Loading...
BCOM2015-0059�,e�n.G��u goo • aoa, 203 , �� Bin # City of La Qurnta Building 8L Safety Division P.O. Box 1504,78-495 Calle Tampico CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit # WwLa.Quinta, ( b Project.Add.ress: WqAhohine • Owner's Name:. A. P. Number. Address: 81 —715 Legal Description: %bi• Contractor. P1iy\ 1n/ :5j , /kl . � L • City, ST, Zip: 11 01 Telephone: Address: 0 , ( Project Description: r0 City, ST, Zip:&JrA %i2 Telephone 0_)JJ� — 51 1 -",a w4- I uw ro State Lic. #: 3 y 1 t a City Lie. #: vvk,k Arch., Engr., Designer�• 06,14 CQ� C� Address: !9Y' FiV4.i� r City., ST, Zip:PA G 22 Telephone O State Lie. #: G3608 -,c,�:iw�...•.."`'� Construction Type:— Occupancy: Project type (circle one): New Add'n Alter Repair Sq. Ft : # Stories Z(1d # Units: Demo Name of Contact Person: R6 Telephone # of Contact Person: C O " 12. O Esti Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE N Submittal >9 'd Recd ' TRACICiNG •: PERMIT FEES PIM Sets 3 Plan Check submitted Item Amount Structural Calm Reviewed, ready for corrections Plan Check Deposit. . Truss Calcs. Called Contact Person Pian Check Balance 2 Title 24 Calm Plans picked up Construction Flood plain plan Pians resubmitted Mecbatiical Grading plan V Review, ready for correctionslissue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Pians picked up S M.L H.O.A. Approval Plans resubmitted Grading IN ROUSE.- '"' Review, ready for correetionsfissue Developer Impact Fee Planning Approval Called Contact Person A.LP.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees a Y .. . EsGil Corp'oration In Partnership with Government for Building Safety , DATE:. 12/8/15 XL93P�LAN ICANT & JURISDICTION: La Quinta ' ' REVIEWER • ❑ FILE ' PLAN CHECK NO.: BCOM2015-0059 SET: I PROJECT ADDRESS: 43576 Washington -St. PROJECT NAME: Structural Support"for Non -Bearing Glass Walls The Structural plans transmitted herewith have been corrected, where necessary and substantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building-, department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed'for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check list has been sent to: ' f • ® EsGil Corporation staff did not advise the applic.719t that the plan check has.been completed. EsGil Corporation staff did advise the applicant that the check has been completed. Person contacted:_ --o— Telephone #: Date contacted: (b Email: den, tow Mail Telephone Fax In Pe on Cf 1 r 2015: , • - ❑.REMARKS• ' By: Chuck Mendenhall Enclosures: coy of AL09 J►E�'� EsGil Corporation Cp�I1M�� ': ❑ GA [_1EJ .❑ MB ElPC • 9320 Chesapeake Drive,`Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858)560-1576 f O', BUILDING ENERGY ANALYSIS REPORT PROJECT: • BBSI Tenant Improvement 43-576 Washington, Suites 200 & 201 La Quinta, CA 92253 Project Designer: - ' Robert H. Ricciardi, Architect 75-400 Gerald Ford Road, -Suite 115 Palm Desert, CA 92211 (760) 610-5036 F y Report Prepared by: a �►s• �s9 • Tim Scott CITY OF LA QUINTA j • Scott Design and Title 24, 1 cpUILDING & SAFETY DEPT. 1 i 77085 Michigan Drive APPROVED Palm Desert, CA 92211 FOR CONSTRUCTION (760) 200-4780 DA IL to zoiS BY,do - • 4 ' Job Number: ' _ _ 5 201 • 1p Date: Q1311 JP, el" I oEVE1.OpM��� 10/19/2015 COM��NITI The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is • authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 6.7 by EnergySoft User Number: 6712 ID: Y Project Name: BBPI TI NRCC-PRF-01-E 4 Page 1 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 _ Compliance Scope: ExistingAddition Input File Name: " BBPI TI-Ricciardi-15.xm1 A. PROJECT GENERAL INFORMATION 1. Project Location (city) La Quinta 7. # of dwelling units 0 2. CA Zip Code 92253 8. Standards Version Compliance2015 - 3. Climate Zone 15 9. Compliance Software (version) EnergyPro 6.7 4. Total Conditioned Floor Area 7,410 ft2 10. Building Orientation (deg) (W) 270 deg S. Total Unconditioned Floor Area 0 ft2 . 11. Permitted Scope of Work ExistingAddition . 6. # of Stories (Habitable Above Grade) 1 12 Building Type(s) Nonresidential B: COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS - § 140.1 BUILDING COMPLIES 1. Energy Component 2. Standard Design (TDV) 3. Proposed Design (TDV) 4. Compliance Margin (TDV) S. Percent Better than Standard Space Heating 3.4 4.0 -0.6 -17.6% Space Cooling 201.7 200.3 1.4 0.7% Indoor Fans 127.3 105.7 21.6 17.0% Heat Rejection Pumps & Misc. - Domestic Hot Water - Indoor Lighting 42.7 39.5 3.2 7.5% COMPLIANCE TOTAL 375.1 349.5 25.6 6.8% Receptacle 110.4 110.4 0.0% Process - Process Ltg TOTAL 485.5 459.9 5.3% • • �. Project Name: BBPI TI NRCC-PRF-01-E Page 2 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xml C. PRIORITY PLAN CHECK/ INSPECTION ITEMS (in order of highest to lowest TDV energy savings) 1st Indoor Fans: Check envelope and mechanical Compliance Margin By Energy Component (from Table B column 4) 2nd Indoor Lighting: Check lighting Indoor Fans Indoor Lighting Space Cooling 3rd Space Cooling: Check envelope and mechanical 4th Heat Rejection:.Check.envelope and mechanical Heat Rejection 5th Pumps & Misc.: Check mechanical Pumps & Misc. Domestic Hot Water Space Heating ( - 6th Domestic Hot Water: Check mechanical 7th Space Heating: Check envelope and mechanical I Penalty Energy Credit D. EXCEPTIONAL CONDITIONS The building does not include service water heating. Verify that service water heating is not required and is not included in the design. E. HERS VERIFICATION This Section Does Not Apply F. ADDITIONAL REMARKS None Provided y r CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 Project Name: BBPI TI NRCC-PRF-01-E Page 3 of 19 ' Project Address: 43-576 Washington, Suites 200 & 201 La C>uinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 - Compliance Scope: ExistingAddition - Input File Name: I I BBPI TI-Ricciardi-15.xmi r s CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY Identify which building components use the performance or prescriptive path for compliance. "NA"= not in project For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans. Building Component Compliance Path Compliance Forms (required forsubmittal) Location of Mandatory Notes on Plans ® Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E) Envelope E] Prescriptive NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E El NA ® Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E) Mechanical [J Prescriptive NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E ❑ NA El Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E) Domestic Hot Water ❑ Prescriptive NRCC-PLB-01-E ® NA ® Performance NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E) Lighting (Indoor Conditioned) El Prescriptive NRCC-LTI-01 / 02 / 03 / 04 / 05-E ' ❑ NA El Performace. S2 (section of the NRCC-PRF-01-E). Covered Process: Prescriptive NRCC PRC O1/ 03-E Commercial Kitchens ❑ ® NA ❑ Performance S3 (section of the NRCC-PRF-01-E) Covered Process: ❑ Prescriptive NRCC PRC -01/ 04-E Computer Rooms ® NA ❑ Performace S4 (section of the NRCC-PRF-01-E) Covered Process: Laboratory Exhaust NA El Prescriptive NRCC-PRC-01/ 09-E , ® s CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY Identify which building components use the performance or prescriptive path for compliance. "NA"= not in project For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans. Building Component Compliance Path Compliance Forms (required forsubmittal) Location of Mandatory Notes on Plans ® Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E) Envelope E] Prescriptive NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E El NA ® Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E) Mechanical [J Prescriptive NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E ❑ NA El Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E) Domestic Hot Water ❑ Prescriptive NRCC-PLB-01-E ® NA ® Performance NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E) Lighting (Indoor Conditioned) El Prescriptive NRCC-LTI-01 / 02 / 03 / 04 / 05-E ' ❑ NA El Performace. S2 (section of the NRCC-PRF-01-E). Covered Process: Prescriptive NRCC PRC O1/ 03-E Commercial Kitchens ❑ ® NA ❑ Performance S3 (section of the NRCC-PRF-01-E) Covered Process: ❑ Prescriptive NRCC PRC -01/ 04-E Computer Rooms ® NA ❑ Performace S4 (section of the NRCC-PRF-01-E) Covered Process: Laboratory Exhaust NA El Project Name: BBPI TI Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: ExistingAddition • NRCC-PRF-01-E Page 4 of 19 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Input File Name: BBPI TI-Ricciardi-15.xml G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY ` The following building components are only eligible for prescriptive compliance. Indicate which are The following building components may have mandatory requirements per Part 6. Indicate relevant to the project. which are relevant to the project. Yes NA Prescriptive Requirement Compliance Forms Yes NA Mandatory Requirement Compliance Forms Commissioning: §120.8 ❑ ® Lighting (Indoor NRCC-LTI-01 / 02 / 03 / 04 / 05-E ❑ ® Simple Systems NRCC-CXR-01 / 02 / 03 / 05-E Unconditioned) §140.6 ❑ ® Complex Systems NRCC-CXR-01 / 02 / 04 / 05-E ❑ ® Lighting (Outdoor) §140.7 NRCC-LTO-01 / 02 / 03-E ® ❑ Electrical: §130.5 NRCC-ELC-01-E ❑ ® Lighting (Sign) §140.8 NRCC-LTS-01-E ❑ ® Solar Ready: §110.10 NRCC-SRA-01 / 02-E Covered Process: §120.6 NRCC-PRC-01-E ❑ ® Parking Garage NRCC-PRC-02-E ® Solar Thermal Water NRCC-STH-01-E E]® Commercial Refrigeration NRCC-PRC-05-E Heating: §140.5 ❑ ® Warehouse Refrigeration NRCC-PRC-06/07/08-E ❑ ® Compressed Air NRCC-PRC-10-E ❑ ® Process Boilers NRCC-PRC-11-E Project Name: BBPI TI NRCC-PRF-01-E Page 5 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition IInput File Name: BBPI TI-Ricciardi-15.xml H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) — Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. Confirmed Building Component Compliance Forms (required for submittal) Pass Fail Envelope ® NRCI-ENV-01-E - For all buildings El❑ ❑ NRCA-ENV-02-F- NFRC label verification for fenestration ❑ ❑ Mechanical ` ^ ® NRCI-MCH-01-E - For all buildings with Mechanical Systems ❑ ❑ ® NRCA-MCH-02-A- Outdoor Air ❑ ❑ ® NRCA-MCH-03-A — Constant Volume Single Zone HVAC ❑ ❑ ❑ NRCA:MCH-04-H- Air Distribution Dud Leakage ❑ ❑ ❑ NRCA-MCH-05-A- Air Economizer Controls ❑ ❑ ❑ NRCA-MCH-06-A- Demand Control Ventilation ❑ ❑ ❑ NRCA-MCH-07-A— Supply Fan Variable Flow Controls ❑ ❑ ❑ NRCA-MCH-08-A- Valve Leakage Test ❑ ❑ ❑ NRCA-MCH-09-A — Supply Water Temp Reset Controls ❑ ❑ ❑ NRCA-MCH-10-A-' Hydronic System Variable Flow Controls ❑ ❑ ❑ NRCA-MCH-1I-A—Auto Demand Shed Controls ❑ ❑ ❑ NRCA-MCH-12-A- Packaged Direct Expansion Units ❑ ❑ ❑ NRCA-MCH-13-A- Air Handling Units and Zone Terminal Units ❑ ❑ ❑ NRCA-MCH-14-A- Distributed Energy Storage ❑ ❑ ❑ NRCA-MCH-15-A-Thermal Energy Storage ❑ ❑ ❑ N RCA -M CH - 16-A- Supply Air Temp Reset Controls ❑ ❑ ❑ NRCA-MCH-17-A — Condensate Water Temp Reset Controls ❑ ❑ ❑ NRCA-MCH-18-A- Energy Management Controls Systems ❑ ❑ ❑ NRCV-MCH-04-H- Duct Leakage Test ❑ ❑ CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36, Project Name: BBPI TI NRCC-PRF-01-E Page 6 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La 4uinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: lExistingAddition Input File Name: BBPI TI-Ricciardi-15.xm1 H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) — Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. Confirmed Building Component Compliance Forms (required for submittal) Pass Fail Plumbing ❑ NRCI-PL13-01-E - For all buildings with Plumbing Systems ❑ ❑ ❑ NRCI-PLB-02-E - required on central systems in high-rise residential, hotel/motel application. ❑ ❑ ❑ NRCI-PLB-03-E - Single dwelling unit systems in high-rise residential, hotel/motel application. ❑ ❑ ❑ NRCI-PLB-21-E - HERS verified central systems in high-rise residential, hotel/motel application. ❑ ❑ ❑ NRCI-PLB-22-E -HERS verified single dwelling unit systems in high-rise residential, hotel/motel application. ❑ ❑ ❑ NRCV-PLB-21-H- HERS verified central systems in high-rise residential, hotel/motel application. ❑ ❑ ❑ NRCV-PLB-22-H - HERS verified single dwelling unit systems in high-rise residential, hotel/motel application. ❑ ❑ ❑ NRCI-STH-01-E -Any solar water heating ❑ ❑ Indoor Lighting ® NRCI-LTI-01-E -For all buildings ❑ ❑ ❑ NRCI-LTI-02-E -Lighting control system, or for an Energy Management Control System (EMCS) ❑ ❑ ❑ NRCI-LTI-03-E - Line -voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line -voltage track lighting ❑ ❑ ❑ NRCI-LTI-04-E - Two interlocked systems serving an auditorium, a convention center, a conference room, or a theater ❑ ❑ ❑ NRCI-LTI-05-E -Lighting Control Credit Power Adjustment Factor (PAF) ❑ ❑ ❑ NRCI-LTI-06-E - Additional wattage installed in a video conferencing studio ❑ ❑ ❑ NRCA-LTI-02-A - Occupancy sensors and automatic time switch controls. ❑ ❑ ❑ NRCA-LTI-03-A - Automatic daylighting controls ❑ ❑ ❑ NRCA-LTI-04-A - Demand responsive lighting controls ❑ ❑ Outdoor Lighting ❑ NRCI-LTO-01-E —Outdoor Lighting ❑ ❑ ❑ NRCI-LTO-02-E- EMCS Lighting Control System ❑ ❑ ❑ NRCA-LTO-02-A - Outdoor Lighting Control ❑ ❑ Sign Lighting ❑ N RCI-LTS-01-E —Sign Lighting ❑ ❑ Electrical ® NRCI-ELC-01-E - Electrical Power Distribution ., - ❑ ❑ Photovoltaic ❑ NRCI-SPV-01-E Photovoltaic Systems ❑ ❑ CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 Project Name: BBPI TI NRCC-PRF-01-E Page 7 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xm1 H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) — Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance (Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify). See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment. Confirmed Building Component Compliance Forms (required for submittal) Pass Fail Covered Process ❑ NRCI-PRC-01-E Refrigerated Warehouse ❑ ❑ ❑ NRCA-PRC-01-F- Compressed Air Systems ❑ ❑ ❑ NRCA-PRC-02-F- Kitchen Exhaust ❑ ❑ ❑ NRCA-PRC-03-F- Garage Exhaust ❑ ❑ ❑ NRCA-PRC-04-F- Refrigerated Warehouse- Evaporator Fan Motor Controls ❑ ❑ ❑ NRCA-PRC-05-F- Refrigerated Warehouse- Evaporative Condenser Controls ❑ ❑ ❑ NRCA-PRC-06-F= Refrigerated Warehouse- Air Cooled Condenser Controls ❑ ❑ ❑ NRCA-PRC-07F- Refrigerated Warehouse- Variable Speed Compressor ❑ ❑ ❑ NRCA-PRC-08-F- Electrical Resistance Underslab Heating System ❑ ❑ I. ENVELOPE GENERAL INFORMATION (See NRCC-PRF-ENV-DETAILS for more information) 1. Total Conditioned Floor Area 7,410 ft2 S. Number of Floors Above Grade 1 Confirmed 2. Total Unconditioned Floor Area 0 ft2 6. Number of Floors Below Grade 0 H T 3.' Addition Conditioned Floor Area 0 ft2 4. Addition Unconditioned Floor Area 0 ft2 7. Opaque Surfaces & Orientation 8. Total Gross Surface Area 9. Total Fenestration Area 30. Window to Wall Ratio North Wall 940 ft2 306 ft2 32.6% ❑ ❑ East Wall 1,320 ft2 425 ft' 32.2% ❑ ❑ South Wall 390 ft2 85 ft2 21.8% ❑ ❑ West Wall 568 ft2 178 ft2 31.3% ❑ ❑ Total 3,218 ftZ _ 994 ft2 30.9% El ❑ Roof -7,410 ft2 0 ft2 00.0% ❑ ❑ r,r CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 Project Name: BBPI TI Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: ExistingAddition NRCC-PRF-01-E Page 8 of 19 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Input File Name: BBPI TI-Ricciardi-15.xmi • J. FENESTRATION ASSEMBLY SUMMARY § 110.6 Confirmed 1. 2. 3. 4. S. 6. 7. 8. 9. Surface Name Fenestration Assembly Name/ 1 Area (ft) Framing Type Cavity R -Value Continuous R -Value Overall Overall Overall d - N T °' 7410 Fenestration Type Certification Methods Assembly Method Area ftZ E ❑ ❑ Titlt Up Wall w/ R-13 Ins13 ExteriorWall 0 Tag or I.D. 0 NA U -Factor: 0.452 N U -factor SHGC VT N 7410 Wood Double Metal Titnted Vertica I Fenestration DefaultPerformance Manufactured 994- 0.76 0.60 0.55 E ❑ ❑ ` Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Site -built fenestration less than 1,000 ft`, or more than or equal to 1,000 ft` see Reference Nonresidential Appendix NA6. Z Status: N - New, A - Altered, E - Existing Taking compliance credit for fenestration shading devices? (if "Yes", see NRCC-PRF-ENV-DETAILS for more information) K. OPAQUE SURFACE ASSEMBLY SUMMARY § 120.7/ § 140.3 Confirmed 1. 2. 3. 4. S. 6. 7. 8. Surface Name Surface Type 1 Area (ft) Framing Type Cavity R -Value Continuous R -Value U -Factor / F -Factor / C -Factor N N d - R-30 Roof Atticll Roof 7410 Wood 30 NA U -Factor: 0.038 E ❑ ❑ Titlt Up Wall w/ R-13 Ins13 ExteriorWall 0 NA 0 NA U -Factor: 0.452 N ❑ ❑ R-19 Floor39 InteriorFloor 7410 Wood 19 NA U -Factor: 0.048 E ❑ ❑ `Status: N - New, A -Altered, E -Existing L. ROOFING PRODUCT SUMMARY ' 1 §140.3 Confirmed 1. 2. 3. 4. S. 6. 7. Aged Solar Thermal Cool Roof V T Product Type Product >_25 Ib ftZ SRI CRRC Product ID Number Reflectance Emittance Credit R-30 Roof Attic11 No 0.08 0.75 NA No NA ❑ ❑ R CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance C Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 t - •7 • • Project Name: BBPI TI NRCC-PRF-01-E Page 9 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xmi M. HVAC SYSTEM SUMMARY (see NRCC-PRF-MCH-DETAILS for more information)- § 110.1 / § 110.2 Dry System Equipment' (Fan & Economizer info included below in Table N) Confirmed 1. 2. 3. 4. S. 6.. 7. 8. 9. 30. 11. Air System Type Rated Capacity Total Heating Supp Heat Supp Heat Total Cooling Efficiency Acceptance Testing v, d V � L+ °-' Equip Name Equip Type 3 (Simple or Qty Output Source (Y/N) Output Output HP Required? (Y/N) C N CFM - BHP (inch Complex') CFM (kBtu/h) BHP (kBtuh) (kBtu/h) s a WC) WC) Cooling Heating HVAC1 185 HVAC1 SZHP (Packaged3Phase) Simple 8 S7 No 0 60 SEER -13.0 HSPF-7.7 Yes N ❑ ❑ Wet System Equipment 7 Pumps Confirmed Confirmed 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. Air Rated Capacity Economizer Type v N Tank VSD ,�, V N -n °' Equip Name Equip Type Qty Vol (gal) (kBtu/h) Efficiency Standby Loss Ext. R Qty GPM HP (y/N) N CFM - BHP (inch Control CFM HP BHP Value Control a 1 Ory System Equipment includesfurnaces, air handling units, heat pumps, etc. 1 Wet System Equipment includes boilers, chillers, cooling towers, water heaters, etc. 3 Simple Systems must complete NRCC-CXR-03-E commissioning design review form C Complex Systems must complete NRCC-CXR-04-E commissioning design review form - - 5 A summary of which acceptance tests are applicable is provided in NRCC-PRF-MCH-DETAILS - 6 Status: N - New, A - Altered, E - Existing Discrepancy between modeled and designed equipment sizing? (if "Yes", see Table F. "Additional Remarks" for an explanation) No N. ECONOMIZER & FAN SYSTEMS SUMMARY' § 140.4 Confirmed 1. 2. 3. 4. S. Outside Supply Fan Return Fan Air Economizer Type v N °J TSP TSP Equip Name (if present) CFM ' CFM HP BHP (inch Control CFM HP BHP (inch Control WC) WC) HVAC1 185 2000 0:750 0.750 1.43 ConstantVolume NA NA NA NA NA NoEconomizer ❑ ❑ 1 Mechanical ventilation calculations and exhaust fans are included in the NRCC-PRF-MCH-DETAILS section CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015=760 Report Generated at: 2015-10-19 20:05:36 Project Name: BBPI TI NRCC-PRF-01-E Page 10 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time:. 20:05, Mon, Oct 19, 2615 Compliance Scope:. ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xml O. EQUIPMENT CONTROLS § 120.2 Confirmed 1. 2. 3. d r m c Equip Name Equip Type Controls No DCV Controls HVACl1 SZHP No Economizer ❑ ❑ Lighting Control Credits Additional (Custom) Allowance No Supply Air Temp. Control — Q. INDOOR CONDITIONED LIGHTING GENERAL INFO (see NRCC-PRF-LTI-DETAILS for more info)' . § 140.6 Confirmed 1. 2. 3. 4. 5. Occupancy Type 1 Conditioned Floor Area z Installed Lighting Power Lighting Control Credits Additional (Custom) Allowance N — 1n21 (Watts) (Watts) Area Category Footnotes Tailored Method (Watts) ❑ ❑ (Watts) Office (Greater than 250 7,410 5,150 0 0 0 ❑ ❑ square feet in floor area) Building Totals: 7,410 5,150 0 Project Name: BBPI TI Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: ExistingAddition , NRCC-PRF-01-E Page 11 of 19 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 • Input File Name: BBPI TI-Ricciardi-15.xml R. INDOOR CONDITIONED LIGHTING SCHEDULE (Adapted from NRCC-LTI-01-E)1 § 130.0 Luminaire Schedule (includes all permanent installed lighting in conditioned space, and portable lighting over 0.3 w/ft2 in offices) Installed Watts (Conditioned) Confirmed Name or Item Tag Complete Luminaire Description (i.e., 3 -lamp fluorescent troffer, F32T8, one dimmable electronic ballast) Watts per luminaire How Wattage is Determined Total Number Luminaires Installed Watts Pass Fail CEC Default from NA8 According to §130.0(c) 2X4 LED 2X4 LED Panel 50 Yes No 77 3,850 ❑ ❑ 2X4 LED -EM 2X4 LED Panel 50 Yes No 23 1,150 ❑ ❑ 45W LED 45 W LED Lin 45 Yes No 2 90 ❑ ❑ 60W LED 60 W LED Lin 60 Yes No 1 60 ❑ ❑ 'if lighting power densities were used in the compliance model Building Departments will need to check prescriptive forms for Luminaire Schedule details. S1. COVERED PROCESS SUMMARY— ENCLOSED PARKING GARAGES § 140.9 This Section Does Not Apply S2. COVERED PROCESS SUMMARY -COMMERCIAL KITCHENS § 140.9 This Section Does Not Apply This Section Does Not Apply y S4. COVERED PROCESS SUMMARY — LABORATORY EXHAUSTS § 140.9 This Section Does Not Apply CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 Project Name: BBPI TI NRCC-PRF-01-E Page 12 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253. Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xm1 U. ENERGY USE SUMMARY » Electric (kWh/yr) Natural Gas (therms/yr) Total Annual Baseline 134521 131.298 Total Annual Proposed 127315 0 • • Project Name: BBPI TI NRCC-PRF-01-E Page 13 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xml DOCUMENTATION AUTHOR'S DECLARATION STATEMENT § 10-103 I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Company: Scott Design and Title 24, Inc, A Signature: Address: 77085 Michigan Drive Signature Date: 10/19/15 City/State/Zip: Palm Desert CA 92211 CEA Identification (If applicable): Phone: (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1 I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. 2 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 3 I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pe ains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Responsible Envelope Designer Name: Robert Ricciardi Company: Robert H. Ricciardi, Architect Signature: Address: 75-400 Gerald Ford Road, Suite 115 Date Signed: City/State/Zip: Palm Desert CA 92211 Declaration Statement Type: Phone: (760) 610-5036 Title: License #: C �� Responsible Lighting Designer Name: Robert Ricciardi Company: Robert H. Ricciardi, Architect Signature: (FLtzl Address: 75-400 Gerald Ford Road, Suite 115 Date Signed: t 1 City/State/Zip: Palm Desert CA 92211 Declaration Statement Type: Phone: (760) 610-5036 Title: License #: Responsible Mechanical Designer Name: Tim Scott Company: Scott Design and Title 24, Inc. Signature: �e, f Address: 77085 Michigan Drive Date Signed: 10/19/15 City/State/Zip: Palm Desert CA 92211 Declaration Statement Type: Phone: (760) 200-4780 Title: License #: CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 i Project Name: BBPI TI - Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: - ExistingAddition r, s NRCC-PRF-ENV-DETAILS -SECTION START W NRCC-PRF-01-E Page 14 of 19 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Input File Name: BBPI TI-Ricciardi-15.xml A. OPAQUE SURFACE ASSEMBLY DETAILS Confirmed 1. 2. 3. 4. - v m T d - — Surface Name Surface Type Description of Assembly Layers Notes Operation Overall U -factor Asphalt shingles - 1/4 in. Fail or I.D. Vapor permeable felt - 1/8 in. R-30 Roof Attic11 Roof Plywood - 1/2 in. ❑ ❑ Air - Cavity - Wall Roof Ceiling - 4 in. or more Wood framed roof, 24in. OC, 3.5in., R-30 J Gypsum Board - 1/2 in. Titlt Up Wall w/ R-13 Ins13 ExteriorWall Concrete - 140 Ib/ft3 - 6 in. ❑ a Air - Cavity - Wall Roof Ceiling - 4 in. or more Wood framed floor, 16in. OC, 5.5in., R-19 R-19 Floor39 interiorFloor Plywood - 1/2 in. ❑ ❑ Carpet - 3/4 in. _ C. OPAQUE DOOR SUMMARY Confirmed 1. 2. 3. 4. 5. Opaque Door Assembly Name / TagPass Door Type Certification Method Operation Overall U -factor Fail or I.D. Project Name: BBPI TI Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: ExistingAddition NRCC-PRF-MCH-DETAILS -SECTION START I , NRCC-PRF-01-E Page 15 of 19 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Input File Name: BBPI TI-Ricciardi-15.xml A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E) Confirmed 1. DESIGN AIR FLOWS 2. VENTILATION (§ 120.1) 3. 4. S. =v M '^ v N 9* 9 9 Rated Capacity p M g m .0 v 1 70 (kBtuh) z z D z T Z X T X p < v z LA G1 ? Heating N N Min. • Mtn' BHP Cycles ECM M a A O C � 3 O 3 n z m z r m z z z Ratio n r g O Uncontrolled Z NA O n " c 3 1 NA m NA p d L CONDITIONED O n n 3 3 O D v 3 3 H c z m z 3-4 D n �, z' D < < N — — ZONE NAME 00 " D 3< 70 D A 2 = rn v 3 r�o m 1 3D r < z nj r�� "> �Di Or m D A �M O a A O O � r0 z D -n 9Z z< vGz1 ZGz1 j a V7O 4n Z i7 D _ m r �^ .3 O 3 D 70 D 70 - D v m O z _ (1 cO c' T 3 3 1 Tenant HVAC1 2,0000 NA NA NA NA N HVAC1 7,410 0.15 99 11.3 1,112 1,482 NA N ❑ ❑ Improvement - TOTAL 7,410 99 1,112 1,482 NA ❑ ❑ B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY § 140.4 1. 2. 3. 4. S. 6. } 7. 8. Confirmed Rated Capacity Airflow (cfm) Fan (kBtuh) System ID System Type Qty Economizer Zone Name N o Heating Cooling Design Min. • Mtn' BHP Cycles ECM — Ratio Motor Tenant Uncontrolled 8 NA NA NA 1 -Tenant Improvement 2000 NA NA NA NA ❑ ❑ ❑ Improvement3-TRM CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC PRF-Ol-E 10192015 760 Report Generated at: 2015-10-19 20:05:36 • d Fail ❑ d. E E' ,r c 0 L O N cr E X Ui � LL o ❑ ❑ Cn a W mo Y U O co i o •O e`a u cc a ca v MCH -18A v 4. i CO c LU O L.L ui E p c O m Z Qj o MCH -17A CL - CL U Z f0 f0 U LL 3 C 0 v C Supply, Air Temp. Reset w U m ec 'N MCH -16A 0 3 C A ' • to m c C O x H V O U TES Systems ' J O N MCH -15A Z 0 L w Ca O O N C `o W � � a � Q �+ E 3 Y u Energy Storage O? O 'n }p0 M 3 Y a o W N 3IA MCH -14A DX AC ' i Q IA Q E - F d Co tD n NED Ch d C x W C Z ? a= Q Z W pC ? a Q Auto FDOAir &e ♦ • ci E Z v ° Q C CL en V J Q eL o Z N W o C 0 H Q F- O Z o Z N o a c C U Q. v ei a v LU Ln VI g O ii U rn N fL O o`no o 14 V f6 C tw J' M 11 d Fail ❑ d. E E' ,r c 0 Pass ❑ � LL o ❑ ❑ ECMS v MCH -18A v 4. i M c Condenser Water o MCH -17A CL Reset Controls w, 0 v C Supply, Air Temp. Reset w U m ec 'N MCH -16A 0 3 C A O • C C O O U TES Systems Y MCH -15A eu CL C `o E �+ E 3 Y u Energy Storage O? O U °Dist. Of 7 lL O MCH -14A DX AC ' U Q E O Y c Auto FDOAir &e 0 MCH -13A nor CU FDD for DX Units O W 14 o MCH -12A O o`no o 14 V f6 C tw J' M 11 a o , cMCH-11A Auto Demand Shed N U 1O Control YJ lY X NC n Hyd. Variable Flow W eu MCH -10A Control H 0 E � J C Supply Water Temp. Y C 40 C C_ D. MCH -09A Reset o +� u T S u E 'O w Q v CC o U Valve leakage °' o Z Y MCH -08A d °o n1 ve cu , c n a n ro v N eo dC N `O F V d E 1u C C Supply Fan VAV CO CC o � MCH -07A H U N W`= Q ey O v W C r0 d U MCH -06A DCV L �D U CL v Q U U J b0 Economizer Controls V1 Q O a MCH -05A cc CL n Y Cr Cr Z E U N 1 0f0 mad W C7 c v N MCH -04A Air Dist. Ducts en E :C ,L C eo H W �. O 0 L 0 _ C N Single Zone Unitary x LLA t " Z ~ ate+ MCH -03A a U c C (IJd Mm. `N eU W aeco M 1: l74 (9 4u Z O d Outdoor Air U W U U CL ate, Q U MCH -02A r - x Q M O O Z Y J eL 0 ° C 00 Y 0 toS Z O > r O M L Q C ON 0 C > C m o GoC 'F3 Uj Qj r1 n CL Cr 'v _ J V a N E im 'O LL El d. E ,r c u° o ❑ ❑ a� c to ._ i M o Q Y > w, w U m 0 3 O O C C O O U M C `o +_' �+ E 3 Y u O o O? O Of 7 lL O O U Q O Y c 0 U O W 14 o N C s O o`no o 14 f6 C tw J' M 11 o , N U YJ w . 0 NC n Yk N J C D: Y C 40 C C_ D. Z o +� u S O 'O w Q v o C E U °' o o E ?� d °o � v w cu O c n a n ro v N eo dC 'D Q `O F V d E C C C C N CO CC H U N W`= Q ey O v W C r0 H C eU 0: L �D U J b0 O CL n Y Cr Cr t i E U N 1 0f0 O f0 C7 c v M'°/ N v N" -� E :C ,L C eo H 7 a— O 0 L 0 _ C N r> t= w L —O. ~ ate+ a(+C U c C (IJd Mm. `N eU W N O Y u M 1: l74 (9 4u Z O d 3 L U U U F- u O r- r - o O O Z Y O 0 Y Y toS m c o E c wO ' E O M L i :2 C eL >eU C > p m o o U 0 Co e n r1 n J N„ E N E Q ,r Project Name: BBPI TI Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: ExistingAddition NRCC-PRF-01-E Page 17 of 19 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Input File Name: BBPI TI-Ricciardi-15.xm1 A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E) § 140.6 Lighting Control Credits Schedule (includes all lighting controls installed in conditioned space for Control Credit Calculation General lighting power from special function areas (see Table E) Confirmed compliance credit per §140.6(a)2 and Table 140.6-A) 0 V If Acceptance Test c wired q 0 Location in Occupancy Type (must meet Type/Description of Lighting NA Watts of Power Control Credit NA _ Building requirements of Table 140.6-A) Control (i.e., partial on occupancy # of Units Controlled Adjustment Watts sensor, manual dimming, etc.) _ Lighting Factor Pass Fail S -1 -Tenant Office (Greater than 250 square - none specified - 1 90 0.00 - 0 Cl ElImprovement feet in floor area) S -1 -Tenant Office (Greater than 250 square none specified 1 60 0.00 0 ❑ ❑ Improvement feet in floor area) B. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS (Adapted from NRCC-LTI-02-E) § 130.1 This Section Does Not Apply §130.1(0) =Manual area controls; §130.0(6) = Multi Level; §130.1(c) =Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) =Demand Responsive C. TAILORED METHOD LIGHTING POWER ALLOWANCE SUMMARY AND CHECKLIST (Adapted from NRCC-LTI-04-E) § 140.6 General lighting power (see Table D) 0 General lighting power from special function areas (see Table E) NA Additional "use it or lose it" (See Table G) 0 -" Total watts 0 E. GENERAL LIGHTING FROM SPECIAL FUNCTION AREAS (Adapted from NRCC-LTI-04-E) § 140.6(c) 3H Room Number Primary Function Area Illuminance Value (LUX) Room Cavity Ratio (Table G) Allowed LPD Floor Area (ft2) Allowed Watts Confirmed Pass Fail NA NA NA NA NA NA NA ❑ ❑ Note: Tailored Method for Special Function Areas is not currently implemented CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36. Project Name: BBPI TI NRCC-PRF-01-E Page 18 of 19 Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Compliance Scope: ExistingAddition ti Input File Name: BBPI TI-Ricciardi-15.xml F. ROOM CAVITY RATIO (Adapted from NRCC-LTI-04-E) Rectangular Spaces ' Room Number Task/Activity Description Room Length (ft) Room Width (ft) Room Cavity Height (ft) RCR Confirmed Pass Fail NA NA NA NA NA NA ❑ ❑ Non -Rectangular Spaces This Section Does Not Apply NOW: All appucaoie spaces are usrea unaer me non-rrecrangutor Spaces rame G. ADDITIONAL "USE IT OR LOSE Ir (Adapted from NRCC-LTI-04-E) 1. 2. 3. 4. Allowed Watts Confirmed Wall Display Combined Floor Display and Task lighting Combined Ornamental and Special Effects Lighting Very Valuable Merchandise N N d = 0 0 0 0 0 ❑ ❑ S. Wall Display r This Section Does Not Apply y . ; 7. Combined Ornamental and Special Effects Lighting This Section Does Not Apply 8. Very Valuable Merchandise Y This Section Does Not Apply Project Name: BBPI TI Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Compliance Scope: ExistingAddition NRCC-PRF-01-E Page 19 of 19 a Calculation Date/Time: 20:05, Mon, Oct 19, 2015 Input File -Name: BBPI TI-Ricciardi-15.xmi- H. INDOOR & OUTDOOR LIGHTING ACCEPTANCE TESTS & FORMS (Adapted from NRCC-LTI-01-E and NRCC-LTO-01-E) - § 130.4 Declaration of Required Acceptance Certificates (NRCA) —Acceptance Certificates that must be verified in the field. (Retain copies and verify -forms are completed and signed to post in -field for Field Inspector to verify). Test Description Indoor Outdoor Confirmed NRCA-LTI-02-A - NRCA-LTI-03-A NRCA-LTI-04-A NRCA-LTO-02-A Equipment Requiring Testing or Verification # of units Occ Sensors / Auto Time Switch Auto Daylight Demand Responsive Outdoor Controls V N T d Occupant Sensors 0 ❑ ❑ ❑ ❑ ❑ ❑ Automatic Time Switch 0 ❑ ❑ ❑ ❑ ❑ ❑ Automatic Daylighting 0 ❑ ❑ ❑ ❑ ❑ ❑ Demand Responsive 0 ❑ ❑ ❑ ❑ ❑ ❑ Outdoor Controls 0 ❑ ❑ ❑ ❑ ❑ ❑ ENVELOPE MANDATORY MEASURES:`NONRESIDENTIAL ENV -MM Project Name Date - - BBPI Tenant Improvement 10/19/2015 DESCRIPTION Building Envelope Measures: §110.8(a):. Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §110.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §110.8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. §110.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products, and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §110.6(a): window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging). §110.6(a): Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §110.6(a) : Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default SHGC. §110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). r EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19720:06:08 /D: Page 22 of 39 120/208V 3PH 4W WYE kWh'Meter . = 7. 100 3 Split CTs 21<208-01W 200 _ 2K208 -02W SERIES 2000 THREEPHASE .DETERS ' 2K208704W kWh meter with' optional. Peak Demand functionality (includes Reset Key) 120/208V or 277/480V 3PH 4W WYE only, 2K208 -12W .1010-1200 Amps 3 SOLID CTs Isolated'Pulse output -standard feature 277%480V 3PH 4W WYE kWh Meter t f -Large LCD Display 3 Split CTs e Revenue grade accuracy: 0.5% accuracy. class 200 Use with_split core or solid core CTs 400 t 800 '21<480-08W 1200 ' 2K480 -12W 100 • ..: �� - . e FIG 2K480-2SW 120/208V 3PH 4W , ; WYE Demand Meter , - 100 Ser7es Y000 :4 Silo 20 200 2K208 -02D , • r 4 800 2K208 08D 1200 viN:�YM�'rirr 277/480V 3PH 4W WYE Demand Meter . 100 2K480 -01D 200 SERIES 2000 THREE PHASE METER KITS 400 `Note: Kits include meter, specified enclosure and required current transformers 800" INDOOR ENCLOSURE OUTDOOR ENCLOSURE VOLTAGE AMPS CTS INCLUDED CAT. NO. VOLTAGE AMPS 120/208V 3PH 4W WYE kWh'Meter . = 7. 100 3 Split CTs 21<208-01W 200 _ 2K208 -02W 400 ' 2K208704W —800- 2K208 -08W 1200 2K208 -12W 100 200 3 SOLID CTs 2K208=1SW 2K 277%480V 3PH 4W WYE kWh Meter t 100 3 Split CTs 2K480 -01W 200 2K480 -02W 400 2K480 -04W 800 '21<480-08W 1200 ' 2K480 -12W 100 3 SOLID CTS, 2K480-1SW 200. 2K480-2SW 120/208V 3PH 4W , ; WYE Demand Meter , - 100 3 Split CTs 2K208 -01D ' 200 2K208 -02D , 400 2K208 04D ' 800 2K208 08D 1200 2K208 -12D 277/480V 3PH 4W WYE Demand Meter . 100 2K480 -01D 200 2K480 -02D 400 2K480 04D 800" 2K480.08D 1200. , 2K480 -12D . 100 200 120/208V 3PH 4W " 400 WYE kWh Meter J _ 800. 1200 100,( 200. 277/,480V 3PH 4W WYE kWh Meter 400 800 1200 , J _ J 00 it LTt^tie�� . C CTSINCLUDED ', CAT.NO.. . ' '20208-01W 20208-02W ' 20208-08W 20208-12W �3 Split CTs . E20�80-01W' l.- e a. Y • , w STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power Distribution Project Name: BBPI Tenant Improvement CALIFORNIA ENERGY COMMISSION N RCC-ELC-01-E (Page 1 "of 7) Date Prepare& 10/19/2015 „ A. General Information Project Address: 43-576 Washington, Suites 200 & 201 Climate Zone: 15 Conditioned Floor Area : .. 7,410 Unconditioned Floor Area 0 t Building Type: ® Nonresidential 0 High -Rise Residential ❑ Hotel/Motel ❑ Schools ❑ Relocatable Public Schools m Conditioned Spaces ❑ Unconditioned Spaces Phase of Construction: ❑ New Construction ❑ • Addition - m Alteration r `STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) s CERTIFICATE OF COMPLIANCE Electrical Power Distribution Project Name: BBPI Tenant Improvement e CALIFORNIA ENERGY COMMISSION • ' 'NRCC-ELC-01-E'' ,..T -a, -� (Page 2 of 7) .< y• . Date Prepared: - < ,P 10/19/2015 B. Electrical Service Metering '. fi` � ' . .6; - • tea ❑ Each newly installed electrical service (in both existing and newly constructed buildings) is required to be metered, as set out in Table 130.5-A, which is reproduced below.' c ... , , " •' ;+-:M ❑ Fill out a separate line for each electrical service that is connected to the building. ' Electrical Field Electrical Service Schedule Service Rating Metering Capabilities (check all that are present) Inspector, A •�� Ai. B C • D S,x E F G` , $ + + rD N 3 7 f1 rD �. �-n Dl `1 a,3 rD it v �__ o- �r y Designation/location in building/description kVA ❑ ❑ ❑� ,❑ .❑ ❑ rt + r .ti 4v `�♦: ❑. ❑ ❑ ❑ ❑ ❑ ❑, ❑ o ❑ ❑ ❑ CA Building Energy Efficiency Standards 2013 Nonresidential Compliance: ❑ i� �'� .Yr. '❑ 2015 ❑ ❑ ❑ ❑ ❑ 1,. ❑ ❑ ❑ ❑ ❑ .❑' .. ❑ ❑ ❑ ❑- ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑ ❑ ❑: ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑, ❑ ❑ �+ ❑ ❑,, ❑ , ❑ ❑ Table 130.5'A - MINIMUM REQUIREMENTS FORMETERINGOF ELECTRICAL LOAD y << • �•_,i .• ... i a More than SOkVA More than 250 kVA Services rated j and less than or _ and less than or • ..,,,more than + < Meter Rating (kVA) 50 kVA or less equal to 250 kVA equal to 3000kVA 1000kVA Instantaneous (at the r. Re + 'quired > "Required � f Required 1 Required' a time) kW demand 4'11.�„1 . " Historical peak demand 7Required r Not required Not required 1 '` "Requlred a; •' Resettable kWh -Required,` °' Required ` 't', y Required " `� --,,Req'uir'ed`- kWh per rate period Not required Not required Not required ',Required ' - '. fi` � ' . .6; - • tea �� r. 'I. rt.t4 4• / �J ... , • • •. •� i •�� Ai. 1 A. e t Y - • a .•y S,x r.4. , • 1F rt + r .ti 4v `�♦: CA Building Energy Efficiency Standards 2013 Nonresidential Compliance: i� �'� .Yr. r� 2015 ♦tMay STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power Distribution 07 Project Name: BBPI Tenant Improvement r CALIFORNIA ENERGY COMMISSION NRCC-ELC-01-E (Page 3 of 7) Date Prepared: 10/19/2015 t C. Disaggregation of Electrical Circuits ❑ Each newly installed switchboard, panel, and motor control center (in both existing and newly constructed buildings) is required to be disaggregated according to the requirements of Table 130.5-B, shown on the next page. 11Individual branch circuits, taps or disconnects that require overcurrent protection devices rated 60A or greater. ❑ As an alternative, current transformers can be added for individual branch circuits and loads throughout the building, and a permanent measurement system can be installed. In this case, disaggregated wiring would not be required as long as the metering system allows the equivalent disaggregated measurements. ❑ Fill out a separate line for each switchboard, motor control center, panelboard and subpanel. Switchboard, motor control center, panelboard or Electrical Service that supplies that switchboard or panel Electrical Service Rating Field Inspector -0 -nsubpanel A B C D Designation/location in Designation/location in building/description kVA building/description ❑ ❑ ❑ ❑ ❑ 11❑ ❑ 13 ❑ ❑ ❑ ❑ ❑ 1:10 13❑ ❑ ❑ ❑ ❑ 13- ❑ 130 ❑ ❑ ❑ ❑ ❑ ❑ 13❑ ❑ ❑ ❑ ❑ 13❑ ❑ ❑ ❑ OR _ s and loads throughout the building, and a permanent saggregated measurement as required by the Standards.. ❑ ❑ Current transformers have been attached to individual branch circuit measurement system is installed that allows an equivalent degree of di CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 i STATE OF CALIFORNIA Electrical Power Distribution f CEC-NRCC-ELC-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E Electrical Power Distribution (Page 4 of 7) Vm,ect name: BBPI Tenant Improvement °ate Vre°a'ed: 10/19/2015 D. Disaggregation of Electrical Circuits (continued) Table 130.5-B - MINIMUM REQUIREMENTS FOR SEPARATION OF ELECTRICAL LOAD l Table 130.5 — B sets the upper limit on how many load(s) of each type can be supplied by each feeder. A feeder may not supply loads of more than one type unless the service is rated at 50 kVA or less. For instance, on the fifth row of the table, one feeder on a service >50 kVA could be used to supply all the plug loads on a floor of a building, provided that there are no areas in which more than 25kVA of plug load is supplied to a space less than 5000sf Services rated more than Services rated more than Services rated 50kVA and less than or 250 kVA and less than or Services rated more Load Type 50 kVA or less equal to 250 kVA equal to 3000kVA than 1000kVA Lighting including exit and All lighting egress lighting and exterior Not required All lighting in aggregate All lighting disaggregateddisaggregated by floor, lighting g g by floor, type or area type or area HVAC systems and components including chillers, fans, heaters, All HVAC in aggregate All HVAC in aggregate furnaces, package units, cooling Not required All HVAC in aggregate and each HVAC load and each HVAC load towers, and circulation pumps rated at least 50 kVA rated at least 50kVA associated with HVAC Domestic and service water system pumps and related Not required All loads in aggregate All loads in aggregate All loads in aggregate systems and components All plug load separated by All plug loads separated All plug load in aggregate floor, type or area by floor, type or area. Plug load including appliances Groups of plug loads Groups of plug loads All groups of plug loads Not required exceeding 25 kVA rated less than 25 kVA exceeding 25 kVA exceeding 25 kVA connected load in an area connected load in an area connected load in an less than 5000 sf less than 5000 sf area less than 5000 sf Elevators, escalators, moving. ' � Not required All loads in aggregate All loads in aggregate . All loads in aggregate walks, and transit systems Other individual non -HVAC loads or appliances rated 25kVA Not required All Each Each or greater , Industrial and commercial load centers 25 kVA or greater including theatrical lighting Not required All Each Each installations and commercial r kitchens. Renewable power source (net Each group Each group Each group Each group or total) Loads associated with Not required All loads in aggregate All loads.in aggregate All loads in aggregate renewable power source Charging stations for electric vehicles All loads in aggregate All loads in aggregate All loads in aggregate All loads in aggregate x • CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance , May 2015 STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Mi Electrical Power Distribution Project Name: BBPI Tenant Improvement 4 CALIFORNIA ENERGY COMMISSION' NRCC-ELC-01-E (Page 5 of 7) Date Prepared: 10/19/2015 E. Voltage Drop ❑ Attach voltage drop worksheet to this form, ❑ Field inspector has discretion to approve the worksheets; the tables shown below in this section are advisory only ❑ Feeder conductors and branch circuits that are dedicated to emergency services are exempt from these requirements. ❑ An advisory table of typical power factors is shown below Field Inspector N V1 a Feeders. Feeder conductors shall be sized for a maximum voltage drop of 2 percent at design load. ❑ ❑ Branch Circuits. Branch circuit conductors shall be sized for a maximum voltage drop of 3 percent at design load. ❑ ❑ Compliance Manual, Chapter 8, Table 8 2: Typical Power Factors for Voltage Drop Calculations Default Power Factor Default Power Factor Load Type at 120 volts at 277 volts Clarifying Notes .Fluorescent lighting 0.95 0.95 Compact p 0.9 (hardwired) 0.9 (hardwired) fluorescent lighting NPF magnetic ballasts use GU -24 values 0.5 (GU -24) 0.3 (GU -24) LED lighting 0.7 0.5 May be higher if specifications call for high ' power factor drivers Incandescent lighting 1.0 1.0 HID lighting 0.9 0.9 May be lower if NPF ballasts are specified HVAC packages 0.85 0.9 Other motors <5 HP 0.8 0.8 Other motors >5 HP 0.85 0.85 Kitchen equipment 0.9 N/A Receptacles 0.6 N/A For dedicated receptacles, may be rated according to the load Electric heating 1.0 1.0 including hot water Other 0.85 0.85 '10 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance May 2015 1 STATE OF CALIFORNIA 'Electrical Power Distribution +CEC-NRCC-ELC-01-E (Revised 05/15) CERTIFICATE OF COMPLIANCE Electrical Power. Distribution, Project Name:. - BBPI Tenant Improvement F. Circuit Controls for 120 -Volt Receptacles ❑ II 3• � c t CALIFORNIA ENERGY COMMISSION ' Ic^ K; NRCC-ELC-01 E i. (Page`6 of 7) y Date Prepared: , i - 10/19/2015 Com ci ed 120 volt receptacles shall be provided, as required by Section 130.5(d) of the Standards.. }' ! ❑. In open office areas, controlled circuit receptacles are not required if, at time of final permit, workstations are installed, and each workstation is • �,. .� equipped with an occupant sensing control that is permanently mounted in each workstation, and which controls a hardwired, nonresidential- r .1 rated power strip: Plug-in strips and other plug-in devices that incorporate an occupant sensor shall not be used for this exception. ❑ Receptacles that are only for the following purposes are exempt: -Receptacles specifically for refrigerators and water dispensers in kitchenettes. �. ' -Receptacles located a minimum of six feet above the floor that are specifically for clocks. • •-Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in copy rooms.. T't n' L. ~ i ' •• ` "* Field r . • c. , —'' �, • . Inspector `. ` +'. I� • 'rJ � . -n' � • t 1. At least one controlled receptacle is installed within 6 feet of each uncontrolled receptacle, or split -wired duplex r,' r receptacles are installed, that have one controlled and one uncontrolled receptacle. This applies in all of the following Ke, , •. v �F spaces �` ^'4 .,j /• i. , ...:.t ,wC., - `' c '•, Private offices, open office areas • t "` • + _ ;` i,f �'� "`y• Receptions and lobbies :• ,,. - ' • A. ` " + • Conference rooms •, ' Al ' t • Kitchenettes in office spaces ( i", t ` ' • e Copy room Ok 2.� Electric circuits serving controlled receptacles are equipped with automatic,shut-OFF controls following the , requirements prescribed in Section 130.1(c)1 through 5 (in many cases this will mean that the receptacles are connected ' ❑ ' to the same automatic shut -OFF system as the lighting of the space).' r, ! ` i— , May 2015 •;: general 3. -"Controlled receptacles shall have a permanent marking to differentiate them from uncontrolled receptacles: ❑ � '= - ❑+ + 14. , For open office areas, controlled circuits shall be provided and marked to support installation and configuration of office y 1• t furniture with receptacles that comply with Section 130.5(d) 1, 2, and 3. - ❑ �pt F : S. For.hotel and motel guest rooms at least one-half of the 120 -volt receptacles in each guest room are controlled ,t:•t :z� receptacles that comply with Section 130.5(d)1, 2, and 3 (see numbers 1,2 and 3 above). Electric circuits serving , ' controlled receptacles have captive card key controls, occupancy sensing controls, or automatic controls such that, no t ❑ r is ❑ •' i longer than 30 minutes after the guest room has been vacated, power is switched off. 4 Plug-in strips and other plug-in devices that incorporate an occupant sensor are'not used to comply with any of these • requirements. i .. , { - } ,ft❑.; ❑, ' .. .. JW •. ^'4 .,j /• i. , ...:.t ,wC., - r .• + �5;,'et '� r y} l.,t i - ' • A. Al , CA Building Energyffficiency Standards - 2013 Nonresidential Compliance ! ` i— , May 2015 •;: STATE OF CALIFORNIA Electrical Power Distribution CEC-NRCC-ELC-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Tim Scott Documentation Author Signature: A J Company: Scott Design and Title.24, Inc, Signature Date: 10/19/2015 Address: 77085 Michigan Drive , CEA/ HERS Certification Identification (if applicable): r City/State/Zip: Palm Desert, CA 92211 ,Palm Phone - (760) 200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct.. „ 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design- '. identified on this Certificate of Compliance (responsible designer). 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with th b ilding permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that co leted signed copy of this Certificate of Compliance is required to be included with the documentation the builder provid to a uil g ow rat ccupaney.4. Responsible Designer Name: Robert Ricciardi Responsible Designer Signature X J1 company: Robert H. Ricciardi, Architect Date Signed: n Address: 75-400 Gerald Ford Road, Suite 115' License: G, City/State/Zip: Palm Desert, CA 92211 Phone: (760) 610-5036 r HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name BBPI Tenant Improvement Date 10/19/2015 System Name HVAC Floor Area 7,410 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 8 COIL CFM Total Room Loads 13,375 Return Vented Lighting Return Air Ducts Return Fan Ventilation 1,482 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible -Output perSystem 57,000 190,753 39,491 5,717 74,252 Total Output Btuh 456,000 0 Output Btuh/s ft 61.5 9,538 3,713 Cooling System 01 0 Output perSystem 60,0001 59,492 12,276 1,482 69,564 Total Output Btuh 480,000 0 51,767 0 Total Output Tons 40.0 9,538 3,713 Total Output Btuh/s ft 64.8 Total Output s ft/Ton 185.3 269,320 1151,241 Air System CFM perSystem 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 16,000 5 Ton Unit 306,754 127,034 284,805 Airflow cfm/s ft 2.16 Airflow cfm/Ton 400.0 Outside Air % 9.3% Total Adjusted System Output 306,754 127,034 284,805 (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jul 3 PM Jan 1 AM Outside Air cfmis ft 0.20 Note: values above Ivan at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 66 OF Outside Air 1,482 cfm Supply Fan 16,000 cfm 70 OF 66 OF 82 OF Heating Coil 82 OF ,ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112/78°F 78/66°F 78/66°F 60/59°F Outside Air Ar 1,482 cfm Supply Fan Cooling Coil 61 / 59 OF 16,000 cfm 60.7%- ROOM L75/65°F 74/65°F EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19720:06:08 ID: Page 30 of 39 ZONE •AD SUMMARY ProjectDate BBPI Tenant Improvementi Name HVAC FloorSystem -. 7,410 ZONE LOAD SUMMARY - COOLING NAME Tenant Improvement (BLOCKSYSTEM LOAD) • c: C i ROOM HEATING PEAK LOADS Project Name BBP1 Tenant Improvement Date • 1 10/19/2015 ROOM INFORMATION DESIGN CONDITIONS Room Name " T/ Floor Area 7,410.0 ft' Indoor Dry Bulb Temperature 70 OF, Time of Peak , Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X to Ceiling U -Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X AT *F _ _ = = = = = _ = = - _ = = _ = = = = = = = _ _ M_ = = - = = = 44 Btu/hr R-30 Roof Attic 7,410.0 0.0310 44 10,107 Titlt Up Wall w/R-131nsu1. 2,224.2 0.0703 44 6,882 Double Metal Titnted 993.8 0.7100 44 31,046 ' Items shown with an asterisk (') denote conduction Infiltration: 1.00 X 1.072 Schedule Air Sensible Fraction through an interior surface X 7,410 X Area another room 9.00 X 0.500 Height ACH Page Total /60] X AT 48,036 0 26,216 TOTAL HOURLY HEAT LOSS FOR ROOM 74,252 EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19T20:06:08 /D: Page 33 of 39 l .. • • ROOM COOLING PEAK LOADS Project Name BBP/ Tenant Improvement ROOM INFORMATION Room Name Floor Area Indoor Dry Bulb Temperature t;onouction R-30 Roof Attic Tit/t Up Wall w/R-13 Insul. Double Metal Titnted Double Metal Titnted Tit/t Up Wall w/R-13 /nsul. Tit/t Up Wall w/R-131nsul. Tit/t Up Wall w/R-13 /nsu1. Date 10/19/2015 DESIGN CONDITIONS TI Time of Peak Jul 3 PM 7,410.0 ft' Outdoor Dry Bulb Temperature 112 OF 74 OF Outdoor Wet Bulb Temperature 78 OF Area U -Value DETD' Btu/hr X X X X X X X X X 0.0310 X X X X X X X X X 65.9 = = = = = = = = = 0.0703 39.5 0.7100 27.5 0.7100 27.5 0.0703 42.4 0.0703 43.1 0.0703 64.5 Page Total 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Relar Gain Window Window Window Window Window Window Window Window Window Orientation (N) (N) (N) (N) (N) (E) (E) (E) (E) 15,147 1,759 2,712 16,681 2,671 925 1,772 1 41,6661 Area X X X X X X X X X SGF 41 41 41 41 41 41 41 41 41 X X X X X X X X X SC 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.668 0.6681 X X X X X X X X X Weighting Factor 0.894 0.894 0.894 0.894 0.894 1.944 1.944 1.944 1.944 = = = = = = = = = 50.01 39.0 132.3 42.5 42.5 42.51 42.5 42.5 42.5 Page Total L Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = Occupants 1.00 X 7,410 X 300 Btu/occ. / 75 Sgft/occ. X 1.000 = Receptacle 1.00 X 7.410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000 = Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = Process Lighting 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X l 0.000 = Btu/hr 1,234 962 3,265 1,049 1,049 2,281 2,281 2,281 212811 16,6841 tstuinr 17,575 29,640 33,889 0 0 Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ] . X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/occ, - / 75 SgfUocc. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Waft = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EncirgryPrp 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 34 of 39 • • • ROOM COOLING PEAK LOADS Project Name BEIR Tenant Improvement ROOM INFORMATION Room Name Floor Area Indoor Dry Bulb Temperature Conduction Date 10/19/2015 DESIGN CONDITIONS TI Time of Peak 7,410.0 ft2 Outdoor Dry Bulb Temperature 74 OF Outdoor Wet Bulb Temperature Area U -Value DETD' X X X X X X X X X X X X X X X X X X = = = = = = = = = Weighting Area SGF SC Factor 42.5 X 41 X 0.668 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Window Window Window Window Window Window Window Window Window Orientation (E) (E) (E) (E) (E) (E) (S) (S) (iM Page Total Page Total Jul 3 PM 112 OF 78 OF Btu/hr 01 Btu/hr 2,281 2,281 2,281 2,281 2,281 2,281 1,459 1,459 3,395 20, 000 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 17,575 Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640 Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 BtufWatt X 1.000 = 33,889 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0 Process Lighting 1.00 X 7.410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0 Infiltration:[ 1.00 X 1.072 X 7.410 X 9.00 X 0.50 / 60 X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EnergyPro, 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 35 of 39 Weighting Area SGF SC Factor 42.5 X 41 X 0.668 X 1.944 = 42.5 X 41 X 0.668 X 1.944 = 42.5 X 41 X 0.668 X 1.944 = 42.5 X 41 X 0.668 X 1.944 = 42.5 X 41 X 0.668 X 1.944 = 42.51 X 41 X 0.668 X 1.944 = 42.5 X 46 X 0.668 X 1.109 = 42.5 X 46 X 0.668 X 1.109 = 50.0 X 243 X 0.6681 X 0.418 = Page Total Jul 3 PM 112 OF 78 OF Btu/hr 01 Btu/hr 2,281 2,281 2,281 2,281 2,281 2,281 1,459 1,459 3,395 20, 000 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 17,575 Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640 Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 BtufWatt X 1.000 = 33,889 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0 Process Lighting 1.00 X 7.410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0 Infiltration:[ 1.00 X 1.072 X 7.410 X 9.00 X 0.50 / 60 X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EnergyPro, 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 35 of 39 • ROOM COOLING PEAK LOADS Project Name Date BBPI Tenant Improvement 10/19/2015 ROOM INFORMATION DESIGN CONDITIONS Room Name Tl Time of Peak Jul 3 PM Floor Area 7,410.0ft' Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 74 OF Outdoor Wet Bulb Temperature 78 OF Conduction Area U -Value DETD' Btu/hr X X = X X = y X X = X X = X X = X X - X X = X X = X X = Page Total 0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr Window (IM 42.5 X 243 X 0.668 X 0.418 = 2,886 Window (WJ 42.5 X 243 X 0.668 X 0.418 = 2,886 Window (VVJ 42.5 X 243 X 0.668 X 0.418 = 2,886 X X X = X X X = X X X = X X X = X X X = X X X = Page Total 8,658 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 17,575 Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640 Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 33,889 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X1 0.000 = 0 Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ] X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/OCC. / 75 Sgft/occ. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 = 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 ID: Page 36 of 39 • • 11 11 u ROOM COOLING COIL LOADS Project Name BBP/ Tenant Improvement ROOM INFORMATION Room Name Floor Area Indoor Dry Bulb Temperature Conduction R-30 Roof Attic Tit/t Up Wall w/R-13 Insul. Double Metal Titnted Double Metal Titnted Tit/t Up Wall w/R-13 /nsul. Tit/t Up Wall w/R-131nsul. Tit/t Up Wall w/R-131nsul. Date 10/19/2015 DESIGN CONDITIONS T/ Time of Peak 7,410.0 ft2 Outdoor Dry Bulb Temperature 74 OF Outdoor Wet Bulb Temperature Area U -Value DETD' X X X X X X X X X 0.0310 X X X X X X X X I X 65.9 Weighting Factor 0.894 = 0.894 _ 0.894 0.894 0.894 1.944 1.944 1.944 1.944 Page Total Weighting 0.0703 39.5 0.7100 27.5 0.7100 27.5 0.0703 42.4 0.0703 43.1 0.0703 64.5 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Window Window Window Window Window Window Window Window Window t Sched. Orientation (N) (N) (N) (N) (N) (E) (E) (E) (E) Page Total Jul 3 PM 112 °F 78 OF Btu/hr 15,147 1,759 2,712 16,681 2,671 925 1,772 1 41,6661 Area SGF X 41 X 41 X 41 X 41 X 41 X 41 X 41 X 41 X 41 SC X 0.668 X 0.668 X 0.668 X 0.668 X 0.668 X 0.668 X 0.668 X 0.668 X 0.668 X X X X X X X X X Weighting Factor 0.894 = 0.894 _ 0.894 0.894 0.894 1.944 1.944 1.944 1.944 Page Total Weighting 50.01 39.0 132.3 42.5 42.5 42.51 42.5 42.5 42.5 Internal Gain Frac. Area Heat Gain Factor Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = Occupants 1.00 X 7,410 X 300 Btu/occ. / 75 Sgft/occ. X 1.000 = Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 BtuiWatt X 1.000 Process Lighting 1.00 X 1 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X1 0.000 Btu/hr 1,234 962 3,265 1,049 1,049 2,281 2,281 2,281 2,281 16,6841 Btu/hr 17,575 29,640 33,889 0 0 Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 /60] X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sgft/occ. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19720:06:08 ID: Page 37 of 39 • I ROOM COOLING COIL LOADS ATION re DESIGN CONDITIONS T/ Time of Peak 7,410.0 ft' Outdoor Dry Bulb Temperature 74 °F Outdoor Wet Bulb Temperature Area Date 10/19/2015 X X X X X X X X X U -Value X X X X X X X X X DETD' = X X X X X X X X X Weighting Factor = = 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 41 0.668 1.944 Page Total 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Window Window Window Window Window Window Window Window Window Orientation' (E) (E) (E) (E) (E) (E) (S) (S) (►M Area X X X X X X X X X SGF X X X X X X X X X SC X X X X X X X X X Weighting Factor = = 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 41 0.668 1.944 42.5 46 0.668 1.109 42.5 46 0.668 1.109 50.0 243 0.668 0.418 Page Total Jul 3 PM 112 OF 78 OF Btu/hr 01 Btu/hr 2,281 2,281 2,281 2,281 2,281 2,281 1,459 1,459 3,395 20,000 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 BtuMatt X 1.000 = 17,575 Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640 Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 33,889 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 1 0 Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ] X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 ID: Page 38 of 39 L� r� ROOM COOLING COIL LOADS Project Name1-'Date BBP/ Tenant Improvement 10/19/2015 ROOM INFORMATION DESIGN CONDITIONS Room Name T/ Time of Peak Jul 3 PM Floor Area 7,410.0ft' Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 74 OF Outdoor Wet Bulb Temperature 78 OF Conduction Area U-Value DETD' Btu/hr X X = X X = X X = X X = X X = X X = X X = X X = X X = , Page Total 0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Weighting Solar Gain Orientation Area SGF SC Factor Btu/hr Window (KO 42.51 X 243 X 0.668 X 0.418 = 2,886 Window 42.5 X 243 X 0.668 X 0.418 ' = 2,886 Window (Vl/) 42.5 X 243 X 0.668 X 0.418 = 2,886 X X X = X X X = X X X - X X X = X X X = X X X = Page Total 8,658 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Li hts 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 17,575 Occupants 1.00 X 7,410 X 300 Btu/occ. / 75 Sgft/occ. X 1.000 = 29,640 Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3:413 Btu/Watt X 1.000 = 33,889 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0 Process Lighting 1.00 X 1 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.000 = 0 Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ] X 38 = 22,641 Schedule Air Sensible Area Ceiling Height ACH AT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640 Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0 Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 -_ 9,851 Schedule Air Sensible Area Ceiling Height ACH AW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491 EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 39 of 39