic. #:
(signature) (date)
Enforcement Agency
Name:
Title:
Agency:
Telephone: _
(signature / stamp)
(date)
Documentation Author
Name: ff0A P D. PA cXCe
Title/Firm:
Address: CL - d -S �7 C.0 MXA (LV
CASEn2a�,
Telephone: 7 u 0 — 2 > 4-
117)I I u [0
(signatur (date)
Compliance Forms August 2001 A-4
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 1 of 2) MF -1R
Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used.
Items marked with an asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable.
DESCRIPTION
DESIGNER
ENFORCEMENT
Building Envelope Measures:
• §150(a): Minimum R-19 ceiling insulation.
§150(b): Loose fill insulation manufacturer's labeled R -Value.
• §150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -Factor in metal frame walls
does not apply to exterior mass walls).
• §150(d): Minimum R-13 raised floor insulation in framed floors.
§ 150(l) : Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no
eater than 2.0 erm/inch.
§118: Insulation specified or installed meets insulation quality standards. Indicate type and form.
§ 116-17: Fenestration Products, Exterior Doors, and Infiltration/Exfiltration Controls
I. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field -fabricated) have label with certified U -Factor, certified Solar Heat
Gain Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
§ 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
§ I50(f): Special infiltration barrier installed to comply with § 151 meets Commission quality standards.
§150(c): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
I. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning gas pilot lights allowed.
Space Conditioning, Water Heating and Plumbing System Measures:
§1 l0-§113: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
§ 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA.
§150(i): Setback thermostat on all applicable heating and/or cooling systems.
§ 1500): Pipe and tank insulation
I. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater)
3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R -I2
external insulation or R-16 combined internal/external insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55° F insulated.
6. Piping insulated between heating source and indirect hot water tank.
Compliance Forms August 2001 A-5
MANDATORY MEASURES CHECKLIST: RESIDENTIAL (Page 2 of 2) MF -1R
Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used.
Items marked with an asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of
Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as
minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents
or on this checklist only.
Instructions: Check or initial applicable boxes when completed or enter N/A if not applicable.
DESCRIPTION
DESIGNER
ENFORCEMENT
Space Conditioning, Water Heating and Plumbing System Measures: (continued)
• § 150(m): Ducts and Fans
I. All ducts and plenums installed, sealed and insulated to meet the requirement of the 1998 CIVIC Sections 601,
603, 604, and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in
conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system
that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B. If mastic or tape is used to seal
openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building
cavities shall not be used for conveying conditioned air. Joints and seams of duct systems and their
components shall not be scaled with cloth back rubber adhesive duct tapes unless such tape is used iti
combination with mastic and drawbands.
2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials
other than sealed sheet metal, duct board or Flexible duct shall not be used for conveying conditioned
air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support
platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts.
3. Joints and seams of duct systems and their components shall not be scaled with cloth back rubber
adhesive duct tapes unless such tape is used in combination with mastic and drawbands.
4. Exhaust fan systems have back draft or automatic dampers.
5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible,
manually operated dampers.
6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight,
moisture, equipment maintenance, and wind but not limited to the following: Insulation exposed to
weather shall be suitable for outdoor service e.g., protected by aluminum, sheet metal, painted canvas,
or plastic cover. Cellular foam insulation shall be protected as above or painted with a coating that is
water retardant and provides shielding from solar radiation that can cause degradation of the material.
§ 114: Pool and Spa Heating Systems and Equipment.
I. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no
electric resistance heating and no pilot light.
2. System is installed with:
a. At least 36" of pipe between filter and heater for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation pump time switch.
§ 115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no
continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr
§ 118 (f): Cool Roof material meet specified criteria
Lighting Measures:
§150(k)l.: Luminaires for general lighting in kitchens shall have lamps with an efficacy of 40 lumens/watt
or greater for general lighting in kitchens. This general lighting shall be controlled by a switch on a readily
accessible lighting control panel at an entrance to the kitchen.
§ 150(k)2.: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an
efficacy of 40 lumens/watt or greater switched at the entrance to the room or one of the alternatives to this
requirement allowed in § I50(k)2.; and incandescent recessed ceiling fixtures are IC (insulation cover)
approved.
Compliance Forms August 2001 A-6
assessing how a proposed design compares to this package of features. More detail on
each of the requirements follows later in this chapter.
Table 3-1- Summary of Package D Requirements
Solar Heat Gain Coefficient'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
BUILDING ENVELOPE
NR
0.40
NR
0.40
NR
NR
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
NR
Insulation minimums2
NR
0.40
NR
0.40
NR
NR
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
NR
Ceiling
R38
R30
R30
R30
R30
R30
R30
R30
R30
R30
R38
R38
R38
R38
R38
R38
Walls
R21
R13
R13
R13
R13
R13
R13
R13
R13
R13
R19
R19
R19
R21
R21
R21
"Heavy mass" walls
R4.76
R2.44
R2.44
R2.44
R2.44
R2.44
R2.44
R2.44
R2.44
R2.44
R4.76
R4.76
R4.76
R4.76
R4.76
R4.76
Below -grade walls
RO
RO
RO
RO
RO
RO
RO
RO
RO
RO
RO
RO
RO
RO
RO
R13
Slab floor perimeter
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
R7
Raised floors
R192
R192
R192
R192
R192
R192
R192
R192
R192
R192
R192
R192
R192
R192
R 1 9 2
R192
Concrete raised floors
R8
R8
RO
RO
RO
RO
RO
RO
RO
RO
R8
R4
R8
R8
R4
R8
Radiant Barrier
NR
REQ
NR
REQ
NR
NR
NR
REQ
REQ
REQ
REQ
REQ
REQ
REQ
REQ
NR
GLAZING
Maximum U -factor'
0.65
0.65
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.65
0.65
0.65
0.65
0.65
0.65
0.60
Maximum total area
16%
16%
20%
20%
16%
20%
20%
20%
20%
20%
16%
16%
16%
16%
16%
16%
Solar Heat Gain Coefficient'
South -facing glazing
NR
0.40
NR
0.40
NR
NR
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
NR
West -facing glazing
NR
0.40
NR
0.40
NR
NR
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
NR
East -facing glazing
NR
0.40
NR
0.40
NR
NR
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
NR
North -facing glazing
NR
0.40
NR
0.40
NR
NR
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
NR
THERMAL MASS'
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
NR
SPACE -HEATING SYSTEM6
Electric -resistant allowed
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
If gas, AFUE =
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
If heat pump, split system HSPF6 =
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
Single package system HSPF =
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
MIN
SPACE -COOLING SYSTEM
If split system A/C, SEER = MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN
Refrigerant charge and airflow NR REQ' NR NR NR NR NR REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' NR
testing or TXV
If single package A/C, SEER = MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN MIN
SPACE CONDITIONING DUCTS
Duct Sealing REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ' REQ'
DOMESTIC WATER -HEATING
TYPE (System must meet budget, Any Any Any Any Any Any Any Any Any Any Any Any Any Any Any Any
see §151 (b) 1 and (f) 8 and
Tables 3-14 to 3-17)
HERS rater field verification and diagnostic testing are required for this feature. As an alternative under Package D, better glazing and higher
efficiency equipment can be used instead of the diagnostic testing of air distribution ducts, split system air conditioners and heat pumps. See
Table 3-2 for the increased values, which vary by climate.
NR = Not Required REQ = Required MIN = Minimum
3-2 August 2001 Residential Manual
Table 7-2 —
Size of Addition
Prescriptive
Less than 500 ft2 Less than 1,000
Requirements for
Component 100 ft2 or less (1) (1) ft2 (1) All Additions (1)
Additions
Ceiling Insulation R-19 Package D (2) Package D (2) Package D (2)
Wall Insulation (3) R-13 R-13 R-13 Package D (2)
Floor Insulation R-13 Package D (2) Package D (2) Package D (2)
Fenestration U- factor (5) 0.75 (10) 0.75 (10) Package D (2) Package D (2)
Glazing < 50 ft2 (6) Package + Glass Package + Glass Package D (2)
Area Removed (7) Removed (7)
Solar Heat Gain Package D(2) Package D (2) Package D (2) Package D (2)
Coefficient (SHGC)
Radiant Barriers (4) N/A Package D (2) Package D (2) Package D (2)
Space Heating & Cooling (8) Mandatory Package D (2) Package D (2) Package D (2)
Refrigerant Charge and N/A Package D (2) Package D (2) Package D (2)
Airflow, (or TXV) (9)
Duct Sealing (9) N/A Package D (2) Package D (2) Package D (2)
Water Heater Replacement N/A N/A N/A N/A
Add Water Heater See Table 7-5 See Table 7-5 See Table 7-5 See Table 7-5
Notes:
1. Additions for any specific size range column can also use prescriptive requirements listed in any column to
the right as long as all requirements in the chosen column are met.
2. Areas shown in gray are the Package D requirements that apply to additions in the same manner as they
apply to new construction. For these requirements, either the standard Package D or the Alternative to
Package D may be used (see Table 3-2).
3. "Heavy Mass" and "Light Mass" walls may meet the Package D requirements for mass wall insulation
instead of R-13 (see Table 3-1).
4. The radiant barrier requirement only applies to the addition roof area. It is not necessary to retrofit a radiant
barrier in the existing attic.
5. Dual -glazed greenhouse windows and dual -glazed skylights are assumed to meet the applicable U -factor
requirements.
6. This approach does not allow credit for glass removed. As described in Note 1, compliance with all the
requirements for the column for additions of less than 500 square feet is allowed, in which case credit for
glazing removed is allowed.
7. Glazing area is limited to the Package D fenestration area plus the area of any glazing removed because of
the addition.
8. When heating and/or cooling will be extended to an addition from the existing system(s), the existing
equipment need not comply with Title 24, Part 6. The heating system capacity must be adequate to meet
the minimum requirements of UBC Section 310.11. No electric resistance space heating may be installed.
9. The requirements for testing refrigerant charge and airflow (or installing a thermostatic expansion valve
(TXV)) apply only if a new split system air conditioner or heat pump is installed as part of the addition, If a
separate air distribution system is installed for the addition, then this new system must be tested and sealed
to have a leakage less than or equal to 6% of the fan airflow. If an existing air distribution system is
extended to serve the addition, this too must be tested, but the tested target duct leakage depends on the
size of the addition and other factors discussed in Section 7.2.3, Determining the Target Percent Leakage.
In lieu of testing duct leakage and refrigerant charge and airflow (or installing and verifying a TXV), the
builder can choose to meet the Alternative to Package D requirements. See Table 3-2.
10. When the Alternative to Package D is used for additions of 500 ft2 or less, the fenestration U -factor and
SHGC criteria of the Alternative to Package D must be met. See Table 3-2 for a summary of the
requirements.
11. When replacing a central air conditioner that serves both the addition and existing building, the replacement
is an alteration and must meet the requirements described in 7.5.2, New Space Conditioning Equipment.
Residential Manual August 2001 7-7