Loading...
09-1325 (RC)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: 09-00001325 Property Address: 43576 WASHINGTON ST STE 101 APN: 609-070-028-25 -000000- Application description: REMODEL - COMMERCIAL Property Zoning: COMMUNITY COMMERCIAL Application valuation: 500000 c&ht 4 4 Qum& Applicant: Architect or Engineer: NI P BUILDING & SAFETY DEPARTMENT BUILDING PERMIT -------------------------------------------------- LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class: B Licens No.: 693077 mete: P40 &l 0 ntractor: O NER-BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason .(Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_ 1 I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_ 1 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractors) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT Owner: ARCHNA, LLC 75277 SKYLARK TRAIL INDIAN WELLS, CA 92210 VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 2/17/10 Contractor: _ ORR BUILDERS 39301 BADGER, SUITE #30;P?Di PALM DESERT, CA 92211 (760)360-6632 ti Lic. No.: 693077 F!� 20lU t 4 Cf1'Y CF F -A i': L' NTA rie"6 :tarti• n cx.vn, -——------——--------------------—------—------—- WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier DELOS INS Policy Number 02DKRM12003959 I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of �Ilelo orthwith om ly w' those provisions. ae�/1'/ WARNING: FAILURE TO SECURE WORKERS' CO IPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,0001. IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION .3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this count to enter upon thea ove-ment d property for inspection ipose ., Dat �" 711 �igna a (Applicant or A Application Number . . . . . 09-00001325 ------ Structure Information TI SUITE 101 & 105 ----- Other struct info . . . . . CODE EDITION 2007 FIRE SPRINKLERS YES MIXED-USE OCCUPANCY B/S-1 OCCUPANT LOAD 78.00 1ST FLOOR SQUARE FOOTAGE 7847.00 ---------------------------------------------------------------------------- 2ND FLOOR SQUARE FOOTAGE .00 Permit . . . BUILDING PERMIT Aaairimai desc Permit Fee . . . . 2039.50 Plan Check Fee 1325.68 Issue Date . . . . Valuation . . . . 500000 Expiration Date 8/16/10 Qty Unit Charge Per Extension BASE FEE 639:50 400.00 3.5000 ---------------------------------------------------------------------------- THOU BLDG 100,001-500,000 1400..00 Permit ELECT - ADD/ALT/REM Additional desc . Permit Fee . . . . 134.55 Plan Check Fee 33.64 Issue Date . . . . Valuation . . . . 0 Expiration Date 8/16/10 Qty Unit Charge Per Extension BASE FEE 15.00 120.00 .0200 ELEC GARAGE OR NON-RESIDENTIAL 2.40 20.00 .7500 PER ELEC DEVICE/FIXTURE 1ST 20 15.00 227.00. .4500 ---------- ----------------------------------------------------------------- EA ELEC DEVICE/FIXTURE >20 102.15 Permit . . . MECHANICAL Additional desc . Permit Fee . . . . 136.00 Plan Check Fee 34.00 Issue Date . . . . Valuation . . . . 0 Expiration Date 8/16/10 Qty Unit Charge Per Extension BASE FEE 15.00 2.00 9.0000 EA MECH FURNACE <=100K 18.00 9.00 4.5000 EA MECH VENT INST/ DUCT ALT 40.50 3.00 16.5000 EA MECH B/C >3-15HP/>100K-500KBTU 49.50 2.00 6.5000 ---------------------------------------------------------------------------- EA MECH VENT FAN 13.00 Permit . . . . . . PLUMBING LQPERMIT Application Number . Permit . . . Additional desc . . Permit Fee . . . . Issue Date . . . . Expiration Date . . . . . . 09-00001325 PLUMBING 142.50 Plan Check Fee . Valuation . . . . 8/16/10 35.63 0 Qty Unit Charge Per Extension BASE FEE 15.00 19.00 6.0000 EA PLB FIXTURE 114.00 1.00 7.5000 EA PLB WATER HEATER/VENT 7.50 1.00 3.0000 EA PLB WATER INST/ALT/REP 3.QQ 1.00 3.0000 EA PLB FIX`URE DRAIN/VENT REP/ALT 3.00 ---------------------------------------------------------------------------- Special Notes and Comments 7,847 SF TENANT IMPROVEMENT FOR A DIALYSIS CLINIC IN SUITES 101 & 105. "B" OCCUPANCY, TYPE V -B CONSTRUCTION. OCCUPANT LOAD = 78. TENANT IS VALLEY COMPREHENSIVE MEDICAL GROUP. 2007 CODES.NOTE: T.I. INCLUDES 120 SF OF NEW BUILDING AREA. 2008 DIF ASSESSED. ---------------------------------------------------------------------------- Other Fees . . . . . . . . . ACCESSIBILITY PLAN REVIEW 132.57 BLDG STDS ADMIN (SB1473) 20.00 DIF CIVIC CENTER - COMM 16.20 ENERGY REVIEW FEE 132.57 DIF FIRE PROTECTION -COMM 9.12 STRONG MOTION (SMI) - COM 105.00 DIF STREET MAINT FAC -COMM 37.08 DIF TRANSPORTATION - COMM 831.72 Fee summary Charged Paid Credited ------------------------------ Due --------------------------- Permit Fee Total 2452.55 .00 .00 2452.55 Plan Check Total 1428.95 .00 .00 1428.95 Other Fee Total 1284.26 .00 .00 1284.26 Grand Total 5165.76 .00 .00 5165.76 LQPERMIT C A City of La Quinta Building 8T Safety Division Permit # P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 cpt,�ni� Building Permit Application and Tracking Sheet Project Address: +5777 (() A41V1, OU1 sfi �/2"b Z Owner's Name: 06u\ uhemive hu (oeta IA-f A. P. Number: Address: 15(-'( 1V7 tom- • 49XVY-) V'WD Legal Description: City, ST, Zip: jn Qj D! CA 9 ZZO I Contractor /Z� ! M�' t% p� Telephon : 1 &O� 408) -IZOS :. � ..'Aw a:.:::;, tiz;w.;;q�w y. Address: U ' Project Description: City, ST, Zip: Telephone: il':ti. `:.:: bid ?;C:• �:�n - ,,4:....�:•;;<<.,,"'�::::� /`� State Lie. # : City Lie. Arch., Baer jZrJ Io 81' R i C C t [V► GC t Address: 715-8i� �� PZ1✓1.7 W* City, ST, Zip: iraIwl Telephon : 7 60 4" (-LOO ? ' .... ;.: ;;yer Construction Type: WV Occupancy: State Lic. #: eoO Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person: 8060 ` Sq. FL:'I'I 27 #Stories: OY1 ?� # Units: Telephone # ,if Contact Person �� �t� .-(ZQ� Estimated Value of Project: V200i t�B f APPLICANT: DO NOT WRITE BELOW THIS LINE N Submittal Plan Sets Req'd Recd TRACING Plan Check submitted PERMIT FEES Item Amount Structural Calcs. Reviewed, ready for corrections I 1 3 Plan Check Deposit Truss Cales. Called Contact Person 1//4 Plan Check Balance. Title 24 Calcs. Plans picked up rz61,,,, —9,kc j A ( Constractiom. Flood plain plan Plans resubmitted Mechanical Grading plan 2" Review, ready for correction issue Z � Electrical Subcontactor List Called Contact Person L �. Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE: Review, ready for correctionsrssue Developer Empact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit Issue School Fees Total Permit Fees 1*Vj J1A - � <6111004 S144" To &*4tAvJ,4� rC�l�vG�e1�GlS�- Bin # P City of La Quinta Bmlding 8F Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quanta, CA 92253.(760) 777-7012 Buildin Permit Application g App cation and Tracking Sheet Permlt # I3 Project Address:3 6,_7 St. Owner's Name: A. P. Number. Address: Legal Description: Contractor: City, ST, Zip: Telephone: Project Description: Address: City, ST, Zip: V 5, Telephone: State Lie. #: City Lie. #, Arch., Engr., Designer Address: City., ST, Zip: Telephone: State Lie. #: Name of Contact Person: Construction Type: Occupancy: Project type (circle one): New Add'n Alter Repair Demo Sq. Ft: #Stones: #Units: Telephone # of Contact Person: — Estimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS UNE # Submittal Req'd Recd TRACKIIVG PERMIT FEES Plan Set Plan Cheek submitted Item Amount Structural Cala. Reviewed, ready for corrections Plan Check Deposit Truss Culex. Called Contact Person Plan Check Balance Title 24 Coles. Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2" Review, ready for correctio Electrical Subcortaetor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.L H.O.A. Approval Plans resubmitted Grading IN HOUSE:- 3" Review, ready for eorrectionslissue Developer Impact Fee Planning Approval Called Contact Person A.LP.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees 35 99D 61 lit a patze- �� .�y �� .,, L , Jas aAs"..e, - I TITLE 24 REPORT I �7 Title 24 Report for: Valley Comprehensive Medical Group 43-576 Washington Street, Suite 101 & 105 La Quinta, Ca 92253 Project Designer: Robert H. Ricciardi 75-860 Sarazen Way Palm Desert, CA 92211 (760) 408-1208 Report Prepared By: di Jon Scott Scott Design & Title 24 77085 Michigan Dr. Palm Desert, CA 92211 JAN 2 8 2010 BY: Job Number: Date: 1/25/2010 CITY OF LA QUINTA BUILDINa & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATEZ a 0P gyok' - I271 o computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Erergy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.4 by EnergySoft Job Number: /� User Number: 6712 I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 17 Form LTG -7-C Room Cavity Ratio Worksheet 18 Form OLTG-1-C Certificate of Compliance 19 Form OLTG-2-C Lighting Compliance Summary 21 Form OLTG-3-C Illuminated Area Calculation Worksheet 22 Form LTG -MM Lighting Mandatory Measures 23 Form MECH-MM Mechanical Mandatory Measures 24 HVAC System Heating and Cooling Loads Summary 26 Zone Load Summary 32 Room Load Summary 38 Room Heating Peak Loads 44 Room Cooling Peak Loads 50 Room Cooling Coil Loads 57 Lighting Inspection Checklist 64 EnergyPro 4.4 by EnergySoft Job Number: User Number: 6712 a I L L PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERFA PROJECT NAME SIGNATURE \ DATE Valle Comprehensive Medical Group1/25/2010 DATE OF PLANS OJECT ADDRESS consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this BUILDING CONDITIONED FLOOR AREA 43-576 Washington Street, Suite 101 & 105 La Quinta CLIMATE ZONE 15 PRINCIPAL DESIGNER - ENVELOPE ® TELEPHONE Building Permit # Robert H. Ricciardi ❑ ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document (760) 408-1203 ® DOCUMENTATION AUTHOR ENVELOPE COMPLIANCE TELEPHONE Checked by/Date Scott Design & Title 24 Re ui e m 760) 200-4780 Enforcement Agency Use GENERAL INFORMATION SIGNATURE \ DATE Jon Scott DATE OF PLANS The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this BUILDING CONDITIONED FLOOR AREA 7, 847 Sq.Ft. ENV. LTG. MECH. CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ❑ ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document NEW CONSTRUCTION ADDITION ® EXI-STING + ADDITION/ALTERATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE \ DATE Jon Scott • zS• 20 The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. ❑ El ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Prcfessions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Mea u e EN -1 Re ui e m PRINCIPAL ENVELOPE DESIGNER - NAME IG T R LIC. NO. DAT Robert H. Ricciardi D Z5 I6 LIGHTING COMPLIANCE M su Indicate location on plans of Note Block for Manneu s r or s -1, LTG -2 PRINCIPAL LIGHTING DESIGNER - NAME SI A E LIC. NO. Robert H. Ricciardi Iv MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 MECH-5 Required Forms PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE LIC. NO. DATE Scott Design and Title 24 Inc. Run Initiation Time: 01/25/10 13:54.5 Run Code: 1264456t-91 EnergyPro 4.4 by Energysoft User Number: 6712 Job Number: Page:3 of 64 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PE PROJECT NAME I DATE ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance ENERGY COMPONENT Design Design Margin il=stenaare Proposed Space Heating 0.13 0.17 -0.031 Space Cooling 251.44 222.35 29.09 Indoor Fans 84.45 84.17 0.28 ,ili ll Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 0.00 Domestic Hot Water 18.22 18.46 -0.25 Lighting 79.611 68.40 11.21 EWE E Receptacle 91.54 91.54 0.00�� Process o.00 0.00 0.00 0 20 40 8'0�80�at003120 140 180,180 200 220 240 . ay _ ; kBtulagft Yr„ti4'`' TOTALS:, 525.39 485.09 40.30 e Percent better than Standard: 7.7% ( 7.7% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones (W)270deg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 7,847 sgft. sgft. sqft. 1 0 8 7,847 6 Natural Gas 422 45.9% Orientation Front Elevation Left Elevation (N) Rear Elevation E Right Elevation (S Total Roof Gross Area sgft. sgft. sgft. sgft. sgft. sgft. Glazing Area Glazing sgft. sgft. sgft. sgft. sgft. sgft. Ratio 920 422 45.9% 885 0 0.0% 1,230 555 45.1% 1,140 119 10.4% 4,175 1,096 7,847 ==� 0.0% Standard Proposed Lighting Power Density 1.200 w/sgft. 1.031 w/sgft. Prescriptive Env. Heat Loss 1,883 Btu/h 1,390 Btu/h Prescriptive Env. Heat Gain 165,242 Btu/h-F 188,063 Btu/h-F Remarks: Run Initiation Time: 01/25/10 13:54:51 Run Code: 1264456491 EnergyPro 4.4 by Energysoft User Number: 6712 Job Number: Page:4 of 64 .. 4 F_ PERFORMANCE CERTIFICATE OF COMPLIANCE . Part 3 of 3 PERF -1 PROJECT NAME DATE Valle Comprehensive Medical Group1/25/2010 ONE INFORMATION Floor Inst.Allowed LPD ." Proc Area LPD Credits Loads Area Tailored System Name Zone Name Occupancy Type (sgft.) (W/sf)1 .(W/sf)?, „ Y /s 3 Is 4... (VV/s. HP 1 Existing. Dr. Office 1,084 0.81 Office HP 2 Existing Conference/Breakroom Office 1,514 1.12 :.:3� s _ z.. s� ti HP 3 Reception Lab Tech 1,205 1.07 Office HP 4, 5 & 6 Existing Treatment Area 2,543 1.38s7i1:,. Office HP7 Existing Treatment & Delivery Office 900 0.42 *" ; tf +.,f HP ; 8 TechMater/Supply Rm office 6011 0.53 :;,x:...�€° E yyfl f€ 4 {€r' {:.... {'¢4�4 Y ff'l(E?Y .. F€ft ��Y. 1, r;.�rT f•``;vNfiY r' S�!:.ab '��."sE :f s�'SI i -K A1 u n .• 7 E NOtOS: 1. See LTG -2-C 2. See LTG -4-C 3: See LTG -5-C 4. See LTG -6-C Items atiove'requve speaal documAM"Z oni (items marked with asterisk, see LTG -2 -C by others) , (by others) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified In this checklist. These Items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System "Carrier 25HBS360/FK4DNB060" is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement. The HVAC System "Existing HVAC' is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement. 4 rhe exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and cumentation for their use have been provided by the applicant. uthorized Signature or Stam Run Initiation Time: 01/25110 13:54:51 Run Code: 1264456491 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:5 of 64 i 4 CERTIFICATE OF COMPLIANCE ENV -1-C ECT NAME DATE Vallev COMDrehensive Medical GroUD 1/25/2010 # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 1 Roof 10 0.035 R-30 R-0.0 0 0 Existin 02-A10 Dr. Office 2 Wall 41 0.074 R-19 R-0.0 0 90 Existin 09-A5 Dr. Office 3 Wall 5 0.086 None R-13.0 180 90 Existing 13-D5 Dr. Office 4 Wall 14 0.086 None R-13.0 270 90 Existin 13-D5 Dr. Office 5 Roof 1,51 0.035 R-30 R-0.0 0 0 Existin 02-A10 Conference/Breakroom 6 Wall 430 0.074 R-19 R-0.0 0 90 Existing 09-A5 Conference/Breakroom 7 Wall 37 0.086 None R-13.0 90 90 Existing 13-D5 Conference/Breakroom 8 Roof 1,201 0.035 R-30 R-0.0 0 0 Existing 02-A10 Reception Lab Tech 9 Wall 90 0.086 None R-13.0 90 90 Existing 13-D5 Reception Lab Tech 10 Roof 2,54 0.035 R-30 R-0.0 0 0 Existin 02-A10 Treatment AreE 11 Wall 70 0.069 R-21 R-0.0 90 90 New 09-A6 Treatment Area 12 lWall 20 0.086 None R-13.0 90 90 Existing 13-D5 Treatment Ares 13 Wall 50 0.086 None R-13.0 180 90 Existin 13-D5 Treatment AreE 14 Wall 16 0.086 None R-13.0 180 90 Removed 13-D5 Treatment AreE 15 Wall 15 0.074 R-19 R-0.0 180 90 New 09-A5 Treatment Area 16 Wall 3 0.086 None R-13.0 270 90 Existin 13-D5 Treatment AreE 17 Wall 5 0.069 R-21 R-0.0 270 90 New 09-A6 Treatment AreE 18 Door 2 0.5001 Insul R-0.0 270 90 1 New 28-A3 Treatment AreE 19 Roof 90 0.035 R-30 R-0.0 0 0 1 Existing 02-A10 Treatment & Delivery 20 JWall 1 101 0.0861 None R-13.01 90 90 1 Existing 13-D5 Treatment & Delivery N, E. A. R (New, Existing, Altered, I FENESTRATION SURFACES I (�j More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default 1.1 -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors oroiect office durina construction and in the building managers office after construcBon # Type # Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments 1 Window Front 3 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Dr. Office Window Front None 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Dr. Office Window Rear E 70 0.790 116-A 0.59 116-B 90 Existing Double Metal Tinted Conference/Breakroom 4 Window Rear E 25 0.790 116-A 0.59 116-B 90 Existing Double Metal Tinted Conference/Breakroom 5 Window Rear E 44 0.790 116-A 0.59 116-B 90 Existing Double Metal Tinted Conference/Breakroom 6 Window Rear E 70 0.790 116-A 0.59 116-B 90 Existing Double Metal Tinted Reception Lab Tech 7 Window Rear E 70 0.7901116-A 0.59 116-B 90 Existing Double Metal Tinted Reception Lab Tech 8 Window Rear E 44 0.790 116-A 0.59 116-B 90 Existing Double Metal Tinted Reception Lab Tech 9 Window Rear E 25 0.790 116-A 0.59 116-B 90 Existing Double Metal Tinted Treatment Area 10 Window Rear E 70 0.790 116-A 0.59 116-B 901 Existing Double Metal Tinted Treatment Area 11 Window Rear E 44 0.790 116-A 0.59 116-B 1 901 Existing Double Metal Tinted Treatment Area 12 Window Rear E 25 0.790 116-A 0.59 116-B 1 901 Existing Double Metal Tinted Treatment Area 13 lWindow Rear E 70 0.790 116-A 0.59 116-B 1 901 Existing Double Metal Tinted Treatment Area (1) LI -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type Window Overhang Left Fin Right Fin SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. Mt. Dist. Len. H t. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 6 None 0.76 7 None 0.76 8 None 0.76 9 None 0.76 10 None 0.76 11 1 None 0.76 12 None 0.76 13 INone 0.76 INIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building Is In climate zones 2 through 16 and contains an enclosed space with floor area greater than 26,000 ft2, a ceiling height greater than 16 feet, and an LPD for general lighting of at least 0.6 W/ft2. See Section 143(c). If this box is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach. Run Initiation Time: 01/25/10 13,54:51 un Code: 126"56491 EnergyPro 4.4 by Energysoft User Number: 6712 Job Number: Page:6 of 64 i 4 CERTIFICATE OF COMPLIANCE ENV -1-C NAVDATE allev Comprehensive Medical Group 1/25/2010 E SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt . Cond. Status Joint Appendix IV Reference Location / Comments 21 Wall 32 0.086 None R-13.0 180 90 Existing 13-D5 Treatment & Delivery 22 Wall 84 0.086 None R-13.0 270 90 Existing 13-D5 Treatment & Delivery 23 Roof 60 0.035 R-30 R-0.0 0 0 Existin 02-A10 Tech/Water/Supply Rm 24 Wall 4 0.086 None R-13.0 0 90 Existing 13-D5 Tech/Water/Suoply Rm 25 Wall 167 0.0861 None R-13.01 270 90 1 Existin 13-D5 Tech/Water/Sup I Rm 0.59 116-B 270 Existing Double Metal Tinted Treatment & Delivery 20 Window Front 25 0.7901116-A 0.59 116-B 270 Existin Double Metal Tinted Treatment & Delivery 21 Window Front 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Tech/Water/Supply Tech/Water/SupplyRm 22 Window Front 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted TechAA/ater/Supply Tech/Water/SupplyRm 23 Window Front 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Tech/Water/Supp Rm N, E, A, R (New, Existing, Altered, I I More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default LI -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors oroiect office durino construction and in the buildino manacefs office after construc0on # T ## Window Overhang Left Fin Right Fin Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. Ligt. Dist. Len. H t. Area U -Fac' SHGC2 Act. Am. A. Cond. Stat. Glazing Type Location/ Comments 14 Window Right S 70 0.790 116-A 0.59 116-B 180 Removed Double Metal Tinted Treatment Area Window Right S 70 0.790 116-A 0.59 116-B 180 Removed Double Metal Tinted Treatment Area Window Right S 37 0.790 116-A 0.59 116-B 180 Existing Double Metal Tinted Treatment Area 17 lWindow Right S 82 0.790 116-A 0.59 116-6 1801 Existing Double Metal Tinted Treatment & Delivery 18 Window Front 25 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Treatment & Delivery 19 Window Front 25 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Treatment & Delivery 20 Window Front 25 0.7901116-A 0.59 116-B 270 Existin Double Metal Tinted Treatment & Delivery 21 Window Front 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Tech/Water/Supply Tech/Water/SupplyRm 22 Window Front 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted TechAA/ater/Supply Tech/Water/SupplyRm 23 Window Front 70 0.790 116-A 0.59 116-B 270 Existing Double Metal Tinted Tech/Water/Supp Rm �1 Ll -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2; SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING ## Window Overhang Left Fin Right Fin Exterior Shade Type SHGC Hgt. Wd. Len. H t. LExt.RExt. Dist. Len. Ligt. Dist. Len. H t. 14 None 0.76 15 None 0.76 16 None 0.76 17 None 0.76 18 None 0.76 19 None 0.76 20 None 0.76 21 None 0.76 22 None 0.76 23 None 0.76 INIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building Is In climate zones 2 through 16 and contains an enclosed space with floor area greater than 26,000 ft2, a calling height greater than 16 feet, and an LPD for general lighting of at least 0.6 W/R2. See Section 143(c). If this box Is checked, ENV41-C must be filled out. when submitting under the Prescriptive Compliance Approach. Run Initiation Time: 01/25/10 13:54:51 Run Code: 1264456491 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:7 of 64 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C AcOJECT NAME DATE Vallev Comprehensive Medical Group 1/25/2010 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 8,090 IALLTW ERNATE COMPLIANCE PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) .IA;1A-s CONTROL IDENTIFICATION CONTROLTYPE (Auto Time Switch, Dimm c Check if SPACE CONTROLLED Daylighting NOTES TO FIELD - For Building Department Use Only INSTALLED E.f�1.+�.t{ [."T s b WATTS i j�C .fi.:S{i kyyi yj �.f. Y... ` fk[y4 X.:.4i ?ij K"`r Zni{ Y E y 1.¢<- A♦ INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 8,090 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 8,090 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 8,090 IALLTW ERNATE COMPLIANCE PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) .IA;1A-s CONTROL IDENTIFICATION CONTROLTYPE (Auto Time Switch, Dimm c Check if SPACE CONTROLLED Daylighting NOTES TO FIELD - For Building Department Use Only E.f�1.+�.t{ [."T s b R f E..ki i j�C .fi.:S{i kyyi yj �.f. Y... ` fk[y4 X.:.4i ?ij K"`r Zni{ Y E y 1.¢<- A♦ ff t .f Nva° C ( X T �.-.1k y,.i'?0.'f;::: ., ti r. i-: . . ! _r:.:: f>{ Nvv.T•f+. Y: ., f �. kS4: i!M.i.t ..Y ^r. .F,s �. I.,.r 1 Nri: f f. i.pLi`" °5 sf • .F 4 sif Run Initiation Time: 01125/1013:54:51 Run Code: 1264456t-91 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:8 of 64 CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-C PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 7esigner: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of to plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Description Test Performed By: ❑ LTG-2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance NI Equipment requiring acceptance testing VINI g Y Ole, C4 . ❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing Run Initiation Time: 01/25/10 13:54:51 Run Code: 1264456491 EnergyPro 4.4 by Energysoft User Number: 6712 Job Number: Page:9 of 64 L CERTIFICATE OF COMPLIANCE MECH-1-C PROJECT NAME DATE hk Valley Comprehensive Medical Group 1/25/2010 esigner: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in :he Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance f I1 j,� Equipment requiring acceptance testing P � y T, Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document r I1 Equipment requiring acceptance testing �i 0 Test required on all New systems both New Construction and Retrofit. MECH 4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 R2 of space or less and 25% or more of the ducts are in nonconditfoned or semicondifioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend duds, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btulhr. -Water-loop Heat Pump Controls Applies to all new waterioop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment re uirin acceptance testing EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:10 of 64 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C NAME Vallev ComDrehensive Medical Grou DATE 1/25/2010 Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Name Type Description �r d �V i=ds �.'D3 Lo. U) m m o 10 mv� VAN �dZ 3U3 Lu ....� m `� i= ��y NDN mYa v dm CI s No r = z x'03 o�� 'nmm �NfD a A1A2�2e4 ft Fluorescent T8 Energy Savings F32T8 2 30 1.0 54.0 '{ 10 540 C (2) 2 ft Fluorescent T8 Elec 2 17 1.0 33.0:{ 39 1,287 D E2ec ft Fluorescent T8 Energy Savings 32T8 2 30 1.0 54.0 X 64 3,456 F 42w Low Voltage Halogen 2 Watt Lamp 1 42 1.01 45.0 X 34 1,530 G (1) 4 ft Fluorescent T8 Energy Savings Elec 1 30 1.0 29.0:{ 1 29 HJ � ) 4 ft Fluorescent T8 Energy Savings 4 30 1.0 X 12 1,248 PAGE TOTAL S 090 BUILDING TOTAL (sum of all pages) 8,090 PORTABLE LIGHTING (From LTG -3-C) D CONTROL CREDIT (From LTG -4-C) D • ADJUSTED ACTUAL WATTS 8 090 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 11 of 64 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C ECT NAME Com ITEM OR SYSTEM TAG(S) Number of Systems nsive Medical Grou T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance DATE 1/25/2010 AIR SYSTEMS, Central or Sir gle Zone HP 1 Existing HP 2 Existing HP 3 1 1 1 Reference on Plans or Specification 1 112(a) 8.00 HSPF 8.00 HSPF 7.60 HSPF 112(a) 12.0 SEER / 10.0 EER 12.0 SEER / 10.0 EER 13.0 SEER / 11.0 EER 112(b) Yes Yes Yes 112(c), 115(a),n/a 47,186 btuh n/a n/a 121(b) Yes Yes Yes 121 b 163 cfm 227 cfm 181 cfm 121 c No No No 121 c No No No 121 c 122(el _Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Auto Auto Auto 122( n/a n/a n/a 123 124 1 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 35,441 btuh 35,441 btuh 33,078 btuh 144 a & b n/a n/a n/a 144 a & b 47,186 btuh 47,204 btuh 41,864 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section aid paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. I EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Paae:12 of 64 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C ECT NAME Vallev Comprehensive Medical Grou ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation �uct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer ,Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance DATE 1/25/2010 AIR SYSTEMS, Central or Sir, le Zone HP 4, 5 & 6 Existing HP7 Existing HP 8 3 1 1 Reference on Plans or Specification 1 112(a) 8.00 HSPF 8.00 HSPF 7.60 HSPF 112(a) 12.0 SEER / 10.0 EER 12.0 SEER / 10.0 EER 13.0 SEER / 11.0 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121 b 509 cfm 135 cfm 90 cfm 121 c No No No 121 c No No No 121(c), 122(e) Procirammable Switch Programmable Switch Programmable Switch 122(e) Heating & ooling Required Heating & Cooling Regtjred Heating & Cooling Required 122 Auto Auto Auto 122 n/a n/a n/a 123 124 R-4.2 R-4.2 n/a 144 a & b n/a n/a n/a 144 a & b 106,324 btuh 35,441 btuh 33,078 btuh 144 a & b n/a n/a n/a 144 a & b 141,276 btuh 50,924 btuh 42,023 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k) No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. Kun Initiation lime: U1/L5/1u 13.5 :5 Kun Gocie: 1Z64456t-91 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 13 of 64 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C -iPROJECT NAME DATE Valley Comprehensive Medical Group 1/25/2010 SYSTEM FEATURES 2 WATER SIDE SYSTEMS: Chillers, Towers, Bcilers, H dronic Loops ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specifcation Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/o, specification section and paragraph •number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Water Heater Certification 113 (a) Water Heater Efficiency 113 b Service Water Heating Installation 113 (c) Pool and Spa Efficiency and Control 114 a Pool and Spa Installation 114 b Pool Heater - No Pilot Light 115 (c) Spa Heater - No Pilot Light 115 d Service Hot Water, Pool Heating DHW Heater 2 AO SMITH ELJF-06* n/a n/a n/a Reference on Plans or Specification 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/Q specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. Run Initiation Time: 01/25/10 13:54:51 Run Code: 1264456491 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 14 of 64 MECHANICAL VENTILATION MECH-3-C NAME Vallev Comprehensive Medical Group IDATE 1/25/2010 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121 b 2 AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM A NDS TAa ..d0 a w�0 am -n 0�3 �'�3 k DO "Q)3 Z 03 OQ' �M my0 f�l mT 3�3 ` m03 K00 vd3 odA �k Q ��D nim TwN 3DB O 0 00 TUl 3�M n �c� y x A p 0 w3D�'i 07K n=� 3 C- y »> D 03 D —1 �. D Dr. Office 1,084 0.15 163 1 1 163 163 HP 1 Existing Total 163 163 Conference/Breakroom 1,514 0.15 227 227 227 HP 2 Existing Total 227 227 Reception Lab Tech 1,205 0.151 181 181 181 HP 3 Total 181 181 Treatment Area 2,542 0.15 381 381 509 HP 4, 5 & 6 Existing Total 381 509 Treatment & Delivery 90C 0.151 135 135 135 HP7 Existing Total 135 135 ech/Water/Supply Rm 60 0.15 90 90 90 P 8 Total 90 90 C Minimum ventilation rate perSection 121 Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REO'D V.A, is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). I Must be greater than orequal to H or use Transfer Air column N to make up the difference. J Design fan supply cfm Fen CFM x 30%; or K Condition area ft. sq.) x 04 cffnt t. sq.; or L Maximum of Columns H, J, K, or 300 cfm M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 15 of 64 4 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Valle Comprehensive Medical Group1/25/2010 DATE ILLER AND TOWER SUMMARY Motor Eff. Drive Eff. Efficiency Tons PUMPS Drive Eff. Existing HVAC Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control Carrier 25HBS360/FK4DNB060 Constant Volume Draw -Through 2,000 1.00 82.5% 100.0% none CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type City Output Aux. kW Eff. Outout Efficiencv Condition Status Economizer Type Existing HVAC Split DX 6 60,000 0.0 8.00 HSPF 59,500 12.0 SEER / 10.0 EER Existing No Economizer !DHW / BOILER SUMMARY S lit DX P Enargy Standby TANK INSUL. Rated Vol. Condition Factor Loss or I Ext. System Name System Type Distribution Type Qty IInput (Gals.) Status or RE Pilot R -Val. O SMITH ELJF-06' Small Elec. Point of Use 2 5,120 6 New 0.95 n/a n/a SUPPLY FAN I RETURN FAN System Name Hot Water P mp Control # HP Type Hot Water Piping Len :h ft In Plenum Outside Buried Add 1/2" Insulation BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. Existing HVAC Constant Volume Draw -Through 2,000 1.00 82.5% 100.0% none Carrier 25HBS360/FK4DNB060 Constant Volume Draw -Through 2,000 1.00 82.5% 100.0% none CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type City Output Aux. kW Eff. Outout Efficiencv Condition Status Economizer Type Existing HVAC Split DX 6 60,000 0.0 8.00 HSPF 59,500 12.0 SEER / 10.0 EER Existing No Economizer Carrier 25HBS360/FK4DNB060 S lit DX P 21 56,000 0.0 7.60 HSPF 56,000 13.0 SEER / 11.0 EER New No Economizer SUPPLY FAN I RETURN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. Existing HVAC Constant Volume Draw -Through 2,000 1.00 82.5% 100.0% none Carrier 25HBS360/FK4DNB060 Constant Volume Draw -Through 2,000 1.00 82.5% 100.0% none EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 16 of 64 F- L L 4 ENVELOPE MANDATORY MEASURES ENV -MM NAME DATE Vallev Comprehensive Medical Groua 1/25/2010 DESCRIPTION Designer Enforcement ❑ §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. X] §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. X❑ § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). FXJ § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. X❑ §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 17 of 64 A B C D E F Room Name Task/Activity Description Room Length (L) ft Room Width (W) ft Room Cavity Height (H) (ft) Room Cay. Ratio 5xHx(L+W) /(LxWW) A B C D E F Room Name Task/Activity Description Room Area (A) (so Room Perimeter (P) (ft) Room Cavity Height (H) (ft) Room Cay. Ratio 2.5 x H x P /A 4 CERTIFICATE OF COMPLIANCE (Part r of 2) OLTG-1-C ROJECT NAME DATE Valley Comprehensive Medical Group 1/25/2010 OJECT ADDRESS - - 43-576 Washington Street, Suite 101 & 105 La Quinta Building Permit # PRINCIPAL DESIGNER - LIGHTING TELEPHONE Robert H. Ricciardi (760) 408-120.3 DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Scott Design & Title 24 (760) 200-478-31 1 Enforcement A enc Use GENERAL INFORMATION DATE OF PLANS OUTDOOR LIGHTING ZONE ❑ LZ1 ❑ LZ2 ❑X LZ3 ❑ LZ4 FUNCTION TYPE OUTDOOR LIGHTING ❑ OUTDOOR SIGNS ❑ INDOOR SIGNS PHASE OF CONSTRUCTION ❑ NEW CONSTRUCTION ❑ ADDITION ® ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE . Jon Scottit. ZS • The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specfications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6. lease Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ❑ I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. ❑ I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 f h Business and Professions Coda to sign this document because it pertains to a structure or type of work descri d s e mpt rsuant to Business an; Professions Code Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING DESIGNER - NAME IG T DAT LIC. # O 0 3 d Robert H. Ricciardi -1'VV LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ®OLTG-I-C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 maybe incorporated in schedules on the p Either LTG -1-C or OLTG-I-C may be used for signs as follows: 1. Use LTG -1-C if the project consists solely of indoor signs. 2. Use LTG -1-C if the project consists of indoor lighting, outdoor or indoor signs, but no other outdoo - lighting. 3. Use OLTG-I-C if the project consists solely of outdoor signs. 4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indmr lighting. IEOLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances :Except Signs). OLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations. OLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and externally illuminated signs, for both indoor and outdoor signs. EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 19 of 64 ans. CERTIFICATE OF COMPLIANCE (Part2 of 2) OLTG-1-C JECT NAME Valle Comprehensive Medical Group1/25/2010 DATE 4j1q0ht1n_q Schedules on Plans Show that Outdoor Lighting Meets Allowed Li-ghting Power ❑X Lighting power allowance for general site Illumination on OLTG-2-C Part 1 of 4 ❑ Not Applicable ❑ Lighting power allowance for local ordinances or for security multipliers on OLTG-2-C Part 2 of 4 ❑X Not Applicable ❑ Lighting power allowances for specific applications, other than vehicle service stations with canopies on OLTG-2-C Part 3 of 4 ❑X Not Applicable ❑ Lighting power allowances for vehicle service station canopies on OLTG-2-C part 4 of 4 ❑X Not Applicable ❑ Sign lighting compliance on OLTG-4-C ❑X Not Applicable ControlsMandatory Measures on Plans Show that Outdoor Licihtina Meets Outdoor Liahtina ❑X Installed lighting power has been determined In accordance with Section 130(c)1 ❑ Not Applicable ❑ All permanently Installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumins per Watt or are controlled by a motion sensor per Section 132(a) ❑X Not Applicable ❑ All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements of Section 132(b) TXX Not Applicable ❑X All permanently Installed outdoor lighting meets the control requirements of Section 132(c)1 ❑ Not Applicable ❑ Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi-Level Lighting Requirements of Section 132(c) ❑X Not Applicable MANDATORY AUTOMATIC CONTROLS NOTE TO FIELD' CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) AREA CONTROLLED EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 20 of 64 LIGHTING COMPLIANCE SUMMARY (Part 1 of 4) OLTG-2-C Name Vallev COMDrehensive Medical G Date 1/25/2010 LIGHTING POWER ALLOWANCES - GENERAL SITE ILLUMINATION - Table 147-A Allotted Watts Luminaire Lamps/Ballasts Installed Watts A B C D E F G H I J K L M N O Lighting Application Category (Table 147-A) r D ma 5�w a T D rHa ra r o o D xa c�� d inn a m Description v me og �; � o .civ v3 m v r- r 33 �y 0. m CD MX 3++ V r Go 3d �� d, m M r- 3 � ' d.v (D n n o m c w r z 33 u'�m y °, ra r� xa z v d Exit Doors 21 0.70 151 11 Compact Fluorescent Tri /Quad 4 in Elec 1 39 1.0 46.0 X 4 • Total Allotted Watts 151 Taal Installed Watts as EnergyPro 4.4 by EnergySoft User Number: 6712 , Job Number: Page:21 of 64 1 4 r L ILLUMINATED AREA CALCULATION WORKSHEET (Part 2 of 5) OLTG-3-C PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 Hardsca a Method ii Hardsca a for driveways, site roads, sidewalks, walkways and bikewEs A B List Specific Application (Table 147-A) Length of 25' wide path incorporating as much of he paved area as possible. 18 216 Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)1 B Method ii - General illumination areas for site roadway, driveway, sidewalk, walkway, or bikeway includes only those illuminated areas that are in the bounds of the Application and includes a 25 foot wide area running along the axis of the path of travel and much of the paved area as possible. B. Building Entrances without Cano ies A B C Width of Door plus 3 feet on each side Smaller of 18 ft or distance to the edge of the property line Area (sf) (Ax B) 12 18 216 Checklist Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with the actual use of the areas. Section 147 (c)1 A - General illumination areas includes only those illuminated areas that in the bounds of the Application and are with a square pattern around a ❑ luminaire that is six times the luminaire mounting height, with the luminaire in the middle of the pattern, less any areas that are within buildings, under canopies, beyond property lines, or obstructed by a signs or other structures. I EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Paae:22 of 64 1 F_ L_ 4 LIGHTING MANDATORY MEASURES LTG -MM ECT NAME DATE Vallev Comprehensive Medical Group I 1/25/2010 DESCRIPTION Designer Enforcement ❑X § 131(d)1 For every floor, all Interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X] § 131(d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch In sight of the lights. The area of override is not to exceed 5,000 square feet. X] § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. X❑ § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor-to-celling walls. § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bl-level switching for uniform reduction of lighting within the room. § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps In each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is Included on plans. ❑ § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 23 of 64 4 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM NAME DATE Vallev Comprehensive Medical GroUD I 1/25/2010 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies ❑X @11 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a) - Fan type central furnaces shall not have a pilot light. ❑ §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls §122(e) Each space conditioning system shall be installed with one of the following: §122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or §122(e)1 B An occupancy sensor to control the operating period of the system; or . F] §122(e)iC A 4 -hour timer that can be manually operated to control the operating period of the system. §122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® §122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. ❑ §112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 24 of 64 4 4 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM ROJECT NAME DATE I Valley Comprehensive Medical Group 1 1/25/2010 Description Designer Enforcement Ventilation §121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. X❑ §4 22(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. ❑ §121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or ❑ §121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or X❑ §I21(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or §121(f)4 Another method approved by the Commission. Service Water Heating Systems 913(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. X❑ §I13(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:25 of 64 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Valle Comprehensive Medical Group1/25/2010 STEM NAME FLOOR AREA HP 1 Existing 1,084 Number of Total Btuh/sgft) Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions (EATING SYSTEM PSYCHROMETRICS 24.0 of 65.9 of Outside Air 163 cfm 69.6 of 10.1 / 74.3 of Outside Air 163 cfm 75.7/62.7 of 1,000 Total Room Loads 000 �I I TOTAL SYSTEM LOAD COIL COOLING PEAK Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts CFM 55.4 Latent 1,500 1,500 5.0 �I I TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 38 645 4 163 25 554 2,000 Existing HVAC 47,186 4,935 35,441 2,000 1.85 403.4 8.1 Total Adjusted System Output 47,186 4,935 35,441 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Jul 5 pm Jan 12 am Heating Coil 82.3 of Supply Fan 2000 cfm 82.3 of —� Supply Air Ducts 82.0 of ROOMS 70.0 of in Return Air Ducts 11 res at Time of 78.5/63.50F M 56.6/55.20F Cooling Coil Supply Fa 2000 cfm 56.6 / 55.2 of —� Supply Air Ducts Fan 57.3 / 55.5 of 49.9% R.H. ROOMS 75.0 / 62.5 of f% Return Air Ducts `I EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 26 of 64 1 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT:NAME DATE Valle Comprehensive Medical Group1/25/2010 STEM NAME FLOOR AREA HP 2 Existing 1,514 T 24.0 OF 64.3 OF Outside Air 227 cfm 69.5 OF 10.1 / 74.3 OF Outside Air 227 cfm 75.8/63.6 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM Sensible 46,420 5,198 34 384 Existing HVAC 47,204 5,886 35,44 Total Adjusted System Output47,204 5,886 35,441 (Adjusted for Peak Design Conditions) Heating Coil TIME OF SYSTEM PEAK I . ul 1 pmt I Jan 12 a- 80.8 OF rstream T Supply Fan 2000 cfm 80.8 OF Supply Air Ducts 80.3 OF ROOMS 70.0 OF �% Return Air Ducts 'I 79.7/64.7 OF M 57.8/56.40, Cooling Coil Supply Fan 2000 cfm 57.8 / 56.4 OF Supply Air Ducts 58.6/56.7 OF 52.9% R.H. IROOM7S 75.0 / 63.4 OF h Return Air Ducts `i EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page:27 of 64 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Valley Comprehensive Medical Group 1/25/2010 STEM NAME FLOOR AREA HP 3 1,205 Number of Systems I 1I Heatina Svstem Output per System 56,000 Total Output (Btuh) 56,000 Outout (Btuh/salt) 46.5 Cooling System Output per System 56,000 Total Output (Btuh) 56,000 Total Output (Tons) 4.7 Total Output (Btuh/sgft) 46.5 Total Output (sgft/Ton) 258.2 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.66 Airflow (cfm/Ton) 428.6 Outside Air (%) 9.0 Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions 24.0 of ) 0 Outside Air -— 181 cfm 69.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,598 0 181 6,705 -323 0 1,598 41,8561 3.7121 Carrier 25HBS360/FK4DNB060 41,864 8,474 33,078 Total Adjusted System Output x1,864 8,474 33,078 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 10 ami I Jan 12am HROMETRICS (Airstream To 65.5 OF . 80.8 OF Heating Coil -Q0-J- Supply Fan 2000 cfm 80.8 of -� Supply Air Ducts 80.5 of ROOMS 70.0 of �% Return Air Ducts 4 :OGLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time o 10.1 / 74.3 of 78.8 / 65.1 of 59.5 / 58.1 of Outside Air O 181 cfm Cooling Coil Supply Fan 2000 cfm 75.7/64.4 OF 59.5/58.1OF Supply Air Ducts 60.2 / 58.4 of 55.8% R.H. ROOMS 75.0 / 64.2 of h Return Air Ducts '*I EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 28 of 64 1 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Valle Comprehensive Medical Group1/25/2010 STEM NAME FLOOR AREA HP 4 5 & 6 Existing 2,543 Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions (EATING SYSTEM PSYCHROMETRI 3 COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 60,000 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD 180,000 70.8 31,304 59,500 178,500 14.9 70.2 171.0 24.0 of 65.9 of %� ✓ %� %� Outside Air 509 cfm 69.8 of 10.1174.3 of Outside Air 509 cfm 75.5/62.7 of 3,322 64,143 10,937 2,406 31,304 0 3,207 1,565 0 0 509 19,000 1,820 509 25,124 0 0 3,207 1,565 89,5571 12,7571 59 559 2,000 6,000 Existing HVAC 141,276 15,071 106,324 2.36 403.4 8 5 Total Adjusted System Output 141,276 15,071 106,324 (Adjusted for Peak Design Conditions) 0.20 TIME OF SYSTEM PEAK Jul 1 pm Jan 12 am Heating Coil 82.3 of s at Time of Heating Peak) 82.3 of O Supply Air Ducts Supply Fan 82.1 of 6000 cfm ROOMS 70.0 of h Return Air Ducts 'I 78.4 / 63.5 of i• 56.6/55.20F Cooling Coil 0 Supply Fa 6000 cfm Cool 56.6 / 55.2 of Supply Air Ducts Fan 57.1 / 55.4 of 49.9% R.H. ROOMS 75.0/62.5OF h Return Air Ducts `i EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:29 of 64 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Valley Comprehensive Medical Group 1/25/2010 STEM NAME FLOOR AREA HP7 Existing 900 PSYC 24.0 of 66.6 of Outside Air 135 cfm 69.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,134 24,954 2,107 1,108 15,109 0 1,248 755 0 0 135 4,434 193 135 6,653 0 0 1,248 1 755 31,8831 1,9141 Existing HVAC 50,924 315 Total Adjusted System Output50,924 315 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Sep 3 pm Heating Coil 83.0 of 35,44 35,441 Jan 12 am 83.0 of O Supply Air Ducts Supply Fan 82'6 OF 2000 cfm ROOMS 70.0 of Return Air Ducts I DOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak] I 106.0/70.2OF Outside Air 135 cfm 75.6/60.7 of 77.6/61.10F M 54.0/52.10F Cooling Coil Supply Fan 2000 cfm 54.0/52.1OF -)oh Supply Air Ducts 54.6 / 52.3 of 42.9% R.H. ROOMS 75.0 / 60.5 of �% Return Air Ducts 4 I EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 30 of 64 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY ECT NAME Valle EM NAME HP 8 Number of Heating Sy Comprehensive Medical Grou Total Output (Btuh) Output(Btuh/sgft) Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sgft) Total Output (sgft/Ton) Air System CFM per System Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) 1 Outside Air (%) Outside Air (cfm/sgft) Note: values above given at ARI conditions 24.0 of Outside 90 cfm 69.7 of 108.0 / 73.7 of Outside 1 90 cfm 75.7/63.10F 93.2 56,000 56,000 4.7 93.2 128.8 67.6 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 1/25/2010 FLOOR AREA 601 COIL COOLING PEAK COIL HTG. PEAK. CFM Sensible Latent CFM I Sensible 1,615 29,052 1,983 973 13,283 0 1,453 664 0 0 90 3,146 222 90 4,447 0 0 1,4531 664 35 104 —22061 E::;:058_ 2,000 2,000 Carrier 25HBS360/FK4DNB060 42,023 7,479 33,078 3.33 428.6 14.5 Total Adjusted System Output 42,023 7,479 33,078 (Adjusted for Peak Design Conditions) 0.15 TIME OF SYSTEM PEAK Jul 5 pm L Jan 12 am im Temperatures at Ti 83.0 of Heating Coil 0 Supply Fan 2000 cfm 83.0 of Siupply Air Ducts 82.6 of ROOMS 70.0 of �% Return Air Ducts '*1 77.1 / 63.4 of M 57.7 / 56.4 of Cooling Coil of Supply Fa 2000 cfm 57.7 / 56.4 of Supply Air Ducts Fan 58.3/56.6OF 51.2% R.H. ROOMS 75.0 / 62.9 of 1% Return Air Ducts 4 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 31 of 64 ZONE LOAD SUMMARY PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 STEM NAME HP 1 Existing FLOOR AREA 1,084 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mull. CFM Cooling Latent Heating CFM I SENSIBLE LATENT CFM SENSIBLE Dr. Office 1.0 1,536 35,481 4,138 1,235 24,024 Values include ventilation load COINCIDENT TOTAL 35,481 4,138 24,024 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:32 of 64 ZONE LOAD SUMMARY PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 STEM NAME HP 2 Existing FLOOR AREA 1,514 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mull. CFM Cooling Latent Heating CFM SENSIBLE- LATENT CFM SENSIBLE Conference/Breakroom 1.0 1,944 42,9591I 5,779 1,905 32,392 I Values include ventilation load COINCIDENT TOTAL 1 42,959 5,779 32,392 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:33 of 64 ZONE LOAD SUMMARY PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 STEM NAME HP 3 FLOOR AREA 1,205 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Cooling Latent Heatin CFM SENSIBLE LATENT CFM SENSIBLE Reception Lab Tech 1.0 1,934 37,753 4,599 1,360 24,370 • 1 i de ventilation load COINCIDENT TOTAL 37,753 4,599 24,370 Valu:EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:34 of 64 ZONE LOAD SUMMARY PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 STEM NAME HP 4, 5 & 6 Existing FLOOR AREA 2,543 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Cooling Latent Heating CFM SENSIBLE LATENT CFM SENSIBLE Treatment Area 1.0 3,308 83,154 12,695 2,406 56,561 I Values include ventilation load COINCIDENT TOTAL 83,154; 12,695 56,561 Energyft 4.4 by EnergySoft User Number: 6712 Job Number: Page:35 of 64 ZONE LOAD SUMMARY PROJECT NAMEDATE Valley Comprehensive Medical Grou 1/25/2010 STEM NAME HP7 Existing FLOOR AREA 900 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Cooling Latent Heating CFM SENSIBLE LATENT CFM SENSIBLE Treatment & Delivery 1.0 1,134 29,472 1,040 1,108 21,813 I i r de ventilation load COINCIDENT TOTAL 29,472: 1,040 21,813 Valu:EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:36 of 64 ZONE LOAD SUMMARY PROJECT:NAME Valle Comprehensive Medical Group1/25/2010 DATE STEM NAME HP 8 FLOOR AREA 601 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Cooling Latent Heating CFM SENSIBLE LATENT CFM SENSIBLE Tech/Water/Supply Rm 1.0 1,615 32,264 2,307 973 17,760 i I I Values include ventilation load COINCIDENT TOTAL 1 32,264 2,307 17,7so EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:37 of 64 ROOM LOAD SUMMARY EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:38 of 64 PROJECT:NAME Valle Comprehensive Medical Group1/25/2010 DATE STEM NAME HP 1 Existing FLOOR AREA 1,084 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Dr. Office Dr. Office 1 1 553 29,640 3,577 1,553 29,640 3,577 1 235 15,949 i 1 1 PAGE TOTAL 1,553 29,640 3,577 1,235 15,949 TOTAL 1,553 29,640 3,577 1,235 15,949 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:38 of 64 ROOM LOAD SUMMARY ::1 PROJECT NAME Valle Comprehensive Medical Group1/25/2010 DATE STEM NAME HP 2 Existing FLOOR AREA 1,514 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Conference/Breakroom Conference/Breakroom 1 1,956 34,555 4,997 1,956 34,555 4,997 1905 21,114 l 1 PAGE TOTAL 1 1,956 34,55E 4,997 1,905 21,114 TOTAL 1 1,956 34,55E 1 1,905 21,114 EnergyPro 4.4 by Energysoft User Number: 6712 Job Number: Page: 39 of 64 ROOM LOAD SUMMARY EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 40 of 64 PROJECT:NAME Valle Comprehensive Medical Group1/25/2010 DATE STEM NAME HP 3 FLOOR AREA 1,205 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Reception Lab Tech Reception Lab Tech 1 2,000 31,956 4,035 2,000 31,956 4 035 1,360 15,394 i PAGE TOTAL 2,000 31,956 4,035 1,360 15,394 TOTAL 1 2,000 31,956 4,035 1,360 15,394 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 40 of 64 ROOM LOAD SUMMARY PROJECT :NAME Valle Comprehensive Medical Group1/25/2010 DATE STEM NAME HP 4 5 & 6 Existing FLOOR AREA 2,543 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Treatment Area Treatment Area 1 3,322 64,143 10,937 3,322 64,143 10,937 2,406 31,304 PAGE TOTAL 1 3,322 64,143 10,937 2,406 31,304 TOTAL 1 3,322 64,143 10,937 2,406 31,304 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 41 of 64 ROOM LOAD SUMMARY PROJECT NAME Valley Comprehensive Medical Group DATE 1/25/2010 STEM NAME HP7 Existing FLOOR AREA 900 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Treatment & Delivery1 Treatment &Delivery 1,134 24,954 2,107 1,134 24,954 2,107 1 108 15,109 PAGE TOTAL 1 1,134 24,954 2,107 1,108 15,109 TOTAL 1 1,134 24,954 2,107 1,108 15,109 EnergyPro 4.4 by Energysoft User Number: 6712 Job Number: Page: 42 of 64 ROOM LOAD SUMMARY PROJECT NAME Valle Comprehensive Medical Group1/25/2010 DATE STEM NAME HP 8 FLOOR AREA 601 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Tech/Water/Su I Rm Tech/Water/Supply Rm. 1 1,615 29,052 1,983 1 615 29,052 1,983 973 13,283 Y I PAGE TOTAL 1 1,615 29,05 1,983 973 13,283 TOTAL 1 1,615 29,052 1 1,983 973 13,283 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 43 of 64 ROOM HEATING PEAK LOADS roject Title Date qW Hey Comprehensive Medical Group 1/25/2010 Room Information Desi n Conditions Room Name Dr. Office Time of Peak Jan 12 am Floor Area 11084 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value /,T of Btu/hr 1084.0 X X X X X X X X X X X X X X X X X X X X X x X X X X X X X X X x X X X X X X X 0.0350 X X X X X X x X X X X X X X X X x X X x X X X X X X X X X X X X X X x X X X X 46 = = = = = = = = = 1,745 415.0 0.0740 46 1,413 50.0 0.0861 46 198 140.6 0.0861 46 557 69.7 0.7900 46 2,533 69.7 0.7900 46 2,533 perimeter = 74.0 0.7300 46 2,485 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 11,463 Infiltration: —Schedule1.00 X 1.080 X 1 084 x 10.00 x 0.500 / 6] x 46 = 4 abs Air Sensible Area Ceiling Height ACH Ins Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 15,949 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 44 of 64 ROOM HEATING PEAK LOADS roject Title Date Hey Comprehensive Medical Group 1/25/2010 Room Information Desicin Conditions Room Name Time of Peak Jan 12 am Floor Area 1,514 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 70°F Conduction Area U -Value dT OF Btu/hr R-30 Roof R.30.2x12.16 R-19 Wall .19.2x6.16 6" Concrete Double Metal Tinted Double Metal Tinted 1,514.0 X X X X X X X X X X X X x X X X X x X X X X X X X X X X X X X X X X X x X X X 0.0350 X X X X X x x X X X X X x X X X X X X X X X X X X X X X X X X X X X x X X X X 46 = = = = = = = = 2,438 430.0 0.0740 46 1,464 373.4 0.0861 46 1,478 69.7 0.7900 46 2,533 24.6 0.7900 46 894 44.3 0.7900 46 1,610 perimeter= 132.0 0.7300 46 4,433 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: I 14,8491 Infiltration: r 1.00 1 X 1.080 X 1 514 X 10.00 x 0.500 / 60] X 46 = 6 265 schedule AIr Sensible Area Ceiling Height ACH Ins-[ Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 21,114 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 45 of 64 ROOM HEATING PEAK LOADS rojact Title Date qW Hey Comprehensive Medical Group 1/25/2010 Room Information Desi - n Conditions Room Name Reception Lab Tech Time of Peak Jan 12 am Floor Area 1,205 Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value ./,T of Btu/hr 1205.0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 0.0350 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 46 = = = = = = = = = = 1,940 96.3 0.0861 46 381 69.7 0.7900 46 2,533 69.7 0.7900 46 2,533 44.3 0.7900 46 1,610 erimeter = 42.0 0.7300 46 1,410 Items shown with an asterisk (') denote conduction through an interior surface to another room. P 39e Total: 10 407 Infiltration: r 1.00l X 1.080 X 1 205 X 10.00 X 0.500 / 6] X 46 = 4987 `schedule Alr Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 15,394 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 46 of 64 ROOM HEATING PEAK LOADS roject Title Date Hey Comprehensive Medical Group 1/25/2010 Room Information Desi n Conditions Room Name Treatment Area Time of Peak Jan 12 am Floor Area 2,543 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value !LNT of Btulhr 2,543.0 X X X X X X X x X X X x X X x X x X X X X X X X X X x X x X X x X X X X X X X 0.0350) X X X x x X X x X X x x x x X x X x X X X x X X X x X X X X X X X X X x x x X 46 = = = = = = = = = = = = = = 4,094 70.0 0.0690 46 222 28.1 0.0861 46 111 24.6 0.7900 46 894 69.7 0.7900 46 2.533 44.3 0.7900 46 1,610 24.6 0.7900 46 894 69.7 0.7900 46 2,533 501.1 0,0861 46 1,984 36.9 0.7900 46 1,341 150.0 0.0740 46=511 36.0 0.0861 46 143 49.9 0.0690 46 158 20.1 0.5000 46= 462 perimeter -98.0 0.7300 46= Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 20 781 Infiltration: r 1.00) 1 x 1.oso x 2 5a3 x 10.00 x 0).500 / 6� x as 10 52a schedule Air Sensible Area Coiling Height ACH D7 Fraction TOTAL HOURLY HEAT LOSS EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 47 of 64 ROOM HEATING PEAK LOADS roject Title Date ,11111111,11ey Comprehensive Medical Group 1/25/2010 Room Information Desi n Conditions Room Name Treatment & Delivery Time of Peak Jan 12 am Floor Area 900 Outdoor Dry Bulb Temperature 24 of Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value dT of Btu/hr Metal Tinted 900.0 X X X X X X X X X X X X X X X X X x X X X X X X X X x X X X X X X X X X X x X 0.0350 X X X x x X X X X x X X X X x X x x x x x x x X X x X X X x X X x x X X X X x 46 = = = = = = = = = 1,449 107.0 0.0861 46 424 320.0 0.0861 46 1,267 82.0 0.7900 46 2,980 84.2 0.0861 46 333 24.6 0.7900 46 894 24.6 0.7900 46 894 24.6 0.7900 46 894 perimeter 67.0 0,7300 46 2,250 Items shown with an asterisk (`) denote conduction through an interior surface to another room. Page Total: 11 384 Infiltration: I 1.00 1 xle 1.08e Area x soo x 10.00 x ACH o.500 / 60]x as 372a schedule Air SensibCoiling Height CT Fraction HOURLY HEAT LOSS FOR EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 48 of 64 15.109 ROOM HEATING PEAK LOADS rojact Title Date ,1111.11ey Comprehensive Medical Group 1/25/2010 Room Information Desicin Conditions Room Name TechNVater/Supply Time of Peak Jan 12 am Floor Area U, Outdoor Dry Bulb Temperature 24 OF Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value LT of Btu/hr Double Metal 601.0 X x X X X X X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 0.0350 x X X x x X x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 46 = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = 968 40.0 0.0861 46 158 166.9 0.0861 46 661 69.7 0.7900 46 2,533 69.7 0.7900 46 2.533 69.7 0.7900 46 2,533 perimeter = 42.0 0.7300 46 1,410 Items shown with an asterisk ('rr) denote conduction through an interior surface to another room. !Page Total: 10,796 Infiltration: L -S 1.00 x 1.080 x 601 x Heigh x 0.500 / 6] x 46 = 2 487 chedule Air Sensible Area Ceiling Height ACH 0T Fraction AL HOURLY HEAT LOSS FOR EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 49 of 64 ROOM COOLING PEAK LOADS t o act Title Date Valle Comprehensive Medical Group1/25/2010 INFORMATION DESIGN CONDITIONS Room Name Dr. Office Time of Peak Jul 5 pm Floor Area 1,084 Outdoor Dry Bulb Temperature 108 `k Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 74 OF Conduction 2.1 Area 1,0E 41 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0350 0.0740 X X X X X X X X X DETD 1 = = = = = = = = = 51.3 36.8 35.7 62.7 24.5 24.5 (W) 69.7 234 Page Total Orientation Area X X X X X X X X XX X SGF X X X X X X X X X Sc Weighting X X X X X X X X X X Factor = = (W) 69.7 234 0.657 0.530 (W) 69.7 234 0.657 0.530 Page Total Btu/hr 1,945 1,131 154 759 1,346 1,346 s sal Btu/hr 5,674 5,674 11 348 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0c x 1,084 X o.811 Watts/sqft x 3.41 Btuh/Watt x 0.999 = 2,998 ccu ants 1.0c x 1,084 x 300 Btuh/OCC. / 10 sgft/occ. X 1.00 = 3,252 Receptacle 1.0 X 1,084 X 0.500 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 1,850 rocess 1.0c x 1,084 X o.000 Watts/sgft x 3.41 Btuh[Watt x 1.00 = 0 Infiltration: 1.00 X 1.080 X 1 084 X 10.00 X 0.50 /601 X 36 = 3 511 chedule Air Sensible Area Ceiling Height ACH QT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 29,640 Sched. Latent Gain Frac. ccu ants 1.00 Receptacle 1.00 rocess 1.00 Infiltration: cn� Area Heat Gain Btu/hr X 1.084 X 3001 Btuh/OCC. / 100 sgft/occ. = 3 252 xx o.000 Watts/sgft x 1 4131 Btuh/Watt = X1Oo84 X 10.000 Watts/sgft X 1 3.413 Btuh/Watt = 0 x Air x Area x Ceiling xACH / 60] x I EnergvPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 50 of 64 ROOM COOLING PEAK LOADS oject Title Date Valle Comprehensive Medical Group1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Conference/Breakroom Time of Peak Jul 1 pm Floor Area 1,514 Outdoor Dry Bulb Temperature 108 `k Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 74 `k Conduction h-30 Roof(R.30.2x12.16 -19 Wall (W.19.2x6.16) Area 1 1.514.01 69.71 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.0350 X 0.0740 X 0.0861 X 0.7900 X 0.7900 X 0.7900 X (E) X 49 X 1.755 X X X X X X X X X DETD ' = = = = = = = = = 77.1 33.9 38.7 22.7 22.7 22.7 U 69.7 49 Page Total Orientation Area X x X X x x x x x x SGF X X x X x x x x X x SC Weighting X X X x x x x x x x Factor = = = = = = = = = U 69.7 49 0.657 1.755 (E) 24.6 49 0.657 1.755 (E) 44.3 49 0.657 1.755 Page Total Btu/hr 4,086 1,078 1,244 1,253 442 796 sass Btu/hr 3,937 1,389 2,502 7 szs Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0c x 1,514 X 1.124 Watts/sgft x ]3.41 Btuh/Watt X 0.999 = 5,799 ccu ants 1.0 X 1,514 X 300 Btuh/occ. / sgft/occ. x 1.00 = 4,542 Receptacle 1.0 x 1,514 X 0.500 Watts/sqft X Btuh/Watt X 1.00 = 2,584 rocess 1.0 x 1,514 x o.00o Watts/sgft x Btuh/Watt x 1.00 = 0 Infiltration: 1.00 X 1.080 X 1514 X 10.00 X 0.50 /60] x 36 = 4903 �clhedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 34,555 Area Heat Gain Btu/hr x 1 514 x 3001 Btuh/OCC. / 100 sqft/occ. = 4542 x x Watts/sgft x BtuhlWatt = x 1,51a xx 0.000 Watts/sgft x 1 3.413 Btuh[Watt = 0 x Alr x Are x Coiling xACH / s] x Z �5 EnerovPro 4.4 by EnergvSoft User Number: 6712 Job Number: Page: 51 of 64 Sched. Latent Gain Frac. Occupants 1.00 Receptacle 1.00 Process 1.00 Infiltration: ch d. �i1J Area Heat Gain Btu/hr x 1 514 x 3001 Btuh/OCC. / 100 sqft/occ. = 4542 x x Watts/sgft x BtuhlWatt = x 1,51a xx 0.000 Watts/sgft x 1 3.413 Btuh[Watt = 0 x Alr x Are x Coiling xACH / s] x Z �5 EnerovPro 4.4 by EnergvSoft User Number: 6712 Job Number: Page: 51 of 64 ROOM COOLING PEAK LOADS roject Title Date Valle Comprehensive Medical Group1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Reception Lab Tech Time of Peak Jul 10 am Floor Area 1,205 Outdoor Dry Bulb Temperature 94 9F Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 70 9F Conduction Area X X X X X X X X X U -Value X X X X X X X X X -30 Roof R.30.2x12.16 1,205.0 0.0350 " Concrete 96.3 0.0861 Double Metal Tinted 69.7 0.7900 Double Metal Tinted 69.7 0.7900 Double Metal Tinted 44.3 0.7900 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Orientation Area (E) 69.7 (E) 69.7 (E) 44.3 SGF SC X 0.657 X 0.657 X 0.657 X x x x x x x DETD 1 59.7 = 44.3 = 14.4 = 14.4 = 14.4 = Page Total Weighting Factor X 0.637 = X 0.637 = X 0.637 = X x x = x = x = x = x Page Total Btu/hr 2,520 367 794 794 505 4 980 Btu/hr 4,931 4,931 3,134 1z ss7 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 1,205 X 1.073 Watts/sqft X ]3.41 Btuh/Watt X 0.998 = 4,406 ccu ants 1.0 X 1,205 X 300 Btuh/OCC. / sqft/occ. X 1.00 = 3,615 ece tacle 1.0 x 1,205 X 0.500 Watts/sqft X Btuh/Watt X 1.00 = 2,056 rocess 1.0 X 1,205 X 0.000 Watts/sqft X Btuh/Watt X 1.00 = 0 Infiltration: I 1.00 x 1.080 x 1 205 x 10.00 x 0.50 /601 x 36 = 3 903 chedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 31,956 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1 205 x 30ol Btuh/OCC. / 100 sqft/occ. = 3 615 Receptacle 1.on x x Watts/sgft x Btuh/Watt = Process 1.00 X 1,205 X 0.000J Watts/sgft X 1 3.413 Btuh/Watt = 0 Infiltration: x x 1,205 x 10.00 ACH x � / 6] x ®= 42p chedule Air La ent Area Ceiling Height pW EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 52 of 64 ROOM COOLING PEAK LOADS roject Title Date Valle Comprehensive Medical Group1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Treatment Area Time of Peak Jul 1 pm Floor Area 2,543 Outdoor Dry Bulb Temperature 108 `k Indoor Dry Bulb Temperature 750F Outdoor Wet Bulb Temperature 74 OF Conduction -30 Roof R.30.2x12.16 -21 Wall W.21.2x6.16 " Concrete Double Metal Tinted ouble Metal Tinted ouble Metal Tinted ouble Metal Tinted Double Metal Tinted " Concrete Area 2,543.0 70.0 28.1 24.6 69.7 44.3 24.6 69.7 501.1 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.0350 X 0.0690 X X 0.0861 0.7900 X 0.7900 X 0.7900 X 0.7900 X 0.7900 X 0.0861 X X X X X X X X X DETD 1 = = = = = = = = = 77.1 36.9 38.7 22.7 22.7 22.7 22.7 22.7 44.1 Page Total Orientation Area X X X X X x x x x x SGF x x X X X x X x x x SC Weighting X X x x X X X x x x Factor = = = = = = = = = (E) 24.6 49 0.657 1.755 (E) 69.7 49 0.657 1.755 (E) 44.3 49 0.657 1.755 (E) 24.6 49 0.657 1.755 (E) 69.7 49 0.657 1.755 (S) 36.9 88 0.657 0.547 Page Total Btu/hr 6,864 178 94 442 1,253 796 442 1,253 1,903 13 223 Btu/hr 1,389 3,936 2,502 1,389 3,936 1.166 14 320 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 2,543 X 1.382 Watts/sgft x 3.41 Btuh[Watt X 0.999 = 11,982 ccu ants 1.0c x 2,543 X 300 Btuh/oCc. / 7 sgft/OCc. x 1.00 = 10,172 Receptacle 1.0c x 2,543 X 0.500 Watts/sgft x 3.41 Btuh/Watt x 1.00 = 4,340 rocess 1.0 X 2,543 x 0.000 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 0 Infiltration: 1.00 X 1.080 X 2543 X 10.00 x 0.50 /601 x 36 = 8 236 chedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 64,143 Area Heat Gain Btu/hr X 2543 X 300 Btuh/OCC. / 75 sgft/OCc. = 10 172 x x Watts/sqft x Btuh/Watt = X2,543 x 0.000�Watts/sgft X 1 3.4131 Btuh/Watt = 0 x AlrXArea � x CeilinL. Height X ACH 0 50 / s] x I InM EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 53 of 53 of 641 Sched. Latent Gain Frac. Occupants 1.00 Receptacle 1.00 Process 1.00 Infiltration: ch� Area Heat Gain Btu/hr X 2543 X 300 Btuh/OCC. / 75 sgft/OCc. = 10 172 x x Watts/sqft x Btuh/Watt = X2,543 x 0.000�Watts/sgft X 1 3.4131 Btuh/Watt = 0 x AlrXArea � x CeilinL. Height X ACH 0 50 / s] x I InM EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 53 of 53 of 641 ROOM COOLING PEAK LOADS r ect Title Valley Compi ROOM INFORMATION Room Name Floor Area Indoor Dry Bulb Temperature Conduction ouble Metal Tinted -19 Wall (W.19.2x6.16) nsive Medical Grou Treatment Area I Time of Peak 2,543 Outdoor Dry Bulb Temperature 75917 Outdoor Wet Bulb Temperature Area 36.9 150.0 36.0 49.9 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.7900 X X 0.0740 X X 0.0861 X X 0.0690 X X 0.5000 X X X X X X X X X Date 1/25/2010 DETD 1 22.7 = 40.8 = 46.3 = 42.5 = 46.1 = Page Total Weighting Orientation Area SGF SC Factor x x x = x x x = X X x x x x = x x x = x x x = x x x = x x x = x x x = x x x = Page Total Jul 1 pm 108 9F 74 OF Btu/hr 663 453 143 146 464 1 870 Btu/hr 0 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 2,543 X 1.382 Watts/sqft X 3.41 Btuh/Watt X 0.999 = 11,982 ccu ants 1.0c X 2,543 X 300 Btuh/OCC. / d3.41 sgft/occ. x 1.00 = 10,172 Receptacle 1.0 x 2,543 X 0.500 Watts/sqft x Btuh/Watt x 1.00 = 4,340 rocess (�1.0 X 2,543 X 0.000 Wafts/sqft X Btuh/Waft X 1.00 = 0 Infiltration: I 1.00 x 1.080 x 2543 x 10.00 x 0.50 /601 x 36 = 8 236 chedule Air Sensible Area Ceiling Height ACH ZST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 64,143 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 x 2543 X 30ol Btuh/OCC. / 75 sqft/occ. = 10 172 Receptacle 1.00 x x 0 pool Watts/sgft x Btuh/Watt = Process 1.00 X 2,543 X 0.000 Wafts/sgft X 1 3.4131 BtuhlWatt = 0 Infiltration: x 543 x x x / 60] x = 7s5 chedule Air La ent Area Ceiling Height ACH pW I EneravPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 54 of 64 ROOM COOLING PEAK LOADS rojed Title Date Valle Comprehensive Medical Group1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Treatment & Delivery Time of Peak Sep 3 pm Floor Area 900 Outdoor Dry Bulb Temperature 106 OF Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 70 OF Conduction 30.2x12. Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03501 1 0.79001 X X X X X X X X X DETD 1 = = = = = = = = = 52.7 33.3 47.2 21.0 58.6 21.0 21.0 21.0 112 Page Total Orientation Area X x X X X X X X X X SGF X X x X X X X X x X SC Weighting x X x X X x X X X X Factor = = = = (S) 82.0 112 0.657 0.958 (W) 24.6 245 0.657 0.375 (W) 24.6 245 0.657 0.375 (W) 24.6 245 0.657 0.375 Page Total Btu/hr 1,662 307 1,299 1,361 425 408 408 408 s 277 Btu/hr 5,780 1,486 1,486 1,486 10 237 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 900 X 0.420 Watts/sgft x 3.41 Btuh/Watt X 0.999 = 1,289 ccu ants 1.0 X 900 X 300 Btuh/OCC. / 10 sgft/occ. X 1.00 = 2,700 Receptacle 1.0 x 900 X 0.500 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 1,536 rocess 1.0 x 900 x o.000 Watts/sgft x 3.41 Btuh/Watt x 1.00 = o Infiltration: 1.00 x 1.080 x 900 x 10.00 x 0.50 /601 x 36 = 2,915 "'--- chedule Air Sensible Area Ceiling Height ACH &T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 24,954 Sched. Latent Gain Frac. Occupants 1.00 Receptacle 1.00 Process 1.00 Infiltration: chedule Area Heat Gain Btu/hr X 900 X 300 Btuh/OCC. / 100 sgft/occ. = 2 700 x x amp Watts/sgft x 3 413 Btuh/Waft = X 900 X 0.000 Watts/sgft x 3.4131 Btuh/Watt = o x Air xArea � x Coiling xACH / s] x glgnM _ EneroyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page: 55 of 64 1 ROOM COOLING PEAK LOADS roJect Title Valley Comprehensive Medical Group X X X X X X X XX X Date 1/25/2010 ROOM INFORMATION DESIGN CONDITIONS 0.0350 Room Name Technivatedsuppy Rm. Time of Peak Jul 5 pm Floor Area 601 Outdoor Dry Bulb Temperature 108 C� Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 74 OF Conduction .2x12.1 Area X X X X X X X XX X U -Value X X X X X X X X 601.0 0.0350 40.0 0.0861 166.9 0.0861 69.7 0.7900 69.7 0.7900 69.7 0.7900 234 0.657 0.530 (W) 69.7 234 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain DETD 1 51.3 = 39.3 = 62.7 = 24.4 = 24.4 = 24.4 = Page Total Orientation Area X X x x x x X X x X SGF x X X X x x X x XX X SC Weighting x x X X X X x x x Factor = = = (W) 69.7 234 0.657 0.530 (W) 69.7 234 0.657 0.530 (W) 69.7 234 0.657 0.530 Page Total Btu/hr 1,078 135 901 1,346 1.346 1,346 6 153 Btu/hr 5,673 5,673 5,673 17 019 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 601 X 0.539 Watts/sgft x 3.41 Btuh/Watt x 0.999 = 1,105 ccu ants 1.0 X 601 X 300 Btuh/OCC. / 10 sgft/occ. x 1.00 = 1,803 Receptacle 1.0 x 601 x 0.500 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 1,026 rocess 1.0 x 601 x o.000 Watts/sgft X 3.41 Btuh/Watt x 1.00 = 0 Infiltration:1.00 X 1.080 X 601 X 10.00 X 0.50 /601 x 36 = 1 946 Ledule Air Sensible Area Coiling Height ACH Z�,T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 29,052 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 601 X 3001 Btuh/OCC. / 100 sgft/occ. = 1 803 Receptacle 1.00 x x0.00 Watts/sgft x Btuh/Watt = Process 1.00 x 601 x 0.000 Watts/sgft X 1 3.413 Btuh/Watt = 0 Infiltration: x x x x � / 6] x � = 1ao chedule AIr La ent Area Ceiling Height ACH pW EneravPro 4.4 by EnerpvSoft User Number: 6712 Job Number: Page: 56 of 64 ROOM COOLING COIL LOADS ir act Title Valley Compl ROOM INFORMATION Room Name Floor Area Indoor Dry Bulb Temperature Conduction -30 Roof R.30.2x12.16 -19 Wall .19.24.16 " Concrete " Concrete Double Metal Tinted Double Metal Tinted hensive Medical Grou Dr. Office I Time of Peak 1,084 Outdoor Dry Bulb Temperature 75`k Outdoor Wet Bulb Temperature Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03501 Date 1/25/2010 DETD 1 X 51.3 = X 36.8 = X 35.7 = X 62.7 = X 24.5 = X 24.5 = X = X = X = Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = (W) 69.7 234 0.657 0.530 (W) 69.7 234 0.657 0.530 Page Total Jul 5 pm 108 9F 74 9F Btu/hr 1,945 1,131 154 759 1.346 1,346 6 681 Btu/hr 5,674 5,674 11 348 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 1,084 X 0.811 Watts/sgft X 3.41 Btuh/Watt X 0.999 = 2,998 ccu ants 1.0c X 1,084 X 300 Btuh/occ. / 10 sgft/occ. X 1.00 = 3,252 Receptacle 1.0 X 1,084 x 0.500 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 1,850 rocess 1.0 X 1,084 X 0.000 Wafts/sgft X 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 x 1.080 x 1 084 x 10.00 x 0.50 /601 x 36 = 3 511 —Schedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 29,640 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1,084 X 3001 Btuh/occ. / 100 sgft/occ. = 3 252 Receptacle 1.00 x xWatts/sgft x Stuh/Watt Process 1.00 X 1,084 X 0.000 Watts/sgft X 1 '3.413 3tuh/Watt1111, = o Infiltration: x x L-1 x ACH x � / 6] x � = 0 chedule Air La ent Area Ceiling Height pW I EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 57 of 64 1 ROOM COOLING COIL LOADS roject Title Date Valle Comprehensive Medical Group1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Conference/Breakroom Time of Peak Jul 1 pm Floor Area 1,514 Outdoor Dry Bulb Temperature 108 9F Indoor Dry Bulb Temperature 750F Outdoor Wet Bulb Temperature 74 * Conduction 00 Roof(R.30.2x12.16) -19 Wall (W.19.2x6.16) Area 69.7 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0350 0.0740 X X X X X X X X X DETD ' = = = = = = = = = 77.1 33.9 38.7 22.7 22.7 22.7 Q 69.7 49 Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X Sc Weighting X X X X X X X X X X Factor = = = Q 69.7 49 0.657 1.755 (E) 24.6 49 0.657 1.755 (E) 44.3 49 0.657 1.755 Page Total Btulhr 4,086 1,078 1,244 1,253 442 796 8 899 Btu/hr 3,937 1,389 2,502 7 828 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 1,514 X 1.124 Watts/sgft X 3.41 Btuh/Watt X 0.999 = 5,799 ccu ants 1.0 X 1,514 X 300 Btuh/OCC. / 10i sgftlocc. X 1.00 = 4,542 Receptacle 1.0 X 1,514 X 0.500 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 2,584 rocess 1.0 X 1,514 X 0.000 Watts/sqft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: 1.00 X 1.080 X 1 514 X 10.00 X 0.50 /601 X 36 = 4 903 —Schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 34,555 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1 514 X 3'001 Btuh/OCC. / 100 sgft/occ. = 4 542 Receptacle 1.D0 x x Watts/sgft x 3 413 Btuh/Watt = Process 1.00 X 1,514 X 0.000 Watts/sgft x 3.413 Btuh/Watt = 0 Infiltration: x x 1,514 x x � / 6] x � _ chedule Alr La ent Area Ceiling Height ACH pW EnergvPro 4:4 by EnergvSoft User Number: 6712 Job Number: Page: 58 of 64 ROOM COOLING COIL LOADS roject Title Date Valle Comprehensive Medical Group1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Reception Lab Tech Time of Peak Jul 10 am Floor Area 1,205 Outdoor Dry Bulb Temperature 94 `k Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 70 OF Conduction 2x12.1 Ti Area 1 96.3 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03501 DETD 1 Area X 59.7 = X 44.3 = X 14.4 = X 14.4 = X 14.4 = X = X = X I = X = Page Total Orientation Area X X X X X X X X X x SGF X X X X X X X X X x SC Weighting K K K K K K K K K K Factor = = = = (E) 69.7 169 0.657 0.637 (E) 69.7 169 0.657 0.637 (E) 44.3 169 0.657 0.637 Page Total Btu/hr 2,520 367 794 794 505 4 980 Btu/hr 4,931 4,931 3,134 1 z ss7 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 1,205 X 1.073 Watts/sgft XIA3.41 Btuh/Watt K 0.998 = 4,406 ccu ants 1.0 X 1,205 X 300 Btuh/occ. /sgft/occ. K 1.00 = 3,615 Receptacle 1.0 X 1,205 X 0.500 Watts/sqft xBtuh/Watt K 1.00 = 2,056 rocess 1.0 X 1,205 x 0.000 Watts/sqft XBtuhfWatt K 1.00 = 0 Infiltration: 1.00 x 1.080 x 1205 x 10.00 x 0.50 /601 x 36 = 3903 chedule Air Sensible Area Calling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM31,956 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 x 1 1 205 X 3001 Btuh/OCC. / 100 s aft/occ. = 3 615 Receptacle 1.00 x x0.00 Wafts/sqft x Btuh/Waft = Process 1.00 X 1,205 X 0.000 Wafts/sgft X 1 3.413 Btuh/WattIlk = 0 Infiltration: x x 7,205 x x � / 6] x ®_ chedule Air La ent Area Ceiling Height ACH pW EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 59 of 64 1 ROOM COOLING COIL LOADS roject Tltle Valle Comprehensive Medical GroupDate 1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Treatment Area Time of Peak Jul 1 pm Floor Area 2,543 Outdoor Dry Bulb Temperature 108 `F Indoor Dry Bulb Temperature 750F Outdoor Wet Bulb Temperature 74 9F Conduction -30 Roof R.30.2x12.16 -21 Wall .21.24.16 " Concrete Double Metal Tinted ouble Metal Tinted Double Metal Tinted Double Metal Tinted Double Metal Tinted " Concrete Area 2,543.0 70.0 28.1 24.6 69.7 44.3 24.6 69.7 501.1 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0350 0.0690 X X X X X X X X X DETD 1 = = = = = = = = = 77.1 36.9 38.7 22.7 22.7 22.7 22.7 22.7 44.1 Page Total Orientation Area X X X X X X X X X X SGF X X X x x X X X X X SC Weighting X X x X X x X X x X Factor = = = = = = = (E) 24.6 49 0.657 1.755 (E) 69.7 49 0.657 1.755 (E) 44.3 49 0.657 1.755 (E) 24.6 49 0.657 1.755 (E) 69.7 49 0.657 1.755 (S) 36.9 88 0.657 0.547 Page Total Btu/hr 6,864 178 94 442 1,253 796 442 1,253 1,903 13 223 Btu/hr 1,389 3,936 2,502 1,389 3,936 1,166 14 320 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0c X 2,543 X 1.382 Wafts/sgft x 3.41 Btuh/Watt X 0.999 = 11,982 ccu ants 1.0 x 2,543 X 300 Btuh/occ. / 7 sgft/occ. x 1.00 = 10,172 Receptacle 1.0 X 2,543 x 0.500 Wafts/sgft x 3.41 Btuh/Watt x 1.00 = 4,340 rocess 1.0 X 2,543 X 0.000 Watts/sgft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration:1.00 x 1.080 x 2543 x 10.00 x 0.50 /601 x 36 = 8 236 Ledule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7143 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 x 2543 x 3001 Btuh/occ. / 75 Sgft/occ. = 10 172 Receptacle 1.00 x x Watts/sgft x Btuh/Watt = Process 1.00 X 2,543 X 0.000 Watts/sgft X 3.413 Btuh/WattIII = o Infiltration: x x 2 �a3 x x � / 6] x � _ chedule Air La ent Area Ceiling Height ACH pW EnergvPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 60 of 64 ROOM COOLING COIL LOADS roJect Title Date Valley Comprehensive Medical Group 1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Treatment Area Time of Peak Jul 1 pm Floor Area 2,543 Outdoor Dry Bulb Temperature 108 `IF Indoor Dry Bulb Temperature 75`F Outdoor Wet Bulb Temperature 74 OF Conduction 19 Area 36.91 49.91 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.7900 X 0.0740 X 0.0861 X 0.0690 X 0.5000 X X X X X X X X DETD 1 X 22.7 = X 40.8 = X 46.3 = X 42.5 = X 46.1 = X = X = X = X = Page Total Weighting Orientation Area SGF SC Factor X X K X X K X X K X x K X x x = x x x = x x x x x x = x x x = x x x Page Total Btu/hr 663 453 143 146 464 1 870 Btu/hr 0 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 X 2,543 X 1.382 Watts/sqft X 3.41 Btuh/Watt x 0.999 = 11,982 ccu ants 1.0c x 2,543 x 300 Btuh/OCC. / 7 sgft/occ. x 1.00 = 10,172 Receptacle 1.0 x 2,543 x 0.500 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 4,340 rocess I�1.0 X 2,543 X 0.000 Watts/sqft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: I 1.00 x 1.080 x 2543 x 10.00 x 0.50 /601 x 36 = 8 236 chedule Air Sensible Area Coiling Height ACH &T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 7 64,143 Sched. Latent Gain Frac. Occupants 1.00 Receptacle 1.00 Process 1.00 Infiltration: chedule Area Heat Gain Btu/hr X 2 543 X 300 Btuh/OCC. / 75 sqft/occ. = 10 172 x x 0000 Watts/sqft x Btuh/Watt = X2,543 x 0.000 Watts/sgft X 1 3.413 Btuh/Watt = 0 x AirL 4$4OJ x Area x Ceiling xACH /s] x zSW EneravPro 4.4 by EneravSoft User Number: 6712 Job Number: Page: 61 of 64 1 ROOM COOLING COIL LOADS roject ;INFORMATION e Date 41 Valle Comprehensive Medical Group1/25/2010 ROOM DESIGN CONDITIONS Room Name Treatment & Delivery Time of Peak Sep 3 pm Floor Area 900 Outdoor Dry Bulb Temperature 106 `k Indoor Dry Bulb Temperature 75OFOutdoor Wet Bulb Temperature 70 9F Conduction Area 00.0 107 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0350 0.0861 X X X X X X X X X DETD 1 = = = = = = = = = 52.7 33.3 47.2 21.0 58.6 21.0 21.0 21.0 112 Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = = = (S) 82.0 112 0.657 0.958 (W) 24.6 245 0.657 0.375 (W) 24.6 245 0.657 0.375 (W) 24.6 245 0.657 0.375 Page Total Btu/hr 1,662 307 1,299 1,361 425 408 408 408 6 277 Btu/hr 5,780 1,486 1,486 1,486 10 237 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 x 900 x 0.420 Watts/sgft x 3.41 Btuh/Watt x 0.999 = 1,289 ccu ants 1.0 x 900 X 300 Btuh/occ. / 10 sgft/occ. X 1.00 = 2,700 Receptacle 1.0 X 900 X 0.500 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 1,536 rocess 1.0 x 900 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 X 1.080 X 900 X 10.00 X 0.50 /601 X 36 = 2 915 -Schedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 24,954 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccu ants 1.00 x 900 x 3001 Btuh/occ. / 100 sqft/occ. = 2 700 Receptacle 1.00 x xWatts/sgft x Btuh/Watt = rocess 1.00 x soo x o.000 Wafts/sgft x 1 3.4131 Btuh/Watt = o Infiltration: x x x x � / 6] x � _ chedule Air La ent Area Ceiling Height ACH pW EnergvPro 4.4 by EnergvSoft User Number: 6712 Job Number: Page: 62 of 64 1 ROOM COOLING COIL LOADS roject Title Date Valley Comprehensive Medical Group 1/25/2010 ROOM INFORMATION DESIGN CONDITIONS Room Name Tech/Water/supply Rm. Time of Peak Jul 5 pm Floor Area 601 Outdoor Dry Bulb Temperature 108 97 Indoor Dry Bulb Temperature 75OFOutdoor Wet Bulb Temperature 74 OF Conduction 30.2x12. Concrete Area 601 69.7 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.0350 X 0.0861 X X 0.0861 0.7900 X 0.7900 X 0.7900 X 0.530 X 69.7 X 0.657 X X X X X X X X X DETD ' = = = = = = = = = 51.3 39.3 62.7 24.4 24.4 24.4 ON) 69.7 234 Page Total Orientation Area X x x x x x x x x x SGF x x X x x x x x x x SC Weighting x x x x x x x x x x Factor = = = = = = = = = ON) 69.7 234 0.657 0.530 (W) 69.7 234 0.657 0.530 (W) 69.7 234 0.657 0.530 Page Total Btu/hr 1,078 135 901 1,346 1,346 1,346 6 153 Btu/hr 5,673 5,673 5,673 17 019 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0c X 601 X 0.539 Watts/sgft x 3.41 BtuhfWatt }_ 0.999 = 1,105 ccu ants 1.0 X 601 X 300 Btuh/OCC. / 10 sgft/occ. X 1.00 = 1,803 Receptacle 1.0c X 601 X 0.500 . Watts/sgft x 3.41 Btuh/Watt 7. 1.00 = 1,026 rocess 1.0c X 601 x 0.000 Watts/sgft X 3.41 Btuh/Watt }. 1.00 = 0 Infiltration: 1.00 x 1.080 x 601 x 10.00 x 0.50 / 601 x 36 = 1 946 -Schedule Air Sensible Area Ceiling Height ACH Z�,T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM29,052 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 601 x 3001 Btuh/OCC. / 100 sc#Vocc. = 1 803 Receptacle 1.00 x x0000 Watts/sgft x Bhih/VUatt = Process 1.00 x 601 x 0.000 Watts/sqft x 3.413 Btuh/Watt = 0 Infiltration: x x x x � / 6] )1 _ chedule Air La nt Area Ceiling Height ACH pyy EnergyPro 4.4 by EnergySoft User Number. 6712 Job Number: Page: 63 of 64 LIGHTING INSPECTION CHECKLIST LTG -I ECT NAME Vallev Comprehensive Medical Grou INSPECTION DATE. 1/25/2010 FIXTURE CODE TYPE DESCRIPTION LAMP TYPE LAMP QUANT. NUMBER OF FIXTURES WATTS PER FIXTURE FIELD NOTES A1A2 2 4 ft Fluorescent T8 Energy Savings Elec F32T8 2 10 54.0 C 2 2 ft Fluorescent T8 Elec F17T8 2 39 33.0 D 2 4 ft Fluorescent T8 Energy Savings Elec F32T8 2 64 54.0 F 42w Low Voltage Halogen 42 Watt 11 34 45.0 G 1 4 ft Fluorescent T8 Energy Savings Elec 4TP8 1 1 29.0 HJ 4 4 ft Fluorescent T8 Energy Savings Elec F32T8 4 12 104.0 EnergyPro 4.4 by EnergySoft User Number: 6712 Job Number: Page:64 of 64