BCOM2015-0059�,e�n.G��u goo • aoa, 203 , ��
Bin #
City of La Qurnta
Building 8L Safety Division
P.O. Box 1504,78-495 Calle Tampico
CA 92253 - (760) 777-7012
Building Permit Application and Tracking Sheet
Permit # WwLa.Quinta, (
b
Project.Add.ress: WqAhohine
•
Owner's Name:.
A. P. Number.
Address: 81 —715
Legal Description: %bi•
Contractor. P1iy\ 1n/
:5j , /kl
.
� L •
City, ST, Zip: 11 01
Telephone:
Address: 0 , (
Project Description: r0
City, ST, Zip:&JrA %i2
Telephone
0_)JJ� — 51
1
-",a w4- I uw ro
State Lic. #: 3 y 1 t a
City Lie. #:
vvk,k
Arch., Engr., Designer�•
06,14
CQ� C�
Address: !9Y' FiV4.i�
r
City., ST, Zip:PA
G 22
Telephone O
State Lie. #: G3608
-,c,�:iw�...•.."`'�
Construction Type:— Occupancy:
Project type (circle one): New Add'n Alter Repair
Sq. Ft : # Stories Z(1d # Units:
Demo
Name of Contact Person: R6
Telephone # of Contact Person: C
O " 12. O
Esti Value of Project:
APPLICANT: DO NOT WRITE BELOW THIS LINE
N
Submittal
>9 'd
Recd
'
TRACICiNG •:
PERMIT FEES
PIM Sets
3
Plan Check submitted
Item
Amount
Structural Calm
Reviewed, ready for corrections
Plan Check Deposit. .
Truss Calcs.
Called Contact Person
Pian Check Balance
2
Title 24 Calm
Plans picked up
Construction
Flood plain plan
Pians resubmitted
Mecbatiical
Grading plan
V Review, ready for correctionslissue
Electrical
Subcontactor List
Called Contact Person
Plumbing
Grant Deed
Pians picked up
S M.L
H.O.A. Approval
Plans resubmitted
Grading
IN ROUSE.-
'"' Review, ready for correetionsfissue
Developer Impact Fee
Planning Approval
Called Contact Person
A.LP.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees
a
Y .. .
EsGil Corp'oration
In Partnership with Government for Building Safety
,
DATE:. 12/8/15 XL93P�LAN
ICANT
&
JURISDICTION: La Quinta ' ' REVIEWER
• ❑ FILE '
PLAN CHECK NO.: BCOM2015-0059 SET: I
PROJECT ADDRESS: 43576 Washington -St.
PROJECT NAME: Structural Support"for Non -Bearing Glass Walls
The Structural plans transmitted herewith have been corrected, where necessary and
substantially comply with the jurisdiction's building codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building-,
department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
❑ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed'for the jurisdiction to forward to the applicant
contact person.
❑ The applicant's copy of the check list has been sent to: '
f
• ® EsGil Corporation staff did not advise the applic.719t that the plan check has.been completed.
EsGil Corporation staff did advise the applicant that the check has been completed.
Person contacted:_ --o— Telephone #:
Date contacted: (b Email: den,
tow
Mail Telephone Fax In Pe on Cf
1 r
2015: , • -
❑.REMARKS• '
By: Chuck Mendenhall Enclosures: coy of AL09 J►E�'�
EsGil Corporation Cp�I1M��
': ❑ GA [_1EJ .❑ MB ElPC
•
9320 Chesapeake Drive,`Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858)560-1576
f
O',
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
• BBSI Tenant Improvement
43-576 Washington, Suites 200 & 201
La Quinta, CA 92253
Project Designer: - '
Robert H. Ricciardi, Architect
75-400 Gerald Ford Road, -Suite 115
Palm Desert, CA 92211
(760) 610-5036 F y
Report Prepared by: a �►s• �s9
• Tim Scott CITY OF LA QUINTA j
• Scott Design and Title 24, 1 cpUILDING & SAFETY DEPT.
1 i 77085 Michigan Drive APPROVED
Palm Desert, CA 92211 FOR CONSTRUCTION
(760) 200-4780
DA IL to zoiS BY,do
-
• 4
' Job Number:
' _ _ 5 201 •
1p
Date: Q1311 JP,
el" I oEVE1.OpM���
10/19/2015
COM��NITI
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
• authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 6.7 by EnergySoft User Number: 6712 ID:
Y
Project Name: BBPI TI NRCC-PRF-01-E 4 Page 1 of 19
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015 _
Compliance Scope: ExistingAddition Input File Name: " BBPI TI-Ricciardi-15.xm1
A. PROJECT GENERAL INFORMATION
1.
Project Location (city)
La Quinta
7.
# of dwelling units
0
2.
CA Zip Code
92253
8.
Standards Version
Compliance2015 -
3.
Climate Zone
15
9.
Compliance Software (version)
EnergyPro 6.7
4.
Total Conditioned Floor Area
7,410 ft2
10.
Building Orientation (deg)
(W) 270 deg
S.
Total Unconditioned Floor Area
0 ft2 .
11.
Permitted Scope of Work
ExistingAddition .
6.
# of Stories (Habitable Above Grade)
1
12
Building Type(s)
Nonresidential
B: COMPLIANCE RESULTS FOR PERFORMANCE COMPONENTS
-
§ 140.1
BUILDING COMPLIES
1. Energy Component 2. Standard Design (TDV)
3. Proposed Design (TDV)
4. Compliance Margin (TDV)
S. Percent Better than Standard
Space Heating
3.4
4.0
-0.6
-17.6%
Space Cooling
201.7
200.3
1.4
0.7%
Indoor Fans
127.3
105.7
21.6
17.0%
Heat Rejection
Pumps & Misc.
-
Domestic Hot Water
-
Indoor Lighting
42.7
39.5
3.2
7.5%
COMPLIANCE TOTAL
375.1
349.5
25.6
6.8%
Receptacle
110.4
110.4
0.0%
Process
-
Process Ltg
TOTAL
485.5
459.9
5.3%
• • �.
Project Name: BBPI TI NRCC-PRF-01-E Page 2 of 19
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xml
C. PRIORITY PLAN CHECK/ INSPECTION ITEMS (in order of highest to lowest TDV energy savings)
1st
Indoor Fans: Check envelope and mechanical
Compliance Margin By Energy
Component (from Table B column
4)
2nd
Indoor Lighting: Check lighting
Indoor Fans
Indoor Lighting
Space Cooling
3rd
Space Cooling: Check envelope and mechanical
4th
Heat Rejection:.Check.envelope and mechanical
Heat Rejection
5th
Pumps & Misc.: Check mechanical
Pumps & Misc.
Domestic Hot Water
Space Heating
(
-
6th
Domestic Hot Water: Check mechanical
7th
Space Heating: Check envelope and mechanical
I
Penalty
Energy
Credit
D. EXCEPTIONAL CONDITIONS
The building does not include service water heating. Verify that service water heating is not required and is not included in the design.
E. HERS VERIFICATION
This Section Does Not Apply
F. ADDITIONAL REMARKS
None Provided
y
r
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
Project Name:
BBPI TI
NRCC-PRF-01-E
Page 3 of 19 '
Project Address:
43-576 Washington, Suites 200 & 201 La C>uinta 92253
Calculation Date/Time:
20:05, Mon, Oct 19, 2015 -
Compliance Scope:
ExistingAddition -
Input File Name: I I
BBPI TI-Ricciardi-15.xmi
r
s
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY
Identify which building components use the performance or prescriptive path for compliance. "NA"= not in project
For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans.
Building Component Compliance Path Compliance Forms (required forsubmittal) Location of Mandatory Notes on
Plans
® Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E)
Envelope E] Prescriptive NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E
El NA
® Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E)
Mechanical [J Prescriptive NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E
❑ NA
El Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E)
Domestic Hot Water ❑ Prescriptive NRCC-PLB-01-E
® NA
® Performance NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E)
Lighting (Indoor Conditioned) El Prescriptive NRCC-LTI-01 / 02 / 03 / 04 / 05-E '
❑ NA
El Performace. S2 (section of the NRCC-PRF-01-E).
Covered Process:
Prescriptive NRCC PRC O1/ 03-E
Commercial Kitchens ❑
® NA
❑ Performance S3 (section of the NRCC-PRF-01-E)
Covered Process:
❑ Prescriptive NRCC PRC -01/ 04-E
Computer Rooms
® NA
❑ Performace S4 (section of the NRCC-PRF-01-E)
Covered Process:
Laboratory Exhaust
NA
El
Prescriptive
NRCC-PRC-01/ 09-E ,
®
s
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY
Identify which building components use the performance or prescriptive path for compliance. "NA"= not in project
For components that utilize the performance path, indicate the sheet number that includes mandatory notes on plans.
Building Component Compliance Path Compliance Forms (required forsubmittal) Location of Mandatory Notes on
Plans
® Performance NRCC-PRF-ENV-DETAILS (section of the NRCC-PRF-01-E)
Envelope E] Prescriptive NRCC-ENV-01 / 02 / 03 / 04 / 05 / 06-E
El NA
® Performance NRCC-PRF-MCH-DETAILS (section of the NRCC-PRF-01-E)
Mechanical [J Prescriptive NRCC-MCH-01 / 02 / 03 / 04 / 05 / 06 / 07-E
❑ NA
El Performance NRCC-PRF-PLB-DETAILS (section of the NRCC-PRF-01-E)
Domestic Hot Water ❑ Prescriptive NRCC-PLB-01-E
® NA
® Performance NRCC-PRF-LTI-DETAILS (section of the NRCC-PRF-01-E)
Lighting (Indoor Conditioned) El Prescriptive NRCC-LTI-01 / 02 / 03 / 04 / 05-E '
❑ NA
El Performace. S2 (section of the NRCC-PRF-01-E).
Covered Process:
Prescriptive NRCC PRC O1/ 03-E
Commercial Kitchens ❑
® NA
❑ Performance S3 (section of the NRCC-PRF-01-E)
Covered Process:
❑ Prescriptive NRCC PRC -01/ 04-E
Computer Rooms
® NA
❑ Performace S4 (section of the NRCC-PRF-01-E)
Covered Process:
Laboratory Exhaust
NA
El
Project Name: BBPI TI
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: ExistingAddition
•
NRCC-PRF-01-E Page 4 of 19
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Input File Name: BBPI TI-Ricciardi-15.xml
G. COMPLIANCE PATH & CERTIFICATE OF COMPLIANCE SUMMARY `
The following building components are only eligible for prescriptive compliance. Indicate which are
The following building components may have mandatory requirements per Part 6. Indicate
relevant to the project.
which are relevant to the project.
Yes NA
Prescriptive Requirement
Compliance Forms
Yes NA
Mandatory Requirement
Compliance Forms
Commissioning: §120.8
❑ ®
Lighting (Indoor
NRCC-LTI-01 / 02 / 03 / 04 / 05-E
❑ ®
Simple Systems
NRCC-CXR-01 / 02 / 03 / 05-E
Unconditioned) §140.6
❑ ®
Complex Systems
NRCC-CXR-01 / 02 / 04 / 05-E
❑ ®
Lighting (Outdoor) §140.7
NRCC-LTO-01 / 02 / 03-E
® ❑
Electrical: §130.5
NRCC-ELC-01-E
❑ ®
Lighting (Sign) §140.8
NRCC-LTS-01-E
❑ ®
Solar Ready: §110.10
NRCC-SRA-01 / 02-E
Covered Process: §120.6
NRCC-PRC-01-E
❑ ®
Parking Garage
NRCC-PRC-02-E
®
Solar Thermal Water
NRCC-STH-01-E
E]®
Commercial Refrigeration
NRCC-PRC-05-E
Heating: §140.5
❑ ®
Warehouse Refrigeration
NRCC-PRC-06/07/08-E
❑ ®
Compressed Air
NRCC-PRC-10-E
❑ ®
Process Boilers
NRCC-PRC-11-E
Project Name: BBPI TI NRCC-PRF-01-E Page 5 of 19
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Compliance Scope: ExistingAddition IInput File Name: BBPI TI-Ricciardi-15.xml
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) —
Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance
(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).
See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component
Compliance Forms (required for submittal)
Pass
Fail
Envelope
® NRCI-ENV-01-E - For all buildings
El❑
❑ NRCA-ENV-02-F- NFRC label verification for fenestration
❑
❑
Mechanical
`
^
® NRCI-MCH-01-E - For all buildings with Mechanical Systems
❑
❑
® NRCA-MCH-02-A- Outdoor Air
❑
❑
® NRCA-MCH-03-A — Constant Volume Single Zone HVAC
❑
❑
❑ NRCA:MCH-04-H- Air Distribution Dud Leakage
❑
❑
❑ NRCA-MCH-05-A- Air Economizer Controls
❑
❑
❑ NRCA-MCH-06-A- Demand Control Ventilation
❑
❑
❑ NRCA-MCH-07-A— Supply Fan Variable Flow Controls
❑
❑
❑ NRCA-MCH-08-A- Valve Leakage Test
❑
❑
❑ NRCA-MCH-09-A — Supply Water Temp Reset Controls
❑
❑
❑ NRCA-MCH-10-A-' Hydronic System Variable Flow Controls
❑
❑
❑ NRCA-MCH-1I-A—Auto Demand Shed Controls
❑
❑
❑ NRCA-MCH-12-A- Packaged Direct Expansion Units
❑
❑
❑ NRCA-MCH-13-A- Air Handling Units and Zone Terminal Units
❑
❑
❑ NRCA-MCH-14-A- Distributed Energy Storage
❑
❑
❑ NRCA-MCH-15-A-Thermal Energy Storage
❑
❑
❑ N RCA -M CH - 16-A- Supply Air Temp Reset Controls
❑
❑
❑ NRCA-MCH-17-A — Condensate Water Temp Reset Controls
❑
❑
❑ NRCA-MCH-18-A- Energy Management Controls Systems
❑
❑
❑ NRCV-MCH-04-H- Duct Leakage Test
❑
❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36,
Project Name: BBPI TI NRCC-PRF-01-E Page 6 of 19
Project Address: 43-576 Washington, Suites 200 & 201 La 4uinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Compliance Scope: lExistingAddition Input File Name: BBPI TI-Ricciardi-15.xm1
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) —
Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance
(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).
See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component
Compliance Forms (required for submittal)
Pass
Fail
Plumbing
❑ NRCI-PL13-01-E - For all buildings with Plumbing Systems
❑
❑
❑ NRCI-PLB-02-E - required on central systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-PLB-03-E - Single dwelling unit systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-PLB-21-E - HERS verified central systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-PLB-22-E -HERS verified single dwelling unit systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCV-PLB-21-H- HERS verified central systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCV-PLB-22-H - HERS verified single dwelling unit systems in high-rise residential, hotel/motel application.
❑
❑
❑ NRCI-STH-01-E -Any solar water heating
❑
❑
Indoor Lighting
® NRCI-LTI-01-E -For all buildings
❑
❑
❑ NRCI-LTI-02-E -Lighting control system, or for an Energy Management Control System (EMCS)
❑
❑
❑ NRCI-LTI-03-E - Line -voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to
energize only line -voltage track lighting
❑
❑
❑ NRCI-LTI-04-E - Two interlocked systems serving an auditorium, a convention center, a conference room, or a theater
❑
❑
❑ NRCI-LTI-05-E -Lighting Control Credit Power Adjustment Factor (PAF)
❑
❑
❑ NRCI-LTI-06-E - Additional wattage installed in a video conferencing studio
❑
❑
❑ NRCA-LTI-02-A - Occupancy sensors and automatic time switch controls.
❑
❑
❑ NRCA-LTI-03-A - Automatic daylighting controls
❑
❑
❑ NRCA-LTI-04-A - Demand responsive lighting controls
❑
❑
Outdoor Lighting
❑ NRCI-LTO-01-E —Outdoor Lighting
❑
❑
❑ NRCI-LTO-02-E- EMCS Lighting Control System
❑
❑
❑ NRCA-LTO-02-A - Outdoor Lighting Control
❑
❑
Sign Lighting
❑ N RCI-LTS-01-E —Sign Lighting
❑
❑
Electrical
® NRCI-ELC-01-E - Electrical Power Distribution ., -
❑
❑
Photovoltaic
❑ NRCI-SPV-01-E Photovoltaic Systems
❑
❑
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
Project Name:
BBPI TI
NRCC-PRF-01-E
Page 7 of 19
Project Address:
43-576 Washington, Suites 200 & 201 La Quinta 92253
Calculation Date/Time:
20:05, Mon, Oct 19, 2015
Compliance Scope:
ExistingAddition
Input File Name:
BBPI TI-Ricciardi-15.xm1
H. CERTIFICATE OF INSTALLATION, CERTIFICATE OF ACCEPTANCE & CERTIFICATE OF VERIFICATION SUMMARY (NRCI/NRCA/NRCV) —
Documentation Author to indicate which Certificates must be submitted for the features to be recognized for compliance
(Retain copies and verify forms are completed and signed to post in field for Field Inspector to verify).
See Tables G. and H. in MCH and LTI Details Sections for Acceptance Tests and forms by equipment.
Confirmed
Building Component
Compliance Forms (required for submittal)
Pass
Fail
Covered Process
❑ NRCI-PRC-01-E Refrigerated Warehouse
❑
❑
❑ NRCA-PRC-01-F- Compressed Air Systems
❑
❑
❑ NRCA-PRC-02-F- Kitchen Exhaust
❑
❑
❑ NRCA-PRC-03-F- Garage Exhaust
❑
❑
❑ NRCA-PRC-04-F- Refrigerated Warehouse- Evaporator Fan Motor Controls
❑
❑
❑ NRCA-PRC-05-F- Refrigerated Warehouse- Evaporative Condenser Controls
❑
❑
❑ NRCA-PRC-06-F= Refrigerated Warehouse- Air Cooled Condenser Controls
❑
❑
❑ NRCA-PRC-07F- Refrigerated Warehouse- Variable Speed Compressor
❑
❑
❑ NRCA-PRC-08-F- Electrical Resistance Underslab Heating System
❑
❑
I. ENVELOPE GENERAL INFORMATION (See NRCC-PRF-ENV-DETAILS for more information)
1.
Total Conditioned Floor Area
7,410 ft2
S.
Number of Floors Above Grade 1
Confirmed
2.
Total Unconditioned Floor Area
0 ft2
6.
Number of Floors Below Grade 0
H
T
3.'
Addition Conditioned Floor Area 0 ft2
4.
Addition Unconditioned Floor Area 0 ft2
7. Opaque Surfaces & Orientation 8. Total Gross Surface Area 9. Total Fenestration Area 30. Window to Wall Ratio
North Wall
940 ft2
306 ft2
32.6%
❑
❑
East Wall
1,320 ft2
425 ft'
32.2%
❑
❑
South Wall
390 ft2
85 ft2
21.8%
❑
❑
West Wall
568 ft2
178 ft2
31.3%
❑
❑
Total
3,218 ftZ
_ 994 ft2
30.9%
El
❑
Roof
-7,410 ft2
0 ft2
00.0%
❑
❑
r,r
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
Project Name: BBPI TI
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: ExistingAddition
NRCC-PRF-01-E Page 8 of 19
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Input File Name: BBPI TI-Ricciardi-15.xmi
•
J. FENESTRATION ASSEMBLY SUMMARY
§ 110.6
Confirmed
1.
2.
3.
4.
S.
6.
7.
8.
9.
Surface Name
Fenestration Assembly Name/
1
Area (ft)
Framing
Type
Cavity
R -Value
Continuous
R -Value
Overall
Overall
Overall
d
-
N
T
°'
7410
Fenestration Type
Certification Methods
Assembly Method
Area ftZ
E
❑
❑
Titlt Up Wall w/ R-13 Ins13
ExteriorWall
0
Tag or I.D.
0
NA
U -Factor: 0.452
N
U -factor
SHGC
VT
N
7410
Wood
Double Metal Titnted
Vertica I Fenestration
DefaultPerformance
Manufactured
994-
0.76
0.60
0.55
E
❑
❑
` Newly installed fenestration shall have a certified NFRC Label Certificate or use the CEC default tables found in Table 110.6-A and Table 110.6-B. Site -built fenestration less than 1,000 ft`, or more than or equal to 1,000 ft` see Reference Nonresidential
Appendix NA6.
Z Status: N - New, A - Altered, E - Existing
Taking compliance credit for fenestration shading devices? (if "Yes", see NRCC-PRF-ENV-DETAILS for more information)
K. OPAQUE SURFACE ASSEMBLY SUMMARY
§ 120.7/ § 140.3
Confirmed
1.
2.
3.
4.
S.
6.
7.
8.
Surface Name
Surface Type
1
Area (ft)
Framing
Type
Cavity
R -Value
Continuous
R -Value
U -Factor / F -Factor
/ C -Factor
N
N
d
-
R-30 Roof Atticll
Roof
7410
Wood
30
NA
U -Factor: 0.038
E
❑
❑
Titlt Up Wall w/ R-13 Ins13
ExteriorWall
0
NA
0
NA
U -Factor: 0.452
N
❑
❑
R-19 Floor39
InteriorFloor
7410
Wood
19
NA
U -Factor: 0.048
E
❑
❑
`Status: N - New, A -Altered, E -Existing
L. ROOFING PRODUCT SUMMARY '
1 §140.3
Confirmed
1.
2.
3.
4.
S.
6.
7.
Aged Solar
Thermal
Cool Roof
V
T
Product Type
Product >_25 Ib ftZ
SRI
CRRC Product ID Number
Reflectance
Emittance
Credit
R-30 Roof Attic11
No
0.08
0.75
NA
No
NA
❑
❑
R
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance
C
Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36 t -
•7 • •
Project Name: BBPI TI NRCC-PRF-01-E Page 9 of 19
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253 Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Compliance Scope: ExistingAddition Input File Name: BBPI TI-Ricciardi-15.xmi
M. HVAC SYSTEM SUMMARY (see NRCC-PRF-MCH-DETAILS for more information)-
§ 110.1 / § 110.2
Dry System Equipment' (Fan & Economizer info included below in Table N)
Confirmed
1.
2.
3.
4.
S.
6..
7.
8.
9.
30.
11.
Air
System Type
Rated Capacity
Total Heating
Supp Heat
Supp Heat
Total Cooling
Efficiency
Acceptance
Testing
v,
d
V
�
L+
°-'
Equip Name
Equip Type
3
(Simple or
Qty
Output
Source (Y/N)
Output
Output
HP
Required? (Y/N)
C
N
CFM
-
BHP
(inch
Complex')
CFM
(kBtu/h)
BHP
(kBtuh)
(kBtu/h)
s
a
WC)
WC)
Cooling
Heating
HVAC1
185
HVAC1
SZHP
(Packaged3Phase)
Simple
8
S7
No
0
60
SEER -13.0
HSPF-7.7
Yes
N
❑
❑
Wet System Equipment 7
Pumps
Confirmed
Confirmed
12. 13.
14.
15.
16.
17.
18.
19.
20. 21.
22.
23.
24.
Air
Rated Capacity
Economizer Type
v
N
Tank
VSD
,�,
V
N
-n
°'
Equip Name Equip Type
Qty
Vol (gal)
(kBtu/h)
Efficiency
Standby Loss
Ext. R
Qty GPM
HP
(y/N)
N
CFM
-
BHP
(inch
Control
CFM
HP
BHP
Value
Control
a
1 Ory System Equipment includesfurnaces, air handling units, heat pumps, etc.
1 Wet System Equipment includes boilers, chillers, cooling towers, water heaters, etc.
3 Simple Systems must complete NRCC-CXR-03-E commissioning design review form
C Complex Systems must complete NRCC-CXR-04-E commissioning design review form - -
5 A summary of which acceptance tests are applicable is provided in NRCC-PRF-MCH-DETAILS -
6 Status: N - New, A - Altered, E - Existing
Discrepancy between modeled and designed equipment sizing? (if "Yes", see Table F. "Additional Remarks" for an explanation) No
N. ECONOMIZER & FAN SYSTEMS SUMMARY'
§ 140.4
Confirmed
1.
2.
3.
4.
S.
Outside
Supply Fan
Return Fan
Air
Economizer Type
v
N
°J
TSP
TSP
Equip Name
(if present)
CFM '
CFM
HP
BHP
(inch
Control
CFM
HP
BHP
(inch
Control
WC)
WC)
HVAC1
185
2000
0:750
0.750
1.43
ConstantVolume
NA
NA
NA
NA
NA
NoEconomizer
❑
❑
1 Mechanical ventilation calculations and exhaust fans are included in the NRCC-PRF-MCH-DETAILS section
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance
Report Version: NRCC-PRF-01-E-10192015=760 Report Generated at: 2015-10-19 20:05:36
Project Name:
BBPI TI
NRCC-PRF-01-E
Page 10 of 19
Project Address:
43-576 Washington, Suites 200 & 201 La Quinta 92253
Calculation Date/Time:.
20:05, Mon, Oct 19, 2615
Compliance Scope:.
ExistingAddition
Input File Name:
BBPI TI-Ricciardi-15.xml
O. EQUIPMENT CONTROLS
§ 120.2
Confirmed
1.
2.
3.
d
r
m
c
Equip Name
Equip Type
Controls
No DCV Controls
HVACl1
SZHP
No Economizer
❑
❑
Lighting Control Credits
Additional (Custom) Allowance
No Supply Air Temp. Control
—
Q. INDOOR CONDITIONED LIGHTING GENERAL INFO (see NRCC-PRF-LTI-DETAILS for more info)' .
§ 140.6
Confirmed
1.
2.
3.
4.
5.
Occupancy Type 1
Conditioned Floor Area z
Installed Lighting Power
Lighting Control Credits
Additional (Custom) Allowance
N
—
1n21
(Watts)
(Watts)
Area Category Footnotes
Tailored Method (Watts)
❑
❑
(Watts)
Office (Greater than 250
7,410
5,150
0
0
0
❑
❑
square feet in floor area)
Building Totals:
7,410
5,150
0
Project Name: BBPI TI
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: ExistingAddition ,
NRCC-PRF-01-E Page 11 of 19
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
• Input File Name: BBPI TI-Ricciardi-15.xml
R. INDOOR CONDITIONED LIGHTING SCHEDULE (Adapted from NRCC-LTI-01-E)1
§ 130.0
Luminaire Schedule (includes all permanent installed lighting in
conditioned space, and portable lighting over 0.3 w/ft2 in
offices)
Installed Watts (Conditioned)
Confirmed
Name or Item Tag
Complete Luminaire Description (i.e.,
3 -lamp fluorescent troffer, F32T8,
one dimmable electronic ballast)
Watts per luminaire
How Wattage is Determined
Total Number Luminaires
Installed Watts
Pass
Fail
CEC Default
from NA8
According to
§130.0(c)
2X4 LED
2X4 LED Panel
50
Yes
No
77
3,850
❑
❑
2X4 LED -EM
2X4 LED Panel
50
Yes
No
23
1,150
❑
❑
45W LED
45 W LED Lin
45
Yes
No
2
90
❑
❑
60W LED
60 W LED Lin
60
Yes
No
1
60
❑
❑
'if lighting power densities were used in the compliance model Building Departments will need to check prescriptive forms for Luminaire Schedule details.
S1. COVERED PROCESS SUMMARY— ENCLOSED PARKING GARAGES § 140.9
This Section Does Not Apply
S2. COVERED PROCESS SUMMARY -COMMERCIAL KITCHENS § 140.9
This Section Does Not Apply
This Section Does Not Apply y
S4. COVERED PROCESS SUMMARY — LABORATORY EXHAUSTS § 140.9
This Section Does Not Apply
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
Project Name:
BBPI TI
NRCC-PRF-01-E
Page 12 of 19
Project Address:
43-576 Washington, Suites 200 & 201 La Quinta 92253.
Calculation Date/Time:
20:05, Mon, Oct 19, 2015
Compliance Scope:
ExistingAddition
Input File Name:
BBPI TI-Ricciardi-15.xm1
U. ENERGY USE SUMMARY
»
Electric
(kWh/yr)
Natural Gas
(therms/yr)
Total Annual Baseline
134521
131.298
Total Annual Proposed
127315
0
•
•
Project Name:
BBPI TI
NRCC-PRF-01-E
Page 13 of 19
Project Address:
43-576 Washington, Suites 200 & 201 La Quinta 92253
Calculation Date/Time:
20:05, Mon, Oct 19, 2015
Compliance Scope:
ExistingAddition
Input File Name:
BBPI TI-Ricciardi-15.xml
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
§ 10-103
I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Tim Scott
Company: Scott Design and Title 24, Inc,
A
Signature:
Address: 77085 Michigan Drive
Signature Date: 10/19/15
City/State/Zip: Palm Desert CA 92211
CEA Identification (If applicable):
Phone: (760) 200-4780
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am
licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
2
1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its
preparation; and that I am a licensed contractor performing this work.
3
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pe ains to a structure or type of work described as exempt pursuant to
Business and Professions Code Sections 5537, 5538 and 6737.1.
Responsible Envelope Designer Name: Robert Ricciardi
Company: Robert H. Ricciardi, Architect
Signature:
Address: 75-400 Gerald Ford Road, Suite 115
Date Signed:
City/State/Zip: Palm Desert CA 92211
Declaration Statement Type:
Phone: (760) 610-5036
Title: License #: C ��
Responsible Lighting Designer Name: Robert Ricciardi
Company: Robert H. Ricciardi, Architect
Signature:
(FLtzl
Address: 75-400 Gerald Ford Road, Suite 115
Date Signed: t 1
City/State/Zip: Palm Desert CA 92211
Declaration Statement Type:
Phone: (760) 610-5036
Title: License #:
Responsible Mechanical Designer Name: Tim Scott
Company: Scott Design and Title 24, Inc.
Signature:
�e, f
Address: 77085 Michigan Drive
Date Signed: 10/19/15
City/State/Zip: Palm Desert CA 92211
Declaration Statement Type:
Phone: (760) 200-4780
Title: License #:
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36
i
Project Name: BBPI TI -
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: - ExistingAddition
r, s
NRCC-PRF-ENV-DETAILS -SECTION START
W
NRCC-PRF-01-E Page 14 of 19
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Input File Name: BBPI TI-Ricciardi-15.xml
A. OPAQUE SURFACE ASSEMBLY DETAILS
Confirmed
1.
2.
3.
4. -
v
m
T
d -
—
Surface Name
Surface Type
Description of Assembly Layers
Notes
Operation
Overall U -factor
Asphalt shingles - 1/4 in.
Fail
or I.D.
Vapor permeable felt - 1/8 in.
R-30 Roof Attic11
Roof
Plywood - 1/2 in.
❑
❑
Air - Cavity - Wall Roof Ceiling - 4 in. or more
Wood framed roof, 24in. OC, 3.5in., R-30
J Gypsum Board - 1/2 in.
Titlt Up Wall w/ R-13 Ins13
ExteriorWall
Concrete - 140 Ib/ft3 - 6 in.
❑
a
Air - Cavity - Wall Roof Ceiling - 4 in. or more
Wood framed floor, 16in. OC, 5.5in., R-19
R-19 Floor39
interiorFloor
Plywood - 1/2 in.
❑
❑
Carpet - 3/4 in. _
C. OPAQUE DOOR SUMMARY
Confirmed
1.
2.
3.
4.
5.
Opaque Door Assembly Name / TagPass
Door Type
Certification Method
Operation
Overall U -factor
Fail
or I.D.
Project Name: BBPI TI
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: ExistingAddition
NRCC-PRF-MCH-DETAILS -SECTION START
I ,
NRCC-PRF-01-E Page 15 of 19
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Input File Name: BBPI TI-Ricciardi-15.xml
A. MECHANICAL VENTILATION AND REHEAT (Adapted from 2013-NRCC-MCH-03-E)
Confirmed
1. DESIGN AIR FLOWS
2. VENTILATION (§ 120.1)
3.
4.
S.
=v
M
'^
v
N
9*
9
9
Rated Capacity
p
M
g
m
.0
v
1
70
(kBtuh)
z
z
D z
T Z
X
T X
p
<
v
z
LA
G1
?
Heating
N
N
Min. •
Mtn'
BHP
Cycles
ECM
M
a A
O C
� 3
O 3
n
z
m
z
r m
z
z
z
Ratio
n
r
g
O
Uncontrolled
Z
NA
O
n
"
c
3 1
NA
m
NA
p
d
L
CONDITIONED
O
n
n 3
3
O D
v
3
3
H
c
z
m
z
3-4
D
n
�, z'
D
<
<
N
—
—
ZONE NAME
00 "
D
3<
70
D A
2
=
rn
v
3
r�o m
1
3D
r
<
z
nj
r��
">
�Di
Or
m
D
A
�M
O
a A
O O
�
r0
z
D
-n
9Z
z<
vGz1
ZGz1
j
a
V7O
4n
Z
i7
D
_
m
r
�^
.3
O
3
D
70
D
70 -
D
v
m
O
z
_
(1
cO
c'
T
3
3
1 Tenant
HVAC1
2,0000
NA
NA
NA
NA
N
HVAC1
7,410
0.15
99
11.3
1,112
1,482
NA
N
❑
❑
Improvement
-
TOTAL
7,410
99
1,112
1,482
NA
❑
❑
B. ZONAL SYSTEM AND TERMINAL UNIT SUMMARY
§ 140.4
1.
2.
3.
4.
S.
6.
} 7.
8.
Confirmed
Rated Capacity
Airflow (cfm)
Fan
(kBtuh)
System ID
System Type
Qty
Economizer
Zone Name
N
o
Heating
Cooling
Design
Min. •
Mtn'
BHP
Cycles
ECM
—
Ratio
Motor
Tenant
Uncontrolled
8
NA
NA
NA
1 -Tenant Improvement
2000
NA
NA
NA
NA
❑
❑
❑
Improvement3-TRM
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC PRF-Ol-E 10192015 760 Report Generated at: 2015-10-19 20:05:36
•
d
Fail
❑
d.
E
E'
,r
c
0
L
O
N
cr
E
X
Ui
�
LL
o
❑
❑
Cn
a
W
mo
Y
U
O
co
i
o
•O
e`a
u
cc
a
ca
v
MCH -18A
v
4.
i
CO
c
LU
O
L.L
ui
E
p
c
O
m
Z
Qj
o
MCH -17A
CL
-
CL
U
Z
f0
f0
U
LL
3
C
0
v
C
Supply, Air Temp. Reset
w
U m
ec
'N
MCH -16A
0 3
C
A
'
•
to
m
c
C
O
x
H
V
O
U
TES Systems
'
J
O
N
MCH -15A
Z
0
L
w
Ca
O
O
N
C
`o
W
�
�
a
�
Q
�+ E
3 Y u
Energy Storage
O?
O
'n
}p0
M
3
Y
a
o
W
N
3IA
MCH -14A
DX AC '
i
Q
IA
Q
E
-
F
d
Co
tD
n
NED Ch
d
C
x
W
C
Z
?
a=
Q
Z
W
pC
?
a
Q
Auto FDOAir &e
♦
•
ci
E
Z
v
°
Q
C
CL
en
V
J
Q
eL
o
Z
N
W
o
C
0
H
Q
F-
O
Z
o
Z
N
o
a
c
C
U
Q.
v
ei
a
v
LU
Ln
VI
g
O
ii
U
rn
N
fL
O
o`no
o
14
V
f6 C tw
J'
M
11
d
Fail
❑
d.
E
E'
,r
c
0
Pass
❑
�
LL
o
❑
❑
ECMS
v
MCH -18A
v
4.
i
M
c
Condenser Water
o
MCH -17A
CL
Reset Controls
w,
0
v
C
Supply, Air Temp. Reset
w
U m
ec
'N
MCH -16A
0 3
C
A
O
•
C
C
O
O
U
TES Systems
Y
MCH -15A
eu
CL
C
`o
E
�+ E
3 Y u
Energy Storage
O?
O
U
°Dist.
Of 7 lL
O
MCH -14A
DX AC '
U
Q
E
O
Y
c
Auto FDOAir &e
0
MCH -13A
nor
CU
FDD for DX Units
O W 14
o
MCH -12A
O
o`no
o
14
V
f6 C tw
J'
M
11
a
o
,
cMCH-11A
Auto Demand Shed
N
U
1O
Control
YJ
lY
X
NC
n
Hyd. Variable Flow
W
eu
MCH -10A
Control
H
0
E
�
J
C
Supply Water Temp.
Y
C
40 C
C_ D.
MCH -09A
Reset
o
+�
u
T
S
u
E
'O
w
Q
v
CC
o
U
Valve leakage
°' o
Z
Y
MCH -08A
d
°o
n1
ve
cu
,
c
n
a
n
ro
v
N
eo
dC
N
`O F
V
d E
1u
C
C
Supply Fan VAV
CO CC
o
�
MCH -07A
H
U N
W`= Q
ey O v
W
C r0
d
U
MCH -06A
DCV
L �D
U
CL
v
Q
U
U
J
b0
Economizer Controls
V1
Q
O
a
MCH -05A
cc
CL
n Y
Cr
Cr
Z
E
U
N 1
0f0
mad
W
C7
c v
N
MCH -04A
Air Dist. Ducts
en
E :C
,L
C eo
H
W
�.
O
0
L 0
_
C
N
Single Zone Unitary
x
LLA
t
"
Z
~ ate+
MCH -03A
a
U c
C (IJd
Mm.
`N
eU
W
aeco
M 1:
l74
(9 4u
Z
O
d
Outdoor Air
U
W
U
U
CL
ate,
Q
U
MCH -02A
r -
x
Q
M
O
O
Z
Y
J
eL
0
° C
00
Y
0
toS
Z
O >
r
O
M
L
Q
C ON
0
C
>
C
m
o
GoC
'F3
Uj
Qj
r1 n
CL
Cr
'v
_
J
V a
N E
im
'O
LL
El
d.
E
,r
c
u°
o
❑
❑
a�
c
to ._
i
M
o
Q Y
>
w,
w
U m
0 3
O
O
C
C
O
O
U
M
C
`o
+_'
�+ E
3 Y u
O
o
O?
O
Of 7 lL
O
O
U
Q
O
Y
c
0
U
O W 14
o
N C
s
O
o`no
o
14
f6 C tw
J'
M
11
o
,
N
U
YJ
w .
0
NC
n
Yk
N
J
C
D:
Y
C
40 C
C_ D.
Z
o
+�
u
S
O
'O
w
Q
v
o C E
U
°' o
o E
?�
d
°o
� v
w
cu
O
c
n
a
n
ro
v
N
eo
dC
'D
Q
`O F
V
d E
C
C
C
C
N
CO CC
H
U N
W`= Q
ey O v
W
C r0
H C eU
0:
L �D
U
J
b0
O
CL
n Y
Cr
Cr
t i
E
U
N 1
0f0
O f0
C7
c v
M'°/
N v
N"
-�
E :C
,L
C eo
H
7
a—
O
0
L 0
_
C
N
r>
t=
w
L —O.
~ ate+
a(+C
U c
C (IJd
Mm.
`N
eU
W
N O
Y u
M 1:
l74
(9 4u
Z
O
d
3 L
U
U
U
F-
u
O
r-
r -
o
O
O
Z
Y
O
0
Y
Y
toS
m
c
o
E
c wO
' E
O
M
L
i :2
C
eL >eU
C
>
p
m
o
o
U
0 Co
e n
r1 n
J
N„ E
N E
Q
,r
Project Name: BBPI TI
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: ExistingAddition
NRCC-PRF-01-E Page 17 of 19
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Input File Name: BBPI TI-Ricciardi-15.xm1
A. INDOOR CONDITIONED LIGHTING CONTROL CREDITS (Adapted from NRCC-LTI-02-E)
§ 140.6
Lighting Control Credits Schedule (includes all lighting controls installed in conditioned space for
Control Credit Calculation
General lighting power from special function areas (see Table E)
Confirmed
compliance credit per §140.6(a)2 and Table 140.6-A)
0
V If Acceptance
Test c wired
q
0
Location in
Occupancy Type (must meet
Type/Description of Lighting
NA
Watts of
Power
Control Credit
NA
_
Building
requirements of Table 140.6-A)
Control (i.e., partial on occupancy
# of Units
Controlled
Adjustment
Watts
sensor, manual dimming, etc.)
_
Lighting
Factor
Pass
Fail
S -1 -Tenant
Office (Greater than 250 square
- none specified -
1
90
0.00 -
0
Cl
ElImprovement
feet in floor area)
S -1 -Tenant
Office (Greater than 250 square
none specified
1
60
0.00
0
❑
❑
Improvement
feet in floor area)
B. INDOOR CONDITIONED LIGHTING MANDATORY LIGHTING CONTROLS (Adapted from NRCC-LTI-02-E) § 130.1
This Section Does Not Apply
§130.1(0) =Manual area controls; §130.0(6) = Multi Level; §130.1(c) =Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) =Demand Responsive
C. TAILORED METHOD LIGHTING POWER ALLOWANCE SUMMARY AND CHECKLIST (Adapted from NRCC-LTI-04-E)
§ 140.6
General lighting power (see Table D)
0
General lighting power from special function areas (see Table E)
NA
Additional "use it or lose it" (See Table G)
0
-" Total watts
0
E. GENERAL LIGHTING FROM SPECIAL FUNCTION AREAS (Adapted from NRCC-LTI-04-E)
§ 140.6(c) 3H
Room Number
Primary Function Area
Illuminance Value
(LUX)
Room Cavity Ratio
(Table G)
Allowed LPD
Floor Area (ft2)
Allowed Watts
Confirmed
Pass
Fail
NA
NA
NA
NA
NA
NA
NA
❑
❑
Note: Tailored Method for Special Function Areas is not currently implemented
CA Building Energy Efficiency Standards- 2013 Nonresidential Compliance Report Version: NRCC-PRF-01-E-10192015-760 Report Generated at: 2015-10-19 20:05:36.
Project Name:
BBPI TI
NRCC-PRF-01-E
Page 18 of 19
Project Address:
43-576 Washington, Suites 200 & 201 La Quinta 92253
Calculation Date/Time:
20:05, Mon, Oct 19, 2015
Compliance Scope:
ExistingAddition ti
Input File Name:
BBPI TI-Ricciardi-15.xml
F. ROOM CAVITY RATIO (Adapted from NRCC-LTI-04-E)
Rectangular Spaces
'
Room Number
Task/Activity Description
Room Length (ft)
Room Width (ft)
Room Cavity Height (ft)
RCR
Confirmed
Pass
Fail
NA
NA
NA
NA
NA
NA
❑
❑
Non -Rectangular Spaces
This Section Does Not Apply
NOW: All appucaoie spaces are usrea unaer me non-rrecrangutor Spaces rame
G. ADDITIONAL "USE IT OR LOSE Ir (Adapted from NRCC-LTI-04-E)
1.
2.
3.
4.
Allowed Watts
Confirmed
Wall Display
Combined Floor Display and Task
lighting
Combined Ornamental and Special
Effects Lighting
Very Valuable Merchandise
N
N
d
=
0
0
0
0
0
❑
❑
S. Wall Display
r This Section Does Not Apply y
. ; 7. Combined Ornamental and Special Effects Lighting
This Section Does Not Apply
8. Very Valuable Merchandise
Y This Section Does Not Apply
Project Name: BBPI TI
Project Address: 43-576 Washington, Suites 200 & 201 La Quinta 92253
Compliance Scope: ExistingAddition
NRCC-PRF-01-E Page 19 of 19 a
Calculation Date/Time: 20:05, Mon, Oct 19, 2015
Input File -Name: BBPI TI-Ricciardi-15.xmi-
H. INDOOR & OUTDOOR LIGHTING ACCEPTANCE TESTS & FORMS (Adapted from NRCC-LTI-01-E and NRCC-LTO-01-E) -
§ 130.4
Declaration of Required Acceptance Certificates (NRCA) —Acceptance Certificates that must be verified in the field. (Retain copies and verify -forms are completed and signed to post in -field for
Field Inspector to verify).
Test Description
Indoor
Outdoor
Confirmed
NRCA-LTI-02-A
-
NRCA-LTI-03-A
NRCA-LTI-04-A
NRCA-LTO-02-A
Equipment Requiring
Testing or Verification
# of units
Occ Sensors / Auto Time
Switch
Auto Daylight
Demand Responsive
Outdoor Controls
V
N
T
d
Occupant Sensors
0
❑
❑
❑
❑
❑
❑
Automatic Time Switch
0
❑
❑
❑
❑
❑
❑
Automatic Daylighting
0
❑
❑
❑
❑
❑
❑
Demand Responsive
0
❑
❑
❑
❑
❑
❑
Outdoor Controls
0
❑
❑
❑
❑
❑
❑
ENVELOPE MANDATORY MEASURES:`NONRESIDENTIAL ENV -MM
Project Name
Date - -
BBPI Tenant Improvement
10/19/2015
DESCRIPTION
Building Envelope Measures:
§110.8(a):. Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§110.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§110.8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§110.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products, and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of
§110.6(a): window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§110.6(a): Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor.
§110.6(a) : Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
r
EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19720:06:08 /D: Page 22 of 39
120/208V 3PH 4W
WYE kWh'Meter . =
7.
100
3 Split CTs
21<208-01W
200 _
2K208 -02W
SERIES 2000 THREEPHASE .DETERS '
2K208704W
kWh meter with' optional. Peak Demand functionality (includes Reset
Key)
120/208V or 277/480V 3PH 4W WYE only,
2K208 -12W
.1010-1200 Amps
3 SOLID CTs
Isolated'Pulse output -standard feature
277%480V 3PH 4W
WYE kWh Meter
t
f -Large LCD Display
3 Split CTs
e Revenue grade accuracy: 0.5% accuracy. class
200
Use with_split core or solid core CTs
400
t
800
'21<480-08W
1200 '
2K480 -12W
100
• ..:
�� - .
e
FIG
2K480-2SW
120/208V 3PH 4W , ;
WYE Demand Meter , -
100
Ser7es Y000
:4 Silo 20
200
2K208 -02D ,
• r
4
800
2K208 08D
1200
viN:�YM�'rirr
277/480V 3PH 4W
WYE Demand Meter .
100
2K480 -01D
200
SERIES 2000 THREE PHASE METER KITS
400
`Note: Kits include meter, specified enclosure and required current transformers
800"
INDOOR ENCLOSURE OUTDOOR ENCLOSURE
VOLTAGE AMPS CTS INCLUDED CAT. NO. VOLTAGE
AMPS
120/208V 3PH 4W
WYE kWh'Meter . =
7.
100
3 Split CTs
21<208-01W
200 _
2K208 -02W
400 '
2K208704W
—800-
2K208 -08W
1200
2K208 -12W
100
200
3 SOLID CTs
2K208=1SW
2K
277%480V 3PH 4W
WYE kWh Meter
t
100
3 Split CTs
2K480 -01W
200
2K480 -02W
400
2K480 -04W
800
'21<480-08W
1200 '
2K480 -12W
100
3 SOLID CTS,
2K480-1SW
200.
2K480-2SW
120/208V 3PH 4W , ;
WYE Demand Meter , -
100
3 Split CTs
2K208 -01D '
200
2K208 -02D ,
400
2K208 04D '
800
2K208 08D
1200
2K208 -12D
277/480V 3PH 4W
WYE Demand Meter .
100
2K480 -01D
200
2K480 -02D
400
2K480 04D
800"
2K480.08D
1200. ,
2K480 -12D .
100
200
120/208V 3PH 4W
"
400
WYE kWh Meter
J
_
800.
1200
100,(
200.
277/,480V 3PH 4W
WYE kWh Meter
400
800
1200
,
J
_
J
00 it
LTt^tie��
.
C
CTSINCLUDED ', CAT.NO.. .
' '20208-01W
20208-02W '
20208-08W
20208-12W
�3 Split CTs .
E20�80-01W'
l.-
e a.
Y
•
,
w
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CERTIFICATE OF COMPLIANCE
Electrical Power Distribution
Project Name:
BBPI Tenant Improvement
CALIFORNIA ENERGY COMMISSION
N RCC-ELC-01-E
(Page 1 "of 7)
Date Prepare&
10/19/2015 „
A. General Information
Project Address:
43-576 Washington, Suites 200 & 201
Climate Zone:
15
Conditioned Floor Area : ..
7,410
Unconditioned Floor Area
0 t
Building Type: ® Nonresidential
0 High -Rise Residential ❑
Hotel/Motel
❑ Schools ❑ Relocatable Public Schools
m Conditioned Spaces ❑
Unconditioned Spaces
Phase of Construction: ❑ New Construction
❑ • Addition - m
Alteration r
`STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
s CERTIFICATE OF COMPLIANCE
Electrical Power Distribution
Project Name: BBPI Tenant Improvement
e CALIFORNIA ENERGY COMMISSION
• ' 'NRCC-ELC-01-E''
,..T -a, -� (Page 2 of 7) .< y• .
Date Prepared:
- <
,P 10/19/2015
B. Electrical Service Metering
'. fi` �
' .
.6; - • tea
❑ Each newly installed electrical service (in both existing and newly constructed buildings) is required to be metered, as set out in Table 130.5-A,
which is reproduced below.'
c
... ,
, " •' ;+-:M
❑ Fill out a separate line for each electrical service that is connected to the building.
'
Electrical
Field
Electrical Service Schedule
Service Rating
Metering Capabilities (check all that
are present)
Inspector,
A
•�� Ai.
B
C
•
D
S,x
E
F
G`
,
$ +
+
rD N
3
7 f1
rD
�.
�-n
Dl
`1
a,3 rD
it v
�__
o-
�r
y
Designation/location in building/description
kVA
❑
❑
❑�
,❑
.❑
❑
rt +
r .ti
4v
`�♦:
❑.
❑
❑
❑
❑
❑
❑,
❑
o
❑
❑
❑
CA Building Energy Efficiency Standards 2013 Nonresidential Compliance:
❑
i� �'� .Yr.
'❑
2015
❑
❑
❑
❑
❑
1,. ❑
❑
❑
❑
❑
.❑' ..
❑
❑
❑
❑-
❑
❑
❑
❑
❑
❑
❑.
❑
❑
❑
❑
❑
❑
❑:
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑,
❑
❑
�+ ❑
❑,,
❑
, ❑
❑
Table 130.5'A
- MINIMUM REQUIREMENTS FORMETERINGOF ELECTRICAL LOAD
y << •
�•_,i .• ...
i
a
More than SOkVA
More than 250 kVA
Services rated
j
and less than or
_ and less than or •
..,,,more than
+
< Meter Rating (kVA)
50 kVA or less equal to 250 kVA
equal to 3000kVA
1000kVA
Instantaneous (at the
r. Re
+ 'quired > "Required �
f Required 1
Required' a
time) kW demand
4'11.�„1
.
"
Historical peak demand
7Required
r
Not required Not required
1 '`
"Requlred
a; •'
Resettable kWh
-Required,` °'
Required `
't', y Required "
`� --,,Req'uir'ed`-
kWh per rate period
Not required
Not required
Not required
',Required '
-
'. fi` �
' .
.6; - • tea
�� r.
'I. rt.t4
4• / �J
... ,
•
•
•.
•�
i
•�� Ai.
1 A. e
t Y -
•
a .•y
S,x
r.4.
,
•
1F
rt +
r .ti
4v
`�♦:
CA Building Energy Efficiency Standards 2013 Nonresidential Compliance:
i� �'� .Yr.
r�
2015
♦tMay
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CERTIFICATE OF COMPLIANCE
Electrical Power Distribution
07 Project Name:
BBPI Tenant Improvement
r
CALIFORNIA ENERGY COMMISSION
NRCC-ELC-01-E
(Page 3 of 7)
Date Prepared:
10/19/2015
t
C. Disaggregation of Electrical Circuits
❑ Each newly installed switchboard, panel, and motor control center (in both existing and newly constructed buildings) is required to be
disaggregated according to the requirements of Table 130.5-B, shown on the next page.
11Individual branch circuits, taps or disconnects that require overcurrent protection devices rated 60A or greater.
❑ As an alternative, current transformers can be added for individual branch circuits and loads throughout the building, and a permanent
measurement system can be installed. In this case, disaggregated wiring would not be required as long as the metering system allows the
equivalent disaggregated measurements.
❑ Fill out a separate line for each switchboard, motor control center, panelboard and subpanel.
Switchboard, motor control center, panelboard or Electrical Service that supplies that
switchboard or panel Electrical Service Rating
Field
Inspector
-0 -nsubpanel
A B C
D
Designation/location in
Designation/location in building/description kVA
building/description
❑
❑
❑
❑
❑
11❑
❑
13
❑
❑
❑
❑
❑
1:10
13❑
❑
❑
❑
❑
13-
❑
130
❑
❑
❑
❑
❑
❑
13❑
❑
❑
❑
❑
13❑
❑
❑
❑
OR _
s and loads throughout the building, and a permanent
saggregated measurement as required by the Standards..
❑
❑
Current transformers have been attached to individual branch circuit
measurement system is installed that allows an equivalent degree of di
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
May 2015
i
STATE OF CALIFORNIA
Electrical Power Distribution f
CEC-NRCC-ELC-01-E (Revised 05/15) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-ELC-01-E
Electrical Power Distribution (Page 4 of 7)
Vm,ect name: BBPI Tenant Improvement °ate Vre°a'ed: 10/19/2015
D. Disaggregation of Electrical Circuits (continued)
Table 130.5-B - MINIMUM REQUIREMENTS FOR SEPARATION OF ELECTRICAL LOAD
l
Table 130.5 — B sets the upper limit on how many load(s) of each type can be supplied by each feeder. A feeder may not supply loads of more than
one type unless the service is rated at 50 kVA or less. For instance, on the fifth row of the table, one feeder on a service >50 kVA could be used to
supply all the plug loads on a floor of a building, provided that there are no areas in which more than 25kVA of plug load is supplied to a space less
than 5000sf
Services rated more than
Services rated more than
Services rated
50kVA and less than or
250 kVA and less than or
Services rated more
Load Type
50 kVA or less
equal to 250 kVA
equal to 3000kVA
than 1000kVA
Lighting including exit and
All lighting
egress lighting and exterior
Not required
All lighting in aggregate
All lighting disaggregateddisaggregated
by floor,
lighting
g g
by floor, type or area
type or area
HVAC systems and components
including chillers, fans, heaters,
All HVAC in aggregate
All HVAC in aggregate
furnaces, package units, cooling
Not required
All HVAC in aggregate
and each HVAC load
and each HVAC load
towers, and circulation pumps
rated at least 50 kVA
rated at least 50kVA
associated with HVAC
Domestic and service water
system pumps and related
Not required
All loads in aggregate
All loads in aggregate
All loads in aggregate
systems and components
All plug load separated by
All plug loads separated
All plug load in aggregate
floor, type or area
by floor, type or area.
Plug load including appliances
Groups of plug loads
Groups of plug loads
All groups of plug loads
Not required
exceeding 25 kVA
rated less than 25 kVA
exceeding 25 kVA
exceeding 25 kVA
connected load in an area
connected load in an area
connected load in an
less than 5000 sf
less than 5000 sf
area less than 5000 sf
Elevators, escalators, moving.
'
�
Not required
All loads in aggregate
All loads in aggregate .
All loads in aggregate
walks, and transit systems
Other individual non -HVAC
loads or appliances rated 25kVA
Not required
All
Each
Each
or greater
,
Industrial and commercial load
centers 25 kVA or greater
including theatrical lighting
Not required
All
Each
Each
installations and commercial
r
kitchens.
Renewable power source (net
Each group
Each group
Each group
Each group
or total)
Loads associated with
Not required
All loads in aggregate
All loads.in aggregate
All loads in aggregate
renewable power source
Charging stations for electric
vehicles
All loads in
aggregate
All loads in aggregate
All loads in aggregate
All loads in aggregate
x
•
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance ,
May 2015
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CERTIFICATE OF COMPLIANCE
Mi Electrical Power Distribution
Project Name:
BBPI Tenant Improvement
4
CALIFORNIA ENERGY COMMISSION'
NRCC-ELC-01-E
(Page 5 of 7)
Date Prepared:
10/19/2015
E. Voltage Drop
❑ Attach voltage drop worksheet to this form,
❑ Field inspector has discretion to approve the worksheets; the tables shown below in this section are advisory only
❑ Feeder conductors and branch circuits that are dedicated to emergency services are exempt from these requirements.
❑ An advisory table of typical power factors is shown below
Field
Inspector
N
V1
a
Feeders. Feeder conductors shall be sized for a maximum voltage drop of 2 percent at design load.
❑
❑
Branch Circuits. Branch circuit conductors shall be sized for a maximum voltage drop of 3 percent at design load.
❑
❑
Compliance Manual, Chapter 8, Table 8 2: Typical Power Factors for Voltage Drop Calculations
Default Power Factor
Default Power Factor
Load Type
at 120 volts
at 277 volts
Clarifying Notes
.Fluorescent lighting
0.95
0.95
Compact
p
0.9 (hardwired)
0.9 (hardwired)
fluorescent lighting
NPF magnetic ballasts use GU -24 values
0.5 (GU -24)
0.3 (GU -24)
LED lighting
0.7
0.5
May be higher if specifications call for high
'
power factor drivers
Incandescent
lighting
1.0
1.0
HID lighting
0.9
0.9
May be lower if NPF ballasts are specified
HVAC packages
0.85
0.9
Other motors <5 HP
0.8
0.8
Other motors >5 HP
0.85
0.85
Kitchen equipment
0.9
N/A
Receptacles
0.6
N/A
For dedicated receptacles, may be rated
according to the load
Electric heating
1.0
1.0
including hot water
Other
0.85
0.85
'10
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance
May 2015
1
STATE OF CALIFORNIA
'Electrical Power Distribution
+CEC-NRCC-ELC-01-E (Revised 05/15)
CERTIFICATE OF COMPLIANCE
Electrical Power. Distribution,
Project Name:. -
BBPI Tenant Improvement
F. Circuit Controls for 120 -Volt Receptacles
❑ II
3• � c t
CALIFORNIA ENERGY COMMISSION '
Ic^ K; NRCC-ELC-01 E i.
(Page`6 of 7) y
Date Prepared: , i -
10/19/2015
Com ci ed 120 volt receptacles shall be provided, as required by Section 130.5(d) of the Standards.. }' !
❑. In open office areas, controlled circuit receptacles are not required if, at time of final permit, workstations are installed, and each workstation is
• �,.
.� equipped with an occupant sensing control that is permanently mounted in each workstation, and which controls a hardwired, nonresidential- r
.1 rated power strip: Plug-in strips and other plug-in devices that incorporate an occupant sensor shall not be used for this exception.
❑ Receptacles that are only for the following purposes are exempt:
-Receptacles specifically for refrigerators and water dispensers in kitchenettes. �.
'
-Receptacles located a minimum of six feet above the floor that are specifically for clocks. •
•-Receptacles for network copiers, fax machines, A/V and data equipment other than personal computers in copy rooms.. T't n' L.
~
i ' •• `
"*
Field
r .
•
c. , —'' �, •
. Inspector
`.
` +'. I� • 'rJ
� .
-n' � •
t 1. At least one controlled receptacle is installed within 6 feet of each uncontrolled receptacle, or split -wired duplex
r,'
r
receptacles are installed, that have one controlled and one uncontrolled receptacle. This applies in all of the following
Ke, ,
•.
v �F spaces
�`
^'4 .,j
/• i. , ...:.t ,wC., -
`'
c '•, Private offices, open office areas • t "` •
+
_ ;`
i,f
�'� "`y• Receptions and lobbies :• ,,.
- ' • A.
` " +
• Conference rooms
•,
'
Al
'
t • Kitchenettes in office spaces ( i",
t `
'
• e Copy room Ok
2.� Electric circuits serving controlled receptacles are equipped with automatic,shut-OFF controls following the
,
requirements prescribed in Section 130.1(c)1 through 5 (in many cases this will mean that the receptacles are connected
' ❑ '
to the same automatic shut -OFF system as the lighting of the space).' r,
! ` i— , May 2015 •;:
general
3. -"Controlled receptacles shall have a permanent marking to differentiate them from uncontrolled receptacles:
❑ �
'= - ❑+
+
14. , For open office areas, controlled circuits shall be provided and marked to support installation and configuration of office
y
1• t furniture with receptacles that comply with Section 130.5(d) 1, 2, and 3. -
❑
�pt
F
: S. For.hotel and motel guest rooms at least one-half of the 120 -volt receptacles in each guest room are controlled
,t:•t :z�
receptacles that comply with Section 130.5(d)1, 2, and 3 (see numbers 1,2 and 3 above). Electric circuits serving ,
'
controlled receptacles have captive card key controls, occupancy sensing controls, or automatic controls such that, no t
❑
r is
❑
•'
i longer than 30 minutes after the guest room has been vacated, power is switched off.
4
Plug-in strips and other plug-in devices that incorporate an occupant sensor are'not used to comply with any of these
•
requirements. i .. , {
- }
,ft❑.;
❑, '
..
..
JW
•.
^'4 .,j
/• i. , ...:.t ,wC., -
r
.•
+
�5;,'et '� r
y}
l.,t
i
- ' • A.
Al
,
CA Building Energyffficiency Standards - 2013 Nonresidential Compliance
! ` i— , May 2015 •;:
STATE OF CALIFORNIA
Electrical Power Distribution
CEC-NRCC-ELC-01-E (Revised 05/15)
CALIFORNIA ENERGY COMMISSION
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Tim Scott
Documentation Author Signature: A J
Company: Scott Design and Title.24, Inc,
Signature Date: 10/19/2015
Address:
77085 Michigan Drive ,
CEA/ HERS Certification Identification (if applicable): r
City/State/Zip: Palm Desert, CA 92211
,Palm
Phone -
(760) 200-4780
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct..
„
2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design- '.
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with th b ilding permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that co leted signed copy of this
Certificate of Compliance is required to be included with the documentation the builder provid to a uil g ow rat ccupaney.4.
Responsible Designer Name: Robert Ricciardi
Responsible Designer Signature
X J1
company: Robert H. Ricciardi, Architect
Date Signed: n
Address: 75-400 Gerald Ford Road, Suite 115'
License: G,
City/State/Zip: Palm Desert, CA 92211
Phone: (760) 610-5036
r
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
BBPI Tenant Improvement
Date
10/19/2015
System Name
HVAC
Floor Area
7,410
ENGINEERING CHECKS
SYSTEM LOAD
Number of Systems
8
COIL
CFM
Total Room Loads 13,375
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation 1,482
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COOLING
PEAK COIL HTG.
PEAK
Heating System
Sensible
Latent CFM
Sensible
-Output perSystem 57,000
190,753
39,491 5,717
74,252
Total Output Btuh 456,000
0
Output Btuh/s ft 61.5
9,538
3,713
Cooling System
01
0
Output perSystem 60,0001
59,492
12,276 1,482
69,564
Total Output Btuh 480,000
0
51,767
0
Total Output Tons 40.0
9,538
3,713
Total Output Btuh/s ft 64.8
Total Output s ft/Ton 185.3
269,320
1151,241
Air System
CFM perSystem
2,000
HVAC EQUIPMENT SELECTION
Airflow cfm
16,000
5 Ton Unit 306,754 127,034
284,805
Airflow cfm/s ft
2.16
Airflow cfm/Ton
400.0
Outside Air %
9.3%
Total Adjusted System Output 306,754 127,034 284,805
(Adjusted for Peak Design conditions)
TIME OF SYSTEM PEAK Jul 3 PM Jan 1 AM
Outside Air cfmis ft 0.20
Note: values above Ivan at ARI conditions
HEATING SYSTEM PSYCHROMETRICS
Airstream Temperatures at Time of Heating Peak
26 OF 66 OF
Outside Air
1,482 cfm Supply Fan
16,000 cfm
70 OF
66 OF 82 OF
Heating Coil 82 OF
,ROOM
70 OF
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
112/78°F 78/66°F 78/66°F 60/59°F
Outside Air Ar
1,482 cfm Supply Fan Cooling Coil 61 / 59 OF
16,000 cfm
60.7%-
ROOM
L75/65°F 74/65°F
EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19720:06:08 ID: Page 30 of 39
ZONE •AD SUMMARY
ProjectDate
BBPI Tenant Improvementi
Name
HVAC
FloorSystem -.
7,410
ZONE LOAD SUMMARY
-
COOLING
NAME
Tenant Improvement
(BLOCKSYSTEM
LOAD)
•
c:
C
i
ROOM HEATING PEAK LOADS
Project Name
BBP1 Tenant Improvement
Date •
1 10/19/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name " T/
Floor Area 7,410.0 ft'
Indoor Dry Bulb Temperature 70 OF,
Time of Peak , Jan 1 AM
Outdoor Dry Bulb Temperature 26 OF
Conduction
Area
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
to
Ceiling
U -Value
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
AT *F
_
_
=
=
=
=
=
_
=
=
-
_
=
=
_
=
=
=
=
=
=
=
_
_
M_
=
=
-
=
=
=
44
Btu/hr
R-30 Roof Attic
7,410.0
0.0310
44
10,107
Titlt Up Wall w/R-131nsu1.
2,224.2
0.0703
44
6,882
Double Metal Titnted
993.8
0.7100
44
31,046
'
Items shown with an asterisk (') denote conduction
Infiltration: 1.00 X 1.072
Schedule Air Sensible
Fraction
through an interior surface
X 7,410 X
Area
another room
9.00 X 0.500
Height ACH
Page Total
/60] X
AT
48,036
0 26,216
TOTAL HOURLY HEAT LOSS FOR ROOM 74,252
EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19T20:06:08 /D: Page 33 of 39
l ..
•
•
ROOM COOLING PEAK LOADS
Project Name
BBP/ Tenant Improvement
ROOM INFORMATION
Room Name
Floor Area
Indoor Dry Bulb Temperature
t;onouction
R-30 Roof Attic
Tit/t Up Wall w/R-13 Insul.
Double Metal Titnted
Double Metal Titnted
Tit/t Up Wall w/R-13 /nsul.
Tit/t Up Wall w/R-131nsul.
Tit/t Up Wall w/R-13 /nsu1.
Date
10/19/2015
DESIGN CONDITIONS
TI Time of Peak Jul 3 PM
7,410.0 ft' Outdoor Dry Bulb Temperature 112 OF
74 OF Outdoor Wet Bulb Temperature 78 OF
Area U -Value DETD' Btu/hr
X
X
X
X
X
X
X
X
X
0.0310
X
X
X
X
X
X
X
X
X
65.9
=
=
=
=
=
=
=
=
=
0.0703
39.5
0.7100
27.5
0.7100
27.5
0.0703
42.4
0.0703
43.1
0.0703
64.5
Page Total
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Relar Gain
Window
Window
Window
Window
Window
Window
Window
Window
Window
Orientation
(N)
(N)
(N)
(N)
(N)
(E)
(E)
(E)
(E)
15,147
1,759
2,712
16,681
2,671
925
1,772
1 41,6661
Area
X
X
X
X
X
X
X
X
X
SGF
41
41
41
41
41
41
41
41
41
X
X
X
X
X
X
X
X
X
SC
0.668
0.668
0.668
0.668
0.668
0.668
0.668
0.668
0.6681
X
X
X
X
X
X
X
X
X
Weighting
Factor
0.894
0.894
0.894
0.894
0.894
1.944
1.944
1.944
1.944
=
=
=
=
=
=
=
=
=
50.01
39.0
132.3
42.5
42.5
42.51
42.5
42.5
42.5
Page Total L
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor
Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 =
Occupants 1.00 X 7,410 X 300 Btu/occ. / 75 Sgft/occ. X 1.000 =
Receptacle 1.00 X 7.410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000 =
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 =
Process Lighting 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X l 0.000 =
Btu/hr
1,234
962
3,265
1,049
1,049
2,281
2,281
2,281
212811
16,6841
tstuinr
17,575
29,640
33,889
0
0
Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ] . X 38 = 22,641
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/occ, - / 75 SgfUocc. = 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Waft = 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491
EncirgryPrp 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 34 of 39
•
•
•
ROOM COOLING PEAK LOADS
Project Name
BEIR Tenant Improvement
ROOM INFORMATION
Room Name
Floor Area
Indoor Dry Bulb Temperature
Conduction
Date
10/19/2015
DESIGN CONDITIONS
TI Time of Peak
7,410.0 ft2 Outdoor Dry Bulb Temperature
74 OF Outdoor Wet Bulb Temperature
Area U -Value DETD'
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
=
=
=
=
=
=
=
=
=
Weighting
Area
SGF
SC
Factor
42.5
X
41
X
0.668
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Solar Gain
Window
Window
Window
Window
Window
Window
Window
Window
Window
Orientation
(E)
(E)
(E)
(E)
(E)
(E)
(S)
(S)
(iM
Page Total
Page Total
Jul 3 PM
112 OF
78 OF
Btu/hr
01
Btu/hr
2,281
2,281
2,281
2,281
2,281
2,281
1,459
1,459
3,395
20, 000
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor Btu/hr
Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 17,575
Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640
Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 BtufWatt X 1.000 = 33,889
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0
Process Lighting 1.00 X 7.410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0
Infiltration:[ 1.00 X 1.072 X 7.410 X 9.00 X 0.50 / 60 X 38 = 22,641
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491
EnergyPro, 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 35 of 39
Weighting
Area
SGF
SC
Factor
42.5
X
41
X
0.668
X
1.944
=
42.5
X
41
X
0.668
X
1.944
=
42.5
X
41
X
0.668
X
1.944
=
42.5
X
41
X
0.668
X
1.944
=
42.5
X
41
X
0.668
X
1.944
=
42.51
X
41
X
0.668
X
1.944
=
42.5
X
46
X
0.668
X
1.109
=
42.5
X
46
X
0.668
X
1.109
=
50.0
X
243
X
0.6681
X
0.418
=
Page Total
Jul 3 PM
112 OF
78 OF
Btu/hr
01
Btu/hr
2,281
2,281
2,281
2,281
2,281
2,281
1,459
1,459
3,395
20, 000
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor Btu/hr
Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 17,575
Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640
Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 BtufWatt X 1.000 = 33,889
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 BtufWatt X 1.000 = 0
Process Lighting 1.00 X 7.410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 0
Infiltration:[ 1.00 X 1.072 X 7.410 X 9.00 X 0.50 / 60 X 38 = 22,641
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491
EnergyPro, 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: Page 35 of 39
•
ROOM COOLING PEAK LOADS
Project Name
Date
BBPI Tenant Improvement
10/19/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name Tl
Time of Peak
Jul 3 PM
Floor Area 7,410.0ft'
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature 74 OF
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U -Value DETD'
Btu/hr
X X
=
X X
=
y X X
=
X X
=
X X
=
X X
-
X X
=
X X
=
X X
=
Page Total
0
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
Window (IM 42.5 X 243 X 0.668 X
0.418 =
2,886
Window (WJ 42.5 X 243 X 0.668 X
0.418 =
2,886
Window (VVJ 42.5 X 243 X 0.668 X
0.418 =
2,886
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
X X X
=
Page Total
8,658
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 17,575
Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ.
X 1.000
= 29,640
Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 33,889
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 0
Process Lighting 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X1 0.000
= 0
Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ]
X 38
= 22,641
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
190,753
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/OCC. / 75
Sgft/occ.
= 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60]
X 0.00369
= 9,851
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
39,491
EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 ID:
Page 36 of 39
•
•
11 11
u
ROOM COOLING COIL LOADS
Project Name
BBP/ Tenant Improvement
ROOM INFORMATION
Room Name
Floor Area
Indoor Dry Bulb Temperature
Conduction
R-30 Roof Attic
Tit/t Up Wall w/R-13 Insul.
Double Metal Titnted
Double Metal Titnted
Tit/t Up Wall w/R-13 /nsul.
Tit/t Up Wall w/R-131nsul.
Tit/t Up Wall w/R-131nsul.
Date
10/19/2015
DESIGN CONDITIONS
T/ Time of Peak
7,410.0 ft2 Outdoor Dry Bulb Temperature
74 OF Outdoor Wet Bulb Temperature
Area U -Value DETD'
X
X
X
X
X
X
X
X
X
0.0310
X
X
X
X
X
X
X
X
I X
65.9
Weighting
Factor
0.894 =
0.894 _
0.894
0.894
0.894
1.944
1.944
1.944
1.944
Page Total
Weighting
0.0703
39.5
0.7100
27.5
0.7100
27.5
0.0703
42.4
0.0703
43.1
0.0703
64.5
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Solar Gain
Window
Window
Window
Window
Window
Window
Window
Window
Window
t
Sched.
Orientation
(N)
(N)
(N)
(N)
(N)
(E)
(E)
(E)
(E)
Page Total
Jul 3 PM
112 °F
78 OF
Btu/hr
15,147
1,759
2,712
16,681
2,671
925
1,772
1 41,6661
Area
SGF
X 41
X 41
X 41
X 41
X 41
X 41
X 41
X 41
X 41
SC
X 0.668
X 0.668
X 0.668
X 0.668
X 0.668
X 0.668
X 0.668
X 0.668
X 0.668
X
X
X
X
X
X
X
X
X
Weighting
Factor
0.894 =
0.894 _
0.894
0.894
0.894
1.944
1.944
1.944
1.944
Page Total
Weighting
50.01
39.0
132.3
42.5
42.5
42.51
42.5
42.5
42.5
Internal Gain Frac. Area Heat Gain Factor
Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt X 1.000 =
Occupants 1.00 X 7,410 X 300 Btu/occ. / 75 Sgft/occ. X 1.000 =
Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 BtuiWatt X 1.000
Process Lighting 1.00 X 1 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X1 0.000
Btu/hr
1,234
962
3,265
1,049
1,049
2,281
2,281
2,281
2,281
16,6841
Btu/hr
17,575
29,640
33,889
0
0
Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 /60] X 38 = 22,641
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sgft/occ. = 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491
EnergyPro 6.7 by EnergySoft User Number: 6712 Run Code: 2015-10-19720:06:08 ID: Page 37 of 39
•
I ROOM COOLING COIL LOADS
ATION
re
DESIGN CONDITIONS
T/ Time of Peak
7,410.0 ft' Outdoor Dry Bulb Temperature
74 °F Outdoor Wet Bulb Temperature
Area
Date
10/19/2015
X
X
X
X
X
X
X
X
X
U -Value
X
X
X
X
X
X
X
X
X
DETD'
=
X
X
X
X
X
X
X
X
X
Weighting
Factor
=
=
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
41
0.668
1.944
Page Total
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Solar Gain
Window
Window
Window
Window
Window
Window
Window
Window
Window
Orientation'
(E)
(E)
(E)
(E)
(E)
(E)
(S)
(S)
(►M
Area
X
X
X
X
X
X
X
X
X
SGF
X
X
X
X
X
X
X
X
X
SC
X
X
X
X
X
X
X
X
X
Weighting
Factor
=
=
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
41
0.668
1.944
42.5
46
0.668
1.109
42.5
46
0.668
1.109
50.0
243
0.668
0.418
Page Total
Jul 3 PM
112 OF
78 OF
Btu/hr
01
Btu/hr
2,281
2,281
2,281
2,281
2,281
2,281
1,459
1,459
3,395
20,000
Sched. Weighting
Internal Gain Frac. Area Heat Gain Factor Btu/hr
Lights 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 BtuMatt X 1.000 = 17,575
Occupants 1.00 X 7,410 X 300 Btu/OCC. / 75 Sgft/occ. X 1.000 = 29,640
Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 33,889
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 1.000 = 0
Process Lighting 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt X 0.0001 = 1 0
Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ] X 38 = 22,641
Schedule Air Sensible Area Ceiling Height ACH AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 190,753
Sched.
Latent Gain Frac. Area Heat Gain Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75 Sqf /occ. = 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt = 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60] X 0.00369 9,851
Schedule Air Sensible Area Ceiling Height ACH AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 39,491
EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 ID: Page 38 of 39
L�
r�
ROOM COOLING COIL LOADS
Project Name1-'Date
BBP/ Tenant Improvement
10/19/2015
ROOM INFORMATION
DESIGN CONDITIONS
Room Name T/
Time of Peak
Jul 3 PM
Floor Area 7,410.0ft'
Outdoor Dry Bulb Temperature
112 OF
Indoor Dry Bulb Temperature 74 OF
Outdoor Wet Bulb Temperature
78 OF
Conduction Area U-Value DETD'
Btu/hr
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
X X
=
, Page Total
0
1. Design Equivalent Temperature Difference (DETD)
Items shown with an asterisk (') denote conduction through an interior surface to another room.
Weighting
Solar Gain Orientation Area SGF SC
Factor
Btu/hr
Window (KO 42.51 X 243 X 0.668 X
0.418 =
2,886
Window 42.5 X 243 X 0.668 X
0.418 ' =
2,886
Window (Vl/) 42.5 X 243 X 0.668 X
0.418 =
2,886
X X X
=
X X X
=
X X X
-
X X X
=
X X X
=
X X X
=
Page Total
8,658
Sched.
Weighting
Internal Gain Frac. Area Heat Gain
Factor
Btu/hr
Li hts 1.00 X 7,410 X 0.695 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 17,575
Occupants 1.00 X 7,410 X 300 Btu/occ. / 75 Sgft/occ.
X 1.000
= 29,640
Receptacle 1.00 X 7,410 X 1.340 Watts/Sgft X 3:413 Btu/Watt
X 1.000
= 33,889
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 1.000
= 0
Process Lighting 1.00 X 1 7,410 X 0.000 Watts/Sgft X 3.413 Btu/Watt
X 0.000
= 0
Infiltration:[ 1.00 X 1.072 X 7,410 X 9.00 X 0.50 / 60 ]
X 38
= 22,641
Schedule Air Sensible Area Ceiling Height ACH
AT
Fraction
TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM
190,753
Sched.
Latent Gain Frac. Area Heat Gain
Btu/hr
Occupants 1.00 X 7,410 X 300 Btuh/occ. / 75
Sqf /occ.
= 29,640
Receptacle 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Process 1.00 X 7,410 X 0.000 Watts/Sgft X 3.413
Btu/Watt
= 0
Infiltration:[ 1.00 X 4,806 X 7,410 X 9.00 X 0.50 /60]
X 0.00369
-_ 9,851
Schedule Air Sensible Area Ceiling Height ACH
AW
Fraction
TOTAL HOURLY LATENT HEAT GAIN FOR ROOM
39,491
EnergyPro 6.7 by EnergySoft User Number: 6712 RunCode: 2015-10-19720:06:08 /D: