Loading...
9909-111 (BLCK)LICENSED CONTRACTOR DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License #Lic. Class Exp. Date ?322.32 H ID2/28i"lit t� V ate `' ' �" / Signature of Contractor �a OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business ,& -Professionals Code). () I am exempt under Section B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: () I have and will maintain a certificate of consent to self -insure for workers' compensation, As provided for -by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. (y) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carver qy•yy / (y ry ` Policy No. y 1.4V :'V'of ,�j.7-i.F-S �S .E^Sey1' WV�,�W�r"� ��P aJ-f'�.1.Y➢ (Thissection need not be completed if the.permit valuation is for $100.00 or less): ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workerp'6ompensation laws of California, and agree that if I should become subject' to the workers' compensation provisions ofSection 3700 -of: the Labor C de, I shall forthwith comply with th se rovisior� j �te: L!, •'QgApplicantIF -. Warning: Failure to secure Workers' Compensation coverage is unla ul and shall subject an employer to criminal penalties and civil fines up to $100,000, in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application.. 1. Each, person upon whose behalf this application is made & each person at whose request and for whose benefit work is.performed under or pursuant to any permit issued as a result of this applicaton agrees to, & shall, indemnify & hold harmless the City of La Quinta, its officers, agents and employees. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation.. I certify that I have read this application and state that the above information is correct. I agree to comply with all City, and State laws relating to the building construction, and hereby authorize representatives of this City to enter upon ee above-mentioned property for inspection rirposes. r �+ rSignature (Owner/Agent)l_ •.� Date BUILDING PERMIT PERMIT# , DATE.rr/11 eVALUATION ep,�k•�p LOT TRACT. JOB SITE ADDRESS 56-007 WINGED YO APN •%I.ri �r�>�P-'��l�I OWNER CONTRACTOR/DESIGNER/ENGINEER if . +au 1',,R.E 1` 110 IIS SAIN ` EGO, „N11^. of a.sa. ata aa� 12805 }OWE DEL IMAR, SUME 200 M55110I TF, 33.UL MAR, S1.1.rTE 2W) CA. 91,014-380 OR.L MAR CA 92014-X' flw' d X3 -R"_ fr'13t.K 5350 USE OF PERMIT 14 - 1. e.i.—U.1..i�li�li y 70 am °!". 6 ENGJMSk .�'"'fE RE1"rt:iN-040- NVALL LL ti �' iU..:e W 1'e Y• t d' d . . Gtl �1L tY ° n1 Ar-�rK....0^aAtrEnr .!r CA•e a.�P.g+g EE SBWWWARY C 0N:KVRUC:'1'1C: N Fre101.-069-411,-4JOO $4 101 SUR 1, CONSTR UCT10. N ANYD Y1 A7W i¢'1�agCt:�K �L . yg _ LESS' .tma�.,',F-1I.A�. D FY P «4Z P�i 11nF r.- 2's;3T.AO_, 69RMIT 1+`EWS OUNNOW RECEIPT I DATE I BY / -" I DATE FINALED I INSPECTOR A .1..P oV . SOAX) INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wali Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final Final POOLS - SPAS BLOCKWALL APPROVALS Steel Set Backs Electric Bond Footings t / Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste Lines Heater Final Water Piping Plumbing Final Plumbing Top Out Equipment Enclosure Shower Pans O.K. for Finish Plaster Sewer Lateral Pool Cover Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final COMMENTS: Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) fia CITY OF - LA QUANTA _ -- BUILD & SAFET`�:DEPT. �. 6U Client. MDS Consulting ' I FOR CONSTRUCTION (760) 771-4012. s gY .� a DATE t . Project: Brookfield Homes,, ° Retaining Wall Design-$- Address: Lot 1, Tact 207219 Winged Foot at PGA West Job: 99-142 } Date: 25 May 1999. „ At. •,n ¢,n �[ �{ -,may" "�. �• ' STRUCTURAL AND CIVIL ENGINEERIN r, DENISE R. POELTLER, IN f 73-t661Highway,1:11 • Suite G • Palm rt, California 922.60 UTEL'. (760).;779-0405 • . FAX (760) 9-1317 � � I am_Palm Desert Califomia 92260 PREPARED FOR: - -' --�--r-'---,-----'--------�---'- --� -- -- - ' '- ------- ---- '---'--- - ----' -'-- --- | | lo sool Lj . _---__~_---_�^_-^_�-_�_-~` -_- . 6-3008 UU1131 RUL I n nrn e-rnrD 9 04' I 1 1 1' 1 �ll�l/ZCf bufl`ned� BY DRP .DATE JOB _ �iLODI�(') Pi(�O NOHCS # 41 9 14Z ' 73.661 Highway 111 • Suite G CKD DATE pG. 3 Palm Desert, California 92260 , (760) 779-0405 0 FAX(760)779-1317 O,F �11 Masonry .Notes 1 All masonry units shall conform to ASTM'C-90'. Grade "N" Medium Weight. ' 2. Grout shall conform to,ASTM C-476 and have a minimum compressive strength of 2500 PSI at 28 days. 3. Portland cement shall.conform to ASTM C-150. ' 4. Masonry units shall,have a rninimum"com ressive strength of 150 P gt 0 PSI. 5. Reinforcing steel shall conform to ASTM A615; Grade 60, and shall be lapped ' 48 bar diameters at splices. 6. Cells containing reinforcement shall be filled solid with grout in fifts not to ' exceed 4 feet. Vertical bars shall be held in place to maintain clearance from masonry during grouting. All debris, and mortar tailings shall be cleaned out before grouting. ' 7. All corner cells shall be grouted solid with one #5 bar full height. 8. Control joints in all masonry walls shall not exceed 25'-0" center to center unless noted on drawings. Concrete Notes 1. Minimum concrete compressive strength at 28 days = 2500 PSI. 2. All load bearing_ footings shall be a minimum of one foot (1'-0"),below ' natural grade. 3. Contractor shall inform the engineer ofany discrepancies, omissions or ' errors on the details before the start of construction. 4. The Engineer assumes no responsibility for construction supervision or deviation from these plans without prior written approval. ' 5. All reinforcing bars shall conform to ASTM A615, Grade 60. Lap a minimum of 40 diameters at splices. .6. All construction shall comply with the latest edition of the UBC as amended by` the local agency having jurisdiction. 7. Do not scale drawings. Written dimensions on drawings _shall take precedence over scaled dimensions. 8. Any engineering design.provided by others must be submitted for review and shall bear the stamp and signature of a registered engineer. 9. If expansive soils or groundwater is encountered on the job site the soils engineer shall be notified immediately. I _' s . 33 14, By D" DATE JOB LOT 'rjz', Z8-138 # C19 -142 73.661 Highway,l I 1 0 jSuite G -CKD DATE PG.� Palm Desert,' Califomia 92260 (760)779-0405 0' FAX (7W)7i921;l7 PREPARED FOR: E14 C41 L), W AL. F T& tD j G1 p A t pRopo 0 Z.� f4 -0�0 -P'e 00 _' s . 33 14, 'IL I i buffise�� BY Me DATE !6/111 JOB u1- # 73.661 Highway 111 • Suite G CKD DATE PG Palm Desert, California 92260 _ -- (760) 779-0405 • FAX (760) 779-1317 OF 1 PREPARED FOR: SOI. I c).. &IzoU - ---I - - -- -- -\0 _.. IK�` - - : FIN:&4zD. _ t O O - t rF 15 . Io : W P: Nflll 6S r : , ------- --- , I E I I BY P DATE I JOB _ WZkI (, # 9q -1+2- 73-661 Highway 111 0 Suite G CKDPG DATE _....._ _ _ _ _._ . �D 1-- _— . Palm Desert, California 92260 - - • (760) 779-0405 0 FAX (760) 779-113117 OF 2(_ PREPARED FOR: .. ...... ._.:. _ .. _.- - . asN :. C"447!- fe ---�---, — ,. -- iE —2'3/4,x---•--------.-------- -. - �-fix -- - .. -=-- - — -- - —-----�.�,- --, til � q�' � -p,C. �'f»rff'•' ---- ,— a0 F6* WW; I lal✓E5 cid' ` ��e ii�,G; CTYi<�--- -- 3'-r.77 u- 1 1 i i l 1 �;f- IWO i t I I s 3 i BY Qa ;DATE JOB # 73.661 Highway 111 • Suite GCKD DATE PG ' ; Palm Oeserf; California 92260- _ (760) 779-0405 • FAX (760) 779-1317 OF PREPARED FOR: �j'OLIG_ . �KOU T I � i i y� 70 4 W? QK Poo FI N C, i -- - X -- 7%F- WW I�oi.�S 4f' Ko1'o,G'• : i i : J i : i 1 -- - ----- - _ .- - - - - - . - --- - - _ I t � i i flZ��l�j6/L� buffy-e�� BY0$1DATE 11 JOB -1.01 1. -T2. 25736!-- 1 73.661 Highway 111 • Suite G CKD DATEU 11 IJ&.60_ (COOf ! ` " P_G' Palm Desert, Califomia 92260 ; (760) 779-0405 0 FAX '760) 779=1317 OF 1 ' PREPARED FOR: -- y- i I i I a F.h _ .j�foP 2 i2 FIFT ri Tf,475.! O --- ...----- I ' a 1 : Tof -77 - - R7 -__j __._-,---------_._--- ==2.1_71- -- ? � � -+---t----'----+-'----r---;- ,---- �- �--' 1 i_--. i i fT��lI�G/ll� dll��/T2�d BY' DATE JOB- I.OT �. -rn73 -#z -'-- 73.661 Highway. l l l _.4o' Suite G_ CKD DATE . ; - -- - ! ----�_— -- _-- }-- Palm Desert,'. Califomia 92260 ! PG; ---F I (760) 779-0405 '0 FAX (760) 779.1317 OF, PREPARED FOR:' I ! I I I --------- 480- 0 _-_480.0 f4, • i I . i _ - - I I I 1 I -_ .. --- - -- - - -- -- -- .._-........ _..__.•. __._ _... ._. _ ._ - --- - i I I� 1 . -•-- r i ! -' - -.i �— , _ ^-J' �! -,' --i•- - � --•-- j !' f— � - J _ i - ` r - - - 1 _. f -i- - f --�-- ��- �- - �---F--- i- I of! ! _3 }{ 41 . 3 ; ,,. - _ ' --__ --�-_- 1. __ _ _-�---_ _- ._-.�. __-. Y•'-_ + __ -_'_' _ _ .-1_ I i i J i ' ' The Flying Buttress Structural and Civil Engineering 73661 Highway 111, Suite G Palm Desert, CA 92260 (760) 7794405 FAX (760) 779-1317 Title ' ' Brookfield Hordes Job # .99-142 Dsgnr. DRP Description.... 6-FT. Retaining Wall (U/2 Date: MAY 1 ,01999 , Cantilevered Retaining Wall Design 5.0.4 ' Criteria - Soil Data Footing'Strengths & Dimensions Retained Height 6.00 ft Allow Soil 'Bearing = 1,300.0 psf fc = 2,000 psi Fy = .60,000 psi ..Wall height above soil = 0.00 ft Equivalent Fluid Pressure Method Min. As % `� = 0.0018 ' Slope Behind Wall 0.00:1 Heel Active Pressure = Toe Active Pressure 38.0 psf/ft Toe Width 38.0 psf/ft `� Heel Width _ = 0.00 ft 5.25 _ - .Height of Soil over Toe., 8.00 in _ Passive Pressure 265.0 psf/R v Total Footing Width 5.25 Sal Density = 110.00 pcf Water height over heel = 0.0 ft Footing Thickness = 15.00 in FootingllSoil Friction = 0.400 ✓ ' - Wind on Stem 0.0 psf - Sal height to ignore Key Width Key Depth _ 0.00 in 0.00 in for passive pressure - 0.00 in Key Distance from Toe - 0.00 ft Cover @ Top = . 2.00 in @ Btm.= 3.00 in Design Summary Stem Construction Top stem 2nd - mi Stem OK Stem OK Total Bearing Load 4,755 lbs Design height ft= 2.00 0.00 :..resultant ecc. _ 4:52 in Wall Material Above"W' = Masonry Masonry soil Pressure @ Toe= 1,296 psf OK Thickness. Rebar Size 8.00 # . 5 # 5 # 5 Soil Pressure @ Heel = 516 psf OK Rebar Spacing = 16.00 16.00 Allowable = 1,300 psf Rebar Placed at = Edge Edge Soil Pressure Less Than Allowable Design Data ACI factored @ Toe 1,659 psf fb/FB + fa/Fa = 0.383 0.533 ' ACI Factored @ Heel - 661 psf Total Force @ Section lbs = 304.0 675.6 Footing Shear @ Toe = 0.0 psi OK Moment.... Actual ft-#= 405.3 1,366.1 Footing Shear @ Heel = 3.4 psi. OK Moment.... Allowable ft-# = 1,058.0 2,563.0 ' Allowable - .76.0 psi Shear.... Actual psi = 5.4 6.9 Wall Stability Ratios Overtuming = 4.94 OK Shear .... Allowable psi= 19.4 19.4 Sliding = 2.39 OK, Bar Embed ABOVE Ht. in= 12.00 12.00 Sliding Calcs (Vertical Component Used) Bar Embed BELOW Ht. in = .12.00 6.00 ' Laterad Sliding Force 928.9 lbs Wall Weigh psf = 78.0 124.0 less 100% Passive Force = - 486.8 lbs Rebar Depth 'd in= 5.25 9.00 less 100% Friction Force = - 1,9021 lbs Mfm asonry Data ' Added Force Req'd 0.0 Its OK Fs i 1,500 1,500 ps = psi = 20,000 20,000Solid far 1.5: 1 Stability 0.0 lbs OK Grouting Yes Yes Footing Design Results Special Inspection _ No No Modular Ration' - 25.78 25.78 Toe Heel Short Tenn Factor = 1.000 1.000 ' - Factored Pressure. 1,659 661 psf Equiv. Solid Thick. in= 7.60 11.60 Mu': Upward = 0 0 ft-# Masonry Block Type = 1 Mu': Downward 0 0 ft-# Concrete Data Mu: Design _ 0 2,322 ft-# fc psi = ' Actual 1-Way Shear 0.00 3.45 psi Fy psi =. Allow 1-Way Shear 0.00 76.03 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 18.00 in Toe: Not req'd, Mu < S • Fr Heel Reinforcing = # 4 @,18.00 in Heel: Not req'd, Mu < S • Fr ' Key Reinforcing = None Spec'd Key: No key defined ' The Flying Buttress Title Brookfield Hanes Structural and Civil Engineering Job # r 99-142 Dsgnr.. DRP Date: MAY 10,1999 73661 Highway 111, Suite G Description.... Palm Desert, CA 92260 - 6 -FT. Retaining Wall ' (760) 779-0405 FAX (760) 779-1317 Cantilevered Retaining Wall Design Summary of Overturning & Resisting Forces & Moments- oments.....OVERTURNING..... ..... OVERTURNING .... .....RESISTING..... . Force Distance Moment Fore Distance Moment Item lbs ft ft-# Ibst It ft-# Heel Active Pressure = 998.7 2.42 2,413.5 Soil Over Heel 2,805.0+ 3.13 8,765.6 - Toe Active Pressure = -69.8 0.64 -44.6 Sloped Soil Over Heel — Surcharge Over Toe = Surcharge Over Heel = Adjacent Footing Load _ Adjacent Footing Load = Added Lateral Load Abal Dead Load on Stern = 0.00 Load @ Stem Above Soil Sal Over Toe = Surcharge Over Toe .. _ Stem Weight(s)' = 560.0 0.41 228.0 ' = Total 928.9 O.T.M. = 2,368.9 Earth @ Stem Transitions = 146.7 0.83 122.2 Resisting/Overturning Ratio = 4.94 Footing Weight = 984.4 2.63 2,584.0 ' Vertical Loads used for Soil Pressure = 4,755.3 lbs Key Weight = ' Vert. Component = Vertical component of active pressure used"for soil pressure Total = 4,496.0 lbs R.M.= 11,699.8 w r a 8.in;Mas w/.#5 @ 16.in o/c f Solid Grout, 12.in Mas,W #5.@ 16.in o/c Y Solid Grout, 1 The Flying Buttress ss Title BHomes ��/ Z� ss'neeri Structure and C Engineering ng Job # , . 99-142 Dsgrr. DRP Date: MAY 10,1999 73661 Highway 111, Suite G i Description"" 4'-8" FT. Retaining Wall Desert, CA 92260 'Palm (760) 779-0405 FAX (760) 779-1317 Cantilevered Retaining Wall Design 5.0.4 Soil.Data Footing Strengths 8 Dimensions Criteria ' Retained Height = 4.67 ft Allow Sal Bearing = 1,300.0 psf Pc = 2,00 psi Fy = 60,000 psi Equivalent Fluid Pressure Method Min. As % 0.0018 Wall height abate soil = 0.00 ft Heel Active Pressure 38.0 psft t Toe Width - - 0.00 ft Slope Behind Wall 0.00:1 Toe Active Pressure 38.0 psffft Heel Width _ 3.50 Height of Soil over Toe 8.00 in Passive Pressure 265.0. psf/ft Total Foob% Width 3.50 Soil Density = 110.00 pct Water height aver heel = 0.0 ft, Footing Thi&ness = 15.00 in Footingj�§od Friction 0.400 Key Width = 0.00 in psf Wind on Stem = 0.0 f Sail height to ignore 9 9 Key Depth 0.00 in. = for passive-pressure0.00 in Key Distance from Toe 0.00 ft Cover @ Top = 2.00 in @ Btm.= 3.00 in Design Summary Stem Construction Top stem ' Stem OK - Total Bearing Load 2,649 lbs Design height ft = - 0.00' ...resultant ecc. , = 4.52 in Wall Matte Above "Ht" Masonry ' Soil Pressure @ Toe = 1,246 psf OK Thickness Rebar Size _ 8.00 # 4 Soil Pressure @ Heel = 268 psf OK Rebar Spacing = 16.00 Allowable = 1,300 psf Rebar Placed at = Edge Soil Pressure Less Than Allowable Design Data ACI Factored @ Toe 1,630 psf fb/FB + fa/Fa = 0.710 ' = ACI Factored @ Heel 351 Psf Total Force @ Section lbs = 405.9 Footing Shear @ Toe 0.0 psi OK Moment.... Actual ft-#= 643.2 Footing Shear @ Heel = 2.1 psi OK Moment ... .Allowable = 905.4 ' Allowable = 76.0 psi Shear..... Actual psi = 7.1 Wall Stabillty Ratios Sheir.Z..Allowable psi = 19.4 Overturning = 3.39 OK Sliding - 2.32 OK Bar Embed ABOVE HL in= 12.00 Sliding Calcs (Vertical Component Used) Bar Embed BELOW Ht. in= 6.00 ' Lateral Sliding Force 596.1 lbs Wall Weight = 78.0 less 100% Passive Force = _ 486.8 lbs Rebar Depth 'd in= 5.25 less 100% Friction Force = - .1,059.6 lbs Mpasonry Data psi = 1,500 Added ForceReq'd _ 0.0 lbs OK Fs Psi = 20,000 ' ....for 1.5: 1 Stability 0.0 lbs OK. Solid Grouting = Yes Footing Design Results Special Inspection Modular Ratio'n' = 25ia Toe Heel Short Term Factor = 1.000 ; ' - Factored Pressure 1,630 351 psf Equiv. Solid Thick. in= 7.60 Mu': Upward _ 0 0 ft-# Masonry Block Type = MU: Downward - 0 0 ft-# Concrete Data Mu: Design _ 0 1,093 ft-# fc PSI= ' Actual 1 -Way Shear = 0.00 2.14 psi Fy psi = Allow 1 -Way Shear = 0.00 76.03 psi Other Acceptable Sizes & Spacings Tae Reinforcing = # 4 @ 18.00 in Toe: Not req'd, Mu < S ' Fr Heel Reinforcing = # 4 @ 18.00 in Heel: Not neq'd, Mu < S' Fr ' Key Reinforcing = None Spec'd Key: No key defined , Flying Buttress Title •Brookfield Homes' The DRP Date: 10Z 9J9 Structural and Civil Engineering Job # 99-142 Dsgn,- MAY 73661 Highway 111, Suite G Description...: 4'-8" FT. Retaining Wall Palm Desert, CA 92260 (760) 779.0405 FAX (760) 779-1317 Cantilevered Retaining Wall Design. 5.0.4 1 Summary of Overturning & Resisting Forces & Moments .....RESISTING..... .....OVERTURNING..... Force Distance Moment Force Distance Moment Item lbs ft ft-# lbs ft ft-# ' Heel Active Pressure 665.9 1.97 1,314.0 Soil Over Heel _ 1,455.5 2.08 3,032.3 Toe Active Pressure -69.8 0.64 -44.6 Sloped Soil Over Heel ' Surcharge Over Toe = Surcharge Over Heel Adjacent Footing Load =, ;. t,.. Adjacent Footing Load = ' Added Lateral Load Abal Dead Load on Stem 0.00 , Load @ Stem Above Sal = Sal Over Toe _ - Surcharge Over Toe - Stem Weight(s) = 364.3 0.33 121.4 ' - Total 596.1 O.T.M. = 1,269.4 ' Earth @ Stem Transitions Resistiing/Overtuming Ratio = -3.39 Fooling Weight - 656.2 1.75 1,148.4 Key Weight = Vertical Loads used. for Sal Pressure = 2,648.9 lbs Vert. Component = ' Vertical component of motive pressure used for sal pressure Total = 2,476.0 lbs R -M.= 4,302.1 o.in Inds wi ff4 U io.lu Uic Solid Grout, r r Designer select #9@18.in all horiz. reinf. r r Designer select #9@18.in all horiz. reinf. @ Heel See Appendix A 3'-6" a '. CSI J 1 The Flying Buttress Title Brookfield Homes Structural and Civil Engineering Job # 99-142 Dsgrr. DRP Date: MAY 10, 999 73661 Highway 111, SuiteG Description.... Palm Desert, CA 92260 2'-8" FT. Retaining Wall (760) 779-0405 FAX (760) 779-1317 Cantilevered Retaining Wall Design 5.0.4 Soil Data Footing strengths & Dimensions Criteria, Retained Heigh 2.67 ft Allow Soil Bearing = .1,300.0 psf fc = 2000 psi Fy = • 60,000 psi Wall height above soil = 0.00 It Equivalent Fluid Pressure Method Min. As % = 0.0018 Slope Behind Wall = 0.00:1 Heel Active Pressure Toe Active Pressure = 38.0 psf/ft Toe Width 38.0 psf/ft Heel Width = 0.00 it = 2:00 Heigh of Soil over Toe = 8.00 in Passive Pressure = 265.0 psf/ft Total Footing Width = 2.00 Soil Density = 110.00 pcf Water height over heel = 0.0 ft Footing Thickness = 12.00 in FootingliSoil Friction = 0.400 Wind on Stem = 0.0 psf Soil height to ignore Key Width Key 0.00 in 0.00 in for passive pressure = 0.00 in Key Distance from Toe- - 0.00 ft _ Cover @ Too = 2.00 in @ Btm.= 3.00 in Design Summary Stem Construction, Top stem OK Total Bearing Load = 966 lbs Design height ft = 0.00 ...resultant 11M = 2.80 in Wall Material Above "W' = Masonry Soil Pressure @ Toe = 822 psf OK Thickness Rebar Size 8.00 # 4 Soil Pressure @ Heel = 145 psf OK Rebar Spacing - - 24.00 Allowable = 1,300 psf Rebar Placed at = Edge Soil Pressure Less Than Allowable Design Data 0.0 ACI Factored @ Toe= 1,071 psf fb/FB + falFa = 0.153 ACI Factored @ Heel = 189 psf Total Force @Section lbs = 127.0 Footing Shear @Tce = psi OK Moment••. Actual ft #= 1187 Footing Shear @ Heel _ 1.6 psi OK Moment ... .Allowable - 776.1 Allowable = 76.0 psi Actual. Shear .... ctual. psi = 2.2 Wall Stability Ratios Overturning = 3.14 OK Shear..... Allowable psi = 19.4 Sliding = 2.95 OK Bar Embed ABOVE Ht In= 12.00 Sliding Calcs (Vertical Component Used) Bar Embed BELOW Ht in= 6.00 Lateral Sliding Force 203.1 lbs Wall Weigh = 78:0 less 100% Passive Force = - 368.1 lbs Rebar Depth 'd' in= 5.25. less 100% Friction Force = - 386.5 lbs Masonry Data Added Force Req'd = 0.0 lbs OK f psl = 1,500 psi = 20,000 for 1.5: 1 Stability = 0.0 Fos OK Solid Grouting = Yes Footing Design Results Special Inspection = No Modular Ration' = 25.78 Toe Heel Term Short TeFactor = - 1.000 Factored Pressure = 1,071 189 psf Equiv. Solid Thick. in= 7.60 Mu': Upward = 0 0 ft-# Masonry Block Type = Mu': Downward _ 0 0 ft-# Concrete Data Mu: Design = 0 202 ft-# fc psi = Actual 1 -Way Shear = 0.00; 1.62 psi FY psi = Allow 1 -Way Shear. = 0.00 76.03 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 18.00 in Tce. Not Wd, Mu, < S ' Fr Heel Reinforcing = # 4 @ 18.00 in Heel: Not req'd, Mu < S ` Fr Key Reinforcing = None Speed Key: No key defined 'The Flying Buttress Title Brookfield Homes ' / L Structural and Civil Engineering Jab # 99-142 Dsgnr ORP Date: MAY 10,1959 73661 Highway 111, Suite Description.... Z-8" FT. Retaining Wall Palm Desert, CA 92260 (760) 779-0405 FAX (760) 779-1317 .. Cantilevered Retaining Wall Design ' ' 5.0.4 SUM= of Overturning & Resisting Forces & Moments .....OVERTURNING..... Force Distance Moment ..... RESISTING ..... Force Distance Moment Item lbs ft ft-# lbs ft ft-# ' Heel Active Pressure = 255.9 1.22 313.1 Sal Over Heel = 3, 1.6 1.33 522.1 Toe Active Pressure = -52.8 0.56 -29.3 Sloped Soil Over Heel Surcharge Over Toe = Surcharge Over Heel = Adjacent Footing Load _ Adjacent Footing load = Added Lateral load = A dal Dead load on Stem = 0.00 Load @ Stem Above Soil = Sal Over Toe _ Surcharge Over Toe = Stem Weight(s) 208.3 0.33 69.4 ' Total = 203.1 O.T.M. = 283.7 Earth @ Stem Transitions = Resisting/Overturning Ratio = 3.14 Footing Weigh = 300.0 1.00 300.0 Key Weight ' Vertical Loads used for Sal Pressure = 966.3 lbs Vertical component of active pressure used for sal pressure Vert Component .. _ Total = 899.9 lbs R.M = 891.6 t: 1