Loading...
07-2057 (RC)P.O. BOX-1504.- 78-495 OX 1504:-78-495 CAL'LE TAMPICO LA QUINTA,. CALIFORNIA 92253 Application Number: 07-00002057- 7-00002057-Property PropertyAddress: 43576 WASHINGTON S QST 0 > APN: 609-070-028-25 -00 Application description: REMODEL - COMMERCIAL Property Zoning: COMMUNITY COMMERCIAL. Application valuation: 88000 Applicant: Architect or Engineer: BUILDING & SAFETY DEPARTMENT BUILDING PERMIT VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Owner: LA QUINTA BUSINESS CENTER, LLC 43576 WASHINGTON ST. LA QUINTA, CA 92253 Contractor: MAR. VEST 42335 WASHINGTON ST,.STE F442 PALM DESERT, CA 92211 (760)360-7061 Lic. No.: 876299 / Date: 8/22/07 ' R ——=---==-—————---———————---—————--------—--——--------------—---——---—--------------- `vnC_V, LICENSED CONTRACTOR'S DECLARATION _ WORKER'S COMPENSATION DECLARATION oCL`AT %q 1 hereby affirm under penalty of perjury that I am licensed and isions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business a ro sion s Code, nd my License is in full force and effect. I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provide - ,License Class: B en o.: 876299 for by Section 3700 of the Labor Code, for the performance of the work for which this per �t is e: 'O tractor:' issued. ' I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor - Code, for the performance of the work for•which this permit is issued. My workers' compensation . OWNER -BUILDER DECLARATION - - insurancecarrierand policy number are: I hereby affirm under penalty of perjury that 1 am exempt from the Contractor's State License Law for the Carrier STATE FUND Policy Number 1846155 .. following reason (Sec. 7031 .5, Business and Professions Code: Any city or county that requires a permit to - _ I certify that, in the performance of the work for which this permit is issued, 1 shall not employ any construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the person in any manner so as to a subject workers' compensation laws of California, permit to file a signed statement that he or is licensed pursuant to the provisions of the Contractor's State and agree that, if I should bec a su ect to th work s' compensation provisions of Section - License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or 3700 ofthe L bor Code, I shal ort ompl nth those provisions. - �� that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by �j -a� any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: D G plicant: (_ I 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and ' the structure is not intended or offered for sale (Sec: 7044, Business and Professions Code: The WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS.UNLAWFUL, AND SHALL Contractors' State License Law does not apply to an owner of property who builds or improves thereon, SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND - and who does the work himself or herself through his or her own employees, provided that the DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN improvements are not intended or offered for sale. If, however) the building or improvement is sold within SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. one year of completion, the owner -builder will have the burden of proving that he or shedid not build or ' improve for the purpose of sale.). - APPLICANT ACKNOWLEDGEMENT - - (_ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project' (Sec: IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of conditions and restrictions set forth on this application. property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed 1 . Each person upon whose behalf this. application is made, each person at whose request and for pursuant to the Contractors' State License Law.). whose benefit work is performed under or pursuant to any permit issued as a result of this application, (_) I am exempt under Sec. , B.&P.C. for this reason '- the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City - - of La Quinta, its officers, agents and employees for any act or omission related to the work being . performed under or following issuance of this permit. Date: Owner: 2. Any permit issued as a result,of this application becomes null and void if workis not commenced - - within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject - CONSTRUCTION LENDING AGENCY . permit to cancellation. I hereby affirm under penalty of perjury that there'is-a construction lending agency for the performance of. the 1 certify that I have read this application and state that the above information is correc . I agree to comply with all work for which this permit is issued (Sec. 3097, Civ. C.). city and county ordinances and state laws relating to building cons uctio , nd her y au rize representatives - of this t to enter upon t 'above-mentioned property for'insp ion p rposes. Lender's Name: 5' ature(Applicant or Agent): Lender's Address: - - - LQPERIIIIT `� Applic"ation'Number . . . . . \07-00002057 Information EXISTING SHELL, SUITE 105 -=--- Other struct info CODE EDITION 01BM04E05EN FIRE SPRINKLERS YES" MIXED-USE OCCUPANCY B OCCUPANT LOAD 26.00 1ST FLOOR SQUARE FOOTAGE 2516.`00• 2ND FLOOR SQUARE FOOTAGE 00 Permit BUILDING PERMIT' 'Additional desc Permit, Fee` 585.50 Plan Check Fee 380.58 Issue Date Valuation 88000 Expiration Date _ 2/18/08 Qty Unit Charge Re Extension BASE FEE - 414.50 318.00 4.5000 THOU_ BLDG 50„001-100,000 171.00 Permit ELECT - ADD/ALT/REM Additional desc . ' Permit Fee 76.35 Plan Check Fee 19:09 Issue Date . . Valuation 0 Expiration Date,. 2,/18/08- Unit Charge Per ' Extension -,Qty BASE .FEE” 1,. 15.00 20..00 :"7500 PER ELEC DEVICE/FIXTURE IST 15.00 "20 103:00 .4500 EA •ELEC-DEVICE/FIXTURE->20 46.35' Permit MECHANICAL Additional desc:. Permit Fee 24.00 Plan Check Fee. 6.00 Issue Date Valuation 0 Expiration•Date .. 2/18/68..:. Qty Unit Charge Per Extension'. BASE FEE 15.00 2.00 4.5000'EA MECH,VENT INST/ DUCT ALT 9.00 . p ---------------------- ---- ---------------.------------------ S ecial'Notes and Comments 2.,516 SF INTERIOR TENANT' IMPROVEMENT "LA QUINTA,BUSINESS.CENTRE EXECUTIVE " —OFFICES" SUITE 10�5 "B" OCC. TYPE -V -N,:" CONSTR. 26"TOTAL,OCCUPANT LOAD.2001 . LQPERMIT ., , -. . -. .., .. ".. - - �_ _ ... •. .. " _ .. Application Number 07-00002057 ------------------------------------------------------------- Special Notes and Comments CBC,CMC,2004 CEC, 2005 ENERGY CODES. --------------------------------- Other Fees'- ------------------------------------------- ACCESSIBILITY PLAN REVIEW 38.06 ENERGY REVIEW FEE ,38.06 Fee summary Charged Paid' Credited Due Permit Fee Total -- ------ 685.85, ------.-------------- .00 --------.--. .00 685.85 Plan Check Total 405.67 :00 .00 405.67 Other. Fee Total 7:6.12 00 .00 76.12 Grand Total 1161.64 .00 .00. 1167.64 r LQPERMIT Bin # City of La Quinta Building 8t Safety Division Box 1504, 78-495 Calle Tampico La Quinta; CA 92253 - (760) 777-7012 Building Permit Application and Tracking. Sheet PermitP.O. (� 1 Project Address: . IS-14A%9µ r�Z641 Owner's Name: (-A . ust uesr- A. P. Number: �� p^T Q . OZ� OZ Address: g"3 •9;7< Legal Description: /05 Contractor: TD City, ST, Zip: CA QO uCTA . Telephone: �% ZSp. $C�.$s , Address: Project Description: City, ST, Zip: �{ Telephone:' " State Lic. # : City Lic. #: Arch., Engr., Designer:) STS / • Address: .2, 1S&Ik, <-0 *QV City, ST, Zip: Telephone:.� �� S " � �" -� � - Construction Type: Occupancy: State Lic. #:=q. Project type (circle one): New Add'n Alter Repair .Demo Name of Contact Person: Sq. Ft. 215/ # Stories:. # Units: Telephone # of Contact Person: EstimatedsValue of Project:,;"'". APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req'd Rec'd TRACKING 1 PERMIT FEES Plan Sets Plan Check submitted 1/0/,91 Item Amount Structural Calcs. Reviewed, ready for corrections 7 Plan Check Deposit Truss Calcs. Called Contact Person Plan Check Balance Energy Calcs. Plans picked up I07 Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2°' Review, ready for correct'on 'ssue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- Jrd Review, ready for corrections/issueDeveloper Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of p rmit issue School Fees Ll Permit Fees 7�I3�o? �`"'v �d6t,.c.�.-t- v�- �,c� � �CvnNe►1C��'r•GD� r�t'Ie�t•91b�0? OI� P�ar� John R. Hawkins Fire Chief Proudly serving the unincorporated areas of Riverside County and the Cities of: Banning 4. Beaumont .- Calimesa' ' Canyon Lake . Coachella Desert Hot Springs Indian Wells 4. Indio Lake•Elsmore . 4. La Quinta Moreno Valley 4. Palm Desert Perris Rancho Mirage San Jacinto 4. Temecula Board of Supervisors Bob Buster, District 1 . John Tavaglione, . District 2 Jeff Stone, District 3, ;Roy Wilson, District 4 Marion Ashley,. District 5 RIVERSIDE COUNTY FIRE DEPARTMENT In cooperation with the California Department, of Forestry and'Fire Protection 82675 Highway I11, Suite 2150 • Indio, California 92201 • (760) 863788.86 •Fax (760) 863-7072.. July 26, 2007 A.P."Skip" Lench .P.O. Box 450. La.Quinta, CA 92247 Re: Non -Structural Building Plan Review LAQ-07-TI-061, La Quinta Business Center, Suite 105. Fire Department'personnel*have.reviewed and approved -the plans you submitted for the above referenced project. Please be advised the following conditions apply as a part of the conditions for the issuance of a building permit. 1) Fire Department approval is based upon the 2.001 CBC requirements for Group B occupancies. Itis prohibited to use-, processor store any materials in the occupancy that would classify it as a Group;H occupancy per Sec. 307 of the 2001 CBC. 2) Repair work and/or maintenance using open flame equipment, welding or the use of Class], 11, or III -A liquids are prohibited. The following conditions must be. met prior to occupancy: 3) Fire sprinkler system plans for the tenant improvement.area must• be submitted to the Fire Department for . review, along with a plan/inspection fee. 'A licensed .0-16 contractor will have to submit plans for review and approval and modify the flre'sprinkler system in'•accordance with. NFPA.13, 1999 Edition. A licensed C-16 contractor shall do.all sprinkler work and certification., The approved plans; with Fire Department Job card must be at the job site.for all inspections: 4) *Install an alarm monitoring system for fire sprinkler systems) with 100 or more heads.. Valve monitoring, Water -flow alarm and trouble signals shall be automatically transmitted to ad approved• central station, , remote station or proprietary monitoring station in accordance with 2001 CBC, Sec. 904.3.1. An approved audible, sprinkler flow.alarm shall be provided on the -exterior in an approved location and.also in the interior in a normally occupied location. A C-10 licensed contractor must submit plans, designed in accoedance'with NFPA 72, 1999 Edition, to the Fire Department for review and approval prior to installation. 2300 Market Street, Suite 150 • Riverside, -California, • (951.) 955=4777 • Fax (951) 955-4886, 39493 Los Alamos Road, Suite A • Murrieta, California 92563 •'(951) 600-6160 • Fax (95 1) 600-6964 Buildings/facilities y 5) Provide keys to the tenant.space foe,inclusion in the main building Knox Box. Key(s) shall have durable and legible tags affixed for identification of the correlating tenant space. 6) • If the building/facility is protected with a fire alarm system or burglar alarm system, the lock boxes will require "tamper" monitoring. Other requirements: 7) _ Install portable fire'extinguishers per Title 19, but not less than 2A1 OBC in rating. Contact a certified extinguisher company for proper placement and spacing of equipment., 8) All fire sprinkler systems, fixed fire suppression systems and alarm plans must be submitted separately for approval prior to construction. Contractors should contact the Planning & Engineering office for submittal requirements. 9) Approved building address or suite/unit number shall be placed in such a position as -to be plainly visible. Said numbers shall contrast with their background. Please contact the Fire .Department Planning & Engineering staff for final inspection prior to occupancy. Applicant/installer shall be responsible to contact the' Fire Department to schedule inspections: Requests for inspections are to be.made at least 72 hours in advance and may be arranged by calling'(760) 863-8886. . All questions regarding the, meaning of these conditions should be referred to the Fire Department Planning & Engineering staff at (760) 863-8886. Sincerely., Tracy Hobday • . . Chief Fire Department Planner By Norman Davidson Fire. Safety Specialist 2300 Market Street, Suite 150 • Riverside, Califomia •°. (951) 955-4777 • Fax (951) 9554886 , 39493 Los Alamos Road, Suite A • Murrieta, California 92563 • (951) 600-6160 • Fax (951) 600-6164 • icafeoCert�ffOccupancYos a s2 g C�j CV i{ ppn, t R: I RATM 3A G� OF9 Building & Safety Department a This Certificate is issued pursuant to the requirements of Section 109 of the California Building , Code, certifying .that, at the time of issuance, this structure was. in compliance with the j provisions of the Building City g Code and the various ordinances of the Cit regulating building construction and/or use. i SY BUILDING ADDRESS: 43-576 WASHINGTON ST STE#F:fs105 k' I .; 9 (wz( sir'` "fJ"!I' r u[„SNt 4 h.� � .wtf A v/ 1 Use -classification: COMMERICAL (;Prism;L'eadershi GrouptfncJ ° ;. Building Permit No.: 07-2057 Occupancy Group: B Type of Construction: V -N Land Use Zone: O t I i Owner of Building: LA QUINTA BUSINESS CENTRE Address: 77-892 LITTLE EAGLE CT I City, ST, ZIP: LA QUINTA, CA 92253 By: STEVE TRAXEL , o'er# Date: December 20, 2007 :I 3 Building Official POST INA CONSPICUOUS PLACE , TITLE 24 REPORT i Title' 24 Report for: s •. A La Quinta Business Center +3 -tj'I� w��` Suite 105 M:WIII The EnergyPro computer program has been used to perform the calculations summarized in this.compliance report. This program has approval and is authorized by the California Energy Commission for use with.both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.3 by EnergySoft Job Number: User Number: 2655 TABLE OF CONTENTS Cover Page + Table of Contents ` 2 Form LTG -1-C Certificate of Compliance ^» 3 Form LTG -2-C Indoor,Lighting Schedule, 6 +. • • Form LTG -3-C Portable Lighting Worksheet 7' % Form LTG -5-C Indoor Lighting Power Allowance ' 8. Form LTG 7-C Room Cavity Ratio Worksheet = r Form LTG -MM Lighting Mandatory Measures 10 ' ' , Form MECH-1; C Certificate of Compliance 11 Form MECH-2-C Air & Water,System Requirements ; 13 VForm MECH-3-C Mechanical Ventilation 15 Form MECH-4-C HVAC Misc. Prescriptive Requirements 16 Form MECH-MM*Mechanical Mandatory Measures 17 HVAC System Heating and. Cooling Loads Summary . 19 r EnergyPro 4.3 by EnergySoft Job Number: User Number: 2655 , [CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG -1 C PROJECT NAME La QUlnta Business Center DATE PROJECT ADDRESS 8/1/2007 Suite 105 La Quinta PRINCIPAL DESIGNER - LIGHTING TELEPHONE Building Permit # DOCUMENTATION AUTHOR TELEPHONE Insu-form, Inc. (760) 779-0657 Checked by/Date GENERAL INFORMATION Enforcement A enc DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 2,516 Sq.Ft. 15 BUILDING TYPE O NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM ❑X CONDITIONED SPACES ❑ UNCONDITIONED SPACES ❑ INDOOR & OUTDOOR SIGNS PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION ❑ ADDITION a ALTERATION METHOD OF LIGHTING O 'COMPLETE BUILDING ❑ AREA CATEGORY ❑ TAILORED ❑ PERFORMANCE COMPLIANCE ❑ COMMON LIGHTING STATEMENT'OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, . Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNA�URE ___ r -%I i I A I DATE The Principal Lighting Designer hereby certifies that the prop sed uilding design represented in this set of construction do uments is consistent with the other compliance forms and worksheets, wl the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 - 132, 146, 148 & 149 of Title 24, Part 6. ❑ The plans & specifications meet the requirements of Part 6 (Sections 10-103a). ❑ The installation certificates meet the requirements of Part 6 (10-103a 3). ❑ The operation & maintenance information meet the requirements of Part 6 (10-103c). Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. ❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Lhd Professions Co t ocument because it pertains to a structure or type of work described as exempt pursuant to Bu nesions C Sections 5537, 553 and 6737.1.' AL LIGH LNG DESIGNER,q NAME SI DI�T�' Z• LIC. # �9/bN STUDt / NG LIGHTING MANDATORY MEASURES Indicate location on plans of Note Block for Ma atory Measures LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ®LTG -1-C, Parts 1 of 4 and 2 of 4: Certificate of Compliance. Part 1 of 4 and 2 of 4 are required for all submittals ❑LTG -1-C, Part 3 of 4: Certificate of Compliance. Part 3 of 4 submittal is required only if Control Credits are claimed ®LTG -1-C, Part 4 of 4: Certificate of Compliance. Part 4 of 4 submittal is required when lighting controls are installed ' ®LTG -2-C: Indoor Lighting Schedule ®LTG -3-C: Portable Lighting Worksheet ®LTG -4-C: Lighting Controls Credit Worksheet 1KLTG-5-C: Indoor Lighting Power Allowance 0LTG-6-C: Tailored Method Worksheet ®LTG -7-C: Room Cavity Ratio Worksheet ❑LTG -8-C: Common Lighting Systems Method Worksheet ❑LTG -9-C: Line Voltage Track Lighting Worksheet EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Pace:3 of 19 n CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG -1 -C PROJECT NAME DATE La Quinta Business Center 8/1/2007 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 1,632 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 1,632 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 I LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑X COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 2,768 ALTERNATE COMPLIANCE ❑ PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS 4.3 User Number: 2655 Job Number: PageA of 19 CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) NOTE TO FIELD SPACE CONTROLLED Check if Daylighting 4.3 User Number: 2655 Job Number: PageA of 19 CERTIFICATE OF COMPLIANCE (Part 4 of 4) LTG -1-C PROJECT NAME La Quinta Business Center DATE 8/1/2007 Designer: This form is to be used by the designer and attachedJo the plans. Listed.below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of,this section will allow the responsible party to budget for the scope of work appropriately., Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. z Test Description Test Performed By: ❑ LTG -2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing - ❑. LTG -3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page:5 of 19 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2--C] PROJECT NAMELa QuiDATE nta Business Center 8/1/2007 INSTALLED LIGHTING POWER FOR CONDITIONED SPACES Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Name Type Description �m CD r� Z c c �.3� nm _.� n�� 3! m -p in rooZ cmc.. 3.m3 _. a o r c 3v� �m�' d H m O m0 Um — n r c Z 3. X03 Q N `^ G��^ Xvm _ " N a (2) 4 ft Fluorescent T8 ElecRO F32T8 2 30 1.0 48.0 X 34 T.632 PAGE TOTAL 1 632 ' BUILDING TOTAL (sum of all pages) 1,632 PORTABLE LIGHTING (From LTG -3-C) • CONTROL CREDIT (From LTG -4-C) ADJUSTED ACTUAL WATTS 1 632 EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page:6 of 19 PORTABLE LIGHTING WORKSHEET LTG -3-C PROJECT NAME DATE La Quinta Business Center I 8/1/2007 TABLE 1 - PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B C D ROOM # OR ZONE ID DEFAULT W/s ft AREA SF TOTAL WATTS B X C PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTS PER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E). TOTAL WATTS (C x E) TOTAL 0 0 TABLE 2 - PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET A B 0 C D E F G ROOM # OR ZONE ID PORTABLE LIGHTING Description # OF FIXT. LUMIN. WATTS PER FIXTURE TASK # OF AREA TASK (SF) AREAS TOTAL AREA (SF) (D x E). TOTAL WATTS (C x E) TOTAL 0 0 TABLE 3 - PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS > 250 SQUARE FEET ROOM # TOTAL AREA OR ZONE ID (SF) TOTALI BUILDING SUMMARY - PORTABLE LIGHTING Designer needs to provide detailed documentation that the lighting level provided by the overhead lighting meets the needs of the space. The details include luminaire types and mounting locations relative to work areas. BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1+2+3) TOTAL WATTS BUILDING TOTAL 0 0 EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page:7 of 19 INDOOR LIGHTING POWER ALLOWANCE ' LTG -5-]C PROJECT NAME La Quinta Business Center ALLOWED LIGHTING POWER Choose One Method r COMPLETE BUILDING METHOD - CONDITIONED SPACES BUILDING CATEGORY (From Section 146 Table 146-B) ip Bldg Office AREA CATEGORY METHOD - CONDITIONED SPACES AREA CATEGORY (From Section 146 Table 146-C) " - TAILORED METHOD - CONDITIONED SPACES UNCONDITIONED SPACES ' WATTS PER SF DATE 8/1/2007 ALLOWED WATTS WATTS PER SF 1.10 COMPLETE BLDG. AREA 2,516. ALLOWED WATTS 2,768 WATTS PER SF AREA (SF) ALLOWED WATTS PAGE TOTAL BUILDING TOTAL AREA WATTS TOTAL ALLOWED WATTS (From LTG -6-C or from computer run.) *' Complete Building and Area Catagory Methods Category (From Section 146 Table 146 -B&C) WATTS PER SF AREA (SF) ALLOWED WATTS TAILORED METHOD - UNCONDITIONED £ t PAGE TOTAL D D BUILDING TOTAL AREA WATTS TOTAL UNCONDITIONED SPACES ALLOWED WATTS E=(From LTG -5-C and LTG -6-C) Energfro 4:3 by EnergySoft User Number: 2655 Job Number: Page:B of 19 ROOM CAVITY RATIO WORKSHEET (RCR>=3.5) LTG -7-C PROJECT NAME La QUlnta BUSIneSS Centel DOCUMENTATION AUTHOR DATE • FORtENFOR�CEMy�ENwTS`tAGENCY USE ONLY,r_+�{3jgs PLAN CHECK"BYrb��itY! ¢r DATE�#s i i!i?lS`iC i.b,1 Ott. .y.#i�r- . J�:; 7F.x+�i'`. _ ' RECTANGULAR SPACES A B. C D E F Room'. Name y Task/Activity Description Room Length (L) ft Room Width (W). ft Room Cavity Height (H) (ft) Room Cay. Ratio. 5xHx(L+W) /(LxW) s NON -RECTANGULAR SPACES A B C p E F Room ' Name Task/Activity Description Room Area (A) (sf) Room Perimeter (P) (ft) Room Cavity Height (H) (ft) '. Room Cay. -Ratio 2.5 x H x P ! /A :f ' IL i EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number�� Page:9 of 19 ILIGHTING. MANDATORY MEASURES LTG -MM PROJECT NAME , , DATE La Quinta Business Center 8/1/2007 DESCRIPTION Designer Enforcement FX §131(d)1 For every floor, all interior lighting systems shall be equipped .with a separate automatic control,to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 0 §131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is z provided with a manual, accessible override switch in sight of the lights. The area + of override is not to exceed 5,000 square feet. ' �. §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. a§111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. "F-] §132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are ' specified with electronic high -frequency ballasts and are exempt from tandem ' { wiring requirements. R. §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - ceiling walls. §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 wafts per square foot of lighting load shall be a controlled with bi-level switching for uniform reduction of lighting within the room. ' FX . §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for -the effective use of daylight in the area shall + have 50% of the lamps in each daylit area controlled by a separate switch; or the ; effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during ' different times of the year is included on plans. El §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. ' r EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page: 10 of 19 CERTIFICATE OF COMPLIANCE (Part 1 of 2) MECH-1-C PROJECT NAME La Quinta Business Center PROJECT ADDRESS Suite 105 . La Quinta PRINCIPAL DESIGNER - MECHANICAL DOCUMENTATION AUTHOR Insu-form, Inc. TELEPHONE TELEPHONE (760) 779-0657 DATE 8/1/2007 Building Permit # Checked by/Date Enforcement Aaencv GENERAL INFORMATION DATE OF PLANS BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE 2,516Sq.Ft. 15 BUILDING TYPE NONRESIDENTIAL ❑ HIGH RISE RESIDENTIAL ❑ HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION ❑ ADDITION O ALTERATION ❑ UNCONDITIONED (File Affidavit) METHOD OF MECHANICAL ® PRESCRIPTIVE ❑ PERFORMANCE COMPLIANCE PROOF OF ENVELOPE COMPLIANCE PREVIOUS ENVELOPE PERMIT ❑ ENVELOPE COMPLIANCE ATTACHED STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building mechanical requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHORSIGNATURE DATE JoanD. Hacker o The Principal Mechanical Designer hereby certifies that the proposkd b ilding design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the mechanical requirements contained in the applicable parts of Sections 100, 101, 102, 110 through115, 120 through 125, 142, 144, and 145. ❑ The plans & specifications meet the requirements of Part 1 (Sections 10-103a). ❑ The installation certificates meet the requirements of Part 1 (10-103a 3). ❑ The operation & maintenance information meets the requirements of Part 1 (10-103c). Please Check one: (These sectionsof the Business and Professions Code are printed in full in the Nonresidential Manual.) ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, or mechanical engineer or I am a licensed architect. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described pursuant to Business and Professions Code sections 5537, 5538, and 6737.1. PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE --jDATE INSTRUCTIONS TO APPLICANT ® MECH-1-C: Certificate of Compliance. Part 1, 2, 3 of 3 are required on plans for all submittals. © MECH-2-C: Air/Water/Service/Water Pools Requirements. Part 1 of 3, 2 of 3, 3 of 3 are required for all submittals, but may be on plans. ❑O MECH-3-C: Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation, but may be on plans. MECH-4-C: HVAC Misc. Prescriptive Requirements is required for all prescriptive submittals, but may be on plans. ❑ MECH-5-C: Mechanical Equipment Details are required for all performance submittals. EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page: 11 of 19 CERTIFICATE OF COMPLIANCE (Part 2 of 2) MECH-1-C + PROJECT NAME DATE La Quinta Business Center 8/1/2007 .Designer:. This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that -apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section, will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance: f In addition a Certificate of Acceptance, MECH-1-A Form shall be submitted to the building department that certifies plans, specifications, installation rnp.dlfiCAtpS and nnprntlnn and maint— a— inform nlin matt }he ro o../n ..a C....1:.... , n , no— .. - - - STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing ` Test required on all New systems both New Construction and Retrofit. MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction,and Retrofit. ❑ MECH4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing _ Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing - This test required If the unit serves 5,000 ft2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. - ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document + Equipment requiring acceptance testing R - All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. ' - -Automatic Isolation Controls . Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Bfu/hr. , -Water-loop Heat Pump Controls Applies to all new watedoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump «, or condenser water systems where the pumps motors are greater than 5 hp. Equipment re uirin acceptance testing EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page:12 of 19 AIR SYSTEM REQUIREMENTS IPart 1 of 2 MECH-2-C (PROJECT NAME DATE La Quinta Business Center 8/1/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS Central or Single Zone Office Spaces 2 Reference on Plans or Specification 1 112(a) 6.00 COP 112(a) 10.0 SEER/ 8.0 EER 112(b) Yes 112(c), 115(a n/a 121(b) Yes 121 b 377 cfm 121(c) No 121 c No 121 c 122(e) Programmable Switch 122(e) Heating & Cooling Required 122 Auto 122 n/a 123 124 R-8.0 144 a & b 68,639 btuh 144 a & b 134,062 btuh 144 a & b 103,616 btuh 144 a & b 77,090 btuh 144 c Constant Volume 144 c 144 c Yes 144 d No 144 a No Economizer 144 Constant Tem 144(f) Constant Temp 144 k No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Paoe:13 of 19 1 WATER SIDE SYSTEM.REQUIREMENTS -'Part 2 of 2 MECH-2-C PROJECT NAME DATE La Quinta Business Center 8/1/2007 EnergyPro 4.3 by EnergySoft User Number: 2655 2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops ITEM OR SYSTEM TAG(S) - Number of Systems - T-24 MANDATORY MEASURES Section Reference on Plans or Specification' Equipment Efficiency 112(a) Pipe Insulation 123 a ' PRESCRIPTIVE MEASURES Calculated Capacity 144 (a & b) Proposed Capacity: 144 (a & b) r ' Tower Fan Controls 144 h Tower Flow Controls 144 h Variable Flow Systembesign 144 0) Chiller and Boiler Isolation 144 • ` CHW and HHW Reset Controls .• 144 - r . ' ' WLHP Isolation Valves 144 VSD on CHW, CW & WLHP Pumps > 5 HP 144 .. DP Sensor Location 144 , 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. , 2: Water side systems include wet side system using other, liquids such as glycol or brine.' y Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW Heater r Number of Systems 1 '• MANDATORY MEASURES Reference on Plans or Specification Water Heater Certification 113 (a) Standard Gas 50 gal or Less -Water Heater, Efficiency 113 b) 78% Service Water Heating Installation 113 (c) Pool and Spa Efficiency and Control 114 (a) n/a Pool and Spa Installation - 114 b n/a "f ' Pool Heater - No Pilot Light 115 (c) n/a Spa Heater - No Pilot Light 115 d n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. EnergyPro 4.3 by EnergySoft User Number: 2655 MECHANICAL VENTILATION MECH-3-C ROJECT NAME La Quinta Business Center DATE 8/1/2007 PRESCRIPTIVE REHEAT LIMITATION (Section 144(d)) MECHANICAL VENTILATION Section 121 b 2 AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM D'a Tom= Cn m y �t'� °o _ o°- 0.0 " m am fD o m 0 o 63 ' m xc n T _ q �x O D 'C n.. Ln ' m D 1 w o o c) o -n u) c l7 ° �' c° n W in x 0 p o o=x 0 O 2— O m v � 0 3 D i m D Office Spaces 2,51 E 0.15 377 377 377 Office Spaces Total 377 377 C Minimum ventilation rate perSection 121 Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load fore ress u oses fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). I Must be greater than ore ual to H or use Transfer Air column N to make up the difference. J - Design fan supply cfm (Fan CFM) x 30%; or K Condition area ft. sq.) x 04 cfmfft. sq.: or L Maximum of Columns H, J, K, or 300 cfm M This must be less than orequal to Column L and qreater that or actual to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page: 15 of 19 MECHANICAL SIZING AND FAN POWER MECH=4-C PROJECT NAME DATE La Quinta Business Center 8/1/2007 SYSTEM NAME FLOOR AREA Office Spaces 2,516 IFAN POWER CONSUMPTION B DESIGN BRAKE HP 1.000 E NUMBER OF FANS 2.0 r TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. - ITEM or SYSTEM TAG(S Total Adjustments FILTER PRESSURE ADJUSTMENT EQUATION 144-A• A) If filter pressure drop is greater than 1 inch W.C. enter filter pressure drop. SPa on line 4 and Total Fan pressure SPf on Line 5. B) Calculate Fan Adjustment and enter on Line 6. C) Calculate Adjusted Fan Power Index and enter on Line 7. 1 TOTAL FAN SYSTEM POWERWatts, Sum Column F 1 HO8 2) SUPPLY DESIGN AIRFLOW (CFM) 4,000 3 TOTAL FAN SYSTEM POWER INDEX Row 1/Row 2 1 4 SPa 144 (h) 5 SPf 6) Fan Adjustment = 1-(SPa -1)/SPf 144 i [7)ADJUSTED FAN POWER INDEX Line 3 x Line 6 1 0.452 r TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/cfm for Constant Volume systems or 1.25 W/cfm for VAV systems. - ITEM or SYSTEM TAG(S PRESCRIPTIVE MEASURES Electric Resistance Heating 1 Heat Rejection System 2 Air Cooled Chiller Limitation s T-24 Section Capacity Exception Notes 144 144 (h) 144 i 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used, explain which exception(s) to Section(g) apply. 2. Are centrifugal fan cooling towers used on this project? (Enter "Yes" or "No") If centrifugal fan cooling tower are used, explain which exception(s) to Section 144(h) apply. 3. Total installed capacity (tons) of all water and air cooled chillers under this permit. If there are more than 100 tons of air-cooled chiller capacity being installed, explain which exception(s) to Section ' 144(i) apply. " EnergyPro 4.3 by EnergySoft User Number: 2655 Job Number: Page: 16 of 1971 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MN PROJECT NAME La Quinta Business Center DESCRIPTION Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. F§ 115(a) Fan type central furnaces shall not have a pilot light. FX] § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. A I §124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls § 122(e) Each space conditioning system shall be installed with one of the following: X❑ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ § 122(e)1B An occupancy sensor to control the operating period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. F§ 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. ❑, § 122(g) Each space conditioning system serving multiple zones with a combined ' conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone:, shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. �. a § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: DATE 8/1 /2007 Desi ner Enforcement MECHANICAL MANDATORY MEASURES -Part2 & 2 MECH-MM PROJECT NAME La Quinta Business Center DATE 8/1/2007 Descri tion Designer Enforcement Ventilation X❑ .§121 (e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. FX] § 122(f) Gravity or automatic dampers interlocked and closed on'fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. JAI § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. t § 121(91 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design .. r mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or § 121(03 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or' F'§ 121(f)4 Another method approved by the Commission. Service Water Heating Systems X❑ § 113(b)2 If a circulating hot water system is installed, it shall have 'a control capable of automatically turning off the circulating pump(s) when hot water is not required. a § 113(c) lavatories in restrooms of public facilities shall be equipped with controls to limit the s . outlet temperature to 110 degrees F. ` EnergyPro By EnergySoft User Number: User Job Number: Page: 18 of 19 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME La Quinta Business Center DATE SYSTEM NAME 8/1/2007 Office Spaces FLOOR AREA 2,516 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL- COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 4,614 64,236 6,919 974 27,689 0 3,212 1,384 0 0 377 14,958 3,65 377 17,541 0 0 3,212 ' 1,384 85 63310 570 F 48.000 HVAC EQUIPMENT SELECTION Exist HVAC 77,090 31,634 99 ,932 5.0 kW Supplemental Electric 34,130 Total Adjusted System Output77,090 31,634 134,062 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Tem eratures at Time of Heating Peak 26.0 OF 65.6 OF 65.6 OF 89.0 °F 97.0 OF Outside Air °0 '� Supply Air Duct 377 cfm Supply Fan Heating Coil Aux. Heat Coil 96.7 OF 4000 cfm ROOMS 69.7 of 70.0 OF Return Air Ducts DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0 / 77.9 OF 78.3 / 66.1 OF 78.3 / 66.2 OF 60.2/59.20 Outside Air o .. Supply Air Ducts 377 cfm ' u Supply Fan Cooling Coil 60.9 / 59.5 OF 4000 cfm 60.3% R.H. ROOMS 74.8/64.7 °F 1 74.0 / 64:5 °F . I 4.3 User Number: 2655 , Xcwi i i rut UUL LS Job Number: 19 of 19