STORM DRAIN HYDRAl1LIC� -S REPORT
For Property Located
In a portion of Section 15, T6S., RM, SBM
La Quinta, California
Griffin Ranch
Tract Map No. 32879
Revised December 6, 2005
Prepared for:
Trans West Housing
47120 Dune Palms Road, Suite C
La Quinta, CA 92253 -2051
JN 1721
MSA CONSULTING, INC.
MARMRO, SMUH & Assocu= INC.
PLAmiwo ■ Cim Bxonmmm ■ Lmm SoRyEywo
34200 Bw Horn DRm ■ Rnxcao MmAcm ■ CA 92270
T ammoxn (760) 320 -9M ■ FAx (760) 323 -7893
I
STORM DRAIN HYDRAULICS REPORT
For Property Located
In a portion of Section 15, T6S., RM, SBM
La Quinta, California
Griffin Ranch
Tract Map No. 32879
Revised December 6, 2005
Pr. epared for:
Trans West Housing
47120 Dune Palms Road, Suite C
La Quinta, CA 92253 -2051
JN 1721
QR0F ESSJO
a. D E,1 4e
N0. 43880
L.3e.ot
'r C►VIL
0 CALIF
MSA CONSULTING, INC.
MAwmo, Smrm & Assoamn, INC.
Pl.AMMO ■ CMM ENOM MUM ■ LAM SURVUWG
34200 13os HOPE Diva ■ RANCHO Mhum ■ CA 92270
'Fer moan (760) 320 -9811 ■ FAx (760) 323 -7893
?53
.,. %0,.,.. DRAIN
INDEX$ MAP
pff
MSA CoNSULTINo, INC
w MADmo, SmrrH & Assoc ATBs, INc
v0 PLAMM • ONM BRODMm a ■ LAND Stmvama
34200 Boa Hora Dun ■ �o I�� ■ G 92270
TSLEpmm (760) 920+9311 ■ PAZ (760) 323 -7893
LINE 253
User
Name: mpompa
Date: 10 -04 -05
Project: 1721
STORM DRAIN
ALIGN AND ANNO
Time: 11:50:10
�T twork: 01 -
LINE 253
Page: 1
Storm Sewers Summary
Report
----------
Pipe
- - -
Name
- -- - --
Total Flow Pipe Dim
HGL
Down
HGL Up
Invert Down
invert Up
Downstream
cfs
in
ft
ft
ft
ft
Junction
Pipe
1
67.42
48.00
461.80
461.94
450.50
451.38
Outfall
Pipe
2
67.42
48.00
461.97*
462.11*
451.38
452.34
45 BEND 1
Pipe
3
67.42
48.00
462.14*
462.16*
452.34
452.45
45 BEND 2
Pipe
4
67.42
48.00
462.18*
462.79*
452.54
454.19
MH 1
Pipe
5
67.42
48.00
462.81*
463.01*
454.28
455.01
MH 2
Pipe
18
35.68
48.00
463.36*
463.37*
455.01
455.11
WYE 1
Pipe
6
35.68
30.00
463.68*
464.05*
456.61
457.01
REDUCER 1
Pipe
7
19.80
30.00
464.68*
464.95*
457.01
457.96
WYE 2
Pipe
8
19.80
30.00
464.97*
465.67*
458.04
462.66
MH 3
Pipe
9
19.80
30.00
465.68*
466.12
462.74
464.13
MH 4
Pipe
20
9.90
30.00
466.66*
466.66
464.13
464.18
WYE 3
Pipe
10
9.90
18.00
466.86*
467.06*
465.18
465.32
REDUCER 3
Pipe
11
9.90
18.00
467.29*
467.68*
465.32
465.38
45 BEND 3
Pipe
13
31.74
30.00
463.36*
463.70*
455.76
455.93
WYE 1
Pipe
14
15.87
24.00
465.09*
465.55*
456.43
456.59
CB 2
Pipe
15
9.90
18.00
466.66*
467.49*
464.63
464.88
WYE 3
Pipe
16
15.87
24.00
464.68*
465.34*
457.26
457.30
WYE 2
•
Storm Sewed ,-.Detail Report
PIPE DESCRIPTION: Pipe 1
- - -- RAINFALL INFORMATION--- -
eturn Period = 100 Year
ainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 9.27
Catchment Area
Current Pipe
= Pipe 1
= 0.500
Downstream Pipe
= Outfall
Inlet Intensity
Pipe Material
= HDPE
= 0.00 cfs
Pipe Length
= 61.9337
ft
Plan Length
= 61.9274
ft
Pipe Type
= Circular
gpd
Pipe Dimensions
= 48.00 in
= 5.36 ft /s
Pipe Manning's "n"
= 0.013
Uniform Velocity Upstream
Pipe Capacity at Invert Slope
= 171.15
cfs
Invert Elevation Downstream
= 450.50
ft
Invert Elevation Upstream
= 451.38
ft
Invert Slope
= 1.42W
Invert Slope (Plan Length)
= 1.42W
Rim Elevation Downstream
= 460.00
ft
Rim Elevation Upstream
= 467.00
ft
Natural Ground Slope
= 11.308
Crown Elevation Downstream
= 454.50
ft
Crown Elevation Upstream
= 455.38
ft
- -- -FLOW INFORMATION--- -
= 9.27
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 67.42 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
otal Time of Concentration
= 9.27
min
otal Intensity
= 8.70
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 67.42
cfs
Uniform Capacity
= 171.15
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 461.80 ft
HGL Elevation Upstream
= 461.94 ft
HGL Slope
= 0.22 8
EGL Elevation Downstream
= 462.25 ft
EGL Elevation Upstream
= 462.38 ft
EGL Slope
= 0.22 W
Critical Depth
= 29.7696 in
Depth Downstream
= 48.0000 in
Depth Upstream
= 48.0000 in
Velocity Downstream
= 5.36 ft /s
Velocity Upstream
= 5.36 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 12.81 ft /s
Area Downstream
= 12.57 ft "2
Area Upstream
= 12.57 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.029 ft
- -- -INLET INFORMATION--- -
= 0.00 ft /ft
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000 0.
avement Cross -Slope
= 0.00 ft /ft
-utter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow = 0.00 cfs
Pavement Flow = 0.00 cfs
Gutter'Flow = 0.00 cfs
Depth at Curb = 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
*avement Spread
= 0.0000 ft
otal Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 2
ft
- - -- RAINFALL INFORMATION--- -
= Circular
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
atchment Area
Current Pipe
= Pipe 2
= 0.500
Downstream Pipe
= Pipe 1
Inlet Intensity
Pipe Material
= HDPE
= 0.00 cfs
Pipe Length
= 67.2257
ft
Plan Length
= 67.2188
ft
Pipe Type
= Circular
Pipe Dimensions
= 48.00 in
Pipe Manning's "n"
= 0.013
Total Rational Flow
Pipe Capacity at Invert Slope
= 171.58
cfs
Invert Elevation Downstream
= 451.38
ft
Invert Elevation Upstream
= 452.34
ft
Invert Slope
= 1.43%
Invert Slope (Plan Length)
= 1.43%
Rim Elevation Downstream
= 467.00
ft
Rim Elevation Upstream
= 467.33
ft
Natural Ground Slope
= 0.49%
Crown Elevation Downstream
= 455.38
ft
Crown Elevation Upstream
= 456.34
ft
FLOW INFORMATION--- -
atchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
= 10.24 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 67.42 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 9.06 min
Total Intensity
= 8.77 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 67.42 cfs
Uniform Capacity
= 171.58 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 461.97 ft
HGL Elevation Upstream
= 462.11 ft
HGL Slope
= 0.22 %
EGL Elevation Downstream
= 462.41 ft
EGL Elevation Upstream
= 462.56 ft
EGL Slope
= 0.22 %
Critical Depth
= 29.7696 in
Depth Downstream
= 48.0000 in
Depth Upstream
= 48.0000 in
Velocity Downstream
= 5.36 ft /s
Velocity Upstream
= 5.36 ft /s
Uniform Velocity Downstream
= 12.84 ft /s
Uniform Velocity Upstream
= 12.84 ft /s
Area Downstream
= 12.57 ft"2
Area Upstream
= 12.57 ft"2
(JLC)
= NA
Calculated Junction Loss
= 0.029 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = 45 BEND 1
Inlet Description = <None>
Inlet Type = Undefined
Computation Case = Sag
Longitudinal Slope = 0.00 ft /ft
Mannings n -value = 0.000
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
10ntercept Efficiency
low from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
"nvert Elevation Downstream
nvert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
*GL Slope
critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
0.00
= 100 Year
= Tutorial
= Pipe 3
= Pipe 2
= HDPE
= 7.9542 ft
= 10.2884 ft
= Circular
= 48.00 in
= 0.013
= 168.85 cfs
= 452.34 ft
= 452.45 ft
= 1.38%
= 1.07%
= 467.33 ft
= 467.38 ft
= 0.65%
= 456.34 ft
= 456.45 ft
= 0.00 ac
= 0.500
= 5.00 min
= 10.24 in /hr
= 0.00 cfs
= 67.42 cfs
= 0.00 cfs
= 0.00 ac
= 0.500
= 9.03 min
= 8.78 in /hr
= 0.00 cfs
= 67.42 cfs
= 168.85 cfs
= 0.00 cfs
= 0.00 gpd
= 462.14 ft
= 462.16 ft
= 0.22 %
= 462.59 ft
= 462.61 ft
= 0.22 %
= 29.7696 in
= 48.0000 in
= 48.0000 in
= 5.36 ft /s
= 5.36 ft /s
= 12.69 ft /s
= 12.69 ft /s
= 12.57 ft "2
= 12.57 ft'2
Kj (JLC)
= NA
Calcvlated Junction Lo-ne
= 0.022 ft
- -- -INLET INFORMATION--- -
= Pipe 3
Downstream Inlet
= 45 BEND 2
nlet Description
= <None>
nlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 'k
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * 9
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
PIPE INFORMATION--- -
urrent Pipe
= Pipe 4
Downstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 276.9835 ft
Plan Length
= 276.9835 ft
Pipe Type
= Circular
Pipe Dimensions
= 48.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 110.82 cfs
Invert Elevation Downstream
= 452.54 ft
Invert Elevation Upstream
= 454.19 ft
Invert Slope
= 0.61%
Invert Slope (Plan Length)
= 0.60%
Rim Elevation Downstream
= 467.38 ft
Rim Elevation Upstream
= 467.18 ft
Natural Ground Slope
= -0.07%
Crown Elevation Downstream
= 456.54 ft
Crown Elevation Upstream
= 458.19 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
= 10.24 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 67.42 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 8.17 min
Total Intensity
= 9.05 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 67.42 cfs
niform Capacity
= 110.82 cfs
kipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 462.18 ft
HGL Elevation Upstream
= 462.79 ft
HGL Slope
= 0.22 %
EGL Elevation Downstream
= 462.63 ft
EGL Elevation Upstream
= 463.24 ft
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
eelocity Upstream
niform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
"urb Efficiency
rate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
nlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
= 0.22 %
= 29.7696.;n
= 48.0000 in
= 48.0000 in
= 5.36 ft /s
= 5.36 ft /s
= 9.25 ft /s
= 9.25 ft /s
= 12.57 ft'2
= 12.57 ft "2
= NA
= 0.022 ft
= MH 1
= <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
* %
= 0.00 %
= 100 Year
= Tutorial
= Pipe 5
= Pipe 4
= HDPE
= 89.0593 ft
= 91.3943 ft
= Circular
= 48.00 in
= 0.013
= 129.99 cfs
= 454.28 ft
= 455.01 ft
= 0.82%
= 0.80%
= 467.18 ft
= 466.57 ft
= -0.69%
= 458.28 ft
= 459.01 ft
= 0.00 ac
= 0.500
= 5.00 min
= 10.24 in /hr
= 0.00 cfs
= 67.42 cfs
= 0.00 cfs
= 0.00 ac
= 0.500
= 7.88 min
= 9.14 in /hr
= 0.00 cfs
= 67.42 cfs
Uniform Capacity
= 129.99 cfs
Skipped flow -
= 0.00 cfs
Infiltration
= 0.00 gpd
-- HYDRAULIC INFORMATION--- -
= Undefined
GGL Elevation Downstream
= 462.81 ft
GL Elevation Upstream
= 463.01 ft
HGL Slope
= 0.22 %
EGL Elevation Downstream
= 463.26 ft
EGL Elevation Upstream
= 463.46 ft
EGL Slope
= 0.22 %
Critical Depth
= 29.7696 in
Depth Downstream
= 48.0000 in
Depth Upstream
= 48.0000 in
Velocity Downstream
= 5.36 ft /s
Velocity Upstream
= 5.36 ft /s
Uniform Velocity Downstream
= 10.44 ft /s
Uniform Velocity Upstream
= 10.44 ft /s
Area Downstream
= 12.57 ft'2
Area Upstream
= 12.57 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.352 ft
- -- -INLET INFORMATION--- -
= 0.00 cfs
Downstream Inlet
= MH 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Flow to Current Inlet
= 0.00 cfs
Dotal
low Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %.
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 18
= 466.57 ft
- - -- RAINFALL INFORMATION--- -
= 466.68 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 18
Downstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 12.7820 ft
Plan Length
= 12.7816 ft
Pipe Type
= Circular
Pipe Dimensions
= 48.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 127.00 cfs
Invert Elevation Downstream
= 455.01 ft
Invert Elevation Upstream
= 455.11 ft
Invert Slope
= 0.78%
Invert Slope (Plan Length)
= 0.78%
im Elevation Downstream
= 466.57 ft
Rim Elevation Upstream
= 466.68 ft
Natural Ground Slope
= 0.89%
Crown Elevation Downstream
= 459.01 ft
Crown Elevation Upstream
= 459.11 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
*eighted Coefficient
otal Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
"ongitudinal Slope
annings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
ipe Length
OPlan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
10.24 in /hr
_- 0.00 cfs
35.68 cfs
0.00 cfs
0.00 ac
0.500
7.81 min
9.17 in /hr
0.00 cfs
= 35.68 cfs
127.00 cfs
0.00 cfs
0.00 gpd
= 463.36 ft
= 463.37 ft
= 0.06 %
= 463.49 ft
= 463.50 ft
= 0.06 %
= 21.3408 in
= 48.0000 in
= 48.0000 in
= 2.84 ft /s
= 2.84 ft /s
= 8.68 ft /s
= 8.68 ft /s
= 12.57 ft "2
= 12.57 ft "2
= NA
= 0.305 ft
= WYE 1
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
= 0.0000 ft
0.00_ft /s
* %
* %
= 0.00
= 100 Year
= Tutorial
= Pipe 6
= Pipe 18
= HDPE
= 49.6797 ft
= 49.6781 ft
= Circular
= 30.00 in
= 0.013
= 36.79 cfs
= 456.61 ft
= 457.01 ft
= 0.81%
= 0.81%
Rim Elevation Downstream
= 466.68 ft
Rir- Elevation-- Upstrear.. --
= 466.19 ft
Natural Ground Slope
= -0.98%
Crown Elevation Downstream
= 459.11 ft
Crown Elevation Upstream
= 459.51 ft
0 -- -FLOW INFORMATION--- -
= 464.87 ft
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
= 10.24 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 35.68 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 7.69 min
Total Intensity
= 9.21 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 35.68 cfs
Uniform Capacity
= 36.79 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 463.68 ft
HGL Elevation Upstream
= 464.05 ft
HGL Slope
= 0.76 W
EGL Elevation Downstream
= 464.50 ft
EGL Elevation Upstream
= 464.87 ft
EGL Slope
= 0.76 %
Critical Depth
= 24.3240 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 7.27 ft /s
Velocity Upstream
= 7.27 ft /s
Uniform Velocity Downstream
= 8.54 ft /s
Uniform Velocity Upstream
= 8.54 ft /s
rea Downstream = 4.91 ft "2
rea Upstream = 4.91 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.632 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= REDUCER 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00 %
ISIPE DESCRIPTION: Pipe 7
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 7
Downstream Pipe = Pipe 6
Pipe Material = HDPE
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
pe Capacity at t
pe Cit Invert Slope
nvert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
OGL Elevation Downstream
GL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
utter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
= 116.2278 ft
118.2239 ft
= Circular
= 30.00 in
= 0.013
= 37.07 cfs
= 457.01 ft
= 457.96 ft
= 0.82%
= 0.80%
= 466.19 ft
= 466.70 ft
= 0.44%
= 459.51 ft
= 460.46 ft
= 0.00 ac
= 0.500
= 5.00 min
= 10.24 in /hr
= 0.00 cfs
= 19.80 cfs
= 0.00 cfs
= 0.00 ac
= 0.500
= 7.20 min
= 9.38 in /hr
= 0.00 cfs
= 19.80 cfs
= 37.07 cfs
= 0.00 cfs
= 0.00 gpd
= 464.68 ft
= 464.95 ft
= 0.23 %
= 464.94 ft
= 465.21 ft
= 0.23 %
= 18.1260 in
= 30.0000 in
= 30.0000 in
= 4.03 ft /s
= 4.03 ft /s
= 7.68 ft /s
= 7.68 ft /s
= 4.91 ft°2
= 4.91 ft"2
= NA
= 0.013 ft
= WYE 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
* %
= 0.00 %
PIPE DESCRIPTION: Pipe-8
- - -- RAINFALL INFORMATION - - --
Return Period
= 100 Year
Rainfall File
= Tutorial
0---PIPE INFORMATION--- -
ac
Current Pipe
= Pipe 8
Downstream Pipe
= Pipe 7
Pipe Material
= HDPE
Pipe Length
= 299.7792 ft
Plan Length
= 299.7792 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 50.90 cfs
Invert Elevation Downstream
= 458.04 ft
Invert Elevation Upstream
= 462.66 ft
Invert Slope
= 1.56%
Invert Slope (Plan Length)
= 1.54%
Rim Elevation Downstream
= 466.70 ft
Rim Elevation Upstream
= 468.21 ft
Natural Ground Slope
= 0.50%
Crown Elevation Downstream
= 460.54 ft
Crown Elevation Upstream
= 465.16 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
EGL Elevation Downstream
Inlet Time
= 5.00
min
Inlet Intensity
= 10.24
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 19.80
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 4.91 ft "2
Total Time of Concentration
= 5.97
min
Total Intensity
= 9.84
in /hr
otal Rational Flow = 0.00 cfs
otal Flow = 19.80 cfs
Uniform Capacity = 50.90 cfs
Skipped flow = 0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 464.97 ft
HGL Elevation Upstream
= 465.67 ft
HGL Slope
= 0.24 %
EGL Elevation Downstream
= 465.22 ft
EGL Elevation Upstream
= 465.92 ft
EGL Slope
= 0.24 %
Critical Depth
= 18.1260 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 4.03 ft /s
Velocity Upstream
= 4.03 ft /s
Uniform Velocity Downstream
= 9.72 ft /s
Uniform Velocity Upstream
= 9.72 ft /s
Area Downstream
= 4.91 ft "2
Area Upstream
= 4.91 ft°2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.013 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
utter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
utter Velocity
urb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 9
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
unoff Coefficient
nlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
• - -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
= 0.00 cfs.
= 0.0000 -in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
* %
* %
= 0.00 %
= 100 Year
= Tutorial
= Pipe 9
= Pipe 8
= HDPE
= 219.4937 ft
= 219.4937 ft
= Circular
= 30.00 in
= 0.013
= 32.63 cfs
= 462.74 ft
= 464.13 ft
= 0.64%
= 0.63%
= 468.21 ft
= 469.37 ft
= 0.52%
= 465.24 ft
= 466.63 ft
= 0.00 ac
= 0.500
= 5.00 min
= 10.24 in /hr
= 0.00 cfs
= 19.80 cfs
= 0.00 cfs
= 0.00 ac
= 0.500
= 5.13 min
= 10.19 in /hr
= 0.00 cfs
= 19.80 cfs
= 32.63 cfs
= 0.00 cfs
= 0.00 gpd
= 465.68 ft
= 466.12 ft
= 0.20 %
= 465.93 ft
= 466.46 ft
= 0.25 %
= 18.1260 in
= 30.0000 in
= 23.8364 in
= 4.03 ft /s
= 4.74 ft /s
= 6.97 ft /s
= 6.97 ft /s
= 4.91 ft"2
= 4.18 ft"2
= NA
= 0.539 ft
= MH 4
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Poi;ding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
arryover from previous inlet
= 0.00 cfs
Total Flow to Current inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00 W
PIPE DESCRIPTION: Pipe 20
cfs
- - -- RAINFALL INFORMATION--- -
= 32.93
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
Current Pipe
= Pipe 20
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
Pipe Length
= 7.7512 ft
Plan Length
= 7.7510 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 32.93 cfs
Invert Elevation Downstream
= 464.13 ft
Invert Elevation Upstream
= 464.18 ft
vert Slope
= 0.65%
ervert Slope (Plan Length)
= 0.65%
Rim Elevation Downstream
= 469.37 ft
Rim Elevation Upstream
= 469.41 ft
Natural Ground Slope
= 0.58%
Crown Elevation Downstream
= 466.63 ft
Crown Elevation Upstream
= 466.68 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
EGL Elevation Downstream
Inlet Time
= 5.00
min
Inlet Intensity
= 10.24
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 9.90
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 4.91 ft"2
Total Time of Concentration
= 5.07
min
Total Intensity
= 10.21
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 9.90
cfs
Uniform Capacity
= 32.93
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 466.66 ft
HGL Elevation Upstream
= 466.66 ft
HGL Slope
= 0.08 %
EGL Elevation Downstream
= 466.72 ft
EGL Elevation Upstream
= 466.73 ft
EGL Slope
= 0.08 %
Critical Depth
= 12.6150 in
epth Downstream
= 30.0000 in
Depth Upstream
= 29.7826 in
Velocity Downstream
= 2.02 ft /s
Velocity Upstream
= 2.02 ft /s
Uniform Velocity Downstream
= 5.87 ft /s
Uniform Velocity Upstream
= 5.87 ft /s
Area Downstream
= 4.91 ft"2
Area Upstream
= 4.90 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.202 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = WYE 3
Inlet Description = <None>
Type
= Undefined
*let
mputation Case
= Sag
ongitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 10
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 10
Pipe
= Pipe 20
Catchment Area
isownstream
ipe Material
= HDPE
= 0.500
Pipe Length
= 22.5311
ft
Plan Length
= 22.5307
ft
Pipe Type
= Circular
Inlet Hydrograph Flow
Pipe Dimensions
= 18.00 in
= 0.00 ac
Pipe Manning's "n"
= 0.013
Total Time of Concentration
Pipe Capacity at Invert Slope
= 8.28 cfs
= 10.24 in /hr
Invert Elevation Downstream
= 465.18
ft
Invert Elevation Upstream
= 465.32
ft
Invert Slope
= 0.62%
Invert Slope (Plan Length)
= 0.62%
= 0.00 gpd
Rim Elevation Downstream
= 469.41
ft
Rim Elevation Upstream
= 469.52
ft
Natural Ground Slope
= 0.49%
EGL Elevation Downstream
Crown Elevation Downstream
= 466.68
ft
Crown Elevation Upstream
= 466.82
ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
= 10.24 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.90 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
weighted Coefficient
= 0.500
Total Time of Concentration
= 5.00 min
Total Intensity
= 10.24 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.90 cfs
Uniform Capacity
= 8.28 cfs
Skipped flow
= 0.00 cfs
4w nfiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 466.86 ft
HGL Elevation Upstream
= 467.06 ft
HGL Slope
= 0.89 %
EGL Elevation Downstream
= 467.35 ft
EGL Elevation Upstream
= 467.55 ft
EGL Slope
= 0.89 %
Critical Depth
= 14.5638 in
Depth Downstream = 18.0000 in
Depth Upstream = 18.0000 in
Velocity Downstream = 5.60 ft /s
Velocity Upstream = 5.60 ft /s
Uniform Velocity Downstream = 5.60 ft /s
niform Velocity Upstream = 5.60 ft /s
rea Downstream = 1.77 ft "2
Area Upstream = 1.77 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.227 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= REDUCER 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 9,
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
lot Efficiency
= * %
otal Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 11
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 11
Downstream Pipe
= Pipe 10
Pipe Material
= HDPE
Pipe Length
= 9.3006 ft
Plan Length
= 10.8004 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 8.43 cfs
Invert Elevation Downstream
= 465.32 ft
Invert Elevation Upstream
= .465.38 ft
Invert Slope
= 0.65%
Invert Slope (Plan Length)
= 0.56%
Rim Elevation Downstream
= 469.52 ft
Rim Elevation Upstream
= 469.88 ft
Natural Ground Slope
= 3.87%
Crown Elevation Downstream
= 466.82 ft
Crown Elevation Upstream
= 466.88 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
nlet Input Flow
= 9.90 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.90 cfs
Uniform Capacity
= 8.43 cfs
Skipped flow
= 0.00 cfs
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
GGL Slope
GL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
ypassed Flow
IMF avement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Oatural Ground Slope
Town Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
= 0.00 gpd
= 467.29 ft
= 467.68 ft
= 4.16 %
= 467.78 ft
= 468.17 ft
= 4.16 %
= 14.5638 in
= 18.0000 in
= 18.0000 in
= 5.60 ft /s
= 5.60 ft /s
= 5.60 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft "2
= NA
= 0.624 ft
= 45 SEND 3
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.0000 in
= 0.0000 in
= 0.0000 ft
0.0000 ft
= 0.00 ft /s
* %
_ * %
* %
= 0.00 %
= 100 Year
= Tutorial
= Pipe 13
= Pipe 5
= HDPE
= 56.7122 ft
= 58.2120 ft
= Circular
= 30.00 in
= 0.013
= 22.45 cfs
= 455.76 ft
= 455.93 ft
= 0.30%
= 0.29%
= 466.57 ft
= 466.56 ft
_ -0.01%
= 458.26 ft
= 458.43 ft
= 0.00 ac
= 0.500
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
i
Inlet Input Flow
= 31.74
cfs
..Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 464.35 ft
Total Time of Concentration
= 0.19
min
eotal Intensity
= 12.98
in /hr
otal Rational Flow
= 0.00
cfs
Total Flow
= 31.74
cfs
Uniform Capacity
= 22.45
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 463.36 ft
HGL Elevation Upstream
= 463.70 ft
HGL Slope
= 0.60 %
EGL Elevation Downstream
= 464.01 ft
EGL Elevation Upstream
= 464.35 ft
EGL Slope
= 0.60 %
Critical Depth
= 23.0340 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 6.47 ft /s
Velocity Upstream
= 6..47 ft /s
Uniform Velocity Downstream
= 6.11 ft /s
Uniform Velocity Upstream
= 6.47 ft /s
Area Downstream
= 4.91 ft"2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 1.386 ft
- -- -INLET INFORMATION--- -
= 0.00 ft /ft
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
C ross -Slope
= 0.00 ft /ft
g:t:::vnt
Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 9d
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 14
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 14
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
Pipe Length
= 53.4578 ft
Plan Length
= 57.3074 ft
ipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 12.37 cfs
Invert Elevation Downstream
= 456.43 ft
Invert Elevation Upstream
= 456.59 ft
Invert Slope
= 0.30%
Invert Slope (Plan Length)
= 0.28%
Rim Elevation Downstream
= 466.56 ft
Rim Elevation Upstream
= 466.55 ft
Natural Ground Slope
= -0.02%
Crown Elevation Downstream
= 458.43 ft
Crown Elevation Upstream
='458.59 ft
-- -FLOW INFORMATION--- -
= 0.86 W
Oatchment Area
= 0.00 ac
unoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 15.87 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
weighted Coefficient
= 0.500
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 15.87 cfs
Uniform Capacity
= 12.37 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 465.09 ft
HGL Elevation Upstream
= 465.55 ft
HGL Slope
= 0.86 W
EGL Elevation Downstream
= 465.49 ft
EGL Elevation Upstream
= 465.95 ft
EGL Slope
= 0.86 %
Critical Depth
= 17.2392 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.05 ft /s
Velocity Upstream
= 5.05 ft /s
Uniform Velocity Downstream
= 5.05 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft^2
] (JLC) = NA
alculated Junction Loss = 0.495 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 15
RAINFALL Seturn
Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 15
Downstream Pipe = Pipe 9
Pipe Material = HDPE
Pipe Length = 49.1194 ft
Plan Lenqth = 50.6188 ft
Pipe Type = Circular
Pipe Dimensions = 18.00 in
Pipe Manning's "n" = 0.013
Pipe Capacity at Invert Slope = 7.49 cfs
Invert Elevation Downstream
= 464.63
ft
nvert Elevation Upstream
= 464.88
ft
nvert Slope
= 0.51%
EGL Elevation Downstream
Invert Slope (Plan Length)
= 0.49%
min
Rim Elevation Downstream
= 469.37
ft
Rim Elevation Upstream
= 469.88
ft
Natural Ground Slope
= 1.05%
cfs
Crown Elevation Downstream
= 466.13
ft
Crown Elevation Upstream
= 466.38
ft
- -- -FLOW INFORMATION--- -
= 0.0000
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 9.90
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 1.77 ft "2
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 9.90
cfs
Uniform Capacity
= 7.49
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000
HGL Elevation Downstream
= 466.66 ft
HGL Elevation Upstream
= 467.49 ft
HGL Slope
= 1.69 %
EGL Elevation Downstream
= 467.14 ft
EGL Elevation Upstream
= 467.98 ft
GL Slope
= 1.69 %
ritical Depth
= 14.5638 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 5.60 ft /s
Velocity Upstream
= 5.60 ft /s
Uniform Velocity Downstream
= 5.38 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.810 ft
- -- -INLET INFORMATION--- -
= 0.0000
Downstream Inlet
= WYE 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000
in
epth at Pavement /Gutter Joint
= 0.0000
in
Pavement Spread
= 0.0000
ft
Total Spread
= 0.0000
ft
Gutter Velocity
= 0.00
ft /s
Curb Efficiency
= *
8
Grate Efficiency
= *
%
Slot Efficiency
= *
96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
PIPE INFORMATION--- -
HGL Elevation Downstream
eurrent Pipe
= Pipe 16
ow-n-stream Pipe
= Pipe 6
= 0.500
Pipe Material
= HDPE
= 0.00
Pipe Length
= 7.4015
ft
Plan Length
= 8.9014
ft
Pipe Type
= Circular
= 15.87
Pipe Dimensions
= 24.00
in
Pipe Manning's "n"
= 0.013
= 0.00
Pipe Capacity at Invert Slope
= 16.62
cfs
Invert Elevation Downstream
= 457.26
ft
Invert Elevation Upstream
= 457.30
ft
Invert Slope
= 0.54%
= 0.00
Invert Slope (Plan Length)
= 0.45%
= 15.87
Rim Elevation Downstream
= 466.19
ft
Rim Elevation Upstream
= 466.51
ft
Natural Ground Slope
= 4.318
Crown Elevation Downstream
= 459.26
ft
Crown Elevation Upstream
= 459.30
ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 15.87
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 3.14 ft "2
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 15.87
cfs
niform Capacity = 16.62 cfs
kipped flow = 0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 464.68 ft
HGL Elevation Upstream
= 465.34 ft
HGL Slope
= 8.88 %
EGL Elevation Downstream
= 465.08 ft
EGL Elevation Upstream
= 465.74 ft
EGL Slope
= 8.88 %
Critical Depth
= 17.2392 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.05 ft /s
Velocity Upstream
= 5.05 ft /s
Uniform Velocity Downstream
= 6.55 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 1.565 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
Ponding Width
= 0.0000 ft
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
- Pavement Spread
Total Spread
Gutter Velocity
�
urb Efficiency
rate Efficiency
Slot Efficiency
Total Efficiency
•
I 1
J
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* 96
* 96
0.00 %
PIPE 45 PIPE 60 -2 PIPE 60 -3
PIPE 60 -4 PIPE 60 -5 PIPE 60 -6
PIPE 48 PIPE 46 PIPE 60 -1 MADISON STREET - -
_ _ - - - - - - PIPE 60 -8 - -
- - - - - - PIPE 60 -7
I
PIPE 55 280 281 282 263 264
11 252 253 254 255 256 257 279
247 CANANERO DRIVE 285
249
248 9L PIPE 44 CIRCLE
6) \251 _-
258 278 / 295 294 293 292 286
= 264 263 262 261 CO / / PIPE 7
y< I PIP 43 a 277 /
250 0 / 0 259 O / 298 291 287
PIPE 51 I
Q / 296 297
I
\ PIPE 53 265 266 267 288 276 - - D I
I
299 I 288
\ PIPE 5 PIPE 52 - 260 AFFIRMED CIRCLE / 290 z I
\ PIPE 41 _ - _ _ / - I m PIPE 7
275 / m D
PIPE 49 1 o I I m
PIPE 42 _ - CIRCLE _
1\ 303 302 301 300 289 1 I Ic
272 273 m m
PIPE 2 PIPE 4 PIPE 39 271 274 m PIPE 7
7 PIPE 5 270 I 1 1 LOT 'AO'
IPE 5 A
- 269 I I 1 WELL SITE 1
PIPE '6 P49E 3 PIPE 7 1
PIPE 3 PIPE 4 \ 55 54 53 II 52 51 50 PIPE 37
PIPE 8 _ -
56 DRIVE
PIPE 72
- _ - - - - --� _ - - - p`YSHEBA PIPE 70
PIPE 11 -
DRIVE PIPE 34
- - - - - - PIPE 36
PIPE '35
NLY SHE -
1 45 46 47 48
� 41 42 43 44
PIPE 10 to I PIPE 33 I
LOT •AW PIPE 7 PIPE 9 IZ I
COMMUNITY RECREATION CENTER 40 E:
AND RETENTION 1 I PIPE 18 I
IPE 19 Im I PIPE 32
PIPE 14 I�
OWN PIPE 12. 6 5 4 3 2 1
PIPE 13 I �Fq PIPE 3.1 PIPE 30 1
PIPE 21 �A PIPE 22 PIPE 23 PIPE 25 PIPE 27
I PIPE 20 _ _ PIPE 24 _ _
PIPE •28
PIPE 15 PIPE 1�LEW W - - - - PIPE 2
PIPE 29
PIPE 17 LINE 103
STORM DRAIN
INDEX MAP
MIS
MSA Coxsln,nm, INc.
MADC=0, SNIM & AmoclAm INC
AD Pum me ■ d m. mammumnm ■ w® Smvemm
34= B Hm Darya . Rmo >� . G 922'N
Tsuwmm C76M 320+9®11 ■ FAx C76M 923 -'1893
LINE 103
User
Name: mpompa
Date: 12 -07 -05
Project:
1721
STORM DRAIN
ALIGN AND ANNO
Time: 08:48:13
0-twork:
02 -
LINE 103
Page: 1
Storm Sewers Summary Report
----------------------------------------------------------------
Pipe
Name
Total Flow Pipe Dim
HGL Down
HGL Up
Invert Down
Invert Up
Downstream
cfs
in
ft
ft
ft
ft
Junction
Pipe
2
106.99
60.00
476.50
476.97
462.58
463.93
Outfall
Pipe
3
106.99
60.00
477.07*
477.18*
463.93
464.25
BEND 1
Pipe
4
106.99
60.00
477.28*
477.31*
464.25
464.32
BEND 2
Pipe
39
43.93
36.00
477.63*
477.75*
465.47
466.80
MH 1
Pipe
57
16.37
36.00
478.28*
478.29*
466.80
467.20
WYE 1
Pipe
40
16.37
24.00
478.42*
478.66*
468.20
470.45
REDUCER 1
Pipe
41
16.37
24.00
478.81*
479.32*
470.45
471.53
BEND 4
Pipe
42
16.37
24.00
479.34*
479.80*
471.61
472.08
MH 14
Pipe
43
16.37
24.00
479.92*
480.53*
472.08
472.62
WYE 2
Pipe
44
16.37
24.00
480.55*
481.82*
472.70
477.34
MH 15
Pipe
45
5.29
18.00
481.84*
482.20*
477.84
478.53
MH 16
Pipe
46
5.29
18.00
482.20*
482.87*
478.61
479.84
MH 17
Pipe
48
5.29
18.00
482.88*
483.57*
479.92
481.22
MH 18
Pipe
5
63.72
60.00
477.63*
477.67*
464.47
464.84
MH 1
Pipe
6
63.72
60.00
477.71*
477.86*
464.84
466.01
BEND 3
Pipe
7
36.17
60.00
478.36*
478.40*
466.13
467.04
MH 2
Pipe
12
36.17
42.00
478.41*
478.42*
468.54
468.90
MH 3
Pipe
13
36.17
42.00
478.47*
478.48*
468.90
469.11
BEND 8
Pipe
49
27.57
24.00
478.28*
480.81*
467.30
476.23
WYE 1
Pipe
50
13.78
18.00
480.84*
481.32*
476.48
477.95
WYE 5
Pipe
51
13.78
18.00
481.32*
481.54*
477.95
478.35
BEND 17
Pipe
8
34.64
36.00
478.36*
478.42*
467.13
467.36
MH 2
Pipe
9
34.64
36.00
478.49*
478.52*
467.36
467.45
BEND 18
Pipe
55
14.11
24.00
481.84*
482.05*
477.40
477.60
MH 16
Pipe
52
13.78
18.00
480.84*
481.92*
476.48
478.33
WYE 5
Pipe
10
17.32
18.00
478.52*
479.98*
468.20
469.61
MH 4
1pe
11
17.32
18.00
478.52*
479.98*
468.20
469.61
MH 4
lWipe
18
9.65
24.00
478.57*
478.59*
470.61
471.14
MH 5
Pipe
19
9.65
24.00
478.75*
478.85*
471.14
471.59
BEND 21
Pipe
20
9.38
24.00
478.57*
478.61*
470.61
471.88
MH 5
Pipe
21
9.38
24.00
478.70*
478.75*
471.88
472.16
BEND 20
Pipe
14
20.22
30.00
478.57*
479.18*
470.11
475.92
MH 5
Pipe
15
3.51
18.00
479.41*
479.44*
476.99
477.13
MH 6
Pipe
16
3.51
18.00
479.47*
479.47*
477.13
477.16
BEND 9
Pipe
17
3.51
18.00
479.49*
479.50*
477.16
477.17
BEND 10
Pipe
22
15.59
24.00
479.41*
479.47*
476.42
476.56
MH 6
Pipe
23
15.59
24.00
479.55*
480.89*
476.56
477.90
BEND 11
Pipe
24
15.59
24.00
480.90*
482.30*
477.98
479.38
MH 7
Pipe
25
15.59
24.00
482.31*
483.33*
479.46
480.46
MH 8
Pipe
26
7.49
18.00
483.38*
483.50*
480.96
481.13
MH 9
Pipe
27
2.97
18.00
483.71*
483.83*
481.13
482.16
WYE 4
Pipe,
28
2.97
18.00
483.93*
483.92
482.16
483.21
BEND 12
Pipe
29
2.97
18.00
483.92
486.67
483.21
485.90
MH 10
Pipe
30
5.61
18.00
483.71*
483.79*
481.13
481.21
WYE 4
Pipe
31
8.10
24.00
483.38*
483.42*
480.52
481.28
MH 9
Pipe
32
8.10
24.00
483.54*
483.70
481.28
482.06
BEND 13
Pipe
33
8.10
24.00
483.72
483.93
482.06
482.85
MH 11
Pipe
34
8.10
24.00
484.04
484.04
482.85
482.97
BEND 14
Pipe
35
8.10
24.00
484.06
485.34
482.97
484.32
MH 12
Pipe
36
8.10
24.00
485.35
485.43
484.32
484.40
MH 13
Pipe
70
8.10
24.00
485.54
485.64
484.40
484.61
BEND 15
Pipe
37
0.00
18.00
484.61
484.72
484.61
484.72
WYE5
Pipe
38
0.00
18.00
484.72
484.93
484.72
484.93
BEND 16
Pipe
60 -1
9.45
24.00
482.82*
483.34*
477.80
478.69
CB 7
Pipe
60 -2
9.45
18.00
483.36*
485.65*
479.19
480.04
MH 41
Pipe
60 -3
6.32
18.00
485.67*
486.57*
480.24
480.99
MH42
Pipe
60 -4
6.32
18.00
486.58*
487.50*
481.19
481.95
MH43
Pipe
60 -5
3.15
18.00
487.51*
487.73*
482.15
482.92
MH44
Pipe
60 -6
3.15
18.00
487.74*
487.97*
483.12
483.90
MH 45
Pipe
60 -7
3.13
18.00
485.67*
485.68*
480.24
480.27
MH42
ipe
60 -8
3.17
18.00
487.51*
487.52*
482.15
482.18
MH44
ipe
71
8.10
18.00
485.72
485.98
484.61
484.73
WYE5
Pipe
72
8.10
18.00
486.09
486.54
484.73
485.16
BEND 25
Pipe
73
8.10
18.00
486.66
486.93
485.16
485.43
BEND 26
Pipe
74
8.10
18.00
487.04*
487.49*
485.43
485.81
BEND 27
Pipe
75
8.10
18.00
487.51*
489.16*
485.89
487.29
MH 46
Pipe
76
8.10
18.00
489.28*
489.51*
487.29
487.38
BEND 28
Date: 12 -07 -05
Time: 09:27:25
Page: 1
User Name: mceledon
Project: 1721 STORM DRAIN ALIGN AND ANNO
Network: 02 - LINE 103
Storm Sewers
----------------------------------------------------------
Detail Report
----------------------------------------------------------
PIPE DESCRIPTION: Pipe 2
•
-- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 2
Downstream Pipe
= Outfall
Pipe Material
= HDPE
Pipe Length
= 277.6540 ft
Plan Length
= 277.6508 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 181.53 cfs
Invert Elevation Downstream
= 462.58 ft
Invert Elevation Upstream
= 463.93 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 475.10 ft
Rim Elevation Upstream
= 484.00 ft
Natural Ground Slope
= 3.21%
Crown Elevation Downstream
= 467.58 ft
Crown Elevation Upstream
= 468.93 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 106.99 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 12.78 min
Total Intensity
= 7.78 in /hr
•
Total Rational Flow
= 0.00 cfs
Total Flow
= 106.99 cfs
Uniform Capacity
= 181.53 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 476.50 ft
HGL Elevation Upstream
= 476.97 ft
HGL Slope
= 0.17 %*
EGL Elevation Downstream
= 476.96 ft
EGL Elevation Upstream
= 477.43 ft
EGL Slope
= 0.17 %r
Critical Depth
= 35.3922 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 5.45 'ft /s
Velocity Upstream
= 5.45 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
Date: 12 -07 -05
Time: 09:27:25
Page: 1
Kj (JLC)
= NA
Calculated Junction Loss
= 0.102 ft
---- INLE'l-INFORMATION----
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
•
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 64.5580 ft
Plan Length
•
= 64.5572 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 183.28 cfs
Invert Elevation Downstream
= 463.93 ft
Invert Elevation Upstream
= 464.25 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.50%
Rim Elevation Downstream
= 484.00 ft
Rim Elevation Upstream
= 483.98 ft
Natural Ground Slope
= -0.04%
Crown Elevation Downstream
= 468.93 ft
Crown Elevation Upstream
= 469.25 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 106.99 cfs
•
•
1r�
u
•
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
w ...= 12.58 min
Total Intensity
= 7.82 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 106.99 cfs
Uniform Capacity
= 183.28 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000 ft
HGL Elevation Downstream
= 477.07 ft
HGL Elevation Upstream
= 477.18 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 477.53 ft
EGL Elevation Upstream
= 477.64 ft
EGL Slope
= 0.17 %
Critical Depth
= 35.3922 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 5.45 ft /s
Velocity Upstream
= 5.45 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.102 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4
Downstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 15.5127 ft
Plan Length
= 20.3376 ft
Pipe Type
= Circular
Pipe Dimensions
•
= 60.00 in
Pipe manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 174.87 cfs
Invert Elevation Downstream
= 464.25 ft
Invert Elevation Upstream
= 464.32 ft
Invert Slope
= 0.45%
Invert Slope (Plan Length)
= 0.34%
Rim Elevation Downstream
= 483.98 ft
Rim Elevation Upstream
= 484.04 ft
Natural Ground Slope
= 0.39%
Crown Elevation Downstream
= 469.25 ft
Crown Elevation Upstream
= 469.32 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 106.99 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 12.52 min
Total Intensity
= 7.84 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 106.99 cfs
Uniform Capacity
= 174.87 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 477.28 ft
HGL Elevation Upstream
= 477.31 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 477.74 ft
EGL Elevation Upstream
•
= 477.77 ft
EGL Slope
= 0.17 %
Critical Depth
= 35.3922 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 5.45 ft /s
Velocity Upstream
= 5.45 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
Kj (,TLC)
= NA
Calculated Junction Loss
= 0.321 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
is
C]
•
L
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 39
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0•.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
* %
0.00 %
= 100 Year
= Tutorial
= Pipe 39
= Pipe 4
= HDPE
= 26.9608 ft
= 30.3067 ft
= Circular
= 36.00 in
= 0.013
= 148.08 cfs
= 465.47 ft
= 466.80 ft
= 4.94%
= 4.39%
= 484.04 ft
= 484.40 ft
= 1.37%
= 468.47 ft
= 469.80 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 43.93 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 12.00 min
= 7.96 in /hr
= 0.00 cfs
= 43.93 cfs
= 148.08 cfs
= 0.00 cfs
= 0.00 gpd
CJ
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 477.63 ft
HGL Elevation Upstream
= 477.75 ft
HGL Slopee
= 0.43 %
EGL Elevation Downstream
= 478.23 ft
EGL Elevation Upstream
= 478.35 ft
•
EGL Slope
Critical Depth
= 0.43 %
= 25.9164 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 6.22 ft /s
Velocity Upstream
= 6.22 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 7.07 ft "2
Area Upstream
= 7.07 ft^2
Kj (JLC)
= NA
Calculated Junction LOSS
= 0.538 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
•
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slct Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 57
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 57
Downstream Pipe
= Pipe 39
Pipe Material
= HDPE
Pipe Length
= 8.2702 ft
Plan Length
= 8.2605 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 146.62 cfs
Invert Elevation Downstream
= 466.80 ft
CJ
•
Invert Elevation Upstream
= 467.20 ft
Invert Slope
= 4.84%
Invert Slope (Plan Length)
= 4.84%
Rim Elevation Downstream
- = 484.40 ft
Rim Elevation Upstream
= 484.79 ft
Natural Ground Slope
= 4.66%
•
Crown Elevation Downstream
Crown Elevation Upstream
= 469.80 ft
= 470.20 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 16.37 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 11.94 min
Total Intensity
= 7.98 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 16.37 cfs
Uniform Capacity
= 146.62 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.28 ft
HGL Elevation Upstream
= 478.29 ft
HGL Slope
= 0.06 %
EGL Elevation Downstream
= 478.37 ft
EGL Elevation Upstream
= 478.37 ft
EGL Slope
= 0.06 %
Critical Depth
= 15.5124 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 2.32 ft /s
Velocity Upstream
= 2.32 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 7.07 ft "2
Area Upstream
= 7.07 ft "2
•
Kj (JLC)
= NA
Calculated Junction Loss
= 0.130 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
•
r�
�J
•
I
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 40
Inlet Hydrograph Flow
- - -- RAINFALL INFORMATION--- -
cfs
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
in
Current Pipe
= Pipe 40
Downstream Pipe
= Pipe 57
Pipe Material
= HDPE
Pipe Length
= 46.7432 ft
Plan Length
= 46.6890 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 49.61 cfs
Invert Elevation Downstream
= 468.20 ft
Invert Elevation Upstream
= 470.45 ft
Invert Slope
= 4.82%
Invert Slope (Plan Length)
= 4.82%
Rim Elevation Downstream
= 484.79 ft
Rim Elevation Upstream
= 484.32 ft
Natural Ground Slope
= -1.00%
Crown Elevation Downstream
= 470.20 ft
Crown Elevation Upstream
= 472.45 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 16.37
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
in
Total Time of Concentration
= 11.79
min
Total Intensity
= 8.01
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 16.37
cfs
Uniform Capacity
= 49.61
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.42
ft
HGL Elevation Upstream
= 478.66
ft
HGL Slope
= 0.52 %
EGL Elevation Downstream
= 478.84
ft
EGL Elevation Upstream
= 479.08
ft
EGL Slope
= 0.52 %
Critical Depth
= 17.5056
in
Depth Downstream
= 24.0000
in
Depth Upstream
= 24.0000
in
Velocity Downstream
= 5.21 ft
/s
•
•
•
Velocity Upstream
= 5.21 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.147 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= REDUCER 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 41
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 41
Downstream Pipe
= Pipe 40
Pipe Material
= HDPE
Pipe Length
= 97.2103 ft
Plan Length
= 99.2043 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 23.83 cfs
Invert Elevation Downstream
= 470.45 ft
Invert Elevation Upstream
= 471.53 ft
Invert Slope
= 1.11%
Invert Slope (Plan Length)
= 1.09%
Rim Elevation Downstream
= 484.32 ft
Rim Elevation Upstream
= 485.71 ft
Natural Ground Slope
= 1.43%
Crown Elevation Downstream
= 472.45 ft
Crown Elevation Upstream
= 473.53 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
•
•
lI ,,
�.I
Runoff Coefficient
= 0.000
HGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational• Flow
= 0.00
cfs
Inlet Input Flow
= 16.37
cfs
Inlet Hydrograph Flow.
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 5.21 ft /s
Total Time of Concentration
= 11.47
min
Total Intensity
= 8.09
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 16.37
cfs
Uniform Capacity
= 23.83
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.81 ft
HGL Elevation Upstream
= 479.32 ft
HGL Slope
= 0.52 %
EGL Elevation Downstream
= 479.23 ft
EGL Elevation Upstream
= 479.74 ft
EGL Slope
= 0.52 %
Critical Depth
= 17.5056 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.21 ft /s
Velocity Upstream
= 5.21 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.021 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
•
PIPE DESCRIPTION: Pipe 42
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
_ Tutorial
--- -PIPE INFORMATION--- -
Current Pipe
= Pipe 42
Downstream Pipe
= Pipe 41
Pipe Material
= HDPE
Pipe Length
= 87.9740 ft
Plan Length
= 90.0430 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 16.53 cfs
Invert Elevation Downstream
= 471.61 ft
Invert Elevation Upstream
= 472.08 ft
Invert Slope
= 0.53%
Invert Slope (Plan Length)
= 0.52%
Rim Elevation Downstream
= 485.71 ft
Rim Elevation Upstream
= 485.70 ft
Natural Ground Slope
= -0.01%
Crown Elevation Downstream
= 473.61 ft
Crown Elevation Upstream
= 474.08 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 16.37 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 11.19 min
Total Intensity
= 8.17 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 16.37 cfs
Uniform Capacity
= 16.53 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 479.34 ft
HGL Elevation Upstream
= 479.80 ft
HGL Slope
= 0.52 %
EGL Elevation Downstream
= 479.76 ft
EGL Elevation Upstream
= 480.22 ft
EGL Slope
= 0.52 %
Critical Depth
= 17.5056 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.21 ft /s
Velocity Upstream
= 5.21 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.123 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 14
Inlet Description
= <None>
•
•
/ 1
J
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Manni_ngs.n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 43
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 43
Downstream Pipe
= Pipe 42
Pipe Material
= HDPE
Pipe Length
= 116.4558 ft
Plan Length
= 118.4545 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.40 cfs
Invert Elevation Downstream
= 472.08 ft
Invert Elevation Upstream
= 472.62 ft
Invert Slope
= 0.46%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 485.70 ft
Rim Elevation Upstream
= 487.03 ft
Natural Ground Slope
= 1.14%
Crown Elevation Downstream
= 474.08 ft
Crown Elevation Upstream
= 474.62 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 16.37
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 10.81
min
Total Intensity
= 8.27
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 16.37 cfs
Uniform Capacity
= 15.40 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION----
HGL Elevation Downstream
= 479.92 ft
HGL Elevation Upstream
•
= 480.53 ft
HGL Slope
= 0.52 %
EGL Elevation Downstream
= 480.35 ft
EGL Elevation Upstream
= 480.96 ft
EGL Slope
= 0.52 %
Critical Depth
= 17.5056 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.21 ft /s
Velocity Upstream
= 5.21 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
3.14 ft"2
Area Upstream
= 3.14 ft°2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.020 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 44
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 44
Downstream Pipe
= Pipe 43
Pipe Material
= HDPE
Pipe Length
= 242.6221 ft
Plan Length
= 246.6141 ft
•
�I
�J
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Inlet Time
Pipe Capacity at Invert Slope
= 31.27 cfs
Invert Elevation Downstream
= 472.70
ft
Invert Elevation Upstream
= 477.34
ft
Invert Slope
= 1.91%
= 0.00 ac
Invert Slope (Plan Length)
= 1.88%
Total Time of Concentration
Rim Elevation Downstream
= 487.03
ft
Rim Elevation Upstream
= 487.19
ft
Natural Ground Slope
= 0.07%
= 31.27 cfs
Crown Elevation Downstream
= 474.70
ft
Crown Elevation Upstream
= 479.34
ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 16.37 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 10.02 min
Total Intensity
= 8.48 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 16.37 cfs
Uniform Capacity
= 31.27 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 480.55 ft
HGL Elevation Upstream
= 481.82 ft
HGL Slope
= 0.52 %
EGL Elevation Downstream
= 480.98 ft
EGL Elevation Upstream
= 482.25 ft
EGL Slope
= 0.52 %
Critical Depth
= 17.5056 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.21 ft /s
Velocity Upstream
= 5.21 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.020 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 15
Inlet Description
= <NOne>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow °'
= 0.00 cfs."
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 45
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 45
Downstream Pipe
= Pipe 44
Pipe Material
= RCP
Pipe Length
= 139.1509 ft
Plan Length
= 143.2616 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n°
= 0.013
Pipe Capacity at Invert Slope
= 7.39 cfs
Invert Elevation Downstream
= 477.84 ft
Invert Elevation Upstream
= 478.53 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 487.19 ft
Rim Elevation Upstream
= 487.29 ft
Natural Ground Slope
= 0.07%
Crown Elevation Downstream
= 479.34 ft
Crown Elevation Upstream
= 480.03 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 5.29 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.96 min
Total Intensity
= 11.23 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 5.29 cfs
Uniform Capacity
= 7.39 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 481.84 ft
HGL Elevation Upstream
= 482.20 ft
HGL Slope
= 0.25 %
EGL Elevation Downstream
= 481.98 ft
EGL Elevation Upstream
= 482.34 ft
.7
•
is
EGL Slope
Critical Depth
Depth Downstream
Depth-Up-stream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (J:,C)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Compu-ation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth, at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 46
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Inver:. Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
= 0.25 %
= 10.6380 in
= 18.0000 in
= 18.0000 in
= 3.00 ft /s
= 3.00 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft"2
= 1.77 ft^2
= NA
= 0.007 ft
= MH 16
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
0.00
= 100 Year
= Tutorial
= Pipe 46
= Pipe 45
= RCP
= 261.5899 ft
= 265.6768 ft
= Circular
= 18.00 in
= 0.013
= 7.20 cfs
= 478.61 ft
= 479.84 ft
= 0.47%
= 0.46%
= 487.29 ft
= 486.45 ft
_ -0.32%
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
= 480.11 ft
= 481.34 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 5.29 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 1.48 min
= 12.09 in /hr
= 0.00 cfs
= 5.29 cfs
= 7.20 cfs
= 0.00 cfs
= 0.00 gpd
= 482.20 ft
= 482.87 ft
= 0.25 %
= 482.34 ft
= 483.01 ft
= 0.25 %
= 10.6380 in
= 18.0000 in
= 18.0000 in
= 3.00 ft /s
= 3.00 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft^2
= NA
= 0.007 ft
= MH 17
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment•Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
= 480.11 ft
= 481.34 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 5.29 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 1.48 min
= 12.09 in /hr
= 0.00 cfs
= 5.29 cfs
= 7.20 cfs
= 0.00 cfs
= 0.00 gpd
= 482.20 ft
= 482.87 ft
= 0.25 %
= 482.34 ft
= 483.01 ft
= 0.25 %
= 10.6380 in
= 18.0000 in
= 18.0000 in
= 3.00 ft /s
= 3.00 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft^2
= NA
= 0.007 ft
= MH 17
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
•
•
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 48
Inlet Time
- - -- RAINFALL INFORMATION--- -
min
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
cfs
Current Pipe
= Pipe 48
Downstream Pipe
= Pipe 46
Pipe Material
= RCP
Pipe Length
= 262.0390 ft
Plan Length
= 265.5364 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.40 cfs
Invert Elevation Downstream
= 479.92 ft
Invert Elevation Upstream
= 481.22 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 486.45 ft
Rim Elevation Upstream
= 485.32 ft
Natural Ground Slope
= -0.43%
Crown Elevation Downstream
= 481.42 ft
Crown Elevation Upstream
= 482.72 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 5.29
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft^2
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 5.29
cfs
Uniform Capacity
= 7.40
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 482.88 ft
HGL Elevation Upstream
= 483.57 ft
HGL Slope
= 0.26 %
EGL Elevation Downstream
= 483.02 ft
EGL Elevation Upstream
= 483.71 ft
EGL Slope
= 0.26 %
Critical Depth
= 10.6380 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.00 ft /s
Velocity Upstream
= 3.00 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
0
•
•
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
= 0.175 ft
MH 18
<None>
= Undefined
Sag
0.00 ft /ft
= 0.000
0.00 ft /ft
0.00 ft /ft
0.0000 in
= 0.0000 ft
= 0.0000 ft
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
0.00
= 100 Year
= Tutorial
= Pipe 5
= Pipe 4
= HDPE
= 77.5882 ft
= 81.0624 ft
= Circular
= 60.00 in
= 0.013
= 179.77 cfs
= 464.47 ft
= 464.84 ft
= 0.48%
= 0.46%
= 484.04 ft
= 483.13 ft
-1.17%
469.47 ft
469.84 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 63.72 cfs
= 0.00 cfs
•
s
•
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 477.67 ft
Total Time of Concentration
= 12.10
min
Total. Intensity
= 7.94
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 63.72
cfs
Uniform Capacity
= 179.77
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 477.63 ft
HGL Elevation Upstream
= 477.67 ft
HGL Slope
= 0.06 %
EGL Elevation Downstream
= 477.79 ft
EGL Elevation Upstream
= 477.84 ft
EGL Slope
= 0.06 %
Critical Depth
= 26.9862 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 3.25 ft /s
Velocity Upstream
= 3.25 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.039 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION - - --
•
•
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
= Pipe 6
= Pipe 5
= HDPE
= 251.636'1 ft
= 254.6534 ft
= Circular
= 60.00 in
= 0.013
= 177.51 cfs
= 464.84 ft
= 466.01 ft
= 0.46%
= 0.46%
= 483.13 ft
= 482.05 ft
= -0.43%
= 469.84 ft
= 471.01 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 63.72 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 10.79 min
= 8.27 in /hr
= 0.00 cfs
= 63.72 cfs
= 177.51 cfs
= 0.00 cfs
= 0.00 gpd
= 477.71 ft
= 477.86 ft
= 0.06 %
= 477.88 ft
= 478.03 ft
= 0.06 %
= 26.9862 in
= 60.0000 in
= 60.0000 in
= 3.25 ft /s
= 3.25 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 19.63 ft^2
= 19.63 ft^2
= NA
= 0.500 ft
= BEND 3
= <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
0
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept-Efficiency-
_ * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 7
= 8.93
- - -- RAINFALL INFORMATION--- -
min
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
Current Pipe
= Pipe 7
Downstream Pipe
= Pipe 6
Pipe Material
= HDPE
Pipe Length
= 198.5807 ft
Plan Length
= 205.9118 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 176.23 cfs
Invert Elevation Downstream
= 466.13 ft
Invert Elevation Upstream
= 467.04 ft
Invert Slope
= 0.46%
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 482.05 ft
Rim Elevation Upstream
= 480.18 ft
Natural Ground Slope
= -0.94%
Crown Elevation Downstream
= 471.13 ft
Crown Elevation Upstream
= 472.04 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 36.17
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 8.93
min
Total Intensity
= 8.80
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 36.17
cfs
Uniform Capacity
= 176.23
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION - - --
•
•
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 12
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
= 478.36 ft
= 478.40 ft
= 0.02 %
= 478.42 ft
= 478.46 ft
= 0.02 %
= 20.1024 in
= 60.0000 in
= 60.0000 in
= 1.84 ft /s
= 1.84 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 19.63 ft "2
= 19.63 ft'2
= NA
= 0.003 ft
= MH 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
0.00 $
= 100 Year
= Tutorial
= Pipe 12
= Pipe 7
= HDPE
= 8.0304 ft
= 11.6968 ft
= Circular
= 42.00 in
= 0.013
= 212.93 cfs
= 468.54 ft
= 468.90 ft
•
•
Invert Slope
= 4.49%
Invert Slope (Plan Length)
= 3.08%
Rim Elevation Downstream
= 480.18 ft
Rim.Flevation Upstream
= 479.97 ft
Natural Ground Slope
= -2.66%
Crown Elevation Downstream
= 472.04 ft
Crown Elevation Upstream
= 472.40 ft
- -- -FLOW INFORMATION--- -
= 22.3986 in
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 36.17 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 8.88 min
Total Intensity
= 8.82 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 36.17 cfs
Uniform Capacity
= 212.93 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.41 ft
HGL Elevation Upstream
= 478.42 ft
HGL Slope
= 0.13 %
EGL Elevation Downstream
= 478.63 ft
EGL Elevation Upstream
= 478.64 ft
EGL Slope
= 0.13 %
Critical Depth
= 22.3986 in
Depth Downstream
= 42.0000 in
Depth Upstream
= 42.0000 in
Velocity Downstream
= 3.76 ft /s
Velocity Upstream
= 3.76 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 9.62 ft'2
Area Upstream
= 9.62 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.058 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000- ft
= 0.00 ft /s
_ * %
0.00 %
= 100 Year
= Tutorial
= Pipe 13
= Pipe 12
= HDPE
= 4.8449 ft
= 7.1703 ft
= Circular
= 42.00 in
= 0.013
= 209.37 cfs
= 468.90 ft
= 469.11 ft
= 4.34%
= 2.93%
= 479.97 ft
= 480.12 ft
= 3.03%
= 472.40 ft
= 472.61 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 36.17 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 8.85 min
= 8.83 in /hr
= 0.00 cfs
= 36.17 cfs
= 209.37 cfs
= 0.00 cfs
= 0.00 gpd
= 478.47 ft
= 478.48 ft
= 0.13 %
= 478.69 ft
= 478.70 ft
= 0.13 %
= 22.3986 in
= 42.0000 in
= 42.0000 in
= 3.76 ft /s
= 3.76 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 9.62 ft^2
Aria - -- Upstream
= 9.62 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.088 ft
- - - -INLET INFORMATION--- -
Downstream Inlet
= BEND 8
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carrycver from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 49
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
•
Current Pipe
= Pipe 49
Downstream Pipe
= Pipe 39
Pipe Material
= HDPE
Pipe Length
= 170.0088 ft
Plan Length
= 169.7741 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 51.83 cfs
Invert Elevation Downstream
= 467.30 ft
Invert Elevation Upstream
= 476.23 ft
Invert Slope
= 5.26%
Invert Slope (Plan Length)
= 5.26%
Rim Elevation Downstream
= 484.40 ft
Rim Elevation Upstream
= 483.16 ft
Natural Ground Slope
= -0.73%
Crown Elevation Downstream
= 469.30 ft
Crown Elevation Upstream
= 478.23 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
r
•
•
Inle: Time
= 0.00
min
Inle= Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 27.57•,cfs
Inlet. Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 24.0000 in
Total Time of Concentration
= 0.10
min
Total Intensity
= 13.04
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 27.57
cfs
Uniform Capacity
= 51.83
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.28 ft
HGL Elevation Upstream
= 480.81 ft
HGL Slope
= 1.49 %
EGL Elevation Downstream
= 479.48 ft
EGL Elevation Upstream
= 482.01 ft
EGL Slope
= 1.49 %
Critical Depth
= 21.8424 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 8.78 ft /s
Velocity Upstream
= 8.78 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft°2
Area Upstream
= 3.14 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.031 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000'ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 50
1r ®�
u
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 50
•
Downstream Pipe
Pipe Material
= Pipe 49
= HDPE
Pipe Length
= 28.0350 ft
Plan Length
= 27.9965 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 24.04 cfs
Invert Elevation Downstream
= 476.48 ft
Invert Elevation Upstream
= 477.95 ft
Invert Slope
= 5.25%
Invert Slope (Plan Length)
= 5.25%
Rim Elevation Downstream
= 483.16 ft
Rim Elevation Upstream
= 483.02 ft
Natural Ground Slope
= -0.50%
Crown Elevation Downstream
= 477.98 ft
Crown Elevation Upstream
= 479.45 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 13.78 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.02 min
Total Intensity
= 13.10 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 13.78 cfs
Uniform Capacity
= 24.04 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 480.84 ft
HGL Elevation Upstream
= 481.32 ft
HGL Slope
= 1.73 %
EGL Elevation Downstream
= 481.79 ft
EGL Elevation Upstream
= 482.27 ft
EGI, Slope
= 1.73 %
Critical Depth
= 16.5060 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 7.80 ft /s
Velocity Upstream
= 7.80 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= 0.03
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 5
Inlet Description
= <None>
Inlet Type
= Undefined
1r ®�
u
•
•
J
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 51
Crown Elevation Downstream
- - -- RAINFALL INFORMATION--- -
ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 51
ac
Downstream Pipe
= Pipe 50
Pipe Material
= HDPE
min
Pipe Length
= 7.6236
ft
Plan Length
= 9.1131
ft
Pipe Type
= Circular
cfs
Pipe Dimensions
= 18.00 in
cfs
Pipe Manning's "n"
= 0.013
ac
Pipe Capacity at Invert Slope
= 24.05 cfs
Invert Elevation Downstream
= 477.95
ft
Invert Elevation Upstream
= 478.35
ft
Invert Slope
= 5.25%
cfs
Invert Slope (Plan Length)
= 4.39%
cfs
Rim Elevation Downstream
= 483.02
ft
Rim Elevation Upstream
= 483.35
ft
Natural Ground Slope
= 4.38%
Crown Elevation Downstream
= 479.45
ft
Crown Elevation Upstream
= 479.85
ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 13.78
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 13.78
cfs
•
Uniform Capacity
= 24.05 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 481.32 ft
HGL Elevation Upstream
HGL Slope
= 481.54 ,ft
= 2.88 %
EGL Elevation Downstream
= 482.27 ft
EGL Elevation Upstream
= 482.49 ft
EGL Slope
= 2.88 %
Critical Depth
= 16.5060 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 7.80 ft /s
Velocity Upstream
= 7.80 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.093 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 17
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
•
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 8
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 8
Downstream Pipe
= Pipe 6
Pipe Material
= HDPE
Pipe Length
= 22.1709 ft
Plan Length
= 25.8637 ft
Pipe Type
= Circular
•
•
Pipe Dimensions
= 36.00
in
Pipe Manning's "n"
= 0.013
ac
Pipe Capacity at Invert Slope
= 67.90
cfs
Invert Elevation Downstream
= 467.TT
ft
Invert Elevation Upstream
= 467.36
ft
Invert Slope
= 1.04%
cfs
Invert Slope (Plan Length)
= 0.89%
cfs
Rim Elevation Downstream
= 482.05
ft
Rim Elevation Upstream
= 481.70
ft
Natural Ground Slope
= -1.59%
= 7.07 ft^2
Crown Elevation Downstream
= 470.13
ft
Crown Elevation Upstream
= 470.36
ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 34.64
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 7.07 ft^2
Total Time of Concentration
= 0.11
min
Total Intensity
= 13.04
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 34.64
cfs
Uniform Capacity
= 67.90
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.36 ft
HGL Elevation Upstream
= 478.42 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 478.74 ft
EGL Elevation Upstream
= 478.80 ft
EGL Slope
= 0.27 %
Critical Depth
= 22.9500 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.90 ft /s
Velocity Upstream
= 4.90 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 7.07 ft^2
Area Upstream
= 7.07 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.068 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
•
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
-Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
•
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 9
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 9
Downstream Pipe
= Pipe 8
Pipe Material
= HDPE
Pipe Length
= 9.1104 ft
Plan Length
= 11.3600 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 66.26 cfs
Invert Elevation Downstream
= 467.36 ft
Invert Elevation Upstream
= 467.45 ft
Invert Slope
= 0.99%
Invert Slope (Plan Length)
= 0.79%
Rim Elevation Downstream
= 481.70 ft
Rim Elevation Upstream
= 481.54 ft
Natural Ground Slope
= -1.68%
Crown Elevation Downstream
= 470.36 ft
Crown Elevation Upstream
= 470.45 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
=0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 34.64 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.07 min
Total Intensity
= 13.07 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 34.64 cfs
Uniform Capacity
= 66.26 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.49 ft
HGL Elevation Upstream
= 478.52 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 478.87 ft
EGL Elevation Upstream
= 478.89 ft
EGL Slope
= 0.27 %
•
•
1
i
Critical Depth
= 22.9500 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 4.90'-ft /s
Velocity Upstream
= 4.90 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 7.07 ft"2
Area Upstream
= 7.07 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 18
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 55
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 55
Downstream Pipe
= Pipe 44
Pipe Material
= RCP
Pipe Length
= 53.8654 ft
Plan Length
= 60.7000 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 13.78 cfs
Invert Elevation Downstream
= 477.40 ft
Invert Elevation Upstream
= 477.60 ft
Invert Slope
= 0.37%
Invert Slope (Plan Length)
= 0.33%
Rim Elevation Downstream
= 487.19 ft
Rim Elevation Upstream
= 487.10 ft
Natural Ground Slope
= -0.17%
Crown Elevation Downstream
= 479.40 ft
Crown Elevation Upstream
= 479.60 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
•
Inlet Input Flow
= 14.11 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 9.79 min
Total Intensity
= 8.55 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 14.11 cfs
Uniform Capacity
= 13.78 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 481.84 ft
HGL Elevation Upstream
= 482.05 ft
HGL Slope
= 0.39 %
EGL Elevation Downstream
= 482.16 ft
EGL Elevation Upstream
= 482.37 ft
EGL Slope
= 0.39 %
Critical Depth
= 16.2408 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.49 ft /s
Velocity Upstream
= 4.49 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.769 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 16
Inle- Description
= <None>
Inlet Type
= Undefined
•
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
•
0
•
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 52
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
-
-- - PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's 'In"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
0.00 %
= 100 Year
= Tutorial
= Pipe 52
= Pipe 49
= HDPE
= 46.7130 ft
= 48.1763 ft
= Circular
= 18.00 in
= 0.013
= 20.90 cfs
= 476.48 ft
= 478.33 ft
= 3.96%
= 3.84%
= 483.16 ft
= 483.33 ft
= 0.37%
= 477.98 ft
= 479.83 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 13.78 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 13.78 cfs
= 20.90 cfs
= 0.00 cfs
= 0.00 gpd
= 480.84 ft
= 481.92 ft
= 2.32 %
= 481.79 ft
= 482.87 ft
= 2.32 %
= 16.5060 in
= 18.0000 in
= 18.0000 in
= 7.80 ft /s
= 7.80 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft'2
= 1.77 ft'2
= NA
= 0.295 ft
•
0
1r
u
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 5
Inlet Description"
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 10
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 10
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
Pipe Length
= 28.1574 ft
Plan Length
= 40.7548 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 23.50 cfs
Invert Elevation Downstream
= 468.20 ft
Invert Elevation Upstream
= 469.61 ft
Invert Slope
= 5.01%
Invert Slope (Plan Length)
= 3.46%
Rim Elevation Downstream
= 481.54 ft
Rim Elevation Upstream
= 481.78 ft
Natural Ground Slope
= 0.84%
Crown Elevation Downstream
= 469.70 ft
Crown Elevation Upstream
= 471.11 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 17.32
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
•
I[]
•
weighted Coefficient
= 0.000
HGL Elevation Downstream
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0:00
cfs
Total Flow
= 17.32
cfs
Uniform Capacity
= 23.50
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.52 ft
HGL Elevation Upstream
= 479.98 ft
HGL Slope
= 5.20 %
EGL Elevation Downstream
= 480.01 ft
EGL Elevation Upstream
= 481.47 ft
EGL Slope
= 5.20 %
Critical Depth
= 17.3232 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 9.80 ft /s
Velocity Upstream
= 9.80 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.466 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 11
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 11
is
is
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe ac s "n"
C
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
= Pipe 9
= HDPE
= 28.1101 ft
= 40.7549 ft
= Circular
= 18.00 in
= 0.013
= 23.52 cfs
= 468.20 ft
= 469.61 ft
= 5.02%
= 3.46%
= 481.54 ft
= 482.01 ft
= 1.66%
= 469.70 ft
= 471.11 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 17.32 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 17.32 cfs
= 23.52 cfs
= 0.00 cfs
0.00 gpd
= 478.52 ft
= 479.98 ft
= 5.20 %
= 480.01 ft
= 481.47 ft
= 5.20 %
= 17.3232 in
= 18.0000 in
= 18.0000 in
= 9.80 ft /s
= 9.80 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft^2
= 1.77 ft°2
= NA
= 0.466 ft
= MH 4
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
•
•
•
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0:0,u cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 18
- - -- RAINFALL INFORMATION--- -
= 0.06
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
in /hr
Current Pipe
= Pipe 18
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
Pipe Length
= 10.6881 ft
Plan Length
= 12.6113 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 50.53 cfs
Invert Elevation Downstream
= 470.61 ft
Invert Elevation Upstream
= 471.14 ft
Invert Slope
= 5.00%
Invert Slope (Plan Length)
= 4.23%
Rim Elevation Downstream
= 480.12 ft
Rim Elevation Upstream
= 480.10 ft
Natural Ground Slope
= -0.14%
Crown Elevation Downstream
= 472.61 ft
Crown Elevation Upstream
= 473.14 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 9.65
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.06
min
Total Intensity
= 13.08
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 9.65
cfs
Uniform Capacity
= 50.53
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.57
ft
•
lI 11
u
•
HGL Elevation Upstream
= 478.59 ft
HGL Slope
= 0.18 %
EGL Elevation Downstream
= 478.71 ft
..EGL Elevation Upstream
= 478.73 ft
EGL Slope
= 0.18 %
Critical Depth
= 13.3296 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 3.07 ft /s
Velocity Upstream
= 3.07 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft'2
Area Upstream
= 3.14 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.162 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= *
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 19
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 19
Downstream Pipe
= Pipe 18
P_pe Material
= HDPE
Pipe Length
= 9.0112 ft
Plan Length
= 10.5000 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 50.53 cfs
Invert Elevation Downstream
= 471.14 ft
Invert Elevation Upstream
= 471.59 ft
Invert Slope
= 5.00%
�J
Invert Slope (Plan Length)
= 4.29%
Rim Elevation Downstream
= 480.10 ft
Rim Elevation Upstream
= 479.39 ft
Natural Ground Slope
= -':89%
Crown Elevation Downstream
= 473.14 ft
Crown Elevation Upstream
= 473.59 ft
- -- -FLOW INFORMATION--- -
•
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.65 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.65 cfs
Uniform Capacity
= 50.53 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.75 ft
HGL Elevation Upstream
= 478.85 ft
HGL Slope
= 1.13 %
EGL Elevation Downstream
= 478.90 ft
EGL Elevation Upstream
= 479.00 ft
EGL Slope
= 1.13 %
Critical Depth
= 13.3296 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 3.07 ft /s
Velocity Upstream
= 3.07 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.579 ft
- -INLET INFORMATION--- -
Downstream Inlet
= BEND 21
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
�J
0
1r
u
0
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity"'
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 20
= O.M ac
- - -- RAINFALL INFORMATION--- -
= 0.000
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.00 cfs
Current Pipe
= Pipe 20
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
Pipe Length
= 25.4613 ft
Plan Length
= 27.4605 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's 'n',
= 0.013
Pipe Capacity at Invert Slope
= 50.53 cfs
Invert Elevation Downstream
= 470.61 ft
Invert Elevation Upstream
= 471.88 ft
Invert Slope
= 5.00%
Invert Slope (Plan Length)
= 4.63%
Rim Elevation Downstream
= 480.12 ft
Rim Elevation Upstream
= 480.16 ft
Natural Ground Slope
= 0.17%
Crown Elevation Downstream
= 472.61 ft
Crown Elevation Upstream
= 473.88 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.38 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= O.M ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.04 min
Total Intensity
= 13.09 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.38 cfs
Uniform Capacity
= 50.53 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.57 ft
HGL Elevation Upstream
= 478.61 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 478.71 ft
EGL Elevation Upstream
= 478.75 ft
EGL Slope
= 0.17 %
Critical Depth
= 13.1328 in
Depth Downstream
= 24.0000 in
Depth Upstream
=-24.0000 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 2.99 ft /s
Unifcrm Velocity Downstream
= 0.00 ft /s
•
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft ^2
Area Upstream
= 3.14 ft"2
• Kj (JLC)
= NP.
Calculated Junction Loss
= 0.087 ft
•
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 21
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION----
Current Pipe
= Pipe 21
®
Downstream Pipe
= Pipe 20
Pipe Material
= HDPE
Pipe Length
= 5.5069 ft
Plan Length
= 6.5000 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's n,,
= 0.013
Pipe Capacity at Invert Slope
= 50.53 cfs
Invert Elevation Downstream
= 471.88 ft
Invert Elevation Upstream
= 472.16 ft
Invert Slope
= 5.00%
Invert Slope (Plan Length)
= 4.23%
Rim Elevation Downstream
= 480.16 ft
Rim Elevation Upstream
= 479.08 ft
Natural Ground Slope
= - 19.58%
Crown Elevation Downstream
= 473.88 ft
Crown Elevation Upstream
= 474.16 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
•
•
•
•
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 9.38
cfs
Inlet Hydrograph•Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 24.0000 in
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 9.38
cfs
Uniform Capacity
= 50.53
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.70 ft
HGL Elevation Upstream
= 478.75 ft
HGL Slope
= 0.95 %
EGL Elevation Downstream
= 478.84 ft
EGL Elevation Upstream
= 478.89 ft
EGL Slope
= 0.95 %
Critical Depth
= 13.1328 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 2.99 ft /s
Velocity Upstream
= 2.99 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.309 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 20
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 14
- - -- RAINFALL INFORMATION - - --
u
Return Period
= 100 Year
Rainfall File
= Tutorial
s - -- -PIPE INFORMATION - - --
Current Pipe
= Pipe 14
Downstream Pipe
= Pipe 13
•
Pipe Material
Pipe Length
= .
= 250 250.5991 ft
Plan Length
= 255.1544 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 62.43 cfs
Invert Elevation Downstream
= 470.11 ft
Invert Elevation Upstream
= 475.92 ft
Invert Slope
= 2.32%
Invert Slope (Plan Length)
= 2.28%
Rim Elevation Downstream
= 480.12 ft
Rim Elevation Upstream
= 481.53 ft
Natural Ground Slope
= 0.56%
Crown Elevation Downstream
= 472.61 ft
Crown Elevation Upstream
= 478.42 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.22 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
weighted Coefficient
= 0.000
Total Time of Concentration
= 7.82 min
Total Intensity
= 9.16 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.22 cfs
Uniform Capacity
= 62.43 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.57 ft
HGL Elevation Upstream
= 479.18 ft
HGL Slope
= 0.24 %
EGL Elevation Downstream
= 478.83 ft
EGL Elevation Upstream
= 479.44 ft
EGL Slope
= 0.24 %
Critical Depth
= 18.3240 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 4.12 ft /s
Velocity Upstream
= 4.12 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 4.91 ft'2
Area Upstream
= 4.91 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.233 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
u
C
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slcpe
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 15
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 15
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 31.4697 ft
Plan Length
= 33.5736 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.00 cfs
Invert Elevation Downstream
= 476.99 ft
Inver= Elevation Upstream
= 477.13 ft
Inver- Slope
= 0.44%
Inver: Slope (Plan Length)
= 0.42%
Rim Elevation Downstream
= 481.53 ft
Rim Elevation Upstream
= 481.66 ft
Natural Ground Slope
= 0.42%
Crown Elevation Downstream
= 478.49 ft
Crown Elevation Upstream
= 478.63 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 3.51
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.08
min
Total Intensity
= 13.06
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 3.51
cfs
Uniform Capacity
= 7.00
cfs
r�
�i
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
-- - -P =PE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
= 0.00 cfs
= 0.00 gpd
= 479.41 ft
= 479.44 ft
= 0.11 %
= 479.47 ft
= 479.51 ft
= 0.11 %
= 8.5806 in
= 18.0000 in
= 18.0000 in
= 1.99 ft /s
= 1.99 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft"2
= 1.77 ft ^2
= NA
= 0.022 ft
= MH 6
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
= 0.00 ft /s
0.00 %
= 100 Year
= Tutorial
= Pipe 16
= Pipe 15
= HDPE
= 5.6875 ft
= 5.6874 ft
= Circular
= 18.00 in
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
•
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
r�
�i
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
-- - -P =PE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
= 0.00 cfs
= 0.00 gpd
= 479.41 ft
= 479.44 ft
= 0.11 %
= 479.47 ft
= 479.51 ft
= 0.11 %
= 8.5806 in
= 18.0000 in
= 18.0000 in
= 1.99 ft /s
= 1.99 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft"2
= 1.77 ft ^2
= NA
= 0.022 ft
= MH 6
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
= 0.00 ft /s
0.00 %
= 100 Year
= Tutorial
= Pipe 16
= Pipe 15
= HDPE
= 5.6875 ft
= 5.6874 ft
= Circular
= 18.00 in
•
r�
�i
0
Pipe Manning's "n"
= 0.013
HGL Elevation Downstream
Pipe Capacity at Invert Slope
= 7.63 cfs
Invert Elevation Downstream
= 477.13
ft
Invert Elevation-Upstream
= 477.16
ft
Invert Slope
= 0.53%
= 0.00
Invert Slope (Plan Length)
= 0.53%
= 0.00
Rim Elevation Downstream
= 481.66
ft
Rim Elevation Upstream
= 481.57
ft
Natural Ground Slope
= -1.58%
= 0.00
Crown Elevation Downstream
= 478.63
ft
Crown Elevation Upstream
= 478.66
ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 3.51
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft ^2
Total Time of Concentration
= 0.03
min
Total Intensity
= 13.09 in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 3.51
cfs
Uniform Capacity
= 7.63
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 479.47 ft
HGL Elevation Upstream
= 479.47 ft
HGL Slope
= 0.11 %
EGL Elevation Downstream
= 479.53 ft
EGL Elevation Upstream
= 479.53 ft
EGL Slope
= 0.11 %
Critical Depth
= 8.5806 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Veloc -ty Downstream
= 1.99 ft /s
Velocity Upstream
= 1.99 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.022 ft
- -- -INLET INFORMATION--- -
Downs=ream Inlet
= BEND 9
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
•
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
.--Gutter Flow
=:--O..00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
•
Pavement Spread
Total Spread
= 0.0000 ft
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 17
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 17
Downstream Pipe
= Pipe 16
Pipe Material
= HDPE
Pipe Length
= 3.0000 ft
Plan Length
= 4.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 6.06 cfs
Invert Elevation Downstream
= 477.16 ft
Invert Elevation Upstream
= 477.17 ft
Invert Slope
= 0.33%
Invert Slope (Plan Length)
= 0.25%
Rim Elevation Downstream
= 481.57 ft
Rim Elevation Upstream
= 480.64 ft
Natural Ground Slope
= - 31.00%
Crown Elevation Downstream
= 478.66 ft
Crown Elevation Upstream
= 478.67 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
•
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 3.51 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
weighted Coefficient
= 0.000
Total Time•of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 3.51 cfs
Uniform Capacity
= 6.06 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 479.49 ft
HGL Elevation Upstream
= 479.50 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 479.56 ft
EGL Elevation Upstream
= 479.56 ft
EGL Slope
= 0.27 %
Critical Depth
= 8.5806 in
•
lr
u
' 11
J
•
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000
in
Velocity Downstream
= 1.99
ft /s
Velocity Upstream
= 1.99
ft /s
Uniform Velocity Downstream
= 0.00
ft /s
Uniform Velocity Upstream
= 0.00
ft /s
Area Downstream
= 1.77
ft "2
Area Upstream
= 1.77
ft^2
Kj (JLC)
= NA
= * %
Calculated Junction Loss
= 0.077
ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 10
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 22
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 22
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 13.6394 ft
Plan Length
= 15.9833 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe 14anning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 22.91 cfs
Inver= Elevation Downstream
= 476.42 ft
Invert Elevation Upstream
= 476.56 ft
Invert Slope
= 1.03%
Invert Slope (Plan Length)
= 0.88%
Rim Elevation Downstream
= 481.53 ft
Rim Elevation Upstream
= 481.51 ft
Natural Ground Slope
= -0.14%
Crown Elevation Downstream
= 478.42 ft
Crown Elevation Upstream
= 478.56 ft
•
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
.=-O-;.000.
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
•
Inlet Input Flow
= 15.59 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 7.76 min
Total Intensity
= 9.18 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 15.59 cfs
Uniform Capacity
= 22.91 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 479.41 ft
HGL Elevation Upstream
= 479.47 ft
HGL Slope
= 0.47 %
EGL Elevation Downstream
= 479.79 ft
EGL Elevation Upstream
= 479.86 ft
EGL Slope
= 0.47 %
Critical Depth
= 17.0832 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.96 ft /s
Velocity Upstream
= 4.96 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.077 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
•
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
=.0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft/8
Curb Efficiency
=
Grate Efficiency
= * $
•
•
J
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 23
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
_ *%
0.00
= 100 Year
= Tutorial
= Pipe 23
= Pipe 22
= HDPE
= 281.2974 ft
= 283.2942 ft
= Circular
= 24.00 in
= 0.013
= 15.61 cfs
= 476.56 ft
= 477.90 ft
= 0.48%
= 0.47%
= 481.51 ft
= 483.18 ft
= 0.59%
= 478.56 ft
= 479.90 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 15.59 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 6.81 min
= 9.52 in /hr
= 0.00 cfs
= 15.59 cfs
= 15.61 cfs
= 0.00 cfs
= 0.00 gpd
= 479.55 ft
= 480.89 ft
= 0.47 %
= 479.93 ft
= 481.27 ft
= 0.47 %
= 17.0832 in
= 24.0000 in
= 24.0000 in
= 4.96 ft /s
= 4.96 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 3.14 ft "2
= 3.14 ft"2
= NA
= 0.011 ft
0
•
is
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 11
Inlet Description
= <None>
Inlet Type
-: Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carrycver from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 24
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 24
Downstream Pipe
= Pipe 23
Pipe Material
= HDPE
Pipe Length
= 296.0018 ft
Plan Length
= 300.0003 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.55 cfs
Invert Elevation Downstream
= 477.98 ft
Invert Elevation Upstream
= 479.38 ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 483.18 ft
Rim Elevation Upstream
= 484.72 ft
Natural Ground Slope
= 0.52t
Crown Elevation Downstream
= 479.98 ft
Crown Elevation Upstream
= 481.38 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 15.59
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weigh -ed Coefficient
= 0.000
•
•
•
Total Time of Concentration
= 5.80 min
Total Intensity
= 9.91 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow ---
= 15.59 cfs
Uniform Capacity
= 15.55 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 480.90 ft
HGL Elevation Upstream
= 482.30 ft
HGL Slope
= 0.47 t
EGL Elevation Downstream
= 481.28 ft
EGL Elevation Upstream
= 482.69 ft
EGL Slope
= 0.47 t
Critical Depth
= 17.0832 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.96 ft /s
Velocity Upstream
= 4.96 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.011 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= •0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 25
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 25
Downstream Pipe
= Pipe 24
•
•
•
Pipe Material
= HDPE
Pipe Length
= 214.8200 ft
Plan Length
= 218.8243 ft
Pipe Type
-Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 15.43 cfs
Invert Elevation Downstream
= 479.46 ft
Invert Elevation Upstream
= 480.46 ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 484.72 ft
Rim Elevation Upstream
= 485.79 ft
Natural Ground Slope
= 0.50%
Crown Elevation Downstream
= 481.46 ft
Crown Elevation Upstream
= 482.46 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 15.59
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 3.14 ft'2
Total Time of Concentration
= 5.07
min
Total Intensity
= 10.21
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 15.59
cfs
Uniform Capacity
= 15.43
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 482.31 ft
HGL Elevation Upstream
= 483.33 ft
HGL Slope
= 0.47 %
EGL Elevation Downstream
= 482.70 ft
EGL Elevation Upstream
= 483.72 ft
EGL Slope
= 0.47 %
Critical Depth
= 17.0832 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.96 ft /s
Velocity Upstream
= 4.96 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft'2
Area Upstream
= 3.14 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.046 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 8
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
•
•
•
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from-.previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 26
= 0.00
- - -- RAINFALL INFORMATION--- -
Total Flow
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Skipped flow
Current Pipe
= Pipe 26
Downstream Pipe
= Pipe 25
Pipe Material
= HDPE
Pipe Length
= 23.7443 ft
Plan Length
= 25.7482 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 8.88 cfs
Invert Elevation Downstream
= 480.96 ft
Invert Elevation Upstream
= 481.13 ft
Invert Slope
= 0.72%
Invert Slope (Plan Length)
= 0.66%
Rim Elevation Downstream
= 485.79 ft
Rim Elevation Upstream
= 486.03 ft
Natural Ground Slope
= 1.02%
Crown Elevation Downstream
= 482.46 ft
Crown Elevation Upstream
= 482.63 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 7.49
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.03
min
Total Intensity
= 11.19
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 7.49
cfs
Uniform Capacity
= 8.88
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 483.38
ft
HGL Elevation Upstream
= 483.50
ft
•
•
r
�i
HGL Slope
= 0.51 %
EGL Elevation Downstream
= 483.66 ft
EGL Elevation Upstream
= 483.78 ft
EGL Slope
- 0.51.• %
Critical Depth
= 12.7224 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.24 ft /s
Velocity Upstream
= 4.24 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.211 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 9
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 27
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 27
Downstream Pipe
= Pipe 26
Pipe Material
= HDPE
Pipe Length
= 152.6835 ft
Plan Length
= 152.6800 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 8.62 cfs
Invert Elevation Downstream
= 481.13 ft
Invert Elevation Upstream
= 482.16 ft
Invert Slope
= 0.67%
Invert Slope (Plan Length)
= 0.67%
•
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter.Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
= 486.03 ft
= 486.77 ft
= 0.48%
= 482.63 ft
= 483.66 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 2.97 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 1.51 min
= 12.07 in /hr
= 0.00 cfs
= 2.97 cfs
= 8.62 cfs
= 0.00 cfs
= 0.00 gpd
= 483.71 ft
= 483.83 ft
= 0.08 %
= 483.76 ft
= 483.88 ft
= 0.08 %
= 7.8606 in
= 18.0000 in
= 18.0000 in
= 1.68 ft /s
= 1.68 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft^2
= 1.77 ft'2
= NA
= 0.093 ft
= WYE 4
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
•
-- - -FLCW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
•
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter.Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
= 486.03 ft
= 486.77 ft
= 0.48%
= 482.63 ft
= 483.66 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 2.97 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 1.51 min
= 12.07 in /hr
= 0.00 cfs
= 2.97 cfs
= 8.62 cfs
= 0.00 cfs
= 0.00 gpd
= 483.71 ft
= 483.83 ft
= 0.08 %
= 483.76 ft
= 483.88 ft
= 0.08 %
= 7.8606 in
= 18.0000 in
= 18.0000 in
= 1.68 ft /s
= 1.68 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft^2
= 1.77 ft'2
= NA
= 0.093 ft
= WYE 4
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
17-�
•
1/ I1
u
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= 0.000
Grate Efficiency
Inlet Time
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 28
Inlet Rational Flow
- - -- RAINFALL INFORMATION--- -
cfs
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
cfs
Current Pipe
= Pipe 28
Downstream Pipe
= Pipe 27
Pipe Material
= HDPE
Pipe Length
= 65.7784 ft
Plan Length
= 67.7700 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 13.27 cfs
Invert Elevation Downstream
= 482.16 ft
Invert Elevation Upstream
= 483.21 ft
Invert Slope
= 1.60%
Invert Slope (Plan Length)
= 1.55%
Rim Elevation Downstream
= 486.77 ft
Rim Elevation Upstream
= 487.20 ft
Natural Ground Slope
= 0.65%
Crown Elevation Downstream
= 483.66 ft
Crown Elevation Upstream
= 484.71 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 2.97
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.08
min
Total Intensity
= 12.35
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 2.97
cfs
Uniform Capacity
= 13.27
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 483.93 ft
HGL Elevation Upstream
= 483.92 ft
HGL Slope
= -0.00 %
EGL Elevation Downstream
= 483.97 ft
EGL Elevation Upstream
= 484.12 ft
EGL Slope
= 0.23 %
Critical Depth
= 7.8606 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 8.5777 in
Velocity Downstream
= 1.68 ft /s
Velocity Upstream
= 3.57 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
•
Area Downstream
= 1.77 ft ^2
Area Upstream
= 0.83 ft "2
Kj (JLC)
= NA
Calculated- Junction Loss
= 0.000 ft
- -- -INLET INFORMATION----
•
Downstream Inlet
Inlet Description
= BEND 12
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 29
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 29
Downstream Pipe
= Pipe 28
•
Pipe Material
= HDPE
Pipe Length
= 241.9652 ft
Plan Length
= 245.9800 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's 'In"
= 0.013
Pipe Capacity at Invert Slope
= 11.07 cfs
Invert Elevation Downstream
= 483.21 ft
Invert Elevation Upstream
= 485.90 ft
Invert Slope
= 1.11%
Invert Slope (Plan Length)
= 1.09%
Rim Elevation Downstream
= 487.20 ft
Rim Elevation Upstream
= 491.40 ft
Natural Ground Slope
= 1.74%
Crown Elevation Downstream
= 484.71 ft
Crown Elevation Upstream
= 487.40 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
•
•
1�
u
•
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 30
- - -- RAINFALL INFORMATION--- -
Return Period
= 0.00 cfs
= 2.97 cfs
= 0.00 cfs
0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 2.97 cfs
= 11.07 cfs
= 0.00 cfs
= 0.00 gpd
= 483.92 ft
= 486.67 ft
= 1.13 %
= 484.12 ft
= 486.92 ft
= 1.16 %
= 7.8606 in
= 8.5777 in
= 7.8606 in
= 3.57 ft /s
= 4.00 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 0.83 ft^2
= 0.74 ft'2
= NA
= 0.459 ft
= MH 10
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
0.00 ft /s
0.00
= 100 Year
•
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe.
= Pipe 30
Downstream Pipe
= Pipe 26
Pipe Material
= HDPE
•
Pipe Length
Plan Length
= 17.6576 ft
= 18.6574 ft
Pipe Type
= Circular
Pipe' Dimensions
= 18.00 in
Pipe Manning's ',n"
= 0.013
Pipe Capacity at Invert Slope
= 7.07 cfs
Invert Elevation Downstream
= 481.13 ft
Invert Elevation Upstream
= 481.21 ft
Invert Slope
= 0.45%
Invert Slope (Plan Length)
= 0.43%
Rim Elevation Downstream
= 486.03 ft
Rim Elevation Upstream
= 486.04 ft
Natural Ground Slope
= 0.06%
Crown Elevation Downstream
= 482.63 ft
Crown Elevation Upstream
= 482.71 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 5.61 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 5.61 cfs
Uniform Capacity
= 7.07 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 483.71 ft
HGL Elevation Upstream
= 483.79 ft
•
HGL Slope
= 0.46 %
EGL Elevation Downstream
= 483.87 ft
EGL Elevation Upstream
= 483.95 ft
EGL Slope
= 0.46 %
Critical Depth
= 10.9692 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.18 ft /s
Velocity Upstream
= 3.18 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft'2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.196 ft
- -- -INLET INFORMATION--- -
Downszream Inlet
= WYE 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
•
1�
i
u
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 31
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Cimensions
Pipe Manning's "n°
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
0.0000 ft
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
= 0.0000 in
0.0000 ft
0.0000 ft
0.00 ft /s
0.00 %
= 100 Year
= Tutorial
= Pipe 31
= Pipe 25
= HDPE
= 32.1316 ft
= 34.6822 ft
= Circular
= 24.00 in
= 0.013
= 34.85 cfs
= 480.52 ft
= 481.28 ft
= 2.38%
= 2.20%
= 485.79 ft
= 485.97 ft
= 0.58%
= 482.52 ft
= 483.28 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.10 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 4.84 min
= 10.31 in /hr
= 0.00 cfs
= 8.10 cfs
= 34.85 cfs
= 0.00 cfs
•
/ 1
J
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 483.38 ft
HGL Elevation Upstream
= 483.42 ft
HGL Slope
= 0.13 %
EGL Elevation Downstream
= 483.48 ft
EGL Elevation Upstream
= 483.52 ft
EGL Slope
= 0.13 %
Critical Depth
= 12.1608 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 2.58 ft /s
Velocity Upstream
= 2.58 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.114 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 9
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 32
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 32
Downstream Pipe
= Pipe 31
Pipe Material
= HDPE
Pipe Length
= 156.2608 ft
Plan Length
= 158.2589 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
•
•
•
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
---- I14LET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
= 15.99 cfs
= 481.28 ft
= 482.06 ft
= 0.50%
= 0.49%
= 485.97 ft
= 487.30 ft
= 0.85%
= 483.28 ft
= 484.06 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.10 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 3.89 min
= 10.75 in /hr
= 0.00 cfs
= 8.10 cfs
= 15.99 cfs
= 0.00 cfs
= 0.00 gpd
= 483.54 ft
= 483.70 ft
= 0.11 %
= 483.64 ft
= 483.84 ft
= 0.13 %
= 12.1608 in
= 24.0000 in
= 19.6699 in
= 2.58 ft /s
= 2.94 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 3.14 ft°2
= 2.76 ft^2
= NA
= 0.016 ft
= BEND 13
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
•
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at -Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
•
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 33
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 33
Downstream Pipe
= Pipe 32
Pipe Material
= HDPE
Pipe Length
= 157.5651 ft
Plan Length
= 159.5631 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.99 cfs
Invert Elevation Downstream
= 482.06 ft
Invert Elevation Upstream
= 482.85 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 487.30 ft
Rim Elevation Upstream
= 487.85 ft
Natural Ground Slope
= 0.34%
Crown Elevation Downstream
= 484.06 ft
Crown Elevation Upstream
= 484.85 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
•
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 8.10 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.19 min
Total Intensity
= 11.11 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 8.10 cfs
Uniform Capacity
= 15.99 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 483.72 ft
HGL Elevation Upstream
= 483.93 ft
HGL Slope
= 0.13 %
EGL Elevation Downstream
= 483.85 ft
EGL Elevation Upstream
= 484.27 ft
EGL Slope
= 0.27 %
Critical Depth
= 12.1608 in
Depth Downstream
= 19.8655 in
•
•
•
is
Depth Upstream
= 12.8800 in
Velocity Downstream
= 2.91
ft /s
Velocity Upstream
= 4.71
ft /s
Uniform Velocity Downstream
= 0.00
ft /s
Uniform Velocity Upstream
= 0.00
ft /s
Area Downstream
= 2.78
ft^2
Area Upstream
= 1.72
ft^2
Kj (JLC)
= NA
Ponding Width
Calculated Junction Loss
= 0.114
ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 11
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 34
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 34
Downstream Pipe
= Pipe 33
Pipe Material
= HDPE
Pipe Length
= 23.4859 ft
Plan Length
= 25.4856 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.99 cfs
Invert Elevation Downstream
= 482.85 ft
Invert Elevation Upstream
= 482.97 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 487.85 ft
Rim Elevation Upstream
= 488.00 ft
Natural Ground Slope
= 0.66%
Crown Elevation Downstream
= 484.85 ft
Crown Elevation Upstream
= 484.97 ft
•
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time-
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 8.10
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.94 ft^2
Total Time of Concentration
= 3.09
min
Total Intensity
= 11.16
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 8.10
cfs
Uniform Capacity
= 15.99
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 484.04 ft
HGL Elevation Upstream
= 484.04 ft
HGL Slope
= 0.01 %
EGL Elevation Downstream
= 484.31 ft
EGL Elevation Upstream
= 484.39 ft
EGL Slope
= 0.34 %
Critical Depth
= 12.1608 in
Depth Downstream
= 14.2480 in
Depth Upstream
= 12.8800 in
Velocity Downstream
= 4.17 ft /s
Velocity Upstream
= 4.71 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.94 ft^2
Area Upstream
= 1.72 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.016 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 14
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= *
Slot Efficiency
= *
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION - - --
1r 1
u
= 0.00 %
= 100 Year
= Tutorial
= Pipe 35
= Pipe 34
= HDPE
= 270.3932 ft
= 274.7946 ft
= Circular
= 24.00 in
= 0.013
= 16.00 cfs
= 482.97 ft
= 484.32 ft
= 0.50%
= 0.49%
= 488.00 ft
= 489.65 ft
= 0.61%
= 484.97 ft
= 486.32 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.10 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 2.15 min
= 11.68 in /hr
= 0.00 cfs
= 8.10 cfs
= 16.00 cfs
= 0.00 cfs
= 0.00 gpd
= 484.06 ft
= 485.34 ft
= 0.47 %
= 484.39 ft
= 485.74 ft
= 0.50 %
= 12.1608 in
= 13.0756 in
= 12.1608 in
= 4.63 ft /s
= 5.07 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.75 ft "2
= 1.60 ft "2
= NA
= 0.016 ft
Total Efficiency
PIPE DESCRIPTION: Pipe 35
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
•
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's 'In"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
•
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION - - --
1r 1
u
= 0.00 %
= 100 Year
= Tutorial
= Pipe 35
= Pipe 34
= HDPE
= 270.3932 ft
= 274.7946 ft
= Circular
= 24.00 in
= 0.013
= 16.00 cfs
= 482.97 ft
= 484.32 ft
= 0.50%
= 0.49%
= 488.00 ft
= 489.65 ft
= 0.61%
= 484.97 ft
= 486.32 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.10 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 2.15 min
= 11.68 in /hr
= 0.00 cfs
= 8.10 cfs
= 16.00 cfs
= 0.00 cfs
= 0.00 gpd
= 484.06 ft
= 485.34 ft
= 0.47 %
= 484.39 ft
= 485.74 ft
= 0.50 %
= 12.1608 in
= 13.0756 in
= 12.1608 in
= 4.63 ft /s
= 5.07 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.75 ft "2
= 1.60 ft "2
= NA
= 0.016 ft
•
•
•
Downstream Inlet
= MH 12
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 36
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 36
Downstream Pipe
= Pipe 35
Pipe Material
= HDPE
Pipe Length
= 14.1828 ft
Plan Length
= 16.5269 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 16.18 cfs
Invert Elevation Downstream
= 484.32 ft
Invert Elevation Upstream
= 484.40 ft
Invert Slope
= 0.51%
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 489.65 ft
Rim Elevation Upstream
= 489.95 ft
Natural Ground Slope
= 2.07%
Crown Elevation Downstream
= 486.32 ft
Crown Elevation Upstream
= 486.40 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 8.10
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 2.09
min
•
Total Intensity
= 11.71 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 8.10 cfs
Uniform Capacity
c ... = 16.18 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
•
HGL Elevation Downstream
= 485.35 ft
HGL Elevation Upstream
= 485.43 ft
HGL Slope
= 0.54 %
EGL Elevation Downstream
= 485.74 ft
EGL Elevation Upstream
= 485.81 ft
EGL Slope
= 0.51 %
Critical Depth
= 12.1608 in
Depth Downstream
= 12.3564 in
Depth Upstream
= 12.4007 in
Velocity Downstream
= 4.97 ft /s
Velocity Upstream
= 4.94 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.63 ft ^2
Area Upstream
= 1.64 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.114 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 13
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
•
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 70
—-RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 70
Downstream Pipe
= Pipe 36
Pipe Material
= HDPE
•
•
/ 1
•
Pipe Length
= 42.7861 ft
Plan Length
= 42.7856 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.97 cfs
Invert Elevation Downstream
= 484.40 ft
Invert Elevation Upstream
= 484.61 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.50%
Rim Elevation Downstream
= 489.95 ft
Rim Elevation Upstream
= 489.90 ft
Natural Ground Slope
= -0.11%
Crown Elevation Downstream
= 486.40 ft
Crown Elevation Upstream
= 486.61 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inle- Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 8.10
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.86 ft^2
Total Time of Concentration
= 1.94
min
Total Intensity
= 11.81 in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 8.10
cfs
Uniform Capacity
= 15.97 cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 485.54 ft
HGL Elevation Upstream
= 485.64 ft
HGL Slope
= 0.23 %
EGL Elevation Downstream
= 485.84 ft
EGL Elevation Upstream
= 486.02 ft
EGL Slope
= 0.44 %
Critical Depth
= 12.1608 in
Depth Downstream
= 13.7687 in
Depth Upstream
= 12.4007 in
Velocity Downstream
= 4.34 ft /s
Velocity Upstream
= 4.94 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.86 ft^2
Area Upstream
= 1.64 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.081 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 15
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
•
•
•
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 37
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown. Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
0.00 ft /s
_ * %
0.00 %
= 100 Year
= Tutorial
= Pipe 37
= Pipe 70
= HDPE
= 22.2503 ft
= 22.2500 ft
= Circular
= 18.00 in
= 0.013
= 7.44 cfs
= 484.61 ft
= 484.72 ft
= 0.50%
= 0.50%
= 489.90 ft
= 489.95 ft
= 0.22%
= 486.11 ft
= 486.22 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 0.00 cfs
= 7.44 cfs
= 0.00 cfs
= 0.00 gpd
= 484.61 ft
= 484.72 ft
= 0.50 %
•
•
EGL Elevation Downstream
= 484.61 ft
EGL Elevation Upstream
= 484.72 ft
EGL Slope
= 0.50 %
Criticcl.Depth
= 0.0018 in
Depth Downstream
= 0.0000 in
Depth Upstream
= 0.0000 in
Velocity Downstream
= 0.00 ft /s
Velocity Upstream
= 0.00 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.00 ft^2
Area Upstream
= 0.00 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYES
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 38
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 38
Downstream Pipe
= Pipe 37
Pipe Material
= HDPE
Pipe Length
= 42.8840 ft
Plan Length
= 43.1335 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.40 cfs
Invert Elevation Downstream
= 484.72 ft
Invert Elevation Upstream
= 484.93 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 489.95 ft
•
Rim Elevation Upstream
= 490.00 ft
Natural Ground Slope
= 0.12%
Crown Elevation Downstream
= 486.22 ft
Crown Elevation Upstream
= 486.43 ft
- -- -FLOW INFORMATION----
•
Catchment Area
Runoff Coefficient
= 0.00 ac
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 0.00 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
weighted Coefficient
= 0.500
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 0.00 cfs
Uniform Capacity
= 7.40 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 484.72 ft
HGL Elevation Upstream
= 484.93 ft
HGL Slope
= 0.50 %
EGL Elevation Downstream
= 484.72 ft
EGL Elevation Upstream
= 484.93 ft
EGL Slope
= 0.50 %
Critical Depth
= 0.0018 in
Depth Downstream
= 0.0000 in
Depth Upstream
= 0.0000 in
Velocity Downstream
= 0.00 ft /s
Velocity Upstream
= 0.00 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.00 ft^2
Area Upstream
= 0.00 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION--- -
•
Downstream Inlet
= BEND 16
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
•
•
•
•
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
=
Grate Efficiency
=
Slot Efficiency
=
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 60 -1
= 0.00
- - -- RAINFALL INFORMATION--- -
Inlet Rational Flow
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Inlet Hydrograph Flow
Current Pipe
= Pipe 60 -1
Downstream Pipe
= Pipe 55
Pipe Material
= RCP
Pipe Length
= 293.6003 ft
Plan Length
= 298.2600 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 12.45 cfs
Invert Elevation Downstream
= 477.80 ft
Invert Elevation Upstream
= 478.69 ft
Invert Slope
= 0.30%
Invert Slope (Plan Length)
= 0.30%
Rim Elevation Downstream
= 487.10 ft
Rim Elevation Upstream
= 487.75 ft
Natural Ground Slope
= 0.22%
Crown Elevation Downstream
= 479.80 ft
Crown Elevation Upstream
= 480.69 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 9.45
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 3.14 ft "2
Total Time of Concentration
= 8.14
min
Total Intensity
= 9.06
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 9.45
cfs
Uniform Capacity
= 12.45
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 482.82 ft
HGL Elevation Upstream
= 483.34 ft
HGL Slope
= 0.17 %
EGL Elevation Downstream
= 482.96 ft
EGL Elevation Upstream
= 483.48 ft
EGL Slope
= 0.17 %
Critical Depth
= 13.1832 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 3.01 ft /s
Velocity Upstream
= 3.01 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft "2
•
= 3.14 ft'2
= NA
= 0.022 ft
= CB 7
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
0.00 ft /s
* %
* %
0.00 %
= 100 Year
= Tutorial
= Pipe 60 -2
= Pipe 60 -1
= RCP
= 282.8012 ft
= 286.8000 ft
= Circular
= 18.00 in
= 0.013
= 5.76 cfs
= 479.19 ft
= 480.04 ft
= 0.30%
= 0.30%
= 487.75 ft
= 488.47 ft
= 0.25%
= 480.69 ft
= 481.54 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
•
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 60 -2
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
•
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet ,Intensity
Inlet Rational Flow
•
= 3.14 ft'2
= NA
= 0.022 ft
= CB 7
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
0.00 ft /s
* %
* %
0.00 %
= 100 Year
= Tutorial
= Pipe 60 -2
= Pipe 60 -1
= RCP
= 282.8012 ft
= 286.8000 ft
= Circular
= 18.00 in
= 0.013
= 5.76 cfs
= 479.19 ft
= 480.04 ft
= 0.30%
= 0.30%
= 487.75 ft
= 488.47 ft
= 0.25%
= 480.69 ft
= 481.54 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
•
•
•
Inlet Input Flow
= 9.45
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weig. ")ted Coefficient
= 0.000
Total Time of Concentration
= 7.25
min
Total Intensity
= 9.36
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 9.45
cfs
Uniform Capacity
= 5.76
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 483.36 ft
HGL Elevation Upstream
= 485.65 ft
HGL Slope
= 0.81 %
EGL Elevation Downstream
= 483.80 ft
EGL Elevation Upstream
= 486.09 ft
EGL Slope
= 0.81 %
Critical Depth
= 14.2524 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 5.35 ft /s
Velocity Upstream
= 5.35 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.022 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 41
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 60 -3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 60 -3
Downstream Pipe
= Pipe 60 -2
Pipe Material
= RCP
Pipe Length
= 249.5011 ft
Plan Length
= 253.5000 ft
Pipe Type
•
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 5.76 cfs
Invert Elevation Downstream
= 480.24 ft
Invert Elevation Upstream
= 480.99 ft
Invert Slope
= 0.30%
Invert Slope (Plan Length)
= 0.30%
Rim Elevation Downstream
= 488.47 ft
Rim Elevation Upstream
= 489.18 ft
Natural Ground Slope
= 0.28%
Crown Elevation Downstream
= 481.74 ft
Crown Elevation Upstream
= 482.49 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 6.32 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 6.06 min
Total Intensity
= 9.80 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 6.32 cfs
Uniform Capacity
= 5.76 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 485.67 ft
HGL Elevation Upstream
= 486.57 ft
HGL Slope
= 0.36 %
EGL Elevation Downstream
•
= 485.87 ft
EGL Elevation Upstream
= 486.77 ft
EGL Slope
= 0.36 %
Critical Depth
= 11.6622 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.57 ft /s
Velocity Upstream
= 3.57 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.010 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH42
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
•
•
•
1, I1
u
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Pondinc Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= *
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 60 -4
Skipped flow
- - -- RAINFALL INFORMATION--- -
cfs
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 60 -4
Downstream Pipe
= Pipe 60 -3
Pipe Material
= RCP
Pipe Length
= 253.0011 ft
Plan Length
= 257.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 5.75 cfs
Invert Elevation Downstream
= 481.19 ft
Invert Elevation Upstream
= 481.95 ft
Invert Slope
= 0.30%
Invert Slope (Plan Length)
= 0.30%
Rim Elevation Downstream
= 489.18 ft
Rim Elevation Upstream
= 489.80 ft
Natural Ground Slope
= 0.25%
Crown Elevation Downstream
= 482.69 ft
Crown Elevation Upstream
= 483.45 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 6.32
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.87
min
Total Intensity
= 10.30
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 6.32
cfs
Uniform Capacity
= 5.75
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
•
•
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 60 -5
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
= 486.58 ft
= 4'87.50 ft
= 0.36 %
= 486.78 ft
= 487.70 ft
= 0.36 W
= 11.6622 in
= 18.0000 in
= 18.0000 in
= 3.57 ft /s
= 3.57 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft"2
= 1.77 ft "2
= NA
= 0.010 ft
= MH43
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
0.00 %
= 100 Year
= Tutorial
= Pipe 60 -5
= Pipe 60 -4
= RCP
= 254.2212 ft
= 258.2200 ft
= Circular
= 18.00 in
= 0.013
= 5.78 cfs
•
•
Invert Elevation Downstream
= 482.15
ft
Invert Elevation Upstream
= 482.92
ft
Invert Slope
= 0.30%
EGL Elevation Downstream
Invert. Slope (Plan Length)
= 0.30%
min
Rim Elevation Downstream
= 489.80
ft
Rim Elevation Upstream
= 490.45
ft
Natural Ground Slope
= 0.26%
cfs
Crown Elevation Downstream
= 483.65
ft
Crown Elevation Upstream
= 484.42
ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 3.15
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft^2
Total Time of Concentration
= 2.45
min
Total Intensity
= 11.51
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 3.15
cfs
Uniform Capacity
= 5.78
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 487.51 ft
HGL Elevation Upstream
= 487.73 ft
HGL Slope
= 0.09 %
EGL Elevation Downstream
= 487.56 ft
EGL Elevation Upstream
= 487.78 ft
EGL Slope
= 0.09 %
Critical Depth
= 8.1018 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 1.78 ft /s
Velocity Upstream
= 1.78 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.002 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH44
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
•
•
•
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 60 -6
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 "in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
0.00 %
= 100 Year
= Tutorial
= Pipe 60 -6
= Pipe 60 -5
= RCP
= 257.9703 ft
= 261.4700 ft
= Circular
= 18.00 in
= 0.013
= 5.77 cfs
= 483.12 ft
= 483.90 ft
= 0.30%
= 0.30%
= 490.45 ft
= 491.10 ft
= 0.25%
= 484.62 ft
= 485.40 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 3.15 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 3.15 cfs
= 5.77 cfs
= 0.00 cfs
= 0.00 gpd
= 487.74 ft
= 487.97 ft
= 0.09 %
= 487.79 ft
= 488.02 ft
= 0.09 %
= 8.1018 in
= 18.0000 in
= 18.0000 in
•
•
•
Velocity Downstream
= 1.78
ft /s
Velocity Upstream
= 1.78
ft /s
Uniform Velocity Downstream
= 0.00
ft /s
Uniform Velocity Upstream
= 0.00
ft /s
Area Downstream
= 1.77
ft°2
Area Upstream
= 1.77
ft"2
Kj (JLC)
= NA
Gutter Width
Calculated Junction Loss
= 0.061
ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 45
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
=
Grate Efficiency
=
Slot Efficiency
=
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 60 -7
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 60 -7
Downstream Pipe
= Pipe 60 -2
Pipe Material
= RCP
Pipe Length
= 7.4052 ft
Plan Length
= 11.3800 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 6.68 cfs
Invert Elevation Downstream
= 480.24 ft
Invert Elevation Upstream
= 480.27 ft
Invert Slope
= 0.41%
Inver= Slope (Plan Length)
= 0.26%
Rim Elevation Downstream
= 488.47 ft
Rim Elevation Upstream
= 488.56 ft
Natural Ground Slope
= 1.22%
Crown Elevation Downstream
= 481.74 ft
Crown Elevation Upstream
= 481.77 ft
- -- -FLOW INFORMATION - - --
•
•
•
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /'hr
= 0.00 cfs
= 3.13 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 3.13 cfs
= 6.68 cfs
= 0.00 cfs
= 0.00 gpd
= 485.67 ft
= 485.68 ft
= 0.13 %
= 485.72 ft
= 485.73 ft
= 0.13 %
= 8.0820 in
= 18.0000 in
= 18.0000 in
= 1.77 ft /s
= 1.77 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft'2
= 1.77 ft^2
= NA
= 0.061 ft
= MH42
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
= 0.0000 ft
0.00 ft /s
* %
= 0.00 %
PIPE DESCRIPTION: Pipe 60 -8
- - -- RAINFALL INFORMATION----
Return Period =
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
•
= Pipe 60 -8
Downstream Pipe
= Pipe 60 -4
Pipe Material
= RCP
Pipe Length
= 7.3952 ft
Plan Length
= 11.3700 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 6.69 cfs
Invert Elevation Downstream
= 482.15 ft
Invert Elevation Upstream
= 482.18 ft
Invert Slope
= 0.41%
Invert Slope (Plan Length)
= 0.26%
Rim Elevation Downstream
= 489.80 ft
Rim Elevation Upstream
= 489.83 ft
Natural Ground Slope
= 0.41%
Crown Elevation Downstream
= 483.65 ft
Crown Elevation Upstream
= 483.68 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 3.17 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 3.17 cfs
Uniform Capacity
= 6.69 cfs
Skipped flow
= 0.00 cfs
• Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 487.51 ft
HGL Elevation Upstream
= 487.52 ft
HGL Slope
= 0.13 %
EGL Elevation Downstream
= 487.56 ft
EGL Elevation Upstream
= 487.57 ft
EGL Slope
= 0.13 %
Critical Depth
= 8.1342 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 1.79 ft /s
Velocity Upstream
= 1.79 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.062 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH44
•
•
•
is
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= *
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 71
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 71
Downstream Pipe
= Pipe 70
Pipe Material
= HDPE
Pipe Length
= 23.6884 ft
Plan Length
= 23.6881 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.47 cfs
Invert Elevation Downstream
= 484.61 ft
Invert Elevation Upstream
= 484.73 ft
Invert Slope
= 0.51%
Invert Slope (Plan Length)
= 0.51%
Rim Elevation Downstream
= 489.90 ft
Rim Elevation Upstream
= 490.53 ft
Natural Ground Slope
= 2.66%
Crown Elevation Downstream
= 486.11 ft
Crown Elevation Upstream
= 486.23 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 8.10
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.87
min
Total Intensity
= 11.85
in /hr
•
Total Rational Flow
= 0.00 cfs
Total Flow
= 8.10 cfs
Uniform Capacity
= 7.47 cfs
Sk•apped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 485.72 ft
•
HGL Elevation Upstream
= 485.98 ft
HGL Slope
= 1.08 %
EGL Elevation Downstream
= 486.24 ft
EGL Elevation Upstream
= 486.39 ft
EGL Slope
= 0.65 %
Critical Depth
= 13.2318 in
Depth Downstream
= 13.3775 in
Depth Upstream
= 14.9986 in
Velocity Downstream
= 5.75 ft /s
Velocity Upstream
= 5.15 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.41 ft^2
Area Upstream
= 1.57 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.114 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYES
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 9,
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
•
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 72
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 72
Downstream Pipe
= Pipe 71
Pipe Material
= HDPE
Pipe Length
= 86.0892 ft
•
•
•
•
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION----
Downstream Inlet
Inlet Description
Inlet Type
Compu -ation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
= 86.0881 ft
= Circular
= 18.00 in
= 0.013
= 7.42 cfs
= 484.73 ft
= 485.16 ft
= 0.50%
= 0.50%
= 490.53 ft
= 491.74 ft
1.41%
486.23 ft
486.66 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.10 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 1.57 min
= 12.04 in /hr
= 0.00 cfs
= 8.10 cfs
= 7.42 cfs
= 0.00 cfs
0.00 gpd
= 486.09 ft
= 486.54 ft
= 0.52 %
= 486.45 ft
= 486.90 ft
= 0.52 %
= 13.2318 in
= 16.3666 in
= 16.6192 in
= 4.80 ft /s
= 4.75 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.69 ft "2
= 1.70 ft "2
= NA
= 0.114 ft
= BEND 25
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
•
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
_F_.ow. Intercepted by -Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
•
Gutter Flow
Depth at Curb
= 0.00 cfs
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter velocity
= 0.00 ft /s
Curb Efficiency
= "
Grate Efficiency
= '
Slot Efficiency
=
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 73
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 73
Downstream Pipe
= Pipe 72
Pipe Material
= HDPE
Pipe Length
= 53.9698 ft
Plan Length
= 53.9691 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.43 cfs
Invert Elevation Downstream
= 485.16 ft
Invert Elevation Upstream
= 485.43 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.50%
Rim Elevation Downstream
= 491.74 ft
Rim Elevation Upstream
= 492.16 ft
Natural Ground Slope
= 0.78%
Crown Elevation Downstream
= 486.66 ft
Crown Elevation Upstream
= 486.93 ft
- -- -FLOW INFORMATION--- -
•
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 8.10 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.37 min
Total Intensity
= 12.16 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 8.10 cfs
Uniform Capacity
= 7.43 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 486.66 ft
HGL Elevation Upstream
= 486.93 ft
HGL Slope
= 0.50 W
EGL Elevation Downstream
= 486.99 ft
•
•
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Unifcrm Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 74
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
'Rim Elevation Upstream
= 487.25 ft
= 0.50 %
= 13.2318 in
= 17.9892 in
= 17.9703 in
= 4.58 ft /s
= 4.58 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft^2
= 1.77 ft^2
= NA
= 0.114 ft
= BEND 26
= <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
= 0.0000 ft
0.00 ft /s
_ * %
= 0.00 %
= 100 Year
= Tutorial
= Pipe 74
= Pipe 73
= HDPE
= 75.2692 ft
= 77.2682 ft
= Circular
= 18.00 in
= 0.013
= 7.46 cfs
= 485.43 ft
= 485.81 ft
= 0.50%
= 0.49%
= 492.16 ft
= 492.27 ft
•
Natural Ground Slope
= 0.15%
Crown Elevation Downstream
= 486.93 ft
Crown Elevation Upstream
= 487.31 ft
- -- -FLOW INFORMATION----
Catchment Area
= 0.00 ac
•
Runoff Coefficient
Inlet Time
= 0.000
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 8.10 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.09 min
Total Intensity
= 12.34 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 8.10 cfs
Uniform Capacity
= 7.46 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 487.04 ft
HGL Elevation Upstream
= 487.49 ft
HGL Slope
= 0.59 %
EGL Elevation Downstream
= 487.37 ft
EGL Elevation Upstream
= 487.82 ft
EGL Slope
= 0.59 %
Critical Depth
= 13.2318 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.58 ft /s
Velocity Upstream
= 4.58 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.016 ft
- -- -INLET INFORMATION----
Downstream Inlet
= BEND 27
•
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
•
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
• PIPE DESCRIPTION: Pipe
-- RAINFALL INFORMATION-N-
-- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
• Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
•
= 0.00 ft /s
0.00 %
= 100 Year
= Tutorial
= Pipe 75
= Pipe 74
= HDPE
= 279.0698 ft
= 281.0662 ft
= Circular
= 18.00 in
= 0.013
= 7.44 cfs
= 485.89 ft
= 487.29 ft
= 0.50%
= 0.50%
= 492.27 ft
= 491.28 ft
_ -0.35%
= 487.39 ft
= 488.79 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.10 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.07 min
= 13.07 in /hr
= 0.00 cfs
= 8.10 cfs
= 7.44 cfs
= 0.00 cfs
= 0.00 gpd
= 487.51 ft
= 489.16 ft
= 0.59 %
= 487.83 ft
= 489.49 ft
= 0.59 %
= 13.2318 in
= 18.0000 in
= 18.0000 in
= 4.58 ft /s
= 4.58 ft /s
= 0.00 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.114 ft
- - -- INLET INFORMATION--- -
Downstream Inlet
= MH 46
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
•
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 76
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 76
Downstream Pipe
= Pipe 75
Pipe Material
= HDPE
Pipe Length
= 16.8850 ft
Plan Length
•
= 18.3848 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n°
= 0.013
Pipe Capacity at Invert Slope
= 7.67 cfs
Invert Elevation Downstream
= 487.29 ft
Invert Elevation Upstream
= 487.38 ft
Invert Slope
= 0.53%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 491.28 ft
Rim Elevation Upstream
= 490.94 ft
Natural Ground Slope
= -2.01%
Crown Elevation Downstream
= 488.79 ft
Crown Elevation Upstream
= 488.88 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 8.10 cfs
•
•
u
1 0
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
weighted Coefficient
= 0.000
EGL Elevation Downstream
Total Time of Concentration
= 0.00 -min
= 489.84 ft
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total 7low
= 8.10
cfs
Uniform Capacity
= 7.67
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 489.28 ft
HGL Elevation Upstream
= 489.51 ft
HGL Slope
= 1.38 %
EGL Elevation Downstream
= 489.60 ft
EGL Elevation Upstream
= 489.84 ft
EGL Slope
= 1.38 %
Critical Depth
= 13.2318 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.58 ft /s
Velocity Upstream
= 4.58 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.407 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 28
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= *
Total Efficiency
= 0.00 %
I
I ,
I i
I i
I I
\ \ PIPE 1
PIPE 8
PIPE 7
PIPE 5
PIPE 24 '
PIPE 3
j
PIPE 27
PIPE 12
PIPE 11,,
I
t PIPE 18
_ _AFLEE" -LE"AY - - - -
PIPE 14 __� --
PIPE 16 PIPE 17 }
o _
PIPE 13 13 i PIPE 19
PIPE 15
lec
W
—PIPE 9
PIPE 26
PIPE 6 MERV GRIFFIN WA - -
PIPE 2 PIPE 25
PIPE 4
PIPE 1
i4
iC
,a
W i PIPE 20
PIPE 28 PIPE 21
�t� a PIPE 22
i
i
I
I--
I
I
LINE 21.3
STORM DRAIN
INDEX MAP
MSA CoxsuLnwo, Ixc.
Mr K=oa Sage a AssocuTm lN
rummm ■ CFM &v�nao ■ LAM SMV
34700 Bm Hm DmB a 8mo Mfas G
M • 7�wm 3209811 a FAx 9Zi
LINE 213
User
Name: mpompa
Date: 10 -04 -05
Project:
1721
STORM DRAIN
ALIGN AND ANNO
Time: 09:54:39
0twork: 03 -
LINE 213
Page: 1
Storm Sewers Summary Report
Pipe
Name
Total Flow Pipe Dim
HGL Down
HGL Up
Invert Down
Invert Up
Downstream Junction
cfs
in
ft
ft
ft
ft
Pipe
1
78.97
42.00
461.80
462.26
452.00
452.70
Outfall
Pipe
2
63.25
42.00
462.68*
462.74*
452.76
452.84
CB 1
Pipe
3
63.25
42.00
463.18*
463.24*
452.84
452.91
BEND 1
Pipe
4
47.53
42.00
463.27*
463.31*
452.91
452.98
TEE 1
Pipe
5
31.82
30.00
463.34*
464.03*
453.98
454.54
WYE 1
Pipe
6
31.82
30.00
464.06*
465.21*
454.62
455.55
MH 1
Pipe
7
25.73
30.00
465.83*
465.88*
455.55
455.65
WYE 2
Pipe
8
25.73
30.00
466.03*
466.29*
455.65
456.16
BEND 2
Pipe
9
25.73
30.00
466.44*
466.48*
456.16
456.44
BEND 3
Pipe
10
25.73
30.00
466.63*
467.29*
456.44
460.74
BEND 4
Pipe
11
25.73
30.00
467.31*
467.97*
460.82
461.63
MH 2
Pipe
12
25.73
30.00
468.12*
468.20*
461.63
461.74
BEND 5
Pipe
13
25.73
30.00
468.35*
468.39*
461.74
461.78
BEND 6
Pipe
14
4.54
18.00
468.79*
468.86*
462.78
462.93
CB 2
Pipe
15
4.54
18.00
468.87*
469.39*
463.01
464.32
MH 3
Pipe
16
4.54
18.00
469.39*
469.94*
464.40
465.80
MH 4
Pipe
17
4.54
18.00
469.95*
470.44*
465.88
467.12
MH 5
Pipe
18
4.54
18.00
470.48*
470.54*
467.12
467.29
BEND 7
Pipe
19
4.54
18.00
470.55*
472.46
467.37
471.64
MH 6
Pipe
20
4.02
18.00
472.40
472.45
471.72
471.77
MH 7
Pipe
21
4.02
18.00
472.84
472.83
471.77
471.86
BEND 8
Pipe
24
15.72
24.00
463.27*
464.04*
453.66
456.00
TEE 1
Pipe
25
15.72
24.00
463.34*
464.04*
453.73
455.73
WYE 1
Pipe
26
6.09
30.00
465.83*
465.83*
455.55
455.62
WYE 2
Pipe
28
0.52
18.00
472.46
472.47
471.72
471.84
MH 7
Pipe
29
0.52
18.00
472.47
472.47
471.84
471.87
BEND 10
Pipe
22
4.02
18.00
472.88
472.91
471.86
471.88
BEND 9
ipe
27
4.27
18.00
468.79*
468.86*
462.78
462.97
CB 2
is
LINE 213
User
Name: mpompa
Date: 10 -04 -05
Project: 1721
STORM DRAIN
ALIGN AND ANNO
Time: 09:54:39
Work: 03 -
LINE 213
Page: 1
Storm Sewers Summary Report
Pipe
Name
Total Flow Pipe Dim
HGL Down
HGL Up
Invert Down
invert Up
Downstream Junction
cfs
in
ft
ft
ft
ft
Pipe
1
78.97
42.00
461.80
462.26
452.00
452.70
Outfall
Pipe
2
63.25
42.00
462.68*
462.74*
452.76
452.84
CB 1
Pipe
3
63.25
42.00
463.18*
463.24*
452.84
452.91
BEND 1
Pipe
4
47.53
42.00
463.27*
463.31*
452.91
452.98
TEE 1
Pipe
5
31.82
30.00
463.34*
464.03*
453.98
454.54
WYE 1
Pipe
6
31.82
30.00
464.06*
465.21*
454.62
455.55
MH 1
Pipe
7
25.73
30.00
465.83*
465.88*
455.55
455.65
WYE 2
Pipe
8
25.73
30.00
466.03*
466.29*
455.65
456.16
BEND 2
Pipe
9
25.73
30.00
466.44*
466.48*
456.16
456.44
BEND 3
Pipe
10
25.73
30.00
466.63*
467.29*
456.44
460.74
BEND 4
Pipe
11
25.73
30.00
467.31*
467.97*
460.82
461.63
MH 2
Pipe
12
25.73
30.00
468.12*
468.20*
461.63
461.74
BEND 5
Pipe
13
25.73
30.00
468.35*
468.39*
461.74
461.78
BEND 6
Pipe
14
4.54
18.00
468.79*
468.86*
462.78
462.93
CB 2
Pipe
15
4.54
18.00
468.87*
469.39*
463.01
464.32
MH 3
Pipe
16
4.54
18.00
469.39*
469.94*
464.40
465.80
MH 4
Pipe
17
4.54
18.00
469.95*
470.44*
465.88
467.12
MH 5
Pipe
18
4.54
18.00
470.48*
470.54*
467.12
467.29
BEND 7
Pipe
19
4.54
18.00
470.55*
472.46
467.37
471.64
MH 6
Pipe
20
4.02
18.00
472.40
472.45
471.72
471.77
MH 7
Pipe
21
4.02
18.00
472.84
472.83
471.77
471.86
BEND 8
Pipe
24
15.72
24.00
463.27*
464.04*
453.66
456.00
TEE 1
Pipe
25
15.72
24.00
463.34*
464.04*
453.73
455.73
WYE 1
Pipe
26
6.09
30.00
465.83*
465.83*
455.55
455.62
WYE 2
Pipe
28
0.52
18.00
472.46
472.47
471.72
471.84
MH 7
Pipe
29
0.52
18.00
472.47
472.47
471.84
471.87
BEND 10
22
4.02
18.00
472.88
472.91
471.86
471.88
BEND 9
�pe
pe
27
4.27
18.00
468.79*
468.86*
462.78
462.97
CB 2
•
Storm Sewers Detail Report
PIPE DESCRIPTION: Pipe 1
-- RAINFALL INFORMATION--- -
laturn Period = 100 Year
infall File = Tutorial
- -- -PIPE INFORMATION--- -
= 10.68
min
Current Pipe
= Pipe 1
ac
Downstream Pipe
= Outfall
cfs
Pipe Material
= HDPE
min
Pipe Length
= 73.9753
ft
Plan Length
= 75.4720
ft
Pipe Type
= Circular
cfs
Pipe Dimensions
= 42.00 in
cfs
Pipe Manning's "n"
= 0.013
ac
Pipe Capacity at Invert Slope
= 97.83 cfs
= 9.62 ft^2
Invert Elevation Downstream
= 452.00
ft
Invert Elevation Upstream
= 452.70
ft
Invert Slope
= 0.95%
Invert Slope (Plan Length)
= 0.93%
Rim Elevation Downstream
= 460.00
ft
Rim Elevation Upstream
= 466.45
ft
Natural Ground Slope
= 8.72%
Crown Elevation Downstream
= 455.50
ft
Crown Elevation Upstream
= 456.20
ft
- -- -FLOW INFORMATION--- -
= 10.68
min
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
cfs
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 78.97
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 9.62 ft^2
Time of Concentration
= 10.68
min
Ifotal
otal Intensity
= 8.30
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 78.97
cfs
Uniform Capacity
= 97.83
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00
HGL Elevation Downstream
= 461.80 ft
HGL Elevation Upstream
= 462.26 ft
HGL Slope
= 0.62 %
EGL Elevation Downstream
= 462.85 ft
EGL Elevation Upstream
= 463.30 ft
EGL Slope
= 0.62 %
Critical Depth
= 33.3354 in
Depth Downstream
= 42.0000 in
Depth Upstream
= 42.0000 in
Velocity Downstream
= 8.21 ft /s
Velocity Upstream
= 8.2L ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 11.32 ft /s
Area Downstream
= 9.62 ft^2
Area Upstream
= 9.62 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.425 ft
- -- -INLET INFORMATION--- -
= 0.00
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Cross -Slope
= 0.00
ft /ft
*avement
utter Cross -Slope
= 0.00
ft /ft
Gutter Local Depression
= 0.0000
in
Gutter width
= 0.0000
ft
Ponding Width
= 0.0000
ft
Intercept Efficiency
= *
%
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
=.0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
ement Spread
= 0.0000 ft
Wtal Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= ` %
Grate Efficiency
= * %
Slot Efficiency
= ' %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 2
= 0.50%
- - -- RAINFALL INFORMATION--- -
= 0.46%
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 2
Downstream Pipe
= Pipe 1
Pipe Material
= HDPE
Pipe Length
= 15.9494 ft
Plan Length
= 17.4533 ft
Pipe Type
= Circular
Pipe Dimensions
= 42.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 71.22 cfs
Invert Elevation Downstream
= 452.76 ft
Invert Elevation Upstream
= 452.84 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 466.45 ft
Rim Elevation Upstream
= 466.23 ft
Natural Ground Slope
= -1.38%
Crown Elevation Downstream
= 456.26 ft
Crown Elevation Upstream
= 456.34 ft
-F LOW INFORMATION--- -
HGL Elevation Downstream
atchment Area
Qun-
= 0.00
ac
off Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 63.25
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
weighted Coefficient
= 0.000
= 9.62 ft "2
Total Time of Concentration
= 10.63
min
Total Intensity
= 8.31
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 63.25
cfs
Uniform Capacity
= 71.22
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 462.68 ft
HGL Elevation Upstream
= 462.74 ft
HGL Slope
= 0.40 %
EGL Elevation Downstream
= 463.35 ft
EGL Elevation Upstream
= 463.42 ft
EGL Slope
= 0.40 %
Critical Depth
= 29.9208 in
Depth Downstream
= 42.0000 in
Depth Upstream
= 42.0000 in
Velocity Downstream
= 6.57 ft /s
Velocity Upstream
= 6.57 ft /s
Uniform Velocity Downstream
= 8.37 ft /s
Uniform Velocity Upstream
= 8.37 ft /s
Area Downstream
= 9.62 ft "2
Area Upstream
= 9.62 ftA2
K) (JLC) = NA
alculated Junction Loss = 0.435 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope = 0.00 ft /ft
Gutter Cross -Slope = 0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter Width = 0.0000 ft
Ponding Width = 0.0000 ft
Efficiency
= * 96
0ntercept
low from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 3
in /hr
- - -- RAINFALL INFORMATION--- -
= 0.00
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 452.84
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 14.7389 ft
Plan Length
= 14.7387 ft
Pipe Type
= Circular
Pipe Dimensions
= 42.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 69.31 cfs
Invert Elevation Downstream
= 452.84
ft
nvert Elevation Upstream
= 452.91
ft
Invert Slope
= 0.47%
ft
Invert Slope (Plan Length)
= 0.47%
min
Rim Elevation Downstream
= 466.23
ft
Rim Elevation Upstream
= 466.36
ft
Natural Ground Slope
= 0.88W
cfs
Crown Elevation Downstream
= 456.34
ft
Crown Elevation Upstream
= 456.41
ft
- -- -FLOW INFORMATION--- -
INFORMATION--- -
"GL
ritical Depth
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 63.25
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 10.60
min
Total Intensity
= 8.32
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 63.25
cfs
Uniform Capacity
= 69.31
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC
INFORMATION--- -
"GL
ritical Depth
= 29.9208 in
HGL
Elevation
Downstream
= 463.18
ft
HGL
Elevation
Upstream
= 463.24
ft
HGL
Slope
Area Downstream
= 0.40 W
Area Upstream
EGL
Elevation
Downstream
= 463.85
ft
EGL
Elevation
Upstream
= 463.91
ft
Slope
= 0.40 %
"GL
ritical Depth
= 29.9208 in
Depth Downstream
= 42.0000 in
Depth Upstream
= 42.0000 in
Velocity Downstream
= 6.57 ft /s
Velocity Upstream
= 6.57 ft /s
Uniform Velocity Downstream
= 8.17 ft /s
Uniform Velocity Upstream
= 8.17 ft /s
Area Downstream
= 9.62 ft^2
Area Upstream
= 9.62 ft"2
Kj (JLC) = NA
Calculated Junction Loss = _0...037 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = BEND 1
Inlet Description
= <None>
nlet Type
= Undefined
omputation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
�urrent Pipe
= Pipe 4
ownstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 14.6962 ft
Plan Length
= 14.6960 ft
Pipe Type
= Circular
Pipe Dimensions
= 42.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 69.41 cfs
Invert Elevation Downstream
= 452.91 ft
Invert Elevation Upstream
= 452.98 ft
Invert Slope
= 0.48%
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 466.36 ft
Rim Elevation Upstream
= 466.44 ft
Natural Ground Slope
= 0.53%
Crown Elevation Downstream
= 456.41 ft
Crown Elevation Upstream
= 456.48 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 47.53 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 10.55 min
Total Intensity
= 8.34 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 47.53 cfs
Uniform Capacity
= 69.41 cfs
kipped flow
= 0.00 cfs
infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 463.27 ft
HGL Elevation Upstream
= 463.31 ft
HGL Slope
= 0.22 %
EGL Elevation Downstream
= 463.65 ft
EGL Elevation Upstream
= 463.69 ft
EGL Slope = 0.22 %
Critical Depth._. = 25.8342 in
Depth Downstream = 42.0000 in
Depth Upstream = 42.0000 in
Velocity Downstream = 4.94 ft /s
elocity Upstream = 4.94 ft /s
niform Velocity Downstream = 7.77 ft /s
niform Velocity Upstream = 7.77 ft /s
Area Downstream = 9.62 ft "2
Area Upstream = 9.62 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.037 ft
- -- -INLET INFORMATION--- -
Intensity
Downstream Inlet
= TEE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
rate Efficiency
= * %
Blot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Intensity
Current Pipe
= Pipe 5
Downstream Pipe
= Pipe 4
Pipe Material
= HDPE
Pipe Length
= 113.6882 ft
Plan Length
= 115.6868 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 28.77 cfs
Invert Elevation Downstream
= 453.98 ft
Invert Elevation Upstream
= 454.54 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 466.44 ft
Rim Elevation Upstream
= 466.70 ft
Natural Ground Slope
= 0.23%
Crown Elevation Downstream
= 456.48 ft
Crown Elevation Upstream
= 457.04 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Inlet
Intensity
= 0.00
in /hr
nlet
Rational Flow
= 0.00
cfs
Inlet
Input Flow
= 31.82
cfs
Inlet
Hydrograph Flow
= 0.00
cfs
Total
Area
= 0.00
ac
weighted Coefficient
= 0.000
Total
Time of Concentration
= 10.25
min
Total
Intensity
= 8.42
in /hr
Total
Rational Flow
= 0.00
cfs
Total
Flow
= 31.82
cfs
Uniform Capacity = 28.77 cfs
Skipped flow = ...0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION - - --
GL Elevation Downstream
= 463.34 ft
GL Elevation Upstream
Q
= 464.03 ft
GL Slope
= 0.60 %
EGL Elevation Downstream
= 464.00 ft
EGL Elevation Upstream
= 464.68 ft
EGL Slope
= 0.60 %
Critical Depth
= 23.0580 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 6.48 ft /s
Velocity Upstream
= 6.48 ft /s
Uniform Velocity Downstream
= 6.48 ft /s
Uniform Velocity Upstream
= 6.48 ft /s
Area Downstream
= 4.91 ft"2
Area Upstream
= 4.91 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.033 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
islow Intercepted by Current Inlet
= 0.00 cfs
ypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 6
Downstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 191.3688 ft
Plan Length
= 193.4004 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 28.58 cfs
Invert Elevation Downstream
= 454.62 ft
Invert Elevation Upstream
= 455.55 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 466.70 ft
im Elevation Upstream
= 467.96 ft
atural Ground Slope
= 0.65%
Crown Elevation Downstream
= 457.12 ft
Crown Elevation Upstream
= 458.05 ft
- -- -FLOW INFORMATION--- -
Catchment Area
=.0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet
Intensity
= 0.00
in /hr
Inlet
Ration.al.Flow
= 0.00
cfs
Inlet
Input Flow
= 31.82
cfs
Inlet
Hydrograph Flow
= 0.00
cfs
Total
Area
= 0.00
ac
eighted Coefficient
= 0.000
HGL Elevation Downstream
otal Time of Concentration
= 9.75
min
Total Intensity
= 8.56
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 31.82
cfs
Uniform Capacity
= 28.58
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 13.3971 ft
HGL Elevation Downstream
= 464.06 ft
HGL Elevation Upstream
= 465.21 ft
HGL Slope
= 0.60 W
EGL Elevation Downstream
= 464.71 ft
EGL Elevation Upstream
= 465.87 ft
EGL Slope
= 0.60 %
Critical Depth
= 23.0580 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 6.48 ft /s
Velocity Upstream
= 6.48 ft /s
Uniform Velocity Downstream
= 6.48 ft /s
Uniform Velocity Upstream
= 6.48 ft /s
Area Downstream
= 4.91 ft^2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.617 ft
- -- -INLET INFORMATION--- -
= 13.3971 ft
Downstream Inlet
= MH 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Invert Elevation Downstream
= 455.55 ft
Oannings n -value
= 0.000
avement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Garb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread'
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 7
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 7
Downstream Pipe = Pipe 6
Pipe Material = HDPE
Pipe Length
= 13.3971 ft
lan Length
= 13.3967 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 35.42 cfs
Invert Elevation Downstream
= 455.55 ft
Invert Elevation Upstream
= 455.65 ft
Invert Slope
= 0.75%
Invert Slope (Plan Length)
= 0.75%
Rim Elevation Downstream = 467.96 ft
Rim Elevation Upstream 467.76 ft
Natural Ground Slope = -1.45%
Crown Elevation Downstream = 458.05 ft
Crown Elevation Upstream = 458.15 ft
- - -- HYDRAULIC INFORMATION--- -
0 -- -FLOW INFORMATION--- -
= 465.83 ft
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 25.73 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 9.71 min
Total Intensity
= 8.57 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 25.73 cfs
Uniform Capacity
= 35.42 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 465.83 ft
HGL Elevation Upstream
= 465.88 ft
HGL Slope
= 0.39 %
EGL Elevation Downstream
= 466.26 ft
EGL Elevation Upstream
= 466.31 ft
EGL Slope
= 0.39 %
Critical Depth
= 20.7480 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 5.24 ft /s
Velocity Upstream
= 5.24 ft /s
Uniform Velocity Downstream
= 7.87 ft /s
Uniform Velocity Upstream
= 7.87 ft /s
Area Downstream
= 4.91 ft "2
rea Upstream
= 4.91 ft "2
j (JLC)
= NA
Calculated Junction Loss
= 0.149 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
•PIPE DESCRIPTION: Pipe 8
-- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 8
Downstream Pipe = Pipe 7
Pipe Material = HDPE
Pipe'Length
= 66.2515 ft
Plan Length....._.
= 66.2496 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Wipe Capacity at Invert Slope
= 35.97 cfs
nvert Elevation Downstream
= 455.65 ft
Invert Elevation Upstream
= 456.16 ft
Invert Slope
= 0.77%
Invert Slope (Plan Length)
= 0.77W
Rim Elevation Downstream
= 467.76 ft
Rim Elevation Upstream
= 468.41 ft
Natural Ground Slope
= 0.98%
Crown Elevation Downstream
= 458.15 ft
Crown Elevation Upstream
= 458.66 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 25.73 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 9.50 min
Total Intensity
= 8.63 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 25.73 cfs
Uniform Capacity
= 35.97 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 466.03 ft
HGL Elevation Upstream
= 466.29 ft
HGL Slope
= 0.39 %
EGL Elevation Downstream
= 466.46 ft
*GL Elevation Upstream
= 466.72 ft
GL Slope
= 0.39 %
Critical Depth
= 20.7480 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 5.24 ft /s
Velocity Upstream
= 5.24 ft /s
Uniform Velocity Downstream
= 7.97 ft /s
Uniform Velocity Upstream
= 7.97 ft /s
Area Downstream
= 4.91 ft'2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.149 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
epth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 9 __
- - -- RAINFALL INFORMATION - - --
Return Period
= 100 Year
Rainfall File
= Tutorial
-- -PIPE INFORMATION--- -
ac
Current Pipe
= Pipe 9
Downstream Pipe
= Pipe 8
Pipe Material
= HDPE
Pipe Length
= 10.4617 ft
Plan Length
= 10.4579 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 67.07 cfs
Invert Elevation Downstream
= 456.16 ft
Invert Elevation Upstream
= 456.44 ft
Invert Slope
= 2.68%
Invert Slope (Plan Length)
= 2.68%
Rim Elevation Downstream
= 468.41 ft
Rim Elevation Upstream
= 468.53 ft
Natural Ground Slope
= 1.13%
Crown Elevation Downstream
= 458.66 ft
Crown Elevation Upstream
= 458.94 ft
- -- -FLOW INFORMATION--- -
= 0.0000
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 25.73
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 4.91 ft "2
Total Time of Concentration
= 9.46
min
Total Intensity
= 8.64
in /hr
Total Rational Flow
= 0.00
cfs
eotal Flow
= 25.73
cfs
niform Capacity
= 67.07
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000
HGL Elevation Downstream
= 466.44 ft
HGL Elevation Upstream
= 466.48 ft
HGL Slope
= 0.39 %
EGL Elevation Downstream
= 466.87 ft
EGL Elevation Upstream
= 466.91 ft
EGL Slope
= 0.39 %
Critical Depth
= 20.7480 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 5.24 ft /s
Velocity Upstream
= 5.24 ft /s
Uniform Velocity Downstream
= 12.77 ft /s
Uniform Velocity Upstream
= 12.77 ft /s
Area Downstream
= 4.91 ft "2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.149 ft
- -- -INLET INFORMATION--- -
= 0.0000
Downstream Inlet
= BEND 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000
in
utter Width
= 0.0000
ft
Ponding Width
= 0.0000
ft
Intercept Efficiency
= *
%
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00
cfs
Pavement Flow
= 0.00
cfs'
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
"utter Velocity
urb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 10
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
*nlet Time
nlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
INLET ISDownstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* 96
* 96
0.00 %
= 100 Year
= Tutorial
= Pipe 10
= Pipe 9
= HDPE
= 166.9085 ft
= 168.8531 ft
= Circular
= 30.00 in
= 0.013
= 65.81 cfs
= 456.44 ft
= 460.74 ft
= 2.58%
= 2.55%
= 468.53 ft
= 471.13 ft
= 1.56%
= 458.94 ft
= 463.24 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 25.73 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 8.93 min
= 8.81 in /hr
= 0.00 cfs
= 25.73 cfs
= 65.81 cfs
= 0.00 cfs
= 0.00 gpd
= 466.63 ft
= 467.29 ft
= 0.39 %
= 467.06 ft
= 467.71 ft
= 0.39 %
= 20.7480 in
= 30.0000 in
= 30.0000 in
= 5.24 ft /s
= 5.24 ft /s
= 12.59 ft /s
= 12.59 ft /s
= 4.91 ft "2
= 4.91 ft "2
= NA
= 0.026 ft
= BEND 4
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter Width _ _ __.- 0.0000 ft
Ponding Width = 0.0000 ft
Intercept Efficiency = * 96
Flow from Catchment = 0.00 cfs
from previous inlet
= 0.00 cfs
�arryover
otal Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 8
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 11
= 473.48 ft
- - -- RAINFALL INFORMATION--- -
= 1.416
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
INFORMATION--- -
Current Pipe
= Pipe 11
Downstream Pipe
= Pipe 10
Pipe Material
= HDPE
Pipe Length
= 166.8550 ft
Plan Length
= 168.8531 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 28.57 cfs
Invert Elevation Downstream
= 460.82 ft
Invert Elevation Upstream
= 461.63 ft
Invert Slope
= 0.49%
nvert Slope (Plan Length)
= 0.48%
im Elevation Downstream
= 471.13 ft
Rim Elevation Upstream
= 473.48 ft
Natural Ground Slope
= 1.416
Crown Elevation Downstream
= 463.32 ft
Crown Elevation Upstream
= 464.13 ft
- -- -FLOW INFORMATION--- -
INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 25.73 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 8.39 min
Total Intensity
= 8.98. in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 25.73 cfs
Uniform Capacity
= 28.57 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC
INFORMATION--- -
epth Upstream
= 30.0000 in
HGL
Elevation
Downstream
= 467.31
ft
HGL
Elevation
Upstream
= 467.97
ft
HGL
Slope
Kj (JLC)
= 0.39 W
Calculated Junction Loss
EGL
Elevation
Downstream
= 467.74
ft
EGL
Elevation
Upstream
= 468.40
ft
EGL
Slope
= 0.39 %
Critical Depth
= 20.7480
in
Depth Downstream
= 30.0000 in
epth Upstream
= 30.0000 in
velocity Downstream
= 5.24 ft /s
Velocity Upstream
= 5.24 ft /s
Uniform Velocity Downstream
= 6.59 ft /s
Uniform Velocity Upstream
= 6.59 ft /s
Area Downstream
= 4.91 ft "2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.149 ft
_ - -- -INLET INFORMATION--- -
Downstream Inlet
= MH 2
Inlet Description
= <None>
Inlet Type
= Undefined
omputation Case
= Sag
ongitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 8
Slot Efficiency
= * 96
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 12
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 12
Downstream Pipe
= Pipe 11
ipe Material
= HDPE
ipe Length
= 21.0197 ft
Plan Length
= 21.0194 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 29.66 cfs
Invert Elevation Downstream
= 461.63 ft
Invert Elevation Upstream
= 461.74 ft
Invert Slope
= 0.52%
Invert Slope (Plan Length)
= 0.52%
Rim Elevation Downstream
= 473.48 ft
Rim Elevation Upstream
= 473.65 ft
Natural Ground Slope
= 0.81%
Crown Elevation Downstream
= 464.13 ft
Crown Elevation Upstream
= 464.24 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac .
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 25.73 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 8.32 min
Total Intensity
= 9.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 25.73 cfs
Uniform Capacity
= 29.66 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 468.12 ft
HGL Elevation Upstream
= 468.20 ft
HGL Slope
= 0.39 %
EGL Elevation Downstream
= 468.55 ft
EGL Elevation Upstream
= 468.63 ft
EGL Slope
= 0.39 %
Critical Depth
= 20.7480 in
Depth Downstream
= 30.0000 in
Depth Upstream _
= 30.0000 in
Velocity Downstream
= 5.24 ft /s
Velocity Upstream
= 5.24 ft /s
Uniform Velocity Downstream
= 6.81 ft /s
"niform Velocity Upstream = 6.81 ft /s
rea Downstream = 4.91 ft"2
Area Upstream = 4.91 ft"2
Kj (JLC) = NA
Calculated Junction Loss = 0.149 ft
- -- -INLET INFORMATION--- -
= 25.73
Downstream Inlet
= BEND 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 9d
Grate Efficiency
= * %
Slot Efficiency
= * 96
Dotal Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 25.73
Current Pipe
= Pipe 13
Downstream Pipe
= Pipe 12
Pipe Material
= HDPE
Pipe Length
= 9.1207 ft
Plan Length
= 10.6206 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "ri"
= 0.013
Pipe Capacity at Invert Slope
= 27.15 cfs
Invert Elevation Downstream
= 461.74 ft
Invert Elevation Upstream
= 461.78 ft
Invert Slope
= 0.44%
Invert Slope (Plan Length)
= 0.38%
Rim Elevation Downstream
= 473.65 ft
Rim Elevation Upstream
= 472.95 ft
Natural Ground Slope
= -7.69%
Crown Elevation Downstream
= 464.24 ft
Crown Elevation Upstream
= 464.28 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Inlet Intensity = 0.00 in /hr
Inlet Rational Flow = 0.00 cfs
Inlet Input Flow
= 25.73
cfs
nlet Hydrograph Flow
= 0.00
cfs
1'Otal Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 8.29
min
Total Intensity
= 9.01
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 25.73
cfs
Uniform Capacity
= 27.15
cfs
Skipped flow
= 0.00
cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION - - --
HGL Elevation Downstream = 468.35 ft
HGL Elevation Upstream = 468.39 ft
GL Slope
= 0.39 %
GL Elevation Downstream
= 468.78 ft
EGL Elevation Upstream
= 468.81 ft
EGL Slope
= 0.39 W
Critical Depth
= 20.7480 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 5.24 ft /s
Velocity Upstream
= 5.24 ft /s
Uniform Velocity Downstream
= 6.30 ft /s
Uniform Velocity Upstream
= 6.30 ft /s
Area Downstream
= 4.91 ft"2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.401 ft
- -- -INLET INFORMATION--- -
= 0.00 cfs
Downstream Inlet
= BEND 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
avement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 14
= 0.38%
- - -- RAINFALL INFORMATION--- -
= 0.35%
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 14
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
Pipe Length
= 39.8048 ft
Plan Length
= 43.3328 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at invert Slope
= 6.45 cfs
Invert Elevation Downstream
= 462.78 ft
Invert Elevation Upstream
= 462.93 ft
Invert Slope
= 0.38%
Invert Slope (Plan Length)
= 0.35%
Rim Elevation Downstream
= 472.95 ft
Rim Elevation Upstream
= 473.91 ft
V atural Ground Slope = 2.40%
rown Elevation Downstream = 464.28 ft
Crown Elevation Upstream = 464.43 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Inlet Intensity = 0.00 in /hr
Inlet Rational Flow = 0.00 cfs
Inlet Input Flow = 4.54 cfs
Inlet Hydrograph Flow = 0.00 cfs
Total Area = 0.00 ac
Weighted Coefficient = 0.000
Total Time of Concentration = 8.01 min
otal Intensity
= 9.10 in /hr
otal Rational Flow
= 0.00 cfs
Total Flow
= 4.54 cfs
Uniform Capacity
= 6.45 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= Circular
HGL Elevation Downstream
= 468.79 ft
HGL Elevation Upstream
= 468.86 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 468.89 ft
EGL Elevation Upstream
= 468.96 ft
EGL Slope
= 0.19 8
Critical Depth
= 9.8190 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.57 ft /s
Velocity Upstream
= 2.57 ft /s
Uniform Velocity Downstream
= 3.95 ft /s
Uniform Velocity Upstream
= 3.95 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.005 ft
- -- -INLET INFORMATION--- -
= Circular
Downstream Inlet
= CB 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
utter Cross -Slope
= 0.00 ft /ft
utter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * $
Grate Efficiency
= * $
Slot Efficiency
= * $
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 15
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall.File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 15
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 277.3760 ft
Plan Length
= 281.8750 ft
Pipe Type
= Circular
ipe Dimensions
= 18.00
in
dipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.22 cfs
Invert Elevation Downstream
= 463.01
ft
Invert Elevation Upstream
= 464.32
ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 473.91
ft
Rim Elevation Upstream
= 475.33
ft
Natural Ground Slope = .0.51%
Crown Elevation Downstream = 464.51 ft
Crown Elevation Upstream = 465.82 ft
- -- -FLOW INFORMATION - - --
Area
= 0.00
ac
�Catchment
unoff Coefficient
= 0.000
= 469.39 ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 4.54
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 6.18
min
Total Intensity
= 9.76
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 4.54
cfs
Uniform Capacity
= 7.22
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 468.87 ft
HGL Elevation Upstream
= 469.39 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 468.97 ft
EGL Elevation Upstream
= 469.49 ft
EGL Slope
= 0.19 %
Critical Depth
= 9.8190 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.57 ft /s
Velocity Upstream
= 2.57 ft /s
Uniform Velocity Downstream
= 4.32 ft /s
Uniform Velocity Upstream
= 4.32 ft /s
Area Downstream
= 1.77 ft ^2
Area Upstream
= 1.77 ft ^2
Kj (JLC)
= NA
calculated Junction Loss
= 0.005 ft
- -- - INLET INFORMATION--- -
Downstream Inlet
= MH 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %
Slot Efficiency
= * $
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 16
- -- RAINFALL INFORMATION--- -
&eturn Period
= 100 Year
ainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 16
Downstream Pipe
= Pipe 15
Pipe Material
= HDPE
Pipe Length
= 296.0033 ft
Plan Length
= 300.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.22 cfs
Invert Elevation Downstream
= 464.40 ft
Elevation Upstream
= 465.80 ft
Wnvert
nvert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 475.33 ft
Rim Elevation Upstream
= 476.89 ft
Natural Ground Slope
= 0.53%
Crown Elevation Downstream
= 465.90 ft
Crown Elevation Upstream
= 467.30 ft
- -- -FLOW INFORMATION--- -
= 4.32 ft /s
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 4.54 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.23 min
Total Intensity
= 10.59 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 4.54 cfs
Uniform Capacity
= 7.22 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000 in
HGL Elevation Downstream
= 469.39 ft
HGL Elevation Upstream
= 469.94 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 469.49 ft
EGL Elevation Upstream
= 470.05 ft
EGL Slope
= 0.19 %
eritical Depth
= 9.8190 in
epth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.57 ft /s
Velocity Upstream
= 2.57 ft /s
Uniform.Velocity Downstream
= 4.32 ft /s
Uniform Velocity Upstream
= 4.32 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.005 ft
- -- -INLET INFORMATION--- -
= 0.0000 in
Downstream Inlet
= MH 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * $
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
avement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * $
Grate Efficiency
= * $
Slot Efficiency
= * $
Total Efficiency
= 0.00 $
PIPE DESCRIPTION: Pipe 17
- - -- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION - - --
Current Pipe
Current
= Pipe 17
Pipe
= Pipe 16
Pipe Material
= HDPE
Pipe Length
= 262.7174 ft
Plan Length
= 264.7150 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.21 cfs
Invert Elevation Downstream
= 465.88 ft
Invert Elevation Upstream
= 467.12 ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 476.89 ft
Rim Elevation Upstream
= 478.34 ft
Natural Ground Slope
= 0.55%
Crown Elevation Downstream
= 467.38 ft
Crown Elevation Upstream
= 468.62 ft
- -- -FLOW INFORMATION--- -
= 0.0000 ft
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 4.54
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft "2
Total Time of Concentration
= 2.52
min
Total Intensity
= 11.47
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 4.54
cfs
Uniform Capacity
= 7.21
cfs
Okipped flow
= 0.00
cfs
nfiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000 ft
HGL Elevation Downstream
= 469.95 ft
HGL Elevation Upstream
= 470.44 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 470.05 ft
EGL Elevation Upstream
= 470.54 ft
EGL Slope
= 0.19 %
Critical Depth
= 9.8190 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.57 ft /s
Velocity Upstream
= 2.57 ft /s
Uniform Velocity Downstream
= 4.32 ft /s
Uniform Velocity Upstream
= 4.32 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.036 ft
- -- -INLET INFORMATION--- -
= 0.0000 ft
Downstream Inlet
= MH 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
ntercept Efficiency
= * %
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00
cfs
Pavement Flow
= 0.00
cfs
Gutter Flow
= 0.00
cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
Pavement Spread - = 0.0000 ft
Total Spread = 0.0000 ft
Gutter Velocity = 0.00 ft /s
Curb Efficiency = * %
Grate Efficiency
= * %
lot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 18
= HDPE
- - -- RAINFALL INFORMATION--- -
= 35.7854 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= BEND 7
Current Pipe
= Pipe 18
Downstream Pipe
= Pipe 17
Pipe Material
= HDPE
Pipe Length
= 35.7854 ft
Plan Length
= 37.7850 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.24 cfs
Invert Elevation Downstream
= 467.12 ft
Invert Elevation Upstream
= 467.29 ft
Invert Slope
= 0.48%
Invert Slope (Plan Length)
= 0.45%
Rim Elevation Downstream
= 478.34 ft
Rim Elevation Upstream
= 478.10 ft
Natural Ground Slope
= -0.65%
Crown Elevation Downstream
= 468.62 ft
Crown Elevation Upstream
= 468.79 ft
- -- -FLOW INFORMATION--- -
= BEND 7
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
nlet Rational Flow
= 0.00
cfs
nlet Input Flow
= 4.54
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft "2
Total Time of Concentration
= 2.27
min
Total Intensity
= 11.61
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 4.54
cfs
Uniform Capacity
= 7.24
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= BEND 7
HGL Elevation Downstream
= 470.48 ft
HGL Elevation Upstream
= 470.54 ft
HGL Slope
= 0.19 %
EGL Elevation Downstream
= 470.58 ft
EGL Elevation Upstream
= 470.65 ft
EGL Slope
= 0.19 %
Critical Depth
= 9.8190 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.57 ft /s
Velocity Upstream
= 2.57 ft /s
Uniform Velocity Downstream
= 4.33 ft /s
Uniform Velocity Upstream
= 4.33 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.005 ft
- -- -INLET INFORMATION - - --
Downstream Inlet
= BEND 7
nlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width = 0.0000 ft
Intercept - .Efficiency. _ * 96
Flow from Catchment = 0.00 cfs
Carryover from previous inlet = 0.00 cfs
Total Flow to Current Inlet = 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
ypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 19
= 1.52%
- - -- RAINFALL INFORMATION--- -
= 478.10 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 470.55 ft
Current Pipe
= Pipe 19
Downstream Pipe
= Pipe 18
Pipe Material
= HDPE
Pipe Length
= 276.4872 ft
Plan Length
= 281.0771 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 13.05 cfs
Invert Elevation Downstream
= 467.37 ft
Invert Elevation Upstream
= 471.64 ft
Invert Slope
= 1.54%
Invert Slope (Plan Length)
= 1.52%
Rim Elevation Downstream
= 478.10 ft
im Elevation Upstream = 476.54 ft
atural Ground Slope = -0.57%
Crown Elevation Downstream = 468.87 ft
Crown Elevation Upstream = 473.14 ft
- -- -FLOW INFORMATION--- -
= 470.55 ft
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 4.54 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.97 min
Total Intensity
= 12.43 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 4.54 cfs
Uniform Capacity
= 13.05 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION - - --
HGL Elevation Downstream
= 470.55 ft
HGL Elevation Upstream
= 472.46 ft
HGL Slope
= 0.69 %
EGL Elevation Downstream
= 470.65 ft
EGL Elevation Upstream
= 472.79 ft
EGL Slope
= 0.77 W
Critical Depth
= 9.8190 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 9.8190 in
Velocity Downstream
= 2.57 ft /s
•velocity Upstream
= 4.61 ft /s
Uniform Velocity Downstream
= 6.72 ft /s
Uniform Velocity Upstream
= 6.72 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 0.99 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.000 ft
- -- -INLET INFORMATION - - --
Downstream Inlet
= MH 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
n -value
= 0.000
�annings
avement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 20
cfs
- - -- RAINFALL INFORMATION--- -
= 0.00
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 20
Downstream Pipe
= Pipe 19
Pipe Material
= HDPE
Pipe Length
= 6.2436
ft
lan Length
= 8.2447
ft
ipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Inlet Intensity
Pipe Capacity at Invert Slope
= 9.40 cfs
Invert Elevation Downstream
= 471.72
ft
Invert Elevation Upstream
= 471.77
ft
Invert Slope
= 0.80%
cfs
Invert Slope (Plan Length)
= 0.61%
ac
Rim Elevation Downstream
= 476.54
ft
Rim Elevation Upstream
= 476.48
ft
Natural Ground Slope
= -0.89W
in /hr
Crown Elevation Downstream
= 473.22
ft
Crown Elevation Upstream
= 473.27
ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 4.02
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
in
Total Time of Concentration
= 0.08
min
Total Intensity
= 13.06
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 4.02
cfs
Uniform Capacity
= 9.40
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
-- HYDRAULIC INFORMATION--- -
GL Elevation Downstream
�
= 472.40
ft
r�GL Elevation Upstream
= 472.45
ft
HGL Slope
= 0.80 %
EGL Elevation Downstream
= 472.81
ft
EGL Elevation Upstream
= 472.86
ft
EGL Slope
= 0.80 %
Critical Depth
= 9.2070
in
Depth Downstream
= 8.2141
in
Depth Upstream
= 8.2141
in
Velocity Downstream = 5.11 ft /s
Velocity. Upstream = 5.11 ft /s
Uniform Velocity Downstream = 5.11 ft /s
Uniform Velocity Upstream = 5.11 ft /s
Area Downstream = 0.79 ft "2
rea Upstream = 0.79 ft^2
qWj (JLC) = NA
Calculated Junction Loss = 0.382 ft
- -- -INLET INFORMATION--- -
= 0.00
Downstream Inlet
= MH 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 W
0IPE DESCRIPTION: Pipe 21
-- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
Current Pipe
= Pipe 21
Downstream Pipe
= Pipe 20
Pipe Material
= HDPE
Pipe Length
= 11.3141 ft
Plan Length
= 11.3137 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 9.36 cfs
Invert Elevation Downstream
= 471.77 ft
Invert Elevation Upstream
= 471.86 ft
Invert Slope
= 0.80%
Invert Slope (Plan Length)
= 0.80%
Rim Elevation Downstream
= 476.48 ft
Rim Elevation Upstream
= 476.40 ft
Natural Ground Slope
= -0.71%
Crown Elevation Downstream
= 473.27 ft
Crown Elevation Upstream
= 473.36 ft
- -- -FLOW INFORMATION--- -
= 0.00
ac
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
min
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 4.02
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
eighted Coefficient
= 0.000
Total Time of Concentration
= 0.02
min
Total Intensity
= 13.10
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 4.02
cfs
Uniform Capacity
= 9.36
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream.
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
GL Elevation Upstream
GL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
epth at Curb
epth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 24
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- --FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
= 472.84 ft
= 472.83 ft
_ -0.02
= 472.98 ft
= 473.00 ft
= 0.25 %
= 9.2070 in
= 12.7981 in
= 11.6855 in
= 2.99 ft /s
= 3.31 ft /s
= 5.10 ft /s
= 5.10 ft /s
= 1.34 ft "2
= 1.21 ft"2
= NA
= 0.045 ft
= BEND 8
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* 96
0.00 %
= 100 Year
= Tutorial
= Pipe 24
= Pipe 3
= HDPE
= 35.5964 ft
= 37.0194 ft
= Circular
= 24.00 in
= 0.013
= 57.98 cfs
= 453.66 ft
= 456.00 ft
= 6.59%
= 6.328
= 466.36 ft
= 466.32 ft
-0.11%
455.66 ft
458'.00 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 15.72 cfs
= 0.00 cfs
Total Area = 0.00 ac
Weighted Coefficient = 0.000
Total Time of Concentration = 0.00 min
Total Intensity = 0.00 in /hr
Total Rational Flow = 0.00 cfs
Total Flow = 15.72 cfs
niform Capacity = 57.98 cfs
Skipped flow = 0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.013
HGL Elevation Downstream
= 463.27 ft
HGL Elevation Upstream
= 464.04 ft
HGL Slope
= 2.16 %
EGL Elevation Downstream
= 463.66 ft
EGL Elevation Upstream
= 464.43 ft
EGL Slope
= 2.16 W
Critical Depth
= 17.1552 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 5.00 ft /s
Velocity Upstream
= 5.00 ft /s
Uniform Velocity Downstream
= 20.45 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 1.534 ft
- -- -INLET INFORMATION--- -
= 0.013
Downstream Inlet
= TEE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Outter width
= 0.0000 ft
onding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 25
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 25
Downstream Pipe
= Pipe 4
Pipe Material
= HDPE
Pipe Length
= 20.0892 ft
Plan Length
= 21.4894 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
ipe Capacity at Invert Slope
4invert
= 71.35
cfs
Elevation Downstream
= 453.73
ft
Invert Elevation Upstream
= 455.73
ft
Invert Slope
= 10.01%
Invert Slope (Plan Length)
= 9.31%
Rim Elevation Downstream
= 466.44
ft
Rim Elevation Upstream
= 466.46
ft
Natural Ground Slope
= 0.11%
Crown Elevation Downstream
= 455.73
ft
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
nlet Time
qw nlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
INLET So-w-n-stream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 26
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
-- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
= 457.73 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 15.72 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 15.72 cfs
= 71.35 cfs
= 0.00 cfs
= 0.00 gpd
= 463.34 ft
= 464.04 ft
= 3.47 %
= 463.73 ft
= 464.43 ft
= 3.47 %
= 17.1552 in
= 24.0000 in
= 24.0000 in
= 5.00 ft /s
= 5.00 ft /s
= 6.48 ft /s
= 0.00 ft /s
= 3.14 ft "2
= 3.14 ft"2
= NA
= 1.534 ft
= WYE 1
= <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
0.00 ft /s
* %
* %
0.00 %
= 100 Year
= Tutorial
= Pipe 26
= Pipe 6
= HDPE
= 15.1762 ft
= 16.6761 ft
= Circular
= 30.00 in
Pipe Manning's "n" = 0.013
Pipe Capacity at Invert Slope = 27.84 cfs
Invert Elevation Downstream = 455.55 ft
Invert Elevation Upstream = 455.62 ft
Invert Slope = 0.46%
nvert Slope (Plan Length) = 0.42W
im Elevation Downstream = 467.96 ft
Rim Elevation Upstream = 468.08 ft
Natural Ground Slope = 0.81%
Crown Elevation Downstream = 458.05 ft
Crown Elevation Upstream = 458.12 ft
- -- -FLOW INFORMATION--- -
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 6.09
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 4.91 ft^2
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 6.09
cfs
Uniform Capacity
= 27.84
cfs
Skipped flow
= 0.00
cfs
Infiltration
0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 465.83 ft
HGL Elevation Upstream
= 465.83 ft
HGL Slope
= 0.03 %
EGL Elevation Downstream
= 465.85 ft
EGL Elevation Upstream
= 465.86 ft
EGL Slope
= 0.03 %
Critical Depth
= 9.8010 in
Depth Downstream
= 30.0000 in
Oepth Upstream
= 30.0000 in
elocity Downstream
= 1.24 ft /s
Velocity Upstream
= 1.24 ft /s
Uniform Velocity Downstream
= 6.44 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 4.91 ft^2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.059 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
utter Velocity
ICurb
= 0.00 ft /s
Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 28
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
- -- -PIPE INFORMATION--
Current Pipe
Downstream Pipe
ipe Material
Wipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
.Total Flow
Uniform Capacity
Skipped flow
Infiltration
0 - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter width
Ponding Width
Intercept Efficiency
Flow from Catchment
arryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
= Tutorial
= Pipe 28
= Pipe 19
HDPE
29.3365 ft
31.8021 ft
= Circular
18.00 in
0.013
= 6.72 cfs
471.72 ft
471.84 ft
0.41%
= 0.38%
476.54 ft
476.35 ft
-0.64%
473.22 ft
= 473.34 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 0.52 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.17 min
= 12.99 in /hr
= 0.00 cfs
= 0.52 cfs
= 6.72 cfs
= 0.00 cfs
= 0.00 gpd
= 472.46 ft
= 472.47 ft
= 0.03 %
= 472.47 ft
= 472.48 ft
= 0.04 %
= 3.2130 in
= 8.9298 in
= 7.5803 in
= 0.60 ft /s
= 0.74 ft /s
= 3.97 ft /s
= 2.26 ft /s
= 0.87 ft "2
= 0.71 ft^2
= NA
= 0.000 ft
= MH 7
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.0000 in
= 0.0000 in
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter..V.elocity
= 0.00 ft.,/_S
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
•Total Efficiency = 0.00
PIPE DESCRIPTION: Pipe 29
- - -- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= Undefined
HGL Elevation Downstream
Current Pipe
= Pipe 29
ac
Downstream Pipe
= Pipe 28
EGL Elevation Downstream
Pipe Material
= HDPE
min
Pipe Length
= 7.0001
ft
Plan Length
= 8.0000
ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
= 0.00
Pipe Manning's "n"
= 0.013
= 0.00
Pipe Capacity at Invert Slope
= 6.87 cfs
= 0.000
Invert Elevation Downstream
= 471.84
ft
Invert Elevation Upstream
= 471.87
ft
Invert Slope
= 0.43%
= 0.00
Invert Slope (Plan Length)
= 0.38%
= 0.52
Rim Elevation Downstream
= 476.35
ft
Rim Elevation Upstream
= 476.31
ft
Natural Ground Slope
= -0.55%
= 0.00
Crown Elevation Downstream
= 473.34
ft
Crown Elevation Upstream
= 473.37
ft
- -- -FLOW INFORMATION--- -
= Undefined
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 0.52
cfs
nlet Hydrograph Flow
= 0.00
cfs
otal Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 0.71 ft "2
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 0.52
cfs
Uniform Capacity
= 6.87
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= Undefined
HGL Elevation Downstream
= 472.47 ft
HGL Elevation Upstream
= 472.47 ft
HGL Slope
= 0.01 %
EGL Elevation Downstream
= 472.48 ft
EGL Elevation Upstream
= 472.48 ft
EGL Slope
= 0.02 %
Critical Depth
= 3.2130 in
Depth Downstream
= 7.5815 in
Depth Upstream
= 7.2260 in
Velocity Downstream
= 0.74 ft /s
Velocity Upstream
= 0.79 ft /s
Uniform Velocity Downstream
= 2.30 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 0.71 ft "2
Area Upstream
= 0.66 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.003 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = BEND 10
Inlet Description = <None>
Inlet
Inlet Type
= Undefined
Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
avement Flow
utter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 22
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
*Natural Ground Slope
rown Elevation Downstream
rown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
niform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
0.00 %
= 100 Year
= Tutorial
= Pipe 22
= Pipe 21
= HDPE
= 3.0001 ft
= 4.0000 ft
= Circular
= 18.00 in
= 0.013
= 8.57 cfs
= 471.86 ft
= 471.88 ft
= 0.67%
= 0.50%
= 476.40 ft
= 476.38 ft
_ -0.67%
= 473.36 ft
= 473.38 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 4.02 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 4.02 cfs
= 8.57 cfs
= 0.00 cfs
= 0.00 gpd
= 472.88 ft
= 472.91 ft
= 1.00 %
= 473.03 ft
= 473.07 ft
= 1.18 %
= 9.2070 in
= 12.2195 in
= 12.0268 in
= 3.15 ft /s
= 3.20 ft /s
= 4.77 ft /s
= 0.00 ft /s
= 1.28 ft "2
= 1.25 ft "2
= NA
= 0.163 ft
= BEND 9
_ <None>
Inlet Type = Undefined
Computation Case = Sag ._.
Longitudinal Slope = 0.00 ft,ft
Mannings n -value = 0.000
Pavement Cross -Slope = 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
utter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 27
= 7.58
- - -- RAINFALL INFORMATION--- -
Skipped flow
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 468.86 ft
Current Pipe
= Pipe 27
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
-Pipe Length
= 36.4804 ft
Plan Length
= 38.9900 ft
Pipe Type
= Circular
ipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.58 cfs
Invert Elevation Downstream
= 462.78 ft
Invert Elevation Upstream
= 462.97 ft
Invert Slope
= 0.52%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 472.95 ft
Rim Elevation Upstream
= 472.94 ft
Natural Ground Slope
= -0.03W
Crown Elevation Downstream
= 464.28 ft
Crown Elevation Upstream
= 464.47 ft
- -- -FLOW INFORMATION--- -
= 468.86 ft
qHGL
GL Slope
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Slope
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 4.27
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 4.27
cfs
Uniform Capacity
= 7.58
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream = 468.79 ft
Elevation Upstream
= 468.86 ft
qHGL
GL Slope
= 0.19 %
EGL Elevation Downstream
= 468.88 ft
EGL Elevation Upstream
= 468.95 ft
EGL Slope
= 0.19 %
Critical Depth
= 9.5112 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.42 ft /s
Velocity Upstream
= 2.42 ft /s
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
•Calculated Junction Loss
-
-- - INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
•
= 4.48 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft "2
= NA
= 0.114 ft
= CB 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* 96
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.0000 in
= 0.0000 in
0.0000 ft
= 0.0000 ft
= 0.00 ft /s
_ * 96
_ * %
* 96
0.00
I
I
U
�w ir
I w Q�
I w
co , 16L
II
7
I
w 4
m I
I I
` I I
I
PIPE 1
PIPE 13-
PIPE 1
PIPE 2
AR_ DENIAS _
— - PIPE 18
PIPE 3
Qom/ OQ 0
r' I
Lul
I � Z
I
Q'
PIPE 17 I
I
I. PIPE 7
PIPE 11
PIPE 9 PIPE 10
-PIPE 20 PIPE - -
PIPE 15
DRIVE
PIPE 4 PIPE 8
PIPE 21 PIPE 5
-PIPE 19 PIPE 16
I
I
I
I
I
I
I
I
I
I
I
I
I.
I
I
I
I
PIPE 12
LINE 233
STORM DRAIN
INDEX MAP
ors
MSA Coxsui.�rn�o, INr-
MAurmso. Smrm a Assoc T&% lNc_
• s- Awmmm ■ Cim m�nvo ■ Lo" Mmvemm
34200 B® Hoes Due m H�o ;� m G 92Y70
r� 'luwsmm 320M w FAx 3Zi7M
LINE 233
User
Name: mpompa
Date: 10 -04 -05
Project: 1721
STORM DRAIN
ALIGN AND ANNO
Time: 10:09:35
�etwork: 04 -
LINE 233
Page: 1
Storm Sewers Summary
Report
-----------------------------------------------
Pipe
Name
Total Flow Pipe Dim
HGL
Down
HGL Up
Invert Down
Invert Up
Downstream
cfs
in
ft
ft
ft
ft
Junction
Pipe
1
67.10
42.00
461.80
462.02
453.00
454.17
Outfall
Pipe
2
67.10
42.00
462.51*
463.18*
454.17
457.63
BEND 1
Pipe
3
37.56
36.00
463.48*
464.38*
458.13
461.07
MH 1
Pipe
18
37.56
30.00
464.43*
464.88*
461.65
461.90
MH 2
Pipe
19
29.13
30.00
465.38*
465.51*
461.90
462.02
WYE 3
Pipe
4
20.69
24.00
465.55*
468.06*
462.52
463.54
WYE 4
Pipe
5
20.96
24.00
468.09*
468.32*
463.62
463.84
MH 3
Pipe
6
14.30
24.00
468.77*
468.87*
463.84
464.04
WYE 1
Pipe
7
7.90
18.00
468.96*
470.34*
464.54
466.57
WYE 2
Pipe
8
7.90
18.00
470.36*
472.06*
466.65
468.07
MH 4
Pipe
9
7.90
18.00
472.07*
472.55*
468.15
468.53
MH 5
Pipe
10
7.90
18.00
472.57*
473.53*
468.53
469.31
BEND 2
Pipe
11
7.90
18.00
473.55*
473.62*
469.31
469.35
BEND 3
Pipe
12
7.90
18.00
473.77*
474.85*
469.43
472.94
MH 6
Pipe
13
29.86
24.00
463.48*
463.62*
459.13
460.33
MH 1
Pipe
14
14.93
24.00
464.47*
465.21*
460.39
460.95
CB 2
Pipe
15
6.40
18.00
468.77*
468.98*
464.09
465.22
WYE 1
Pipe
16
6.40
18.00
468.96*
469.04*
464.29
464.58
WYE 2
Pipe
17
0.00
18.00
469.43
470.39
469.43
470.39
MH 6
Pipe
20
8.43
18.00
465.38*
465.84*
462.40
462.96
WYE 3
Pipe
21
8.43
18.00
465.55*
465.78*
462.52
463.01
WYE 4
•
C]
Storm Sewers
Detail Report
------------------------------------------------------------
PIPE DESCRIPTION: Pipe 1.
- - -- RAINFALL INFORMATION--- -
eturn Period
= 100 Year
ainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 1
Downstream Pipe
= Outfall
Pipe Material
= HDPE
Pipe Length
= 50.5383 ft
Plan Length
= 50.5247 ft
Pipe Type
= Circular
Pipe Dimensions
= 42.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 153.01 cfs
Invert Elevation Downstream
= 453.00 ft
Invert Elevation Upstream
= 454.17 ft
Invert Slope
= 2.32%
Invert Slope (Plan Length)
= 2.32W
Rim Elevation Downstream
= 460.00 ft
Rim Elevation Upstream
= 462.74 ft
Natural Ground Slope
= 5.428
Crown Elevation Downstream
= 456.50 ft
Crown Elevation Upstream
= 457.67 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 67.10 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 6.01 min
otal Intensity
= 9.82 in /hr
otal Rational Flow
= 0.00 cfs
Total Flow
= 67.10 cfs
Uniform Capacity
= 153.01 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 461.80 ft
HGL Elevation Upstream
= 462.02 ft
HGL Slope
= 0.44 %
EGL Elevation Downstream
= 462.56 ft
EGL Elevation Upstream
= 462.78 ft
EGL Slope
= 0.44 %
Critical Depth
= 30.8196 in
Depth Downstream
= 42.0000 in
Depth Upstream
= 42.0000 in
Velocity Downstream
= 6.97 ft /s
Velocity Upstream
= 6.97 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 15.39 ft /s
Area Downstream
= 9.62 ft "2
Area Upstream
= 9.62 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.490 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
utter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow = 0.00 cfs
Pavement Flow = 0.00 cfs
Gutter Flow = 0.00 cfs
Depth at Curb = 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
avement Spread
= 0.0000 ft
otal Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 2
= 152.5244 ft
- - -- RAINFALL INFORMATION--- -
= Circular
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= NA
atchment Area
4kun-
Current Pipe
= Pipe 2
= 0.000
Downstream Pipe
= Pipe 1
Inlet Intensity
Pipe Material
= HDPE
= 0.00 cfs
Pipe Length
= 150.2342 ft
Plan Length
= 152.5244 ft
Pipe Type
= Circular
Pipe Dimensions
= 42.00
in
Pipe.Manning's "n"
= 0.013
= 9.97 in /hr
Pipe Capacity at Invert Slope
= 152.62
cfs
Invert Elevation Downstream
= 454.17
ft
Invert Elevation Upstream
= 457.63
ft
Invert Slope
= 2.30%
Invert Slope (Plan Length)
= 2.27%
Rim Elevation Downstream
= 462.74
ft
Rim Elevation Upstream
= 467.20
ft
Natural Ground Slope
= 2.97%
Crown Elevation Downstream
= 457.67
ft
Crown Elevation Upstream
= 461.13
ft
-F LOW INFORMATION--- -
= NA
atchment Area
4kun-
= 0.00 ac
off Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 67.10 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 5.64 min
Total Intensity
= 9.97 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 67.10 cfs
Uniform Capacity
= 152.62 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= NA
HGL Elevation Downstream
= 462.51 ft
HGL Elevation Upstream
= 463.18 ft
HGL Slope
= 0.44 %
EGL Elevation Downstream
= 463.27 ft
EGL Elevation Upstream
= 463.94 ft
EGL Slope
= 0.44 %
Critical Depth
= 30.8196 in
Depth Downstream
= 42.0000 in
Depth Upstream
= 42.0000 in
Velocity Downstream
= 6.97 ft /s
Velocity Upstream
= 6.97 ft /s
Uniform Velocity Downstream
= 15.36 ft /s
Uniform Velocity Upstream
= 15.36 ft /s
Area Downstream
= 9.62 ft "2
Area Upstream
= 9.62 ft"2
= NA
c(JLC)
alculated Junction Loss
= 0.300 ft
- -- - INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Efficiency
= * %
"ntercept
low from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00 W
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 284.3294 ft
Plan Length
= 284.3294 ft
Pipe Type
= Circular
Pipe Dimensions
= 36.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 67.79 cfs
Invert Elevation Downstream
= 458.13 ft
nvert Elevation Upstream
= 461.07 ft
invert Slope'
= 1.05%
Invert Slope (Plan Length)
= 1.03%
Rim Elevation Downstream
= 467.20 ft
Rim Elevation Upstream
= 468.04 ft
Natural Ground Slope
= 0.298
Crown Elevation Downstream
= 461.13 ft
Crown Elevation Upstream
= 464.07 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 37.56 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 4.75 min
Total Intensity
= 10.35 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 37.56 cfs
Uniform Capacity
= 67.79 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 463.48 ft
HGL Elevation Upstream
= 464.38 ft
HGL Slope
= 0.32 %
EGL Elevation Downstream
= 463.92 ft
EGL Elevation Upstream
= 464.82 ft
EGL Slope
= 0.32 8
ri
ritical Depth
= 23.9328 in
Depth Downstream
= 36.0000 in
Depth Upstream
= 36.0000 in
Velocity Downstream
= 5.31 ft /s
Velocity Upstream
= 5.31 ft /s
Uniform velocity Downstream
= 9.84 ft /s
Uniform Velocity Upstream
= 9.84 ft /s
Area Downstream
= 7.07 ft "2
Area Upstream
= 7.07 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.045 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = MH 1
nlet Description
= <None>
nlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
=•* %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 18
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
PIPE INFORMATION--- -
lburrent Pipe
= Pipe 18
ownstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 53.6256 ft
Plan Length
= 55.6265 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 27.99 cfs
Invert Elevation Downstream
= 461.65 ft
Invert Elevation Upstream
= 461.90 ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.45%
Rim Elevation Downstream
= 468.04 ft
Rim Elevation Upstream
= 468.33 ft
Natural Ground Slope
= 0.54%
Crown Elevation Downstream
= 464.15 ft
Crown Elevation Upstream
= 464.40 ft
- -- -FLOW INFORMATION--- -
= 27.99 cfs
kipped flow
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
= 0.00
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 37.56
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
ft
Total Time of Concentration
= 4.63
min
Total Intensity
= 10.41
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 37.56
cfs
Uniform Capacity
= 27.99 cfs
kipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC
INFORMATION--- -
HGL Elevation
Downstream
= 464.43
ft
HGL Elevation
Upstream
= 464.88
ft
HGL Slope
= 0.84
%
EGL Elevation
Downstream
= 465.34
ft
EGL Elevation
Upstream
= 465.79
ft
EGL Slope = 0.84 W
Critical Depth = 24.8850 in
Depth Downstream = 30.0000 in
Depth Upstream = 30.0000 in
Velocity Downstream = 7.65 ft /s
elocity Upstream = 7.65 ft /s
niform Velocity Downstream = 7.65 ft /s
Uniform Velocity Upstream = 7.65 ft /s
Area Downstream = 4.91 ft "2
Area Upstream = 4.91 ft^2
Kj (JLC) = NA
Calculated Junction Loss = 0.499 ft
- -- -INLET INFORMATION--- -
= * %
Downstream Inlet
= MH 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
_ * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
rate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 19
= 25.6411 ft
- - -- RAINFALL INFORMATION--- -
= 25.6409 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Intensity
Current Pipe
= Pipe 19
Downstream Pipe
= Pipe 18
Pipe Material
= HDPE
Pipe Length
= 25.6411 ft
Plan Length
= 25.6409 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 28.05 cfs
Invert Elevation Downstream
= 461.90 ft
Invert Elevation Upstream
= 462.02 ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 468.33 ft
Rim Elevation Upstream
= 468.46 ft
Natural Ground Slope
= 0.52%
Crown Elevation Downstream
= 464.40 ft
Crown Elevation Upstream
= 464.52 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Intensity
= 0.00
in /hr
*islet
nlet
Rational Flow
= 0.00
cfs
Inlet
Input Flow
= 29.13
cfs
Inlet
Hydrograph Flow
= 0.00
cfs
Total
Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total
Time of Concentration
= 4.56
min
Total
Intensity
= 10.44
in /hr
Total
Rational Flow
= 0.00
cfs
Total
Flow
= 29.13
cfs
Uniform Capacity = 28.05 cfs
Skipped flow _ = 0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION - - --
GL Elevation Downstream
= 465.38 ft
GL Elevation Upstream
= 465.51 ft
HGL Slope
= 0.50 %
EGL Elevation Downstream
= 465.93 ft
EGL Elevation Upstream
= 466.06 ft
EGL Slope
= 0.50 %
Critical Depth
= 22.0860 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 5.93 ft /s
Velocity Upstream
= 5.93 ft /s
Uniform Velocity Downstream
= 5.93 ft /s
Uniform Velocity Upstream
= 5.93 ft /s
Area Downstream
= 4.91 ft "2
Area Upstream
= 4.91 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.040 ft
- -- -INLET INFORMATION--- -
= 0.00 cfs
Downstream Inlet
= WYE 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
low Intercepted by Current Inlet
= 0.00 cfs
ypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4
Downstream Pipe
= Pipe 19
Pipe Material
= HDPE
Pipe Length
= 300.0000 ft
Plan Length
= 300.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 13.19 cfs
Invert Elevation Downstream
= 462.52 ft
Invert Elevation Upstream
= 463.54 ft
Invert Slope
= 0.34%
Invert Slope (Plan Length)
= 0.34%
lm Elevation Downstream = 468.46 ft
im Elevation Upstream = 469.59 ft
Natural Ground Slope = 0.38%
Crown Elevation Downstream = 464.52 ft
Crown Elevation Upstream = 465.54 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Inlet
Intensity
= 0.00
in /hr
Inlet
Rational Flow
= 0.00
cfs
Inlet
Input Flow
= 20.69
cfs
Inlet
Hydrograph Flow
= 0.00
cfs
Total
Area
= 0.00
ac
Coefficient
= 0.000
"eighted
otal Time of Concentration
= 3.80 min
Total Intensity
= 10.80 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.69 cfs
Uniform Capacity
= 13.19 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 465.55 ft
HGL Elevation Upstream
= 468.06 ft
HGL Slope
= 1.16 %
EGL Elevation Downstream
= 466.22 ft
EGL Elevation Upstream
= 468.73 ft
EGL Slope
= 1.16 %
Critical Depth
= 19.5768 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 6.59 ft /s
Velocity Upstream
= 6.59 ft /s
Uniform Velocity Downstream
= 6.59 ft /s
Uniform Velocity Upstream
= 6.59 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.034 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = WYE 4
Inlet Description = <None>
Inlet Type = Undefined
Computation Case = Sag
Longitudinal Slope
= 0.00 ft /ft
annings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 5
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 5
Downstream Pipe = Pipe 4
Pipe Material = HDPE
Pipe
Pipe Length
= 26.3772 ft
Length
= 28.3806 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 20.65 cfs
Invert Elevation Downstream
= 463.62 ft
Invert Elevation Upstream
= 463.84 ft
Invert Slope
= 0.83%
Invert Slope (Plan Length)
= 0.78%
Rim Elevation Downstream
= 469.59 ft
Rim Elevation Upstream
= 469.73 ft
Natural Ground Slope
= 0.55%
Crown Elevation Downstream
= 465.62 ft
Crown Elevation Upstream
= 465.84 ft
0 -- -FLOW INFORMATION--- -
= 469.01 ft
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 20.96 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.73 min
Total Intensity
= 10.83 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 20.96 cfs
Uniform Capacity
= 20.65 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 468.09 ft
HGL Elevation Upstream
= 468.32 ft
HGL Slope
= 0.86 %
EGL Elevation Downstream
= 468.79 ft
EGL Elevation Upstream
= 469.01 ft
EGL Slope
= 0.86 %
Critical Depth
= 19.6896 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 6.67 ft /s
Velocity Upstream
= 6.67 ft /s
Uniform Velocity Downstream
= 6.67 ft /s
Uniform Velocity Upstream
= 6.67 ft /s
Area Downstream = 3.14 ft "2
rea Upstream = 3.14 ft'2
K] (JLC) = NA
Calculated Junction Loss = 0.450 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= 96
Grate Efficiency
=
Slot Efficiency
=
Total Efficiency
= 0.00 %
�IPE DESCRIPTION: Pipe 6
- - -- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 6
Downstream Pipe = Pipe 5
Pipe Material = HDPE
Pipe Length
= 24.5009 ft
Plan Length
= 24.5001 ft -.
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Capacity at Invert Slope
= 20.43 cfs
�Pipe
nvert Elevation Downstream
= 463.84 ft
Invert Elevation Upstream
= 464.04 ft
Invert Slope
= 0.82%
Invert Slope (Plan Length)
= 0.82%
Rim Elevation Downstream
= 469.73 ft
Rim Elevation Upstream
= 469.86 ft
Natural Ground Slope
= 0.51%
Crown Elevation Downstream
= 465.84 ft
Crown Elevation Upstream
= 466.04 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 14.30 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.64 min
Total Intensity
= 10.88 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 14.30 cfs
Uniform Capacity
= 20.43 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 468.77 ft
HGL Elevation Upstream
= 468.87 ft
HGL Slope
= 0.40 %
EGL Elevation Downstream
= 469.09 ft
*GL Elevation Upstream
= 469.19 ft
EGL Slope
= 0.40 %
Critical Depth
= 16.3512 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.55 ft /s
Velocity Upstream
= 4.55 ft /s
Uniform Velocity Downstream
= 7.04 ft /s
Uniform Velocity Upstream
= 7.04 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.089 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
_ * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
epth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %
Slot Efficiency
= %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 7 - --
---- RAINFALL INFORMATION--- -
Return Period
Rainfall File
ec-- - -PIPE INFORMATION--- -
urrent Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Oniform otal Flow
Capacity
Skipped flaw
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
utter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
= 100 Year
= Tutorial
= Pipe 7
= Pipe 6
= HDPE
= 245.1278 ft
= 247.1194 ft
= Circular
= 18.00 in
= 0.013
= 9.56 cfs
= 464.54 ft
= 466.57 ft
= 0.83%
= 0.82%
= 469.86 ft
= 471.13 ft
= 0.52%
= 466.04 ft
= 468.07 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 7.90 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 2.72 min
= 11.36 in /hr
= 0.00 cfs
= 7.90 cfs
= 9.56 cfs
= 0.00 cfs
0.00 gpd
= 468.96 ft
= 470.34 ft
= 0.57 %
= 469.27 ft
= 470.65 ft
= 0.57 %
= 13.0698 in
= 18.0000 in
= 18.0000 in
= 4.47 ft /s
= 4.47 ft /s
= 6.04 ft /s
= 6.04 ft /s
= 1.77 ft "2
= 1.77 ft "2
= NA
= 0.015 ft
= WYE 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
_ * %
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
Gutter Flow = 0.00 cfs
Depth at Curb = 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
Pavement Spread = 0.0000 ft
Total Spread. = 0.0000 ft
Velocity
= 0.00 ft /s
�utter
urb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 8
= 300.0000 ft
- - -- RAINFALL INFORMATION--- -
= Circular
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.000
Current Pipe
= Pipe 8
Downstream Pipe
= Pipe 7
Pipe Material
= HDPE
Pipe'Length
= 300.0000 ft
Plan Length
= 300.0000 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.22 cfs
Invert Elevation Downstream
= 466.65 ft
Invert Elevation Upstream
= 468.07 ft
Invert Slope
= 0.48%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 471.13 ft
Rim Elevation Upstream
= 472.67 ft
Natural Ground Slope
= 0.51%
Crown Elevation Downstream
= 468.15 ft
Crown Elevation Upstream
= 469.57 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
unoff Coefficient
= 0.000
HGL Elevation Downstream
nlet Time
= 0.00
min
nlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 7.90
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 4.47 ft /s
Total Time of Concentration
= 1.60
min
Total Intensity
= 12.01
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 7.90
cfs
Uniform Capacity
= 7.22
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 470.36 ft
HGL Elevation Upstream
= 472.06 ft
HGL Slope
= 0.57 %
EGL Elevation Downstream
= 470.67 ft
EGL Elevation Upstream
= 472.37 ft
EGL Slope
= 0.57 %
Critical Depth
= 13.0698 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.47 ft /s
Velocity Upstream
= 4.47 ft /s
Uniform Velocity Downstream
= 4.47 ft /s
Uniform Velocity Upstream
= 4.47 ft /s
Area Downstream
= 1.77 ft"2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.015 ft
•_ -- -INLET INFORMATION--- -
Downstream Inlet = MH 4
Inlet Description = <None>
Inlet Type = Undefined
Computation Case = Sag
Longitudinal Slope = 0.00 ft /ft
Mannings n -value = 0.000
Pavement Cross -Slope = 0.00 ft /ft
Gutter Cross -Slope = 0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter Width = 0.0000 ft
Ponding Width = 0.0000 ft
Intercept Efficiency = * %
Flow from Catchment = 0.00 cfs
from previous inlet
= 0.00 cfs
"arryover
otal Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 9,
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 9
= 1.28
- - -- RAINFALL INFORMATION--- -
Total Intensity
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.45%
Current Pipe
= Pipe 9
Downstream Pipe
= Pipe 8
Pipe Material
= HDPE
Pipe Length
= 84.5585 ft
Plan Length
= 86.5652 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.04 cfs
Invert Elevation Downstream
= 468.15 ft
Invert Elevation Upstream
= 468.53 ft
Invert Slope
= 0.45%
INFORMATION--- -
nvert Slope (Plan Length)
= 0.44%
ac
im Elevation Downstream
= 472.67
ft
Rim Elevation Upstream
= 473.12
ft
Natural Ground Slope
= 0.53%
in /hr
Crown Elevation Downstream
= 469.65
ft
Crown Elevation Upstream
= 470.03
ft
- -- -FLOW INFORMATION--- -
HYDRAULIC
INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
= 472.07
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 7.90
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
ft
Total Time of Concentration
= 1.28
min
Total Intensity
= 12.22
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 7.90
cfs
Uniform Capacity
= 7.04
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - --
HYDRAULIC
INFORMATION--- -
= 18.0000
in
HGL
Elevation
Downstream
= 472.07
ft
HGL
Elevation
Upstream
= 472.55
ft
HGL
Slope
Area Downstream
= 0.57 %
ft "2
EGL
Elevation
Downstream
= 472.38
ft
EGL
Elevation
Upstream
= 472.86
ft
EGL
Slope
= 0.57 $
Critical Depth
= 13.0698
in
epth Downstream
= 18.0000 in
epth Upstream
l
= 18.0000
in
Velocity Downstream
= 4.47
ft /s
Velocity Upstream
= 4.47
ft /s
Uniform velocity Downstream
= 4.47
ft /s
Uniform Velocity Upstream
= 4.47
ft /s
Area Downstream
= 1.77
ft "2
Area Upstream
= 1.77
ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.014
ft
- -- -INLET INFORMATION--- -
Downstream Inlet = MH 5
Inlet Description = <None>
Inlet Type = Undefined
Case
= Sag
computation
ongitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept Efficiency
= * 9d
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 'k
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 10
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 10
ownstream Pipe
= Pipe 9
ipe Material
= HDPE
Pipe Length
= 170.8656 ft
Plan Length
= 170.8638 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.09 cfs
Invert Elevation Downstream
= 468.53 ft
Invert Elevation Upstream
= 469.31 ft
Invert Slope
= 0.46%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 473.12 ft
Rim Elevation Upstream
= 474.50 ft
Natural Ground Slope
= 0.81%
Crown Elevation Downstream
= 470.03 ft
Crown Elevation Upstream
= 470.81 ft
- -- -FLOW INFORMATION--- -
= 0.00 gpd
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
= 472.57 ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 7.90
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.64
min
Total Intensity
= 12.65
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 7.90
cfs
Uniform Capacity
= 7.09
cfs
Skipped flow
= 0.00
cfs
•infiltration
= 0.00 gpd
- - -- HYDRAULIC
INFORMATION--- -
HGL Elevation
Downstream
= 472.57 ft
HGL Elevation
Upstream
= 473.53 ft
HGL Slope
= 0.57 %
EGL Elevation
Downstream
= 472.88 ft
EGL Elevation
Upstream
= 473.84 ft
EGL Slope
= 0.57 %
Critical Depth
= 13.0698 in
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Snifo'm Velocity Upstream
rea Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Dotal Efficiency
PIPE DESCRIPTION: Pipe 11
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
nlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
= 18.0000 in
= 18.0000 in
= 4.47 ft /s
= 4.47 ft /s
= 4.47 ft /s
= 4.47 ft /s
= 1.77 ft°2
= 1.77 ft'2
= NA
= 0.014 ft
= BEND 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
_ * %
0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
_ * %
0.00 %
= 100 Year
= Tutorial
= Pipe 11
= Pipe 10
= HDPE
= 12.5201 ft
= 12.5201 ft
= Circular
= 18.00 in
= 0.013
= 5.93 cfs
= 469.31 ft
= 469.35 ft
= 0.37%
= 0.32%
= 474.50 ft
= 475.20 ft
= 5.59%
= 470.81 ft
= 470.85 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 7.90 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.59 min
= 12.68 in /hr
= 0.00 cfs
= 7.90 cfs
= 5.93 cfs
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= BEND 3
HGL Elevation Downstream
= 473.55 ft
HGL Elevation Upstream
= 473.62 ft
Slope
= 0.71 %
"GL
GL Elevation Downstream
= 473.86 ft
EGL Elevation Upstream
= 473.93 ft
EGL Slope
= 0.71 %
Critical Depth
= 13.0698 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.47 ft /s
Velocity Upstream
= 4.47 ft /s
Uniform Velocity Downstream
= 4.47 ft /s
Uniform Velocity Upstream
= 4.47 ft /s
Area Downstream
= 1.77 ft°2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.155 ft
- -- -INLET INFORMATION--- -
= 0.00 cfs
Downstream Inlet
= BEND 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
avement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 12
= 2.26%
- - -- RAINFALL INFORMATION--- -
= 2.21%
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 1.76%
Current Pipe
= Pipe 12
Downstream Pipe
= Pipe 11
Pipe Material
= HDPE
Pipe Length
= 155.6862 ft
Plan Length
= 159.1471 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 15.77 cfs
Invert Elevation Downstream
= 469.43 ft
Invert Elevation Upstream
= 472.94 ft
Invert Slope
= 2.26%
Invert Slope (Plan Length)
= 2.21%
Rim Elevation Downstream
= 475.20 ft
Rim Elevation Upstream
= 477.94 ft
Ground Slope
= 1.76%
Natural
rown Elevation Downstream
= 470.93 ft
Crown Elevation Upstream
= 474.44 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow = 7.90 cfs
Inlet Hydrograph Flow = 0.00 cfs
Total Area = 0.00 ac
Weighted Coefficient = 0.000
Total Time of Concentration = 0.00 min
Intensity
= 0.00
in /hr
VFotal
otal Rational Flow
= 0.00
cfs
Total Flow
= 7.90
cfs
Uniform Capacity
= 15.77
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 473.77 ft
HGL Elevation Upstream
= 474.85 ft
HGL Slope
= 0.69 %
EGL Elevation Downstream
= 474.08 ft
EGL Elevation Upstream
= 475.16 ft
.EGL Slope
= 0.69 %
Critical Depth
= 13.0698 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.47 ft /s
Velocity Upstream
= 4.47 ft /s
Uniform Velocity Downstream
= 8.93 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.642 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 6
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
utter Cross -Slope
= 0.00 ft /ft
utter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint.
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 13
Downstream Pipe = Pipe 2
Pipe Material = HDPE
Pipe Length = 7.7944 ft
Plan Length = 12.0213 ft
Pipe Type = Circular
ipe Dimensions = 24.00 in
Pipe Manning's "n" = 0.013
Pipe Capacity at Invert Slope = 88.73 cfs
Invert Elevation Downstream = 459.13 ft
Invert Elevation Upstream = 460.33 ft
Invert Slope = 15.58*
Invert Slope (Plan Length) = 9.98%
Rim Elevation Downstream = 467.20 ft
Rim Elevation Upstream = 466.92 ft
Natural Ground Slope = -3.59%
Crown Elevation Downstream =,461.13 ft
Crown Elevation Upstream = 462.33 ft
- -- -FLOW INFORMATION - - --
Area
= 0.00 ac
"atchment
unoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 29.86 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.22 min
Total Intensity
= 12.95 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 29.86 cfs
Uniform Capacity
= 88.73 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 cfs
HGL Elevation Downstream
= 463.48 ft
HGL Elevation Upstream
= 463.62 ft
HGL Slope
= 1.76 W
EGL Elevation Downstream
= 464.89 ft
EGL Elevation Upstream
= 465.02 ft
EGL Slope
= 1.76 W
Critical Depth
= 22.3272 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 9.51 ft /s
Velocity Upstream
= 9.51 ft /s
Uniform Velocity Downstream
= 26.29 ft /s
Uniform Velocity Upstream
= 25.48 ft /s
Area Downstream
= 3.14 ft^2
Area Upstream
= 3.14 ft^2
Kj (JLC) = NA
Awalculated Junction Loss = 0.850 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 14
RAINFALL INFORMATION--- -
eturn Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 14
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
Pipe Length
= 59.5948 ft
Plan Length
= 62.6135 ft
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
4jnMt Elevation Upstream
nt Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Gritical Depth
epth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
avement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 15
= Circular
- 24.00 in
= 0.013
= 21.92 cfs
= 460.39 ft
= 460.95 ft
= 0.94%
= 0.89%
= 466.92 ft
= 467.20 ft
= 0.47%
= 462.39 ft
= 462.95 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 14.93 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 14.93 cfs
= 21.92 cfs
= 0.00 cfs
= 0.00 gpd
= 464.47 ft
= 465.21 ft
= 1.25 %
= 464.82 ft
= 465.57 ft
= 1.25 %
= 16.7160 in
= 24.0000 in
= 24.0000 in
= 4.75 ft /s
= 4.75 ft /s
= 7.51 ft /s
= 0.00 ft /s
= 3.14 ft"2
= 3.14 ft "2
= NA
= 1.386 ft
= CB 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
= 0.00 %
- - -- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION - - --
urrent Pipe
= Pipe 15
ownstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 43.1483 ft
Plan Length
= 44.6335 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 16.99 cfs
Invert Elevation Downstream
= 464.09 ft
Invert Elevation Upstream
= 465.22 ft
Invert Slope
= 2.62%
Invert Slope (Plan Length)
= 2.5396
Rim Elevation Downstream
= 469.73 ft
Rim Elevation Upstream
= 470.22 ft
Natural Ground Slope
= 1.13%
Crown Elevation Downstream
= 465.59 ft
Crown Elevation Upstream
= 466.72 ft
- -- -FLOW INFORMATION--- -
= 0.0000
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 6.40
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 6.40
cfs
0 Uniform Capacity = 16.99 cfs
kipped flow = 0.00 cfs
nfiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000
HGL Elevation Downstream
= 468.77 ft
HGL Elevation Upstream
= 468.98 ft
HGL Slope
= 0.49 %
EGL Elevation Downstream
= 468.97 ft
EGL Elevation Upstream
= 469.19 ft
EGL Slope
= 0.49 %
Critical Depth
= 11.7378 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.62 ft /s
Velocity Upstream
= 3.62 ft /s
Uniform Velocity Downstream
= 10.93 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.254 ft
- -- -INLET INFORMATION--- -
= 0.0000
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Width
= 0.0000
ft
*onding
ntercept Efficiency
= *
96
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00
cfs
Pavement Flow
= 0.00
cfs
Gutter Flow
= 0.00
cfs
Depth at Curb
= 0.0000
in
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
rate Efficiency
allot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
nlet Rational Flow
nlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION - - --
Downstream Inlet
nlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* %
0.00 %
= 100 Year
= Tutorial
= Pipe 16
= Pipe 6
= HDPE
= 7.7836 ft
= 9.2782 ft
= Circular
= 18.00 in
= 0.013
= 20.27 cfs
= 464.29 ft
= 464.58 ft
= 3.73%
= 3.13%
= 469.86 ft
= 470.22 ft'
= 4.64%
= 465.79 ft
= 466.08 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 6.40 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 6.40 cfs
= 20.27 cfs
= 0.00 cfs
= 0.00 gpd
= 468.96 ft
= 469.04 ft
= 1.03 %
= 469.16 ft
= 469.24 ft
= 1.03 %
= 11.7378 in
= 18.0000 in
= 18.0000 in
= 3.62 ft /s
= 3.62 ft /s
= 10.76 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft"2
= NA
= 0.250 ft
= WYE 2
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
Ponding Width = 0.0000 ft
Intercept Efficiency = " % -
Flow from Catchment = 0.00 cfs
Carryover from previous inlet = 0.00 cfs
Total Flow to Current Inlet = 0.00 cfs
low Intercepted by Current Inlet
= 0.00 cfs
ypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= ' %
Grate Efficiency
= ' 96
Slot Efficiency
= " %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 17
Pipe Capacity at Invert Slope
- - -- RAINFALL INFORMATION--- -
in
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
Current Pipe
= Pipe 17
ac
Downstream Pipe
= Pipe 11
ft
Pipe Material
= HDPE
min
Pipe Length
= 38.7909
ft
Plan Length
= 41.7016
ft
Pipe Type
= Circular
cfs
Pipe Dimensions
= 18.00 in
cfs
Pipe Manning's "n"
= 0.013
ac
Pipe Capacity at Invert Slope
= 16.52 cfs
in
Invert Elevation Downstream
= 469.43
ft
Invert Elevation Upstream
= 470.39
ft
Invert Slope
= 2.48%
cfs
Invert Slope (Plan Length)
= 2.30%
cfs
Rim Elevation Downstream
= 475.20
ft
im Elevation Upstream
= 474.50
ft
atural Ground Slope
= -1.80%
gpd
Crown Elevation Downstream
= 470.93
ft
Crown Elevation Upstream
= 471.89
ft
- -- -FLOW INFORMATION--- -
= 0.00
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 0.00
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
in
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 0.00
cfs
Uniform Capacity
= 16.52
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00
HGL Elevation Downstream
= 469.43
ft
HGL Elevation Upstream
= 470.39
ft
HGL Slope
= 2.48 %
ft /s
EGL Elevation Downstream
= 469.43
ft
EGL Elevation Upstream
= 470.39
ft
EGL Slope
= 2.48 %
Area Upstream
Critical Depth
= 0.0018
in
Depth Downstream
= 0.0000
in
Depth Upstream
= 0.0000
in
elocity Downstream
= 0.00
ft /s
elocity Upstream
0
= 0.00
ft /s
Uniform Velocity Downstream
= 9.25
ft /s
Uniform Velocity Upstream
= 0.00
ft /s
Area Downstream
= 0.00
ft "2
Area Upstream
= 0.00
ft'2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.500
ft
- -- -INLET INFORMATION - - --
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
annings n -value
qwavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 20
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
- -- -PIPE INFORMATION--- -
Current Pipe
Downstream Pipe
Pipe Material
Pipe Length
Slan Length
ipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
Uniform Capacity
Skipped flow `
Infiltration
HYDRAULIC INFORMATION--- -
,GL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
EGL Slope
Critical Depth
Depth Downstream
Depth Upstream
= MH 6
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.0000 in
= 0.0000 in
0.0000 ft
0.0000 ft
= 0.00 ft /s
* %
* %
* %
= 0.00 $
= 100 Year
= Tutorial
= Pipe 20
= Pipe 18
= HDPE
= 43.7567 ft
= 45.2532 ft
= Circular
= 18.00 in
= 0.013
= 11.88 cfs
= 462.40 ft
= 462.96 ft
= 1.28%
= 1.24%
= 468.33 ft
= 468.82 ft
1.13%
463.90 ft
= 464.46 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.43 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 8.43 cfs
= 11.88 cfs
= 0.00 cfs
= 0.00 gpd
= 465.38 ft
= 465.84 ft
= 1.05 %
= 465.73 ft
= 466.19 ft
= 1.05 %
= 13.4982 in
= 18.0000 in
= 18.0000 in
Velocity Downstream = 4.77 ft /s
Velocity Upstream = 4.77 ft /s
Uniform Velocity Downstream = 5.93 ft /s
Uniform Velocity Upstream = 0.00 ft /s
Area Downstream = 1.77 ft "2
rea Upstream = 1.77 ft^2
jWj (JLC) = NA
Calculated Junction Loss = 0.500 ft
- -- -INLET INFORMATION--- -
= 0.00
Downstream Inlet
= WYE 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00
&IPE DESCRIPTION: Pipe 21
-- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
Current Pipe
= Pipe 21
Downstream Pipe
= Pipe 19
Pipe Material
= HDPE
Pipe Length
= 7.7667 ft
Plan Length
= 9.2512 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 26.37 cfs
Invert Elevation Downstream
= 462.52 ft
Invert Elevation Upstream
= 463.01 ft
Invert Slope
= 6.32%
Invert Slope (Plan Length)
= 5.30%
Rim Elevation Downstream
= 468.46 ft
Rim Elevation Upstream
= 468.82 ft
Natural Ground Slope
= 4.63%
Crown Elevation Downstream
= 464.02 ft
Crown Elevation Upstream
= 464.51 ft
- -- -FLOW INFORMATION--- -
= 0.00
ac
eighted Coefficient
Catchment Area
= 0.00
Total Time of Concentration
ac
Runoff Coefficient
= 0.500
= 0.00
in /hr
Inlet Time
= 0.00
cfs
min
Inlet Intensity
= 0.00
Uniform Capacity
in /hr
Inlet Rational Flow
= 0.00
= 0.00
cfs
Inlet Input Flow
= 8.43
gpd
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
eighted Coefficient
= 0.500
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 8.43
cfs
Uniform Capacity
= 26.37
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
GL Elevation Upstream
qw GL Slope
Critical Depth
Depth Downstream
Depth Upstream
Velocity Downstream
Velocity Upstream
Uniform Velocity Downstream
Uniform Velocity Upstream
Area Downstream
Area Upstream
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
Inlet Description
Inlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Oepth at Curb
epth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
•
= 465.55 ft
= 465.78 ft
= 2.93 %
= 465.90 ft
= 466.13 ft
= 2.93 %
= 13.4982 in
= 18.0000 in
= 18.0000 in
= 4.77 ft /s
= 4.77 ft /s
= 6.59 ft /s
= 0.00 ft /s
= 1.77 ft "2
= 1.77 ft "2
= NA
= 0.500 ft
= WYE 4
_ <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.00 cfs
= 0.0000 in
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
= 0.00 ft /s
* 96
* %
* 96
0.00
LINE 181
User
Name: mpompa
Downstream
ft
ft
Junction
Project: 1721
STORM DRAIN
ALIGN AND ANNO
467.17
467.28
BEND 1
�etwork: 06 -
LINE 181
MH 1
467.66
468.15
WYE 1
468.24
469.03
MH 2
Storm Sewers Summary
Report
WYE 1
-------------------------------
Pipe
Name
Total Flow Pipe Dim
HGL
Down
HGL Up
475.16
475.26
cfs
in
ft
MH 3
ft
Pipe
1
60.12
60.00
476.50
470.87
476.58
Pipe
2
60.12
60.00
476.63*
474.21
476.65*
Pipe
3
50.75
60.00
476.65*
BEND 2
476.68*
Pipe
4
43.66
60.00
476.72*
476.75*
Pipe
5
43.66
60.00
476.76*
476.81*
Pipe
15
7.09
18.00
476.72*
476.84*
Pipe
16
14.19
24.00
476.65*
476.87*
Pipe
19
7.09
24.00
477.14*
477.16
Pipe
17
7.09
24.00
477.17*
477.20
Pipe
6
43.66
60.00
476.81*
476.85*
Pipe
7
36.31
60.00
476.89*
476.89*
Pipe
8
36.31
60.00
476.90*
476.93*
Pipe
9
36.31
60.00
476.93*
476.96*
Pipe
10
9.08
30.00
476.99*
477.01*
Pipe
11
9.08
30.00
476.99*
477.01*
Pipe
12
10.18
18.00
476.89*
476.99*
Pipe
13
10.18
18.00
477.01*
477.15*
Pipe
14
10.18
18.00
477.33*
478.72*
Pipe
18
10.18
18.00
478.75*
480.29*
is
•
Date: 10 -04 -05
Time: 10:47:23
Page: 1
Invert Down
Invert Up
Downstream
ft
ft
Junction
466.60
467.17
Outfall
467.17
467.28
BEND 1
467.37
467.66
MH 1
467.66
468.15
WYE 1
468.24
469.03
MH 2
469.16
473.65
WYE 1
468.87
471.84
MH 1
471.97
475.16
CB 7
475.16
475.26
DEFL 1
469.12
469.81
MH 3
469.81
469.90
WYE 2
469.99
470.74
MH 4
470.87
471.50
MH 5
474.00
474.21
CB 1
474.00
474.21
CB 1
471.59
474.12
WYE 2
474.12
474.21
BEND 2
474.21
475.21
BEND 3
475.21
476.08
BEND 4
Storm Sewers Detail Report
-------------------------------------------------------
-------------------------------------------------------
PIPE DESCRIPTION: Pipe 1
- - -- RAINFALL INFORMATION--- -
eturn Period = 100 Year
ainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 0.00 ft /ft
Current Pipe
= Pipe 1
Downstream Pipe
= Outfall
Pipe Material
= HDPE
Pipe Length
= 151.8480 ft
Plan Length
= 151.8469 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 159.50 cfs
Invert Elevation Downstream
= 466.60 ft
Invert Elevation Upstream
= 467.17 ft
Invert Slope
= 0.38%
Invert Slope (Plan Length)
= 0.38%
Rim Elevation Downstream
= 475.10 ft
Rim Elevation Upstream
= 481.04 ft
Natural Ground Slope
= 3.91%
Crown Elevation Downstream
= 471.60 ft
Crown Elevation Upstream
= 472.17 ft
- -- -FLOW INFORMATION--- -
= 0.00 ft /ft
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 60.12 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 7.42 min
otal Intensity
= 9.30 in /hr
otal Rational Flow
= 0.00 cfs
Total Flow
= 60.12 cfs
Uniform Capacity
= 159.50 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 476.50 ft
HGL Elevation Upstream
= 476.58 ft
HGL Slope
= 0.05 %
EGL Elevation Downstream
= 476.65 ft
EGL Elevation Upstream
= 476.73 ft
EGL Slope
= 0.05 %-
Critical Depth
= 26.1792 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 3.06 ft /s
Velocity Upstream
= 3.06 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 7.55 ft /s
Area Downstream
= 19.63 ft"2
Area Upstream
= 19.63 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.051 ft
- -- -INLET INFORMATION--- -
= 0.00 ft /ft
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
utter Cross -Slope
= 0.00
ft /ft
Gutter Local Depression
= 0.0000
in
Gutter Width
= 0.0000
ft
Ponding Width
= 0.0000
ft
Intercept Efficiency
= +
%.
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow = 0.00 cfs
Pavement Flow =.0.00 cfs
Gutter Flow = 0.00 cfs
Depth at Curb = 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
Spread
= 0.0000 ft
"avement
otal Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= *
Slot Efficiency
= *
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 2
Plan Length
- - -- RAINFALL INFORMATION--- -
ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Oatchment Area
Current Pipe
= Pipe 2
= 0.000
Downstream Pipe
= Pipe 1
Inlet Intensity
Pipe Material
= HDPE
= 0.00 cfs
Pipe Length
= 26.5688
ft
Plan Length
= 28.8986
ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Total Intensity
Pipe Manning's "n"
= 0.013
= 0.00 cfs
Pipe Capacity at Invert Slope
= 167.51
cfs
Invert Elevation Downstream
= 467.17
ft
Invert Elevation Upstream
= 467.28
ft
Invert Slope
= 0.41%
Invert Slope (Plan Length)
= 0.38%
Rim Elevation Downstream
= 481.04
ft
Rim Elevation Upstream
= 480.83
ft
Natural Ground Slope
= -0.79%
Crown Elevation Downstream
= 472.17
ft
Crown Elevation Upstream
= 472.28
ft
FLOW INFORMATION--- -
Oatchment Area
= 0.00 ac
unoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 60.12 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 7.27 min
Total Intensity
= 9.35 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 60.12 cfs
Uniform Capacity
= 167.51 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 476.63 ft
HGL Elevation Upstream
= 476.65 ft
HGL Slope
= 0.05 W
EGL Elevation Downstream
= 476.78 ft
EGL Elevation Upstream
= 476.79 ft
EGL Slope
= 0.05 %
Critical Depth
= 26.1792 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 3.06 ft /s
Velocity Upstream
= 3.06 ft /s
Uniform Velocity Downstream
= 7.83 ft /s
Uniform Velocity Upstream
= 7.83 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
n] (JLC) = NA
alculated Junction Loss = 0.007 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope = 0.00 ft /ft
Gutter Cross -Slope = 0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter Width = 0.0000 ft
Ponding Width = 0.0000 ft
Efficiency
= * %
AMntercept
low from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
in /hr
- - -- RAINFALL INFORMATION--- -
= 0.00
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 175.42
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 63.8667 ft
Plan Length
= 66.1963 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 175.42 cfs
Invert Elevation Downstream
= 467.37 ft
nvert Elevation Upstream
= 467.66 ft
Invert Slope
= 0.45%
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 480.83 ft
Rim Elevation Upstream
= 480.52 ft
Natural Ground Slope
= -0.48%
Crown Elevation Downstream
= 472.37 ft
Crown Elevation Upstream
= 472.66 ft
- -- -FLOW INFORMATION--- -
HYDRAULIC
INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 50.75
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
ft
Total Time of Concentration
= 6.84
min
Total Intensity
= 9.51
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 50.75
cfs
Uniform Capacity
= 175.42
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - --
HYDRAULIC
INFORMATION--- -
ritical Depth
k
= 23.9652
in
HGL
Elevation
Downstream
= 476.65
= 60.0000
ft
HGL
Elevation
Upstream
= 476.68
= 2.58
ft
HGL
Slope
ft /s
= 0.04
%
ft /s
EGL
Elevation
Downstream
= 476.76
= 19.63
ft
EGL
Elevation
Upstream
= 476.78
ft
GL Slope
= 0.04
%
ritical Depth
k
= 23.9652
in
Depth Downstream
= 60.0000
in
Depth Upstream
= 60.0000
in
Velocity Downstream
= 2.58
ft /s
Velocity Upstream
= 2.58
ft /s
Uniform Velocity Downstream
= 7.73
ft /s
Uniform Velocity Upstream
= 7.73
ft /s
Area Downstream
= 19.63
ft "2
Area Upstream
= 19.63
ft "2
Kj (JLC)
Calculated Junction Loss
- -- -INLET INFORMATION--- -
Downstream Inlet
nlet Description
nlet Type
Computation Case
Longitudinal Slope
Mannings n -value
Pavement Cross -Slope
Gutter Cross -Slope
Gutter Local Depression
Gutter Width
Ponding Width
Intercept Efficiency
Flow from Catchment
Carryover from previous inlet
Total Flow to Current Inlet
Flow Intercepted by Current Inlet
Bypassed Flow
Pavement Flow
Gutter Flow
Depth at Curb
Depth at Pavement /Gutter Joint
Pavement Spread
Total Spread
Gutter Velocity
Curb Efficiency
Grate Efficiency
Slot Efficiency
Total Efficiency
PIPE DESCRIPTION: Pipe 4
- - -- RAINFALL INFORMATION--- -
Return Period
Rainfall File
PIPE INFORMATION--- -
urrent Pipe
Downstream Pipe
Pipe Material
Pipe Length
Plan Length
Pipe Type
Pipe Dimensions
Pipe Manning's "n"
Pipe Capacity at Invert Slope
Invert Elevation Downstream
Invert Elevation Upstream
Invert Slope
Invert Slope (Plan Length)
Rim Elevation Downstream
Rim Elevation Upstream
Natural Ground Slope
Crown Elevation Downstream
Crown Elevation Upstream
- -- -FLOW INFORMATION--- -
Catchment Area
Runoff Coefficient
Inlet Time
Inlet Intensity
Inlet Rational Flow
Inlet Input Flow
Inlet Hydrograph Flow
Total Area
Weighted Coefficient
Total Time of Concentration
Total Intensity
Total Rational Flow
Total Flow
0 Uniform Capacity
Skipped flow
Infiltration
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
HGL Elevation Upstream
HGL Slope
EGL Elevation Downstream
EGL Elevation Upstream
= NA
= 0.046•ft
= MH 1
= <None>
= Undefined
= Sag
= 0.00 ft /ft
= 0.000
= 0.00 ft /ft
= 0.00 ft /ft
= 0.0000 in
= 0.0000 ft
= 0.0000 ft
* %
= 0.00 cfs
= 0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
0.00 cfs
= 0.00 cfs
0.0000 in
0.0000 in
0.0000 ft
0.0000 ft
= 0.00 ft /s
* %
* %
= 0.00
= 100 Year
= Tutorial
= Pipe 4
= Pipe 3
= HDPE
= 110.2822 ft
= 112.6111 ft
= Circular
= 60.00 in
= 0.013
= 173.53 cfs
= 467.66 ft
= 468.15 ft
= 0.44%
= 0.44%
= 480.52 ft
= 480.91 ft
= 0.35%
= 472.66 ft
= 473.15 ft
= 0.00 ac
= 0.000
= 0.00 min
= 0.00 in /hr
= 0.00 cfs
= 43.66 cfs
= 0.00 cfs
= 0.00 ac
= 0.000
= 5.99 min
= 9.83 in /hr
= 0.00 cfs
= 43.66 cfs
= 173.53 cfs
= 0.00 cfs
= 0.00 gpd
= 476.72 ft
= 476.75 ft
= 0.03 %
= 476.80 ft
= 476.83 ft
EGL Slope = 0.03 %
Critical Depth = 22.1604 in
Depth Downstream = 60.0000 in
Depth Upstream = 60.0000 in
Velocity Downstream = 2.22 ft /s
"elocity Upstream = 2.22 ft /s
niform Velocity Downstream = 7.36 ft /s
Uniform Velocity Upstream = 7.36 ft /s
Area Downstream = 19.63 ft "2
Area Upstream = 19.63 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.004 ft
- -- -INLET INFORMATION--- -
= * %
Downstream Inlet
= WYE 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
rate Efficiency
= * %
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 5
Pipe Material
- - -- RAINFALL INFORMATION--- -
= 0.00 cfs
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Intensity
= 0.00 in /hr
Current Pipe
= Pipe 5
= 0.00 cfs
Downstream Pipe
= Pipe 4
= 43.66 cfs
Pipe Material
= HDPE
= 0.00 cfs
Pipe Length
= 174.0371
ft
Plan Length
= 178.8049
ft
Pipe Type
= Circular
Total
Pipe Dimensions
= 60.00
in
Pipe Manning's "n"
= 0.013
Total
Pipe Capacity at Invert Slope
= 175.39
cfs
Invert Elevation Downstream
= 468.24
ft
Invert Elevation Upstream
= 469.03
ft
Invert Slope
= 0.458
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 480.91
ft
Rim Elevation Upstream
= 481.97
ft
Natural Ground Slope
= 0.61%
Crown Elevation Downstream
= 473.24
ft
Crown Elevation Upstream
= 474.03
ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Intensity
= 0.00 in /hr
•Inlet
Inlet
Rational Flow
= 0.00 cfs
Inlet
Input Flow
= 43.66 cfs
Inlet
Hydrograph Flow
= 0.00 cfs
Total
Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total
Time of Concentration
= 4.65 min
Total
Intensity
= 10.40 in /hr
Total
Rational Flow
= 0.00 cfs
Total
Flow
= 43.66 cfs
Uniform Capacity
= 175.39 cfs
Skipped flow _ -..._
= 0.00 ,cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= Undefined
GL Elevation Downstream
= 476.76 ft
GL Elevation Upstream
= 476.81 ft
HGL Slope
= 0.03 %
EGL Elevation Downstream
= 476.84 ft
EGL Elevation Upstream
= 476.88 ft
EGL Slope
= 0.03 %
Critical Depth
= 22.1604 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 2.22 ft /s
Velocity Upstream
= 2.22 ft /s
Uniform Velocity Downstream
= 7.42 ft /s
Uniform Velocity Upstream
= 7.42 ft /s
Area Downstream
= 19.63 ft"2
Area Upstream
= 19.63 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.004 ft
- -- -INLET INFORMATION--- -
= 0.00 cfs
Downstream Inlet
= MH 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
low Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 15
= 480.52 ft
- - -- RAINFALL INFORMATION--- -
= 480.65 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 15
Downstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe Length
= 8.9452 ft
Plan Length
= 9.2368 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 74.39 cfs
Invert Elevation Downstream
= 469.16 ft
Invert Elevation Upstream
= 473.65 ft
Invert Slope
= 58.03%
Invert Slope (Plan Length)
= 48.61%
Elevation Downstream
= 480.52 ft
•Rim
Rim Elevation Upstream
= 480.65 ft
Natural Ground Slope
= 1.43%
Crown Elevation Downstream
= 470.66 ft
Crown Elevation Upstream
= 475.15 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet
Intensity
= 0.00
in /hr
Inlet
Rational Flow
= 0.00
cfs
Inlet
Input Flow
= 7.09
cfs
Inlet
Hydrograph Flow
= 0.00
cfs
Total
Area
= 0.00
ac
Bighted Coefficient
= 0.000
HGL Elevation Downstream
= 476.72 ft
0 ctal Time of Concentration
= 0.00
HGL Slope
min
Total Intensity
= 0.00
EGL Elevation Upstream
in /hr
Total Rational Flow
= 0.00
Critical Depth
cfs
Total Flow
= 7.09
Depth Upstream
cfs
Uniform Capacity
= 74.39
Velocity Upstream
cfs
Skipped flow
= 0.00
Uniform Velocity Upstream
cfs
Infiltration
= 0.00
Area Upstream
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 476.72 ft
HGL Elevation Upstream
= 476.84 ft
HGL Slope
= 1.54 %
EGL Elevation Downstream
= 476.97 ft
EGL Elevation Upstream
= 477.09 ft
EGL Slope
= 1.54 %
Critical Depth
= 12.3786 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 4.01 ft /s
Velocity Upstream
= 4.01 ft /s
Uniform Velocity Downstream
= 39.15 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft"2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.312 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = WYE 1
Inlet Description = <None>
Inlet Type = Undefined
Computation Case = Sag
Longitudinal Slope
= 0.00 ft /ft
annings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding width
= 0.0000 ft
Intercept.Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * 8
Total Efficiency,
= 0.00 %
PIPE DESCRIPTION: Pipe 16
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 16
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Length
= 54.2962 ft
•Pipe
Plan Length
= 59.5665 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 52.89 cfs
Invert Elevation Downstream
= 468.87 ft
Invert Elevation Upstream
= 471.84 ft
Invert Slope
= 5.48%
Invert Slope (Plan Length)
= 4.99%
Rim Elevation Downstream
= 480.83 ft
Rim Elevation Upstream
= 480..8.7 ft
Natural Ground Slope
= 0.07%
Crown Elevation Downstream
= 470.87 ft
Crown Elevation Upstream
= 473.84 ft
0 -- -FLOW INFORMATION--- -
= 477.18 ft
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 14.19 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.42 min
Total Intensity
= 12.81 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 14.19 cfs
Uniform Capacity
= 52.89 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 476.65 ft
HGL Elevation Upstream
= 476.87 ft
HGL Slope
= 0.39 %
EGL Elevation Downstream
= 476.97 ft
EGL Elevation Upstream
= 477.18 ft
EGL Slope
= 0.39 %
Critical Depth
= 16.2864 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 24.0000 in
Velocity Downstream
= 4.52 ft /s
Velocity Upstream
= 4.52 ft /s
Uniform Velocity Downstream
= 18.80 ft /s
Uniform Velocity Upstream
= 14.27 ft /s
Area Downstream
= 3.14 ft'2
rea Upstream
= 3.14 ft°2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.276 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
isPIPE DESCRIPTION: Pipe 19
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 19
Downstream Pipe
= Pipe 16
Pipe Material
= HDPE
Pipe Length
= 32.7511 ft
Plan Length
= 34.5465 ft
Pipe Type
= Circular
Pipe Dimensions
= 24.00 in
Pipe Manning's "n"
= 0.013
eipe Capacity at Invert Slope
= 70.57 cfs
nvert Elevation Downstream
= 471.97 ft
Invert Elevation Upstream
= 475.16 ft
Invert Slope
= 9.79W
Invert Slope (Plan Length)
= 9.23%
Rim Elevation Downstream
= 480.87 ft
Rim Elevation Upstream
= 480.65 ft
Natural Ground Slope
= -0.67%
Crown Elevation Downstream
= 473.97 ft
Crown Elevation Upstream
= 477.16 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 7.09 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.17 min
Total Intensity
= 13.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 7.09 cfs
Uniform Capacity
= 70.57 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 477.14 ft
HGL Elevation Upstream
= 477.16 ft
HGL Slope
= 0.05 %
Elevation Downstream
= 477.22 ft
•EGL
EGL Elevation Upstream
= 477.24 ft
EGL Slope
= 0.05 %
Critical Depth
= 11.3472 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 23.9998 in
Velocity Downstream
= 2.26 ft /s
Velocity Upstream
= 2.26 ft /s
Uniform Velocity Downstream
= 14.39 ft /s
Uniform Velocity Upstream
= 14.39 ft /s
Area Downstream
= 3.14 ft "2
Area Upstream
= 3.14 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.014 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB 7
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Flow
= 0.00 cfs
•Gutter
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * 9,
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 17
- - -- RAINFALL INFORMATION - - --
Return Period = 100 Year
Rainfall File = Tutorial
- -- -FLOW INFORMATION--- -
= 0.00
cfs
0 -- -PIPE INFORMATION--- -
= 0.00
ac
Current Pipe
= Pipe 17
cfs
Downstream Pipe
= Pipe 19
min
Pipe Material
= HDPE
in /hr
Pipe Length
= 20.9728
ft
Plan Length
= 22.4726
ft
Pipe Type
= Circular
cfs
Pipe Dimensions
= 24.00 in
ac
Pipe Manning's "n"
= 0.013
= 3.14 ft'2
Pipe Capacity at Invert Slope
= 15.61 cfs
min
Invert Elevation Downstream
= 475.16
ft
Invert Elevation Upstream
= 475.26
ft
Invert Slope
= 0.48%
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 480.65
ft
Rim Elevation Upstream
= 480.75
ft
Natural Ground Slope
= 0.48%
Crown Elevation Downstream
= 477.16
ft
Crown Elevation Upstream
= 477.26
ft
- -- -FLOW INFORMATION--- -
= 0.00
cfs
Catchment Area.
= 0.00
ac
Runoff Coefficient
= 0.000
cfs
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 7.09
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 3.14 ft'2
Total Time of Concentration
= 0.00
min
Total Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
otal Flow
= 7.09
cfs
Uniform Capacity
= 15.61
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000
HGL Elevation Downstream
= 477.17 ft
HGL Elevation Upstream
= 477.20 ft
HGL Slope
= 0.13 %
EGL Elevation Downstream
= 477.25 ft
EGL Elevation Upstream
= 477.28 ft
EGL Slope
= 0.14 %
Critical Depth
= 11.3472 in
Depth Downstream
= 24.0000 in
Depth Upstream
= 23.2085 in
Velocity Downstream
= 2.26 ft /s
Velocity Upstream
= 2.28 ft /s
Uniform Velocity Downstream
= 4.85 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 3.14 ft'2
Area Upstream
= 3.11 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.103 ft
- -- -INLET INFORMATION--- -
= 0.0000
Downstream Inlet
= DEFL 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000
in
Gutter Width
= 0.0000
ft
Ponding.Width
= 0.0000
ft
Intercept Efficiency
= *
%
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00
cfs
Pavement Flow
= 0.00
cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
utter Velocity
= 0.00 ft /s
urb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 6
= 469.12 ft
- - -- RAINFALL INFORMATION--- -
= 469.81 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.000
Current Pipe
= Pipe 6
Downstream Pipe
= Pipe 5
Pipe Material
= HDPE
Pipe Length
= 153.5575 ft
Plan Length
= 155.9551 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 174.51 cfs
Invert Elevation Downstream
= 469.12 ft
Invert Elevation Upstream
= 469.81 ft
Invert Slope
= 0.45%
Invert Slope (Plan Length)
= 0.44%
Rim Elevation Downstream
= 481.97 ft
Rim Elevation Upstream
= 480.88 ft
Natural Ground Slope
= -0.71%
Crown Elevation Downstream
= 474.12 ft
Crown Elevation Upstream
= 474.81 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient
= 0.000
nlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 43.66 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 3.49 min
Total Intensity
= 10.95 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 43.66 cfs
Uniform Capacity
= 174.51 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 476.81 ft
HGL Elevation Upstream
= 476.85 ft
HGL Slope
= 0.03 %
EGL Elevation Downstream
= 476.89 ft
EGL Elevation Upstream
= 476.93 ft
EGL Slope
= 0.03 %
Critical Depth
= 22.1604 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 2.22 ft /s
Velocity Upstream
= 2.22 ft /s
Uniform Velocity Downstream
= 7.39 ft /s
Uniform Velocity Upstream
= 7.39 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.037 ft
• - -- -INLET INFORMATION--- -
Downstream Inlet
= MH 3
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter width = 0.0000 ft
Ponding Width = 0.0000 ft
Intercept Efficiency = * %
Flow from Catchment = 0.00 cfs
from previous inlet
= 0.00 cfs
isarryover
otal Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 8
PIPE DESCRIPTION: Pipe 7
= 3.28
- - -- RAINFALL INFORMATION--- -
Total Intensity
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.44%
Current Pipe
= Pipe 7
Downstream Pipe
= Pipe 6
Pipe Material
= HDPE
Pipe Length
= 20.5200 ft
Plan Length
= 22.8498 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 172.41 cfs
Invert Elevation Downstream
= 469.81 ft
Invert Elevation Upstream
= 469.90 ft
Invert Slope
= 0.44%
Depth Upstream
nvert Slope (Plan Length)
= 0.39%
ac
Rim Elevation Downstream
= 480.88
ft
Rim Elevation Upstream
= 481.26
ft
Natural Ground Slope
= 1.87%
in /hr
Crown Elevation Downstream
= 474.81
ft
Crown Elevation Upstream
= 474.90
ft
- -- -FLOW INFORMATION--- -
INFORMATION--- -
Depth Upstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
ft
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 36.31
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
EGL
Total Time of Concentration
= 3.28
min
Total Intensity
= 11.06
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 36.31
cfs
Uniform Capacity
= 172.41
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC
INFORMATION--- -
Depth Upstream
= 60.0000 in
HGL
Elevation
Downstream
= 476.89
ft
HGL
Elevation
Upstream
= 476.89
ft
HGL
Slope
Kj (JLC)
= 0.02 W
Calculated Junction Loss
EGL
Elevation
Downstream
= 476.94
ft
EGL
Elevation
Upstream
= 476.95
ft
EGL
Slope
= 0.02 %
Critical Depth
= 20.1408
in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 1.85 ft /s
Velocity Upstream
= 1.85 ft /s
Uniform Velocity Downstream
= 6.96 ft /s
Uniform Velocity Upstream
= 6.96 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.003 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = WYE 2
Inlet Description = <None>
Inlet Type = Undefined
Case
= Sag
computation
ongitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 9,
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 9d
Slot Efficiency
= * 9d
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 8
= 0.00 ac
- - -- RAINFALL INFORMATION--- -
= 0.000
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 8
Downstream Pipe
= Pipe 7
ipe Material
= HDPE
Pipe Length
= 172.4415 ft
Plan Length
= 178.8049 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 171.69 cfs
Invert Elevation Downstream
= 469.99 ft
Invert Elevation Upstream
= 470.74 ft
Invert Slope
= 0.43%
Invert Slope (Plan Length)
= 0.42%
Rim Elevation Downstream
= 481.26 ft
Rim Elevation Upstream
= 480.36 ft
Natural Ground Slope
= -0.52%
Crown Elevation Downstream
= 474.99 ft
Crown Elevation Upstream
= 475.74 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 36.31 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 1.67 min
Total Intensity
= 11.97 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 36.31 cfs
Uniform Capacity
= 171.69 cfs
Skipped flow
= 0.00 cfs
• Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 476.90 ft
HGL Elevation Upstream
= 476.93 ft
HGL Slope
= 0.02 %
EGL Elevation Downstream
= 476.95 ft
EGL Elevation Upstream
= 476.98 ft
EGL Slope
= 0.02 %
Critical Depth
= 20.1408 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 6Q,.0.000 in
Velocity Downstream
= 1.85 ft /s
Velocity Upstream
= 1.85 ft /s
Uniform Velocity Downstream
= 6.94 ft /s
gftniform Velocity Upstream = 6.94 ft /s
rea Downstream = 19.63 ft "2
Area Upstream = 19.63 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.003 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= MH 4
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.m ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00.cfs
Flow Intercepted.by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * %
Slot Efficiency = * P6
otal Efficiency = 0.00
PIPE DESCRIPTION: Pipe 9
- - -- RAINFALL INFORMATION--- -
Return Period = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 9
Downstream Pipe
= Pipe 8
Pipe Material
= HDPE
Pipe Length
= 135.4671 ft
Plan Length
= 140.4542 ft
Pipe Type
= Circular
Pipe Dimensions
= 60.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 177.53 cfs
Invert Elevation Downstream
= 470.87 ft
Invert Elevation Upstream
= 471.50 ft
Invert Slope
= 0.47%
Invert Slope (Plan Length)
= 0.45%
Rim Elevation Downstream
= 480.36 ft
Rim Elevation Upstream
= 479.59 ft
Natural Ground Slope
= -0.57%
Crown Elevation Downstream
= 475.87 ft
Crown Elevation Upstream
= 476.50 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 36.31 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.40 min
Total Intensity
= 12.82 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 36.31 cfs
Uniform Capacity
= 177.53 cfs
Skipped flow
= 0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream = 476.93 ft
HGL Elevation Upstream = 476.96 ft
GL Slope
=
GL Elevation Downstream
.
= 476 476.99 ft
EGL Elevation Upstream
= 477.01 ft
EGL Slope
= 0.02 %
Critical Depth
= 20.1408 in
Depth Downstream
= 60.0000 in
Depth Upstream
= 60.0000 in
Velocity Downstream
= 1.85 ft /s
Velocity Upstream
= 1.85 ft /s
Uniform Velocity Downstream
= 7.11 ft /s
Uniform Velocity Upstream
= 7.11 ft /s
Area Downstream
= 19.63 ft "2
Area Upstream
= 19.63 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.027 ft
- -- -INLET INFORMATION--- -
= 0.00 cfs
Downstream Inlet
= MH 5
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Flow
= 0.00 cfs
'Gutter
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 9,
Grate Efficiency
= * 96
Slot Efficiency
= * 96
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 10
= 0.51%
- - -- RAINFALL INFORMATION--- -
= 0.47%
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 10
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
Pipe Length
= 41.1452 ft
Plan Length
= 44.6141 ft
Pipe Type
= Circular
Pipe Dimensions
= 30.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 29.29 cfs
Invert Elevation Downstream
= 474.00 ft
Invert Elevation Upstream
= 474.21 ft
Invert Slope
= 0.51%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 479.59 ft
Rim Elevation Upstream
= 479.59 ft
Ground Slope
= 0.00%
•Natural
Crown Elevation Downstream
= 476.50 ft
Crown Elevation Upstream
= 476.71 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow = 9.08 cfs
Inlet Hydrograph Flow = 0..00 cfs
Total Area = 0.00 ac
weighted Coefficient = 0.000
Total Time of Concentration = 0.00 min
otal Intensity
= 0.00
in /hr
otal Rational Flow
= 0.00
cfs
Total Flow
= 9.08
cfs
Uniform Capacity
= 29.29
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00 ft /ft
HGL Elevation Downstream
= 476.99 ft
HGL Elevation Upstream
= 477.01 ft
HGL Slope
= 0.06 %
EGL Elevation Downstream
= 477.04 ft
EGL Elevation Upstream
= 477.06 ft
EGL Slope
= 0..06 %
Critical Depth
= 12.0570 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 1.85 ft /s
Velocity Upstream
= 1.85 ft /s
Uniform Velocity Downstream
= 5.26 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 4.91 ft^2
Area Upstream
= 4.91 ft^2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.066 ft
- -- -INLET INFORMATION--- -
= 0.00 ft /ft
Downstream Inlet
= CB 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
utter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Blow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= *
Grate Efficiency
= *
Slot Efficiency
= * 96
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 11
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 11
Downstream Pipe
= Pipe 9
Pipe Material
= HDPE
Pipe Length
= 40.8647 ft
Plan Length
= 44.6141 ft
Type
= Circular
•Pipe
Pipe Dimensions
= 30.00
in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 29.39
cfs
Invert Elevation Downstream
= 474.00
ft
Invert Elevation Upstream
= 474.21
ft
Invert Slope
= 0.51%
Invert Slope (Plan Length)
= 0.47%
Rim Elevation Downstream
= 479.59
ft
Rim Elevation Upstream
= 479.59
ft
Natural Ground Slope = 0.00%
_ Crown Elevation - Downstream = 476.50 ft
Crown Elevation Upstream = 476.71 ft
- -- -FLOW INFORMATION - - --
atchment Area
= 0.00 ac
40 unoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 9.08 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 9.08 cfs
Uniform Capacity
= 29.39 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= NA
HGL Elevation Downstream
= 476.99 ft
HGL Elevation Upstream
= 477.01 ft
HGL Slope
= 0.06 %
EGL Elevation Downstream
= 477.04 ft
EGL Elevation Upstream
= 477.06 ft
EGL Slope
= 0.06 %
Critical Depth
= 12.0570 in
Depth Downstream
= 30.0000 in
Depth Upstream
= 30.0000 in
Velocity Downstream
= 1.85 ft /s
Velocity Upstream
= 1.85 ft /s
Uniform velocity Downstream
= 5.28 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 4.91 ft"2
Area Upstream
= 4.91 ft "2
j (JLC)
= NA
alculated Junction Loss
W
= 0.066 ft
- -- - INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 12
RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe = Pipe 12
Downstream Pipe = Pipe 6
Pipe Material = HDPE
Pipe Length = 10.3248 ft
Plan Length = 10.0100 ft
Pipe Type
= Circular
Pipe Dimensions
= 1.8.00
in
Pipe Manning's "n"
= 0.013
= 0.00 min
Pipe Capacity at Invert Slope
= 51.98
cfs
Invert Elevation Downstream
= 471.59
ft
Elevation Upstream
= 474.12
ft
lenvert
nvert Slope
= 25.27%
= 0.000
Invert Slope (Plan Length)
= 25.27%
Total Intensity
Rim Elevation Downstream
= 480.88
ft
Rim Elevation Upstream
= 481.21
ft
Natural Ground Slope
= 3.20%
= 0.00 cfs
Crown Elevation Downstream
= 473.09
ft
Crown Elevation Upstream
= 475.62
ft
- -- -FLOW INFORMATION--- -
HYDRAULIC
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 10.18 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.85 min
Total Intensity
= 12.51 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 10.18 cfs
Uniform Capacity
= 51.98 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - --
HYDRAULIC
INFORMATION--- -
= 14.7492 in
Depth Downstream
HGL
Elevation
Downstream
= 476.89
ft
HGL
Elevation
Upstream
= 476.99
ft
HGL
Slope
= 1.77 ft "2
= 0.97 %
= 1.77 ft "2
EGL
Elevation
Downstream
= 477.41
ft
EGL
Elevation
Upstream
= 477.50
ft
EGL Slope
= 0.97 %
ritical Depth
= 14.7492 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 5.76 ft /s
Velocity Upstream
= 5.76 ft /s
Uniform Velocity Downstream
= 28.82 ft /s
Uniform Velocity Upstream
= 22.84 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.026 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= WYE 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
Pavement Spread = 0.0000 ft
Total Spread = 0.0000 ft
Gutter Velocity = 0.00 ft /s
Curb Efficiency = * %
Grate Efficiency = * %
Slot Efficiency = * %
Total Efficiency = 0.00 %
PIPE DESCRIPTION: Pipe 13
- - -- RAINFALL INFORMATION----
_ _ Return Period_ = 100 Year
Rainfall File = Tutorial
- -- -PIPE INFORMATION - - --
Afturrent Pipe
= Pipe 13
ownstream Pipe
= Pipe 12
Pipe Material
= HDPE
Pipe Length
= 14.0319 ft
Plan Length
= 14.0316 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 8.41 cfs
Invert Elevation Downstream
= 474.12 ft
Invert Elevation Upstream
= 474.21 ft
Invert Slope
= 0.64%
Invert Slope (Plan Length)
= 0.64%
Rim Elevation Downstream
= 481.21 ft
Rim Elevation Upstream
= 481.55 ft
Natural Ground Slope
= 2.42%
Crown Elevation Downstream
= 475.62 ft
Crown Elevation Upstream
= 475.71 ft
- -- -FLOW INFORMATION--- -
= 0.0000 ft
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 10.18
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft'2
Total Time of Concentration
= 0.81
min
Total Intensity
= 12.54
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 10.18
cfs
Uniform Capacity = 8.41 cfs
kipped flow = 0.00 cfs
Infiltration = 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.0000 ft
HGL Elevation Downstream
= 477.01 ft
HGL Elevation Upstream
= 477.15 ft
HGL Slope
= 0.94 %
EGL Elevation Downstream
= 477.53 ft
EGL Elevation Upstream
= 477.66 ft
EGL Slope
= 0.94 W
Critical Depth
= 14.7492 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 5.76 ft /s
Velocity Upstream
= 5.76 ft /s
Uniform Velocity Downstream
= 5.76 ft /s
Uniform Velocity Upstream
= 5.76 ft /s
Area Downstream
= 1.77 ft'2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.180 ft
- -- -INLET INFORMATION--- -
= 0.0000 ft
Downstream Inlet
= BEND 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross - Slope
= 0.00 ft /ft
Gutter Cross - Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
width
= 0.0000 ft
isPonding
Intercept Efficiency
= * %
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00
cfs
Pavement Flow
= 0.00
cfs
Gutter Flow
= 0.00
cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= .0..0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Orate Efficiency
= * 96
lot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 14
= 0.013
- - -- RAINFALL INFORMATION--- -
= 8.61 cfs
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 0.00 in /hr
Current Pipe
= Pipe 14
Downstream Pipe
= Pipe 13
Pipe Material
= HDPE
Pipe Length
= 148.6841 ft
Plan Length
= 148.6808 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 8.61 cfs
Invert Elevation Downstream
= 474.21 ft
Invert Elevation Upstream
= 475.21 ft
Invert Slope
= 0.67%
Invert Slope (Plan Length)
= 0.67%
Rim Elevation Downstream
= 481.55 ft
Rim Elevation Upstream
= 481.72 ft
Natural Ground Slope
= 0.11%
Crown Elevation Downstream
= 475.71 ft
Crown Elevation Upstream
= 476.71 ft
- -- -FLOW INFORMATION--- -
Catchment Area = 0.00 ac
Runoff Coefficient = 0.000
Inlet Time = 0.00 min
Intensity
= 0.00 in /hr
•Inlet
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 10.18 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.38 min
Total Intensity
= 12.84 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 10.18 cfs
Uniform Capacity
= 8.61 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 477.33 ft
HGL Elevation Upstream
= 478.72 ft
HGL Slope
= 0.94 %
EGL Elevation Downstream
= 477.84 ft
EGL Elevation Upstream
= 479.24 ft
EGL Slope
= 0.94 %
Critical Depth
= 14.7492 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 5.76 ft /s
Velocity Upstream
= 5.76 ft /s
Uniform Velocity Downstream
= 5.76 ft /s
Uniform Velocity Upstream
= 5.76 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.026 ft
- -- -INLET INFORMATION----
Inlet
= BEND 3
•Downstream
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
low Intercepted by Current Inlet
= 0.00 cfs
ypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 18
= 478.75 ft
- - -- RAINFALL INFORMATION--- -
= 480.29 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 18
Downstream Pipe
= Pipe 14
Pipe Material
= HDPE
Pipe Length
= 128.4729 ft
Plan Length
= 129.9699 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 8.64 cfs
Invert Elevation Downstream
= 475.21 ft
Invert Elevation Upstream
= 476.08 ft
Invert Slope
= 0.68%
Invert Slope (Plan Length)
= 0.67%
Rim Elevation Downstream = 481.72 ft
im Elevation Upstream = 481.82 ft
Natural Ground Slope = 0.08%
Crown Elevation Downstream = 476.71 ft
Crown Elevation Upstream = 477.58 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00 ac
Runoff Coefficient
= 0.500
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 10.18 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 0.00 min
Total Intensity
= 0.00 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 10.18 cfs
Uniform Capacity
= 8.64 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 478.75 ft
HGL Elevation Upstream
= 480.29 ft
HGL Slope
= 1.20 %
EGL Elevation Downstream
= 479.27 ft
EGL Elevation Upstream
= 480.81 ft
EGL Slope
= 1.20 %
Critical Depth
= 14.7492 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Downstream
= 5.76 ft /s
•Velocity
Velocity Upstream
= 5.76 ft /s
Uniform Velocity Downstream
= 5.76 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.644 ft
- -- -INLET INFORMATION - - --
Downstream Inlet
= BEND 4
Inlet Description _
= _sNone>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
ing s n -value
= 0.000
O:v:n ment Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 6
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 6
Grate Efficiency
= * 6
Slot Efficiency
= * 6
Total Efficiency
= 0.00 6
•
•
i 1
S \�\ F
E 4 `
i
' � 1
I I '
I I
LINE 171
STORM DRAIN
INDEX MAP
MSA CONSULnNG, INC.
MmNmo. Smm & ASSCIQA7'84, ING
f. B[emmq ■ Cim Emanumm ■ Lmw Smvamm
1►�_.�s 34200 Hae Hie Dwva m Rio !fum a G 92270
r� Tzuwmm (76M 320-M m FAx (76M 323-7W
LINE 171
User Name: mpompa Date: 10 -04 -05
Project: 1721 STORM DRAIN ALIGN AND ANNO Time: 10:16:51
_ nTor .,�, ti • nc - r.TmF 111 Paae : 1
Invert Up Downstream Junction
ft
470.80 Outfall
474.60 BEND 1
474.76 BEND 2
475.11 CB 1
Storm Sewers Detail Report
PIPE DESCRIPTION: Pipe 1
- - -- RAINFALL INFORMATION--- -
18 eturn Period = 100 Year
ainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
HGL Elevation Downstream
Current Pipe
= Pipe 1
ac
Downstream Pipe
= Outfall
EGL Elevation Downstream
Pipe Material
= HDPE
min
Pipe Length
= 39.8805
ft
Plan Length
= 39.8800
ft
Pipe Type
= Circular
cfs
Pipe Dimensions
= 18.00 in
cfs
Pipe Manning's "n"
= 0.013
ac
Pipe Capacity at Invert Slope
= 7.44 cfs
= 1.77 ft°2
Invert Elevation Downstream
= 470.60
ft
Invert Elevation Upstream
= 470.80
ft
Invert Slope
= 0.50%
cfs
Invert Slope (Plan Length)
= 0.50%
cfs
Rim Elevation Downstream
= 474.10
ft
Rim Elevation Upstream
= 483.56
ft
Natural Ground Slope
= 23.718
gpd
Crown Elevation Downstream
= 472.10
ft
Crown Elevation Upstream
= 472.30
ft
- -- -FLOW INFORMATION--- -
= 0.00
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Elevation Downstream
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 5.44
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
= 1.77 ft°2
Total Time of Concentration
= 0.63
min
Ootal Intensity
= 12.66
in /hr
ctal Rational Flow
= 0.00
cfs
Total Flow
= 5.44
cfs
Uniform Capacity
= 7.44
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00
HGL Elevation Downstream
= 476.50 ft
HGL Elevation Upstream
= 476.61 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 476.65 ft
EGL Elevation Upstream
= 476.75 ft
EGL Slope
= 0.27 %
Critical Depth
= 10.7910 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.08 ft /s
Velocity Upstream
= 3.08 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 4.60 ft /s
Area Downstream
= 1.77 ft°2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.208 ft
- -- -INLET INFORMATION--- -
= 0.00
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00
ft /ft
utter Cross -Slope
= 0.00
ft /ft
Gutter Local Depression
= 0.0000
in
Gutter Width
= 0.0000
ft
Ponding Width
= 0.0000
ft
Intercept Efficiency
= *
%
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow = 0.00 cfs
Pavement Flow -• = 0.00 cfs
Gutter Flow = 0.00 cfs
Depth at Curb = 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
avement Spread
= 0.0000 ft
otal Spread
41Gutter
= 0.0000 ft
Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00
PIPE DESCRIPTION: Pipe 2
= 18.00 in
- - -- RAINFALL INFORMATION--- -
= 0.013
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 2
Downstream Pipe
= Pipe 1
Pipe Material
= HDPE
Pipe Length
= 20.4757 ft
Plan Length
= 20.1200 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 45.23 cfs
Invert Elevation Downstream
= 470.80 ft
Invert Elevation Upstream
= 474.60 ft
Invert Slope
= 18.89%
Invert Slope (Plan Length)
= 18.89%
Rim Elevation Downstream
= 483.56 ft
Rim Elevation Upstream
= 483.36 ft
Natural Ground Slope
= -0.97%
Crown Elevation Downstream
= 472.30 ft
Crown Elevation Upstream
= 476.10 ft
-- -FLOW INFORMATION--- -
Oatchment Area
= 0.00 ac
unoff Coefficient
= 0.000
Inlet Time
= 0.00 min
Inlet Intensity
= 0.00 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 5.44 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.52 min
Total Intensity
= 12.73 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 5.44 cfs
Uniform Capacity
= 45.23 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 476.81 ft
HGL Elevation Upstream
= 476.87 ft
HGL Slope
= 0.27 %
EGL Elevation Downstream
= 476.96 ft
EGL Elevation Upstream
= 477.02 ft
EGL Slope
= 0.27 %
Critical Depth
= 10.7910 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.08 ft /s
Velocity Upstream
= 3.08 ft /s
Uniform Velocity Downstream
= 17.28 ft /s
Uniform Velocity Upstream
= 17.28 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
cj (JLC) = NA
alculated Junction Loss = 0.116 ft
-
-- - INLET INFORMATION--- -
Downstream Inlet = BEND 1
Inlet Description = <None>
Inlet Type
= Undefined
Computation Case ..
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
utter Cross -Slope
= 0.00 ft /ft
utter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
= 477.07 ft
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 31.1049 ft
Plan Length
= 32.6045 ft
Pipe Type
= Circular
ipe Dimensions
= 18.00 in
ipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.53 cfs
Invert Elevation Downstream
= 474.60 ft
Invert Elevation Upstream
= 474.76 ft
Invert Slcpe
= 0.51%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 483.36 ft
Rim Elevation Upstream
= 483.26 ft
Natural Ground Slope
= -0.31%
Crown Elevation Downstream
= 476.10 ft
Crown Elevation Upstream
= 476.26 ft
- -- -FLOW INFORMATION--- -
= 477.07 ft
�HGL
GL Slope
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
EGL Slope
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 5.44
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.35
min
Total Intensity
= 12.86
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 5.44
cfs
Uniform Capacity
= 7.53
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream = 476.99 ft
Elevation Upstream
= 477.07 ft
�HGL
GL Slope
= 0.27 %
EGL Elevation Downstream
= 477.13 ft
EGL Elevation Upstream
= 477.22 ft
EGL Slope
= 0.27 %
Critical Depth
= 10.7910 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.08 ft /s
Velocity Upstream
= 3.08 ft /s
Uniform Velocity Downstream = 4.64 ft /s
Uniform Velocity Upstream = 4.64 ft /s
Area Downstream = 1.77 ft "2
Area Upstream = 1.77 ft^2
Kj (JLC) = NA
Calculated Junction Loss
= 0.500 ft
-- -INLET INFORMATION--- -
= Pipe 4
Downstream Inlet
= BEND 2
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 8
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * Yr
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 4
- -- RAINFALL INFORMATION--- -
Infiltration
0eturn Period
= 100 Year
ainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 4
Downstream Pipe
= Pipe 3
Pipe Material
= HDPE
Pipe-Length
= 41.0131 ft
Plan Length
= 44.0127 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.33 cfs
Invert Elevation Downstream
= 474.91 ft
Invert Elevation Upstream
= 475.11 ft
Invert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.45%
Rim Elevation Downstream
= 483.26 ft
Rim Elevation Upstream
= 483.26 ft
Natural Ground Slope
= 0.00%
Crown Elevation Downstream
= 476.41 ft
Crown Elevation Upstream
= 476.61 ft
- -- -FLOW INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.000
Inlet Time
= 0.00
min
Inlet Intensity
= 0.00
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 3.74
cfs
r.nlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.000
Total Time of Concentration
= 0.00
min
otal Intensity
= 0.00
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 3.74
cfs
Uniform Capacity
= 7.33
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 477.57 ft
HGL Elevation Upstream
= 477.66 ft
HGL Slope -. _
= 0. 21.A. -
EGL Elevation Downstream
= 477.64 ft
EGL Elevation Upstream
= 477.73 ft
EGL Slope
= 0.21 %
Depth
= 8.8668 in
Writical
epth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 2.12 ft /s
Velocity Upstream
= 2.12 ft /s
Uniform Velocity Downstream
= 4.17 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft"2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.500 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter Width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * %
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
avement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * 96
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
•
I I
i
I
I 153
i
164
a
152
\PIPE3
LL
MADAGASCAR
PIPE 2
151
LINE 271
STORM DRAIN
INDEX$ MAP
Pff
MSA CONSULTING, INC
Menu Sams a Assocsem hic
ww_ Fummq ■ am, Mimum m ■ Luw lzzw ma
p� 94200 Bo® Hors Onus ■ Rmsm m-mm ■ G 92270
1�emm C70 32"M ■ Fnz UW =3-M
LINE 271
User Name: mpompa Date: 10 -04 -05
Project: 1721 STORM DRAIN ALIGN AND ANNO Time: 10:53:11
•Network: 07 - LINE 271 Page: 1
Storm Sewers Summary Report
----------------------------------- - - - - -- -
Pipe Name Total Flow Pipe Dim HGL Down HGL Up Invert Down Invert Up
cfs in ft ft ft ft
Pipe 2 12.27 18.00
Pipe 3 6.13 18.00
r
J
•
Downstream
Junction
461.80 462.78 455.00 455.36 Outfall
463.43* 463.68* 455.42 455.73 CB 1
Storm Sewers Detail - Report
PIPE DESCRIPTION: Pipe 2
- - -- RAINFALL INFORMATION--- -
eturn Period = 100 Year
ainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
Current Pipe
= Pipe 2
Downstream Pipe
= Outfall
Pipe Material
= HDPE
Pipe Length
= 71.5476 ft
Plan Length
= 73.0467 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.45 cfs
Invert Elevation Downstream
= 455.00 ft
Invert Elevation Upstream
= 455.36 ft
Invert Slope
= 0.50%
Invert Slope (Plan Length)
= 0.49%
Rim Elevation Downstream
= 459.50 ft
Rim Elevation Upstream
= 466.05 ft
Natural Ground Slope
= 9.15%
Crown Elevation Downstream
= 456.50 ft
Crown Elevation Upstream
= 456.86 ft
- -- -FLOW INFORMATION--- -
= 0.00
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
EGL Elevation Downstream
Inlet Time
= 5.00
min
Inlet Intensity
= 10.24
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 12.27
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
weighted Coefficient
= 0.500
= 1.77 ft "2
Total Time of Concentration
= 5.31
min
Ootal Intensity
= 10.11
in /hr
ctal Rational Flow
= 0.00
cfs
Total Flow
= 12.27
cfs
Uniform Capacity
= 7.45
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00
HGL Elevation Downstream
= 461.80 ft
HGL Elevation Upstream
= 462.78 ft
HGL Slope
= 1.36 %
EGL Elevation Downstream
= 462.55 ft
EGL Elevation Upstream
= 463.53 ft
EGL Slope
= 1.36 %
Critical Depth
= 15.8994 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 6.94 ft /s
Velocity Upstream
= 6.94 ft /s
Uniform velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 6.94 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.654 ft
- -- -INLET INFORMATION--- -
= 0.00
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Cross -Slope
= 0.00
ft /ft
�avement
utter Cross -Slope
= 0.00
ft /ft
Gutter Local Depression
= 0.0000
in
Gutter width
= 0.0000
ft
Ponding width
= 0.0000
ft
Intercept Efficiency
= *
%
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow
= 0.00 cfs
-.. Pavement Flow.. --
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Spread
= 0.0000 ft
4pavement
otal Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
- - -- RAINFALL INFORMATION--- -
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 61.3561 ft
Plan Length
= 64.3553 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.46 cfs.
Invert Elevation Downstream
= 455.42 ft
Invert Elevation Upstream
= 455.73 ft
Invert Slope
= 0.51%
Invert Slope (Plan Length)
= 0.48%
Rim Elevation Downstream
= 466.05 ft
Rim Elevation Upstream
= 466.35 ft
Natural Ground Slope
= 0.49%
Crown Elevation Downstream
= 456.92 ft
Crown Elevation Upstream
= 457.23 ft
FLOW INFORMATION--- -
atchment Area
*Runoff
= 0.00 ac
Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
= 10.24 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 6.13 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 5.00 min
Total Intensity
= 10.24 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 6.13 cfs
Uniform Capacity
= 7.46 cfs
Skipped flew
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
HGL Elevation Downstream
= 463.43 ft
HGL Elevation Upstream
= 463.68 ft
HGL Slope
= 0.41 %
EGL Elevation Downstream
= 463.62 ft
EGL Elevation Upstream
= 463.87 ft
EGL Slope
= 0.41 %
Critical Depth
= 11.4858 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 3.47 ft /s
Velocity Upstream
= 3.47 ft /s
Uniform Velocity Downstream
= 4.72 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream.
= 1.77 ft"2
Area Upstream
= 1.77 ft"2
] (JLC) = NA
alculated Junction Loss = 0.234 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= CB 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope = 0.00 ft /ft
Gutter Cross -Slope - s -0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter width = 0.0000 ft
Ponding Width = 0.0000 ft
Efficiency
= * %
"ntercept
low from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
•
SEE LINE
PIPE 1
PIPE 2
i
U
�— PIPE 3 J
Q
Z
O
LINE 261
STORM DRAIN
INDEX$ MAP
NT
MSA CoxsuLTiNo, Ixc
MmmmA SirrH a Assoc ms. INN
ID PLANK= ■ CNM RNMU MO . Iatm eoavema
34200 Boa Hone Darya ■ RAx® Mg-m ■ G 92270
TUzpK m p60) 3209811 ■ FAx (760) 323 -7893
Q
U
�
�
I
w
Im
U
�— PIPE 3 J
Q
Z
O
LINE 261
STORM DRAIN
INDEX$ MAP
NT
MSA CoxsuLTiNo, Ixc
MmmmA SirrH a Assoc ms. INN
ID PLANK= ■ CNM RNMU MO . Iatm eoavema
34200 Boa Hone Darya ■ RAx® Mg-m ■ G 92270
TUzpK m p60) 3209811 ■ FAx (760) 323 -7893
LINE 261
User Name: mpompa
Date:
10 -04 -05
Project: 1721
STORM DRAIN
ALIGN AND ANNO
Time:
11:00:18
isetwork: 08 -
LINE 261
Page:
1
Storm Sewers Summary
Report
---------------------------------------------------------------------
Pipe Name
Total Flow Pipe Dim
HGL
Down
HGL Up
Invert
Down
Invert Up
Downstream
cfs
in
ft
ft
ft
ft
Junction
Pipe 1
11.49
18.00
461.80
462.08
455.00
455.12
Outfall
Pipe 2
11.49
18.00
462.31*
463.00*
455.12
460.71
BEND 1
Pipe 3
5.75
18.00
463.50*
463.70*
460.84
461.11
CB 1
•
v
Storm Sewers Detail Report
PIPE DESCRIPTION: Pipe 1
- - -- RAINFALL INFORMATION--- -
eturn Period = 100 Year
ainfall File = Tutorial
- -- -PIPE INFORMATION--- -
= 0.00
HGL Elevation Downstream
Current Pipe
= Pipe 1
ac
Downstream Pipe
= Outfall
EGL Elevation Downstream
Pipe Material
= HDPE
min
Pipe Length
= 23.5436
ft
Plan Length
= 23.5433
ft
Pipe Type
= Circular
cfs
Pipe Dimensions
= 18.00 in
cfs
Pipe Manning's "n"
= 0.013
ac
Pipe Capacity at Invert Slope
= 7.50 cfs
= 1.77 ft "2
Invert Elevation Downstream
= 455.00
ft
Invert Elevation Upstream
= 455.12
ft
Invert Slope
= 0.51%
cfs
Invert Slope (Plan Length)
= 0.51%
cfs
Rim Elevation Downstream
= 459.50
ft
Rim Elevation Upstream
= 461.30
ft
Natural Ground Slope
= 7.65%
gpd
Crown Elevation Downstream
= 456.50
ft
Crown Elevation Upstream
= 456.62
ft
- -- -FLOW INFORMATION--- -
= 0.00
HGL Elevation Downstream
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
EGL Elevation Downstream
Inlet Time
= 5.00
min
Inlet Intensity
= 10.24
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 11.49
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
= 1.77 ft "2
Total Time of Concentration
= 5.45
min
eotal Intensity
= 10.05
in /hr
otal Rational Flow
= 0.00
cfs
Total Flow
= 11.49
cfs
Uniform Capacity
= 7.50
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - -- HYDRAULIC INFORMATION--- -
= 0.00
HGL Elevation Downstream
= 461.80 ft
HGL Elevation Upstream
= 462.08 ft
HGL Slope
= 1.20 %
EGL Elevation Downstream
= 462.46 ft
EGL Elevation Upstream
= 462.74 ft
EGL Slope
= 1.20 %
Critical Depth
= 15.5160 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 6.50 ft /s
Velocity Upstream
= 6.50 ft /s
Uniform Velocity Downstream
= 0.00 ft /s
Uniform Velocity Upstream
= 6.50 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
Kj (JLC)
= NA
Calculated Junction Loss
= 0.230 ft
- -- -INLET INFORMATION--- -
= 0.00
Downstream Inlet
= Outfall
Inlet Description
= <None>
Inlet Type
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
avement Cross -Slope
= 0.00
ft /ft
utter Cross -Slope
= 0.00
ft /ft
Gutter Local Depression
= 0.0000
in
Gutter Width
= 0.0000
ft
Ponding Width
= 0.0000
ft
Intercept Efficiency
= *
%
Flow from Catchment
= 0.00
cfs
Carryover from previous inlet
= 0.00
cfs
Total Flow to Current Inlet
= 0.00
cfs
Flow Intercepted by Current Inlet
= 0.00
cfs
Bypassed Flow = 0.00 cfs
Pavement Flow = 0.00 cfs
Gutter Flow = 0.00 cfs
Depth at Curb = 0.0000 in
Depth at Pavement /Gutter Joint = 0.0000 in
Spread
= 0.0000 ft
lWavement
otal Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * 96
Grate Efficiency
= * 96
Slot Efficiency
= * 9d
Total Efficiency
= 0.00 W
PIPE DESCRIPTION: Pipe 2
Plan Length
- - -- RAINFALL INFORMATION--- -
ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
=
&atchment Area
Current Pipe
= Pipe 2
= 0.500
Downstream Pipe
= Pipe 1
Inlet Intensity
Pipe Material
= HDPE
= 0.00 cfs
Pipe Length
= 57.4630
ft
Plan Length
= 58.6905
ft
Pipe Type
= Circular
Total Time of Concentration
Pipe Dimensions
= 18.00 in
= 10.11 in /hr
Pipe Manning's "n"
= 0.013
Total Flow
Pipe Capacity at Invert Slope
= 32.75 cfs
= 32.75 cfs
Invert Elevation Downstream
= 455.12
ft
Invert Elevation Upstream
= 460.71
ft
Invert Slope
= 9.77%
Invert Slope (Plan Length)
= 9.52%
Rim Elevation Downstream
= 461.30
ft
Rim Elevation Upstream
= 466.36
ft
Natural Ground Slope
= 8.81%
Crown Elevation Downstream
= 456.62
ft
Crown Elevation Upstream
= 462.21
ft
FLOW INFORMATION--- -
=
&atchment Area
= 0.00 ac
unoff Coefficient
= 0.500
Inlet Time
= 5.00 min
Inlet Intensity
= 10.24 in /hr
Inlet Rational Flow
= 0.00 cfs
Inlet Input Flow
= 11.49 cfs
Inlet Hydrograph Flow
= 0.00 cfs
Total Area
= 0.00 ac
Weighted Coefficient
= 0.500
Total Time of Concentration
= 5.30 min
Total Intensity
= 10.11 in /hr
Total Rational Flow
= 0.00 cfs
Total Flow
= 11.49 cfs
Uniform Capacity
= 32.75 cfs
Skipped flow
= 0.00 cfs
Infiltration
= 0.00 gpd
- - -- HYDRAULIC INFORMATION--- -
=
HGL Elevation Downstream
= 462.31 ft
HGL Elevation Upstream
= 463.00 ft
HGL Slope
= 1.20 W
EGL Elevation Downstream
= 462.97 ft
EGL Elevation Upstream
= 463.66 ft
EGL Slope
= 1.20 %
Critical Depth
= 15.5160 in
Depth Downstream
= 18.0000 in
Depth Upstream
= 18.0000 in
Velocity Downstream
= 6.50 ft /s
Velocity Upstream
= 6.50 ft /s
Uniform Velocity Downstream
= 16.91 ft /s
Uniform Velocity Upstream
= 16.91 ft /s
Area Downstream
= 1.77 ft "2
Area Upstream
= 1.77 ft "2
(JLC)
=
Calculated Junction Loss
C
•
O.
= 0.500 ft
- -- -INLET INFORMATION--- -
Downstream Inlet
= BEND 1
Inlet Description
= <None>
Inlet Type
= Undefined
Computaticn Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Manninqs n -value
= 0.000
Pavement Cross -Slope = 0.00 ft /ft
Gutter Cross -Slope = 0.00 ft /ft
Gutter Local Depression = 0.0000 in
Gutter Width = 0.0000 ft
Ponding width = 0.0000 ft
ntercept Efficiency
= * %
low from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
= 0.00 cfs
Flow Intercepted by Current Inlet
= 0.00 cfs
Bypassed Flow
= 0.00 cfs
Pavement Flow
= 0.00 cfs
Gutter Flow
= 0.00 cfs
Depth at Curb
= 0.0000 in
Depth at Pavement /Gutter Joint
= 0.0000 in
Pavement Spread
= 0.0000 ft
Total Spread
= 0.0000 ft
Gutter Velocity
= 0.00 ft /s
Curb Efficiency
= * %
Grate Efficiency
= * %
Slot Efficiency
= * %
Total Efficiency
= 0.00 %
PIPE DESCRIPTION: Pipe 3
= 462.34 ft
- - -- RAINFALL INFORMATION--- -
= 462.61 ft
Return Period
= 100 Year
Rainfall File
= Tutorial
- -- -PIPE INFORMATION--- -
HYDRAULIC
Current Pipe
= Pipe 3
Downstream Pipe
= Pipe 2
Pipe Material
= HDPE
Pipe Length
= 55.3748 ft
Plan Length
= 58.8741 ft
Pipe Type
= Circular
Pipe Dimensions
= 18.00 in
Pipe Manning's "n"
= 0.013
Pipe Capacity at Invert Slope
= 7.33 cfs
Invert Elevation Downstream
= 460.84 ft
Onvert Elevation Upstream
= 461.11 ft
nvert Slope
= 0.49%
Invert Slope (Plan Length)
= 0.46%
Rim Elevation Downstream
= 466.36 ft
Rim Elevation Upstream
= 466.61 ft
Natural Ground Slope
= 0.45%
Crown Elevation Downstream
= 462.34 ft
Crown Elevation Upstream
= 462.61 ft
- -- -FLOW INFORMATION--- -
HYDRAULIC
INFORMATION--- -
Catchment Area
= 0.00
ac
Runoff Coefficient
= 0.500
= 463.50
Inlet Time
= 5.00
min
Inlet Intensity
= 10.24
in /hr
Inlet Rational Flow
= 0.00
cfs
Inlet Input Flow
= 5.75
cfs
Inlet Hydrograph Flow
= 0.00
cfs
Total Area
= 0.00
ac
Weighted Coefficient
= 0.500
ft
Total Time of Concentration
= 5.00
min
Total Intensity
= 10.24
in /hr
Total Rational Flow
= 0.00
cfs
Total Flow
= 5.75
cfs
Uniform Capacity
= 7.33
cfs
Skipped flow
= 0.00
cfs
Infiltration
= 0.00
gpd
- - --
HYDRAULIC
INFORMATION--- -
= 11.1042 in
Depth Downstream
HGL
Elevation
Downstream
= 463.50
ft
HGL
Elevation
Upstream
= 463.70
ft
HGL
Slope
= 1.77 ft^2
= 0.36 %
= 1.77 ft "2
EGL
Elevation
Downstream
= 463.66
ft
EGL
Elevation
Upstream
= 463.86
ft
GL Slope
= 0.36 %
ritical Depth
= 11.1042 in
Depth Downstream
= 18.0000 in
Depth Upstream
18.0000 in
Velocity Downstream
= 3.25 ft /s
Velocity Upstream
= 3.25 ft /s
Uniform Velocity Downstream
= 4.59 ft /s
Uniform Velocity Upstream
= 0.00 ft /s
Area Downstream
= 1.77 ft^2
Area Upstream
= 1.77 ft "2
Kj (JLC) = NA
Calculated Junction Loss = 0.205 ft
- -- -INLET INFORMATION--- -
Downstream Inlet = CB 1
nlet Description
= <None>
nlet Tyre
= Undefined
Computation Case
= Sag
Longitudinal Slope
= 0.00 ft /ft
Mannings n -value
= 0.000
Pavement Cross -Slope
= 0.00 ft /ft
Gutter Cross -Slope
= 0.00 ft /ft
Gutter Local Depression
= 0.0000 in
Gutter width
= 0.0000 ft
Ponding Width
= 0.0000 ft
Intercept Efficiency
= * 96
Flow from Catchment
= 0.00 cfs
Carryover from previous inlet
= 0.00 cfs
Total Flow to Current Inlet
0.00 cfs
Flow Intercepted by Current Inlet
0.00 cfs
Bypassed Flow
0.00 cfs
Pavement Flow
0.00 cfs
Gutter Flow
0.00 cfs
Depth at Curb
0.0000 in
Depth at Pavement /Gutter Joint
0.0000 in
Pavement Spread
0.0000 ft
Total Spread
0.0000 ft
Gutter Velocity
0.00 ft /s
Curb Efficiency
* 96
Grate Efficiency
* %
Slot Efficiency
* 96
Total Efficiency
0.00
•
•
AMA
IM AFAM Am
ar
Prepared By: Endo Engineering
vim MM M
September 2004
1
Endo Engineering Traffic Engineering Air Quality Studies Noise Assessments
September 7, 2004
Mr. Rod Grinberg
Trans West Housing
9968 Hibert Street - Suite 102
San Diego, CA 92131
SUBJECT: Griffin Ranch Specific Plan and Vesting TTM 32879
Traffic Impact Study
Dear Mr. Grinberg;
Endo Engineering is pleased to submit this evaluation of the traffic impacts associated with
the Griffin Ranch development in the City of La Quinta. The project site is located on 199±
acres located east of Madison Street and south of Avenue 54. The proposed Griffin Ranch
development includes the development of up to 305 single - family residential dwellings in a
gated community with an equestrian center. The proposed project is expected to be
completed by the year 2008.
The format and content of this report have been approved by the City of La Quinta. The
pages which follow briefly summarize in graphic and narrative form: (1) existing
circulation conditions in the project vicinity; (2) year 2008 circulation conditions with and
without the proposed project; and (3) specific mitigation measures designed to reduce any
significant impacts identified to acceptable levels.
' We trust that the information provided herein will be of value in your review the impacts
and conditions of approval associated. with the project. Should questions or comments
arise regarding the findings and recommendations herein, please do not hesitate to contact
' our offices by telephone, facsimile or electronic mail at'endoengr@cox.net. We look
forward to,discussing our findings with you.
1
1
1
Sincerely,
ENDO ENGINEERING
1;9), XA4 tar,
Vicki Lee Endo, P.E.
Registered Professional
Traffic Engineer TR 1161
�o Qiof SIO /V"
lE f Elkoo
TR 1161
j . N 131 1400 (,
S TRAFF \� �P
l� Of CALtE�
28811 Woodcock Drive, Laguna Niguel, CA 92677 -1330
Phone: (949) 362 -0020 FAX: (949) 362 -0015
GRIFFIN RANCH SPECIFIC PLAN
AND VESTING T.T.M. 32879
TRAFFIC IMPACT STUDY
EAST OF MADISON STREET
SOUTH OF AVENUE 54
CITY OF LA QUINTA
September 7, 2004
Prepared For:
Trans West Housing
9968 Hibert Street - Suite 102
San Diego, CA 92131
(858) 653 -3003
Prepared By:
ENDO ENGINEERING
28811 Woodcock Drive
Laguna Niguel, CA 92677
Phone: (949) 362 -0020
FAX: (949) 362 -0015
E -Mail: endoengr @cox.net
Table of Contents
Section Title Page
1.0 EXECUTIVE SUMMARY ............... ................................
1 -1 .
- Existing Conditions
- Circulation Impacts
- Recommended Mitigation
2.0 PROJECT LOCATION AND DESCRIPTION .....................
2 -1
- Project Location
- Project Description
- Project Phasing Plan
- Study Area and Key Intersections
- Cumulative Development
3.0 EXISTING CIRCULATION CONDITIONS .......................
3 -_1
- Surrounding Street System
- Current Traffic Volumes
- Roadway Capacity Considerations
- Applicable LOS Standards
- Daily Volume -To- Capacity Analysis
- Peak Hour Intersection Analysis
- Relevant Circulation Plans
- Traffic Signal Warrants
- Alternative Transportation Modes
- Congestion Management Program (CMP)
- Regional Transportation Improvement Plan
4.0 CIRCULATION IMPACT ANALYSIS .............................
4 -1
- Trip Generation Forecast
- Traffic Distribution and Assignment
- Future Year 2008 Ambient Conditions
- Future Year 2008 +Project Conditions
- Traffic Signal Warrants
- Other Considerations
5.0 CIRCULATION MITIGATION MEASURES ...................... 5 -1
- Measures Required On -Site
- Measures Required Off -Site
APPENDIX
A. Traffic Count Data
B . HCM Methodology and Worksheets
C. Traffic Signal Warrant Worksheets
D. Traffic Glossary .
U
List of Figures
Number
Title Following Page
2 -1
Regional Location ................................................ ....
2 -1
2 -2
"Vicinity Map ....... . ....................................................
2 -1
2 -3
Site Development Plan ........... ....... ......................... ..
2 -1
3 -1
Existing Transportation System .....................................
3 -1
3 -2
Existing Key Intersection Lane Geometrics ...............:........
3 -1
3 -3
Current Peak Hour Traffic Volumes ...............................
3 -4
3 -4
Current Daily Traffic Volumes .........................................
3 -4
3 -5
Adopted Circulation Plan- City of La Quints .:...................
3 -11
3 -6
Typical Cross - Sections - City. of La Quints .........................
3 -11
4 -1
Site Traffic Assignment ..............................................
4 -2
4 -2
Project - Related Traffic Volumes ...............
4 -2
4 -3
Yeai.2008 .Traffic Volumes - Without Project .....................
4 -4
4 -4
Year 2008 Traffic Volumes - With Project ........................
4 =7
5 -1
Year 2008 Intersection Lane Geometrics ..........................
5 -1 .
U
List of Tables
Number Title Page
3 -1
City of La Quinta Daily Capacity Estimates
By Roadway Classification ........... ...............................
3 -5
3 -2
Current Daily Volumes and V/C Ratios
For Roadways in the Study Area ...............................
3 -7
3 -3
Current Peak Hour Delay and LOS
at the Unsignalized Key Intersections ...............................
3 -9
3 -4
Existing Signalized Intersection
Peak Hour Delay and LOS Summary ..............................
3 -11
4 -1
Project- Related Traffic Generation ..................... .........
4 -2
4 -2
Year 2008 Daily Volumes and V/C Ratios
For Roadways Adjacent to. Key Intersections ....................
4 -4
4 -3
Year 2008 Unsignalized Key Intersection
Peak Hour Delay and LOS Summary .. ....... . ....................
4 -6
4 -4
Year 2008 Signalized Key Intersection
Peak Hour Delay and LOS Summary .. .........I .....................
4 -7
I
m
1.0 EXECUTIVE SUMMARY
1.1 EXISTING CONDITIONS
1. All roadway segments adjacent to the key intersections evaluated in the study area are
currently operating below capacity (i.e., handling daily traffic volumes which
comprise less than 80 percent of the current daily roadway capacity). Current traffic
volumes utilize between 6 and 77 percent of the existing daily capacity of the roadway
segments within the study area.
' 2. - Although a single overall intersection delay and LOS are not defined for unsignalized
intersections with two -way stop control (TWSC) in the Highway Capacity Manual
(HCM 2000), it may be concluded that current levels of delay at the intersection of
' Madison Street and the PGA West access located opposite the Griffin Ranch site are
acceptable (LOS B or better) during the peak season.
' 3. With one exception, the current peak season AWSC key intersection delay values
correspond to overall intersection operation at LOS B or better during the morning
and evening peak hours. The intersection of Jefferson Street and Avenue 54 is
currently operating at LOS D during the evening peak hour in the peak season.
' 4. The signalized key intersection of Jefferson Street at Highway 111 currently provides
acceptable levels of service (LOS C during the morning and evening peak hours).
' 5. Based upon peak season peak hour traffic volumes, three of the five unsignalized key
intersections currently meet rural traffic signal warrants, but are operating at
acceptable levels of service (LOS D or better).'
1.2 CIRCULATION IMPACTS
t 1. Buildout of the proposed project would generate approximately 2,900 daily trip -ends,
with 223 trip -ends during the morning peak hour (56 inbound and 167 outbound) and
292 trip -ends during the evening peak hour (184 inbound and 108 outbound).
' 2. With the projected growth in background traffic by the year 2008, all of the roadway
segments evaluated except one are projected to be carrying daily traffic volumes that
are below their capacity (i.e., that comprise less than 80 percent of their daily
' capacity). Highway 111, east of Jefferson Street, is projected to have a daily
volume -to- capacity ratio of 0.86, which would be classified as "near capacity."
' 3. Following the addition of project - related traffic to the year 2008 ambient daily traffic
projections, all of the roadway segments evaluated except one are projected to be
carrying daily traffic volumes that are below their capacity (i.e., that comprise less
' than 80 percent of their daily capacity). Highway 111,. east of Jefferson Street, is
projected to have a daily volume -to- capacity ratio of 0.86, which would be classified
as "near capacity."
' 4. Assuming the site access improvements shown in Figure 5 -1, the three unsignalized
site access intersections are projected to provide LOS B operation on the approaches
with the most delay following project completion in the year 2008.
1 -1
'
5. With the expected traffic growth in the area, the following three key intersections are
projected to operate at LOS E or F in the year. 2008 and require signalization to
'
maintain acceptable levels of service: (1) Jefferson Street at Avenue 54, (2) Madison
Street at Avenue 54, and (3) Monroe Street at Avenue 54. With and without project-
related traffic, all of the signalized key intersections (including the three unsignalized
key intersections on Avenue 54 recommended for signalization by the year 2008) are
'
projected to provide acceptable levels of service (LOS D or better operation) during
the peak hours in the year 2008 with existing lane geometrics.
'
1.3 RECOMMENDED MITIGATION
The following mitigation measures should be incorporated in the project to minimize the
potential for significant adverse circulation impacts associated with the proposed
'
development.
'
1. The project proponent shall dedicate appropriate right -of -way and improve Madison
Street and Avenue 54 adjacent to the site, as required by the City La
project of Quinta.
2. An on- street Class II bikeway and golf cart path (a minimum of 8 feet wide) shall be
'
appropriately striped along Madison Street and Avenue 54 adjacent to the site.
3: A left -turn bay shall be constructed in the median along Madison Street as a refuge
and to permit southbound motorists to decelerate out of travel lanes prior to turning
'
left into the site access on Madison Street.
4. The final layout and site access design shall be subject to the review and approval of
'
the City Traffic Engineer during the development review process, to ensure
compliance with City of La Quinta roadway and access design standards.
5.. Clear unobstructed sight distances shall be provided at all site access points and at all
internal intersections including the roundabouts.
'
6. Stop signs shall be installed on -site at the proposed access points on Madison Street
and Avenue 54 to control exiting site traffic.
7. The project proponent shall provide (at a minimum) the lane geometrics shown in
Figure 5
'
-1 at the site access points in conjunction with on -site development.
8. Appropriate street lighting and signage shall be provided as part of the roundabout
' design.
9. The proposed roundabouts on -site should be reviewed by an individual with
tdemonstrated expertise in roundabout design.
10. To achieve and maintain the City of La Quinta minimum intersection performance
standard of LOS "D" in the year 2008 (with or without project traffic), the project
' proponent may be required to contribute on a "fair- share" basis to the cost of
installing traffic signals at the following key intersections: (1) Jefferson Street at
Avenue 54, (2) Madison Street at Avenue 54, and (3) Monroe Street at Avenue 54.
11. The project proponent may be required to participate in a traffic mitigation fee
program which would ensure that a "fair-sh are". contribution is made to future
roadway infrastructure improvements of area -wide benefit.
' 1 -2
2.0 PROJECT LOCATION AND DESCRIPTION
2.1 PROJECT LOCATION
The project site is comprised of approximately 199 gross acres, generally located in the
southeastern portion of the City of La Quinta. The land is currently vacant and used for
agriculture. Figure 2 -1 depicts the project.site in its regional context.
Figure 2 -2, the Vicinity Map, depicts the study area and the existing key intersections. As
shown therein, the project site is more precisely located on the southeast.corner of the
intersection of Madison Street and 54th Avenue, opposite the PGA West development.
2.2 PROJECT DESCRIPTION
The proposed Griffin Ranch project includes a Specific Plan to address the requested
downgrading of Madison Street from a six -lane major roadway to a four -lane primary
roadway and a Tentative Tract Map (TTM 32879) addressing a gated residential
development with up to 305 private residential lots and equestrian facilities on 192.7 net
acres. Figure 2 -3 illustrates the Site Development Plan, including the proposed site access
and internal circulation system. The proposed development would include the development
of single - family residential dwellings in a gated community. A 39.8 -acre parcel located in
the middle of the project (adjacent to Avenue 54) is not part of the proposed project and
would remain a horse ranch.
Site Access and Internal Circulation
The main site access will be gated and is.proposed on Madison Street, opposite the existing
PGA West gated access. It is located approximately 2,000 feet south of Avenue 54 and
650 feet north of the southern site boundary. The project also proposes two urisignalized
access points on Avenue 54; one on either side of the 39.8 -acre parcel that is not part of the
proposed project. The western site access is proposed approximately. 855 feet east of
Madison Street. The eastern site access is proposed approximately 875 feet west of the
eastern site boundary (about 3,080 feet east of Madison Street or 2,200 feet west of
Monroe Street).
Internal circulation on -site will accomplished via 6.3 acres of dedicated private streets.
Street "A" will permit entry to the, site from Madison Street and 54th Avenue (via the
eastern site access). Street "B" will permit entry from 54th Avenue and extend south to
Street "A ", where a roundabout is planned to facilitate access to the equestrian center by
vehicles towing horse trailers. Similarly, a roundabout is planned where Street "A"
intersects Street "C" (which will permit the most direct access to the equestrian center from
Madison Street).
Street "CC" will extend north -south along the eastern site boundary and east -west across
the majority of the site, terminating in a cul -de -sac near the equestrian center. This
roadway, while long and straight, is, for the most part, a single- loaded residential street
that will collect traffic and intersect several roadways that essentially forms three internal
loop roads with Street "A ".
2 -1
Figure 2 -1
Regional Location
V ndo Engineering
Scale: 1 " = 13.3 Miles
Sa_n Bernardino_...
10
._-- •-- - - -• --
• - --
Riverside County.
—• - -� _ i
62
- -•
Riverside•
• Desert
�-
60 Bang Ong Ca azon
Hot Springs
91
Moreno
Valley
111
•�
Q
• Cathedral
Palm City
Springs . Palm Desert
15
74
Rancho • Indio
`
Sun Hemet
Mirage 0
-�•
Cty
Indian LaQ uinta
10
Wells
•� 215
Project
111
/
74 Site
Lake
/ Elsinore
Murrieta Hot
/
371
Salton .....:...;.•.
Sea
Temecula Springs
•
f
- - -•—� 79
•�•`• - -• —•— ---
• - - -•— . —•
__ _
- °. •—
-- •-
San Diego County
�_0
CD
�C)
0
c
P .
i -
V ndo Engineering
Scale: 1 " = 13.3 Miles
Figure 2 -2
Study Area and
Key Intersections
Highway 111
Avenue 48
Legend
� Project Site
• Key Intersection
Site Access
Avenue 50.
Avenue 52
Avenue 54
'
Q
0
� Projec.'
C` Site
o a).
o U)
Airport Blvd.
1
�
c
o
CO
Avenue 58
'
!Undo Engineering
Scale: 1 " = 3770'
Figure 2 -3
Site Development Plan
....-
•� —, - - -- — — -- — — — — — — — — —
r�- - - - - --
I _ J.
. -.L
='
A.
I • � -�� \�'' � , y- , �: , • �- �. ��- ,�"`�;� iii
i i --• /;ii � %�_ .. - � -,,. ;.; - ,;;6�= I 'ail
Scale: 1 500'
Source: MSA Inc. " =
Existing and Proposed General Plan and Zoning Designations
The proposed Griffin Ranch project is consistent with the existing General Plan Land Use
' and zoning designations on -site. The project site is currently designated LDR (Low
Density Residential) and VLDR (Very Low Density Residential) in the La Quinta General
Plan, with a permitted residential density of up to 4 units per acre and up to 2 units per
' acre, respectively. The current zoning. on -site is RL (Residential Low) and RVL
(Residential Very Low) with an Equestrian Overlay.
2.3 PROJECT PHASING PLAN
The project would be phased and built over a three -year period. For the purposes of the
traffic analysis, the traffic study assumed. that the project would begin construction in late
spring.of 2005 and be completed and occupied by the year 2008.
2.4 STUDY AREA AND KEY INTERSECTIONS
Based upon coordination with the City of La Quinta, the study area has been identified as
well as six existing key intersections, as shown in Figure 2 -2. Morning and evening peak
hour levels of service were analyzed at the following existing key intersections:
Jefferson Street @ Highway 111;
• Jefferson Street @ Avenue 54;
• Madison Street @ Avenue 54;
2.5 CUMULATIVE DEVELOPMENT
• Monroe Street @ Avenue 54;
• Madison Street @ Avenue 58; and
• Madison Street @ PGA West Access.
Cumulative development is currently occurring at a variety of locations throughout the City
of La . Quinta and the Coachella Valley at a rapid pace. From January 2002 to January
2003; the Cities of Coachella, La Quinta, and. Indio were the fastest growing cities in the
Coachella Valley. The City of Coachella grew by 10.1 percent, the population of La Quinta
grew by 5.9 percent, and the population of Indio grew by 4.4 percent during that 12 -month
interval. During the same period, Riverside County as a whole experienced a population
growth of 3.7 percent.
Cumulative development was addressed herein by reflecting the anticipated traffic growth
on the circulation network in the study area, based on historical 24 -hour traffic counts at
two locations. Published 24 -hour CVAG traffic count data for Madison Street, south of
Avenue 54, indicates a 9 percent annual traffic growth rate from the year 1998 to the year
2003. This annual traffic growth rate was assumed for the key intersections on Monroe
Street, Madison Street, and Avenue 54 at the site access points.
Twenty -four hour traffic counts from 1998 to 2003 were also available.for Jefferson Street,
south of Highway 111. Based upon this traffic count data, the intersection of Jefferson
Street and Highway 111 has experienced an annual traffic growth rate of 2.7 percent.
Based upon coordination with the City of La Quinta, the the north /south through
movements at the intersection of Jefferson Street and Avenue 54 were assumed to
experience an annual traffic growth rate of 2.7 percent. All other turning movements at this
intersection were assumed to be increasing at a rate of 9 percent per year. The 2.7 percent
growth rate reflects the lower anticipated traffic growth from the nearly completed PGA
West development.
2 -2
L�
3.0 EXISTING CIRCULATION CONDITIONS
Regional access to the City of La Quinta is available from State Highway 111 and Interstate
10. Local access is available from Airport Boulevard and Jefferson Street. Direct site
access will be taken from Madison Street and Avenue 54.
Figure 3 -1 depicts. the existing circulation system in the vicinity of the project site. The
number of mid -block through lanes are shown as well as whether or not each roadway is a.
divided or undivided facility. Divided facilities typically provide sufficient pavement width
for left -turn pockets at intersections or mid -block at median openings. Undivided facilities
require left- turning motorists to queue in the through lane, thereby reducing the carrying
capacity of the roadway. The existing traffic control devices and posted speed limits are
shown in Figure 3 -1, based upon field reconnaissance in the project vicinity. The
intersection approach lanes and traffic control at the existing key intersections are shown in
Figure 3 -2.
3.1 SURROUNDING STREET SYSTEM
Jefferson Street runs north /south and is a six -lane divided major arterial with a posted
speed limit of 55 mph from Highway 111 to Avenue 54. North of Highway 111,
Jefferson Street is a four -lane divided major arterial with a posted speed limit of 40 mph.
South of Avenue 54, Jefferson Street becomes PGA Boulevard, a four -lane divided facility
with a 35 mph posted speed limit. Jefferson Street is currently controlled by an all -way
stop at Avenue 54 and by traffic signals at Avenue 50, Avenue 48, and Highway 111. The
intersections of Jefferson Street and Avenue 52 is a roundabout.
Madison Street is a north /south arterial with a 50 mph posted speed limit. Four -lane
roadway segments and accompanying improvements exist on Madison Street where
development has occurred. From Avenue 58 to the project site, Madison Street provides a
four -lane divided cross - section (where the adjacent land on both sides of the roadbed has
been developed in conjunction with the PGA West Specific Plan). North of Avenue 58,
Madison Street has one southbound lane and two northbound lanes. Adjacent to the project
site, Madison Street includes two southbound lanes, with one northbound lane. Madison
Street does not extend between Avenue 54 and Avenue 52, or between Avenue 50 and
Highway 111. Madison Street is a four -lane divided roadway south of Avenue 58.
Madison Street is currently controlled by an all -way stop at the intersection of Avenue 54
and at Avenue 58. A traffic signal controls the intersection of Madison Street and Airport
Boulevard.
Monroe Street is a north/south 2 -lane undivided roadway with a prima facie speed limit
' of 55 mph near Avenue 54. Monroe Street is improved as a two -lane undivided roadway .
near the intersection with Avenue 54 and the intersection is controlled by an all -way stop.
C]
Avenue 54 is an east/west two =lane undivided roadway with 26± feet of pavement, east
of Madison Street. This section of Avenue 54 does not have curbs, gutters, sidewalks or
street lights. West of Madison Street, Avenue 54 has a raised, landscaped median and has
been fully improved to provide a four -lane divided cross - section. The eastbound portion of.
the roadway has improvements that were completed in conjunction with the development of
the PGA West Specific Plan including curbs, gutters, sidewalks, streetlights and
landscaping. The westbound side has recently been improved during development of the
Hideaway project. West of Jefferson Street, Avenue 54 narrows to a 2-lane undivided
3 -1
D
i 50 Highway 111
4D ja, 2D a5
4 Avenue 48
c
CD
U
6D
2U 2D
® 7 � as Avenue 50
TM
2 Avenue 52
Figure 3 -1
Existing Transportation System
Legend
2U
Number of Through Lanes
--�
D = Divided U = Undivided
STOP Sign
0
Signalized Intersection
❑
All Way Stop Control
O-
Roundabout
®
Posted Speed Limit
6D
2U
® 2U so 4D 2U 2U
tt - -� Avenue 54
U.
Q roject ?: <' o
Site
CL
4D'
4D 5o Airport Blvd.
m •
a�
4D-
0
50
CZ
2U 45 50 2U
Avenue 58.
50
�Vndo Engineering 4D Scale: 1 " = 3770'
IN
C
0 a�
a�
U)
Highway 111
Avenue 48
Avenue 50
111
LJ
Q
c�
ject:::::;::::'
Site
c
C
0 a�
a�
U)
Highway 111
Avenue 48
Avenue 50
Figure 3 -2
Existing Key Intersection
Lane Geometrics .
Legend
L Exclusive Right -Turn Lane
�— Through Lane
Exclusive Left -Turn Lane
�= Optional Through /Right Lane
E� Optional Through /Left Lane
�— Optional Through /Right/Left Lane
Signalized Intersection
R. All Way Stop Control
Stop Sign
Avenue 54
Avenue 52
LJ
Q
c�
Figure 3 -2
Existing Key Intersection
Lane Geometrics .
Legend
L Exclusive Right -Turn Lane
�— Through Lane
Exclusive Left -Turn Lane
�= Optional Through /Right Lane
E� Optional Through /Left Lane
�— Optional Through /Right/Left Lane
Signalized Intersection
R. All Way Stop Control
Stop Sign
Avenue 54
Avenue 58
T
VNIEndo Engineering Scaler 1" = 3770'
Q
c�
ject:::::;::::'
Site
c
in
Airport Blvd.
CD
`�—
cn
c
o
LJ
_
Cz
Avenue 58
T
VNIEndo Engineering Scaler 1" = 3770'
eroadway with a prima facie speed of 40 mph. The intersections of Avenue 54 with
Jefferson Street, Madison Street, and Monroe Street are all -way stop - controlled
intersections.
Avenue 58 is an east/west roadway with a prima facie speed of 45 mph (west of Madison
Street) and a 50'mph posted speed limit, east of.Madison Street. Avenue 58 is generally a
' two -lane undivided roadway in the vicinity of Madison Street, except adjacent to the PGA
West Specific Plan area ( east of Madison Street).
' 3.2 CURRENT TRAFFIC VOLUMES
Average daily traffic (ADT) volumes are the total volume passing a point or segment of a
highway facility in both directions on an average day during a specified interval (which can
be the peak month or weekdays etc.). The average daily traffic averaged over a full year is
referred to as the annual average daily traffic, or AADT.
Peak season, (winter) weekday traffic volumes have historically been determined with 24-
hour machine counters placed at various locations throughout the Coachella Valley. The
Coachella Valley Association of Governments (CVAG) compiles the 24 -hour traffic count
' data and publishes traffic census reports annually. The most recent CVAG traffic count
data was collected in the peak season (winter) of 2003. For State Routes such as Highway
111, traffic count data is published annually by Caltrans including the AADT, the peak
month ADT and the peak hour volume.
The Highway 111 peak hour volume (2,300 vehicles per hour) was 9.6 percent of the 2003
AADT (24,000 vehicles per day) between Washington Street and Madison Street, and 8.4
' percent of the 2003 peak month ADT (27,500 vehicles per day).. In.the year 2003, the.peak
month ADT (which represents the ADT for the month of heaviest flow) was 14.6 percent
larger than the AADT. This indicates that the traffic volume on Highway 111 in the peak
season is 14.6 percent greater than the average annual traffic volume. However, the
seasonal variation between summer volumes and winter volumes is even larger than 14.6
percent, because traffic volumes in the summer months are lower than the average annual
traffic volumes in the study area.
Between 2002 and 2003, the peak hour traffic volume on Highway 111 increased by 50
vehicles per hour (or 2.2 percent). During the same period, the AADT increased by 500
vehicles per day (2.1 percent) and the peak month ADT increased by 500 vehicles per day
(1.9 percent).
New Traffic Count Data
Typically, morning and evening peak hours are evident on urban commuter routes on
weekdays, with the evening peak being generally more intense than the morning peak.
t However, commuter travel patterns can vary in response to local travel habits and
environments. Traffic analyses focus on the peak hour traffic volume because it has the
highest capacity requirements and represents the most critical period for operations.
' To document the current traffic volumes in the study area, weekday morning and evening
peak hour traffic counts were made by Counts Unlimited, Inc.. at the existing key
intersections on August 3, 4, and 5, 2004. Manual turning movement counts were made
' continuously between 7:00 a.m. and 9:OO a.m. and again between 4:00 p.m. and 6:00 p.m.
in an effort to quantify the highest volume over a consecutive 60- minute interval.
1
LJ
1
�I
1
Two 24 -hour machine traffic counters were also used in the study area to document the
percentage of the daily traffic volume that occurs in the evening peak hour and permit a
seasonal traffic variation adjustment factor to be identified. A 24 -hour traffic count was
made on Jefferson Street (south of Highway 111) and on Madison Street (south of Avenue
54). The peak hour and 24 -hour traffic count data are included in tabular form by 15-
minute intervals in Appendix A.
The 24 -hour traffic count made adjacent to the project site on Madison Street revealed that
the highest hourly volume hour occurred between 2:00 p.m. and 3:00 p.m. (rather than the
expected 4:00 p.m. to 6:00 p.m.) and included 552 vehicles or 9.6.percent of the 24 -hour
volume. The 24 -hour traffic count on Jefferson Street, south of Highway 111, also
showed that the highest hourly volume occurred between 2:00 p.m. and 3:00 p.m. The
highest hourly volume was 1,457 vehicles (8.1 percent of the 24 -hour volume). .
The selection of an appropriate hour for planning, design, and operational purposes is
critical in providing an adequate level of service for every (or nearly every) hour of the
year. For urban roadways, a design hour for the repetitive weekday peak periods is
common. However, to avoid substantial congestion during the highest- volume hours,
local data is required on which to base a informed judgments, The Highway Capacity
Manual (HCM 2000) states that as a general guide, the most repetitive peak volumes may
be used for the design of new or upgraded facilities.
Commuter and business- oriented travel typically exhibits more uniform travel patterns than
recreational travel (which can create substantial variations in traffic volumes). Since
commuter travel in the study area appears to peak between 2:00 p.m. and 3:00 p.m., it was
determined that the traffic count data collected at the key intersections between 4:00 p.m.
and 6:00 p.m. should be increased proportionately to reflect the higher volumes identified
in the highest - volume hour from the two 24 -hour traffic counts in the study area.
Highest- Volume Hour Correction
The 24 -hour traffic counts at both locations identified the hour with the highest traffic
volume as occurring between 2:00 pm and 3:00 pm. Many employees from the golf
courses and resorts, as well as construction workers in the area, leave work during this
time interval, creating an earlier than normal commuter peak travel hour in the vicinity of
the proposed project. The evening peak hour turning movement traffic count data at each
of the key intersections was proportionately increased to reflect the highest - volume hour
conditions identified at the closest 24 -hour count location. The adjustment for the early
peak hour was applied to all roadway segments south of Highway 111. .
The turning movement traffic count data collected at the intersection of Jefferson Street and
Avenue 54 was increased based on the highest- volume hour data identified by the 24 -hour
traffic count on Jefferson Street, south of Highway 111. The turning movement counts
made between 4:00 p.m. and 6:00 p.m. at the other four existing key intersections were
increased to reflect the highest- volume hour data based on the 24 -hour traffic count made
on Madison Street. The adjustments reflected the difference between the northbound plus
southbound volume observed from 2:00 p.m. to 3:00 p.m. and that counted during the
highest consecutive 60- minute interval from 4:00 p.m. to 6:00 p.m.
The intersection of Jefferson Street and Highway 111 includes a substantial volume of
regional traffic which exhibits more traditional commuter traffic flow patterns. Therefore,
the traffic count data for the six movements through the intersection of Jefferson Street and
Highway 111 that involved travel to or from the south leg of Jefferson Street were
increased by 24 percent to reflect conditions in the highest - volume hour (between 2:00
3 -3
'. P.M. and 3:00 p.m.). The east -west through traffic count data on Highway 111 was not
adjusted and assumed to accurately reflect evening peak hour conditions.
' Seasonal Traffic Variations
Seasonal fluctuations in traffic demand reflect trip purposes and the activity of the area
' served by the roadways. The Coachella Valley is relatively isolated from neighboring
urbanized regions and. is home to hundreds of resort facilities and retirement communities.
In the Coachella Valley, a large tourist and retired population, supported by large service
' sector employment, generates travel patterns that are in many ways atypical of Southern
California. Approximately 3.5 million people visit the Coachella Valley each year. The
tourist season extends from October to May, with the peak of the season beginning in
' January and ending in March.
Since Interstate 10 is removed from the majority of the urbanized areas, it is under utilized
by local inhabitants. This places pressure on State Highway 111. As more east -west roads
are constructed to serve this travel demand, additional alternative routing will be possible.
As a result of the rapid pace of development currently underway in the City of La Quinta
(and throughout the Coachella Valley) the 24 -hour traffic counts made on August 3, 2004
' were substantially greater than the CVAG year 2003 peak season (winter) 24 -hour traffic
count data for the same roadways. The 24 -hour traffic count made on Jefferson Street
' (south of Highway 111) on August 3, 2004 was 14 percent greater than the winter 2003
CVAG 24 -hour traffic count. Similarly, the summer 2004 24 -hour traffic count made on
Madison Street (south of Avenue 54) was 65 percent greater than the 24 -hour CVAG count
in the winter of 2003.
' Even though the expected reduction in summer season traffic was not apparent from the
two 24 -hour traffic counts made in August, a seasonal correction factor of 20 percent was
' applied to the traffic count data from all of the existing intersections to increase the summer
count data to reflect year 2004 peak season conditions. Figure 3 -3 provides the resulting
weekday morning and evening peak hour turning movement traffic volumes at the key
' intersections for year 2004 peak season conditions.
Daily Volume Estimates
' For those roadway segments adjacent to the key intersections where 24 -hour traffic count
data was not available, current daily traffic volumes were estimated from the evening peak
hour traffic volumes. The daily volume estimates were made based on the percentage of
' the daily volume expected to occur in the highest volume hour, as determined at the closest
24 -hour traffic count location.
The year 2004 daily projected volumes on Highway 111 were based upon the peak hour
' counts, a 20 percent seasonal correction factor, and the percentage ,of the peak month daily
traffic during the peak hour provided in the Caltrans year 2003 traffic counts. Figure 3 -4
illustrates the current daily traffic volumes throughout the study area on a typical weekday.
' CVAG traffic counts from the winter of 2003 are provided in Figure 3 -4 for those
roadway segments which are not adjacent to an existing key intersection.
' 3.3 ROADWAY CAPACITY CONSIDERATIONS
Roadway capacity is the maximum number of vehicles that can pass over a given roadway
during a given time period under prevailing roadway, traffic and control conditions,
' assuming no interference from downstream traffic operations. A roadway's ability to
' 3 -4
I • ■ I
�r CO C') t49n8. `
E 0 720/892
.j L (- 142/194
78/115 J & ,;
528/1007 -,- N 'CYO) CD
124/288 iI N C r
v 214/491
2/4.
T Cl) 35/32
11/14
2/4-► T N
1 /2-i o T
C
a�
a�
a�
U)
Highway 111
Avenue 48
Avenue 50
Avenue 52
177/129
34/6
ca
74/144 -> cn o /
307/269 -�
?I o
CO N
t29/69
N �
88/126
a
..1 l.�
8/14
r
M
13/16)
LO/8J
78/152 ->
a N
r
34/69
32/2
1/4
Avenue 54
20/26)
11 /39-►
-
4/6-,
N
2
V ndo Engineering
Figure 3 -3
Current Peak Hour
Traffic Volumes
Legend
'x-5 /8 AM /PM Peak Hour
Turning Volume
A
o `or° rn
t29/69
N �
88/126
..1 l.�
8/14
13/16)
d'
78/152 ->
a N
8/2�
o T
Avenue 54
1 C0
C
Airport Blvd.
Avenue 58
Scale: 1 " = 3770'
Figure 3 -4
Current Daily Traffic Volumes
(2004 Peak Season)
[29,990] [29,4001 Highway 111
CO
r
o rn
N
Avenue 48
0—
LO
4,731 Avenue 50
cli
10,403 5,933 Avenue 52
0
am
M
a
7 O
CO N
Q In
0 `�
CL
1NISndo Engineering
S
O Q) N
C a) �
C �v
Airport Blvd.
(D
a�
CCD
O(
N ri
0y
cC
[900]' [1,660] Avenue 58
0
LO
L
ILL
Legend
1,000 CVAG 2003 ADT
[1,00012004 Peak Season Daily
Volume Estimate
00 24 -Hour Traffic Count
on 8/03/2004
Avenue 54
T
Scale: 1" = 3770'
handle different traffic demands can. be described in terms of levels of service (LOS).
Levels of service are a relative measure of traffic operating conditions and driver
satisfaction, based upon prevailing traffic volumes in relation to roadway capacity. LOS
values range from A (free flow) to F (forced flow). Levels of service reflect a number of
factors such as speed and travel time, traffic interruptions, vehicle delay, freedom to
maneuver, driver comfort and convenience, and vehicle operating costs.
An important distinction, exists between the concepts of capacity and levels of service. A
given lane or roadway may provide a wide range of service levels depending upon traffic
volumes and speeds, but it has only one maximum capacity. The maximum capacity is
determined from roadway factors (such as lane widths, lateral clearance, shoulders, surface
conditions, alignment and grades) as well as traffic factors such as vehicle composition
(truck and bus mix), distribution by lane, peaking characteristics, traffic control devices,
intersections, etc. It is usually given as the hourly service volume at the upper limit of LOS
E because the volume of traffic that can be served under the stop- and -go conditions
associated with LOS �F is lower than that possible at LOS E; therefore, the upper limit of
LOS E corresponds to the maximum flow rate or "physical' capacity of the facility.
The upper limit of LOS E represents the absolute maximum capacity under ideal conditions
on typical master planned roadways. Ideal conditions assume good weather, good
pavement conditions, users familiar with the facility, level terrain, only passenger cars in
the traffic stream, no pedestrians or curb parking, and.no incidents impeding traffic flow.
The LOS E maximum capacity values reflect the absolute maximum volume under ideal
conditions (assuming improvement to full standards under optimum operating conditions).
This level of service is characterized by unstable flows, extremely high volumes, limited
operating speeds, and intermittent vehicle queuing.
The maximum capacity values shown in Table 3 -1 have been applied at the General Plan
level as guidelines relating the daily traffic volume to the number of lanes needed mid -block
to serve that volume. The roadway capacity estimates in Table 3 -1 are "rule -of- thumb"
estimates affected by site specific factors such as the number and configuration of
intersections, the degree of access control., roadway grades, substandard design geometrics
(horizontal and vertical alignment), sight distance, the level of truck and bus traffic, the
percentage of turning movements, and the level of pedestrian and bicycle traffic.
Table 3 -1
City of La Quinta
Maximum Daily Capacity By Roadway Classification
Classification
Typical Lane Configurationa
Daily Capacityb
Major Arterial
6 -Lane Divided Roadway
57,000 Vehicles/Day
Primary Arterial
4 -Lane Divided Roadway
38,000 Vehicles/Day.
Secondary Arterial
4 -Lane Undivided Roadway
28,000 Vehicles/Day
Collector Street
2 -Lane Undivided Roadway
14,000 Vehicles/Day .
Local Street
2 -Lane Undivided Roadway
9,000 Vehicles/Day
a. Format is: number of mid -block through lanes - undivided or divided roadway..
b. The daily capacity values shown have been applied by the City of La Quinta at the General Plan level as
guidelines relating the daily traffic volume to the number of lanes needed mid -block to serve that
volume. Where it is not feasible to add additional mid -block through lanes, localized mitigation may be
needed (e.g. additional turn lanes at intersections, access restrictions, signal synchronization, etc.) to
ensure that acceptable peak hour levels of service are maintained.
3 -5
For planning. purposes, "design" capacities at the upper limit of LOS D are often used
because they ensure a more acceptable quality of service to facility users than the "physical"
carrying capacity of the roadway and because of the expense required to achieve a better
' level of service. The City of La Quinta has established LOS D as a peak hour system
performance standard or design guideline for traffic volumes on the roadway system.
' LOS D represents high density but stable flow, with tolerable operating speeds being
maintained albeit significantly affected by changes in operating conditions. 'With LOS D,
i fluctuations in volume and temporary restrictions to flow may cause substantial drops in
operating speeds.
3.4 APPLICABLE LOS STANDARDS
L,
All State Highways within Riverside County have been designated as part of the CMP
System of Highways and Roadways. State Highway 111 (from Interstate 10 to the
Imperial County line) is designated as part of the' CMP System of Highways and
Roadways. The minimum LOS standard for intersections and segments along the CMP
System of Highways and Roadways is LOS "E ". Intersections or street segments that drop
to LOS "F" are subject to the development of a deficiency plan.
Minimum level of service performance standards have been established by the City of La
Quinta that .apply to the roadways and intersections located within the study area. Since.
peak hour traffic creates the heaviest demand upon the circulation system and the lane
configuration at intersections is the limiting factor in roadway capacity, peak hour
intersection capacity analyses are .indicators of "worst- case" conditions and used to
determine required mitigation. The City of La Quinta requires the HCM 2000 methodology
to be used to determine mitigation and has adopted a circulation policy that level of service
"D" or better operation shall be maintained in the peak hours of the peak season at
intersections throughout the City: Any project which does not meet the performance
standard is considered to have a significant impact that warrants mitigation.
The analysis herein addresses whether or not the required level of service will be achieved
after the proposed project is constructed. Intersections not meeting the required LOS
standard have been evaluated both with and without mitigation to demonstrate that the
required level of service will be achieved. Roadway segments have been evaluated with a
daily link analysis to facilitate an understanding of which segments may need widening to
provide additional master planned through lanes and how soon widening may be needed.
No single.overall intersection level of service is defined for intersections with two -way stop
control (TWSC). The operation of TWSC intersections is reviewed on a cases -by -case
basis by the City of La Quinta, based upon evaluation with the HCM 2000 methodology.
When unacceptable operation is projected on the minor leg approach at a TWSC
intersection, mitigation is typically required in the form of geometric improvements or
signalization of the intersection (if traffic signal warrants are met).
3.5 DAILY VOLUME -TO- CAPACITY ANALYSIS
.A comparison of daily traffic volumes to the daily capacity gives the proportion of the
roadway capacity being utilized by the traffic volumes present. Daily volume -to- capacity
ratios reflect mid -block operations based upon daily traffic volumes and capacities derived
from the number of through lanes available on each roadway. Therefore,-a volume -to-
capacity (V /C) ratio of 1.0 indicates that the facility is handling the maximum traffic volume
that it can accommodate at the maximum capacity of the facility. Smaller volume -to-
3 -6
capacity ratios imply better operational characteristics. Ratios which exceed 1.0 imply less
favorable operating conditions (forced flow).
' Daily traffic volumes on roadway segments adjacent to the key intersections in the project
vicinity were evaluated to determine if existing and projected future traffic volumes would
approach or exceed the daily capacity of the roadway segments. Table 3 -2 provides the
1 current daily traffic volumes, roadway capacity, and volume -to- capacity ratios for roadway
segments adjacent to the existing key intersections in the study area. As shown therein, all
mid -block roadway links in the study area are currently handling volumes which comprise
' less than 80 percent of their current daily. capacity. Current volumes utilize between 6 and
77 percent of the existing daily capacity of the roadway segments within the study area.
Table 3 -2
Current Daily V/C Ratios For Roadways in the Study Area
Roadway Segment
Daily Volumea
(Vehicles/Day)
Daily Capacity
(Vehicles/Day)
V/C
Ratio
Conclusion
Jefferson Street
- North of Highway 111
111540
38,000
0.36
Below
- South of Highway 111
21,030
57,000
0.37
Below
- North of Avenue 54
13,960
57,000
0.24
Below
- South of Avenue 54
5,200
38,000
0.14
Below
Madison Street
- South of Avenue 54
6,900
14,000
0.49
Below.
- South of PGA West Access
6,260
14,000
0.45
Below
- North of Avenue 58
3,920
38,000
0.10.
Below
- South of Avenue 58
2,550
38,000
0.07
Below
Monroe Street
- North of Avenue.54
6,300
14,000
0.45
Below
- South of Avenue 54
4,520
14,000
0.32
Below
Highway 111
- West of Jefferson Street
29,990
57,000-
0.53
Below
- E/O Jefferson Street
29,400
38,000
0.77-
Below
Avenue 54
- West of Jefferson Street
310
14,000
0.02
Below
- East of Jefferson Street
10,060
38,000
0.26
Below
- West of Madison Street
9,410
38,000
'0.25
Below
- East of Madison Street
3,170
14,000
0.23
Below
- West of West Site Access
3,350
14,000
0.24
Below
- East of West Site Access
3,350
14,000
0.24
Below
- West of East Site Access
3,350
14,000
0.24
Below
- East of East Site Access
3,350
14,000
0.24
Below
- West of Monroe Street
3,350
14,000
0.24
Below
- East of Monroe Street
4,890
14,000
0.35
Below
Avenue 58.
- West of Madison Street
900
14,000
0.06
Below
- East of Madison Street
1,660
14,000
0.12.
Below
a. These peak season-weekday volumes were estimated from year 2004 evening peak hour traffic counts.
b. "Below" indicates that the volume is less than 80 percent of the capacity. . .
3 -7
'
3.6 PEAK HOUR INTERSECTION ANALYSIS
'
The latest update of the Highway Capacity Manual (HCM 2000) presents the best available
for determining capacity, delay and LOS for transportation facilities.1 The peak
techniques
hour delay and levels of service were determined at the existing key intersections with the
methodologies outlined in the HCM 2000. The Highway Capacity Software (HCS 2000)
'
package is a direct computerized implementation of the HCM 2000 procedures, prepared
under FHWA sponsorship and maintained by the McTrans Center at the University of
Florida Transportation Research Center. HCS 2000 Version 4.1d was employed.to
'
evaluate the operation of the key intersections in the project vicinity.
A brief discussion of the HCM 2000 operational analysis is provided in Appendix B, in
conjunction with the corresponding LOS criteria and intersection evaluation worksheets.
levels is
'
The relationship between peak hour intersection control delay and of service
provided in Appendix B (Table B -1 for unsignalized and Table B -2 for signalized
intersections). The. City of La Quinta has defined Level of Service "D" as the minimum
'
adequate intersection service level during peak hours for planning and design purposes.
Unsignalized Intersection Analysis
' .
Five of the key intersections in the project vicinity are currently unsignalized. Unsignalized
intersections are typically categorized as either two -way stop - controlled (TWSC) or all -way
'
stop- controlled (AWSC) intersections. The future main site access to be located on
Madison Street opposite the existing access to the PGA West development is the only
unsignalized key intersections that is a two -way stop - controlled intersection. The other
unsignalized key intersections are all -way stop - controlled intersections.
'
h approaches controlled b the stop sin are referred to as the
At TWSC intersections, the pp y p g
minor street approaches. Minor street approaches can be either public streets or private
driveways. The intersection approaches that are not controlled by stop signs are called the
'
major.street approaches. The left -turn movement from the minor street is normally the ,
most difficult to execute at a TWSC intersection, because it faces the most complex set of
conflicting moves.
delay, delay to
The performance measures for TWSC and AWSC intersections are: control
major street through vehicles, queue length, and volume -to- capacity ratio. However, the
level of service is primarily related to the average control delay, which is given in terms of
'
seconds of delay per vehicle by minor movement and intersection approach. The average
control delay for any particular minor movement is a function of the capacity of the
approach and the degree of saturation. Control delay includes initial deceleration delay,
delay.
'
queue move -up time, stopped delay, and final acceleration
Existing approach control delay values and the corresponding level of service values for the
unsignalized.key intersections are provided in Table 3 -3. These results assume existing
lane geometrics at the intersections (as shown in Figure 3 -2) and an 8 percent heavy vehicle
mix. The analysis utilized a peak hour factor of 1.0 to determine the impact of traffic
volumes occurring over the entire peak hour, rather than the peak 15 minutes, as directed
'
by the City of La Quinta.
1. Highway Capacity Manual; Fourth Edition; TRB Report 209; Transportation Research Board, National
'
Research Council; Washington, D.C.; 2000.
3 -8
M M M_ _M M M M M M M M .M M M M so M M
Table 3 -3
Current Peak Hour Delay and Levels of Service
At The Unsignalized Key Intersections
a. Average control dewy (seconasivemcie) ror me ieu -iuIu tuuvc «V«1 «I� 111aj— w—
Figure 3 -2, an 8 percent heavy vehicle mix, and a peak hour factor of 1.0 Appendix B includes the HCS unsignalized intersection worksheets.
b. LOS was determined from the delay (0 -10 sec. /veh. =LOS A; 10 -15 sec. /veh. =LOS B; 15 -25 sec. /veh. =LOS C;'25-35 sec. /veh. =LOS D; 35 -50
sec. /veh. =LOS E; 50+ sec. /veh. = LOS F) per HCM 2000 page 17 -2 and 17 -32. LOS is not defined for the overall intersection but rather for
individual movements and approaches at TWSC intersections.
c. Delay= average approach control delay (seconds /vehicle) for the minor street approach that exhibits the most delay at TWSC intersections. Since
AWSC intersections do not have minor approaches, the delay and LOS for the approach with the most delay `are shown.
d. The overall intersection control delay and intersection LOS are shown for this all -way stop - controlled intersection.
3 -9
Existing Condition
(Year 2004 Peak-Season)
Unsignalized Intersection
Major Street Left
Minor Street A proach With The Most Delay
Control Dela a
vel of Serviceb
Move
Control Dela c
Level of Serviceb
TWO -WAY STOP CONTROL
Madison St. @ PGA West Access
- Morning Peak Hour
8.0
.LOS A.
EB
11.3
LOS B
- Evening Peak Hour
7.8
LOS A
EB
10.9
LOS B
ALL -WAY STOP CONTROL
Jefferson. St. @ Avenue 54
- Morning Peak Hour
13.76d
LOS Bd
SB
16.35
LOS C
- Evening Peak Hour
31.90d
LOS Dd
WB
43.38
LOS E
Madison St. @ Avenue 54
- Morning Peak Hour
10.44d
LOS Bd
EB
10.88
LOS B
-Evening Peak Hour
13.84d
LOS Bd
NB
15.57
LOS C
Monroe St. @ Avenue 54
- Morning Peak Hour
8.79d
LOS Ad
SB
9.14
LOS A
- Evening Peak Hour
12.36d
LOS Bd
SB
13.31
LOS B
Madison St. @ Avenue 58
8.05d
LOS Ad
EB
8.29
LOS A
- Morning Peak Hour
8.47d
LOS Ad
EB
8,83
LOS B
- Evening Peak Hour
.1-,. ..,. ..#I f
A--pe intPreectinn
OBnmetrics shown In
a. Average control dewy (seconasivemcie) ror me ieu -iuIu tuuvc «V«1 «I� 111aj— w—
Figure 3 -2, an 8 percent heavy vehicle mix, and a peak hour factor of 1.0 Appendix B includes the HCS unsignalized intersection worksheets.
b. LOS was determined from the delay (0 -10 sec. /veh. =LOS A; 10 -15 sec. /veh. =LOS B; 15 -25 sec. /veh. =LOS C;'25-35 sec. /veh. =LOS D; 35 -50
sec. /veh. =LOS E; 50+ sec. /veh. = LOS F) per HCM 2000 page 17 -2 and 17 -32. LOS is not defined for the overall intersection but rather for
individual movements and approaches at TWSC intersections.
c. Delay= average approach control delay (seconds /vehicle) for the minor street approach that exhibits the most delay at TWSC intersections. Since
AWSC intersections do not have minor approaches, the delay and LOS for the approach with the most delay `are shown.
d. The overall intersection control delay and intersection LOS are shown for this all -way stop - controlled intersection.
3 -9
As shown in Table 3 -3, the two -way stop - controlled key intersection of Madison Street at
the PGA West access currently has a "worst case" average approach control delay (for the
minor approach with the most delay) that corresponds to level of service B (LOS B) or
better operation during the morning and evening peak hours. The control delay associated
with the left -turn movement from Madison Street at this intersection (which represents the
"best case" movement) corresponds to LOS A operation during the morning and evening
peak hours.
Although a single overall .intersection delay and LOS are not defined for TWSC
intersections in the HCM 2000, it may be concluded from the evaluation summarized in
Table 3 -3 that current levels of delay at the intersection of Madison Street and the PGA
West access are within the range considered acceptable by the City of La Quinta (LOS D or
better).
The ,HCM 2000 procedures for all -way stop - controlled (AWSC) intersections provide the
overall intersection delay and LOS as well as the delay and LOS for the intersection
approach with the most delay. Since AWSC intersections do not have minor street
approaches, the delay and LOS determinations for the approach with the most delay are
included in Table 3 -3 under the heading "Minor Approach With The Most Delay ".
With one exception, the current peak season intersection control delay values were found to
correspond to overall intersection operation at LOS B or better during the morning peak
hours and evening peak hours at the key AWSC intersections. The intersection of
Jefferson Street and Avenue 54 is currently operating at LOS D during the evening peak
hour during the peak season. Motorists using the "worst case" approach at the AWSC
intersections analyzed experience LOS C or better operation during the morning and
evening peak hours, except at the intersection of Jefferson Street and Avenue 54 where
westbound motorists experience LOS E during the evening peak hours. The average
approach control delay on the westbound approach to the intersection of Jefferson Street
and Avenue 54 is currently 43.38 seconds per vehicle. .
Signalized Intersection Analysis
The HCM 2000 procedures were utilized via the HCS 2000 software to evaluate the three
signalized key intersections. The HCM 2000 methodology addresses the capacity, V/C
ratio, and level of service of intersection approaches as well as the level of service of each
intersection as a whole. The analysis is undertaken in terms of the ratio of demand flow
rate to capacity (V /C ratio) for individual movements or approach lane groups during the
peak hour and the composite V/C ratio for the sum of the critical movements or lane groups
within the intersection. The critical V/C ratio is an indicator of whether or not the physical
geometry and signal design provide sufficient capacity for the movements.
' The measures of effectiveness for signalized intersections are: average control delay per
vehicle, critical V/C ratios, and levels of service. The level of service is based on the
average control delay for various intersection movements. The following parameters affect
level's of service: (1) V/C ratio; (2) quality of progression; (3) length of green phases; (4)
' cycle lengths; and (5) average control delay.
Average control delay is the total time vehicles are stopped at an intersection approach
' during a specified time interval divided by the volume departing from the approach during
the same time period. It does not include queue follow -up time (i.e. the time required for
the vehicle to. travel from the last -in -queue position to the first -in -queue position).
' 3 -10
' A critical V/C ratio less than 1.00 indicates that all movements at the intersection can be
accommodated within the defined cycle length and phase sequence by proportionally
' allocating green time. In other words, the total available green time in the phase sequence
is adequate to handle all movements, if properly allocated.
' It is possible to have unacceptable delays (LOS F) while the V/C ratio is below 1.00 (when
the cycle length is long, the lane group has a long red time because of signal timing and/or
the signal progression for the subject movements is poor). Conversely, a saturated
approach (with V/C ratio >_ 1.00) may have low delays if the cycle length is short and/or the
' signal progression is favorable. Therefore, an LOS F designation may not necessarily
mean that the intersection, approach or lane group is overloaded and LOS A to LOS E does
not automatically imply available unused capacity.
it
I
The peak hour intersection delay, critical volume -to- capacity ratios, and intersection level of
service values at the intersection of Jefferson Street and Highway 111 is provided in Table
3 -4. As shown therein, this signalized key intersection is currently operating at level of
service C or better during the morning and evening peak hours. The intersection average
control delay per vehicle ranges from 26.5 seconds per vehicle to 30.4 seconds per .vehicle
during the peak hours.
Table 3 -4
Existing Signalized Intersection
Peak Hour Delay and LOS Summary
(Peak Season Average Weekday)
Signalized Intersection
Existing (Year 2004)
Avg. Delaya Critical Intersection
(Sec./Veh.) V/C Ratio LOSb
Jefferson Street @ Highway 111
- Morning Peak Hour
26.5 0.60 C
- Evening Peak Hour
30.4 0.78 C
a. Average Delay = Average Control Delay (seconds /vehicle) for the intersection as a whole. Assumes
intersection geometrics shown in Figure 3 -2 and an eight percent truck mix. Based upon the 2000
Highway Capacity Manual Signalized Operation Methodology implemented by Version 4.1d of the
Highway Capacity Software (HCS 2000). See Appendix B for the signalized intersection HCS
worksheets with input parameters.
3.7 RELEVANT CIRCULATION PLANS
City of La Quinta Circulation Element
The City of La Quinta General Plan Circulation Element details the location and extent of
the circulation system required to serve future traffic demands upon buildout of the General
Plan Land Use Element. The roadway classifications adopted by the City of La Quinta on
March 20, 2000 in the Circulation Element are depicted in Figure 3 -5. The right -of -way
requirements and typical cross - sections associated with the roadway classifications are
shown in Figure 3 -6.
Major arterials are six -lane divided roadways with restricted access and a 120 -foot right -of-
way. Major arterials provide parkways a minimum of 12 -feet wide and an 18 -foot
3 -11
Highway 111
■■■■■■■■■■i Avenue 48
�
m
L
c,
c,
■
■
U)
a�
■
■
Figure 3 -5
Adopted Circulation Plan
City of La Quinta
Avenue 50
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Avenue 52
■
m
m■
°:
.
c■
■
•
o■
�i
� Major Arterial
7 ■moon Primary Arterial A
��� 4- Primary Arterial B
499•9 Secondary Arterial
I� ...................�aa.. 00000p.a, y••••i••.•••••••••••• Avenue 54
■iii■iiulii■■■■u■■■
a� •
m �
■
(5 ■
c i
o ■
■
ro 0
■
■
Avenue 58 ■
■
■
Endo Engineering Source: "La Quinta General Plan" Adopted March 20, 2002
T
Scale: 1" =
Property
Line
Figure 3 -6
City of La Quinta Typical Street Sections
Right -of -Way
Property
Line
Parkway Parkway
Strip Roadbed Strip
Shoulder Traveled Way Median Traveled Way Shoulder
Sidewalk Sidewalk
Centerline
Corridor Classification
Lanes
Median
(Feet)
Traveled
Way (Ft.)
Shoulder
(Feet)
Parkway
Strip (Ft.)
Sidewalk
(Feet) .
Roadbed
(Feet)
Right -of-
Way (Ft.)
Augmented Major"
8
14
47
—
12
8
108
132
Major Arterial'
6
14
36
8
9
6 78
102
120
Primary Arterial A
4
18
26
8
12
6
86
110
Primary Arterial B
4
12
25
7
12
6
76
100
Secondary Arterial
4
12
26
0
12
6
.64
88
Modified Secondary
2
18
15
8
12
6
64
88-
Collector-
2
—
18
8 -
11
6
52
74
Local Street
2
—
10
8
12
5
36 .
60
'Does not include State Highways, which require additional right of way.
i�ndo Engineering
' landscape median. Jefferson Street, Highway 111, and Madison Street (between Avenue
54 and Avenue 58) are classified as major arterials in the study area.
' Avenue 48, Avenue 52, Airport Boulevard, and Madison Street (north of Avenue 54), and
Monroe Street (between Avenue 52 and Avenue 60) are master planned Primary Arterial -
A in the study area. These primary arterials have 110 -foot rights -of -way. They provide a
' four -lane divided cross - section with an 18 -foot median and an 86 -foot roadbed. Avenue
50 and Avenue 54 (between Jefferson Street and Madison Street) are classified as Primary
Arterial - B. These primary arterials have 100 -foot rights -of -way. They provide a four -
lane divided cross - section with a 12 -foot median and a 76 -foot roadbed.
Avenue 54 (east of Madison Street) and Madison Street (south of Avenue 58) are master
' planned as secondary arterials. Secondary arterials typically include a four -lane undivided
cross- section in an 88 -foot right -of -way with 12 -foot parkways.
Design Standards
The City of La Quinta has adopted policies and standards for each roadway classification
regarding design criteria related to access to adjoining property and minimum intersection
spacing and driveway separation. All access configurations require City Engineer review
and approval. Minimum landscape setbacks are 20 feet (along major arterials and primary
arterials) and 10 feet (along secondary arterials and collector streets).
Left -turn median cuts may be authorized if they do not interfere with other existing or
planned left -turn pockets. Right in /right out access driveways shall be located such that
they exceed the following driveway spacing criteria (measured from the curb returns): (1)
250 feet on the approach leg to a full -turn intersection; (2) 150.feet on the exit leg from a
full -turn intersection; and (3) 250 feet from other driveways.
On major arterials, design speed is 60 mph and the minimum intersection spacing is 2,600
feet in residential areas. It may be reduced to 1,060 feet for commercial frontage. On
primary arterials, the design speed is 50 mph and the minimum intersection spacing is
1,060 feet. On collectors the minimum intersection spacing is 300 feet and the design
' speed is 30 mph. On local streets, the minimum intersection spacing is 250 feet and the
design speed is 25 mph.
' On secondary arterials, the design speed is 40 mph and the minimum intersection spacing is
600 feet. Full access to adjoining properties shall be avoided where feasible and when
necessary shall exceed the minimum separation distances outlined above.
' Standards for all City streets are provided in the Development Code. Streets within
planned residential areas shall be installed and maintained as private streets. Private streets
should be designed to meet the City's public street standards at the point where they
' connect. Within subdivisions, private streets may be designed to a width of 28 feet with
restricted parking, subject to City Engineer and Fire Department approval. The construction
of bikeways should conform to Caltrans specifications and design criteria, with all
bikeways a minimum of six feet in width. Sidewalks should be provided on both sides of
all arterial and collector streets, except where there is a multi -use trail on one side.
Golf Carts
The General Plan includes a two -phase golf cart route implementation plan. The initial
phase benefits existing developments and has a five -year time horizon. Phase II provides a
' long -term comprehensive route plan and includes Class II golf cart paths along Madison
' 3 -12
1
1
1
Street and Avenue 54, adjacent to the project site. These on- street Class lI golf cart paths
should be a minimum of 8 feet wide and appropriately striped adjacent to the site. The
striped lane accommodates one -way golf cart travel shared with bicyclists.
3.8 TRAFFIC SIGNAL WARRANTS
Justification for the installation of a traffic signal at an intersection is based on the warrants
adopted by the Federal Highway Administration in the Manual on Uniform Traffic Control
Devices (2003 Edition) and Caltrans in the MUTCD 2003 California Supplement (May 20,
2004). There are several different types of traffic signal warrants including warrants based
on eight -hour vehicular volumes, four -hour vehicle volumes, peak, hour vehicle volumes
and delay, pedestrian volumes, school crossings, coordinated signal system warrant,
accident experience, and a roadway network warrant. Caltrans also has adopted future
average daily traffic warrants (including minimum vehicular traffic, interruption of
continuous traffic and a combination warrant) to be used for new intersections or.other
locations where it is not reasonable to count actual traffic volumes.
The installation of a traffic signal should be considered if one or more of the warrants is
met; however, the satisfaction of a warrant is not necessarily sufficient justification for the
installation of signals. Delay, congestion, approach conditions, driver confusion, future
land use or other evidence of the need for right -of -way assignment beyond that which
could be provided by stop signs must be demonstrated. Improper or unwarranted signal
installations may cause:,(1) excessive delay; (2) disobedience of the signal indications; (3)
circuitous travel on alternate routes; and (4) increased accident frequency.2
Rural volume warrants (70 percent of the urban warrants) apply when the 85th percentile
speed of traffic on the major street exceeds 40 mph in either an urban or a rural area, or
when the intersection lies within the built -up area of an isolated community with a popula-
tion under 10,000. All other areas are considered urban.
Peak hour signal warrants (see Appendix C) are used herein as a.preliminary indication of
the need for traffic signals. These signal warrants should be considered in conjunction
with the unsignalized peak hour intersection analysis to provide a more complete
' understanding of the need for signalization. The actual design and installation of signals
should be based upon detailed studies which include extensive traffic counts.
' Peak hour signal warrants were checked for the unsignalized key intersections in the study
area. Rural warrants were applied, based upon the posted speed limits. Refer to Appendix
C for the peak hour signal warrant worksheets. Based upon existing peak hour traffic
' volumes, the three unsignalized key intersections of Jefferson Street at Avenue 54,
Madison Street at Avenue 54, and Monroe Street and Avenue 54 appear to currently meet
traffic signal warrants. However, all three intersections are currently operating at
acceptable levels of service (LOS D or better during the peak hours).
' 3.9 ALTERNATIVE TRANSPORTATION MODES
' Public Transportation
.The SunLine Transit Agency was created in 1977 through a Joint Powers Authority of five
cities and Riverside County. SunLine Transit now provides public.transit service to 2.8
' million passengers per year throughout the entire Coachella Valley and has a service area of
2. Caltrans, Traffic Manual, Revised 3/1/95, pg. 9 -1 and 9 -2.
' 3 -13
' approximately 366 square miles. SunLine Transit has bicycle racks on every bus in its
fleet. These bike racks can carry up to two bicycles per bus.
' Twelve SunBus transit lines provide public bus service with a fleet of 27 buses throughout
the Coachella Valley seven days a week (excluding Thanksgiving and Christmas). Line
111 is the major trunk line, which is interconnected with eleven smaller community feeder
' routes that provide access to every community in the Valley. Line 111 travels along
Highway 111 from Palms Springs to Indio. Although there is currently no transit service
available directly adjacent to the project site, the closest transit route (Line 70) passes
through the intersection of Washington Street and Calle Tampico. Line 80 passes through
the intersection of Arabia Street and Avenue 48.
t The SunLine Transit Agency contracts with a private provider for SunDial, a door -to -door
dial -a -ride service. SunDial is a demand response service designed to serve seniors and
those with disabilities on an appointment basis between 8:30 A.M. and 9:00 P.M. on
weekdays, and between 8:30 A.M. and 4:00 P.M. on weekends. In addition to SunDial, a
' subscription -based transit service is available through agencies serving people with
disabilities who need regular repetitive trips. No transit stations or park- and'ride facilities
currently exist or are planned in the City of-La Quinta.
' Bicycle Facilities
The use of bicycles instead of automobiles as a means of transportation improves health
t and fitness, provides enjoyment, reduces. air pollution, traffic congestion, energy
consumption and transportation costs. These benefits justify local and regional government
recognition of bicycles . as a viable transportation mode for local trips as well As the
' development and improvement of facilities to accommodate safe and efficient bicycle use.
Bikeways and pathways are used by a wide variety of people including children on their
way to school, commuters riding to work, and people exercising, racing or touring. While
recreational riders seek routes leading to parks, through areas of interest, or racing circuits,
commuters want the shortest, fastest, and safest route between two points.
' CALTRANS standards are used to design bikeways by most jurisdictions .throughout
California. The City of La Quinta adheres to Caltrans bikeway standards. Bike lanes on
existing roadways should conform to Caltrans standards or be upgraded to meet Caltrans
' standards. These standards apply to three different classifications of bicycle facilities:
Class I, Class H, and Class III bikeways, as described below.
Class I Bikeway A bike path that provides for bicycle travel on a right -of-
' way completely separated from any street or highway. The
paths may be located along alignments parallel to streets or
unrelated alignments as long as there is no encroachment
from motor vehicle or pedestrian traffic except at grade
intersections.
Class II Bikeway A bike lane that provides a striped lane for one -way bike
' travel within the paved area of a street or highway. These
bike lanes are within an exclusive right -of -way designated
for use by bicyclists. However, cross traffic is permitted
for driveway access.
Class III Bikeway A bike route in which both bicycle and motor vehicle traffic
share the same roadway surface area. The route is marked
3 -14
1
with signs or stenciled lettering on the pavement identifying
the roadway as part of a bikeway system.
Existing and. Planned Non- Motorized Facilities .
The Coachella Valley Association of Governments Non - Motorized Transportation Plan
(October, 2001) identifies existing and proposed non - motorized facilities within the project
vicinity. The bicycle element of the CVAG Non - Motorized Transportation Plan (October,
2001) is called the Regional Bikeway Plan. The Regional Bikeway Plan identifies
regionally significant routes that link important destinations in neighboring cities and are
candidates for joint funding applications among cities and/or the County of Riverside. The
Regional Bikeway Plan routes include Class I (bike paths), Class II (bike lanes), and Class
III (signed bike routes) facilities.
Class I bikeways are typically called bike paths as they provide a paved right -of -way
separated from streets and highways. Class I bikeways are estimated to cost $500,000 per
mile. Class II bikeways are often called bike lanes because they provide a striped or
stenciled lane for one -way travel on a street or highway. Costs for Class II projects are
estimated at $50,000 per mile. Class III bikeways are often referred to as bike routes.
They provide for shared use with pedestrian or motor vehicle traffic and are identified only
by signing. Class III projects are estimated to cost $10,000 per mile.
' The City of La Quinta has several existing bikeways including 2.5 miles of Class I and
10.5 miles of Class II facilities. Class II bikeways currently exist'at four locations within
the study area including:
1
• along Avenue 48 from Washington Street to Jefferson Street ( 1.5 miles);
• along Avenue 54 from Jefferson Street to Madison Street (1 mile);
• .a]ong.Madison Street from Avenue 54 to Avenue 58 (2 miles);
• along Airport Boulevard from Madison Street to the City limit (1 mile).
The City of La Quinta proposed eighteen proposed bikeway projects for inclusion in the
CVAG Regional Bikeway Plan including: two Class I projects, fifteen Class II projects,
and one Class III project.
The highest priority bikeway project in the study.area is a Class II facility proposed along
Jefferson Street from the northern city limit south to Avenue 54. Third priority bikeway
projects proposed by the City of La Quinta in the study area include Class II bikeways.
along:
• Highway. 111 (from Indian Wells to Indio);
• Avenue 50 (from Washington Street to Madison Street);
• Avenue 52 (from Washington Street to the eastern city limit);
• Avenue 54 (from Jefferson Street to the eastern city limit);
• Avenue 58 (from Jefferson Street to the eastern city limit);
• Jefferson Street (from Avenue 58 to Avenue 62);
• Madison Street (from Avenue 50 to Avenue 54); and
• All American Canal (from Avenue 50 to Avenue 54).
tiVestern Coachella Valley Area Plan Trails and Bikeways
A Regional Trail is shown through the study area along Jefferson Street, from Highway
.111 to Avenue 54. The trail extends along Avenue 54 to Madison Street, and along .
3 -15
t
I
I
7-
Madison Street from Avenue 54 to Avenue 60. In addition, a regional trail extends from
Madison Street to Lake Cahuilla.
A Class 1 bike path /regional trail is shown through the study area along the general
alignment of the All American Canal from north of Highway 111 to Cahuilla Lake. The All
American Canal is located parallel and east of the alignment of Madison Street, from
Highway 111 to north of Avenue 50. The All American Canal is crossed by Avenue 50, at
the future alignment of Madison Street. South of Avenue 50, the All American Canal
extends southwest and crosses Avenue 52 and Jefferson Street, adjacent to the Hideaway
Resort. West of Jefferson Street, the All American Canal turns south to Lake Cahuilla.
3.10 CONGESTION MANAGEMENT PROGRAM (CMP)
The Congestion Management Program (CMP) is intended to link land use, transportation,
and air quality with reasonable growth management methods, strategies and programs that
effectively utilize new transportation funds to alleviate traffic congestion and related
impacts. The Riverside County Transportation Commission (ROTC) is the designated
Congestion Management Agency (CMA) that prepares the Riverside County Congestion
Management Program updates in consultation with local agencies, the County of Riverside,
transit agencies and sub regional agencies like the Coachella Valley Association of
Governments (CVAG).
The RCTC must'designate a system of highways and roadways to include (at a minimum)
all State Highway facilities within Riverside County and a system of "principal arterials" as
the Congestion Management System (CMS). State Highway 111 is a CMP facility in the
study area. It is the responsibility of local agencies, when reviewing and approving
development proposals to consider the traffic impacts on the CMS.
To include additional arterials on the CMP System, consideration will be given to: (1)
routes identified by Caltrans as "principal arterials" on their "Functional Classification
System" maps; (2) designated expressways;- and (3) facilities linking cities /communities
(inter - regional facilities) and major activity centers (shopping malls, major industrial/
business parks, stadiums). Local agencies may nominate arterials for inclusion on the
CMP System.3 Jefferson Street, Madison Street, Monroe Street, Avenue 48, Avenue 50,
Avenue 52, Avenue 54, and Airport Boulevard are regionally significant arterials in the
study area that have been nominated and included in the CMP System.
Per the adopted Level of Service standard of "E ", when a Congestion Management System
(CMS) segment falls to LOS F, a deficiency plan must be prepared by the local agency
where the deficiency is located, following coordination with other agencies identified as
contributors to the deficiency. The deficiency plan must contain mitigation measures
(including TDM strategies and transit alternatives) and a schedule for mitigating the
deficiency. RCTC will prepare deficiency plans on the State Highway System when
deficiencies are identified by local jurisdictions. In preparation of the 2001 Riverside
County CMP, there were no deficiencies found on the CMP System, based upon the year
2001 monitoring effort.
The CMA provides a uniform database of traffic impacts for use in a countywide
transportation computer model. The RCTC has recognized use of the Coachella Valley
Area Transportation System (CVATS) sub.- regional transportation model to analyze traffic
impacts associated with development proposals or land use plans. The methodology for
measuring LOS must be that contained in the most recent version of the Highway Capacity
3. 2001 Riverside County Congestion Management Program; RCTC; December 12, 2001.
3 -16
Manual (HCM 2000). Traffic standards must be set no lower than LOS E for any segment_
or intersection on the CMP system unless the current LOS is lower (i.e., LOS F).
The Coachella Valley Association of Governments has developed a Transportation Uniform
Mitigation Fee (TUMF) that compliments the objectives of the Congestion Management
Program (CMP). To comply with the Riverside County CMP, all developments must
participate in the TUMF program.
3.11 REGIONAL TRANSPORTATION IMPROVEMENT PLANS
The Capital Improvement Program (CIP) is a 7 -year program including all regional and
local capital improvement projects that maintain or improve the LOS for traffic and transit
and conform to transportation- related emission air quality mitigation measures. Currently,
regional projects are programmed in the Riverside County Transportation Improvement
Plan (TIP), while locally funded projects (off the State Highway System) are identified in
local agency CIPs. To comply with CMP Statutes, CIP-requirements shall be the same as
and accomplished through the RCTC TIP development process. Projects in the CIP may
be incorporated into the Regional Transportation Improvement Program (RTIP).for the
programming of Flexible Congestion Relief (FCR) and Urban and Commuter Rail funds.
The Coachella Valley Association of Governments Regional Arterial Program - Financial
Plan and Expenditure Program Contract Status Report dated December 31, 2002 includes
five I =10 Interchange improvement projects in the Coachella Valley that were authorized
and funded with twenty -one million dollars. The interchange projects were located at: (1)
Washington Street, (2) Jefferson Street, (3) Date Palm, (4) Palm Drive /Gene Autry Trail,
and (5) Indian Avenue.
As growth occurs in the area, commuter traffic is expected to increase significantly.
Without improvements to the I -10 interchanges in the vicinity, conditions at these
interchanges are expected to deteriorate at the ramp intersections, inducing longer traffic
queues and longer control delays until interchange improvements are made.
Although improvements at the I -10 Interchanges in the Coachella Valley were planned and
funding appeared to be available, the State budget shortfall crisis caused the funding to be
revoked so alternative funding mechanisms had to be pursued. Until the planned
improvements are implemented, conditions will deteriorate, as demand for I -10 access
grows with development throughout the Coachella Valley including the study area. .
The City of Indio is the Lead Agency on the planned Interstate 10 interchange redesign
project at Jefferson Street. The improvements are scheduled to begin in April, 2007 and be
completed by July of 2008. The City of Indio is also the Lead Agency for arterial
improvements planned on Monroe Street, between Miles Avenue and Avenue 52. The
project is currently in the process of finalizing design details.
Riverside County is the Lead Agency for scheduled improvements to Jefferson Street from
the intersection of Highway 111 north to Indio Boulevard. Construction is slated to begin
in November, 2004 and continue for 12 months.
3 -17
r
4.0 CIRCULATION IMPACT ANALYSIS
Methodology and Scope
The study area, key intersections, future development scenarios, annual traffic growth
rates, and methodology employed to assess the potential impacts of the proposed
development were determined through coordination with the City of La Quinta. The traffic
study format was also approved by the City of La Quinta.
The average weekday and.peak hour traffic volumes that will be generated by the proposed
development were determined from the land uses proposed on -site and appropriate ITE trip
generation rates. Project - related traffic was manually distributed to current and future
major trip origins and destinations. Project- related peak hour and daily traffic volumes
were determined and added to the future year 2008 background traffic projections for key
intersections and the roadway segments adjacent to the key intersections.
The potential impacts associated with project - related traffic in the year 2008 were
determined by evaluating the peak hour intersection control delay and LOS values with and
without project- related traffic. Both morning and evening peak hour control delay and LOS
evaluations were completed for the off -site key intersections and the three site access
intersections to determine the adequacy of the intersection approach lanes and traffic
control. The City of La Quinta requires the HCM 2000 intersection operation methodology
to be used to assess intersection control delay and levels of service and has established a
minimum peak hour intersection performance standard for the .peak season at the upper
limit of LOS D.
Since the proposed project is expected to be completed by the year 2008, daily mid -block
volume -to- capacity ratios were evaluated on the roadway segments adjacent to the key
intersections for future year 2008 conditions with and without the proposed project.
Although any exceedances of daily capacity may not result in an immediate
recommendation for mid -block roadway widening, daily volume -to- capacity ratios are
useful in that they provide important information with respect to the overall traffic loading
on the circulation system and the timing of future mid -block widening.
4.1 TRIP GENERATION FORECAST
The Institute of Transportation. Engineers (ITE) report Trip Generation is the principal
source of trip - generation rates used in site traffic analyses. Detailed data are provided
therein for vehicular trips with "average" vehicle occupancy. The ITE Trip Generation
database is updated periodically, with the latest revision utilized herein to project the trip
generation associated with the proposed development. All of the trip - generation rates
provided by the ITE reflect isolated single -use stand -alone developments. The trip
generation data compiled by the ITE identifies traffic peaking characteristics by land use
type in terms of the trip generation during the peak hour of the generator as well as during
the peak hours of the traffic on the adjacent street system.
The proposed project includes single - family detached dwelling units. Single - family
detached residences exhibit higher trip generation rates per dwelling unit than attached
residences because they tend to have more residents and more vehicles per dwelling unit.
They are generally located farther from shopping centers, employment centers, and other
trip attractors, and generally have fewer modes of transportation available.
4 -1
' The trip generation potential of the Griffin Ranch development was determined from
average trip generation rates published by the ITE in the Trip Generation manual (Seventh
' Edition; December; 2003). Table 4 -1 provides the peak hour and daily trip generation
associated with the proposed project. As shown therein, the proposed Griffin Ranch
development would generate an estimated 2,900 daily trip -ends. During the morning peak
hour, approximately 223 trip -ends would be generated (56 inbound and 167 outbound).
During the evening peak hour, approximately 292 trip -ends would be generated (184
inbound and 108 outbound).
Table 4 -1
Project - Related Traffic Generationa
Land Use Categoryb
(ITE Code)
Land Use
Quantityc
AM Peak Hour
In Out Total
PM Peak Hour
In Out Total
Daily
2 -Way
Residential - SFD (210)
305 DU
56 167 223
184 108. 292
2,900
' a. Based upon trip generation equations published by the ITE Trip Generation (7th Edition December,
2003).
b. SFD= single family detached.
c. DU= dwelling units.
4.2 TRAFFIC DISTRIBUTION AND ASSIGNMENT
Traffic distribution is the determination of the directional orientation of traffic. It is based
upon the geographical location of the site and land uses that will serve as trip origins and
destinations. Traffic assignment is the determination of which specific routes project-
' related traffic will use, once the generalized traffic distribution is determined. The basic
factors affecting route selection are minimizing time and distance. Other considerations
might be the aesthetic quality of alternate routes, number of turning maneuvers, and
' avoidance of congestion. Site access locations, signalized access points, and turn
restrictions on driveways directly affect the project traffic assignment.
The traffic assignment associated with the proposed development is shown in Figure 4 -1.
' There are three proposed project access intersections including: (1) the main site access at
the intersection of Madison Street and the existing PGA West access; (2) the western site
access on Avenue 54; and (3) the eastern site access on Avenue 54.
' Project - related peak hour traffic volumes at the key intersections 'and site access
intersections are shown in Figure 4 -2. In addition, Figure 4 -2 shows the project - related
daily traffic volumes on the roadway segments adjacent to the key intersections and site
access points.
4.3 FUTURE YEAR 2008 AMBIENT CONDITIONS
The future background traffic volumes in the year 2008 were projected by applying
appropriate annual traffic growth rates to existing traffic volumes in the study area to
' estimate future ambient volumes. The annual traffic growth rates applied were determined
from available current and historical traffic count data in the study area and approved by La
Quinta staff as part of the traffic study scoping process.
d
' 4 -2
0/0
S 0/0
2/0 Figure 4 -1
O/OJ "I 0/0-.. 0 0 ° Site Traffic Assignment
13/01
13% iL 2% Highway 111 .
0
Co
C _
;n a� o
�' C,
(D
0
0
LO
00
0/0. `c c
0/0
Co
a
c�
CL
!Undo Engineering
Avenue 48
Avenue 50
Avenue 52
10/44
,` 1/3
f
44/0 -� o M /
21/01 /
°J
,':<:::.•::•
0/23
0/0
.
0R.5
°o
L" U�
C14 r
0
O
5%
0
0/0 "'
0/0
m
0 /0.
o
t
0o
w
c0
0%
0%
LO
Legend
100% Percent Project - Related
Traffic Assignment
3/11 Percent of Inbound /Outbound
Project - Related Traffic
Making Turning Movement
0 0 0 x-5 /0
..J ° 4 ,`0 /0
0/20J 0 0 0
0/5 ->000
0/01
20%
25 %. , 5% Avenue 54
I
ID
o
Airport Blvd.
Avenue 58.
.0)
Scale: 1" = 3770'
-1/4
NN
u°, N o
�o
m
350
440
:1 09/70
o iD 0/0
° CO 0/0
0 /0--+
0 /O,000
0 /0-,
0
-o
CO
Q
0
CL
VVEndo Engineering
E
Highway 111
Avenue 48
Avenue
48/33
4/14
r'
18/54 -► a,
10/32
Avenue 52
'-5/16
73/47 i-9 /30
f
ch
JOLLY
0/0
�.
13/8
OJ
0
ors
�
o
0�
N
1
CD
t0/0
m..
o
0/0
CD
`
L,
0/0
C.
0J
o t2
0-�a�a
0
CO
0
C
0
Figure 4 -2
Project Related Traffic Volumes
14/9 ->
00
CO
16/53
"'
0
LO
LO
1,100 720
_
CD
m..
o
in
Site `: >:�
Airport Blvd:
Avenue 58
Legend
t5 /8 AM /PM PJHour Turning 1,000 Daily Tw
Volume
Avenue 54
Scale: 1 " = 3770'
Traffic Growth Rates
Growth rates for the key intersections were established with 24 -hour traffic counts.made at
' two locations where historical 24 -hour counts were available from CVAG. For the
intersections near the project site, Madison Street, south of Avenue 54, has exhibited an
annual traffic growth rate of approximately 9 percent from the year 1998 through the year
' 2003. This growth rate was applied to the volumes at the intersections of Madison Street at
Avenue 54, Monroe Street at Avenue 54, Madison Street at Avenue 58, and the site access
intersections.
Jefferson Street, south of Highway 111, has exhibited an annual traffic growth rate of 2.7
percent from the year 1998 through the year 2003. This annual traffic growth rate was
' applied to the traffic volumes at the intersection of Jefferson Street and Highway 111.
A composite growth rate was applied to the volumes at the intersection of Jefferson Street
and Avenue 54. Since the PGA West development is nearly fully. constructed, a lower
' growth rate of 2.7 percent was applied to the north /south movements along Jefferson
Street. A higher growth rate of 9 percent was applied to all other turning movement
volumes at the intersection of Jefferson Street and Avenue 54. It was assumed that all of
' the traffic from cumulative developments was included in the background traffic growth.
Year 2008 ambient daily traffic volumes are provided in Table 4 -2. The year 2008 ambient
peak hour turning movement traffic volumes at the key intersections (without the project)
are shown in Figure 4 -3.
Daily Volume -To- Capacity Ratio Analysis
Daily volume -to- capacity. (V /C) ratios are useful planning tools at the General Plan level of
analysis that provide an indication of whether or not additional mid -block through lanes
will be needed to accommodate future traffic volumes. Daily V/C ratios focus attention on
' . mid -block and network operation. They provide a more regional perspective of unsatisfied
demand for north /south or east/west travel corridors in an area and can be particularly
useful when many developments are occurring that are under the jurisdiction of more than
' one governmental agency. Daily analyses also permit decisions to be made regarding when
a particular roadway requires widening to its master planned cross - section or upgrading to
a higher capacity classification in the Circulation Element.
Site specific mitigation is generally not developed from daily mid -block volume -to- capacity
ratio analyses.. Most projects are not large enough to fund major roadway widening that
extends a significant distance off -site. By providing a mechanism to identify locations
' where a project proponent's fair -share contribution to the cost 'of transportation
improvements of regional benefit could be significant, daily V/C ratio analyses can be
useful in developing conditions of approval.
' The year 2008 daily traffic volume projections. without the project (see Table 4 -2) were
divided by the current daily design capacities (as shown in Table 3 -3) to determine the
ambient daily mid -block volume -to- capacity ratios on the roadway segments adjacent to the
-key intersections. As shown in Table 4 -2, year 2008 ambient daily traffic volumes are
projected to utilize between 3 and 86 percent of the current daily design capacity of the
' roadway segments evaluated within the study area.
1
' 4 -3
Table 4 -2
Year 2008 Daily Volumes and V/C Ratiosa
Roadway Segment
Without Project
With Project
Project- Related Change
ADT I
V/C Ratio
ADT
V/C Ratio
ADT
V/C Ratio
Jefferson Street
- North of Highway 111
18,740
0.49.
19,170
0.50
430
0.01
- South of Highway 111
23,390
0.41
24,260
0.43
870.
0.02
- North of Avenue 54
19,710
0.35
21,600
0.38
1,890
0.03
- South of Avenue 54
7,340
0.19
7,340
0.19
0
0.00
Madison Street
- South of Avenue 54
9,740
0.70
10,470
0.75
730
0.05
- North of Site Access
8,960
0.64
9,690
0.69.
.730
0.05
- South of Site Access
8,840
0.63
9,130
0.65
290
0.02
- North of Avenue 58
51530
0.15
5,680
0.15
150
0.00
- South of Avenue 58
3,600
0.09
3,750
0.10
150
0.01
Monroe Street
-'North of Avenue 54
8,890
0.64
9,470
0.68
580
0.04
- South of Avenue 54
6,380
0.46
6,380
.0.46
0
0.00
Highway 111
- West of Jefferson St.
33,360
0.59
33,740
0.59
380
0.00
- East of Jefferson St.
32,710
0.86
32,770
0.86
60
0.00
Avenue 54
-
- West of Jefferson St.
440
0.03
440
0.03
0
0.00
- East of Jefferson St.
14,200
0.37
16,090
0.42
1,890
0.05
- West of Madison St.
13;280
0.35
15,170
0.40
1,890
0.05
- East of Madison St.
4,470
0.32
5,840
0.42
1,370
0.10
- W/O West Site Access
4730
0.34
6,100
0.44
1,370
0.10
- E/O West Site Access
4,730
0.34
5,810
0.42
1,080
0.08
- W/O East Site Access
4,730
0.34
5,810
0:42
1,080
0.08
- E/O East Site Access
4,730
0.34
5,450
0.39
720
0.05
- West of Monroe Street .
4,730.
0.34
5,450
0.39
720
0.05
- East of Monroe Street
.6,900
0.49
7,040
0.50
140
0.01
Avenue 58
- West of Madison Street
1,270
0.09
1,270
0.09
0
0.00
- East of Madison Street
2,340
0.17
2,340
0.17
0
0.00
a. Assumes the existing capacity of all streets.
In the year 2008, all of the roadway segments evaluated are projected to be handling
ambient daily traffic volumes comprising less than 80 percent of their daily roadway
capacity except one. Highway 111, east of Jefferson Street, is projected to carry daily
' traffic volumes that correspond to 86 percent of its daily capacity. This condition is
categorized as operating "near capacity" on a daily basis and approaching the point where
widening will be necessary to provide an additional mid -block travel lane in each direction.
' 4 -4
co CO c i +-.55/87
U.) m & —801/992
-*J L.. ,F158/216
87/128J'*) ,-
587/1120 'c,-j a T°
137/321 -+ N ° �2 ,
N in + 302/6
LO 3/6
J : x ,`49/45
15/19) I J
3/6 -.
2/3 cR c
C
C az CD �a)
Highway 111
Avenue 48
Avenue 50
Avenue 52
108/182
47/8
105/203.
rn /
434/379 v `"
FVEndo Engineering
Figure 4 -3
Year 2008 Traffic Volumes
Without Project
Legend
'-5/8 AM /PM Peak Hour
Turning Volume
NN
CO r 41/97 \
`c r rn 124/178
i `12/19
19/22) CO a 1-;- 110/214-.,,- � ;�,
12/3
Avenue 54
Airport Blvd.
M N
47/97
CIJ
46/3
`
T L
Q
2/6
:.Project.;;:. c
a
t
ite _ �°
14/11
cg'
2/8-4
a.�
2
CO
FVEndo Engineering
Figure 4 -3
Year 2008 Traffic Volumes
Without Project
Legend
'-5/8 AM /PM Peak Hour
Turning Volume
NN
CO r 41/97 \
`c r rn 124/178
i `12/19
19/22) CO a 1-;- 110/214-.,,- � ;�,
12/3
Avenue 54
Avenue 58
(T)
Scale: 1" = 3770'
Airport Blvd.
M N
47/97
cn
5
46/3
`
CO O � `L.,
2/6
29/36)
t
c
y
cg'
CO
2
Avenue 58
(T)
Scale: 1" = 3770'
Peak Hour Intersection Analysis
' Three unsignalized key intersections along Avenue 54 (i.e. Jefferson Street at Avenue 54,
Madison Street at Avenue 54, and Monroe Street and Avenue 54) appear to currently meet
peak hour traffic signal volume warrants in the peak season. However, these three
intersections do not currently require signalization because they are operating at acceptable
' levels of service (LOS D or better). With the expected traffic growth in the area, all three
intersections are projected to operate at LOS E or F in the year 2008 and require
signalization to maintain acceptable levels of service. Therefore, all three intersections were
assumed to be signalized by the year 2008. with or without project- related traffic.
Unsignalized Intersection Analysis
fTable 4 -3 provides the year 2008 peak hour average control delay values. and levels of
service for the unsignalized key intersections. The unsignalized intersection approach lane
geometrics depicted in Figure 5 -1 (which include existing lanes plus those improvements
' proposed at the site access locations) were assumed for conditions with and without site
traffic in Table 4 -3, to facilitate direct comparison and allow project- related impacts to be
more readily identified.
' As shown in Table 4 -3, the minor street approach (eastbound on the PGA West access) that
will exhibit the most delay at the proposed main site access on Madison Street will operate
at or above LOS B in the year 2008, prior to the addition of project - related traffic.
' Motorists making left -turn movements from the major street at this intersection (Madison
Street) will experience LOS A operation during the peak hours. Without site traffic, this
intersection will provide acceptable levels of service (with a stop sign controling traffic on
the minor street) and meet the City of La Quinta minimum performance standard.
For the intersection of Madison Street and Avenue 58, the overall average intersection
control delay and LOS (as well as the control delay and LOS for the approach with the most
delay) are shown in Table 4 -3. Before site traffic is added to the street network in the year
2008, this unsignalized all -way stop - controlled intersection will operate at LOS A during
the peak hours with average overall intersection control delays ranging from 8.52 to 9.18
' seconds per vehicle. The approach with the highest delay at this intersection will operate at
LOS A during the peak hours.
Signalized Intersection Analysis
The peak hour intersection control delay values, critical volume -to- capacity ratios, and
levels of service at the signalized key intersections, with year 2008 traffic volumes, are
provided in Table 4 -4. Prior to the addition of project- related traffic, all of these key
intersections are projected to operate at LOS D or better during peak hours in the year 2008.
The intersection average control delay is projected to range from 6.3 to 35.9 seconds per
' vehicle at these intersections.
4.4 FUTURE YEAR 2008 +PROJECT CONDITIONS
Figure 4 -4 illustrates year 2008 +project morning and evening peak hour traffic volumes at
the key intersections.. These volumes were developed by adding the project- related traffic
volumes shown in Figure 4 -2 to the year 2008 ambient traffic volumes shown in Figure 4-
' 3. The year 2008 +project daily traffic volumes are provided in Table 4 -2.
4 =5
Table 4 -3
Year 2008 Unsignalized Key Intersection
Peak Hour Delay and LOS Summarya
a. Delay = Average Control Delay (seconctsivemcie). ivts= normoounu. on= souuiuL)uuu. nn= caakJuu... L . —W aLVUu••4. ��� •.�� - -- -• --
delay (0 -10 sec. /veh. =LOS A; 10 -15 sec. /veh. =LOS B; 15 -25 sec. /veh. =LOS C; 25 -35 sec. % w uveh. =LOS D; 35 -50 sec. /veh. =LOS E; 50+ sec. /veh. _
LOS F) per HCM 2000 page 17 -2. Appendix B includes all of the HCS 2000 unsignalized intersection peak hour worksheets.. Assumes the lane
geometrics shown in Figure 5 -1 .and an 8 percent heavy vehicle mix. The average approach control delay was shown for the minor street approach
that exhibits the most delay at TWSC intersections. Since AWSC intersections do not have minor approaches, the delay and LOS for the approach
with the most delay -were included under the heading "Minor Approach Delay/LOS ". NA = Not Applicable.
b. Overall intersection delay and intersection LOS are shown for this all -way stop - controlled intersection.
on
I
No-
Project
With
Project
Change
In
Unsignalized Intersection
Major Left
Minor Approach
Major Left
Minor Approach
Minor Approach
Delay/LOS
Move Delay/LOS
Delay/LOS
Move Delay/LOS
Delay
LOS
TWO -WAY STOP CONTROL
Madison St. @ Site Access /PGA W.
- Morning Peak Hour
8.4/A
EB 12.08
8.4/A
EB
13.28
1.2
No
- Evening Peak Hour
8.0/A
EB 10.9B
8.9/A
EB
12.1B
1.2
No
W. Site Access @ Avenue 54
- Morning Peak Hour
Intersection Does Not Exist
7.6/A
NB.
10:58
NA
NA
- Evening Peak Hour
8.0/A
NB
11.4 /13
NA
NA
E. Site Access @ Avenue 54
- Morning Peak Hour
Intersection Does Not Exist
7.6/A
NB
10.48
NA
NA
- Evening Peak Hour
8.0/A
NB
11.4 /13
NA
NA
ALL -WAY STOP CONTROL
Madison St. @ Avenue 58
- Morning Peak Hour
8.52/Ab
SB 8.75/A
8.59/Ab
SB
8.85/A
0.07
No
- Evening Peak Hour
9.18 /Ab
EB 9.60/A
9.25/Ab EB
9.65/A
0.07 No
a. Delay = Average Control Delay (seconctsivemcie). ivts= normoounu. on= souuiuL)uuu. nn= caakJuu... L . —W aLVUu••4. ��� •.�� - -- -• --
delay (0 -10 sec. /veh. =LOS A; 10 -15 sec. /veh. =LOS B; 15 -25 sec. /veh. =LOS C; 25 -35 sec. % w uveh. =LOS D; 35 -50 sec. /veh. =LOS E; 50+ sec. /veh. _
LOS F) per HCM 2000 page 17 -2. Appendix B includes all of the HCS 2000 unsignalized intersection peak hour worksheets.. Assumes the lane
geometrics shown in Figure 5 -1 .and an 8 percent heavy vehicle mix. The average approach control delay was shown for the minor street approach
that exhibits the most delay at TWSC intersections. Since AWSC intersections do not have minor approaches, the delay and LOS for the approach
with the most delay -were included under the heading "Minor Approach Delay/LOS ". NA = Not Applicable.
b. Overall intersection delay and intersection LOS are shown for this all -way stop - controlled intersection.
on
I
Table 4 -4
Year 2008 Signalized Key Intersection
Peak Hour Delay and LOS Summarya
a. Delay= Intersection Delay (seconds per vehicle). Assumes intersection geometrics shown in vigure -i ana an eignt percent neavy venicie mix.
Based upon the.HCM 2000 Signalized Operation Methodology implemented by Version 4.1d of the HCS 2000. See Appendix B for the signalized
intersection HCS worksheets.
4 -7
No-
Project
With
Project
Chan e
In
Signalized Intersection
Delay
Critical
LOS
Delay ,
Critical
LOS
Delay
LOS
(Sec./Veh.)
V/C
(Sec./Veh.)
V/C
(Sec./Veh.)
Jefferson Street @ Highway 111
- 'Morning Peak Hour
27.9
0.67
C
28.4
0.69
C
0.5
No
- Evening Peak Hour
35.9
0.87
D
36.9
0:88
D
1.0
No
Jefferson Street @ Avenue 54
- Morning Peak Hour
13.2
0.32
B
13.7
0.35
B
0.5
No
- Evening Peak Hour
14.3
0.57
B
15.0
0.62
B
0.7
No
Madison Street @ Avenue 54
- Morning Peak Hour
6.3
0.29
A
7.2
0.36
A
0.9
No
- Evening Peak Hour
8.2
0.48
A
9.1
0.53
A
0.9,
140
Monroe Street @ Avenue 54
- Morning Peak Hour
- Evening Peak Hour
10.9
12.4
0.30
0.55.
B
B
11.2
12.9
0.33
0.58
B
B
0.3
0.5
No
No
a. Delay= Intersection Delay (seconds per vehicle). Assumes intersection geometrics shown in vigure -i ana an eignt percent neavy venicie mix.
Based upon the.HCM 2000 Signalized Operation Methodology implemented by Version 4.1d of the HCS 2000. See Appendix B for the signalized
intersection HCS worksheets.
4 -7
co u, cy 55/87
—801/992
i, 159/220
87/128 r & ,n
587/1120 -> N CO
�45/344-, M � T.
Figure 4 -4
Year 2008 Traffic Volumes
With Project
Highway 111
Avenue 48
y � Legend
CD '-5/8 AM /PM Peak Hour
—i-- -- Avenue 50
—206/247
,F4/14
r'
CO
Turning Volume
Avenue 58
�Vndo Engineering
T
Scale: 1" = 3770'
i
159/293 -
r
10/32
Avenue
52
rJf 41 /97
cr, u,
L410/763
�- 162/230
126/187
CO N LO
9/30
12/19
N r °
39/
181/229
52/44)
..J 4
49/45
52/13
155/249 -> i'
118/220 -► C, M
15!19 -�
(:'
� CO
16/53-1 CO
N
12/3 °' T
3/6�
a N
129/283 -> a
2'3-i
cD "'
446/419 -1 N CO
M P,
14
54
'L38/24
CO
Q
N
° M 0/0
<:
Project::
::..:: •
c a�
d
v%� ,F13/8
Site__
"��
U)
14/11
O /0-'. a
2/8- N
Airport Blvd.
CO F 7
i 5; '
CO °' �,
29/36) � c'
C
y
,
15/56 a N o
5/8 � c
Cz
Avenue 58
�Vndo Engineering
T
Scale: 1" = 3770'
i
Daily Volume -To- Capacity Analysis
Projected year 2008 +project daily traffic volumes were divided by the current daily
roadway capacities to determine daily volume -to- capacity ratios for year 2008 +project
conditions. A comparison of the daily V/C ratios before and after project - related traffic is
added to the street network from Table 4 -2 reveals the impact of the proposed project.
Upon completion of the proposed project in the year 2008, project - related traffic will utilize.
up to 10 percent of the current daily capacity of the roadways within the study area.
Following the addition of project - related traffic,'all of the roadway segments analyzed are
expected to carry daily traffic volumes that comprise less than 80 percent of their daily
capacity in the year 2008, except one. With or without site traffic, Highway 1.11 (east of
Jefferson Street) is projected to carry daily traffic volumes that represent 86. percent of the
daily capacity of this roadway segment. This constitutes a "near capacity" condition which
indicates that widening of Highway 111 to provide an additional through lane in each
direction may be needed before many years have passed.
Peak Hour Intersection Analysis
' Unsignalized Intersection Analysis
Project- related traffic will increase the peak hour average control delay by up to 1.2
' seconds per vehicle on the intersection approaches with the most delay at the unsignalized
key intersections in the.year 2008. Despite these increases in delay, project - related traffic is
not expected to.cause any of the peak hour levels of service to change on the unsignalized
key intersection approaches with the most delay in the year 2008. The peak hour levels of
' service on these approaches will remain LOS A or LOS B during the morning and evening
peak hours, following the addition of project - related traffic.
' As shown in Table 4 -3, once project - related traffic volumes are added to year 2008 ambient
volumes, the AWSC intersection of Madison Street and Avenue 58 will provide LOS A
operation, with intersection delays that range from 8.59 to 9.25 seconds per vehicle during
the peak hours. Site traffic will increase the peak hour overall intersection control delay at
tthis intersection by 0.07 seconds per vehicle but will not change the level of service during
the peak hours.
' Although site traffic will increase the peak hour control delay at the unsignalized key
intersections, the levels of service are projected to remain at or below LOS B in the year
2008. Since the City of La Quinta minimum intersection performance standard will be met
' at these unsignalized key intersections upon project completion without mitigation other
than that proposed to facilitate site access, the project- related impact at these intersections is
not considered significant.
' Signalized Intersection Analysis
Table 4 -4 provides the peak hour intersection average control delay and LOS at the
signalized key intersections for year 2008 +project conditions. Following the addition of
project - related traffic; the signalized key intersections will provide acceptable levels of
service (LOS D or better operation) in the year 2008, provided that the three unsignalized
key intersections along Avenue 54 are signalized.
' The three unsignalized key intersections along Avenue 54 ( i.e.*Jefferson Street at Avenue
54, Madison Street at Avenue 54, and Monroe Street and Avenue 54) currently meet peak .
' hour traffic signal volume warrants but provide acceptable levels of service. Project- related
' 4 =8
traffic will contribute to the need for signalization at these three unsignalized key
intersections along Avenue 54.
Following the addition of project - related traffic, the intersection control delay values at the
signalized key intersections will increase by up to 1.0 seconds per vehicle. Increases in
average control delay of this magnitude will not be sufficient to change the peak hour levels
of service at any of the signalized key intersections. Based upon the City of La Quinta
minimum intersection performance standard, no mitigation will be required at any of the
signalized key intersections to maintain acceptable levels of service with year 2008 +project
traffic volumes. The project- related impact on the signalized key intersections is not
expected to be significant in the year 2008.
4.5 TRAFFIC SIGNAL WARRANTS
The installation of a'traffic signal should be considered if one or more of the warrants is
met; however, the satisfaction of a warrant is not necessarily sufficient justification for the
installation of signals. Delay, congestion, approach conditions, driver confusion, future
land use or other evidence of the need for right -of -way assignment_ beyond that which
could be provided by stop signs must be demonstrated.
The evaluation of peak hour levels of service at unsignalized key intersections provides a
preliminary indication of when and where traffic signals might be needed in the study area
to improve levels of service. Future peak hour traffic projections at the unsignalized key
intersections were compared to rural peak hour traffic signal volume warrants to determine
whether or not. the installation of new traffic signals would be warranted.
Appendix C includes the peak hour traffic signal warrants as well as spreadsheets with the
peak hour traffic volume projections at each unsignalized key intersection with and without
project- related traffic. Other than the three intersections along Avenue 54 (i.e. Jefferson
Street at Avenue 54, Madison Street at Avenue 54, and Monroe Street and Avenue 54)
previously identified as meeting rural peak hour signal warrants with existing traffic
volumes, no other unsignalized key intersections or site access intersections are expected to
meet signal warrants with year 2008 +project traffic volumes.
None of the site access intersections are projected to meet traffic signal warrants with
General Plan buildout traffic volumes. Although future traffic volumes on Madison Street
are anticipated to be high, the westbound minor street approach volume (50 vehicles per
hour or less) at'the site access will remain below the rural traffic signal warrant minimum
volume threshold (75 vehicles per hour) for minor street approaches. Similarly, the
northbound approach volume at the western site access on Avenue 54 will remain below
the minimum volume threshold for the minor street approach. Consequently, the western
site access on Avenue 54 is not expected to ever meet traffic signal volume warrants.
The eastern site access on Avenue 54 is projected to serve the highest percentage of project -
related traffic. The peak hour northbound minor street approach volume is estimated to be
75 vehicles per hour, which is equal to the rural traffic signal warrant minimum volume
threshold for a one -lane approach. However, future daily traffic volumes on Avenue 54
are expected to remain relatively low. The projected year 2008 +project daily traffic volume
on Avenue 54 at this location (approximately 6,000 ADT) exceeds the General Plan
buildout traffic projection.
To warrant a traffic signal at the intersection of the proposed eastern site access with
Avenue 54, the future daily traffic volume on Avenue 54 would have.to be more than twice
the 2008 +project traffic volume. Therefore, even if ultimate traffic volumes exceed the
4 -9
General Plan buildout projection by a wide margin, traffic signals will not be required at the
proposed eastern site access intersection on Avenue 54. If the delay associated with
northbound left -turns becomes excessive at the eastern site access on Avenue 54, project -
related traffic has the option of avoiding the delay by diverting to the site access on
Madison Street and making a right -turn during peak travel periods.
4.6 OTHER CONSIDERATIONS
Consistency with the Circulation Element
Madison Street
Tentative. Tract Map 32879 (dated 8/13/04) shows Madison Street adjacent to the western
site boundary as a four -lane divided primary arterial with an 18 -foot raised median and a
110 =foot right -of -way. This is inconsistent with the recent re- classification of Madison
Street in the General Plan Circulation Element as a major arterial, between Avenue 54 and
Avenue 58.
The west side of Madison Street is fully improved as a. primary arterial with a 34 -foot
roadbed, adjacent to the PGA West development. Prior to the La Quinta General Plan
update of March 20, 2002, Madison Street was a master planned primary arterial between
Avenue 50 and Avenue 58. Consequently, the Madison Street improvements made in
conjunction with development of the PGA West Specific Plan (both adjacent to the
proposed Griffin Ranch development and south of Griffin Ranch) reflect primary arterial
improvement standards.
The proposed project is a Specific Plan -which includes an amendment to the Circulation
Element to classify Madison Street as a primary arterial, consistent with the dedications and
improvements of adjacent development. A separate traffic report will be prepared which
' examines the appropriate roadway classification for Madison Street (between Avenue 54
and Avenue 58) based upon projected development intensities rather than entitlements.
The proposed project shall incorporate the Class II bikeway facility and Class II golf cart
' path a minimum of 8 feet wide and appropriately striped adjacent to the site along Madison
Street. The striped lane will accommodate one -way golf cart travel and be shared with
bicyclists.
Avenue 54
' Avenue 54 is currently master planned as a secondary arterial adjacent to the northern
boundary of the project site. Secondary arterials require an 88 -foot right -of -way and
typically provide four -lane undivided roadways. Prior to the La Quinta General Plan
update of March 20, 2002, Avenue 54 was master planned as a primary arterial that would
t have required a 100 -foot right -of -way and provided a four -lane divided cross - section with
a raised landscape median.
Tentative Tract Map 32879 appears to show Avenue 54 adjacent to the site as a primary
arterial with a raised 12 -foot median and a 100 -foot right -of -way. This is inconsistent with
the lower classification of Avenue 54 currently shown in the La Quinta Circulation
Element. A landscaped parkway is shown adjacent to the right -of -way with a width of 24
feet. A six -foot wide meandering sidewalk is shown along Avenue 54. The Griffin Ranch
Specific Plan reflects the most recent secondary arterial classification of Avenue 54, east of
Madison Street. The Tentative Tract Map is expected to be revised to reflect the smaller
right -of -way 'required by the secondary arterial classification.
4 -10
The proposed project shall incorporate the Class II bikeway facility and Class II golf cart
path a minimum of 8 feet wide and appropriately striped adjacent to the site along Avenue
54. The striped lane will accommodate one -way golf cart travel and be shared with
bicyclists.
' Site Access and Internal Circulation
11
The project site has adequate access for the land uses proposed. As shown on Figure 2 -3,
the project proposes three unsignalized full -tum access points from the two abutting master
planned arterial roadways. They include: (1) the main site access on Madison Street; (2)
the western site access on Avenue 54; and (3) the eastern site access on Avenue 54. All
three site access intersections would be controlled by stop signs facing traffic on the minor
street approach (i.e. controlled by stop signs facing motorists leaving the site). With three
full -turn access points serving 305 single - family dwelling units, these intersections are
expected to provide excellent levels of service (LOS B or better) on all movements.
Madison Street Access Spacing
The proposed site access on Madison Street is located approximately 2,000 feet south of
Avenue 54, opposite an existing access to PGA West. Another access to PGA West is
located less than '1,000 feet south of the proposed access. The distance from Avenue 54 to
the proposed site access on Madison Street complies with the City's minimum intersection
spacing standard for primary arterials. However, the distance from the site access to the
PGA West access to the south is 60 feet less than the 1,060 feet minimum separation
specified in the La Quinta General Plan for primary arterials. Although the access is not
consistent with the minimum intersection spacing specified in the General Plan, the City of
La Quinta may opt to approve this access because it is located opposite an existing access to
PGA West. The proposed access is more than the minimum 250 feet from the nearest
driveway.
The proposed site access is located opposite an existing access that does not have sufficient
minor street approach traffic volumes to warrant signalization. Since traffic from the
proposed project will not meet the rural traffic signal warrant minimum volume threshold
for minor street approaches (75 vehicles per hour), a traffic signal will not be warranted
with the proposed project at the existing access to PGA West.
Engineering Bulletin #03 -08 details City policy regarding auxiliary lanes. As outlined
therein; auxiliary lanes shall be installed on all primary arterial and higher classification
streets. Based upon the number of project - related peak hour trips entering the site by
making left -turn movements from Madison Street (41), a southbound left -turn bay will be
required at the site access. A northbound right -turn deceleration lane will not be required,
as fewer than 50 vehicles per hour will enter the site by making northbound right -turn
movements from Madison Street at the proposed site access.
Avenue 54 Access
The two proposed site access locations on Avenue 54 are located a minimum of 855 feet
from the nearest intersection, and more than the requisite minimum 250 feet from the
nearest driveway. Therefore, both of these site access intersections comply with the City's
minimum intersection spacing requirements for secondary arterials.
Although normally discouraged along secondary arterials, full -turn access is appropriate at
the two locations on Avenue 54 because the project frontage on Avenue 54 is interrupted by
4 -11
a 40 -acre horse ranch (which occupies 1,320 feet of frontage on Avenue 54) that is not part
of the proposed project and future traffic volumes are projected to remain quite low on
' Avenue 54. The two development areas on either side of the 40 -acre out parcel cannot
share a single combined access on Avenue 54 without causing many residents to travel
across the site on internal residential streets to circle the 40 -acre parcel in an effort to gain
' access to /from Avenue 54. Whether one site access or two site access points are provided
on Avenue 54, future traffic volumes. are not expected to be sufficient to warrant
signalization of the site access intersection(s) with Avenue 54.
' Pending full -width improvements on the north side of Avenue 54, opposite the Griffin
Ranch project, Avenue 54 was assumed to be striped as a 2-lane-divided (modified
secondary) arterial upon project completion. The HCS 2000 analysis indicates that a major
' street left -turn bay for either of the site access intersections would require minimal storage
space. The 95th percentile back of queue would be less than one vehicle because the
opposing volume is low and the site access intersections will not warrant signalization.
' Current practice indicates that a minimum storage length of 100 feet is appropriate in
suburban /urban areas and 50 feet is appropriate in rural areas.1 These minimum lengths
apply when the HCS 2000 modeling indicates that a shorter queue length is anticipated.
' The total length required for left -turn bays should include the storage queue length as well
as deceleration length and taper. The City of La Quinta requires a minimum pocket length
of 100 feet plus taper and permits the taper to be part of the deceleration length. The City
' General Plan also specifies that left -turn pockets be 10 feet long for each 10 mph of speed
limit. With a 50 mph speed limit, left turn pockets on Avenue 54 would require 50 feet of
deceleration length. A standard taper length of 100 feet is typically used for single -lane
left -turn bays.
Although the eastern site access on Avenue 54 is projected to have 30 vehicles per hour
(VPH) turning left into the site and 53 VPH turning right into the site, auxiliary lanes are
not required at either the western or eastern site access (based upon the criteria in
Engineering Bulletin #03 -08) because Avenue 54 is classified as a secondary arterial. A
four -lane undivided roadway would accommodate vehicles turning from the inner lane or
' the outer lane by allowing trailing vehicles to divert around them when necessary. As a
two -lane divided (modified secondary arterial; Avenue 54 would be wide enough to
accommodate a westbound left -turn bay at the eastern site access and shoulders of
sufficient width for eastbound vehicles to decelerate out of the travel lane prior: to turning
' right into the site. The future traffic volume on Avenue 54 is projected to be low enough
that a two -lane divided roadway would be able to provide acceptable levels of service.
Dual Left -Turn Lanes
' The intersection of Jefferson Street and
Highway 111 currently has dual northbound left -
turn lanes but a single southbound left -turn lane. Dual left -turn lanes are recommended for
' consideration in the Caltrans "Highway Design Manual" when the left -turn volume exceeds
300 vehicles per hour.
' The intersection of Jefferson Street and Highway 111 is projected to have up to 215 peak
hour southbound left- turning vehicles and therefore will not require dual southbound left -
turn lanes to provide acceptable levels of service with year 2008 +project traffic volumes.
However, the addition of a second left -turn lane would increase the capacity of the
1. Stover, Vergil G., Frank J. Koepke, Transportation and Land Development. Institute of Transportation
Engineers, 2002 (pg. 5-53).
1 4 -12
intersection and may be required in the future as traffic volumes continue to increase at this
intersection.
Roundabouts
The Tentative Tract Map includes two roundabouts adjacent. to the proposed equestrian
center, near the main site access on Madison Street. These roundabouts appear to have an
inscribed diameter of approximately 120 feet. The traffic volumes projected through these
roundabouts will be well below their capacity.. The roundabouts should be reviewed by an
individual with demonstrated expertise to insure that vehicles towing horse trailers to and
from the equestrian center will have sufficient space in which to negotiate the roundabouts.
4 -13
1
5.0 CIRCULATION MITIGATION MEASURES
Figure 5 -1 illustrates the minimum key intersection approach lane geometrics required to
maintain acceptable levels of service upon project completion in the year 2008. With the
exception of the new traffic signals required at the three unsignalized key intersections on
Avenue 54, the improvements depicted in Figure 5 -1 are proposed in conjunction with the
Griffin Ranch project to facilitate site access.
The traffic impact analysis summarized herein assumed the existing circulation network,
which does not include the extension of Madison Street, north of Avenue 54. However,
the Hideaway development is currently under construction north of Avenue 54, between
Jefferson Street and the future. alignment of Madison Street. Consequently, the extension
of Madison Street northerly, from Avenue 54 to Avenue 52, is expected to be completed
within the next 2 to 4 years. In addition, the City of Indio has recently decided to extend
Madison Street from Avenue 50 to Highway 111.
Since the proposed Griffin Ranch development may not be completed for four years, the
circulation network in the project vicinity may need to fully accommodate the proposed
project and background growth, prior to the extension of Madison Street. Therefore, the
traffic. study addressed the worst -case scenario wherein Madison Street terminates at
Avenue 54 through the year 2008.
Once Madison Street is constructed between Avenue 54 and Avenue 52, a substantial
portion of the existing traffic on Madison Street, south of Avenue 54, will no longer pass
through the intersection of Jefferson Street and Avenue 54. Instead of diverting to the west
to use Jefferson Street, north -south travel will be accomplished on Madison Street, north of
Avenue 54. The anticipated reduction in traffic'through the intersection of Jefferson Street
and Avenue 54 may mean that the traffic signal required at that intersection in the near -term
to maintain acceptable levels: of service, may no longer be necessary after the extension of
Madison Street.
Similarly, without the extension of Madison Street, the intersection of Monroe Street and
Avenue 54 is projected to require signalization to accommodate year 2008 traffic volumes at
acceptable levels of service. Extending Madison Street northerly from Avenue 54 may
divert sufficient traffic from the intersection of Monroe Street and Avenue 54 to eliminate
the near -term need for a traffic signal at this intersection. However, based on the General
Plan buildout traffic volumes, a traffic signal will ultimately be required at this intersection.
The following mitigation measures should be incorporated in the project to minimize the
potential for significant adverse circulation impacts associated with the proposed
development. The measures recommende&are separated into two groups: those required
on the project site, and those required off -site.
5.1 MEASURES REQUIRED ON -SITE
1. The project proponent shall dedicate appropriate right -of -way and improve Madison
Street and Avenue 54 adjacent to the project site, as required by the City of La Quinta.
2. An on- street Class ITbikeway and golf cart path (a minimum of 8 feet wide) shall be
appropriately striped along Madison Street and Avenue 54 adjacent to the site.
5 -1
c
Avenue 48
Avenue
Avenue 52
"T
If T
Figure 5 -1
Year 2008 Intersection
Lane Geometrics
Legend
Exclusive Right -Turn Lane
F— Through Lane
Exclusive Left -Turn Lane
Optional Through /Right Lane-
Optional Through /Left Lane
Optional Through /Right/Left Lane
Q Signalized Intersection
Q Future Traffic Signal
❑ All Way Stop Control
Stop Sign
Avenue 54
a !:Projt::;::::::.::• a�
•I Site in
0
a.
Airport Blvd.
T
c
_ LJ o
Avenue 58
T
�Vndo Engineering Scale: 1 " = 3770'
Highway 111
c
Avenue 48
Avenue
Avenue 52
"T
If T
Figure 5 -1
Year 2008 Intersection
Lane Geometrics
Legend
Exclusive Right -Turn Lane
F— Through Lane
Exclusive Left -Turn Lane
Optional Through /Right Lane-
Optional Through /Left Lane
Optional Through /Right/Left Lane
Q Signalized Intersection
Q Future Traffic Signal
❑ All Way Stop Control
Stop Sign
Avenue 54
a !:Projt::;::::::.::• a�
•I Site in
0
a.
Airport Blvd.
T
c
_ LJ o
Avenue 58
T
�Vndo Engineering Scale: 1 " = 3770'
3. A-left -turn bay shall be constructed in the median along Madison Street as a refuge
and to permit southbound motorists to decelerate out of travel lanes prior to turning
' left into the site access on Madison Street.
4. The final layout and site access design shall be subject to the review and approval of
' the City Traffic Engineer during the development review process, to ensure
compliance with City of La Quinta roadway and access design standards.
5. Clear unobstructed sight distances shall be provided at all site access points.and at all
' internal intersections including the roundabouts.
6. Stop signs shall be installed on -site at the proposed access points, on Madison Street
and Avenue 54 to control exiting site traffic.
7. The project proponent shall provide (at a minimum) the lane geometrics shown in
' Figure 5 -1 at the site access points in conjunction with on -site development.
8. Appropriate street.lightmg and signage shall be provided as part of the roundabout
design.
' 9. The proposed roundabouts on -site should be reviewed by an individual with
demonstrated expertise in roundabout design.
5.2 MEASURES REQUIRED OFF -SITE
All of the off -site key intersections are projected to operate at acceptable levels of service
' with existing intersection approach lanes, provided three new traffic signals are installed at
the three unsignalized key intersections along Avenue 54.
1. To achieve and maintain the City of La Quinta minimum intersection performance
standard of LOS "D" in the year 2008 (with or without project traffic), the project
proponent may be required to contribute on a "fair- share" basis to the cost of
installing traffic signals at the following key intersections: (1) Jefferson Street at
' Avenue 54, (2) Madison Street at Avenue 54, and (3) Monroe Street at Avenue 54.
2. The project proponent may be required to participate in a traffic mitigation fee
' program which would ensure that a "fair- share" contribution is made to future
roadway infrastructure improvements of area -wide benefit.
' S -2
.p
a
x
�
1
1
1
1
1
1
1
1
L
1
1
1
1
I
Appendices.
A. 2004 Peak Hour Traffic Count Data
R. HCM Methodology. and Worksheets
C. Traffic Signal Warrants
D. Traffic Glossary.
Appendix A
2004 TRAFFIC COUNT DATA
i
� 11 '
CITY OF LA QUINTA
Directional Volume Counts
August 2004
Counts Unlimited, Inc. 25424 Jaclyn Avenue Moreno Valley, CA 92557 T 909 247 6716 F 909 924 8604
96'
66
S6'
S6'
S6'
Be '
d'H'd
LS61
£91T
899
SZ9
L6L
08S
amnToA
OO:ZO
W90
SI :ZO
.0190
OO:ZO
86:01
inoH Kead
'
$ IS
WOS
WD
R
I Inds
656LI
6ZZ6
OILS
sTeaoy de0
MOT
99SL
Z81S
ME
LOOS
EZLE
sjeIoy
,
61
SZ
OTT
68Z
98
R
sts
T
SS
TI
09S
TIT
SVTT
L£
TOE
ZZ
LET
ST
69t
OE:TT
SE
SLZ
9Z
6ZI
6
661
ST :TT
96
LIZ
9Z
TZi
0Z
91T
OO:TT
'
6LZ
09
E801
TSZ
Z91
9E
6IS
OET
Z11
6Z
69S
IST
W OT
E9
6LZ
E6
66T
OZ
SET
OE:01
09
68Z
LE
LET
EZ
0I
ST:OT.
T6
6EZ
96
Oct
S6
III
OV OT
,
6Z6
8L
MI
96Z
8SZ
96
TOS
EZI
ILI
ZE
US
III
56 :60
ITT
86Z
69
TZT
Z6
LZI
OF 60
801
19Z
L9
6ZT
I6
III
ST :60
,
ZE1
.69Z
9L
8Z1
9S
UT
00'60
LOS
TIT
CLOT
LLZ
96E
98
61S
III
UZ
S6
ZSS
96T
SVS0
_
0T
6ST
ZSZ
L9Z
88
LB
SIT
IN
6S
ZL
LET
66t
ONO
ST :SO
,
OST
SLZ
58
OST
S9
SZI
00,80
69L
SOT
MI
98Z
OZ6
801
US
9E1
66.E
LL
99S
OST
SV LO
0.9T
6LZ
68
9ET
IL
UT
ONO
.
061
LOE
001
Z91
06
SK
SI LO
'
6ZZ
ZLZ
EZI
66I
90T
8ZI
OO:LO
E98
06I
HOT
S8Z
80
66
SSS
SSI
SH
16
S0
OET
st:90
961
66Z
SOT
69T
16
SET
OE:90
SZZ
ON
OEt
TZT
S6
LOT
91 :90
'
ZSZ
BIZ
66T
SIT
801
EOT
00:90
9SII
ZLZ
L99
6ZZ
LE9
BET
606
661
61S
HI
8SZ
S8
W S0
68Z
OR
EST
UT
TOT
9L
OE:SO
,
SOE
ZZT
SLT
6L
OET
86
ST :SO
SZE
86
ILI
66
6St
0
00S0
TLIT
S8Z
88Z
081
SL
IS
819
6ST
TST
ZL
TE
EZ
ESS
9ZI
LET
SOT
66
OE
SV60
O[:60
'
66Z
ZE
Z91
6
LET
EZ
ST:60
66Z
OZ
96T
6
EST
II
0060
99ZI
66Z
6S
91
S09
SM
TZ
6
199
66T
8E
ZI
S6:E0
SEE
IT
ZST
S
EST
9
OE:10
t
ZOE
9T
OST
9
ZST
OT
SU IO
SEE
91
891
9
UT
OT
OO :EO
LS6I
OLE
OS
L
099
SLI
6Z
S
L6L.
EOZ
TZ
Z
SV ZO
SLE
L
L91
L
80Z
OT
OE :ZO
'
SH
ET
89T
9
L6T
L
SI:ZO
RE
ET
OST
IT
681
Z
OO :ZO
MI
S6Z
09
OT
69S
III
SE
S
6Z9
Z91
SZ
S
SV TO
'
ZTE
8I
BET
Zt
6LI
9
O[ :TO
68Z
LT
081
01
6£I
L
ST :TO
ZOE
ST
86T
B
6ST
L
00:10
9801
08Z
Z6
L
Its
ZSI
6S
ZT
S68
8ZI
EE
S
SV ZT
'
OLZ-
TZ
LZI
I
.E6t
8
OE:ZT
99Z
TZ
TZT
91
S6T
S
ST:ZI
OLZ
EE
9T
81
6ZI
ST
EO /80 OO:ZT
W'd
W
7d
W['�
'd
N
am y'
Aepsany
< - --
pautgmoD
> < - - -
ONES.
-- - - - -
>< -
nNHN
->
ut6eg
I a ed
H
N
ITISS & Q'I at ?d
yNno3
SwI140A
M01133410
SH 6Z
600Z /EO /80 ;aaea a1e95 '
Tit x5 /S
'
HMO apoo alts
910-0.Z-606
NosHSddSP
•auI paatqttun
slunoo
viminb vq d0 1113
1
'
CITY OF LA 4 UINTA
Counts
Unlimited Inc.
MADISON AVENUE
909. 247 -6716
Site Code :
096878
/AVBNUB 54
Start Date:
08/03/2004
eS
24 HR DIRECTIONAL VOLUME COUNT
File I.D.
LQMAS054
NORTH
/SOUTH
Page
1
'Time
Begin < - - - - --
A.M
NBND
------ > <
PM
- - - - --
A.M.
SBND
------ > <
PM
- - - - -- Combined
A. M
-
PM
-.>
Tuesday
12:00 08/03 2
50
3
33 .
5
83
12:15 1
60
0
42
1
102
'12:30
1
12:45 0
4
47
48
205
0
1
4
52
43
170
1
1
8
99
.91
375.
01:00 1
68
6
54
7
122
01:15 0
61
0
55
0
116
0
60
2
49
2
109
'01:30
01:45 2
3
52
241
0
8
53
211
2
11
105
452
02:00 . 1
83
0
39
.1
122
'02:30
02:15 0
0
81
124
0
3
47
44
0
3
128
168
02:45 1
2
83
371
0 .
3
51
181
1
5
134
552
03:00 3
67
4
46
7
113
03:15 2
03:30 1
58
114
0
3
34
31
2
4
92
145
03:45 1
7
56
295.
2
9
30
141
3
16
86
436•
04:00 6
56
1
37
7
93
'04:15
3
04 :30 9
48
41
7
24
34
47
10
33
82
88
04 :45 8
26
48
193
25
57
25
143
33
83
73
336
05:00 22
63
11
26
33
89
05:15 9
47
24
28
33
75
05:30 31
23
42
25
73
48
05:45 26
88
26
159
84
161
28
107
110
249
54
266
'06:15
06:00 17
26
33
19
53
65
23
21
70
91
56
40
06:30 46
13
78
15
124
28
06:45 26
115
16
81
. 104
300
20
79
130
415
36
160
07 :00 20
07 :15 35
13
21
85
75
18
20
105
110
31
41
07:30 46
21
61
15
107
36
07:45 42
143
18
73
62
283
16
69
104
426
34
142
'08:00
41
08:15 56
12
11
57
53
12
10
98
109
24
21
08:30 39
10
56
10
95
20
08:45 43
179
9
42
51
217
13
•45
94 .
396
' 22
87
.
48
4
49
6
97
10
'09:00
09:15 54
4
52
15
106
19
09:30 49
8
46
9
95
17
I '10:00
09:45 49
49
200
8
4
24
49
55
196
6
11
36
98
104
396
14
15
60
10:15 60
4
44
8
104
12
10:30 46
1
27
4
73
5
'10:45
68
11:00 60
223
5
0
14
45
54
171
2
2
25
113
114
.394
7
2
39
11 :15 54
2
44
2
98
4
11:30 56
1
40
2
96
3
11:45 60
230
1
4
1 47
185
4
16
101
415
5
14
'
Totals 1220
1.702
1594
1217
2814
2919
Day Totals
2922
2811
5733
1
Split 3 43.33
58.33
56.63
41.6%
0 E:30
02:00
Peak Hour 10:45
02:00
06:30
01:00
Volume 238
371
342
211
469
552
'
P.H.F. 87
.14
.82
95
.90
.82
I
I
09 924 8604
N
W E
S
NOT TO SCALE
.CITY OF LA QUINTA
JEFFERSON AVENUE & SR -111
5470-JEFFERSON-1 11
'
COUNTS UNLIMITED INC.
Peak Hour From
0700 AM to 08:45 AM - Peak 1 of 1
25424 JACLYN AVENUE
CITY OF LA QUINTA
MORENO VALLEY CA 92557
File Name
: LQJE111AM
'N /S: JEFFERSON AVENUE
909- 247 -6716
Site Code
: 00096831
'
EM: SR -111
Start Date .:
8/3%2004
WEATHER: SUNNY
Page No
:2
Volume
127 282 49
Peak Hour From
0700 AM to 08:45 AM - Peak 1 of 1
By
06:00 AM
07:30 AM
07:30 AM
07:45 AM
'
Approach
Volume
127 282 49
458
.118 600
41 759
221 274
103 598
78 452 97 627
Percent
27.7 61.6 10.7
15.5 79.1
5.4
37.0. 45.8
17.2
12.4 72.1 15.5
High Int.
08:00 AM
.07:45 AM
07:30 AM
07:45 AM
Volume
29 83 17
129
36 176
9 221
61 74
28 163
17 123 30 170
Peak Factor
0:888
0.859
0.917 0.922
t
1
'CITY OF LA QUINTA
N /S: JEFFERSON AVENUE
E/W: SR -111
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716
(,rniinc Prinfcrl- Tr)TG1 \ /rll I IMF
File Name
: LQJE111AM
Site Code
:00096831
Start Date
: 8/3/2004
Page No
: 1
w
JEFFERSON AVENUE
SR -111
JEFFERSON AVENUE .
SR -111
'
Southbound'
Westbound
Northbound
29
83
Eastbound
129
36
151,
Start Time
Left
Thru
Right
Total
Left
Thru
Right
Total
F1.0 eft
Thru
Right
Total
Left
Thru
Right
Total
Total
144
Factor
1.0
1.0
1.0
28
1.0
1.0
1.0
21
1 1.01
1.01
08:30 AM
1.01
1.01
1.0
104
20
07:00 AM
20
81 6
107
37
113
13
163
37
62
11
110
16
63
14
93
473
07:15 AM
14
77 9
100
22
108
14
144
48
52
19
119
10
107
26
143
506
07:30 AM
17
66 15
98
20
129
12
161
61
74
28
163
12
99
30
141
'563
07:45 AM
18
65 11
-941
36
176
9
221
47
69
25
141
1 17
123
30
170
626
Total
69
289 41
3991
115
526
48
6891
193
257
83
5331
55
392
100
547
2168
w
08:00 AM
29
83
17
129
36
151,
12
199
58
73
22
153
15
98
22
135
616
08:15 AM
27
81
13
121
26
144
8
178
55
58
28
141
21
.120
21
162
602
08:30 AM
37
55
12
104
20
127
8
155
50
60
15
125
25
111
24
160
544
08:45 AM
34
63
7
104
15
137
18
170.
71
60
24
155
9
122
18
149
578
Total
127
282
49
458
97
559
46
702
234
251
89
574
70
451
85
606
2340 .
Total
196
571
90
857
212
1085
94
1391
427
508
172
1107
125
843
185
1153
4508
'Grand
Apprch %
22.9
66.6
10.5
15.2
78.0
6.8
1
38.6
45.9
15.5
I
10.8
73.1
16.0
Total %
4.3
12.7
2.0
19.0
4.7
24.1
2.1
30.9
9.5
11.3
3.8
24.6
2.8
18.7
4.1
25.6
JEFFERSON AVENUE
SR -111
JEFFERSON AVENUE
SR -111
Southbound
Westbound
Northbound
. Eastbound
Start Time
Left
Thru
Right
Ap
Total
Left
Thru
Right
App-
Total
Left
Thru
Right
App-
Total
Left
Thru
Right
Total
Total
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1.
Intersection
07:30 AM
Volume
91
295
56
442
118
600
41
759
221
274
103
598
65
440
103
608
2407
Percent
20.6
66.7
12.7
15.5
79.1
5.4
37.0
45.8
17.2
10.7
72.4
16.9
07:45
Volume
18
• 65
11
94
36
176
9
221
47
69
25
141
17
123
30-
170
626
Peak Factor
0.961
High Int.
08:00 AM
07:45 AM
07:30 AM
07:45 AM
29.
83
17
129
36
176
9
221
.61
74
28
163
17
123
30
170
'Volume
Peak Factor
0.857
0.859
0.917
0.894
1
1
'
rCOUNTS
UNLIMITED INC.
05:45 PM - Peak 1 of 1
25424 JACLYN AVENUE
05:00 PM
04:45 PM
CITY OF LA QUINTA
MORENO VALLEY CA 92557
File Name
: LQJE111 PM
r
N /S: JEFFERSON AVENUE
909 - 247 -6716
Site Code
: 00096831
E/W: SR -111
Start Date
: 8/3/2004
Volume
WEATHER: SUNNY
57 535
Page No
:2
182 284
95 561
104 842 208 1154
Percent
Peak Hour From 04:00 PM to
05:45 PM - Peak 1 of 1
By
05:00 PM
04:45 PM
04:00 PM .
05:00 PM
r
Approach
Volume
182 296
57 535
130 743
65 938
182 284
95 561
104 842 208 1154
Percent
34.0 55.3
10.7
13.9 79.2
6.9
32.4 50.6
16.9
9.0 73.0 18.0
High.lnt.
05:45 PM
05:15 PM
04:15 PM
05:15 PM
'
Volume
54. 72
19
28 194
15
54 79
24
19 244 54
r
Peak Factor
0 922
0 989
0.893 0.910
r
1
.
1
1
r
.
CITY OF LA QUINTA
N /S: JEFFERSON AVENUE
E/W: SR -111
WEATHER: SUNNY.
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909- 247 -6716
r,rnuns Printari- TOTAI Vni l IMF
File Name
: LQJE111PM
Site Code
: 00096831
Start Date
: 8/3/2004
Page No
: 1
'
JEFFERSON AVENUE
JEFFERSON AVENUE
JEFFERSON AVENUE
SR -111
JEFFERSON AVENUE
Westbound
SR -111
Eastbound
Start Time
Left
Thru
Right
Southbound
Left
Thru
Westbound
App
Total
Left
Northbound
29
72
Eastbound
109
43
168
Start Time
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Total
28
194
1.01
1.01
1.01
57
1.01
1.01
19
244
1.01
1.01
828
21.0
1.01
1.01
1.0
73
17
'Factor
04:00 PM
35
87.
16
138
12
182
24
218
48
69
28
145
18
201
35
254
755
19
04:15 PM
39
66
21
126
'22
192
21
235
54
79
24
157
29
232
37
298
816
57
04:30 PM
41
67
23,
131
30
150
8
188
37
70
20
127
36
218
34
288
734
130
04:45 PM
33
70
13
1161
29
189
16
234
43
66
- 23
1321
22
189
42
253
735
12.4
Total
.148
290
73
511
93
713
69
875
182
284
95
561
1 105
840
148
1093
•3040
Int.
Total
JEFFERSON AVENUE
SR -111
JEFFERSON AVENUE
SR -111
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App.
Total
Left
Thru
Right
App
Total
Left
05:00 PM
29
72
8
109
43
168
20
231
44
57
28
129
22
206
49
277
746 ,
938
167 247
PM
45
79
13
137
28
194
15
237
42
57
38
137
19
244
54
317
828
21.0
'05:15
05:30 PM
54
73
17
144
30
192
14
236
38
67
21
126
33
200
48
281
787
19
244
05:45 PM
54
72
19
145
25
161
19
205
44
48
14
106
30
192
57
279
735
Total
182
296
57
535
126
715
68
909
168
229
101
498
104
842
208,
1154
3096
'Grand
Total
330
586
130
1046
219
1428
137
1784
350
513
196
1059
209
1682
356
2247
6136
17
Apprch %
31.5
56.0
12.4
1
12.3
80.0
7.7
1
33.1
48.4
18.5
I
9.3
74.9
.15.8
0.878
Total %
5.4
9.6
2.1
17.0
'3.6
23.3 '
2.2
29.1
5.7
8.4
3.2
17.3
3.4
27.4
5.8
36.61.
Int.
Total
JEFFERSON AVENUE
SR -111
JEFFERSON AVENUE
SR -111
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App.
Total
Left
Thru
Right
App
Total
Left
Thru
Right
App
Total
Left
Thru
.Right
App
Total
Int.
Total
Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
Intersection
04:45 PM
Volume
161 294
51
506
130
743
65
938
167 247
110
524
96
839
193
1128
3096
Percent
31.8 58.1
10.1
13.9
79.2
6.9
31.9 47.1
21.0
8.5
74.4
17.1
'
05:15
45 79
13
137
28
194
15
237
42 57
38
137
19
244
54
317
828
Volume
Peak Factor
0.935
High Int,
05:30 PM
05:15 PM
05:15 PM
05:15 P.M
'54 73
17
144
28
194
15
237
42 57
38
137
19
244
54
317
'Volume
Peak Factor
0.878
0.989
0.956
0.890
t
-CITY OF LA QUINTA
JEFFERSON AVENUE /AVENUE 54
Turning Movement Counts
August 2004 .
Counts Unlimited, Inc. • 25424 Jaclyn Avenue Moreno Valley, CA 92557 T 909 247 6716 ■ F 909 924 8604
m
aois
0
lu
to
K
CITY OF LA QUINTA
JEFFERSON AVENUE & AVENUE 54
N
W E
S
NOT TO SCALE
Q
BIKE LANE
m
STOP
5530 JEFFERSON 54
p
l>'
Y
lu
to
K
CITY OF LA QUINTA
JEFFERSON AVENUE & AVENUE 54
N
W E
S
NOT TO SCALE
Q
BIKE LANE
m
STOP
5530 JEFFERSON 54
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909- 247 -6716
File Name
: LOJE54AM
'N
CITY OF LA QUINTA
/S: JEFFERSON AVENUE
Start Date
EMI: AVENUE 54
Page No
WEATHER: SUNNY
07:00 AM to
08:45 AM - Peak 1 of 1
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909- 247 -6716
File Name
: LOJE54AM
Site Code
: 00968113
Start Date
: 8/3/2004
Page No
:2
JEFFERSON AVENUE
Out . In Total
274 422 696
16 94 312
Right . Thru Left
North 3 �
N
N rr
r —► /3/2004 7:00:00 AM c
~ /3/2004 7:45:00 AM ro rr
A
°' TOTAL VOLUME �� ro o
00 � o-
W 0
V
T r
Left . Thru Ri ht
1 87 14
124 102 226
Out In Total
JEFFERSON AVENUE
Peak Hour From
07:00 AM to
08:45 AM - Peak 1 of 1
By
07:00 AM
07:00 AM
07:45 AM
08:00 AM
'
Approach
Volume
312 94
16 422
29 2
178 209
2 125
12 139
12 4 1 17
Percent
73.9 22.3
3.8
13.9 1.0
85.2
1.4 89.9
8.6
70.6 23.5 5.9
High Int.
07:00 AM
07:45 AM
07:45 AM
08:00 AM
Volume
94 28
2 4
12 0
43
1 31
4
5 3 0 8
'
I
rr
Peak Factor
0.851
0.950
0.965 0.531
1
'
JEFFERSON AVENUE
AVENUE 54
JEFFERSON AVENUE
AVENUE 54
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
I
COUNTS
UNLIMITED INC.
1 87
14
102
9 2
1
12
745
Percent 73.9 22.3 3.8
13.9 1.0
85.2
1.0 85.3
13.7
25424 JACLYN AVENUE
8.3
'
07:00 94 28 2 124
5 2
42
49
CITY OF LA QUINTA
3.
23
5 0
0
5
MORENO VALLEY CA 92557
Volume
File Name
:
'N
/S: JEFFERSON AVENUE
Peak Factor
909 - 247 -6716
Site Code
Start Date
: 00968113 3
009681
:8/3/2004
E/W: AVENUE
54
High Int. 07:00 AM
07:45 AM
07:45 AM
07:00 AM
Volume 94 28 2 124
12 0
43
WEATHER: SUNNY
1 31
4
36
5 0
0
5
'
Peak Factor 0.851
0.950
Page No
: 1
.0.708
0.600
Groups
Printed- TOTAL VOLUME
JEFFERSON AVENUE
AVENUE 54
JEFFERSON
AVENUE
AVENUE
54
'
•
Southbound .
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
EhjK:h
t
Total
Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
.
07:00 AM
94
28
2
124
5
2
42
49
0 20
3
23
5
0
0
5
201
07:15 AM
69
22
4
95
8
0
45
53
0 18
4
22
0
0
0
0
170
07:30 AM
83
23
3
109
4
0
48
52
0 18
3
21
3
1
0
4.
186
07:45 AM
66
21
7
94
12
0
43
55
1 31
4
36
1
1
1
3
188
Total
312
94
16
422
29
2
178
209
1 87
14
102
9
2
1
12
745
08:00 AM
66
22
1
89
4
1
32
37
1 25
5
31
5
3
0
8
165
08:15 AM
67
31
0
98
8
1
48
57
0 35
1
36
1
.0
0
1
192
t08:30
AM
56
32
34
4
8
92
106
2
7
2
2
49
46
53
55
0 34
0 26
2
5
36
31
2
4
0
1
0
1
2
6
183
198
08:45 AM
Total
64
253
119
13
385
21
'6
175
202
1 120
'13
134
12
4
1
17
738
Grand Total
565
213
29
807
50
8
353
411
2 207
27
236
21
6
2
29
1483
'
Apprch %
70.0
26.4
3.6
I
12.2
1.9
85.9
I 0.8 87.7
11.4
1
72.4
20.7
6.9
Total %
38.1
14.4
2.0
54.4
.3.4
0.5
23.8
27.7 0.1 14.0
1.8
15.9
1.4
0.4
0.1
2.0
Int.
Total
'Peak
JEFFERSON AVENUE
AVENUE 54
JEFFERSON AVENUE
AVENUE 54
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
I
Right
App'
Total
Int.
Total
'Peak
Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
Intersection 07:00 AM
Volume 312 94 16 422
29 2
178
209
1 87
14
102
9 2
1
12
745
Percent 73.9 22.3 3.8
13.9 1.0
85.2
1.0 85.3
13.7
75.0 16.7
8.3
'
07:00 94 28 2 124
5 2
42
49
0 20
3.
23
5 0
0
5
201
Volume
Peak Factor
0.927
High Int. 07:00 AM
07:45 AM
07:45 AM
07:00 AM
Volume 94 28 2 124
12 0
43
55
1 31
4
36
5 0
0
5
'
Peak Factor 0.851
0.950
.0.708
0.600
ICITYOFLAbUINTA
N /S: JEFFERSON AVENUE
EIW: AVENUE 54
WEATHER: SUNNY
M
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716
—JEFFERSON AVERUff-
Out In Total
F-3-6-31 317 1 680
: LQJE54PM
203
31 1111
Right 'Thru
Left
File Name
: LQJE54PM
Site Code
: 00968113
Start Date
: 8/3/2004
Page No
: 2
Peak Hour From 04:00 PM to
Peak Hour From 04:00 PM to
05:45 PM - Peak 1 of 1
By
04:00 PM
04.30 PM
04:00 PM
04:45 PM
'
Approach
Volume
203 111
3 317
16 1 267
284
0 107 18
125
8 4 2 14
Percent
64.0 35.0
0.9
5.6 0.4 94.0
0.0 85.6 14.4
57.1 28.6 14.3
High Int.
04:00 PM
+
05:00 PM
04:00 PM
04:45 PM
'
Volume
59 26
1 86
4 1 86
91
0 34 6
40
2 2 1 5
Peak Factor
0.922
0.780
0.781 0.700
1
t
JEFFERSON AVENUE
JEFFERSON AVENUE
OF LA QUINTA
'CITY
N /S: JEFFERSON AVENUE
JEFFERSON AVENUE
EM: AVENUE 54
AVENUE 54
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716 .
r'.,.-, DAM-4_ TnTAl \ /r)l I IMF
r
File Name ` LQJE54PM
Site Code : 00968113
Start Date : 8/3/2004
Page No 1
' Grand Total 376 213 5 594 25 3 468 496 1 192 27 220 14 4 2 20 1330
Apprch % 63.3 35.9 0.8 5.0 0.6 94.4 I 0.5 87.3 12.3 1 70.0 20.0 10.0
Total % 28.3 16.0 0.4 44.7 I 1.9 0.2 35.2 37.3 0.1 14.4 2.0 16.5 1.1 0.3 0.2 1.5
JEFFERSON AVENUE
JEFFERSON AVENUE
JEFFERSON AVENUE
AVENUE 54
JEFFERSON AVENUE
Westbound
AVENUE 54
Eastbound
Start Time
'
Thru
Right
Southbound
Left
Thru
Westbound
App'
Total
Left
Northbound
Right
App'
Total
Eastbound
Thru
Right
App'
Total
Start Time
Left
Thru
�E�A,tal
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
App.
Total
Int.
Total
Factor
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
'
04:00 PM
59
26
1
86
3
1
73
77
0
34
6
40
1
0
0
1
204
04:15 PM
40
28
0
68
3
1
62
66
0
29
5
34
0
0
0
0
168
04:30 PM
58
28
0
86
3
0
48
51.
0
25
4
29
4
0
0
4
170
04:45 PM
46
29
2
77
7
0
66
73
0
19
3.
22
2
2
1
5
177
'
Total
203
111
3
3171
16
2
249
2671
0
107
18
1251
7
2
1
101
719
05:00 PM
51
25
1
77
4
1
86
91
0
20
2
22
1
2
1
4
194
05:15 PM
36
21
0
57
2
0
67
69
0
20
1
21
0
0
0
0
147
t
05:30 PM
05:45 PM.
46
40
. 27
29
1
0
74
69
3
0
0
0
35
31
38
31
1
0
22
23
5
1
28
24
5
1
0
0
0
0
5
1
145
125
Total
173
102
2
277
9
1
219
229
1
85
9
95
7
2
1
10
611
' Grand Total 376 213 5 594 25 3 468 496 1 192 27 220 14 4 2 20 1330
Apprch % 63.3 35.9 0.8 5.0 0.6 94.4 I 0.5 87.3 12.3 1 70.0 20.0 10.0
Total % 28.3 16.0 0.4 44.7 I 1.9 0.2 35.2 37.3 0.1 14.4 2.0 16.5 1.1 0.3 0.2 1.5
'Peak Hour From 04:00 PM to 05:45 PM - Peak
JEFFERSON AVENUE
AVENUE 54'
JEFFERSON AVENUE
AVENUE 54
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
'Peak Hour From 04:00 PM to 05:45 PM - Peak
1 of 1
Intersection 04:00 PM
! Volume 203 111 3 317
16 2 249 267
0 107 18 125
7 2 1 10'
Percent 64.0 35.0 0.9
6.0 0.7 93.3
0.0 85.6 14.4
70.0 20.0 10.0 .
04:00 .59 26 1 86
'. Volume
3 1 73 77
0 34 6 40
1 0 0 1
Peak Factor
High Int. 04:00 PM
04:00 PM
04:00 PM
04:45 PM
tVolume 59 26 1 86 3 1 73 77 0 34 6 40 2 2 1 5
Peak Factor 0.922 0.867 0.781 0.500
i
t
1
Int.
Total
719
204
0.881
CITY OF LA QUINTA.
MADISON AVENUE. /AVENUE 54
Turning Movement Counts
. August 2004
Counts Unlimited, Inc. 25424 Jaclyn Avenue Moreno Valley, CA 92557 T 909 247 6716 F 909 924 8604
FOR FUTURE LEFT
0
CONSTRUCTION
CITY OF LA QUINTA
MADISON AVENUE & AVENUE 54
5530-MADISON-54
'CITY OF LA QUINTA
N /S: MADISON AVENUE
EM/: AVENUE 54
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716
File Name
: LOMA54AM
Site Code
:00096857
Start Date
: 8/3/2004
Page No
:2
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
B 07:00 AM
07:15 AM
08.00 AM
07:00 AM
'
Approah
Volume 0 0 0 0
28 66
0 94
151 0 20
171
0 62 256, 318
Percent - - -
29.8 70.2
0.0
88.3 0.0 11.7
0.0 19.5 80.5
High Int. -
07:45 AM
08:30 AM
07:00 AM
'Volume
- - - -
10 20
0 30
0.783
42 0 5
47
0.9101.
0 14 81 95
0.837
Peak Factor
1
i1
,CITY OF LA QUINTA
N /S: MADISON AVENUE
E/W: AVENUE 54
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MOR ENO VALLEY CA 92557
909 - 247 -6716
File Name
: LQMA54AM
Site Code
: 00096857
Start Date
: 8/3/2004
Page No
: 1
AVENUE 54
I'
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
AVENUE 54
MADISON AVENUE
AVENUE 54
318
Southbound
AVENUE 54
Northbound
MADISON
AVENUE
Left
Thru
AVENUE 54
Opp.
Total
Left
Thru
Right
App'
Total
Southbound
08:00 AM
0
Westbound
0.
0
Northbound
16
Eastbound
20
29
0
Start Time
Left
Thru
J�EEApp.j
51
Left
Thru
Right
App
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Total
'Factor
9
1.0
0
1.0
0
1.0
0
0
1.0
4
1.0 1.0
14 0
18
1.0
33
1.0 1.0
0 6
39
1.0
0
1.0 1.0
14 81
95
152
0
07:00 AM
07:15 AM
0
0
0
0
8
18 0
26
39
0 0
39
0
11 65
76
141
0
AM
0
0
0
0
6
12 0
18
39
0 4
43
0
24 57
81
142
0
.07:30
07:45 AM
0
0
0
0
10
20 0
30
36
0 7
431
0
13 53
661
139
513
Total
0
0
0
01
28
64 0
92
147
0 . 17
1.641
0
62 256
3181
574
I'
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
AVENUE 54
MADISON AVENUE
AVENUE 54
318
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
Opp.
Total
Left
Thru
Right
App'
Total
Left
08:00 AM
0
0
0.
0
4
16
0
20
29
0
2
31
0
21
51
72
123
08:15 AM
0
0
0 .
0
2
11
0
13
37
0
9
46
0
16
54
70
129
'.
08:30 AM
0
0
0
0
3
13
0
16
42
0
5
47
0
11
50
61
124
08:45 AM
0
0
0
0
3
17
0
20
43
0
4
47
0
21
49 .
70
137
Total
0
0
0
0
12
57,
0
69
151
0.
20
171
0
69
204
273
513
'Grand
Total
0
0
0.0
0
0.0
0
I
40
24.8
121
75.2
0
0.0
161
1
298
89.0
0
0.0
37
11.0
335
I
0
0.0
131
22.2
460
77.8
591
I
1087
Apprch %
0.0
Total %
0.0
0.0
0.0
0.0
3.7
11.1
0.0
14.8
27.4
0.0
3. 4
30.8
0.0
12.1
42.3
54.4.
I'
Volume 0 0 0 0 10 20 0 30
Peak Factor 0.767
I
i
I
1
147 0
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
AVENUE 54
MADISON AVENUE
AVENUE 54
318
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
Opp.
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Volume 0 0 0 0 10 20 0 30
Peak Factor 0.767
I
i
I
1
147 0
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
164
Intersection
07:00 AM
318
89.6 0.0
10.4
Volume
0 0 0
0
28 64 0 92
33 0.
P ercent
07:00
0.0 0.0 0.0
0 0 0
0
30.4 69.6 0.0
4 14 0 18
95
olume
07:00 AM
Peak Factor
39 0
4
43
0 14 •
High Int.
6:45:00 AM
07:45 AM
Volume 0 0 0 0 10 20 0 30
Peak Factor 0.767
I
i
I
1
147 0
17
164
0 62
256
318
89.6 0.0
10.4
0.0 19.5
80.5
33 0.
6
39
0 14
81
95
07:30 AM
07:00 AM
39 0
4
43
0 14 •
81
95
0.953
0.837
Int.
Total
574
152
0.944
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
04:30 PM
04:15 PM
OF LA QUINTA
MORENO VALLEY CA 92557
File Name
: LQMA54PM
,CITY
N /S: MADISON AVENUE
909- 247 -6716
Site Code
: 00096857
E/W: AVENUE 54
7 74
Start Date
: 8/3/2004
WEATHER: SUNNY
0 77 144 221
Page No
: 2
8.6 91.4
0.0
93.4 0.0
6.6
Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
By 04:00 PM
04:30 PM
04:15 PM
04:00 PM
Approach
Volume 0 0 0 0
7 74
0 81
198 0
14 212
0 77 144 221
Percent - - -
8.6 91.4
0.0
93.4 0.0
6.6
0.0 34.8 65.2
High Int. -
05:15 PM
05:00 PM
04:00 PM
Volume - -
3 20
0 23
65' 0
4 69
0 19 43 62
_
Peak-Factor
0.880.
0.768 0..891
CITY OF LA QUINTA
N /S: MADISON AVENUE
ENV: AVENUE 54
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716
.,.... D.; -4-.4 TnTAI \ /nl I IMF
File Name : LQMA54PM
Site Code : 00096857
Start Date 8/312004
Page No : 1
'
1
17
Southbound
18
65
AVENUE 54
Westbound
0
MADISON AVENUE
Northbound
0.
AVENUE 54
Eastbound
28
PM
0
Start Time
Left
Thru
Right
App'
Total
Left
Thru
Right
App'
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Total
'Factor
22.
1.0
1.0
1.0
0
0
1.0
0
1.0 1.0
18 0
18
1.0
61
1.0 1.0
0 4
65
1.0
0
1.0 .1 .0
-19 43
62
145
'
04:00 PM
0
0
9
26
35
73
0
4
64
0
Southbounc
'Peak
Start Time Left Thru Right
Hour From 04:00 PM to 05:45
13
Intersection
04:15 PM
0
0
0
0
0
14 0
14
45
0 4
49
0
18 30
48
111
0
04:30 PM
0
0
0
0
2
18 0
20
37
0 4
41
0
14 48
62
123
04:45 PM
0
0
0
0
- 1
19 0
20
51
0 2
53
0
26 23
49
122
Total
0
0
0
0
3
69 0
721
194
0 14
208
0
77 144
221
501
0
1
17
0
18
65
05:00 PM
0
0
0.
24
28
PM
0
0
0
20
'05:15
05:30 PM
0
0
0
47
0
05:45 PM
.0
0
0
0
Total
0
0
0
22.
Grand Total
0
0
0
20
Apprch %
0.0
0.0
0.0
0
Total %
0.0
0.0
, 0.0
'
5
27
0
9
26
35
73
0
4
64
0
Southbounc
'Peak
Start Time Left Thru Right
Hour From 04:00 PM to 05:45
13
Intersection
04:00 PM
67
108
Volume
0
0
0
133
1 Percent
0.0
0.0
0.0
27
04:00
0
0
0
3961
Volume
5.0
95.0
0.0
Peak Factor
92.8
0.0
7.2
High Int,
3:45:00
PM
'Volume
0.01
0
0
0
15.4
Peak Factor
0.0
3.0
41.2
0.0
15.8
27.6
43.4..
t
0
1
17
0
18
65
0
4
69
0
24
28
52
139.
•0
3
20
0
23
46
0
1
47
0
14
25
39
.109
0
0
16
0
16
22.
0
3
25
0
20
29
49
90
0
0
11
0
11
22
0
5
27
0
9
26
35
73
0
4
64
0
68
155
0
13
168
0
67
108
175
411
0
7
133
0
140
'•349
0
27
3761
0
144
252
3961
912
5.0
95.0
0.0
92.8
0.0
7.2
0.0
36.4
63.6
0.01
0.8
14.6
0.0
15.4
38.3
0.0
3.0
41.2
0.0
15.8
27.6
43.4..
0
0
3 69 0
4.2 95.8 0.0
0 18 0
04:30 PM
72
18
2 18 0 20
0.900
194 0
14
208
0 77
144
221
93.3 0.0
6.7
. 0.0 34.8
65.2
61 0
4
65
0 19
43
62
04:00 PM
04:00 PM
61. 0
4
65
0 19
43
62
0.800
0.891
501
145
0.864
A QUINTA
UE /AVENUE 54
,ment Counts
t 2004
no Valley, CA 92557 . T 909 247 6716 • F 909 924 8604
aos
.M
i w
z
W
I. a
w
0.
Z
O
CITY OF LA QUINTA
MONROE AVENUE & AVEN E
N
W E
S
NOT TO SCALE
AVENUE 54
J1530 M,0NR0E 54
1'
OF LA QUINTA
'CITY
N /S: MONROE AVENUE
E/W: AVENUE 54'
08:45 AM - Peak 1 of 1
WEATHER: SUNNY
Counts Unlimited, Inc.
25424 Jaclyn Avenue
Moreno Valley, _CA 92557
909 - 247 -6716
MONROE AVENUE
Out In Total
105 150 255
18 103 29
Rigtrt Thru Left
File Name : LQM054AM
Site Code : 00096832
Start Date : 8/3/2004
Page'No :2
92
25
0.920
Peak.Hour From 07:00 AM to
08:45 AM - Peak 1 of 1
By
07:00 AM
07:00 AM
07:45 AM.
07:30 AM
'
Approach
'
Volume
27 113
15 155.
• 10 72 24
106
5 81 .
.9 .95
16 70 6
Percent
17.4 72.9
9.7
9.4 67.9 22.6
5.3 85.3
9.5
17.4 76.1 6.5
High Int.
07:15 AM
07:45 AM
07:45 AM
07:30 AM
'Volume
5 33
3 41
4 26 4
34
1 22
3 26
0 24 1
Peak Factor
0.945
0.779
0.913
92
25
0.920
tCITY OF LA QUINTA
N /S: MONROE AVENUE
ENV: AVENUE 54
WEATHER: SUNNY
Counts Unlimited, Inc.
25424 Jaclyn Avenue
Moreno Valley, CA 92557
909 - 247 -6716
f.rni inc Prinfori- Tr1TAI V01IIMF
File Name : LOM054AM
Site Code :00096832
Start Date .: 8/3/2004
Page No :.1
Int.
Total
'
MONROE AVENUE
AVENUE 54
AVENUE 54
AVENUE 54
MONROE AVENUE
Southbound
AVENUE 54
Northbound
Eastbound
Start Time
Left
Southbound
.
App., t.
Westbound
Thru
Right
Northbound
Left
Thru
Eastbound
. Total App-
Left
Start Time
Left
Thru
Right
Totaj
Left
Thru
Right
TAota�
Left
Thru
Right
App.
od
Left
Thru.
Right
Total
Total
Factor
1.0
1.0
1.0
6
1.0
1.0
1.0
2
1.0
1.0
1.0
3
1.0
1.0
1.0
7
08:15 AM
07:00 AM
6
30
1
37
. 3.
13
6
22
0
15
2
17
3
9
1
13
89
07:15 AM
5
33
3
41
2
22
9
33
0
17
3
20
0
11
2
13
107
07:30 AM
8
24
4
36
1
11
5
17
0
15
1
16
0
24
1
25
94
07:45 AM
8
26
7
41
4
26
4
34
1
22
3
26
7
15
1
23
124
Total
27
113.
15
155
10
72
24
106
1
69
9
79
10
59
5
74
414
Int.
Total
'
MONROE AVENUE
AVENUE 54
MONROE AVENUE
AVENUE 54
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App., t.
Left
Thru
Right
Tote-
Left
Thru
Right
. Total App-
Left
Thru.
Right
Total
29 103
18
150
7 73
. 24
104
2 70
9
81
11 65
7.
83
08:00 AM
8
20
4
32
0
14
6
20
1
16
2
19
4
15
3
22
'93
g 26
7
08:15 AM
7
21
2
30
2
11
4
17
1
22
1
24
5
16
1
22
93
'
08:30 AM
6
.18
2
26
2
13
8
23
2
21
3
26
2.
14
1
17
92
08:45 AM
5
14
2
21
3
16
13
32
1
16
0
17
2
19
• 2
23
93
5 33
Total
26.
73
10
109
7
54
31
.92
5
75
6
86
13
64
7
84
.371
'
Grand Total
53
186
25
264
17
126
55
198
6
144
15
165
23
123
12
158
785
Apprch %
20.1
70.5
9.5
I
8.6
63.6
27.8
I
3.6
87.3
9.1
I
14.6
77.8:
7.6
1
Total %
. 6.8
23.7
3.2
33.6
2.2
16.1
7.0
25.2
0.8
18.3
1.9
21.0
2.9
15.7
1.5
20.1 .
t
Int.
Total
'
MONROE AVENUE
AVENUE 54
MONROE AVENUE
AVENUE 54
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
App., t.
Left
Thru
Right
Tote-
Left
Thru
Right
. Total App-
Left
Thru.
Right
Total
Int.
Total
'
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
Intersection
07:15 AM
Volume
29 103
18
150
7 73
. 24
104
2 70
9
81
11 65
7.
83
418
Percent
19.3 68.7
12.0
6.7 70.2
23.1
2.5 86.4
11.1
13.3 78.3
8.4
'
07:45
g 26
7
41
. 4 26
4.
34
1 22
3
.26
-7 15
1
23
124
Volume
Peak Factor
-
0.843
High Int.
07:15 AM
07:45 AM
07:45 AM
07:30 AM
'
Volume
5 33
3
41
4 26
4
34
1. 22
3
26
0 24
1
25
Peak Factor
0.915
0.765
0.779
0.830
t
1
t
t
1
Peak.Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
OF LA QUINTA
'CITY
N /S: MONROE AVENUE
E/W: AVENUE 54
WEATHER: SUNNY
'
Approach
Counts Unlimited, Inc.
25424 Jaclyn Avenue.
Moreno Valley, CA 92557
909 - 247 -6716
- MONROE AVENUE
Out In Total .
163 144 307 .
10 84 50
Right Thru Left
T 1. L,
File Name : LQM054PM
Site Code 00096832
Start Date : 8/3/2004
Page No :2
_ (J N
rr
2 rr
CD
� N
04:45 PM
128 8' 82 4 94
8.5 87.2 4.3
04:45 PM
40 3 27 0 30
0.800 0.783
Peak.Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
'y
04:00 PM
04:30 PM
04:00 PM
'
Approach
Volume
50 84
10 144.
5 73 39
117
3 120 5
Percent
34.7 58.3
6.9
4.3 62.4 33.3
2.3 93.8 3.9
High Int.
04:00 PM
05:15 PM
04:30 PM
'
Volume
9 30
4 43
0 25 9
34
0 39 1
Peak Factor
0.837
0.860
File Name : LQM054PM
Site Code 00096832
Start Date : 8/3/2004
Page No :2
_ (J N
rr
2 rr
CD
� N
04:45 PM
128 8' 82 4 94
8.5 87.2 4.3
04:45 PM
40 3 27 0 30
0.800 0.783
'CITY OF LA QUINTA
N /S: MONROE AVENUE
E/W: AVENUE 54
WEATHER: SUNNY
1 MON
Counts Unlimited, Inc.
25424 Jaclyn Avenue
Moreno Valley, CA 92557
909 - 247 -6716
(:rnunc Printarl- TOTAI W)I tJMF
File Name : LQM054PM
Site Code : 00096832
Start Date : 8/3/2004
Page No 1.
' Peak Hour From 04:00 PM to 05:45 PM - Peak
ROE AVENUE
13
AVENUE 54
0
MONROE AVENUE
2
AVENUE 54
11
27
0
25
Southbound
25
0
Westbound
2
24
Northbound
Left
Thru
Eastbound
11
14
Start Time
teft
Thru
Right
Total
Left
Thru
Right
To�a�
Left
Thru
Right
ToPa-
Left
Thru
Right
TApp. l
Total
Factor
16
1.0
1.0
0
1.0
1.0
1.0
0
1.0
1.0
1.0
5
1.0
1.0
1.0
89
04:00 PM
9
30 •4
43
3
17
7
27
2
30 1
33
1
18
0
19
122
04:15 PM
15
17 3
35
1
13
. 9
23
0
27 1
28
3
19
' 1
23
109
04:30 PM
12
22 1
35
1
18
10
'29
0
39 1
40
1
13
0
14
118
04:45 PM
14
15 2
31
2
16
9
. 27
1
24 2
27
3
27
0
30
115
Total
50
84 10
144
7
. 64
35
1061
3
120 5
.1281
77
1
861.
464
' Peak Hour From 04:00 PM to 05:45 PM - Peak
05:00 PM
13
17
0
30
2
14
11
27
0
25
0
25
0
22
2
24
106
Left
Thru
05:15 PM
11
14
1
26
0
25
9
34
0
15
1
16
0 .
16
1
17
93
'
05:30 PM
13
16
.0
29
0
16
6
22
0
15
0
15
5
17
1
23
89
05:45 PM
6
18
2
26
0
.9
3
12
0
15
0
15
4
10
0
.14
67
Total
43
65
3
111
2
64
.29
95
0
70
1
71
9
65
4
78
355
'
Grand Total
93
149
13
255
9
128
64
201
3
190
6
199
17
142
5
164.
.819
Apprch %
36.5
58.4
5.1
I
4.5
63.7
31.8
I
1.5
95.5
3.60
I
10.4
86.6
3.0
Total %
11.4
18.2
1.6
31.1
1.1
15.6
7.8
24.5
0.4
23.2'
0.7
24.3
2.1
17.3
0.6
20.0
' Peak Hour From 04:00 PM to 05:45 PM - Peak
MONROE AVENUE
AVENUE 54
MONROE AVENUE
AVENUE 54
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
Total
Left
Thru
Right
TAotal
Left
Thru
Right
TAotai
Left
Thru
Right
T
' Peak Hour From 04:00 PM to 05:45 PM - Peak
1 of 1
Intersection 04:00 PM
Volume 50 84 10 144
7 64 35 106
3 120 5 128
Percent 34.7. 58.3 6.9
6.6 60.4 33.0
2.3 93.8 3.9
'
04:00 9 30 4 43
3 17 7 27
2 30 1 33
Volume
Peak Factor
High Int. 04:00 PM
04:30 PM
04:30 PM
Volume - 9 30 4 43 1. 18 10 29 0 39 1 40
D- L, L -fr r 0.837 0.914 0.800
8 77 1
9.3 89.5 1.2
1 18 0
04:45 PM
App. I nt.
Total Total
86 464
19 122
0.951
3 27 0 30
0.717
ri
CITY OF LA QUINTA
MADISON AVENUE / AVENUE 58
Turning Movement Counts
August 2004
Counts Unlimited, Inc. 25424 Jaclyn Avenue • Moreno Valley, CA 92557 T 909 247 6716 F 909 924 8604
d
H
N
m
BIKE LANE
N
W E
S
NOT TO SCALE
AVENUE 58
CITY OF LA QUINTA
MADISON AVENUE & AVENUE
5530 M, ADISON 58
,CITY OF LA QUINTA
N /S: MADISON AVENUE
E/W: AVENUE 58
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN.AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716
Out In Total
i50134 202
51 33
Ri ht Thru Left
l L,.
File Name
: LOMA58AM
Site Code
: 00096811
Start Date
: 8/4/2004
Page No
: 2
Peak Hour From. 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour From. 07:00 AM to 08:45 AM - Peak 1 of 1
By
07:00 AM
07:30 AM
08:00 AM
08:00 AM r
'
Approach
Volume
33 51 50
134
0 29 32
61
2 37
3 42
22 16 1 39
Percent
24.6 38.1 37.3
0.0 47.5 52.5
4.8 88.1
7.1
56.4 41.0 2.6
High Int.
07:15 AM
08:15 AM
08:15 AM
08:30 AM
Volume
12 11 16
39
0.859
0 11 11
22
0.693
0 12
1 13
0.808
9 5 0 14
0.696
Peak Factor
V.
'CITY OF LA QUINTA.
N /S: MADISON AVENUE
E/W: AVENUE 58
WEATHER: SUNNY
COUNTS UNLIMITED INC.
25424 JACLYN AVENUE
MORENO VALLEY CA 92557
909 - 247 -6716
C;rnun-, Printed - TOTAL VOLUME
File Name
: LQMA58AM
Site Code
:00096811
Start Date
: 8/4/2004
Page No
: 1
'Grand T
Start Time
MADISON AVENUE
Southbound
App
Left Thru Right Total
Left
AVENUE 58
Westbound
Thru Right
App.
Total
MADISON AVENUE
Northbound
Left Thru Right Total
Left
AVENUE bb
Eastbound
Thru Right
App
Total
Int.
Total
'Factor
25 4
1.0
1.0 1.0
16
35
1.0
0
1.0
12
1 ()1
5
17
1.01
1
1.01
1
1.0
0.
.2
1.0
2
1.0
0
1.0
1
3
57
Southbound W
07:00 AM
6
13
Northbound E
Eastbound A
0
8
3
3
2
8
66
Left T
07:15 AM
12
11 16
11
39
34
1
0
4
8
6
8
11
16
0
0
8
6
0
6
9
3
0
12
68
07:30 AM
07:45 AM
10
5
13
14 7
26
0
3
9
12
0
8
0
8
3
3
0
6
52
'
Total
33
51 50
134
1
27
28
56
1
23
0
24
17
9
3
29
243
08:00 AM
6
15 11
32
0
7
4
11
0
6
1
7
3
1
0
4
54
08:15 AM
2
12 4
18
0
11
11
22
0
12
1
13
10
4
9
2
5
1
0
7
14
60
63
08:30 AM
7
13 9
11
29
26
1
0
3
7
6
6
10
13
1
1
8
11
1
0
12
6
8
0
14
65
08:45 AM
Tn-1
6
71
9
49 35
105
1
28
27
56
2
37
3
42
22
16
1
39
242
'Grand T
Total 5
54 100 85 239 2
2 5
55 5
55 1
112 3
3 6
60 3
3 6
66 3
39 2
25 4
4 6
68 4
485
' M
MADISON AVENUE A
AVENUE 58 M
MADISON AVENUE A
AVENUE 58
Southbound W
Westbound N
Northbound E
Eastbound A
Start Time L
Left Thru Right Total L
Left T
Thru R
Right T
Total L
Left T
Thru R
Right T
App
Left T
Thru R
Right T
Total T
Total
'Peak H
Hour From 07:00 AM to 08:45 AM - Peak 1
1 of 1
Intersection .
. 07:00 AM
1 2
27 2
28 5
56 1
1 2
23 0
0 2
24 1
17 9
9 3
3 2
29 2
243
Volume 3
24.6 38.1 37.3 1
1.8 4
48.2 5
50.0 4
4.2 9
95.8 0
0.0 5
58.6 3
31.0 1
10.3
' 0
07:30 1
10 13 11 34 0
0 8
8 8
8 1
16 0
0 6
6 0
0 6
6 9
9 3
3 0
0 1
12 6
68
Volume
0.893
Peak Factor
t ig ..
Volume 12 11 16 39 0 12 5 17 0 8 0 8 9 3 0 12
Peak Factor 0.859 0.824 0.750 0.604
1
'
COUNTS UNLIMITED INC.
Peak Hour From 04:00 PM to 05:45 PM
25424 JACLYN AVENUE
CITY OF LA QUINTA
MORENO VALLEY CA 92557
File Name
: LOMA58PM
'N
/S: MADISON AVENUE
909- 247 -6716
Site Code
Start Date
:00096811
: 8/3/2004
E/W: AVENUE 58
WEATHER: SUNNY
Volume 20 48 9
Page No .:
2
■
Peak Hour From 04:00 PM to 05:45 PM
- Peak 1 of 1
By 04:00 PM
04:15 PM
04:30 PM
04:15 PM
'
Approach
Volume 20 48 9
77
2 1 35
38
0 81
2 83
13 20 3 36
Percent 26.0 62.3 11.7
5.3 2.6 92.1
0.0 97.6
2.4
36.1 55.6 8.3
High Int. 04:15 PM
05:00 PM
04:45 PM
04:15 PM
6. 15 3
24
0. 0 15
15
0 24
2 26
4 7 0 11
'Volume
Peak Factor 0.802
0.633
0.798 0.818
1
'
COUNTS UNLIMITED INC
25424 JACLYN AVENUE
OF LA QUINTA
MORENO VALLEY CA 92557
File Name
: LQMA58PM
Right
'CITY
N /S: MADISON AVENUE
909 - 247 -6716.
Site Code
' :00096811
Total
E/W: AVENUE'58
Thru
Start Date
: 8/3/2004
WEATHER: SUNNY
Right
Page No
: 1
.
Groups Printed- TOTAL VOLUME
1.0
1.0
1.0
2
MADISON AVENUE
AVENUE 58
MADISON AVENUE
A1...1L.L.e.A
AVENUE 58
G7e}hnl Ind
7
0
-
Start Time
Leff
JVUl11UIV
Thru
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
-
Left Thru
Right
Total
Total
.
Factor
1.0
1.0
1.0
2
1.0
1
0
6
7
0
21
0
21
4
1
1
0
50
53
56
59
Ti- 8
52
40
16
36
144
362
Int.
Total
220
59
0.932
MADISON AVENUE
04:00 PM
04:15 PM
4
6
15
o
3
IV
24
V
0
I
1
1..
4
5
0
2
12
1 1
13 3
4
-
0
-
11
Left
04:30 PM
6
15
2
23
1
0
6
7
0
21
0
21
4
1
1
0
5
3
3E
04:45 PM
4
7
1
12
1
0
10
11
0
24
2
26
1
7
2
10
04:45
'
Total
. 20
48
9
77
2
2
30
34
1
69
3
73
13
18
3
34
05:00 PM
4
8
1
13
0
0
15
15
0
14
0
14
4
5.
1
10
PM
3
5
2
10
2
0
1
3
0
22
0
22
3
0
2
5
'05:15
05:30 PM
3
5
0
8
0
0
5
5
0
3
0
3
0
0
0
0
05:45 PM
10
12
2
24
0
0
6
6
0
5
0
5
1
0
0
1
.
Total
20
30
5
55
2.
0
27
29
0
44
0
44
8
5
3
16
'
Grand Total
40
78.
14
10.6
132
I
4
6.3
2
3.2
57
90.5
63
I
1
0.9
113
96.6
3
2.6
117
1
21
42.0
23
46.0
6
12.0
50
Apprch %a
30.3
59.1
Total %
11.0
21.5
3.9
36.5
1.1
0.6
15.7
17.4
0.3
31.2
0.8
32.3
5.8
6.4
1.7
13.8
50
53
56
59
Ti- 8
52
40
16
36
144
362
Int.
Total
220
59
0.932
MADISON AVENUE
AVENUE 58
MADISON AVENUE
AVENUE 58
Southbound
Westbound
Northbound
Eastbound
Start Time
:::Le:ft:j:TRi
Intersection
g ht
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
Left
Thru
Right
Total
50
53
56
59
Ti- 8
52
40
16
36
144
362
Int.
Total
220
59
0.932
'Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
Intersection
04:15 PM
Volume
20 45
7
72
2 1
35
38
0 71
. 3
74
13 20
3
3E
Percent
27.8 62.5
9.7
5.3 '2.6
92.1
0.0 95.9
4.1
36.1 55.6
8.3
'
04:45
4 7
1
12
1 0
10
11
0 24
2
26
1 7
2
1l:
Volume
Peak Factor
High Int.
04:15 PM
05:00 PM
04:45 PM
'
04:15 PM
Volume
6 15
3
24
0.750
0 0
15
15
0.633
0 24
2
26
0.712
4 7
0
1'
0.811
Peak Factor
r
.
50
53
56
59
Ti- 8
52
40
16
36
144
362
Int.
Total
220
59
0.932
CITY OF LA QUINTA
MADISON AVENUE / PGA WEST ENTRANCE
Turning Movement Count
August 2004
Counts Unlimited, Inc. 25424 Jaclyn Avenue - Moreno Valley, CA 92557 • T 909 247 6716 • F 909 924 8604
MAIJIbUN AVENUE
Out In Total
145 266 1 411
3 263
Right Thru
T
North
5/2004 7:00:00 AM
/52004 7:45:00 AM
TOTAL VOLUME
4; T
Left Thru
1 137
® 138 402
Out In Total
MADISON AVENUE
File Name : LQMAPGAAM
Site Code :00096832
Start Date : 8/5/2004
Page No :2
08:00 AM 07:45 AM
0 0 0 176 0 176 11 0 4 15
- 0.0 10 0 0.0 73.3 0.0 26.7
08:00 AM 07:45 AM
0 47 0 47 4 0 1 5
- 0.936 0.750
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
By
07:00 AM
Counts Unlimited, Inc.
Approach
25424 Jaclyn Avenue
'CITY
OF LA QUINTA
Moreno Valley, CA 92557
6 263. 3 272
N /S: MADISON AVENUE
909 - 247 -6716
Percent
ENV: PGA WEST ENTRANCE
- -
'
WEATHER: SUNNY
07:00 AM
.
Volume
MAIJIbUN AVENUE
Out In Total
145 266 1 411
3 263
Right Thru
T
North
5/2004 7:00:00 AM
/52004 7:45:00 AM
TOTAL VOLUME
4; T
Left Thru
1 137
® 138 402
Out In Total
MADISON AVENUE
File Name : LQMAPGAAM
Site Code :00096832
Start Date : 8/5/2004
Page No :2
08:00 AM 07:45 AM
0 0 0 176 0 176 11 0 4 15
- 0.0 10 0 0.0 73.3 0.0 26.7
08:00 AM 07:45 AM
0 47 0 47 4 0 1 5
- 0.936 0.750
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
By
07:00 AM
07:00 AM
Approach
Volume
6 263. 3 272
0 0
Percent
2.2 96.7 1.1
- -
'
High Int.
07:00 AM
-
Volume
2 65 3 70
Peak Factor
0.971
1
MAIJIbUN AVENUE
Out In Total
145 266 1 411
3 263
Right Thru
T
North
5/2004 7:00:00 AM
/52004 7:45:00 AM
TOTAL VOLUME
4; T
Left Thru
1 137
® 138 402
Out In Total
MADISON AVENUE
File Name : LQMAPGAAM
Site Code :00096832
Start Date : 8/5/2004
Page No :2
08:00 AM 07:45 AM
0 0 0 176 0 176 11 0 4 15
- 0.0 10 0 0.0 73.3 0.0 26.7
08:00 AM 07:45 AM
0 47 0 47 4 0 1 5
- 0.936 0.750
'
MADISON AVENUE
0
46
0
Counts Unlimited Inc.
MADISON AVENUE
PGA WEST ENTRANCE
25424 Jaclyn Avenue
.0
OF LA QUINTA
Moreno Valley, CA 92557
'CITY
N /S:.' MADISON AVENUE
909 - 247 -6716
57
E: PGA WEST ENTRANCE
NV
Northbound
0
WEATHER: SUNNY
Eastbound
08:30 AM
1
Groups Printed- TOTAL VOLUME
File Name LQMAPGAAM
Site Code : 00096832
Start Date : 8/5/2004
Page No : 1
0
MADISON AVENUE
0
46
0
46
MADISON AVENUE
PGA WEST ENTRANCE
0
.0
39
Southbound
1
56
Westbound
57
0
Northbound
0
0
Eastbound
08:30 AM
1
Start Time
Left
Thru
.Right
Total
Left
Thru
Right
App* t*
Left
Thru
Right
App. ot.
Left
Thru
Right
Total
Total
Factor
1.0
1.0
1.0
0
1.0
1.0
1.0
Grand Total
1.0
1.0
1.0
471
1.0
1.0
1.0
0.1
Apprch %
07:00 AM
2
65 3
70
0
0
0
0
0
31 0
31
1
0 0
1
102
07:15 AM
0
66 0
66
0
0
0
0
0
35 0
.35
1
0 0
1
102
07:30 AM
0
68 0
.68
0
0
0
0
1
29 0
30
2
0 0
2
100
07:45 AM
4
64 0.
681
0
0
0
01
0
42 0
421
4
0 1
51
115
Total
6
263 .3
2721
0
0
0
01
1
137 0
1381
8
0 1
191
419
0
08:00 AM
0
46
0
46
0
.0
0
.0
39
08:15 AM
1
56
0
57
0
0
0
0
'
08:30 AM
1
41
0
42
0
0
0
2
0
08:45 AM
0
54
0
54
0
0
0
4
Total
2
197
0
199
0
0
0
'.
Grand Total
8
460
3
471
0
0
0
0.1
Apprch %
1.7
97.7
0.6
0.0
0.0
0.0
0.0
Total %
•1.0
.57.0
0.4
58.4
0.0
0.0
0.0
1
0
0
47
0
47
5
0
0
0
.0
39
0
39
1
0
0
0
0
45
0
45
1
0
3
0
0
45
0
45
2
0
1
0
0
176
0
176
9
0
4
0
1
313
0
314
17
0
5
High Int.
0.3
99.7
0.0
6:45:00 AM
77.3
0.0
22.7
0.0I
0.1
38.8
0.0
38.9
2.1
0.0
0.6
5 98
1 97
4 91
3 102
13 388
22 I 807
2.7
0
MADISON AVENUE
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
MADISON AVENUE
PGA WEST ENTRANCE
9
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
Topta-
Left
Thru
Right
Tote-
Left
Thru
Right
Tote-
Left
Thru
Right
Total
0
1 137
Peak Hour From 07:00 AM to 08:45 AM - Peak 1 of 1
138
8 0 1
9
Intersection
07:00 AM
0.0
88.9 0.0 11.1
0
Volume
6 263
3
272
0 0
0
07:45 AM
Percent
2.2 96.7
1.1
0.0 0.0
0.0
'
07:45
4 64
0
68
0 0
0
0.821
Volume
0.450
Peak Factor
High Int.
07:00 AM
6:45:00 AM
Volume
2 65
3
70
0 0
0
Peak Factor
0.971
1
t
0
1 137
0
138
8 0 1
9
0.7 99.3
0.0
88.9 0.0 11.1
0
0 42
0
42
4 0 1
5
07:45 AM
07:45 AM
0
0 42
0
42
4 0 1
5
0.821
0.450
Int.
Total
419
115
0.911
CITY OF LA QUINTA
N /S: MADISON AVENUE
ENV: PGA WEST ENTRANCE
WEATHER: SUNNY
Counts Unlimited, Inc. .
25424 Jaclyn Avenue
Moreno Valley, CA 92557
909 - 247 -6716 '
File Name : LQMAPGAPM
Site Code : 00096832
Start Date : 8/5/2004
Page No : 2
Out . In Total
200 109 309
Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
41 105
Right Thru
By
05:00 PM
04:00 PM
a x North
Approach
/5/2004 4:00:00 PM
/5/2004 4:45:00 PM
R
5� TOTAL VOLUME
O
Volume
I
0 0
r Left Thru
1T 196
Percent
108 197 305
- -
Out In . Total
MAD
High Int.
04:00 PM 04:00 PM
0, 0 1 196 0 197 4 0 3 7
- 0.5 99.5 0.0 57.1 0.0 42.9
04:15 PM 04:00 PM
1 59 0 60 1 0 2 3
0.821 0.583
Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
By
05:00 PM
04:00 PM
'
Approach
Volume
8 124 11 143
0 0
Percent
5.6 86.7 7.7
- -
High Int.
05:00 PM
-
'
Volume
8 39 5 52
Peak Factor
0.688
1
04:00 PM 04:00 PM
0, 0 1 196 0 197 4 0 3 7
- 0.5 99.5 0.0 57.1 0.0 42.9
04:15 PM 04:00 PM
1 59 0 60 1 0 2 3
0.821 0.583
Counts Unlimited, Inc.
25424 Jaclyn Avenue
'CITY OF LA QUINTA Moreno Valley, CA 92557 File Name : LQMAPGAPM
N /S: -MADISON AVENUE 909- 247 -6716 Site Code :00096832
E/W: PGA WEST ENTRANCE Start Date :8/5/2004
WEATHER: SUNNY Page No : 1
'
Groups Printed- TOTAL•VOLUME
MADISON AVENUE - MADISON AVENUE PGA WEST ENTRANCE
�i,..kk Ana PnOhminrl
4w
04:00 NM
04:15 PM
Left
AOUin
Thru
ODUnu
Right
25
Left
vv wiwunu
Thru
Right
To��
Left
• - -••
Thru
- - --
Right
App- Left
Thru
Right
Int.
Total Total
0
Start Time
04:45 PM
1
21
TAotal
23
111
0.
0
0
0
0
0
0
Total
2
otl
0
.34
0
34
Factor
1.0
1.0
1.0
39
1.0
1.0
1.0
0
1.0
n
1.0
co
1.0
n
1.0
FQ 1
1.0
n
1.0
7
QA
w
04:00 NM
04:15 PM
l
0
JO
25
0
25
0
0
0
87
71
61
04:30 PM
0
21
2
.23
0
0
0
'
04:45 PM
1
21
1
4
23
111
0.
0
0
0
0
0
0
Total
2
105
0
.34
0
34
2
0
05:00 PM
8
39
5
52
0
0
0
0'.
0
05:15 PM
0
29
2
31
0
0
0
1
'
05:30 PM
0
29
2
31
0
' 0
0
4
0
05:45 PM
0
27
2
29
0
'0
0
8
Total
8
124
11
143
0
0
0
'Grand
Total
10
229
15
5.9
254
I
0
0.0
0
0.0
0
0.0
0.0
Apprch %
3.9
90.2
0.5
1.8
.
1
Total %
1,7
38.4
2.5
42.5
0.0
0.0
0.0
I'
0
0
0
1
0
0
59
48
36
0
0
0
60
48
36
1
0
2
. 0
0
" 0
1
0
0
2
0
2
87
71
61
0
1
196
0
1971
4
0
3
7
315
0
0
38
0
38
1
0
0
1
91
0
0
.34
0
34
2
0
0
2
67
0
0
40
0
40
0'.
0
0
0
71
0
0
23
0
23
1
0
0
1
53
0
0
135
0
135
4
0
0
4
282
0
1
331
0
332
8
0
3
11
597
0.3
99.7
0.0
1 72.7
0.0
.27.3
I
0.0
0.2
55.4
0.0
55.6
1.3
0.0
0.5
1.8
'
MADISON AVENUE
197
MADISON AVENUE
PGA WEST ENTRANCE
Intersection
Southbound
Westbound
Northbound
Eastbound
Start Time
Left
Thru
Right
Tota�
Left
Thru
Right
Toy
Left
Thru
Right
Toy
Left
Thru
Right Total
'
Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1
197
4 0
3
Intersection
04:00. PM
0.5 99.5
0.0
57.1 0.0
.42.9
Volume
2 105
4
111
0 0
0
2
3
Percent
1.8 94.6
3.6
0.0 . 0.0
0.0
0.820
04:00
1 38
1
40
0 0
0
0 1 59
Volume
60
1 0
2
3
Peak Factor
0.821
0.583
High Int.
04:00 PM
3:45:00 PM
Volume
1 38
1
40
0 0
0
Peak Factor
0.694
1
1
Int.
Total
0 1 196
0
197
4 0
3
7
315
0.5 99.5
0.0
57.1 0.0
.42.9
0 0. 53
0
.53
1 0.
2
3
96
0.820
04:15 PM
04:00 PM
0 1 59
0
60
1 0
2
3
0.821
0.583
0
Appendix B
HCM METHODOLOGY
AND WORKSHEETS
Unsignalized Intersections
Signalized Intersections
i
All -Way Stop Control
ra�aivii
ALL -WAY STOP CONTROL ANALYSIS
G�: erallnforrnatio an "� h
Greg
Agency/Co. nt Endo Engineering
Date Performed 8/13/2004
Analysis Time Period PM Peak Hour
Situ nfom atrvr' ��
Intersection Monroe St. @ Avenue 54
Jurisdiction La Ouinta
Analysis Year Existing.
Pro'ect ID Grit in Ranch
East/West Street: Avenue 54 North/South Street:. Monroe Street
VolumeHAd'ustmerits andSiteGharacterisfic's
- a , ~ `
x
+
Approach
Eastbound
Westbound
Movement
Volume
L
16
T
152
R
.2
L
14
T
126
R
69
%Thrus Left Lane
50
50
roach
Northbound
Southbound
Movement
L
T
R
L
T
R
Volume
6
237
10
99
1 166
20'
%Thrus Left Lane
50
50
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1 L2
Configuration
LTR
LTR
LTR
LTR
PHF
1.00
1.00
1.00
1.00
Flow Rate
170
209
253
285
'/, Heavy Vehicles
No. Lanes
1
1
1
1
Geometry. Group
1
1
1
1
Duration T
Saturation�:Hea_dwa �Ad`ustment�Workshe_et�,
S' X1.00
Prop. Left -Turns
0.1
0.1
O.0
0.3
Prop. Right -rums -
0.0
0.3
0.0
0.1
Prop. Heavy Vehicle
hLT -adj .
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
hRT -adj
-0.6
-0.6
-0.6
-0.6
-0.6
-0.6
-0.6
-0.6
hHV -adj
1.7
1.7
1.7
1.7
1.7
1.7
1.7
1.7
hadj, computed
6.04
6.04
6.04
6.04.
ureffl ' _nd1S_er
i¢e�Tr..+p
1
u
����`��
� �� e�z � .� �
915A WX .
hd, initial value
310
3.20
3.20
3.20
x, initial
0.15
0.19
0.22
0.25
hd, final value
6.04
6.04
6.04
6.04
x, final value
0.29
0.34
0.40
0.45
Move -up time, m
2.0
2.0
2.0'
2.0
Service Time
4.0
4.
4.0 1
4.0
Ca ac_ Land L_eueL:ofServiee_1
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
Capacity
420
459
503
535
Delay
11.45
11.67
12.48
13.31
LOS
B
B
8
B
Approach: Delay
11.45 '
11.67.
12.48.
13.31 '
LOS
B
B
B
B
Intersection Delay
12.36
Intersection LOS
B
HCS2000TMt Copyright ® 2003 University of Florida, All Rights Keserveo
v crsmn •. � u
All -Way Stop Control
1
1
t
_E1_ . -
A roach
Itbouna
R
L
T .
R
Movement
L
20
T
11
4
1
32
34
Volume.
50
Left Lane
50
%Thrus
Northbound
Southbound
A roach
R
L
R
Movement
L
1
T
28
0
40
81
60
Volume
50
%,Thrus Left Lane
50
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
C2
L1
L2
L1
L2
CT
R
LT
R
LT
TR
L
TR
Configuration
Con
C1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
31
4
33
34
15
14
40
121
Plow Rate
% Heavy Vehicles
2
2
No. Lanes
2
2
5
5
5
Geometry Group
5
00
1K
Duration, T
v-r M-r H
eadwa eAd ups, ment�Vllorkshe_et,�,.;� :.::�.�
Saturation, :
0.6 0.0
0.0
0.0
0.1
0.0
1.0
0.0
Prop. Left -rums
0.0 1.0
0.0
1.0
0.0
0.0
0.0'
0.5
Prop. Right -Turns
Prop. Heavy Vehicle
0.5
0.5
0.5
0.5
0.5
0.5
0.5
hLT -adj
0.5
'0.7 -0.7
-0.7
-0.7
-0.7
-0.7
-0.7
-0.7
hRT -adj .
1.7 1.7
1.7
1.7
1.7
1.7
1.7
1.7
hHV -adj
5.47 5.47
5.47
5.47
5.47
5 47
5.47
5 47
hadt computed _
s'3z;iJ'l::my e£- „•;,NS - ,- `a'(�" Ikt:: ANC NA De
Head. "wa
arufe _andSenriceTrme;�-
3.20 3.20
3.20
3.20
3.20
3.20
3.20
3.20
hd, initial value
0.03 0.00
0.03
0.03
0.01
0.01
0.04
0.11
x, initial
5.47 5.47
5.47
5.47
5.47
5.47
5.47
5.47
hd, final value
final
0.05 0
0.05
0.04
'0.02
0.02.
0.06
0.15
x, value
2.3
2.3
2.3
2.3
Move -up time, m
3.2
2 1
32
2.1
3.2
2.1
3.2
2.1
Service Time
d Lie a Hof,Serui_cen��`��w
Westbound
°�
Northbound
�
Southbound .
Eastbound
L1
L2
L1
L2
L1
L2
L1
L2
281
254
283
284
265
.264
290
371
Capacity
8.44
7.17
8.09
7.31
7.86
7.82
8.46
8.09
Delay
A
A
A
A
A
A
A
A
Los
Delay
8.29
7.70
7.84
8.18
Approach:
LOS
A
A
A
A
8.05
Intersection Delay
A
Intersection LOS
HCS2000TM Copyright ® 2003 University or FlOrloa, All Kignts Kcservcu
I.,
t
All -Way Stop Control
Al I _WAY STOP CONTROL ANALYSIS.
i u�v a va
s ,..�_ x,_<s�
n. on� � n
Sites nforma %ton 03 F®REMEN-. 0111.
General. Mati
Intersection Madison St. @ Avenue 58
Analyst Grog
A /Co. Endo Engineering
en
g �
Jurisdiction La Ouinta '
Existing
Date Performed 811912004
Analysis Year
Analysis Time Period PM Peak Hour. . .
Project ID Griffin Ranch
EastfWest Street: Avenue 58 North /South Street: Madison Street
VolurnefAd wstmen „titeCharacteristics`�''''
Eastbound Westbound
A roach
L
T E�i
L
T
R
Movement
26
39
4
2
69
Volume*
50
%Thrus Left Lane
50
A roach
Northbound
Southbound
R
Movement
L T R
0 140 6
L T
39 89 14
Volume
50
%Thrus Left Lane
50
Eastbound
WestWbo.ndN01th2b0ur1d
Southbound
L1
L2
L1
2 L1 L2
R L TR
Configuration
1.00
1.00
1.00
00 1.00 1.00
PH F
65
6
6
6 39 103
Flow Rate
0%6 Heavy Vehicles
2
No. Lanes . 2
5
Geometry Group 5
1.00
Duration, 'r
�.������ �� � ����'��ED�'���
Satu�atonHea_dwa Adu is m ne tWork she ^'
Prop. Left-Turns 0.4 0.0 0.7 0.0 0.0 0.0 1.0 0.0
Prop. Right -Tums
0.0
1.0
0.0
1,0
0.0 0.1 0.0.. 0.1
Prop. Heavy Vehicle
0.5
0.5
0.5
0.5
0:5 0.5 0.5 0:5
h�T -adj
-0.7
-0.7
-0.7
-0.7 -0.7 -0.7 -0:7
hRT -adj
-0.7
1
1.7
1.7
1.7
1.7
1.7 1.7 1.7. 1.7
hHV -adj
.
5.62
5.62
5.62
5.62.
5.62 5.62 5.62 5.62
hadj, computed
y ndSeruice�imer:
�De ar,@ure.�Headwa ,a.
y
��_-�° r
=`
hd, initial value
3.20 3.20
3.20 3.20
3.20 3.20 3.20 3.20
0.06 0.01
0.01 0.06
0.06 0.07 0.03 0.09
x, initial
5.62 5.62
5.62 5.62
5.62 5.62. 5.62 5.62
hd, final value
0.10 0.01
0.01 0.09
0.10 0.11 0.06 0.14
x final value
2.3
2.3
2.3 2.3
Move -up time, m
3.3 2.4
3.3 2.4
3:3 2.4 3.3 2.4
Service Time
-Y^
�+4nS�.
°'
-
,�c,.�4' , -
�',�- RS•a'- 35'e
;Ca
yi""'Sr,.a.r=r
-;� .
-
Eastbound
Westbound
Northbound Southbound
L1
L2
L1
L2
L1 L2 L1
12
315
256.
256
319
320 326 289
353
Capacity
8.95
7.46
8.51
7.90
8.41 8.40 8.71
8.60
Delay
A
A
A
A
A A A
A
LOS
8.83
7.94
8.41 8.63
Approach: Delay
LOS
A
A
A A
Intersection Delay
8.47
Intersection I OS
A
HCS2000tTM
Copyright ® 2003 University of Florida, All Ktghts Keserveo
1
1
1
1
i
1
1
1
1
1
1
1
1
1
1
All -Way Stop Control, rage
roach
tastoouna
R L
T
R
Movement'
L
29
T
15 5 2 "
46
47
Volume
50
%,Thrus Left Lane
50
Northbound Southbound
roach
T
R
Movement
L
T
R L
0 56
86
85
Volume
2
39
.
%Thrus Lefl Lane
50
50
Eastbound
Westbound Northbound Southbound
L1
L2
L1
L2 L1 L2 L1 L'2
LT R LT R LT TR L TR
Configuration
PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
44 5 48. 47 21 20 1 56 171
Flow Rate
-/.'Heavy Vehicles
2
No. Lanes 2 2
5 5 `
Geometry Group 5 5
1.00
Duration T
Saturatvon „Headw,a W%�d'ustment 1Norksheet
0.7 0.0" 0.0 0.0 0.1 0.0 1.0 0.0
Prop. Left -Tums
0.0 1.0 0,0 1.0 0.0 0.0 0.0 0.5
Prop. Right -Tums
Prop. Heavy Vehicle
0.5
0.5
0.5
hLT -adj
-0.7
-0.7
hRT -adj
-0.7
1
1.7
1.7
hHV -adj
5.70
5.70
5.70 5 70 5 70 5.70
5.70
hadi, computed
rr
•grer.yy' sl�i°64`i!- �1.�'+'L�2` +,
s y5q.70
y1Tl•. -i!�`
. rA�`°
De artu�reHeadwa.andServiceTime;a
..
_
3.20 3.20
3.20 3.20
3.20 3.20
3.20 3.20
hd, initial value
0.04 0.00
0.04 0.04
0.02 0.02 '
0.05 0.15
x, initial
5.70 5.70
5,70 5.70
5.70 5.70.
5.70. 5.70
hd, final value
0.07 0.01
0.07 0.06
0.03 0.03
0.09 0.22
x, final value
2.3
2.3 -
2.3
Move -up time, m
2.3
2.4
3.4 2 4
3.4 2.4
3 4 L 2.4
Service Time
3.4
C_a ac i NandLevel`.ofzServic_e�r
Northbound Southbound
Eastbound
Westbound
L1
L2
L1
L2
L1
L2 L1
L2
294
255
298
297
271
270 306
'421
Capacity
8.83
7.40
8.47
7.63
8.12
8.06 8.77
8.74
Delay
A
A
A
A
A
A A
A
LOS
8.68
8.05
8.09 8.75
Approach: Delay
A
LOS
A
A
A
8.52
Intersection Delay
A
Intersection LOS
HCS2000TM Copyright 020.03 University of Florida, All Krgnts Keservea
' All -Way Stop Control
1
1
1
1
r arc i, vi i
IX0lumeenu u�..IIc.�wr...,_
.. : •iL
us men '° , s. NO t
2L'Y- .y:
. iy' P3iq. ir3. Yi'" t4.:. 5_ 3Wi3. YMi' ttiRB�M''
0.0 0.0 0.0
Eastbound
Prop. Left -rums
0.4
Westbound
0.7
roach .
0.0
L
0.0
T
R
L
T
R
Movement
36
Prop. Heavy Vehicle
56
8
6
3
97
Volume
0.5
0.5
0.5
0.5
hL.T -adj
-0.7 1
50
-0.7 -0.7 -0.7 1
-0.7 -0.7
%Thrus Left Lane
-0.7
50
1.7
1.7
1.7
1.7 1.7 1.7
1.7 . 1.7
hHV -adj
Northbound
Southbound
roach
5.97
L
6.97. 5.97 5.97 5.97 5.97
T
R
L
T
R
Movement
0
hd, initial value
198
8
56
125
19
Volume
0:01
0.09 0.09 0.10 0.05 0.13
x, initial
5.97
5.97
5.97
5.97 5.97. 5.97 5.97 5.97 '
hd, final value
0.15
50
0.02. 0.14
0.15
%Thrus Left Lane
x, final value
.50
2.3
2.3
2.3 2.3
Eastbound
3.7 2.8
Westbound
Northbound
Southbound
L1
���4`�� 1
L2
Southbound
L1
Eastbound
L2
L1
L2 L1
I L2
L1
LT
L1
R
L1
LT
R
LT
TR I L
TR
Configuration
1.00
306
1.00
Capacity
1.00
7.84
1.00
1.00 1.00 '.1.00
.1.00
PHF
92
9.46
8
A.
9
A
97
99
107 56
144
Flow Rate
Los
9.60
8.62
9.06
9.39
Approach: Delay
A
A
% Heavy Vehicles
A
A
A
Intersection Delay
2
Intersection LOS
2
No. Lanes
HCS2000Tm
2
2
5
5
Geometry Group
5
5
1.00
Duration, T
^.^Rt��'S.e'�'s'tCR= __:..' i
Saturatton;Headwa A
.. : •iL
us men '° , s. NO t
2L'Y- .y:
. iy' P3iq. ir3. Yi'" t4.:. 5_ 3Wi3. YMi' ttiRB�M''
0.0 0.0 0.0
L• a .7A9Y..iY3C.Z "ol.t:.��k.",c -}vX �a•eSaYC'n
1.0 0.0.
Prop. Left -rums
0.4
0.0
0.7
Prop. Right -rums
0.0
1.0
0.0
1.0 0.0 0.1
0.0 0.1
Prop. Heavy Vehicle
0.5
0.5
0.5
0.5
hL.T -adj
-0.7 1
-0.7
-0.7 -0.7 -0.7 1
-0.7 -0.7
hRT -adj
-0.7
1.7
1.7
1.7
1.7 1.7 1.7
1.7 . 1.7
hHV -adj
5.97
5.97 5.97
6.97. 5.97 5.97 5.97 5.97
hadj, computed
er_t ru e,�H�- ea
3.20 3.20 3.20 3:20 3.20
hd, initial value
3.20
3.20
3.20
0.08
0.01
0:01
0.09 0.09 0.10 0.05 0.13
x, initial
5.97
5.97
5.97
5.97 5.97. 5.97 5.97 5.97 '
hd, final value
0.15
0.01
0.02. 0.14
0.15
0.16 0.09 0.21
x, final value
2.3
2.3
2.3 2.3
Move -up time, m
3.7 2.8
3.7 2.8
3.7 2.8 3.7 2.8
Service Time
a a euel oService''��
�kI-
���4`�� 1
Northbound
Southbound
Eastbound
Westbound
L1
L2
L1
L2
L1
L2
L1
L2
342
258.
259
347
349
357
306
394
Capacity
9.75
7.84
8.92
8.60
9.05
9.07
9.21
9.46
Delay
A.
A
A
A
A
A
A
A
Los
9.60
8.62
9.06
9.39
Approach: Delay
A
A
LOS
A
A
A
Intersection Delay
9
Intersection LOS
A
A
Copyright ® 2003 University of Florida, All Rights Reserved Version 4.ld
HCS2000Tm
All-Way Stop Control
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
.-5-. .
ALL -WAY STOP CONTROL ANALYSIS
'&' • +y b x •
General lnforrnatron .
Site` InfOt;fll3tIQ�1
Intersection St. @ Avenue 58
Greg
A gency /Co. Endo Engineering
g
'Madison
Jurisdiction La Quints
Analysis Year Year 2008 W/ Project .
Date Performed 8119 12004
Analysis Time Period AM Peak Hour
Pro ect ID Griffin Ranch
Eas•lWest Street Avenue 58
North/South Street: Madison Street
.,.'sr -- �i"'•- •- asz++�s •� >5.�nrry^Ky s•rtac +:,• .sRa �, - ,. �.
Volume Ad "usfiments and;:SiteCharactensfres
f n �a�:
Westbound
oath
Eastbound
Movement
L.
T
R
5
2 46 47
Volume
29
15
%Thrus Left_ Lane
50
50
A roach
Northbound
Southbound
R
Movement
L T R
2 42 0
L T
S6 95 85
Volume
50
%Thrus Left Lane
50
Eastbound
Westbound
• Northbound Southbound
L1
L2
L1
L2
L1 L2 L1 L2
LT
R
LT
R
LT TR L TR
Configuration
1.00
1.00
1.00
1.00
1.00 1.00 1 J.00-A 1.00
PHF
44
5
48
47
23 21 56 180 .
Flow Rate
% Heavy Vehicles
2 2
No.Lanes 2. 2
5 5
Geometry Group 5 5
1.00
Duration T
Saturat' oHead v+ra Ad'us,' tm t<Workshe`etu - '` y -
Prop. Left -Turns
0.7
0.0
0.0
0.0
0.1 0.0 1.0 0.0
Prop. Right -rums
0.0
1.0
0.0
1.0
0.0 0.0 0.0 0.5
Prop. Heavy Vehicle
0.5
0.5
0.5
0:5
0.5 0.5 0.5. 0.5 ,
hLT -adj
-0.7
-0.7
-0.7
-0.7 -0.7 -0.7 -0.7.
hRT -adj..
-0.7
1.7
1.7
1.7
1':7
1.7 .1.7 1.7 1.7
hHV -adj
1
hadj, computed 5.73
5.73
5.73
5.73
5.73 5 73 5.73 5.7 3
pie artureFlea wa and?Servtce
-
hd, initial value
3.20
3.20
3.20
3.20
3.20 3.20
3.20 3.20
x, initial
0.04
0.00
0.04
0.04
0.02 0.02
0.05 0.16
hd, final value
5.73
5.73
5.73
5.73
5.73. 5.73
5.73 5.73
x, final value
0:07
0.01
0.07
0.06
0.03. 0.03..
0.09 0:24
Move -up time, m
2.3
2.3
2.3
2.3
Service Time
3.4 2.4
3.4 2.4
3.4 2.4
3. 4 2.4
'�"`4•Fitci-
1�AiiR'fn£r:)
�
'rvd?$!° �k$.t`'- '4"'�2,•: - --.'`T
''�.�.,��
� A..� -� -,
Westbound
Northbound Southbound
Eastbound
L1
L2
L1
L2
L1
L2 L1
L2
294
255
298
297
273
.271 306
430
Capacity
8.87
7.44
8.50
7.67
8.14
8.08 8.77
8.87
Delay
A.
A
A
A
A
A A
A
LOS
Approach: Delay
8.72
8.09
8.1.1 8.85
Los
A
A
A A
Intersection Delay
8.59
Intersection LOS
A
HCS2000TMt Copyright ® 2003 University of Florida, All Ktgnts Keservea
All -Way Stop Control
ALL WAY STOP CONTROL ANALYSIS
Page 1 of 1
g .wU a -�� 3 ?
General ���'�:•�
Situ nwrmat o ZZ� ":
<Information�.'��..-
Greg
Agency/Co. Endo Engineering
ge
9 y
Date Performed &1912004
Analysis Time Period PM Peak Hour
Intersection Madison St. @ Avenue 58
Jurisdiction La Quinta
Analysis Year Year 2008 W1 Project
Project ID Griffin Ranch
East/West Street: Avenue 58 NorthlSouth Street: Madtsori Street
Volump�edyAd ustments andStteCharacteistics1`
.
ix'?i{�i7S.+F3 v3h a'!
Eastbound . Westbound
L T R L. T R
36 56 8 6 3 97
A roach
Movement
Volume
%Thrus Left Lane
50
50
A roach
Movement
Northbound Southbound
L T R L T R
"
Volume
0
207
8 56
131
19
%Thrus Left Lane
50
50 .
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
Configuration
PHF
LT
1.00
R
1.00
LT
1.00..
R
1 "00
LT
1:00
TR
1:00
L
1.00
TR_
1.00
Flow Rate
92
8
9
97
103
112
56
150
% Heavy Vehicles
No. Lanes
2
2
2
2
Geometry Group
5
5
5
5
Duration, T 1.00
Saturation Headwa `�Ad ustment�Wocks'heet` >•���x, .,.�`���' _•
Prop. Left -Tums
0.4
0.0
0.7
0.0
0.0
0:0
1.0
0.0
Prop. Right -Tums
0.0
1.0
0.0
1.0
0.0
0.1
0.0
0.1
Prop. Heavy Vehicle
hLT -adj
0.5
0.5
0.5
0.5.
0.5
0.5
0.5
0.5
hRT -adj
-0.7
-0.7
-0.7
-0.7
hHV -adj
1.7
1.7
1.7
hadj, computed
&.01
6.01
6.01
6.01
6.01
6.01
6.01
6 01
De arture3Fleadwa rand rvicetTime��x
hd, initial value
3.20
3.20
3.20
1 3.20
3.20
3.20
3.20 3.20
x, initial
0.08
0.01
0.01
0.09
0.09
0.10
0.05 0.13
hd, final value
- 6.01
6.01
6.01
6.01
6.01
6.01
6.01 6.01
x, final value
0.15
0.01
0.02
0.14
0.16
0.17
0.09 0.22
Move -up time, m
2.3
2.3
2.3
2.3
Service Time
3.7 2.8
3.7
2.8
3.7 2,8
3.7 2.8
Ca',ac�j
-
Eastbound
Westbound
Northbound
Southbound
L1
L2
L1
L2
L1
L2
L1
L2
Capacity
342
258
259
347.
353
362
306.
400
Delay
9.80
.7.88.
8.96
8.65
9.11
9.15
9.23
9.56
Los
A
A
A
A
A
A
A
A
Approach: Delay
9.65
8.67
9.13
9.47
LOS
A
A
A
A
Intersection Delay
.9.25
Intersection LOS
A
HCS*0-
1
Copyright 0 2003 University of Florida, All Rights Reserved
version 4.1a
' Two -Way Stop Control
Page 1 of 1
v/c
TWO -WAY STOP CONTROL SUMMARY
L
T
General Information; 1
T
TR
Greg
0.00
Madison St. @ PGA Entrance
'
Analyst
Agency /Co.
Endo EngineeriLa
=Analysis
Quinta
Control Delay
Date Performed
811312004
Existing
Analysis Time Period
AM Peak Hour
LOS
Minor Street
Westbound
'
Pro'ect Description Griffin Ranch
Movement
7 8 9
10 11 12
East/West Street: PGA West Entrance
—
North /South Street: Madison Street
T
R
Intersection Orientation: North -South
Stud Period hrs : 1.00
R
Volume
Volumes „and =Ad ustmerits, . - _ =� ' °'
'
reet
Northbound
0
1
Southbound
Peak -Hour Factor, PHF
1.00
nt
1
2 3
4
5
T
6
R
Hourly Flow Rate, HFR
L
T R
L
10
0
'
j6hiddVohj,"es
ur Factor, PHF
1
1.00
0
164
1.00
0
1.00
0
1.00
316
1.00
4
1.00
low Rate, HFR
1
0
164
0
0
316
4
Heavy Vehicles
8
Storage
—
—
0
0
RT Channelized
Type
Two Way Left Turn Lane
0
'
Lanes
nelized
0
0
0 0 0
0
0
LR
1
Configuration
1
0
0
2
0
v/c
Lanes
L
T
T
TR
95% queue length
0.00
Configuration
0.06
Control Delay
8.0
U stream.Si nal
1 0
0
LOS
Minor Street
Westbound
Eastbound
'
Movement
7 8 9
10 11 12
Approach Delay
—
L
T
R
L
T
R
Volume
0
0
0
10
0
1
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate, HFR
0
0
0
10
0
1
Percent Heavy Vehicles
0
0
0
8
0
8
Percent Grade ( %)
0
0
'
Flared Approach
N
N
Storage
0
0
RT Channelized
0
0
'
Lanes
0
0
0
0 0 0
LR
Configuration
Dela #'Queue:;Le t6 and
Leueh'of Sery
cep.'' '. ` �. 7A
t
Approach
NB
SB
Westbound
Eastbound
Movement
1
4
7
8
9
10
11
12
Lane Configuration
L
LR
v (vph)
1
11
'
C (m) (vph)
1194
583
000
0.02
v/c
95% queue length
0.00
0.06
Control Delay
8.0
11.3
LOS
A
B
Approach Delay
—
—
11'3
Approach LOS
—
—
8
Rights Reserved
HCS2000TM
Version 4.1 d
Copyright ® 2003 University of Florida, All Rights Reserved
Version 4.Id
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Two -Way Stop Control Page 1 of 1
TWO -WAY STOP CONTROL SUMMARY
r G-- y--
e—neraF ra” ton Y -
Analyst Greg
Agency /Co. Endo Engineering
Date Performed 811312004
Anal sis Time Period PM Peak Hour
� „ -a
.=.7 _Info°ms : on
Intersection Madison St. @ PGA Entrance
Jurisdiction La Quinta
Analysis Year Existing
Project Description Griffin Ranch
East/West Street: PGA West Entrance
North /South Street: Madison Street
Intersection Orientation: North -South
IStudy Period hrs 1.00
"'+°""'„' e�''-- .-e'°,yp.`+},s..-
Vehicle, Vol ..__;and- Ad'.ustments . r�' ,r : 77777---,77, �•
'o' Street
Northbound
Southbound
Movement
!a
1
2
3
4 1
5'
6
L
T
R
L I
T
R
Volume
2
386
0
0
207
8
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
1.00 1
1.00
Hourly Flow Rate, HFR
2
386
0
0
207
8
Percent Heavy Vehicles
8
—
—
0
—
—
Median Type
Two Way Left Turn Lane
RT Channelized
0
0
Lanes
1
1
0
0
2
0
Configuration
L
T
T
TR
Upstream Signal
0.
0
Minor Street
Westbound
Eastbound
Movement
7
8
9
.10
11
12
L
T
R
L
T
R
Volume
0
0
0
8
0
6
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate, HFR
0
1 0
0
8
0
6
Percent Heavy Vehicles
0
0
0
8
0
8
Percent Grade ( %)
0
0
Flared Approach
N
N
Storage
RT Channelized
0
0
0
0
Lanes
0
0
0
0 0 0
Configuration
LR
Vela : _Q Len tl' and
el of SeT rvi
e" ' �' `'r i� w: "
Approach
NB
SB
Westbound-1
Eastbound
Movement
1
4
7
8
9
10
11
12
Lane Configuration
L
LR
v (vph)
2
14
C (m) (vph)
1310
624
v/c
0.00
0.02
„-o, .a
n nn
0.07
Rights Reserved
HCS2000TMt
Version 4.1 d
Copyright ® 2003 University of Florida, All Rights Reserved
Version 4:1d
ao,o t{ucuc , ..y..
—• --
Control Delay
7.8
10.9
LOS
A
B
Approach Delay
—
—
10.9
Approach LOS
—
—
B
Rights Reserved
HCS2000TMt
Version 4.1 d
Copyright ® 2003 University of Florida, All Rights Reserved
Version 4:1d
Two -Way Stop Control
KI UtlalaiCUCGu
Lanes
1
2
0
0
2
0
Configuration
L
T
T
TR
Upstream Signal
0
0
Minor Street
Movement
7
Westbound
8
9
10
Eastbound
11 1 12
L
T
R_
L
T.
R
Volume
Peak -Hour Factor, PHF
0
1.00
0
1.00
0
1.00
14
1.00
0
1.00
2
1.00
Hourly Flow Rate, HFR
0
0
0
14
0
2
Percent Heavy Vehicles
0
0.
0
8
0
8
Percent Grade ( %)
0
0
Flared Approach
N
N
Storage
RT Channelized
0
0
0
0
Lanes
0
0
0
0
0
0
Configuration
LR
Delta, , Q :ueueL ®n th ,andLevel;of
Service
-Y'
Eastbound
Approach
NB
SB
Westbound
Movement
1
4
7
8
9
10
11
12
Lane Configuration
L
LR
v (vph)
2
16
C (m) (vph)
1065
527
v/c
0.00
0.03
95% queue length
0.01
Control Delay
8.4
12.0
12'0
LOS
A
B
Approach Delay
—
--
12'0
Approach LOS
-
--
8
Rights Reserved
HCS2000TM
Version 4.1d
Copyright m 2003 University of Florida, All Rights Reserved
Version 4.Id
Two -Way Stop Control
TWO -WAY STOP CONTROL SUMMARY
'
FZnalyst nf_.orm aton_ _
Situ nocmio.;_ . _.Gre
Intersection
Madison St. @ PGA Entrance
'
Agency/Co.
Endo Engineering
9 9
811312004
Jurisdiction
Analysis Year
La Quinta
Year 2008 No Project
�
Performed
Date Performed
I
Anal sis Time Period
PM Peak Hour
'
Project Description Grim Ranch
East/West Street: PGA West Entrance
North /South Street: Madison Street
Perod hrs : 1.00
Intersection Orientation North South
Stud
WWI:
- Ad'_ustments r,`
Vehicle V to umesand
_p_
'
Ma or Street
Northbound
Southbound
6
4
5 1
1
2
1 3
Movement
L
T
R
L
T
R' .
'
3
545
0
0
292
11
1.00
Volume
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
1.00
0
0
292
11
Hourly Flow Rate, HFR
3
545
'
Percent Heavy Vehicles
Type
8
—
— 0
Two Way Left Turn Lane
Median
0
RT Channelized
0
0
'
Lanes
1
2
0 0
2
TR
L
T
T
Configuration
0
Upstream Signal
0
Minor Street
Westbound
Eastbound
11
'
Movement
7
8
9 10
R R
R L
T
L
T
'
0
0
0 11
0
8
1.00.
8
Volume
Peak -Hour Fac tor, PHF
1.00
1.00
0
1.00 1.00
0 11
1.00
0
Hourly Flow Rate, HFR
0
Percent Heavy Vehicles
0
0
0 8
0
8
'
Percent Grade ( %)
0
N
0
N
Flared Approach
Storage
0
0
0
'
RT Channelized
0
0
0
0 0
0
0
Lanes
LR
Configuration
SIB Westbound
Eastbound
Approach
NB
Movement
1
4
7
8
9 10
11
12
'
Lane Configuration
L
LR
19
v (vph)
3
C (m) (vph)
1212
625
Vic
0.00
0.03
95% queue length
0.01
0.09
'
Control Delay
8.0
10.9
A
B
LOS
10.9
Approach Delay
—
--
'
Approach LOS
8
Rights Reserved
Copyright 02003 University of Florida, All Rights Reserved
Version.4.1d
HCS2000 TM
'
Version 4.1 d
Two -Way Stop Control
. -5- . - -
TWO -WAY STOP CONTROL SUMMARY
;Gene allnformation. �a° ,r
Analyst Greg
Agency /Co. Endo Engineering
Date Performed 811312004
Analysis Time Period AM Peak Hour
,S,itelnformat�on: . Mwi.W
Madison St. @ PGA
Intersection Entrance
Jurisdiction La Quinta
Analysis Year Year 2008 W/ Project
Project Description Ranch
—Griffin
East/West Street: PGA West Entrance
North /South Street: Madison Street
Intersection Orientation:
North -South
IStudy Period hrs : 1.00
Vfflhlicle Volu_mesa_ndAd'ustmenfs ur =.
Major Street Northbound
Movement 1 2
_
3
MITI 1111mmil-I
_ _-
Southbound
4 5 6.
L
T
R
L
T
R
Volume
2
233
4
13
450
5
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate, HFR
Percent Heavy Vehicles
2
8
233.
–
4
--
13
8
450
--
5
""
Median Type.
Two Way Left Turn Lane
RT Channelized
0
0
Lanes
1
2
0
1
2
0
Configuration
L
T
TR
L
T
TR
Upstream Si nal
0
0
Minor Street
Westbound
Eastbound
Movement
7
8
9
10
11
12
L
T
R
L
T
R
Volume
Peak -Hour Factor, PHF
13
1.00
0
1.00
38
1.00
14
1.00
0
1.00
2
1.00
Hourly Flow Rate, HFR
13
0
38
14,
0
2
Percent Heavy Vehicles
8
8
8
8
8
8
Percent Grade ( %)
0
0
Flared Approach
N
N
Storage
0
0,
RT Channelized
0
0
Lanes
0
1
0
0
1
0
Configuration
LTR
LTR
} th,and
Lev_.elofServicp
?s��x�
x01
_eu'eL_en
Approach
NB
SIB
Westbound
Eastbound
Movement
1
4
7
8
9
10
11
12
Lane Configuration
L
L
LTR
LTR
v (vph)
2
13
51
16
C (m) (vph)
1061
1285
759
457
v/c
0.00
0.01
0.07
0.04
95% queue length
0.01.
0.03
0.22
0.11
Control Delay
8.4
7.8
10.1
13.2
LOS
A
A
B
B
Approach Delay
--
--
10.1
13.2
Approach LOS
--
--
B
B
Rights Reserved
Two -Way Stop Control
TWO -WAY STOP CONTROL SUMMARY
General�lnform f�nn� ���- -����•
��te Inf'� o matron .�,.- F } �` � _ b� a
Madison St. @PGA
-- -
Analyst Greg
Intersection Entrance
Endo En ineerin
Agency /Co. g g
Jurisdiction La Quints
Date Performed 8/13/2004
Analysis Year Year 2008 W /Project
Analysis Time Period PM Peak our
Project Description Ranch
—Griffin
East/West Street: PGA West Entrance North /South Street: Madison Street
intersection Orientation: North -South Study Period hrs : 1.00.
Ns: sr!114
RIM
Uehrcle Vo umdAd'ustmen..ts�'`'" P`
Major Street Northbound Southbound
Movement 1 2 3 4 :5 6
T R
L T R L
Volume
3
550
14
41 295 11
Peak -Hour Factor, PHF
1.00
1.00
1:00
1.00 1.00 1.00
Hourly Flow Rate, HFR
3 550 14 41 295 11
Percent Heavy Vehicles
8 – – .8
Median Type
Two Way. Left Turn Lane
RT Channelized
0 0
Lanes
1 2 0 1 2 0
Configuration
L
T
TR
L
T TR
U stream Si nal
0
0
Minor Street
Westbound
Eastbound
Movement
7 8 9
10 11 J 12
L
T
R
L T R
Volume
8
0
24
11 0 8
Peak -Hour Factor, PHF
1.00
1.00
1.00
1.00 1.00 1.00
Hourly Flow Rate, HFR
8 0 24
11 0 8
Percent Heavy Vehicles
8 8 8
8 8 8
Percent Grade ( %)
0
0
Flared Approach
N
N
Storage
0
0
RT Channelized
0
0
Lanes
0
1
0
0 1 0
Configuration
LTR
LTR
Tarr ' -���4;
Dela.
,„}S''FT -. f ^gyp z+� -sex. ter..- x�..�r5�.�ty " ....: -
nd,i_Leuel,of< ,ervi �..t.�.Y��� -
Approach =!7
NB SB Westbound Eastbound
Movement
1 4 7 8 9 10 11 12
Lane Configuration
L
L
LTR
LTR
v (vph)
3
41
32
.19
C (m) (vph)
1209
963
566
527
v/c
0.00
0.04
0.06
0.04
95% queue length
0.01
0.13
0.18
0.11
Control Delay
8.0
8.9
11.7
12.1
LOS
A
A
B
Approach Delay
--
--
11.7 12. . 1
Approach LOS
--
--
B B
Rights Reserved
Two -Way Stop Control
TWO -WAY STOP CONTROL SUMMARY
gain pip
Ste4lnfom anon " �_
West Site Access @ Avenue
`
Analyst Greg
Intersection 54
Endo Engineering Agency /Co. 9 g
Jurisdiction La Quinta
Date Performed 812412004
Analysis Year Year 2008 W/ Project
Analysis Time Period AM Peak Hour
Project Descri tion Griffin Ranch
No
East/West Street: Avenue 54 rth /South Street: West Site Access
Intersection Orientation: East -West
Stud Period
hrs : 1.00.
,.�"3q- ter _
Uehcle�Volumes anAd'ustments_°
Westbound
Major Street
Eastbound
Movement
1 2
4 5 6
T R
L T
L
Volume veh /h
0
159
MO
4 206 0
Peak -hour factor, PHF
1.00
1.00
1.00 1.00 1.00
Hourly Flow Rate (veh /h)
0
159
4 206 0
Proportion of heavy
0
_
_
8 — —
vehicles, PHV
Median type
Two Way Left Turn Lane
RT Channelized?
0
0
Lanes
0
1
0
1
1 0
Configuration
TR
L
T
Upstream Signal
0
0
Minor Street
Northbound
Southbound
Movement
7 8
10 11 12
L
T
L T R
Volume veh /h
Peak -hour factor, PHF
29
1.00
];;F
0 0 0
1.00 1.00 1.00
Hourly Flow Rate (veh /h)
29
0 0 0
Proportion of heavy
8
0 0 0.
vehicles, PHv
]Ono
Percent grade ( %)
0
Flared approach
N
Storage
0
0
RT Channelized?
Lanes
0
0
0
0
Configuration
LR
Control,=,Dela- "�- Que_ue Len th Level_of�Servace, .��z�. �:. ° x�.�- � •sM
Approach EB WB Northbound Southbound
Movement
1
4
7
8
9 10 11 12
Lane Configuration
L
LR
Volume, v (vph)
4
42
Capacity, cm (vph)
1373
708
v/c ratio
0.00
0.06
Queue length (95 %)
0.01
0.19
Control Delay (s /veh)
7.6
10.4
LOS
A
B
Approach delay (s /veh)
--
--
10.4
Approach LOS
HCS2000TM Copyright 0 2003 University of Flonoa, All Kignss reserve°
ITwo -Way Stop Control Page 1 of 1
TWO -WAY STOP CONTROL SUMMARY
W-1-
Gnal ; Site
Analyst Greg Intersection West Site Access @ Avenue
Agency /Co. Endo Engineering
Date Performed 812412004 Jurisdiction La Quinta
Analysis Time Period PM Peak Hour Analysis Year Year 2008 W1 Project
Project Description Griffin Ranch
East/West Street: Avenue 54
_.
North /South Street: West Site Access
Intersection Orientation:
East -West
IStudy Period hrs : 1.00
VehicleUol_umes and=Ad ustmentsi""°
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
Volume veh/h)
Peak -hour factor, PHF
Hourly Flow Rate (veh /h)
L
0
1.00
0
T
293
1.00
1 293
R
32
1.00
1 32
L
14
1.00
14
T
247
1.00
247
R
0
1.00
0
Proportion of heavy
vehicles, PHV
0
—
—
8
Median type
Two Way Left Turn Lane
RT Channelized?
0
0
Lanes
0
1
0
1
1
0
Configuration
TR
L
T
Upstream Signal
0
0
Minor Street
Northbound
Southbound
Movement
7
8
9
10
11
12
Volume veh/h)
Peak -hour factor, PHF
L
19
1.00
T
0
1.00
R
8
1.00
L
0
1.00
T
0
1.00
R
0
1.00
Hourly Flow Rate (veh /h)
19
0
8
0
0
0
Proportion of heavy
vehicles, PHV
8
0
8
0
0
0
Percent grade ( %)
0
0
Flared approach
N
N
Storage
p
0
RT Channelized?
0
0
Lanes
0
0
0
0
0
0
Configuration LR
Approach EB WB " Northbound Southbound
Movement
1
4
7
8
9
10
11
12
Lane Configuration
L
LR
Volume, v (vph)
14
27
Capacity, cm (vph)
1202
588
v/c ratio
0.01
0.05
Queue length (95 %)
0.04
0.14
Control Delay (s /veh)
8.0
11.4
LOS
A
B
Approach delay (s /veh)
--
--
11.4
Approach LOS
vl nnTM
--
_
B
I.opyngnt w. [uus University of Florida, All Rights Reserved Version 4.1 d
ITwo-Way Stop Control
I
i
H
I
I
I
I
I
I
I
i1
I
I
I
I
I
I
I
Page I of I
HCS2000TM Copyright 02003 University of Florida, All Rights Reserved Version 4.1d
TWO-WAY STOP CONTROL SUMMARY
0"_ I I - �
. f
enera 1K
I _wl 0
Site n otmation,, X
Analyst
Agency/Co.
Date Performed
Analysis Time Period
Endo Engineering
812412004
AM Peak Hour
Intersection
Jurisdiction
Analysis Year
I
East Site Access @ Avenue
54
La Quinta
Year 2008 W1 Project
Project Description Griffin Ranch
East/West Street: Avenue 54
INorth /South Street:
East Site Access
Intersection Orientation:
East-West
IStud y Period (hrs):
1.00
_ _'FWhi 6rV6 I i m id on ts
Major Street
Eastbound
Westbound
Movement
1
2
3
4
5
6
L
T
R
L
T
R
Volume veh/h)
0
155
16
9
162
0
Peak-hour factor, PHIF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate (veh/h)
0
155
16
9
1
162
0
Proportion of heavy
vehicles, PHV
0
I
—
8
Median type
Two Way Left Turn Lane
RT Channelized?
0
0
Lanes
0
1
0
1
1
0
Configuration
TR
L
T
Upstream Signal
0
0
Minor Street
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R
L
T
R
Volume veh/h)
48
0
27
0
0
0
Peak-hour factor, PHIF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate (veh/h)
48
0
27
0
0
0
Proportion of heavy
vehicles, PHV
8
0
8
0
I
0
0
Percent grade
0
0
Flared approach
N
N
Storage
0
0
RT Channelized?
0
0
Lanes
0
0
0
0
0
0
Configuration
LR
16_1W, _ - ' i"
dAiF0t1be1 Queue! Aa w.Cgye
V'
Approach
EB
WB
Northbound
Southbound
Movement
1
4
7
8
9
10-
11
12
Lane Configuration
L
LR
Volume, v (vph)
9
75
Capacity, cm (vph)
1371
733
v/c ratio
0.01
0.10
Queue length (95%)
0.02
0.34
Control Delay (s/veh)
7.6
10.5
LOS
A
B
Approach delay (s/veh)
10.5
Approach LOS
B
HCS2000TM Copyright 02003 University of Florida, All Rights Reserved Version 4.1d
Two -Way Stop Control
Page 1 of 1
TWO -WAY STOP CONTROL SUMMARY
Gene al,Informat�on5��
Site Infbmation�
Analyst Greg
Agency /Co. Endo Engineering
Date Performed 812412004
Analysis Time Period PM Peak Hour
Intersection East Site Access @ Avenue
54
Jurisdiction La Quints
Analysis Year Year 2008 W1 Project
Project Description Griffin Ranch
East/West Street: Avenue 54
North /South Street: East Site Access
Intersection Orientation: East -West
IStudy Period hrs : 1.00
r
VehicleVol,umesand;Ad rnen_t_s �
Major Street
Eastbound
Westbound
Movement
1
2
3
4
5
6
L
T
R
L
T
R
Volume -(veh/h)
0
249
53
30
230
0
Peak -hour factor, PHF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate (veh /h)
0
249
53
30
230
0
Proportion of heavy
vehicles, PHV
0
_
_
8
T
-
Median type
Two Way Left Turn Lane
RT Channelized?
0
0
Lanes
0
1
0
1
1
0
Configuration
TR
L
T
Upstream Signal
0
0
Minor Street
Northbound
Southbound
Movement
7
8
9
10
11
12
L
T
R
L
T
R
Volume veh/h)
31
0
18
0
0
0
Peak -hour factor, PHF
1.00
1.00
1.00
1.00
1.00
1.00
Hourly Flow Rate,(veh /h)
31
0
18
0
0
0
Proportion of heavy
vehicles, PHV
8
.0
8
0
0
0
Percent grade ( %)
0
0
Flared approach
N
N
Storage
0
0
RT Channelized?
0
0
Lanes
0
0
0
0
0
0
Configuration
LR
ontrol�D•. le a'Queue"�Len
t'Level�of S�erv�'-
ei4 ,��.� �� ,� � a
��` s�`'���,��_����
���.
Approach
EB
WB
Northbound
Southbound
Movement
1
4
7
8
9
10
11
12
Lane Configuration
L
LR
Volume, v (vph)
30
49
Capacity, cm (vph)
1226
609
v/c ratio
0.02
0.08
Queue. length (95 %)
0.08
0.26
Control Delay (s /veh)
8.0
11.4
LOS
A
8
Approach delay (s /veh)
--
--
11.4
Approach LOS
-
--
g
HCS2000TM Copyright 0 2003 University or Florida, All Rights Reserved Version 4.Id
1
1
1
1
1
Appendix B
Highway Capacity Manual
Signalized Intersection Methodology
The Highway Capacity Manual (HCM 2000) signalized intersection capacity and level of
service methodology addresses the capacity and level of service of intersection approach
land groups as well as the level of service of the intersection as a whole. The analysis is
undertaken in terms of the ratio of demand flow rate to capacity (V /C ratio) for individual
movements during a peak 15- minute interval and the composite V/C ratio for the sum of
critical movements or lane groups within the intersection. The level of service is determined
based, upon average control delay per vehicle, as shown in Table B -2 below.
Table B -2
2000 HCM Signalized Intersection LOS Criteria
Level of
Traffic Flow
Avg. Control Delay
Service
Characteristics
(SecondsNehicle) .
A
Extremely favorable progression with very low control delay.
<_ 10
Most vehicles arrive during the green phase. Many do not stop.
Good progression, short cycle lengths or both. More vehicles
B
stop than with LOS A, causing higher levels of average
> 10 and <_ 20
delay.
Satisfactory operation with fair progression, longer cycle
C
lengths, or both. Individual cycle failures may begin to
appear. Cycle failure occurs when a given green phase does
> 20 and <_ 35
not serve queued vehicles and overflow occurs. A significant
number of vehicles stop but many pass through without
stopping.
Tolerable delay, where congestion becomes more noticeable
and many vehicles stop. Individual cycle failures are noticeable.
D
Longer delays may result from some combination of
> 35 and <_ 55
unfavorable progression, long cycle lengths, or high V/C
ratios.
Unstable flow with poor progression, frequent cycle failures,
E
long cycle lengths and high V/C ratios. Individual cycle
> 55 and <_ 80
failures are frequent occurrences. This is considered the
limit of acceptable delay by many agencies.
Oversaturation with arrival flow rates exceeding the capacity
of intersection lane groups and many individual cycle failures.
F
Poor progression and long cycle lengths as well as high V/C
> 80
ratios and high delay values occur at LOS F. Considered
unacceptable to most drivers.
Source: rnignway uapaccry manual, apeciai xeport LU9, transportation Research Board, Fourth Edition,
2000; pp. 10 -16.
Short Report
Page 1 of 1
SHORT REPORT
Gene�al�lnfofmaton�`$`� '� . s �:�; ti "� °� ?,�." � * ","r
• ..� .
�. � .:.«..� �.,,,:.._.,.: -. < : r �- 4• „- S w � ;.
Site Information .. .r....� {'t�._ , , . a.•; '�' �.
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 811312004 Jurisdiction
Time Period AM Peak Hour
Jefferson St. @ SR ill
Area Type All other areas
La Quinta
Analysis Year Existing
..: ".;.,,. ,- - .Aj'- �•s-••-7,,F`"
Volume andtiTimm In utr_+ ` ..r's, M _ t itn±, �' H ;'w.'S;�x_.....
-.. .T:kr.H -4 yti:f `{t1S.•.
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
2
1
1
2
0
2
2
1
1
3
1
Lane group
L.
T
R
L
TR
L
T
R
L
T
R
Volume (v ph)
78
528
124
142
720
49
265
329
124.
109
354
67
% Heavy veh
8
8
8
1 8
8
1 8
1 8
8
8
8
8
8
PHF
1.00
1.00
1.00
1 1.00
1.00
11.00
1 1.00
1.00 1
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
I A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
. 2.0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr
0
0
0
0
0
0
0
0
0
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
.Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08
Timing
G= 11.0
G= 35.0
G= G=
G= 11.0
G= 17.0
G=
G=
Y= 4
Y= 4
Y= Y=
Y= 4
Y= 4
Y=
Y=
Duration of Anal sis hrs = 1.00
Cycle Len th C = 90.0
Lane•;Group;Gapacity, Control Delay,
arrdrLO$ :Determinatfion Y ,+ ` �
EB
WB
NB
SB
Adj. flow rate
78
528
124
142
769
265
329
124
109 1
354
67
Lane group cap.
204
1300
1179
204
1288
396
631
1179
204
907
1179
v/c ratio
0.38
0.41
0.11
0.70
0.60
0.67
0.52
0.11
0.53
0.39
0.06
Green ratio
0.12
0.39
0.79
0.12
0.39
0.12
0.19
0.79
0.12
0.19
0.79
Unit. delay d1
36.4
20.0
2.2
37.9
21.9
37.8
32.8
2.2
37.1
32.0
2.1
Delay factor k
0.11
0.11
0.11
0.26
0.19
0.24
0.13
0.11
0.14
0.11
0.11
Increm. delay d2
1.2
0.2
0.0
10.4
0.8
4.4
0.8
0.0
2.8 1
0.3
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay
37.6
20.2
2.2
48.3
22.7
42.2
33.6
2.2
39.9
32.2
2.1
Lane group LOS
D
C
A
D
C
D
C
A
D
C
A
Apprch. delay
19.0
26.7
31.4
30.0
Approach LOS
8
C
C
C
Intersec. delay
26.5
Intersection LOS
C
HL3,NUU- t-opyngnt 19 ZUUU University of Flonde, All Rights Reserved Version 4.1d
Short Report
Page I of 1
SHORT REPORT
Gen -eraf
Site rn-fqrmafl'dn-,' 7'--'-1T"- -7:7-
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed •811312004 Jurisdiction
Time Period PM Peak Hour
Jefferson St. @ SR -111
Area Type All other areas
La Quinta
Analysis Year Existing
v6ruifi an
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
2
1
1
2
0
2
.2
1
1
3
1
Lane group
L
T
R
L
TR
L
T
R
L
T
R
Volume (v ph)
115
1007
288
194
892
78
249
369
164
193
439
61
% Heavy veh
8
8
8
8
8
1 8
8
8 1
8
8 1
8
8
PHF
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
.0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking/Grade/Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking/hr
Bus stops/hr
0
1 0
0
0
1 0
.0
0
0
0 1
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
Timing
G= 13.0
G= 35.0
G= G=
G = 13.0
G= 13.0
G=
Y= 4
Y= 4
Y= Y=
'
Y= 4
Y= 4
Y=
Duration of Analysis hrs = 1.00
Cvc1e Lenath C = 90.0
yp�.andl
Lane ro Qotermin4!k4.,
- -1 "1
EB
WB
NB
SB
Adj. flow rate
115
1007
288
194
970
249
369
164
193
439
61
Lane group cap.
241
1300
1146
241
1284
468
483
1146
241
694
1146
v/c ratio
0.48
0.77
0.25
0.80
0.76
0.53
0.76
0.14
0.80
0.63
0.05
' 05
Green ratio
0.14
0.39
1 0.77
0.14
1 0.39
10.14
0.14
1 0.77
0.14 10.14
0.77
Unif. delay dl .35.4
24.1
3.0
37.3
23.8
35.7
37.0
1 2.8
37.2 136.3
2.6
Delay factor k -
0.11
0.32
0.11
0.35
0.31
0.13
0.32
10.11
0.34
0.21
0.11
Increm. delay d2
1.5
3.1
0.1
20.3
2.7
1.2
7.5
0.1
19.6
1.9
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1,000
1.000
1.000
1.000
1.000
Control delay
36.9
27.1
3.2
57.6
26.5
36.9
44.5
2.8
56.9 .
38.2
2.6
Lane group LOS
D I
C
A
E
C
D
D
A
E
D
A
Apprch. delay
23.0
31.6
33.3
40.2
Approach LOS
C
C
C
D
Intersec. delay
30.4
Intersection LOS
C
HCS2000TM Copyright 02000 University of Florida, All Rights Reserved Version 4.1 d
SHORT REPORT
n -1-7 7'
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 811312004 Jurisdiction
Time Period AM Peak Hour
Jefferson St. @ SR-111
Area Type All other areas
La Quinta
Analysis Year Year 2008 No Project
Volume ,
'EB
WB
NB
SB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
2
1
1
2
0
2
2
1
1
3
1
Lane group
L
T
R
L
TR
L
T
R
L
T
R
Volume (v ph)
87
587
137
158
801
55
295
366
137
121
394
75
% Heavy veh
8
8
8
8
8
8-
8
8
8
8
8 1
8
PHF
1.00
1.00
1.00
1.00
1,00 7
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
-2.-0-
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
20
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0-
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking/Grade/Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking/hr
I
Bus stops/hr
0
0
0
0
0
0
0
0
0
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
-3-0
-30-
3.0
3.0
3.0
3.0
Phasing
Excl. Left
I_hru & RT
03
04
Excl. Left
Thru & RT
07
08
G= 12.0
1 G= 34.0
G=
G=
G = 11.0
G= 17.0
G
G
Timing
Y= 4
IY= 4
Y=
Y= A=
4
Y= 4
Y=
Y=
Duration of Analysis hrs = 1.00
Cycle Length C = 90.0
clit 61. Delay, Ind LOS Determination: Lane 'Group P- Capacity; T,
EB
WB
NB
SB
Adj. flow rate
87
587
137
158
856
295
366
137
121
394
75
Lane group pap.
223
1263
1163
223
1250
396
631
1179
204
907
1179
v/c ratio
0.39
-0.46
0.12
0.71
0.68
0.74
0.58
0.1.2
0.59
0.43
0.06
Green ratio
0.13
0.38
0.78
0.13
10.38
0.12
0.19
0.79
0.12
0.19
0.79
Unif. delay d1
35.7
21.1
2.4
37.3
23.5
38.1
33.2
2.2
37.4
32.3
2.1
Delay factor k
0.11
0.11
0.11
0.27
0.25
0.30
0.17
0.11
0.18
0.11
0.11
Increm. delay d2
1.1
0.3
0.0
10.5
1.6
7.9
1.4
0.0
4.7
0.3
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay
36.8
21.4
1 2.5
47.8
125.1
46.0
34.6.
2.3
42.1
32.6
1 2.1
Lane group LOS
D
C
A
D
I C
D
C
A
D
C
A
Apprch. delay
19.9
28.6
33.3
30.7
Approach LOS
B
C
I C
C
Intersec. delay
27.9
Intersection LOS
C'
HCS2000TM Copyright 0 2000 University of Florida, All Rights Reserved Version 4.1 d
I
I
I
I
I
I
I
I
i
I
I
I
I
I
I
I
i
I
I
SHORT REPORT
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 811312004 Jurisdiction
Time Period PM Peak Hour
Jefferson St. @ SR -111
Area Type All other areas
La Quinta
Analysis Year Year 2008 No Project
ume.alridiTiminmi 7A 1 I
EB
WB
NIB
SIB
LT
TH
RT
LT
TH
RT
LT I
TH
RT
LT
TH
RT
Num. of Lanes
1
2
1
1
2
0
2
2
1
1
3
1
Lane group
L
T
R
L
TR
L
T
R
L
T
R
Volume (v ph)
128
11120
321
216
992
87
277
410
183
215
488
68
% Heavy veh
8
8
8
8
8
8
8
8
8
8
8
8
PH IF
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1,00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0 -
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking/hr
I
I
Bus stops/hr
0
0
0
1 0
0
0
0
0
0
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
1 Excl. Left
Thru & RT
07
08
Timing
G= 13.0
G= 35.0
G= I G=
I G= 13.0
G= 13.0
G=
G=
Y= 4
Y= 4
Y= 1Y=
IY= 4
Y= 4
Y=
Y=
Duration of Analysis (hrs) 1.00
-
Cycle Length C 90.0
�Onti4l, 061 d'
Lane a0dij jay,,-ah LOS DeWhilhationj
EB
WIB
NIB
SIB
Adj. flow rate
128
1120
321
216
1079
277
410
183
215
488
68
Lane group cap.
241
1300
1146
241
1284
468
483
1146
241
694
1146
v/c ratio
0.53
0.86
0.28
0.90
0.84
0.59
0.85
0.16
0.89
0.70
0.06
Green ratio
0.14
0.39
0.77
0.14
0.39
0.14
0.14
0.77
0.14
0.14
0.77
Unif. delay dl
35.7
25.3
3.1
37.8
25.0
36.0
37.5
2.8
37.8
10.27
36.7
2.6
Delay factor k
0.13
0.39
0.11
0.42
0.38
0.18
0.38
0.11
0.42
0.11
Increm. delay d2
2.3 1
6.6
0.1
43.8
5.4
2.0
15.2
0.1
42.2
3.3
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay
37.9
31.9
3.3
81.6
30.4
38.0
52.7
2.9
80.0
39.9
2.6
Lane group LOS
D
C
A
F
C
D
D
A
F
D
A
Apprch. delay
26.5
38.9
37.5
47.8
Approach LOS
Intersec. delay
C
35.9
D D I
Intersection LOS
D
D
HC52000 I m Uopyright Q 2000 University of Florida, All Rights Reserved Version 4.1 d
Short Report
Page 1 of 1
SHORT REPORT
General:lnformatr,on'�'�_�"�'r
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 811312004 Jurisdiction
Time Period AM Peak Hour
Jefferson St. @ SR -111
Area Type All other areas
La Quinta
Analysis Year Year 2008 W/ Project
4.
`.Yo16me andxTimin iln ut -..z�,f���
EB
WB
NB
SB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
2
1
1
2
0
2
2
1
1
3
1
Lane group
L
T
R
L
TR
L
T
R
L
T
R
Volume (v ph)
87
587
145 1
159
801
55
317
391
141-
121
402
75
Heavy veh
8
8
8
8
8
8 1
8
8
1 8
8 1
8
8
PH F
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0 .
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr
0
0
0 1
0
1 0
11
0
0
1 0
0
0
0
Unit Extension
3.0 1
3.0
3.0 1
3.0
1 3.0
3.0
3.0
1 3.0
3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08
G= 11.0
G= 34.0
G= G=
G= 12.0
G= 17.0
G=
G=
Timing
Y= 4
Y= 4
Y= Y=
Y= 4
Y= 4
Y=
Y=
Duration of Analysis hrs = 1.00
Cycle Len th C = 90.0
LaneG�oupCapacContrSolDelay "andLOS
De erm nation`�'�3
EB
WB
NB
SB
Adj. flow rate
87
587
145
159
856
317
391
141
121
402
75
Lane group cap.
204
1263
1179
204
1250
432
.631
1163
223
907
1163
v/c ratio
0.43
0.46
0.12
0.78
0.68
0.73
0.62
0.12
0.54
0.44
0.06
Green ratio
6.12
0.38
0.79
0.12
0.38
0.13
0.19
0.78
0.13
0.19
0.78
Unit. delay d1
36.6
21.1
2.2
38.3
23.5
37.5
33.5
2.5
36.4
32.3
2.3
Delay factor k
0.11
0.11
0.11
0.33
0.25
0.29
0.20
0.11
0.14
0.11
0.11
Increm. delay d2
1.4
0.3
0.0
19.5
1.6
6.6
1.9
0.0
2.7
0.3
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay
38.0
21.4
2.3
57.8
25.1
44.1
35.4
2.5
39.2
'32.7
2.4
Lane group LOS
D
C
A
E
C
D
D
A
D
C
A
Apprch. delay
19.8
30.2
33.2
30.2
Approach LOS
8
C
C
C
Intersec. delay
28.4
Intersection LOS
C
HCS2000TM Copyright 0 2000 University of Florida, All Rights Reserved Version '4.Id
Short Report
Page 1 of 1
SHORT REPORT
General) lnfomaton�„�` ". A
Site Infom at o '�r�"
,x
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 811312004 Jurisdiction
Time Period PM Peak Hour
Jefferson St. @ SR -111
Area Type All other areas
La Quinta
Analysis Year Year 2008 W1 Project
4 ME= ow,
. ""
SB'
EB
WB
NB
LT
TH
RT
LT
TH
RT
LT'
TH
I RT
LT
TH I
RT
Num. of Lanes
1
2
1
1
2
0
2
2
1
1
3
1
Lane group
L
T
R
L
TR
L
T
R
L
T
R
Volume (v ph)
128
1120
344
220
992
87
291
426
185
215
516
68
% Heavy veh
8
8
8 1
8.
8
1 8
8
8
8
8 1
8
8
PH F
1.00
1.00
1.00
1.00
1.00
1.00
.1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
.2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
fl3.O
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0
0
0,
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr
0
0
0
0
0
0
0
0
1 0 1
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
1 3.0
3.0
1 3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08.
Timing
G= 13.0
G= 35.0
G= G=
G= 13.0
G= 13.0
G=
G=
Y= 4
Y= 4
Y= Y=
Y= 4
Y= 4
Y=
Y=
Duration of Analysis hrs = 1.00
Cycle Len th C = 90.0.
Lane�Group Cap city *�Coiitrol
Dela
�and�LOS�Dete�in
to on
�` � ''r � �'��
EB
WB
NB
SB
Adj. flow rate
128
1120
344
220
1079
291
426
185
215
516
68
Lane group cap.
241
1300
1146
241
1284
468
483
1146
241
694
1146
v/c ratio
0.53
0.86
0.30
0.91
0.84
0.62
0.88
0.16
6.89
0.74
0.06
Green ratio
0.14
0.39
0.77
6.14
0.39
0.14
0.14
0.77
0.14
0.14
0.77
Unif. delay d1
35.7
25.3
3.2
37.9
25.0
36.2
37.7
2.8
37.8
36.9
2.6
Delay factor k
0.13
0.39
0.11
0.43
0.38
0.20
0.41
0.11
0.42
0.30
0.11
Increm. delay d2
2.3
6.6
0.1
51.0
5.4
2.6
20.7
0.1
42.2
4.5
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay •
37.9
31.9 •
3.3
89.0
30.4
38.8
58.5
2.9
80.0
41.4
2.6
Lane group LOS
D
C
A
F
C
D
E
A
F
D
A
Apprch. delay
26.2
40.3
40.7
48.5
Approach LOS'
C
D
D
D
Intersec. delay
36.9
Intersection LOS
D
11CS2000"M Copyright 0 2000 University of Florida, All Rights Reserved Version 4.1 d
IShort Report
I
11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Page 1 of 1
SHORT REPORT
General -In ko-f-h4trEn'.17 1,"
Analyst Greg
Agency or Co. Endo Engineering
Date Performed 812012004
Time Period AM Peak Hour
Intersection Jefferson Street @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 No Project
n J
EB
WB
NB
SB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
I
1
0
1
2
1
1
2
0
2
2
1
Lane group
L
TR
L
T
R
L
TR
L
T
R
Volume (v ph)
15
3
2
49
3
302
2
116
24
528
2
125
5
27
% Heavy veh
8
8
8 1
8
8 1
8
8
8
8
8
8
8
8
PHF
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
.1.00
1.00
0 0
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
- 0
2021
0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2 - 0
2.0
2 - 0
2.0
Arrival type
3
3
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
1
3.0
3.0
3.0
3.0
3.0
3 .0
3.0
3.0
3 _0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
1.2.0
12.0
12.0
12.0
12.0
12.0
1
9
12.0 1
12.0
12.0
Parking/Grade/Parking
N
0
N.
N
0
N
N
0
N
N
0
N
Parking/hr
I
Bus stops/hr
0
0
0
0
0
0
0
0
0
0
E3 JO
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
. 3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08
Timing
G= 5.0
G= 6.0
G=
G
G= 24.0
G= 9.0
G
G=
Y= 4
Y= 4
Y= Y=
Y= 4
Y= 4
Y=
Y=
Duration of Analysis (hrs) 1.00
g�Len th C = 60.0
Lane,Group- 7tpddity; &o--htrol
EB
WB
NB
SB
Adj. flow rate
15
5
49
3
302
2
140
528
125
27
Lane group cap.
139
165
139
334
1171
668
489
1297
501
698
v/c ratio
0.11
0.03
0.36
0.01
0.26
0.00
0.29
0.41
0.25
0.04
Green ratio
0.08
0.10
0.08
0.10
0.78
0.40
0.15
0.40
0.15
0.47
Unif. delay dl
25.4
24.4
26.0
24.3
1.8
10.8
22.6
12.9
22.5
8.7
Delay factor k
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Increm. delay d2
0.3
0.1
1.5
0.0
0.1
0.0
0.3
0.2
0.3
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
11.000
1.000
11.000
1.000
1.000
Control delay
25.8
24.4
27.5
24.3
1.9
10.8
23.0
13.1
22.8
8.7
Lane group LOS
C
C
C
C
A
B
C
B
C
A
Apprch. delay
25.4
5.6
22.8
14.7
Approach LOS
C
A
C
B
Intersec. delay
13.2
Intersection LOS
B
HCS2000TM Copyright Q 2000 University of Florida, All Rights Reserved Version 4.1
IShort Report Page I of I
SHORT REPORT
ne
Analyst Greg
Agency or Co. Endo Engineering
Date Performed 812012004
Time Period PM Peak Hour
Intersection Jefferson Street @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 No Project
Wlbi6 d 7im
E B
WB
NB
S B
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
1
0
1
2
1
1
2
0
2
2
1
Lane group -
L
TR
L
T
R
L
TR
L
T
R
Volume (vph).,
19
6
3
45
6
693
0
235
50
565
243
8
% Heavy veh
8
8
8
8
8
8
8
8
8
8 1
8
8
P H F
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0'
Arrival type
3
3
3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking/Grade/Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking/hr
Bus stops/hr
0
0 1
1 0
0
0
0
0
0
0
Unit Extension
3.0
3.0 1
1 3.0
3.0
1 3.0
3.0
1 3.01
3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08
G= 5.0
G= 10.0
G=
G=
G= 18.0 G=
.11.0
G=
G=
Timing
Y= 4
Y= 4
Y=
Y=
Y= 4 Y=
4
Y=
Y=
Duration of Analysis (hrs) = 1.00
C
cle Len th C = 60.0
Lai`n�
EB
WB
NB
SB
Adj. flow rate
19
9
45
6
693
0
285
565
243
8
Lane group cap.
139
279
139
557
1171
501
597
973
613
847
v/c ratio
0.14
0.03
0.32
0.01
0.59
0.00
0.48
0.58
0.40
0.01
Green ratio
0.08
0.17
0.08
0.17
0.78
0.30
0.18
0.30
0.18
0.57
Unif. delay dl
25.5
20.9
25.9
20.9
2.6
14.7
21.9
17.8
21.6
5.7
Delay factor k
0.11
0.11
0.11
0.11
0.18
0.11
0.11
0.17
0.11
0.11
Increm. delay d2
0.5
0.0
1.4
0;0
0.8
0.0
0.6
0.9
0.4
0.0
PF factor
1.000
1.060
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay
25.9
21.0
27.3.
20.9
3.4
14.7
22.5
18.7
22.0
5.7
Lane group LOS
C
C
C
C
A
B
C
B
C
A
Apprch. delay
24.4
5.0
22.5
19.5
Approach LOS
C
A
C
B
Intersec. delay
14.3
Intersection LOS
B
HCS2000TM Copyright 0 2000 University of Florida, All Rights Reserved Version 4.1 d
I
11
I
11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SHORT REPORT
'Site
7Jijj6jM 1on
Analyst Intersection
Agency or Co. Endo Engineering
Date Performed 812012004 Jurisdiction
Time Period AM Peak Hour
Jefferson Street @ Avenue 54
Area Type All other areas
La Quinta
Analysis Year Year 2008 W1 Project
;Volume -ja- nd*-,,TimiA ,:In 5u-il,", -1'I
A=
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
1
0
1
2
1
1
2
0
2
2
Lane group
L
TR
L -
T
R
L
TP
L
T
R
Volume (v ph)
15
3
2
49
3
410
2
116
24
565
125
27
% Heavy veh
8
8
8
8
8
8
8-1
8
1 8-
8 1
8
8
P H F
1.00
1.00
1.00
1.00
1,00
1.00
1.00
1 1.00
1.00
'1-00 1
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
70-
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
-2.0
2.0
Arrival type
3
3
3
3
3
3
3
.3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking/Grade/Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking/hr
Bus stops/hr
0
0
0
0
0
0
1 0
0
0
0
Unit Extension
3.0
::30::]
3.0
3.0
3.0
3.0
1 3.0
3.0
3.0
3.0
Phasin
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08
G= 5.0
G= 10.0
G=
G=
G= 20.0 G=
9.0
G=
G=
Timing
Y= 4
Y= 4
Y=
Y=
IY= 4 Y=
4
Y=
Y=
Duration of Analysis (hrs) = 1.00
Cycle
Length C 60.0
Lane Group Capacwty Control - iG By,�and!LOS.Determination;y
,, r
4 q , Ao 4 r 7-
EB
WB
NB
S B
Adj. flow rate
15
5
49
3
410
2
140
565
125
27
Lane group cap.
139
276
139
557
1171
557
489
1081
501
797
v/c ratio
0.11
0.02
0.35
0.01
0.35
0.00
0.29
0.52
0.25
0.03
Green ratio
0.08
0.17
0.08
0.17.
0.78
0.33
0.15
0.33
0.15
0,53
Unif. delay dl
25.4
20.9
26.0
20.9
1,9
13.3
22.6
16.1
22.5
6.7
Delay factor k
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.13 10.11
0.11 1
Increm. delay d2
0.3
0.0
1.5
0.0
0.2
0.0
0.3
0.5 1
0,3.
0.0
PF factor
1.000
1.000
1.000
11.000
1.000
1.000
1,000
1.000 11.000
1.000
Control delay
25.8
20.9
27.5
20.9
2.1
13.4
23.0
16.6
22.8
6.7
Lane group LOS
C
C
C
C
A
B
C
B
C
A
Apprch. delay
24.6
4.9
22.8
17.3
Approach LOS
C
A
C
B
Intersec. delay
13.7
Intersection LOS
B
HCS2000TM Copyright Q 2000 University of Florida, All Rights Reserved Version 4. 1 d
iShort Report
Page 1 of 1
SHORT REPORT
Gene�al�lnformatioii "= ;�E`,,<:�.Y,,.., rs�= �"'•�° : #� � " °�""`
Site lnformafion.`'�;'�?�'�.. '�� 1T:, ,
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 812012004 Jurisdiction
Time Period PM Peak Hour
Jefferson Street @ Avenue 54
Area Type All other areas
La Quinta
Analysis Year Year 2008 W/ Project
Volume:andrTimui :ln ut- ,
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
1
1
0
1
2
1
1
2
0
2
2
1
Lane group
L
TR
L
T
R
L
TR
L
T
R
Volume (v ph)
19
6
3
45
6
763
0
235
50
685
243
8
% Heavy veh
8
8
8
8
8
8
8
8
8
8 1
8
8
P H F
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
1 3
3
3
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr
0
0
0
0
0
0
1 0
1 0 1
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
3.0
1 3.0
3.0
3.0
3.0
Phasing
Excl. Left
Thru & RT
03
04
Excl. Left
Thru & RT
07
08
Timing
G= 5.0
G= 10.0
G=
G=
G= 20.0 G=
9.0
G=
G=
Y= 4
Y= 4
Y=
Y=
Y= 4 Y=
4
Y=
Y=
Duration of Analysis hrs = 1.00
C
cle Len th C = 60.0
L e;G[oup Capacity, Control Delay, and•
LOS- Determinationy�m�`��- �.�,,�' '`' �'��`� ` ^''� `Y'�"
EB
WB
NB
SIB
Adj. flow rate
19
9
45
.6
763
0
285
685
243
8
Lane group cap.
139
279
139
557
1171
557
488
1081
501
797
v/c ratio
0.14
0.03
0.32
0.01
0.65
0.00
0.58
0.63
0.49
0.01
Green ratio
0.08
0.17
0.08
0.17
0.78
0.33
0.15
0.33 1
0.15
0.53
Unif. delay d1
25.5
20.9
25.9
20.9
2.9
13.3
23.8
16.9
23.4
6.6
Delay factor k
0.11
0.11
0.11
0.11
0.23
0.11
0.18
0.21
0.11
0.11
Increm. delay d2
0.5
0.0
1.4
0.0
1.3
0.0
1.8
1.2
0.7
0.0
PF factor
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
Control delay
25.9
21.0
27.3
20.9
4.2
13.3
25.6
18.1
24.1
6.6
Lane group LOS
C
C
C
C
A
B
C
B
C
A
Apprch. delay
24.4
5:6
25.6
19.6
Approach LOS
C
A
C
B
Intersec. delay
15.0
Intersection LOS
B
HCS2000TM Copyright m 2000 University of Florida, All Rights Reserved Version 4.1d
IShort Report
Page I of I
SHORT REPORT
Q n e ir a I I r o r m a fi 6 -n; i; --i
-
ae- Information-•.
Analyst
Agency or Co. Endo Engineering
Date Performed 812012004
Time Period AM Peak Hour
Intersection Madison Street @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 No Project
iv Old mi"i*nd,,Tiafi4�IhV6t,�-.-,"�'. a
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
0
2
1
0
1
0
1
0
1
0
0
0
Lane group
T
R
LT
L
R
Volume (v ph)
105
434
47
108
249
29.
% Heavy veh
8
8 1
8
8
8
8 1
1
PHF
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
Lane Width
12'0
12.0
12.0
12.0
12.0
Parking/Grade/Parking
N
0
N
N
0
N
N
0
N
N
N
Parking/hr
Bus stops/hr
0
1 0
0
1 0
1
0
Unit Extension
3.0
3.0
3.0
3-0
3-0
Phasing
EW Perm
02
03
04
NB Only
06
07
08
Timing
G= 16.0
G
G=
G
G= 36.0
G
G=
G
Y= 4
Y=
Y=
Y=
Y= 4
Y=
Y=
Y
Duration of Analysis hrs = 1.00
Cycle Length C = 60.0
,16hir
4- i n 40 - I - " 4i"t, w
EB
WB
NB
SB
Adj. flow rate
105
434
155
249
29
Lane group cap.
891
1495
418
1003
1495
v/c ratio
0.12
0.29
0.37
0.25
0.02
Green ratio
0.27
1.00
1
0.27
0.60
1
1.00
Unif. delay d1
16.7
0.0
17.9
5.6
0.0
Delay factor k
0.11
0.11
0.11
0.11
0.11
Increm. delay d2
0.1
0.1
0.6
0.1
0.0
PF factor
1.000
0.950
1.000
1.000
0.950
Control delay
16.7
0.1
18,5
5.8
0.0
Lane group LOS
B
- A
B
A
A
Apprch. delay
3.3
18.5
5.2
Approach LOS
A
B
A
lIntersec. delay
6.3
Intersection LOS
A
HCS200OTM Copyright 0 2000 University of Florida, All Rights Reserved Version 4. 1 d
IShort Report Page 1 of 1
1
1
1
SHORT REPORT
+e^..i -M ...,_..._ - �p,�..„y. `�_ t�, `H.:1:>`s� ..�..� - YY"'.+� --y'y '-�•
General.lnfomiat�on F- • _ ^r},, , ,
av=+sr.� -^ ;},i. -,r
Site Information y �`'� 7 °Z
Analyst Greg
Agency or Co. Endo Engineering
Date Performed 812012004
Time Period PM Peak Hour
Intersection Madison Street @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 No Project
1V60me anii3Timm aln ut.a . �..._ ..�_, ,�.r�r�"�s �•u.,�.� . #.�;.a�r
s. � *:, �;,."�n
Y- �;c-,�: =,� � _.f,.• ,.
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
0
2
1
0
1
0
1
0
1
0
0
0
Lane group
T
R
LT
L
R
Volume (v ph)
203
379
8
182
511
37
% Heavy veh
1
8
8
1 8
8
8
8
P H F
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
1
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
N
Parking /hr
Bus stops /hr
0
0
0
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
Phasing
EW Perm
02
03
04
NB
Only
06
07
08
Timing
G= 16.0
G=
G=
G=
G= 36.0
G=
G=
G=
Y= 4
Y=
Y=
Y=
Y= 4
Y=
Y=
Y=
Duration of Analysis hrs 1 00
t
C c e Len h C 60.0
Lan G oup Capac ty,fConttol Dela , and,LOS
D`etermination.,, wr ;`� .: 1a"�i
A
EB
WB
NB
S
Adj. flow rate
203
379
190
511
37
Lane group cap.
891
1495
463
1003
1495
v/c ratio
0.23
0.25
0.41
0.51
0.02
Green ratio
0.27
1.00
0.27
0.60
1.00
Unif. delay d1
17.2
0.0
18.1
6.9
0.0
Delay factor k
0.11
0.11
0.11
0.12
0.11
Increm. delay d2
0.1
0.1
0.6
0.4
0.0
PF factor
1.000
0.950
1.000
1.000
0.950
Control delay
17.3
0.1
18.7
7.4
0.0
Lane group LOS
B
A
B
A
A
Apprch. delay
6.1
18.7
6.9
Approach LOS
A
B
A
Intersec. delay
8.2
Intersection LOS
A
HCS2000TM Copyright 02000 University of Florida, All Rights Reserved Version 4.Id
IShort Report
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1�
I
I
Page I of 1
SHORT REPORT
VffiNnfoMailW,
Analyst
Agency or Co. Endo Engineering
Date Performed 812012004
Time Period AM Peak Hour
Intersection Madison Street @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 W1 Project
r-7 � - �'-" 5. - 77�z-
E B
WB
NB
SB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
0
2
1
0
1
0
1
0
1
0
0
0
Lane group
T
R
LT
L
R
Volume (v ph)
129
446
52
181
1
285
32
% Heavy veh
8
8
8
8
8
1
8
1
P H F
1.00
1.00
11.00.
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
1 3
1 3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N_
N
0
N
N
N
Parking/hr
I
Bus stops/hr
0
0
0
1' 0
0
Unit Extension
3.0
3.0
3.0
1 3.0
3.0
Phasing
EW Perm
02
03
04
NB Only
06
07
08
Timing
G= 19.0
G=
G=
G=
G= 33.0
G=
G=
G
Y= 4
Y=
Y=
Y=
Y= 4
Y=
Y=
Y=
Duration of Analysis hrs 1 00
Cycle Length C 60.0,
Control b e i "rCn iii S-A
EB
WB
NB
SB
Adj. flow rate
129
446
233
285
32
Lane group cap.
1059
1495
508
919
1495
v/c ratio
0.12
0.30
0.46
0.31
0.02
Green ratio
0.32
1.00
0.32
0.55
1.00
Unif. delay dl
14.6
0.0
16.4
7.3
0.0
Delay factor k
0.11
0.11
0.11
1 0.11
0.11
Increm. delay d2
0.1
0.1
0.7
0.2
0.0
PF factor
1.000
0.950
1.000
1.000
0.950
Control delay
14.6
0.1
17.0
7.5
0.0
Lane group LOS
B
A
B
A
A
Apprch. delay
3.4
17.0
6.8
Approach LOS
A
B
A
Intersec. delay
7.2
Intersection LOS
A
HCS2000TM Copyright 02000 University of Florida, All Rights Reserved Version 4.1d
IShort Report Page 1 of 1
1
1
1
SHORT REPORT
Genera'lilnformation x =, �, _ .- .r" �`"'� 2
. � r �
.Site Information � `
Analyst Greg
Agency or Co. Endo Engineering
Date Performed 812012004
Time Period PM Peak Hour
Intersection Madison Street @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 W/ Project
'Wium ndJirnir in ut " -;
., ;,," '31 =:,
EB
WB
NB
SB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
0
2'
1
0
1
0
1
0
1
0
0
0
Lane group
T
R
LT
L
R
Volume (v ph)
283
419
13
229
534
43
% Heavy veh
8
8.
8
8 1
8
8
P H F
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
3.0
P.ed /Bike /RTOR Volume
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
N
Parking /hr
Bus stops /hr
0
0
0
0
0
Unit Extension
3.0
3.0
3.0
3.0
3.0
Phasing
EW Perm
02
03
04
NB
Only
06
07
08
Timing
G= 17.0
G=
G=
G=
G= 35.0
G=
G=
G=
Y= 4
Y=
Y=
Y=
Y= 4
Y=
Y=
Y=
Duration of Analysis hrs 1.00
Cycle Length C 60.0
Lane G.roup.Capacity, Control Delay,,andLO$ D °etermination. �,. _ s ; x - , :Y t, +µY �a `�'� .�
EB
WB
NB
SB
Adj. flow rate
283
419
242
534
43
Lane group cap.
947
1495
487
975
1495
v/c ratio
0.30
0.28
0.50
0.55
0.03
Green ratio
0.28
1.00
0.28
0.58
1.00
Unif. delay d1
16.8
0.0
17.9
7.7
0.0
Delay factor k
0.11
0.11
0.11
0.15
0.11
Increm. delay d2
0.2
0.1
0.8
0.7
0.0
PF factor
1.000
0.950
11.000
11.000
0.950
Control delay
17.0
0.1
18.7
8.3
0.0
Lane group LOS
B
A
B
A
A
Apprch. delay
6.9
18.7
7.7
Approach LOS
A
B
A
Intersec. delay
9.1
Intersection LOS
A
HCS2000TMt . Copyright 0 2000 University of Florida, All Rights Reserved Version 4.1d
IShort Report
1
1
1
1
Page 1 of 1
SHORT REPORT
Generalrinformafio ,r ' �t; -
Site Information'"
Analyst Greg Intersection
Agency or Co. Endo Engineering
Date Performed 812412004
Time Period AM Peak Hour
Monroe St. @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 No Project
in In u iVloure andTim
'
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
0
1
0
0
1
0
0
1
0
0
1
0
Lane group
LTR
LTR
LTR
LTR
Volume (v ph)
19
110
12
12
124
41
3
119
15
49
174
30
% Heavy veh
8
8
8
8
8
8
8
8
8
8
8
8
PHF
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2,0
Ext. eff. green
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr
0
0
0
0
Unit Extension
3.0
3.0
3.0
3.0
Phasing
EW Perm
02
03
04
NS Perm
06
07
08
Timing
G= 23.0
G=
G= I
G=
G= 29.0 G=
G=
G=
Y= 4
Y=
Y= I
Y= IY=
4 Y=
Y =.
Y=
Duration of Analysis hrs = 1.00
Cycle
Length C = 60.0
F:. "'Mfa� -�. -+.r
Lane�Gro : Ca : acit
yRSw ♦ +..7 _..a T ;.� Fl ,t"F`
,.Control Dela ,; and,LOS Determination ;r �, r.� -145; .;
EB
WB
NB
SB
Adj. flow rate
141
177
137
253
Lane group cap.
639
642
834
779
v/c ratio
0.22
0.28
0.16
0.32
Green ratio
0.38
0.38
0.48
0.48
Unif. delay dl
12.5
12.8
8.7
9,5
Delay factor k
0.11
0.11
0.11
0.11
Increm. delay d2
0.2
0.2
0.1
0.2
PF factor
1.000
1.000
1.000
1.000
Control delay
12.6
13.0
8.8
9.7
Lane group LOS
B
B
A
A
Apprch. delay
12.6
13.0
8.8
9,7
Approach LOS
B
B
A
A
Intersec. delay
10.9
Intersection LOS
B
HCS2000 M Copyright 02000 University of Florida, All Rights Reserved Version 4.Id
Short Report
Page 1 of 1
SHORT REPORT
,pn4'r ^.¢.^ -L`$ +-xv `Wr"�deF��'d ^�'i.3 F ice" (¢'+r'`° uM r•` 4'y
Gene_ra�.zlnformation,Y,-,,�,�^ . �,��*�'����
••.r•}Q'�'Bi! .5fs6'STi°' �" A A -r "h:
Site�lnformation� *�����t'
Analyst Intersection
Agency or Co. Endo Engineering
Date Performed 812412004
Time Period PM Peak Hour
Monroe St. @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 No Project
EB
WB
NB
SB
LT
TH
RT
LT
TH
RT
LT.
TH
RT
LT
TH
RT
Num. of Lanes
0
1
0
0
1
0
0
1
0
. 0
1
0
Lane group
LTR
LTR
LTR
LTR
Volume (v ph)
22
214
3
19
178
97
8
334
14
139
234
28
% Heavy veh
8
8
8
8
8
8
8
8
8
8
8
8
P H F
1.00
11.00
11.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 11.00
1.00
Actuated (P/A)
-A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
Unit Extension .
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0 1
0
0 1
0
0
Lane Width
12.0
1
12.0
1
12.0
12.0
Parking /Grade /Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr
0
0
0
0
Unit Extension.
3.0
3.0
3.0
3.0
Phasing
EW Perm
02
03
04
NS Perm
06
07
08
Timing
G= 20.0
G=
G=
G=
G= 32.0
G=
G=
G=
Y= 4
Y=
Y=
Y=
Y= 4
Y=
Y=
Y=
Duration of Analysis hrs = 1.00
Cycle Len th C'-- 60.0
�� na e�G,ro �Ca acit
�. ntr�o
D" le a�_ FandLO�SDetermination��`�����,�
EB
WB
NB
SB
Adj. flow rate
239
294
356
1401
Lane group cap.
561
546
926
725
v/c ratio
0.43
0.54
0.38
0.55
Green ratio
0.33
0.33
0.53
0.53
Unif. delay d1
15:5
16.3
8.2
9.3
Delay factor k
0.11
0.14
0.11
0.15
Increm. delay d2
0.5
1.1
0.3
0.9
PF factor
1.000
1.000
1.000
1.000
Control delay
16.1
17.3
8.5
10.2
Lane group LOS
B
B
A
B
Apprch. delay
16.1
17.3
8.5
10.2
Approach LOS
B
B
A
B
Intersec. delay
12.4
Intersection LOS
B
HCS2000TM Copyright 02000 University of Florida, All Rights Reserved Version 4.1d
IShort Report
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i1
I
I
Page I of 1
SHO RT RE PORT
nera rmtmonl.,
I rn ionf,
Site .77 7 571 --k
Analyst Intersection
Agency or Co. Endo Engineering
Date Performed 812412004
Time Period AM Peak Hour
Monroe St. @ Avenue 54
Area Type All other areas
Jurisdiction La Quinta
Analysis Year Year 2008 W1 Project
Vq- lum-ei-a-nd °ti&-66 -11ii'lliu*11 1 yk
EB
WB
NB
SIB
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
0
1
0
0
1
0
0
1
0
0
1
0
Lane group
L TR
L TR
L TR
LTR
Volume (v ph)
52
118
12
12
126
4 J1
3
119
15
49
174
42
% Heavy veh
8
8
8
8
8
8
8
8
8
8
8
8
PHF
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
.1.00
- A
A
A
A
A
Startup lost time
2.0
2.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
2.0
Arrival type
3
3
3
3
Unit Extension
3.0
3.0
3.0
3.0
Ped/Bike/RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
1
12.0
112.0
Parking/Grade/Parking
N
0
N
N
0
N
N
0
N
N
0
N
Parking/hr
Bus stops/hr
0
0
0
0
Unit Extension
0
3.0
3.0
Phasing
EW Perm
02
03
04
NS Perm
06
07
08
Timing
G= 25.0
G=
G=
G=
G= 27.0
G=
G=
G=
Y= 4
Y=
Y=
Y=
Y= 4
Y=
Y=
Y=
Duration of Anal ys� hr s = 1.00
Cycle Length C = 60.0
bltroFDela ,46d WE 68-beem inAt on
EB
WB
NB
SIB
Adj. flow rate
182
' 82
179
137
265
Lane group cap.
645
645
697
776
723
v/c ratio
0. 28
0.28
0.26
0.18
0.37
Green ratio
0.42
1
0.42
0.45
10.45
Unif. delay dl
11.6
11.4
9.9
110.9
Delay factor k
10.11
0.11
0.11
10.11
Increm. delay d2
0.2
0.2
0.1
0.3
PF factor
1.000
1.000
1.000
1.000
Control delay
11.8
11.6
10.0
11.2
Lane group LOS
B
B
A
B
Apprch. delay
11.8
11.6
10.0
11.2
Approach LOS
B
B
A
B
Intersec. delay
11.2
Intersection LOS
B
HCS2000TM Copyright @2000 University of Florida, All Rights Reserved Version 4.1d
Short Report
Page 1 of 1
Unit Extension
■�§
SHORT REPORT
3.0
3.0
w � �..�,r .y r
Genecaflln ' formation_
Site`Information
Analyst
Agency or Co.
Date Performed
Time Period
Endo Engineering
812412004
PM Peak Hour
3.0
Intersection
Area Type
Jurisdiction
Analysis Year
Monroe St. @ Avenue 54
All other areas
La Quinta
Year 2008 W / Project
0
Volume±and'Ti.min
'•In utw
0
0
0
E
W
NB
0
S
LT
TH
RT
LT
TH
RT
LT
TH
RT
LT
TH
RT
Num. of Lanes
■MMI
0
1
0
0
1
0
0
1
0
0
1
0
Lane group
LTR
LTR
LTR
LTR
Volume (v ph)
44
220
3
19
187
97
8
334
14
139
234
65
% Heavy veh
8
8
8
8
8
8
8
8
8
8
8
8
P H F
1.00
11.00
1.00
1.00
11.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Actuated (P/A)
A
A
A
A
A
A
A
A
A
A
A
A
Startup lost time
2.0
2.0
12.0
2.0
2.0
Ext. eff. green
2.0
2.0
2.0
Arrival type
3
1
3
3
3
Unit Extension
■�§
3.0
3.0
3.0
3.0
Ped /Bike /RTOR Volume
0
0
0
0
0
0
0
0
0
0
0
0
Lane Width
12.0
12.0
12.0
12.0
Parking /Grade /Parking
■MMI
N
0
N
N
0
N
N
0
N
N
0
N
Parking /hr
Bus stops /hr 0
Unit Extension 3.0
Phasing EW Perm 02 03
Timing
G= 20.0 G= G=
Y= 4 Y= Y=
Duration of Analvsis (hrs) = 1.00
Adj. flow rate
Lane group cap.
v/c ratio
Green ratio
Unif. delay d1
Delay factor k
Increm. delay d2
PF factor
Control delay
Lane group LOS
Apprch. delay
Approach LOS
Intersec. delay
Im
'®
In
Im
10
Im
Im
I n
I�
10
WB
303
546
0.55
0.33
16.4
0.15
1.3
1.000
17.6
B
17.6
B
lCycle Le
etermination`
NB
356
925
0.38
0.53
8.2
0.11
0.3
1.000
8.5
A
8.5
A
Intersection LOS
■
■�§
■
■MMI
■
■
HCS2000 " " C:opynght m 2000 University of Florida, All Rights Reserved Version 4.Id
Appendix C
TRAFFIC SIGNAL WARRANTS
2003 Edition
Figure 4C -3. Warrant 3, Peak Hour
2 OR MORE LANES & 1 LANE
■ ■ ■� ■ o a r._ ■
' „ ■ ■ ■ ■ ■ ■■� ■►� =ate
■■ ■■ ■■■ ■■■ ■ ■■■
Page 4C -7
`150
'100
- - -- ivvv I vv icvv i.wv i-rvv 1avv IvvV 1 /Vv 18VV
MAJOR STREET —TOTAL OF BOTH APPROACHES-
VEHICLES PER HOUR •(VPH)
'Note: 150 vph applies as the lower threshold volume for a minor - street
approach with two or more lanes and 100 vph applies as the lower
threshold volume for a minor - street approach with one lane.
Figure 4C -4. Warrant 3, Peak Hour (70% Factor)
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 70 km /h OR ABOVE 40 mph ON MAJOR STREET)
a
U 400
wO
w¢
W a 300 .
U)Q
a:w
Z �
200
_ J
100
W
2
C7
2
2 OR MORE LANES & 2 OR MORE LANES —
2 OR MORE LANES & 1 LANE
/1 LANE & 1 LANE
*100
'75
300 400 500 600 700 800 900 1000 1100 1200 1300
MAJOR STREET —TOTAL OF BOTH APPROACHES
VEHICLES PER HOUR (VPH)
`Note: 100 vph applies as the lower threshold volume for a.minor- street
approach with two or more lanes and 75 vph applies as the lower
threshold volume for a minor- street approach with one lane.
November 2003 Sect. 4C.06
Peak Hour Volume Warrant
Intersection:. Jefferson Street @ Avenue 54
Major Approach: 2+ Lanes Minor Approach: 2.+ Lanes Rural Warrants
Approach
AM Pk Hr
Existing
2008
Ambient
2008+
Project
PM Pk Hr,
Existing
2008
Ambient
2008+
Project
Northbound
122
142
142
246
285
285
Southbound
506
681
717
625
817
936
Westbound
251
354
463
526
743
813
Meets 1 -Hr. Warrant
I No
Yes
Yes
Yes
Yes
Yes
Intersection: Madison Street @ Avenue 54
Major Approach: 2+ Lanes Minor Approach: 2+ Lanes Rural Warrants
Approach
AM Pk Hr
Existing
2008
Ambient
2008+
Project
PM Pk Hr
Existing
2008
Ambient
2008+
Project
Eastbound
382
539
575
412
582
702
Westbound
110
156
234
134
1.90
242
Northbound
197
278
317
388.
548
577
Meets 1 -Hr. Warrant
No
Yes
Yes
Yes
Yes
Yes
Intersection: Monroe Street @ Avenue 54
Major Approach: 1 Lane Minor Approach: 1 Lane Rural Warrants
Approach
AM Pk Hr
Existing
20.08
Ambient
•2008+
Project
PM Pk Hr
Existing
2008
Ambient
2008+
Project
Northbound
97
137
137
252
356
356
Southbound
180
254
265
284
401
438
Westbound
125.
176
179
209
295
304
Meets 1 -Hr. Warrant
No
No
No
Yes
Yes
Yes
Intersection: Madison Street @ Avenue 58
Major Approach: 2+ Lanes Minor Approach: 2+ Lanes ^ Rural Warrants
Approach
AM Pk Hr
Existing
2008
Ambient
2008+
Project
PM Pk Hr
Existing
2008
Ambient
2008+
Project
Northbound
29
41
43
146
206
215
Southbound
161
227
235
142
200
206
Westbound
67
95
95
75
106
106
Meets 1 -Hr. Warrant
No
No
No
No
No
No
Page 1
Peak Hour Volume Warrant
Intersection: West Site Access @ . Avenue 54
Major Approach: 1 Lane Minor Approach: 1 Lane Rural Warrants
Approach
AM Pk Hr
Existing
2008
Ambient
2008+
Project
PM Pk Hr
Existing
2008
Ambient
2008+
Project
Eastbound
100
141
168
170
239
325
Westbound
112
158
210
152
214
261
Northbound
1 0
0
42
0
0
27
Meets 1 -Hr. Warrant
No
No
No
No
No
No
.Intersection: East Site Access @ Avenue 54
Major. Approach: 1 Lane Minor Approach: 1 Lane Rural Warrants
Approach
AM Pk Hr
Existing
2008
Ambient
2008+
Project
PM Pk Hr
Existing
2008
Ambient
2008+ .
Project
Eastbound
100
.141
171
170
239
301
Westbound
112
158
172
152
214
260
Northbound
0
0
75
0
0
49
Meets 1 -Hr. Warrant
No
No
No
No
No
No
Intersection: Main Site Access @ Madison Street
Major Approach: 2+ Lanes Minor Approach: 1 Lane Rural Warrants
Approach
AM Pk Hr
Existing
2008
Ambient
2008+
Project
PM Pk Hr
Existing
2008
Ambient
2008+
Project
Northbound
166
234
239
388
111
158
Southbound
319
451
467
215
93
141
East/Westbound
1.1
15
50
14
19
32
Meets 1 -Hr. Warrant
No
No
No
No
No'
No
Page 2
Appendix D
TRAFFIC GLOSSARY
Appendix D - Traffic Glossary
AASHTO -- American Association of State Highway and Transportation Officials.
Access point -- An intersection, driveway, or opening on the right -hand side of a
roadway. An entry on the opposite side of a roadway or a median opening also can be
' considered as an access point if it is expected to influence traffic flow. significantly in the
direction of interest.
All -way stop controlled -- An intersection with stop signs at all approaches: The
' driver's decision to proceed is based on the rules of the road (e.g., the driver on the right
has the right -of -way) and also on the traffic conditions of the other approaches.
Annual Average Daily Traffic (AADT) -- The total volume passing a point or
segment of a highway facility in both directions for one year divided by the number of days
in the year.
' Average Daily Traffic (ADT) - The total volume passing a point or segment 'of a
highway facility in both directions on an average day during a specified interval (which can
be the peak month or weekdays etc.).
Approach'-- A set of lanes accommodating all left -turn, through, and right -turn
movements arriving at an intersection from a given direction.
Arterial -- Signalized streets that serve primarily through traffic and provide access to
abutting properties as a secondary function, having signal spacing of 2 miles or less and
' turn movements at intersections that usually do not exceed 20 percent of total traffic.
Average approach delay -- Average stopped -time delay at a signalized intersection
plus average time lost because of deceleration to and acceleration from a stop, generally
estimated as 1.3 times the average stopped time delay.
Average control delay -- the total time vehicles are stopped in an intersection approach
' during a specified time interval divided by the volume departing from the approach during
the same time period. It does not include queue follow -up time (i.e. the time required for
the vehicle to travel from the last -in -queue position to the first -in -queue position).
' Average stopped -time delay -- The total time vehicles are stopped in an intersection
approach or lane group during a specified time interval divided by the volume departing
from the approach or lane group during the same time period, in seconds per vehicle.
' Average total delay -- The total additional travel time experienced by drivers,
passengers, or pedestrians as a result of control measures and. interaction with other users
of the facility divided by the volume departing from the corresponding cross section of the
facility.
AWSC intersection -- an all -way stop - controlled intersection (which can be a three-
' way stop if the intersection has only three legs or a four -way stop if 'the intersection has
four legs).
' Bike lane -- A portion of a roadway that has been designated by striping, signing, and.
pavement markings for the preferential or exclusive use of bicycles.
Bike path -- A bikeway physically separated from motorized traffic by an open space or
' barrier, either within the highway right -of -way or within an. independent right -of -way.
' Bikeway -- Any road, path, or way that in some manner is specifically designated as
being open to bicycle travel, regardless of whether such facilities are designated for the
exclusive use of bicyclists or are to be shared with other vehicles.
' Capacity -- The maximum rate of flow at which persons or vehicles can be reasonable
expected to traverse a point or uniform segment of a lane or roadway .during a specified
time period under prevailing roadway, traffic, and control conditions, usually expressed as
' vehicles per hour or persons per hour.
Clearance lost time -- The minimum possible time interval between the departure of one
' bus from a bus berth and the entrance of another.
Clearance time -- The time, in seconds, between signal phases during which an
■ intersection is not used by any traffic.
Conflicting approach -- The approach at approximately 90 degrees to the subject
approach at an all -way stop - controlled (AWSC) intersection.
Conflicting traffic volume -- The volume of traffic that conflicts with a specific . .
movement at an unsignalized intersection.
Control delay -- The component of delay that results when a control signal causes a lane
group to reduce speed or to stop; it is measured by comparison with the uncontrolled
condition.
CMP -- Congestion Management Program, designed to ensure that a balanced
transportation system is developed which relates population growth, traffic growth and
land use decisions to transportation system level of service performance standards to help
reduce traffic congestion and improve air quality.
Constrained operation -- An operating conditions in a weaving area in which, because
of geometric constraints, weaving vehicles are unable to occupy as large a portion of
available lanes as required to achieve balanced operation.
' Critical gap -- The minimum time interval between vehicles in a major traffic stream that
permits side - street vehicles in a stop - controlled approach to enter the intersection under
prevailing traffic and roadway conditions, in seconds.
Critical lane group -- The lane groups that have the highest flow ratio for a given signal
phase.
' Critical volume -to- capacity ratio -- The proportion of available intersection capacity
used by vehicles in critical lane groups.
' Cycle -- Any complete sequence of signal indications.
Cycle length -- The total time for a signal to complete one cycle.
Deceleration lane -- A paved auxiliary lane, including tapered areas, allowing vehicles
leaving the through- traffic lane of the roadway to decelerate.
' Delay -- Additional travel time experienced by a driver, passenger, or pedestrian beyond
what would reasonably be desired for a given trip.
Demand volume -- The traffic volume expected to desire service past a point or segment
' of the highway system at some future time, or the traffic currently arriving or desiring
service past such a point, usually expressed as vehicles per hour.
' Effective green time -- The time allocated for. a given traffic movement (green plus
yellow) at a signalized intersection less the start-up and clearance lost times for the
movement.
Exclusive turn lane -- A designated left- or right -turn lane or lanes used only by
vehicles making those turns.
Expressway -- An arterial which increases vehicular capacity by reducing at -grade access
and increased signal spacing.
Flared approach -- A shared right -turn lane that allows right- turning vehicles to
complete their movement while other vehicles are occupying the lane.
FHWA -- Federal Highway Administration.
Free flow speed -- (1) The theoretical speed of traffic when density is zero, that is,
when no vehicles are present; (2) the average speed of vehicles over an arterial segment.not
close to signalized intersections under conditions of low volume.
Gap. acceptance -- The process by which a minor - street vehicle accepts an available gap
to maneuver.
Green time -- The actual length of the green. indication for a given movement at a
signalized intersection.
HCM -- Highway Capacity Manual.
HCS -- Highway Capacity Software implementing the Highway Capacity Manual
' procedures.
Ideal conditions -- Characteristics for a given type of facility that are assumed to be the
' best possible from the point of view of capacity, that is, characteristics that if further
improved would not result increased capacity.
' Intersection delay -. The total additional travel time experienced by drivers,
passengers, or pedestrians as a result of control measures and interaction with other users
of the facility, divided by the volume departing from the corresponding cross section of the
facility.
ITE -- Institute of Transportation Engineers.
' Level of service (LOS) -- A .qualitative measure describing operational conditions
within a traffic stream, generally described in terms of such factors as speed and travel
time, freedom to maneuver, traffic interruptions, comfort and convenience, and safety.
' Lost time -- Time during which the intersection is not effectively used by any movement;
clearance lost time plus start-up lost time.
' Major street -- The street. not controlled by. stop signs at a two -way stop - controlled
intersection.
r
Maximum service flow rate -- The highest 15- minute rate of flow that can be
' accommodated on a highway facility under ideal conditions while maintaining the operating
characteristics for a stated level of service, expressed as passenger cars per hour per lane.
Minor street -- The street controlled by stop signs at a two -way stop - controlled
intersection; also referred to as a side street.
Passenger car equivalent -- The number of passenger cars that are displaced by a
' single heavy vehicle of a particular type under prevailing roadway, traffic, and control
conditions.
' Peak hour -- The hour during which the greatest number of vehicles are traveling on a.
given facility.
Peak hour factor -= The hourly volume during the maximum volume hour of the day
divided by the peak 15- minute rate of flow within the peak hour; a measure of traffic
demand fluctuation within the peak hour.
Performance measure -- A quantitative or qualitative characteristic describing the
quality of service provided by a transportation facility or service.
' Permitted plus protected -- Compound left -turn protection that displays the :permitted
phase before the protected phase.
Permitted turns -- Left or right turns at a signalized intersection that are made against an
' opposing or conflicting vehicular or pedestrian flow.
Phase -- The part of a signal cycle allocated to any combination of traffic 'movements
' receiving the right -of -way simultaneously during one or more intervals.
Planning analysis -- A use of capacity analysis procedures to estimate the number of
lanes required by a facility in order to provide for a specified level of service based on
' approximate and general planning data in the early stages of project development..
Platoon -- A group of vehicles or pedestrians traveling together as a group, either
voluntarily or involuntarily because of signal control, geometrics, or other factors.
Protected turns -- Left or right turns at a signalized intersection made with no opposing
or conflicting vehicular or pedestrian flow.
Queue -- A line of vehicles or persons waiting to be served by the system in which the
rate of low from the front of the queue determines the average speed within the queue.
' Slowly moving vehicles or people joining the rear of the queue are usually considered a
part of the queue. The internal queue dynamics . may involve a series of starts and stops. A
faster - moving line of vehicles is often referred to as a moving queue or a platoon.
' RTIP -- Regional Transportation Improvement Program is a list of transportation projects,
their costs and projected funding sources, and their anticipated date of completion.
RTP -- Regional Transportation Plan is a plan adopted for the region's transit, highways,
bicycle programs, commuter and inter -city rail lines.
' Shared lane capacity -- The capacity of a lane at an unsignalize.d intersection that is
shared by two or. three movements, in passenger cars per hour.-
' TCM -- Transportation Control Measures.
r�
TDM -- Transportation Demand Management is a program designed to decrease the
demand for peak hour commute and truck travel and increase the use of alternative
transportation modes.
Traffic Impact Study. A Congestion Management Program (TIS) analysis is
required for all large projects.
OTotal delay -- The sum of all components of delay for any lane group, including control
delay, traffic delay, geometric delay, and incident delay.
' Trip -end -- one end of a trip at either the origin or the destination; i.e. each trip has two
trip -ends.
TSM -- Transportation Systems Management is a program to facilitate low cost traffic
' flow improvements like coordinating traffic signals, metering freeway ramps and incident
management.
' Travel speed -- The average speed, in miles per hour, of a traffic stream computed as the
length of a highway segment divided by the average travel time of the vehicles traversing
the segment.
Travel time -- The average time spent by vehicles traversing a highway segment,
including control delay, in seconds per vehicle or minutes per vehicle.
Two -way left -turn lane (TWLTL) -- The center lane on a three -lane or multi -lane
highway that is used continuously for vehicles turning left in either direction of flow at
mid -block locations.
1 Two -way stop - controlled -- The type of traffic control at an intersection where drivers
on the minor street or a driver turning left from the major street wait for a gap in the major-
street traffic to complete a maneuver.
Unconstrained operation -- An operating conditions in a weaving area where
' geometric constraints do not limit the.ability of weaving vehicles to achieve balanced
operation.
Unsignalized intersection -- Any intersection not controlled by traffic signals.
' V/C ratio -- The ratio of demand flow rate to capacity for a traffic facility.
' Volume -- The number of persons or vehicles passing a point on a lane, roadway,,
sidewalk etc. during some time interval, often taken to be one hour, expressed in vehicles.
VMT -- Vehicle miles traveled.
t