Loading...
05-5469 (BLCK)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: 05-0000_54-6.9 Property Address: 45200 WASHINGTON ST APN: 604-040-999- - Application description: WALL/FENCE Property Zoning: TOURIST COMMERCIAL Application valuation: 33921 Applicant: Architect or l VOICE 760 777-7012 4 FAX (760) 777-7011 BUILDING & SAFETY DEPARTMENT INSPECTIONS (760) 777-7153 BUILDING PERMIT Date: 1/24/06 Owner: CP DEV LQ LLC 77564 COUNTRY CLUB DR # 100 PALM DESERT,. CA 92260 (760)360-8001 _ r Contractor: TURNER CONSTRUCTION COMPANY 44-139 MONTEREY AVE STE 201 PALM DESERT, CA 92260 (760) 340-6161 Lic. No.: 210639 LICENSED CONTRACTOR'S DECLARATION _ WORKER'S COMPENSATION DECLARATION -_ I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing,with I hereby affirm under penalty of perjury one of the following declarations: - - Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. - _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided License Cl s: B - License No.: 210639 for by Section 3700 of the Labor Code, for the performance of the work for which this permit is ) / issued. DL Data..� Contractor. '� -' _ I have and will maintain workers` compensation insurance, as required by Section 3700 of the tabor - Code, for the performance of the work.for which this permit is issued. My workers' compensation' WNER-BUILDER DECLARATION - - insurance. carrier and policy number are: I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the Carrier LM INSURANCE Policy Number WC762591131355 following reason (Sec. 7031.5; Business and Professions Code: Any city or county that requires a permit to _ I certify that, in the performance of the work. for which this permit is issued, I shall not employ any _ _ construct, alter, improve, demolish; or repair any structure, prior to its issuance, also requires the applicant for the person in any manner so as to become subject to the workers' compensation laws of California, permit to file asigned-statement that he or she is licensed pursuant to the provisions of the Contractor's State and agree that, if I should become subject to the workers' compensation provisions of Section License Law (Chapter 9'(commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she.is-exempt therefrom and the basis for the alleged exemption." Any violation of Section 7031.5 by P700 of the Labor Code I shall forthwith comply with those provisions. i- {, �� any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ,($500).: �D'^ ate:11�4 60 Applicant. (_ 1 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE. IS UNLAWFUL, AND SHALL Contractors' State License Law does not apply to an owner of property who builds or improves thereon, SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED. THOUSAND - and who does the work himself or herself through his or her own employees, provided that the DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN improvements are not intended or offered for sale. If, however, the building or improvement is sold within SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEESs _ .. one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). - APPLICANT ACKNOWLEDGEMENT , (_ 1 I,.as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. - IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the ' 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of conditions and restrictions set forth -on this application. property who builds or improves thereon, and who contracts for the projects with a contractorls) licensed 1 . Each person upon whose behalf this application is made, each person at whose request and for pursuant to the Contractors' State License Law.). '_ whose benefit work is performed under or pursuant to any permit issued as a result of this application, 1 1 I am exempt under Sec. B.&P.C. for this reason the owner, and the applicant; each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being - -performed under or following issuance of this permit. Date: Owner.' 2. Any permit issued as a result of this application becomes null and void if work is not commenced' - - - _ within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject CONSTRUCTION LENDING AGENCY -_ permit to cancellation. - I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the _ I certify that I have read this application and state that the above information is correct. I agree to comply with all ' work for which this, permit is issued (Sec. 3097, Civ. C.). city and county ordinances and state laws relating to building construction, and hereby authorize representatives - - - of this co t to enter upon the above-mentioned property for inspection pur s- Lender's Name:. - t- A —Date V� Signature -(Applicant -or -Agent):- _ - Lender's Address: LQPERMIT Application Number . . . . . 05-00005469. Permit . . . WALL/FENCE PERMIT Additional•desc . Permit Fee, 310.50 Plan Check Fee .00 Issue Date Valuation .. . . . 33921 Expiration Date 7/23/06 Qty Unit Charge Per Extension BASE FEE. 252.00 9.00 6:5000 THOU BLDG 25,001-50,000 58.50 • - ------.----------------------,------ Special Notes and Comments -------- '905 LF 6' PERIMETER WALL & 760 LF 316" WALL PER CDD & P/W'S WETSTAMPED APPROVED PLANS & ORCO STANDARD. _ MONUMENT SIGNS REQUIRE.SEPERATE PERMIT. Fee summary Charged Paid Credited Due -- - - - - -- - - - - - - - ------ - - - - ------ -- - - ------ - - - Permit Fee Total 310.50 .00 - - - --,-------- .00 310.50 Plan 'Check Total .00 .00 .00• - .00 Grand Total 310.50 :00' .00 310.50 3 ; _LQPERMIT • . {. • r . Total Permit Fees 3/ o Sip 1 Bin #. City of La Qui'ta Building & Safety Division Permit # P.O. Box 1504, 78-495 Calle Tampico " La Quinta, CA 92253 - (760) 777-7012 " 5q Building Permit Application and Tracking Sheet Project Address: ' Owner's Name: G �EV ELOPNl6MY L� Q L A. P. Number: Address: .7 %S�0 e4VNT" CLU B�DR. 4" I pp Legal Description: City, ST Zip: rLN Z2%QContractor: / a • '�60 . Telephone: _ 0� Q , . Address: y 3 !t Project Description: City, ST, Zip: • Co N s. R�ucrl o f- Telephone: '7 � � $8-5 6a �. � s d ' LOG ALL FO A 14 j L4 State Lie. # : (pCity Lie. #: Qq q �lOo u1,1'E.S Arch( Engr. Designer: MSBVL•� IVB Address: Iq zoo tn- City, ST, Zip:. c�bko.I.IZAoGi G x276 Telephone: 76 0— c3 —g � � Constntotion Type: Occupancy: State Lic. #: G ; Project type (circle one): New Add'n Alter Repair Demo Name of Contact Person:5TRIJ2 ' i Ft.: I �bS # Stories: # Units: ^, Telephone # of Contact Person: 60 .. _ S�6 Estimated Value of.Pr t:— APPLICANT: DO NOT WRITE BELOW THIS LINE 4, f : OSLF 514-: '7(,O LF # Submittal Req'd Recd TRACKING PERMIT FEES Plan Sets Plan Check submitted 1 ` Item Amount Structural Calcs. Reviewed, ready for corrections Plan Check Deposit Truss Calcs. Called Contact Person Plan Check Balance Energy Calcs. Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading: plan 2'a Review, ready [or correctionsrssue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S:M.I: II.O.A. Approval Plans resubmitted Grading IN ROUSE:- Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees 3/ o Sip DEBRIS DEPOSITED ON THEM AS ; J.. t 'ATISFACTION OF THE CITY y " _> r a N . ENCE WITH THE •RFO MANCOF WORK UPON ti, - TAIN A NATIONAL POLLUTANT DISCHARGE'ELIMINATION SYSTEM(NPDES)�PERMIT. OWNERS/DEVELOPERS 'ARE REQUIRED TO FILE A NOTICE OF INTENT (N01) WITH THE WATER -RESOURCES CONTROL. BOARD (SWRCB), PREPARE A STORM _WATER POLLUTION i x HE SITE A AND MONITORING PLN FOR T. THE NATIONAL POLLUTANT DISCHARGE.'-. - 'PREVENTION PLAN (SWPPP) t � ` i •' ELIMINATION SYSTEM IS A NATIONAL PROGRAM TO CONTROL NON–POINT SOURCE POLLUTANTS CARRIED BY + i IMPLEMENTED AND ENFORCED BY THE STATE WATER RESOURCES CONTROL'"r' STORM WATER. THE PROGRAM IS ` BOARD. , 14. THE CITY RETAINS THE RIGHT TO REQUIRE PLAN REVISIONS, AS.. NECESSARY, SUBSEQUENT TO PLAN ` APPROVAL, BUT PRIOR TO COMPLETION, OF THE IMPROVEMENTS SHOWN ON, THESE PLANS, IF ANY NEW = j r= STREET IMPROVEMENTS HAVE BEEN .INSTALLED BY THE CITY OR A THIRD PARTY WITHIN, THE IMMEDIATE r. ' VICINITY OF THE IMPROVEMENTS PROPOSED BY THESE PLANS THAT IMPACT THE DESIGN INTEGRITY OF THE IMPROVEMENT PROPOSED IN THESE PLANS AS ORIGINALLY APPROVED. ALL COSTS, INCLUDING BUT NOT w E LIMITED TO DESIGN AND IMPROVEMENT COSTS, INCURRED . AS A RESULT. OF ANY DESIGN' REVISIONS SHALL BE - .+4 , ;"*' BORNE' BY�THE IMPROVEMENT SPONSORS. 15. THESE PLANS ARE VALID FOR A ,PERIOD NOT, TO EXCEED .EIGHTEEN (18) MONTHS FROM. DATE OF APPROVAL. THE IMPROVEMENT SPONSOR SHALL BEAR ALL COSTS ASSOCIATED WITH UPDATING ,THE PLANS, — INCLUDING,- BUT NOT LIMITED TO, DESIGN AND IMPROVEMENT COSTS, TO AFFECT COMPLIANCE WITH ANY NEW + CITY STANDARDS, ORDINANCES, OR LAWS AND,— REGULATIONS, ENACTED OR ADOPTED BY THE CITY OR OTHER I _ JURISDICTIONS'WITH AUTHORITY SUBSEQUENT TO THE PLAN APPROVAL DATE. ' 16. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING SIDEWALK AS NEEDED AT ALL LOCATIONS -WHERE IT IS CRACKED, UNEVEN .AT JOINTS, OR OTHERWISE DAMAGED, PURSUANT TO STREETS AND HIGHWAYS CODE ;' s SECTION 5610. THIS • REQUIREMENT APPLIES TO ALL SIDEWALK LOCATED, IN PUBLIC RIGHT. OF..WAY 'ADJACENT TO PROPERTY BEING DEVELOPED. Iry • NOTE TO CONTRACTOR- SITE CONDITIONS_ 3 CONTRACTOR AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE,JOB •SITE. CONDITION I DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING -THE SAFETY OF ALL PERSONS AND. I REQUIREMENT, APPLIES CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS: PROPERTY. THIS REQU THE CONTRACTOR ALSO AGREES TO DEFEND, INDEMNIFY, AND HOLD THE OWNER AND,THE, MSA CONSULTING, INC., AL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE, HARMLESS FROM ANY AND ALL LIABILITY, RE ILITY ARISING FROM THE SOLE NEGLIGENCE OF THE .OWNER OF WORK ON THIS PROJECT, • EXCEPTING'. FOR. LIAB OR MSA CONSULTING, INC.! .. 1' •' .- s ii NOTE TO CONTRACTOR- EXISTING UTILITIES. INT THE LOCATIONS OF UNDERGROUND UTILITIES SHOWN ON THE PLANS WERE OBTAINED FROM A REVIEW OF LA R 'DATA. WHILE DUE CARE WAS TAKEN IN PREPARATION -OF AVAILABLE INFORMATION, MSA iC )F AVAILABLE RECO D rA� ®�p�e CONSULTING, INC. CANNOT AND DOES -NOT GUARANTEE THE ACCURACY NOR THE COMPLETENESS OF THE' ,ks/En'ginS INFORMATION. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY s,. IROVED­ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS OF ALL EXISTING UTILITIES BEFORE ll , COMMENCING WORK.. YTHE.: CONTRACTOR AGREES TO BE FULLY RESPONSIBLE_,FOR 'AN Y AND ALL DAMAGES, WHICH RESULT FROM +I _ s - Pl HIS FAILURE ATO LOCATE`'EXACTLY' AND •PRESERVE ANY AND `ALL UNDERGROUND UTILITIES.. THE, CONTRACTOR - SHALL' POTHOLE PROPOSED CROSSINGS OF EXISTING 'UiILIIItS PRIOR Tu CQt�STRUC.'ON=ANL�,SHALL,-VERIFY: THEIR HORIZONTAL AND VERTICAL LOCATIONS. IN THE EVENT, DURING CONSTRUCTION, THAT UNKNOWN UTILITIES,OR UNKNOWN STRUCTURES ARE FOUND'AT UNEXPECTED ELEVATIONS OR LOCATIONS, MSA CONSULTING, INC. ANGES .AND THIS TO BE NOTIFIED OF SUCH CONDITION AT ONCE. MSA CONSULTING, WILL REPA RS �p REQUIRED DESIGN CHU . I E CONTRACTOR AGREES TO COMPLETE ALL WORK, INCLUDING - N .Y 1'l:r REQUIRED, IN AN EXPEDITIOUS ,MANNER; THE 'CONTRACTOR FURTHER AGREES TO PURSUE DILIGENTLY THE , COMPLETION. OF SAID WORK. ' ANY DISCREPANCY BETWEEN THE PLANS AND, FIELD SHALL BE BROUGHT •TO THE ATTENTION OF MSA ? 4. TOR SHALL NOTIFY MSA CONSULTING, INC. PRIOR TO POTHOL c— CONSULTING, INING. IF C. THE CONTRACTOR v ` NECESSARY, MSA CONSULTING, INC. SHALL REVISE THE PLANS. THE CONTRACTOR SHALL' BEGIN s. CONSTRUCTION AFTER REVISIONS ARE APPROVED. NOTE TO\CONTR'ACTOR. .QUANTITY ESTIMATE MSA CONSULTING;` INC. MAKES NO REPRESENTATION CONCERNING THE ESTIMATED QUANTITIES ON THESE o . ' PLANS, EXCEPT -THAT ALL•SUCH FIGURES, INCLUDING ALL EARTHWORK 'QUANTITIES, ARE PRELIMINARY ESTIMATES AND. FOR -PERMIT PURPOSES ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PREPARE Q HIS OWN QUANTITY ESTIMATE FOR CONSTRUCTION OR COST PURPOSES. MSA CONSULTING, INC.. SHALL" NOT o BE RESPONSIBLE FOR ANY DEVIATIONS BETWEEN ESTIMATED QUANTITIES AND ACTUAL QUANTITIES AT THE TIME – .. OF CONSTRUCTION. tt S 1 moi, r i�t+•'., .s - - • - -, � • �, a � UTILITIES r . +t • WATER COACHELLA VALLEY WATER DISTRICT (760) 398-2651 3. . SEWER COACHELLA VALLEY WATER -DISTRICT (760) 398-2651 - ;' " ELECTRIC IMPERIAL IRRIGATION DISTRICT (760) 202-4291 GAS THE GAS COMPANY w (760) 323-1851 0 Y COMMUNITY. DEVELOPMENTUIAMEf�� TELEPHONE VERIZON (800) 483-5000�DATE �S . CABLE T.V. TIME -WARNER (760) 340-1312 EXT,281 3 800 227-2600 USA UNDERGROUND ALERT ( ) c < C7 (�i''� h.�'InL:���� awl .. � . c�: •� , N TACALIFORNIA SHEET a CITY -OF LA QUIN . 1 Nti METER BLOCK WALL PLAN °F ,• PERI 4 • COVER SHEET ' C IA HEFT !I rm = >�n Psr W�Na 5PFf7lAL /NSAli77CMIL ,.CDN0W7FXDa 9i4UCWMRMTDLOCSM.21-4&USFOW mESMORTAR PBQ Zwsm No. 21-15 ►bEAnNA615 G MUE4057M KA GRADE 60 FOR #S&4R5 AND UR GROUISJR&WM TD BE20W M MJM FIX LOC•STR. NO 21-1R F0arAGWNOTEW.- 25W FM MN. 0 28 a4YS LdE TYPE wT. . PROVME3-MIN. C3VO MR!$4R COM FOR ANY FDOTM AGW6rX4n4 LS0lL FOR RETADWVG WADS: - PROVME9096 MR &40V3U CO WACtYCAL USL NAT7V -q= 6AOMU PRSMS BVM AWVIDEAAS7NC-33 414"GR4VIiSU80RA/NA99vWx WATERFROi:8400-ML SMEOF WALL W106P "WATER9r0P' OR PROVIDE FIROPIBt ,9yg ZDMG DURM CaWMLCrXN. ��d1r�EwadU �u�-.(G5 • - �o o W�SN► �.1 a� . s -r CITY OF LA QUINTA BUILDING & SAFETY DEPT. APP LIVED i FOR CONSTRUCTION ' LEVEL W/ SLOPE, TO DRAIN DA rEO BY" CENTREPOINT III— r ' LA QUIN.'l A 14 HORZ. CONT. ® 24".-0/C BX16 CMU SOLID GROU7ED W/ NO SPCL. UPPER 'TIER 2" CLR /NSPECAON REOD. RETAINING WALL 8" BAR CMU FULL EDGE OF 8" ULL HEIGHT Q(2) # 4 HORZ CONT. r '_I 2" C 924" O/C F' DOWELS 0 EDGE + OF 12" OR B" CMU U 2 12X16 CMU SOLID GROU7ED W/ NO SPCL. ' 1NSP£C77ON REDD. . 4' D/A. SOR 35 PERF PIPE W/ 1 CF. 3/4' GRAVEL WRAPPED W/ M/RAFI 140N F1L 7ER FABRIC - SLOPE TO DRAIN WATERPROOF BACKSIDE OF WALL. H' BAR V #4 HORZ. CONT. 012-0/ C TOP AND BOTTOM AS SHOWN. 10, NO 7F.- FOUND UPPER 77ER WALL TF AT TW OR LOWER OF LOWER TIER WALL �cHY C 3 cg EX12/31/ ,i 00 • FOALIfO�� 1 .'C' 'D ' 'FDOWEL 'G' VERT 'H' BA R " ' 2 -8' , 2'-8 N/A „ 1 -9. #4432" 0/C. I41 " 12"L N/A_ #4432" .0/C 15 . 6..r-- J'— 4 J'—. N/A » 2'—.3 #4432" 0/C 49" N/A #4432", 0/C 21 12"E 6„f— ' 4-0 N/A 2-6 . #4632o/C4'-0�.. 12_”LN�A 6" 4'-8" 4'-8' N/A 2'-•9" #4®lb" O/C 65 ' NIA #4416» O/C 27 ' 12"L- 6" _ 5 4' 4" 2,_0» 3,_3» #4416" 0/Cj 33' #4416" .O/C #4416» -O/C r36 - --� 12" 6" �cHY C 3 cg EX12/31/ ,i 00 • FOALIfO�� 1 L t .TIMOTHY S. MALLIS CIVIL ENGINEER Title: Job# ORCO BLOCK INC. Dsgnr: Date: 4:09PM, 17 JAN 07 4510 RUTILE ST. S Description RIVERSIDE, CA. 92509 (951) 685-1521 scope . .. Rev: 510300 -' ,. User. KIN-0603522•Vu5.1.3..22Ju 1999,Win32 Cantilevered Retaining Wall ®esign ' (c) 19&}99 ENERCAIC - Page 1 , c:ldocuments and setfinqs\lmalliskmv document Description CENTER POINT 2'-8" UPPER TIER -RETAINING WALL W/ LEVEL BACKFILL. CriteriaSoil Data _� Footing Strengths & Dimensions Retained Height = 2.67 ft Allow Soil Bearing = 1,500.0 psf rc = 2,500 psi Fy = 40,000 psi Wall height above soil = O.00 ft Equivalent Fluid Pressure Method Min. As % = 0.0012 Slope Behind Wall = 0.00:1 Heel Active Pressure. _. 35.0 _ Toe Active Pressure - 0.0 Toe Width ' = 0.00 ft Height of Soil over Toe = 0:00 in 'Water Passive Pressure = 200:0 t = ' 1.75 Heel Width Total Footing Width =• X75 Soil Density = 1.10,00 pcf height over heel = -0 .0 it FootingliSoil Friction _ , 0-450 Footing Thickness = 12.00 in Wind on Stem = 0.0 psf , Soil height to ignore Key Width = 0.00 in . for passive pressure = 12.00 in " Key Depth = 0.00 in Key Distance from Toe . = 0.00 R Cover @ Top = 3.00 in @ Btm.= ..3.00. in Design Summary Stem Construction Top Stem Total Bearing Load. = 855 lbs Design height ft= Stem OK • 0:00 • ..:resultant ecc. _ 3.34 in Wall Material Above "Ht" = Masonry Soil Pressure Toe = 954 psf OK Thickness = 8.00 + . Soil Pressure @) Heel = 23 psf OK Rebar Size_ # 4 . .. Allowable = 1,50 psf Rebar Spacing = 32.00' r � Soil Pressure Less Than Allowable Rebar Placed at = Ed Edge ACI Factored 0- Toe = psf Designe6a Data " ' _1,233 ACI Factored @ Heel = 30 psf fb/FB + fa/Fa = 0,183 Footing Shear Toe= 0.0 psi OK , Total Force @ Section lbs = -124.8 ' Footing Shear @ Heel....,,, _ 7.7 psi OK Moment.... Actual ft-# = 111.0 Allowable= 85.0.1 Moment.::. Allowable = -60 88,. 4 Will Stability Ratios ear...-.cuap Shear psi = 2.1 Overturning = 2.77 OK Shear. -...Allowable psi = 19.4 . Sliding = 1.63. OK Bar Develop ABOVE Ht. in = - 20.00 Sliding pales (Vertical Component Used') Bar Lap/Hook BELOW Ht. in = , 6,00 Lateral Sliding Force = 235.7 lbs Wall.Weight t = 78.0 less 100% Passive Force= - 0.0 lbs Rebar Depth 'd' in= 5.25 less 100%. Friction. Force = - 384.6 lbs Masonry Data Added Force Req'd = 0.0 lbs OK rm psi =, 1,500 for 1.5 : 1 Stability = .0.01bs`OK Fs psi = 20,000 • . Solid Grouting = . Yes FOotin Desi n Resuits Special Inspection = No ' Modular Ration' = 25.78 Toe. Heel Short Term Factor Factored Pressure= _ 1,233 30 psf Equiv. Solid Thick. in =: .7.60 Mu': Upward = 0 0 ft-# Masonry Block Type = Medium Weight Mu': Downward = 0 0 ft-# Concrete Data " Mu: Design = 0 189 ft-# fc `. psi = Actual l -Way Shear = 0.00 7.69 psi Fy R psi = ' Allow 1 -Way Shear = 0.00 85.00 psi other Acceptable Sizes & Spacings " Toe Reinforcing = None Speed Toe: Not req'd, Mu < S' Fr Heel Reinforcing None Spec'd Heel: Not req'd, Mu < S ' Fr Key Reinforcing _- None Spec'd -Key: No key defined mac, "- t cSQ 1 CE31925 rs Exp, A21311211 CN sT9TF • F C P�-���� 1 ` ' TIMOTHY S. MALLIS CIVILENGINEERTitle: Job# ORCO BLOCK INC.;.' Dsgnr: Date: 4:09PM, 17 JAN 07 = 4510. RUTILE ST. Description RIVERSIDE, CA. 92509 (951) 685-1521 Scope Rev: 510300 ^, p User.KW-0603522,Vei5.1.3.22Jtar1gg9.Wn32 `jantlleVered Retaining Wall Design (c) 19&}99 ENERCALC Page 2 , c:ldocuments and settin s\tmaliislm document Description • -, CENTER POINT Z-8" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL Summa of Overturnin Resisting Forces & Moments • .....OVERTURNING.:..'. Force Distance Moment .....RESISTING..... . Force Distance Moment Item' lbs ft ft-#lbs ft'. ft -# Heel Active Pressure _ 235.7 .1.22. 288.3 Soil Over Heel • .. = 318.2 1:21 .. 384.5 Toe Active Pressure: _ . ` 0.33 Sloped Soil Over Heel = Surcharge.Over Toe'' _ : Surcharge Over Heel = Adjacent Footing Load = Adjacent Footing Load= s • Added Lateral Load = A)dal Dead Load on Stem ' _ • 0.00 Load Stem Above Soil = Soil Over Tce _ SeismicLoad y = Surcharge Over Toe _ Total 235 • « = .7 O.T.M. = 288.3 - t Stem Weight(s) = Earth @ Stem Transitions = 208.3.: 0.33' .. 69,4 ResistinglOvertuming Ratio = 2.77 Footing Weight' Vertical Loads used for Soil Pressure = 854.6 lbs = Key Weight 262.5. 0.88 .. 229.7. Vertical component of active pressure'used for soil pressure Vert. Component = 65.7 1.75 t 15.0 Total = 854.6 lbs R M.= ' , - 798.5 Q�pFES SIpN� y • ' : F,,,c i• - ��� OWN � ~ N m • W CE31925 `C Exp. 12/31/2008 sl CN11. 9TFOF CA��F�� TIMOTHY,& MALLIS CIVIL ENGINEER ORCO BLOCK INC. 4510 RUTILE ST. RIVERSIDE, CA. 92509 (9511685-1521 Title: Osgnr: Description Scope: Job # Date: 4:09PM, 17 JAN 07 . ��Re,. ' 510300 A �,/ p t� Wall / A er.KVV-M3522•Ver5.1.3,22-i •1999,Wtn32 CantilLY�irred Retainin � all DGSI(� nPage- 1 198199 ENERCALC ' y c:\documents and settin sNtma1 is\m document Description CENTER POINT 3'-4" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL Criteria Soil Data Footing Strengths &Dimensions Retained Height = 3.33 ft Allow• Soil Bearing = 1,500.0 psf fc = 2,500 psi Fy _ . 40;000 psi Wall height above soil = 0.00 -ft Equivalent Fluid Pressure Method Min. As % = 0.0012 Slope Behind Wall _ = 0:00:1 Heel Active Pressure - 35.0 Toe Active Pressure = 0.0. Toe Width _ 0.00 ft -' Height of Soil over Toe = 0.00 in Passive Pressure = = 200.0 Heel Width Total Footing Width = < 2'25 . Soil Density. = 110.00 pcf Water height over heel = 0:0 ft Footing Thickness - - 12.00 in FootingllSoil Friction = 0.450 . • Wind on Stem . _ . 0:0 psf. � Soil height to ignore Key Width = , 0.00 in for passive pressure = 12.00 in Depth = 0.00 in . Key Distance from Toe = 0.00 ft Cover @ Top 3.00 in @ Btm.= 3.00 in Desi n Sum_ ma Stem Construction I Top Stem Total Bearing Load = 1,269 lbs Design height ft= Stem OK 0.00 ...resultant ecc. _ 3.62 in Wall Material Above "Ht = Masonry SoiFPressure @ Toe = 1,018 psf OK Thickness _ Rebar Size 8.00 # 4 Soil Pressure @ Heel = 110 psf OK _ Rebar Spacing - 32.00 " Allowable _ - 1,500psf Soil Pressure Less Than Allowable Rebar Placed at = Edge ACI Factored @ Toe= 1,322 psf Design Data fb1FB + WFa - = 0.354 ' ACI Factored Heel = 143 psf Total Force @ Section lbs = 194.1 1 Footing Shear @Toe . _ - 0.0 psi OK Moment.... Actual ft-#= 215.4 Footing Shear @ Heel = 12.7 psi OK Moment.... Allowable = 608.4 Allowable = 85.0 psi Shear.... -Actual psi = , .: 3.3 Wall Stability,Ratios Overturning = 3.21 OK Shear...._Allowable i- 19.4 - Sliding = 1.74 OK Bar Develop ABOVE HL in= 20.00 Sliding Calcs (Vertical Component Used). Bar Lap/Hook BELOW Ht. in= . . 6.00 Lateral Sliding Force, _ '. 328.1 lbs Wall Weight = 78.0 ` less 100%"Passive Force =. - . 0.0 lbs Rebar Depth 'd' . in = 5.25 less 10096.Friction Force = -. 570.9 lbs Masonry Data Added Force Req'd = 0.0 lbs OK fm psi = .1,500 ....for 1.5 :.1 Stability = 0.0 lbs OK Fs . psi = Solid Grouting _ 20,000 Yes Footin Desi n Results Special Inspection = No Modular'Ratio'n' = 25.78 ` Toe Heel Short Term Factor • _. •1.000 ' -Factored Pressure = 1,322 143 psf Equiv. Solid Thick.' in 7.60, . Mu' .' Upward = 0 0 ft-# Masonry Block Type = Medium Weight ' Mu': Downward _ 0 O ft-# Concrete Data Mu: Design = 0. 366 ft-# fc psi =. Actual 1 -Way Shear = 0.00 12.74 psi Fy psi= r ' Allow 1 -Way Shear = .0.00 85.00 psi Other Acceptable Sizes a Spacings. Toe Reinforcing = ' None Spec'd Toe: Not req'd, Mu < S ' Fr Heel Reinforcing = None Spec'd Heel: Not req'd, Mu < S' Fr Key Reinforcing = None Spec'd Key: No key'defined . r cc; CE31925 N rn Exp• 12/31/2008 `S> CNI� �TFOF CN -W TIMOTHY S. MALLIS CIVIL ENGINEER Title: Job# ' ORCO.6LOCK INC. Dsgnr Date: 4:09PM, 17 JAN 07 4510 RUTILE ST. Description: _ RIVERSIDE, CA. 92509 .. (951) 685-1521 Scope s, Rev: 510300 rt. n �p 4 UsergMmM E3571. Ver5J.3. 71.1�or1999 Win32 Cantilevered: Retaining Wall Des' (c) 198}99 ENERCALC - Page 2 c:\documents and Setlin sllmallis\m document '• t Description - CENTER POINT 3'-4" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL _ Summa of Overturnin &Resistin Forces & Moments - OVERTURNING..... Force Distance Moment RESISTING.e Force Distance Moment Item _ lbs ft ft lbs . .. it ft-# ..• Heel Active Pressure = .328.1 1144 473.6 Soil Over Heel = '.580.0 1.46 845.8 Toe Active Pressure = 0.33 Sloped Soil Over Heel _ + Surcharge Over Toe _ Surcharge Over Heel _ ' , Adjacent Footing Load = Adjacent. Footing Load - . Added Lateral Load = Axial Dead Load on Stem = . 0,00 Load.@ Stem Above Soil = .' Soil Over Toe SeismicLoad = Surcharge Over Toe _ Stem Weights) - r n ' Total . = 326.1 , O.T.K. _ 473.6 Earth @ Stem Transitions ;.259"7 0.33 86.6• = Resisting/Overturning Ratio = 3.21 Footing Weight ' ' ` Vertical Loads used for Soil Pressure = 1,268.7 lbs Key Weight, ' - 337.5• ' 1.13 379,7, °* Verfical component of active pressure used for soil pressure . Vert. Component _ 91 4 2.25' 205.8 ' Total =. 1,268.7', lbs R.M.= ' 1,517.8 ' { ' . r • �' � F�FESS/ `N m CE31925 rn 1 Finn 19/31/2008 a t TIMOTHY S. MALLIS CIVIL ENGINEER Title: ORCO BLOCK INC. Ds nr. 9 Job # ,. 4510 RUTILE ST: Description Date: 4:09PM, .17 JAN 07 RIVERSIDE, CA. 92509 - (951') 685-1521 _ Scope [(RLe,0 .. 603522. Ve,5.1.3. 22au "ggyW Cantilevered Retaining Wall Design ENERCALC ` Page 1 ' Description c:ldocumenls and settln sltmalllslm document CENTER POINT 4'-0" UPPER TIER RETAININGWALL W/ LEVEL BACKFILL Criteria Soil Data Footing Strengths Dimensions Retained Height Wall height above soil = 4.00 ft = Allow Soil Bearing = 1,500.0 psf Pc = 2,500 Equivalent Fluid Pressure Method psi. Fy 4.'012 psi ' Slope Behind Wall 0.00.ft = 2.00: 1 Heel Active Pressure' = 35.0 Min. As % Toe Width - 0.0012 ' Height of Soil over Toe _ O.00ih Toe Active Pressure = ' 0.0 Passive Pressure = '200.0 Heel Width = 0.00 ft = 2.50 ' Soil Dens' �Y = "110.00 pcf Water height over heel = 9 0.0 ft Total Footing Width _ �F50- Footin911Soil Friction _, 0:450 Footing Thickness = 12.00 in Wind on Stem = 0 0 psf Soil height to ignore Key Width = 0.00 in for passive pressure = 12.00 in . Key Depth = 0.00 in Key Distance from Toe = 0.00 ft .Desi n Summa Cover @ Top . = 3.00 in @:Btm.= 3.00 in. Stem Construction Top stun _ Total Bearing Load = 1,616 lbs Design height ..ft= Ste p 00 resultant ecc..' _. = 4.41 in Wall Material Above "Ht" = Masonry Soil Pressure @ Toe = 1,216 psf OK Thickness = 8.00 Soil Pressure @ Heel = ' . 76 pst OK Rebar Size = 4 } Allowable = 1,500 psf Rebar Spacing = 16.00 ' Soil Pressure Less Than Allowable Rebar Placed at = Edge ACI Factored @ Toe. _ '1,574 psf ' Design Data ACI Factored @,Heel . = gg psf fb/FB + fa/Fa = 0.412 ' Footing Shear @ Toe = 0.0 psi OK Total Force @ Section lbs.= 280.0 Footing Shear Heel = 16 g psi OK Moment.... Actual - . - ft-# = 373.3 4 r, ' Allowable - 85.0 psi Moment = 905.4 Wall Stability Ratios Shear._:.Actual psi = 4.9 f Overturning = 2.96 OK -Shear.*.... Allowable psi = 19.4 Sliding = .1 :66 OK Bar Develop ABOVE Ht. in= 20.00 .: ' Sliding Calcs (Vertical Component Used Bar Lap/Hook BELOW Ht. in a 6_00 Lateral Sliding Force = 437.5 lbs Wall Weight = 78.0 less 100% Passive Force'-- - ' 0.0 lbs Rebar Deem 'd' in = . 5.25 less 100% Friction Force _ = 727.0 lbs Masonry Data "Added Force Req'd _ 0.0 lbs OK fm psi = 1,500 ..for 1.5 : 1 Stabil' Stability, •' - - 0.0 lbs OK Fs psi = 20,000 Solid Grouting - Yes Footin .Desi n Results Special Inspection _ No Toe Heel Modular Ration' _ Short Term Factor _ 25.78 1,000 Factoredpressure = Mu': Upward = ,1,574 99 psf.' 0 , Equiv. Solid Thick.' in= 7.60' .. . . . ' Mu' Downward = 0 ft 0 0 ft- Mason Block Type Concrete Data = Medium Weigh Mu: Design = 0 635 ft-# Fc Actual 1=Way. Shear = 0:00 16.88 psi FY psi= , Allow 1 -Way Shear = Toe Reinforcing = 0.00 85.00 psi None Speed table Size 011ier Acceptable Sizes & Spacings a Heel Reinforcing ' _ .. None Spec'd , Toe: Not < S' Fr Heel: Not req'd, Mu < S ' Fr Key. Reinforcing .. ._ = None Speed Key:' No key defined .r ANYS. �� w CE31925 r*' cc Exp. 12/31/2008. CIVIL OF C TWOTHY-S. MALLIS CIVIL ENGINEER Title: Job # ORCO BLOCK.INC. Dsgnr. Date: 4:09PM, 17 JAN 07 4510 RUTILE ST. Description: RIVERSIDE, CA. 92509 (951) 68571521 Scope: ' Rev: 510300 . uSerKwososm.Vefs.t.3.n i81999.wn32 Ca17tII@V@red R@talillll9 Wall D@SIg171 Page 2 (�) 1983.99 ENERCALC cAdocumentS and Sett10 s\tmallislm document Description CENTER POINT 4'-0" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL Summa of Overturning & Resisting Forces & Moments ' ....OVERTURNING..... Force Distance Moment ..... RESISTING ..... Force Distance Moment Item lbs ft ft-# -lbs Heel Active Pressure = " 437.5 1.67. 729..2 Soil Over Heel , _ 806.7 1.58 1,277.2 Toe Active Pressure = 0.33 Sloped Soil Over Heel = Surcharge Over Toe = Surcharge Over Heel Adjacent Footing Load = Adjacent Footing Load = Added Lateral Load = Axial Dead Load on Stem. = 0.00 Load Stem Above Soil _ Soil Over Toe SeismicLoad " = _ Surcharge Over Toe _ Total = 437.5 O.T.M.729.2 " . _ . Stem Weight(s) Earth @ Stem Transitions = 312.0 . 0.33 104.0 . Resisting/Overturning Ratio = 2.96 Footing Weight Vertical Loads used for Soil Pressure = 1,615.6 lbs = Key Weight _ 375.0 1.25 468.7 . .Vertical component of active pressure used for soil pressure Vert. Component = 121.9 2.50 304.8 Total = 1,615.6 lbs R.M.= 2,154;8 Q?,pFE �e� o�NY S. Lu CE31925 N m " Exp. 12/31/2008 . V 4r ct'J9T QW— ��\P FOF CALIF\) TIMOTHY S. MALLIS CIVIL ENGINEER Title:,Job# ORCO BLOCK INC. Dsgnr: Dater 4:09PM, 17 JAN 07 4510 RUTILE ST. Description RIVERSIDE, CA. 92509 (951) 685-1521 Scope ' Rev 510390 - /► - User.KW-0603522, Ver 5.1.3,22•Ji 1999,W1n32 Cantilevered Retaining Wall Design - - Page 1 (c)198}99 ENERCALC cAdocumenis and-sellin sUmallis\m document ' Description CENTER POINT 4'-8" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL Criteria , �. Soil Data Footing Strengths & Dimensions Retained Height = 4.67 ft Allow Soil Bearing = 1,500,0 psf fc = 2,500 psi Fy = 40 000 psi Wall height above soil 0.00 R Equivalent Fluid Pressure Method . Min. As % _ 40012 Slope Behind'Wall = 0.00: 1 Heel Active Pressure = .. 35.0 Toe Active P 'Pressure Toe Width' - 0.00 ft . Height of Soil l over Toe = ' . 0.00 in . = 00 Passive Pressure - 200.0 Heel Width - ' 2.75 Soil Density - = 11o.00 pci . . Water height over heel = 0.0 ft Total footing Width = 75 ` FootingllSoil Friction • = 0;450 Footing Thickness = 12.00 in Wind.on Stem = 0.0 psf Soil height to ignore Key Width = 0.00 in for passive pressure = .12.00 in Key Depth _ 0.00 in Key Distance from Toe _ 0.00 ft Cover @ Top = 3.00 in @ Btm.= 3.00 In Design Summ'ary Stem Construction Top stem Total Bearing Load = 2,004 lbs Design height ft =Stem . St 0OK resultant ecc. _ 5.21 In Wall Material Above "Ht" = .00 Masonry , . Soil Pressure @Toe = psf OK- ' Thickness 8.00 ,. .1,419 Sal Pressure @ Heel _ 38 pst OK Rebar Size # 4 Allowable = 1,500 psf Rebar Spacing _ 16.00 Soil Pressure Less Than Allowable . Rebar Placed at = Edge ACI Factored @ Toe = 1,831.psf Design Data ACI Factored @ Heel = • 49 psf fb/FB + fa/Fa = 0.666. Footing Shear Toe = 0.0 psi OK Total Force @ Section lbs.= . 381.7 Footing Shear Heel = 21.6 psi OK Moment....Actual ft-# = 'Moment......Allowable 594.1 Allowable. - 85.0.t = 905.4 Wall Stability -Ratios Shear..... Actual psi = 6,7 ,.Overturning = .. 2.77 OK Shear..... Allowable psi = . 19.4 t Sliding = 1.60 OK Bar Develop ABOVE Ht. - in = 20.00 ` Sliding Cates (Vertical Component Used) Bar Lep/Hook BELOW Ht. in = 6.00 Lateral Sliding Force = 562.6 lbs Wall Weight = 78.0 less 100% Passive Force = - 0.0 lbs .. Rebar Depth 'd' _ in= 5.25 less 100% Friction Force = - 9011.7 lbs Masonry Data Added Force Req'd = 0.0 lbs OK fm P� = 1,500' ; for 1.5: 1 Stability = 0.0 lbs OK Fs psi = 20,000 Footin Desi n Results Solid Grouting _ special Inspection = Yes No Modular Ratio'n' = 25.78 Toe Heel Factored Pressure ' = 1,831 49 psf Short Term Factor = Equiv. Solid Thick..in = 1.000 7.60 Mu': Upward' = 0 0 ft-# Mu': Downward = 0 -0 ft-# Masonry Block Type = Medium Weight Concrete Data ` Mu: Design = 0 1,010 ft-# - fc, psi = , Actual 1' -Way Shear . _ 0.00 21.59 psi Fy psi .= Allow 1 -Way Shear = `0, 0 85.00 psi Toe Reinforcing = None Spec'd Other Acceptable sizes & Spacings Heel Reinforcing _ None Speo'd Toe: Not req°d, Mu < S • Fr . Heel: Not.req'd, Mu < S • Fr Key Reinforcing, = None Spec'd Key: No key defined - r • -. - rte.-. CO �G 2 w CE31925 N. m Exp. 12/31/2008 . `rl9T CIVIL FOF CM r -W TIMOTHY S. MALLIS CIVIL ENGINEER Title: Job # ORCO'BLOCK INC. Dsgnr: Date: 4:090M. 17 JAN 07 . 4510 RUTILE ST. y Description ' RIVERSIDE, CA. 92509 (951)685-1521 Scope:'. ' . Rev. 5103M -. User: KWOBWS§2.Ver 5.,:3.YL-Jm,8 .--32 Cantilevered Retaining Mall Design ' (cl �sa3 ss eacn� c Page 2 . cAdocuments and'seffingsMmallisNmy document Description CENTER POINT 4'-8" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL .. Summary of Overturning & Resisting Forces & Moments .....OVERTURNING..... Force, Distance Moment _ .....RESISTING..... Force Distance Moment item lbs . It ftp lbs Heel Active Pressure = 562.6 1.89 . -1,063.3 Soil,Over Heel1,070.2 1.71: 1,828.3' Toe Active Pressure = 0.33 Sloped Soil Over Heel - Surcharge Over Toe = Surcharge Over Heel = Adjacent Footing Load _ ' Adjacent Footing Load = Added Lateral Load _ Axial Dead Load on Stem = 0,00 . Load 0- Stem Above Soil = Soil Over Toe _ SeismicLoad = Surcharge Over Toe Total _; 562.6 ..O.T.M. _ 1,063.3 Stem Weights) . Earth @ Stem Transitions _ 364.3 0.33' 121.4 Resisting/Overtuming Ratio . = 2,77 Footing Weight Vertical Loads used for Soil Pressure = . 2,003.8 lbs Key Weight = 412.5 1.38 .567.2 _ Vertical component of active pressure used for sail pressure Vert..Component = 1•g 2.75 431:2 *' Total = 2,003.8 lbs R.M = - 2,948:1 • s . OQ?,OFESSIO Q� ANY: LU N m ccCE31925 . Exp. 12/31 /2008 i Jj CIVIC �P OFCA TIMOTHY. S. MALL'IS CIVIL ENGINEER Title: Job # 'ORCO BLOCK INC. Dsgnr: Date: 9:56AM; 18 JAN 07 `4510RUTILE ST. Description RIVERSIDE, CA. 92509 Scope (951) 685-1521 , r Rev. 510300 • - User. ,3999E ERCAer5.,.3.22Juir,999•Win32 Cantilevered Retaining Wail Design (c) 198399 ENERCALC Page 1 . c:ldocuments and'settin sltmallislm document Description • CENTER POINT 5'-4" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL. Criteria Soil Data Footing Strengths Dimensions Retained Height = 5.33 ft. Allow Soil Bearing = 1,500.0 psf rc = 2,500 psi Py = 40,000 psi Wall height above soil = _ 0.00 ft Equivalent Fluid Pressure Method - Min. As % _ . 0.0012 Heel Active Pressure = 35.0 Toe Width Slope Behind Wall ; = 0.00:1 _ 0.00 ft Toe Active Pressure = 0.0 Heel Width 3.25 . r . Height of Soil over Toe 0.00 in Passive Pressure = 200.0 Total.Footing Width Soil Density = 110.00 pcf Water height over heel = 0.0 ft Footing Thickness = . 12.001n FootingllSoil Friction _ 0.450: Wind on Stem. = 0:0 psf Soil height to ignore Key Width. = 0.00 in for passive pressure = .12.00 in Key Depth = 0.00 in Key Distance from Toe = b.00 ft Cover @ Top = 3.00 in @ Btm.=, 3"00 in, Design Summary Stem Construction . Top stem ' 2nd' Stem OK Stem OK Total Bearing Load.. - 2,632 lbs Design height ft = 2.00 0.00 ` ...resultant ecc: _ . , 5.53 in Wall Material Above "Ht" = Masonry Masonry Soil Pressure g Toe = 1,499 psf OK Thickness = 8.00 12.00 Soil Pressure @ Heel = 120' psf OK _ Rebar Size = # 4 # 4 ' Rebar Spacing = 16.00 16.00 Allowable - l 1 `� psf Rebar Placed at • = Edge Edge Soil Pressure Less Than Allowable Design Data ACI Factored @ Toe = 1,846 psf tb/FB + fa/Fa _ o.2st3 0.426• ✓~ ACl Factored Heel : 148 psf Total Force @ Section lbs = 194.1 497.2 . Footing Shear @ Toe. = 0.0 psi OK Moment .... Actual ft -#'-215.4 883:3 9 @ 26.0 psi OK Footing Shear Heel = Moment..... Allowable ft-# 905:4 2,074.4 ' Allowable 85.0 psi, Wall Stability Ratios Shear ..... Actual ' psi = ' 3.4 5.0 Overturning . , = 3.07 OK Shear."..Allowable psi= 19.4 19"4 Sliding = +.1.69 OK Bar Develop ABOVE Ht... in = 20.00 20.00 Sliding Calcs (Vertical Component Used) Y - Bar Lap/Hook BELOW Ht. in = ` 20.00 6.00 Lateral Sliding Force = :701.2 lbs Wall Weight psf = 78.0' 124.0 less 100% Passive Force - 0.0 lbs Rebar Depth 'd' in= 5.25 9.00 less 100% Friction Force = 1,184.4 lbs Masonry. Data Added ForceReq'd = 0.0 lbs OK Pm psi= 1,500 1,500 . for 1.5 : 1 Stability " • _ 0.0 lbs OK' Fs Psi = 20,000 20,000 Solid Grouting _ 'Yes Yes , FootingDesi n Results Special Inspection = No No Modular Ration' = 25.78 25.78 Toe Heel Short Term Factor = 1.000 11.000 'Factored Pressure' = 1,846 148 psf Equiv. Solid Thick. in= 7.60 11.62 ; Mu'': Upward = 0 . 0 ft-# Masonry Block Type =, Medium Weight . - Mu' : Downward 0. 0 ft-# Concrete Data Mu: Design _ ' 0 .. 1,502 ft-#. rc psi = Actual 1=Way Shear _ .0.00 26.00 psi Fy. psi = Allow 1 -Way Shear = 0:00 85.00 psi Other Acceptable Sizes & Spacings . Toe Reinforcing = None Spec'd Toe: Not req'd, Mu < S,' Fr Heel Reinforcing = None Spec'd Heel: Not re4d, Mu < S ' Fc Key Reinforcing = None Spec'd Key:.. No key defined C CE31925 N m r Exp. 12/31/2008 `4. r `PfyT CIVIC FOF CAL5 .TIMOTHY,S. MALLIS CIVIL ENGINEER Title: Job # ORCO BLOCK INC. 'Dsgnr: ' Date: 9:56AM, 18 JAN 07 i 4510 RUTILE ST. Description RIVERSIDE, CA. 92509. } (951) 685-1521 . ' Scope : : •. Rev: 510300 Cantilevered n p 4n r1 " 'Page 2 . U019BW-0503524.Ver I-05.1.3, 22Jim-1999, WIn32 - Cantilevered Retaining YVa" Design . k1 19KVY-W3ERCALC cAdoeumerits and setfinas\trna11is\mv document Description CENTER POINT 5'-4" UPPER TIER RETAINING WALL W/ LEVEL BACKFILL. liummary of Overturnin'& Resistin Forces & Moments ...OVERTURNING..... .....RESISTING...... Force Distance Moment Force Distance Moment Item lbs ft ftp lbs ft ft -# Heel Active Pressure = 701.2 2.11 1,479.5 Soil Over Heel 1,319.2 2.13 2,803.2 Toe Active. Pressure = 0.33 Sloped Soil Over Heel _ Surcharge Over Toe = Surcharge Over Heel Adjacent Footing Load = Adjacent Footing Load = Added Lateral Load _ Axial Dead Load on Stem 0.00.+ Load @ Stem Above Soil = _ " Soil Over Toe SeismicLoad _ Surcharge Over Toe Stem Weight(s) • ,507.7 0.41 210.6 1 Total _ 701.2 :O.T.M. = ,479.5 Earth, @ Stem .Transitions = ' 122.1 'i 0.83 101.8 . Resisting/Overtuming Ratio = 3.'07- Footing Weight = 487.5 ' 1.63 792.7 Vertical Loads used for Soil Pressure = 2,631.9 lbs Key Weight = Vert. Component _ 195.4 3:25 635.1 Vertical component of active pressure used for sail pressure Total = _ 2,631, 9 lbs R M.=,' 4,542.9 r S: - q� I'w CFsio0r th1m e F --T--.--------- 1-4 UPPER DER RETAINING 3' MIN. - --1 l WALL LEVEL W/ SLOPE TO DRAIN f —1 A B C. D E F DOWEL G I/ER T H BAR . 2'-0» CENTRE POINT III - 1,-9„ 6» LA. QUINTA � N/A #4®32" 0/C �_., 6» 2,_8,, 2'-8' 4 HORZ CONT.. 1'-9» 8„ #4(932" 0/C ,41" T2' ® 24"'0/C 8X16 CMU'SOLID 0/C 1F . 6 » » 3 —4 BOTTOM TIER 2" CLR NO INRSPECDON REDD.SPCL. » 2 —3 » 8 RETAINING WALL. 8" #4®32" 0/C .21 4'=0' 4'-0" CMU FULL HEIGHT 2'-6" .'8" Q(2) # 4HORZ. CONT. x/4@32" O/C 24 6.. 4'-8" 2-1 2" C ® 24" O/C 3'-0" ' 8" 4 V5®16" o/C �s5" 12' L F' DOWELS ® EDGE #416" o/C JO-' 6' r —`'11 3� ' OF 12" OR B" CMU 3'-6" 8» . 4®16" 0 C # 1I . 12X16 CMU SOLID #4®16" o/c 4@16" OIC', # - 6,. GROUTED W/ NO SPCL. INSPECTION REDD. _ % . 4" DIA. SOR 35 PERF PIPE W/ 1 CF. / '3/4" GRAVEL WRAPPED W/ MIRAFI 140N FIL TER FABRIC' —, SLOPE TO DRAW. b WATERPROOF BACKSIDE OF WALL. H' BAR V #4 HORZ. CONT. ® 12" O/C • a TOP AND BOTTOM AS SHOWN. A B C. D E F DOWEL G I/ER T H BAR . 2'-0» 2,_0, N/A. 1,-9„ 6» 4®332" 0/(,33" 92"� � N/A #4®32" 0/C �_., 6» 2,_8,, 2'-8' N/A 1'-9» 8„ #4(932" 0/C ,41" T2' N/Ar4�32" 0/C 1F . 6 » » 3 —4 3 —4 N/A » 2 —3 » 8 #4 32" 0/C 4.9 12»L N/A #4®32" 0/C .21 4'=0' 4'-0" N/A 2'-6" .'8" #4®T6" O/C 57' I 12" N/A x/4@32" O/C 24 6.. 4'-8" 4'-8' N/A 3'-0" ' 8" 4 V5®16" o/C �s5" 12' L N/A #416" o/C JO-' 6' r —`'11 3� ' 2'-0" 3'-6" 8» . 4®16" 0 C # 1I . j 33' #4®16" o/c 4@16" OIC', # - 6,. 2 cl:CE31925 m Exp. 12/31/2008 s �OF CALIFW TIMOTHY S. MALLIS CIVIL ENGINEER ORCO BLOCK INC. 4510 RUTILE ST. RIVERSIDE, CA. 92509 (951) 685-1521 Rev 510300 User. KW-0603522,Ver5-:1.3.22-Ju 1999, Wr32 (c) 198399 ENERCALC Title: Job # Dsgnr: Date: 8:51AM,' 18 JAN 07 Description Scope: . Cantilevered Retaining Wall Design Description CENTER POINT 2'-0" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER T AWAY Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 0.0 psf Criteria ,� Retained Height 2.00 ft Wall height above soil. = 0.00 ft Slope Behind Wall = 0.00:1 Height of Soil over Toe = 0.00 in Soil Density = 110.00 pcf Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 0.0 psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0 psf Used for Sliding 8 Overturning = 35.0 Axial Load Applied to Stem. . m Passive Pressure Axial Dead Load 0.0 lbs Axial Live Load = 0.0 lbs Axial Load Eccentricity = 0.0 in Design Summary .. for passive pressure Total Bearing Load' = 776 lbs ...resultant ecc. _ 2.09 in Soil Data fc - 2,500 psi ~Fy - Allow Soil Bearing = .1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 35.0 Toe Active Pressure = 0.0 Passive Pressure = 200.0 Water -height over heel = 0.0 ft FootingIlSoil Friction = 0.450 Soil height to ignore 6.00 in .. for passive pressure = 12.00 in Lateral Load Applied to Stem Lateral Load = 0.0 #/ft ...Height to Top = 0.00 it ...Height to Bottom _ 0.00 ft i Footing Strengths & Dimensions fc - 2,500 psi ~Fy - 40,000 psi Min. As % = 0.0012 Toe Width = . 0.00 ft Heel Width = 1.75 Total Footing Width =7� Allowable Footing Thickness = 12.001n Key Width _ 12.00 in Key Depth = 6.00 in 'Key Distance from Toe = 0.75 It Cover @ Top = 3.00 in @ Btrn.= 3.00 in Adjacent Footing Load Design Data . Adjacent Footing Load _ = 2,613.0 lbs Footing Width = 3.25 ft Eccentricity = 5.50 in Wall to Fig CL Dist = 4.50 ft Footing Type Line Load Base AbovelBelow Soil at Back of Wall - . _1.0 ft Stem Construction Top Stem Stem OK, Design height ft= 0.00 Wall Material Above "Ht" = Masonry Soil Pressure @ Toe = 708 psf OK Thickness Rebar Size - 8.00 # 4 Soil Pressure. @ Heel = 178 psf OK Allowable = 1 psf. Rebar Spacing = 32.00 . Soil Pressure Less Than Allowable Rebar Placed at = Edge ACI Factored @ Toe = 935 psf Design Data . ACI Factored @ Heel = 235 psf gb/FB + fa/Fa = 0.077 Footing Shear @ Toe = -0.0 psi OK Total Force @ Section lbs= 71.2 Footing Shear @ Heel = . 6.2 psi OK Moment .... Actual . ft = 46.8 " Allowable, = 85.0 psi Moment..... Allowable = 608.4 Wall Stability Ratios Shear..... Actual psi = 1.2. Overturning . = 3.76 OK Shear..... Allowable psi = 19.4 Sliding = 1.99. OK Bar Develop ABOVE Ht. in = 20.00 • Sliding Calcs (Vertical Component Used) Bar Lap/Hook BELOW Ht.. in = 6.00 Lateral Sliding Force . = 238,7 lbs Wall Weigh = 78.0 less 100% Passive Force.= - 125.0 lbs Rebar Depth 'd in '= 5.25 less 100% Friction Force = - 349.1 lbs - Masonry Data. Added Force Req'd = 0.0 lbs OK fm f� Fs 1'500 _ ....for 1.5: 1 Stability = 0.0 lbs OK psi = Solid Grouting - 20,000 Yes Footing Design Results. Special Inspection = No Modular Ratio 'n' = 25.78 Toe Heel Short Term Factor = 1.000 Factored Pressure = 935 235 psf Equiv. Solid Thick. in = 7.60 Mu': Upward = 0 0 ft_# _. Masonry Block Type = Medium Weight Mu'-. Downward = 0 0 ft4 Concrete Data Mu:, Design 0 80 ft-# fc psi = Actual 1 -Way Shear = Allow 1 -Way Shear = 0.00 6.23 psi 0.00 85.00 Fy psi = -="" �� •_ Toe Reinforcing psi Other Acceptable Sizes & Spacings = Heel Reinforcing None Spec'd Toe: Not req'd, Mu < S' Fr QF. ANY S, M Cn = None Spec'd Heel: Not req'd, Mu < S • Fr ��' O S6 �U) Key Reinforcing = None Spec'dKey: Not req'd, Mu < S' Fr ( 'rt, LU CE31925 m Exp. 12/31/2008 - `ST C 9TF F C C � CO l� c � � 2 LU . CE31925 N m Exp 12/31/2008 CIV11. 9TFOF C'AL�F�Q� TIMOTHY S. MALLIS'CIVIL ENGINEER Title: Job# ' • ORCO BLOCK_INC. Dsgnr: Date: 8:51AM, 18 JAN 07 4510 RUTILE ST. Description : RIVERSIDE, CA. -92509 r (951)'685-1521 Scope: �. • Rey:51030o User:KW-0603522, Ver 5.1.3,22Jurr1999,W1n32 .Cantilevered Retaining Wall Design � fe) 798399 ENERCALC - Page 2 - cNdocumentS and settin sltmallis\m% document Description, CENTER POINT 7-0" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER.TIER T AWAY Summa of Overturning& ResistingForces & Moments ' ......OVERTURNING..... .....RESISTING....: Force Distance Moment Item Force Distance Moment lbs ft ft=# lbs ' It ft4# Heel Active Pressure = - 157.5 1.00 157.5 Soil Over Heel = 238.3 1:21 `' 288.0 - Toe Active Pressure _ 0.33 Sloped Soil Over Heel = Surcharge Over Toe _ � ;Surcharge Over Heel, - - Adjacent Footing Load _ 81.2 0,48 39.2 Adjacent Footing Load = Added Lateral Load = Axial Dead Load on Stem = 0.00' Load @_ Stem Above Soil = Soil Over Toe _ SeismicLoad = Surcharge Over Toe. } = r 238.7 = 238,7 O.T.M. - _ 196.7 Stem Weight(s) Earth @ Stem Transitions 156.0 ' ' 0.33' 52.0- r Resisting/Overtuming Ratio = 3.76 J _ Footing Weight _ ..- 262,5 0.88 - 229.7 Vertical Loads used for Soil Pressure = 775.7 lbs. Key Weight = 75.0 1.25' 93:7 Vertical component of active pressure used for soil pressure Vert. Component 43,9 , 1.75 76.8 Total - 775.7 lbs R.M.= . 740.2 ' . �U•�e�OFESS// S. 2 CO l� c � � 2 LU . CE31925 N m Exp 12/31/2008 CIV11. 9TFOF C'AL�F�Q� TIMOTHY S. MALLIS CIVIL ENGINEER ORCO BLOCK INC. 4510 RUTILE ST: RIVERSIDE, CA. --92609. (951) 685-1521 -Title: Osgnr. Description Scope Job # Date: 8:S1AM, 18 JAN 07 " Rev: 510390 - " U(oser: KW -06035. Ver 5.1.3.22)-1999• Win32 Cantilevered ENERCALC98 RA ` alin'g ill, eSn Page 1 " c:tdocuments and settin sNtma risNmy document Description CENTER -POINT Z-8"LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER 3' AWAY Criteria [Soil Data Footing Strengths & Dimensions Retained Height = 2.67 ft " Allow Soil Bearing = 1,500.0 psf , fc - 2,50G psi c " Fy _ " 40,000 psi Wall height above soil = 0.00ft Equivalent Fluid Pressure Method Min. As % = 0.0012 Slope -Behind Wall = 0.00:1 Heel Active Pressure_ = 35.0. Toe Active Pressure = 0.0 Toe Width = 0.00 ft " Height of Soil over Toe = O:OO in Passive Pressure = 200.0 Heel Width 1.75 Soil Density = 11 0.00, pcf Water height over heel = 0.0 ft Total Footing Width = T- - FootingllSoil Friction . = 0.450 Footing Thickness = 12.00 in Wind on Stem = 0.0 psf , ` Soil height to ignore Key Width = 12.00 in for passive pressurey = 12.00 in Key Depth = 8.00 in Key Distance from Toe _ 0.75 It - Cover @ Top = 3.00 in @ Btm.= 3.00 in Surcharge Loads Lateral Load Applied to Stem Adjacent Footing Load Surcharge Over Heel = 0.0 psf Used To Resist Sliding 8 Overturning Lateral Load 0.0 #/ft Adjaceoti nt Fong Load - 2 613.0 lbs Surcharge Over Toe = 0.0 psf .--Height to Top _ 0.00 ft Footing Width = 3.25 ft - Used for Sliding 8 Overturning :..Height to Bottom -0.00 0.00 ft Eccentricity = 5.50 in Wall to Ftg CL Dist _.. 4.50 ft Axial Load A Iled to Stem Footing Type " Line Load = Axial Dead Load 0.0 lbs - Base Above/Below Soil -1.0 ft - ' Axial Live Load = 0.0 lbs - at Back of Wall Axial Load Eccentricity =. 0.0 in Desicin Summary Stem Construction - Top StemHXM2' ` Total Bearing Load = 955 lbs. Design height ft= Stem OK 0.00 - ...resultant ecc. _.: 4.05 in Wall Material Above "Ht" = Masonry Soil P.ressure @ Tce = 1,184,psf OK Thickness = Rebar Size 8.00 - Soil Pressure @ Heel= 0 psf .OK = . # 4 _ 1,500 '" Allowable psf - Rebar Spacing = 32.00 Soil Pressure Less Than Allowable Rebar Plated at = Edge. • ACI Factored @ Toe = 1,544 psf, Design Data ACI Factored @ Heel = 0 psf fb/FB + fa/Fa = 0.208 Footing Shear Toe" = 0.0 psi' OK Total Force @ Se_ction lbs = 171.5 . Footing.Shear @ Heel = 7.7 psi OK Moment .... Actual ft-#= 126.7 . = 'Allowable 85.O'psi Moment ... :Atlovvable _ 608.4 . Wall Stability Ratios Shear..... Actual psi = 2.9 Overturning= 2;25 OK Shear..:: -Allowable psi = 19.4 Sliding = 1.59 OK Bar Develop ABOVE Ht. in'- 20.00 Sliding Caics (Vertical Component Used) Bar Lap/Hook BELOW Ht. in 6.00.: "Lateral Sliding Force ' " = 382.0 lbs Wall Weight - 78.0 less 100% Passive Force = 177.8 lbs Rebar Depth 'd' -in = 5.25 - " less 100% Friction Force = - 429.6 lbs " Masonry Data Added Force Req'd = 0.0 lbs OK fm psi = 1,500 ....for 1.5: 1 Stability = 0.0 Ibs OK Fs psi = Solid Grouting = 20'000 Yes Footin Desi n Results Special Inspection = No ' Modular Ration' = 25.78 Toe Heel - Short Term Factor = 1.000-, Factored Pressure = 1,544 0 psf Equiv. Solid Thick. in= 7.60 Mu': Upward = 0 0 ft-# Masonry Block Type = Medium Weight. Mu':. Downward = 0 0 ft-# Concrete Data Mu: Design = 0 215 ft-# Actual I -Way Shear _ 0.00 7.69 psi Allow 1 -Way fc psi =" ' Fy psi= p S/ Shear = 0.00 85.00 psi Reinforcing = Other Acceptable Sizes 8r Spacings " / OQ �cQ� S. -Toe None Speed Heel Reinforcing = None Toe: Not reqd, Mu < S' Fr j p(NY Speed Heel: Not req'd, Mu < S' Fr (� Key Reinforcing = None Speed Key: Not req'd, Mu < S' Fr . " w N m CE 92 rn Exp. 12/31/2008 _'0 CP�qTr. . C/VIL Q OF CALIF����\ TIMOTHY.S. MALLIS CIVIL ENGINEER Title: Job# ORCC BLOCK INC. Dsgnr, . Dater 8:51AM, 18 JAN 07 4510 RUTILE ST. Description ' RIVERSIDE, CA. 92509 Scope : . (951) 685-1521 ' Rev: 510300 • ' User: KW -0803522. Ver 5.1.3, 71Jurt999, Win32Page. 2 �i1f1t10eVerEf� Retaining Wall Design (e11983.98 ENERCALC c:ldocuments ==a1lis= document Description CENTER POINT Z-8" LOWER TIER RETAINING WALL W/LEVEL BACKFILL AND r UPPER TIER T.AWAY 't • ' Summary of Overturning & Resisti2s Forces & Moments ' ....OVERTURNING..... .:...RESISTING:.:.. Force Distance Moment Force Distance . Moment Item lbs ft ft-# lbs ft ft-# . Heel Active Pressure = 235.7 1.22 , . 288.3 Soil Over Heel = 318.2 1.21 384.5 ,Toe Active Pressure = 0.33 Sloped Soil,Over Heel = Surcharge Over Toe = Surcharge Over Heel _ Adjacent Footing Load .. = 146.3 0:84; 122.2 Adjacent Footing Load = , Added Lateral Load = Axial Dead Load on Stem _ _ 0.00 Load. @ Stem Above Soil = Soil Over Toe = ` SeismicLoad = Surcharge Over Toe = Total = 382.0 O.T.M. = 410.6 Stem Weight(s)'- Earth @ Stem Transitions = 208.3 0.33 69.4 'Resisting/Overturning Ratio = 2.25 Footing"Weight = 262.5 0.88 229.7 Vertical Loads used for Soil Pressure'= . 954.6 lbs Key Weight = 100.,0 1.25 125.0 Vert. Component = 65.7 " 1.75 . ` 115.0 Vertical component of active pressure used for soil pressure. Total = 954.6 lbs R M.= 923.5 , ' �OQtz•OYESSlO4� r; LU CE31925 N m „ Exp. 12/31/2008 rn cS'J CMI. �P 9TFOF CAUF TIMOTHY S. MALLIS CIVIL ENGINEER ORCO BLOCK INC. 4510 RUTILE ST. RIVERSIDE, CA. 92509 (951) 685-1521 - Rev. 510300 Title: Dsgnr. Description.: Scope:' _User. KVIM3522. Ver 5.1.3.22Jt 1999, Win32 eta Cantilevered Retaining Wall Design le, 1963-99ENERMC �i �ii _ YV Job # Date: 8:51AM; 18 JAN 07 DescriptionCENTER POINT T-4" LOWER_ TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER T.AWAY Criteria 0.0 psf Retained Height = 3.33 ft. .Wall height above soil = 0.00 ft Slope Behind Wall = 0.00: 1 Height of Soil over Toe = 0.00 in Soil Density. = 110.00 pcf Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 0.0 psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0 psf Used for Sliding 8 Overturning = 35.0. Axial Load Applied to Stem Axial Dead Load = 0.0 Ibs Axial Live Load = 0.0 lbs Axial Load Eccentricity = 0.0 in Desic in Summary Soil height to ignore ;Total Bearing Load. = 1,369 lbs ...resultant ecc. ' 4.93 in Soil Data = i,277 psf OK Allow Soil Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 35.0. Toe Active Pressure = 0.0 Passive Pressure = 200.0 Water height over heel _ 0.0 ft'. FootingllSoil Friction . = 0.450 Soil height to ignore = 85.0 psi for passive pressure = 12.00 in Soil Pressure @ Toe = i,277 psf OK Soil Pressure @ Heel = 0 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe. = 1,669 psf ACI Factored @ Heel =, 0 psf Footing Shear @ Toe = 0.0 psi OK Footing Shear @ Heel = .12.7 psi OK Allowable = 85.0 psi Wall Stability Ratios' Cover @ Top = 3.00 in @ Overturning = , 2.37 OK Sliding _ 1.52 OK Sliding Calcs (Vertical Component Used) Lateral Sliding Force = 523,2 lbs less 100% Passive Force = - 177.8 lbs less 100% Friction Force. = - 615.9 lbs Added Force Req'd = 0.0 lbs OK ' ....for 1.5: 1 Stability. = 0.0 lbs OK' [Footing Design Results = Toe Heel Factored Pressure = 1,669 0 psf Mu': Upward = 0 0 ft-# Mu': Downward = 0 0 ft-# Mu: Design = 0 493 ft-# Actual 1 -Way Shear = 0.00 12.74 psi " Allow 1 -Way Shear = 0.00 85.00 psi Toe Reinforcing = None Spec'd Heel Reinforcing = Norte Spec'd Key Reinforcing = None Spec'd Lateral Load Applied to Stem, r Lateral Load = 0.0 #/ft ...Height to Top = 0.00 ft. ...Height to Bottom ' _ '0.00 ft Page 1 Footing Strengths & Dimensions Pc = 2,500 psi Fy = 40,000 psi Min. As % _ 0.0012 Toe Width = 0.00 ft Heel Width. = 2.25 Total Footing Width =5' = Footing Thickness = 1200 in Key Width = 12.00 in Key Depth 4 8.00 in Key Distance from Toe = 1,25 ft Cover @ Top = 3.00 in @ Btm.= 3.00 In Adjacent Footing Load Adjacent Footing Load = ._2,613.0 Itis Footing Width = 3.25 ft, Eccentricity = 5.501n Wall to Ftg CL Dist = 4.50 ft Footing Type Line Load Base Above/Below Soil = _ at Back of Wall - .1.0 ft Stem construction Top stem - Design height ft = Stem OK : 0.00 Wall Material Above "Hr' = Masonry Thickness = 8.00 Rebar Size Rebar Spacing 32.00_ Rebar Placed at = Edge Design Data fb/FB + fa/Fa. = oA77 Total Force. @ Section lbs = 309.0 r Moment.... Actual. ft-#= 290.0 Moment ..... Allowible = 608.4 Shear..... Actual psi = 5.3 Shear..... Allowable '• • psi = 19!4 Bar Develop ABOVE Ht. in= 20.00 Bar Lap/Hook BELOW Ht. in = 6.00 Wall Weight - 78.0 Rebar Depth 'd' in = 5.25 Masonry Data fm. psi = 1,500 Fs psi = 20.000 Solid Grouting = Yes .Special Inspection = No Modular Ration' - 25.78 Short Tenn Factor = . 1.000 Equiv. Solid Thick. in= 7.60 Masonry Block Type = Medium Weight Concrete Data pc FY psi Psi -ES S/; )y/ )i{Y Other Acceptable Sizes & Spacings Toe: Not req'd, Mu < S ' Fr Heel: Not req'd, Mu < S' Fr LLJ E31 25 V7 r Key: Not req'd, Mu < S . Fr Exp. 12/31/2008 �r CIVIL \�F OW'v- TIMOTHY S. MALLIS CIVIL ENGINEER Title: Job # ' ORCO BLOCK INC. Dsgnr: Date: 8:51 AM, 18 JAN 07 • - 4510 RUTILE ST. 'Description RIVERSIDE, CA. 92509 Scope (951) 685-1521 Rer. 510300 ng ,q, User. KW035 -0622. Ver 5.1.3.22Jt 1999. Win32, tant''evereid Retaining all Design (c) 1983-9$ ENERCALC - Page .2. J' •7 C:\documents and'settin ftallislm document - Description CENTER POINT 3'-4" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER V AWAY Summa of Overtumin &.Resisting Forces & Moments ..,OVERTURNING.:... ....RESISTING..... Force Distance Moment Force Distance Moment . Item Ibsft ft-# ' Ibs' ft ft #' Heel Active Pressure = 328.1 1.44 473.6 Soil Over Heel= 580.0 1.46 845.8 Toe Active Pressure = 0.33. Sloped Soil Over Heel = Surcharge Over Toe . = Surcharge Over Heel = Adjacent Footing Load _ 195.1 .1.24 241.6 Adjacent Footing Load Added Lateral Load _ Axial Dead Load on Stem _ 7 '0.00 Load @ Stem Above Soil = Soil Over Toe SeismicLoad = Surcharge Over Toe __ Total = .523.2.. O.T.M. _ 715.2 Stem Weight(s) Earth @ Stem Transitions 259.7 0.33 86:6 ' Resisting/Overturning Ratio = 2.37- Footing Weight = 337.5 1.13 379.7 Vertical Loads -used for Soil Pressure = . •. 1,368.7 lbs ' Key Weight = 100.0 1.75 + 175.0 Vert. Component = 91.4 • 2.25' .205.8 Vertical component of active pressure used for soil pressure. Total = t 1,368.7 lbs R.M = 1,692.8 Uj CE31925 N rn ' Exp. 12/31/2008" �l CIVIL-• �Q q�FOF CA\ -\F TIMOTHY S. MALLIS CIVIL ENGINEER Title: Job# Stem Construction Top Stem. ORCO BLOCK INC.. Dsgnr. Date: 8:51AM, 18 JAN 07 4510 RUTILE ST. Description = 4.49 in . Wall Material Above "Hr' : = RIVERSIDE, CA. 92509 J = 1,447 psf OK Thickness - (951) 685-1521 Scope; 78 psf OK Rebar Size = # . 4 �Rev: 510300 er.K 22,Ve5.1.3, 22-Ja1999,Wn3 1&99ENERCAIC Cantilevered Retaining Wall Design Page 1 16.00 . Soil Pressure Less Than Allowable Rebar Placed at = c:ldocuments and setfingsNtrnallis\my document Description CENTER POINT 4'-0" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND Design Data UPPER TIER T AWAY 1105 psf fb/FB + fa/Fa = Criteria Footing Shear 10 Toe' - 0.0 psi OK Soil Data Footing Strengths & Dimensions Retained Height = 4.00ft Allow Soil Bearing = 1,500.0 psf Pc = 2,500 psi Fy _ 40,000 psi Wall height above soil, = 0.00 ft Equivalent Fluid Pressure Method Min. As % = 0.0012 Slope Behind Wall = 0100:1 Heel Active Pressure = 35.0 Toe Active .Pressure = 0.0 Toe Width = 0.00 ft Height of Soil over Toe = 0:001n Passive Pressure = 2000. Heel Width = 2.50 Soil Density = 11.0.00 pct Water height over heel 0.0 ft Total Footing Width = tf Sliding Calcs (Vertical Component Used) FootinglISoil Friction = 0.450. Footing Thickness = 12.00 in . Wind on Stem. _ . 0.0 psf Soil height to ignore Key Width _ 12.00 in Rebar Depth 'd'. in= for passive pressure = 12.00 in' Key Depth = 8.00 in Added Force Req'd Key Distance from Toe = 1.50 ft 1,500 ....for 1.5: 1 Stability Cover @ Top = 3.00 in @ Btm.= 3.00 in Surcharge Loads Lateral Load Applied to Stem Adjacent Footing Load Solid Grouting = Surcharge Over Heel = 0.0 psf Used To Resist Sliding &Overturning Lateral Load= 0.0 #!ft ' Adjacent Footing Load = 2,613.0 lbs Surcharge Over Toe = 0.0 psf ._.Height to, Top = 0.00 ft Footing Width = 3.25 It Used for Sliding & Overturning ...Height to Bottom 0.00 ft Eccentricity = 5.50 in Factored Pressure = 1,940 105 psf Wall to Ftg CL Dist = 4.50 ft Axial Load Applied to Stem 0 0 ft-# Footing Type Line Load' Axial Dead Load = 0.0 lbs Concrete Data Base Above/Below Soil = -1.0 ft Axial Live Load = . 0.0 lbs fc psi at Back of Wall Actual 1 -Way Shear = Axial Load Eccentricity. = 0.0 in Fy psi =, Allow 1 -Way Shear = Desi n Summa Stem Construction Top Stem. Total Bearing Load = 1,907 lbs Design height ft= Stem OK 0.00 ...resultant ecc. = 4.49 in . Wall Material Above "Hr' : = Masonry Soil Pressure Toe = 1,447 psf OK Thickness - 8.00' Soil Pressure Heel= 78 psf OK Rebar Size = # . 4 Allowable _ 1,500 psf Rebar Spacing = 16.00 . Soil Pressure Less Than Allowable Rebar Placed at = Edge ACI Factored @ Toe = 1,940 psf Design Data ACI Factored @ Heel 1105 psf fb/FB + fa/Fa = 0.605 Footing Shear 10 Toe' - 0.0 psi OK Total Force @ Section lbs = •ftp= 452.8 Footing Shear Heel = 16.9 psi OK Moment...Actual 551.5 Allowable = 85.0 Psi Moment.....Allowable = 905.4 Wall Stability Ratios Shear..... Actual . psi = 7.9 Overturning = 249 OK Shear..... Allowable psi = 19.4 Sliding - = 1.55 OK Bar Develop ABOVE Ht. in= 20.00 Sliding Calcs (Vertical Component Used) Bar Lap/Hook BELOW Ht. in= 6.00 Lateral Sliding Force = 667.5 lbs Wall Weight = 78.0 less 100% Passive Force = - 177.8 lbs . Rebar Depth 'd'. in= 5.25 less 100% Friction Force = - 858.2 lbs Masonry -Data Added Force Req'd = 0.0 lbs OK Pm psi= 1,500 ....for 1.5: 1 Stability = 0.0 lbs OK Fs psi = 20,000 ' Solid Grouting = Yes Footin Desi n Results Special inspection = No Modular Ration' = 25.78 . Toe Heel Short Term Factor = 1.000 Factored Pressure = 1,940 105 psf Equiv. Solid Thick. in= 7.60 ' ,Mu': Upward =_ 0 0 ft-# Masonry Block Type. = Medium Weight Mu': Downward =. 0 0 ft-# Concrete Data Mu: Design = 0 937 ft-# fc psi Actual 1 -Way Shear = 0.00 16.88 psi Fy psi =, Allow 1 -Way Shear = 0.00 85.00 psi Other Acceptable Sizes & Spacings Toe Reinforcing = None Spec'd Toe: Not req'd, Mu < S ' Fr Heel Reinforcing = None Spec'd Heel: Not req'd, Mu < S' Fr Key Reinforcing = None Spec'd Key: Not req'd„Mu <-S • Fr �%p,OFES- `��`��(NY S, My cam. / CO �� C UjCCL:E31925 u7 m Exp. 12/31/2008 �TFCIVI OF CAU`��``�\P TIMOTHY S. MALLIS CIVIL ENGINEER - r Titles Job# ORCO BLOCK INC. Dsgnr. Date: 8:51AM, 18 JAN 07 4510 RUTILE ST. Description: RIVERSIDE, CA. 92509 scope: (951) 685-1521 ' . R'w 510300 p User: KW -0603522. Ver 5.1.3, 22Jier1999, Win32 Cantilevered Retaining Wall Design User: WL0603ERCALC Wall - Page •2 c:\documents arid settin s\tmallis\m document Description CENTER POINT 4'-0" LOWER TIER RETAINING WALL WI LEVEL BACKFILL AND LIPPER•TIER T AWAY I - , Summary of Overtunnin & ResistingForces & Moments .....OVERTURNING..... RESISTING SISTING..... Force Distance Moment Force Distance Moment . hem lbs ft ft-# lbs ft ft-# Heel Active Pressure = 437.5 1..67 729.2 Soil Over Heel = 806.7 1.58 1,277.2 Toe Active Pressure = 0.33 Sloped Soil Over Heel = : Surcharge Over Toe = Surcharge Over Heel = w Adjacent Footing: Load 230.0 1.69 - 389.8 Adjacent. Footing Load = ' 191.6 2.27 435,1 Added Lateral Load Axial Dead Load on Stem = 0•00 Load 0 Stem Above Soil 'Soil Over Toe SeismicLoad = Surcharge Over Toe = Stem Weight(s) 312.0 0.33 104.0 Total _ 667.5 O.T.M. = 1,118:9 Earth @ Stem Transitions Resisting/Overturning Ratio = 2,49. Footing Weight 375.0 1.25 468.7 Key Weight Vertical Loads used for Soil Pressure 1,907.2 Itis = 100.0 2.00. 200.0 Vert. Component - _ 121.9 2.50 304.8 Vertical component of active pressure used for Soil pressure . Total = 1,907.2 lbs R.M.= 2,789.9 ' OFESS�� ����� . S y Lu GE31925 `N rn Exp. 12/31/2008 d19r CIVIL FOF CAOIT TIMOTHY S. MALLIS CIVIL ENGINEER Title: Job # ORCO BLOCK INC. • Dsgnr. Date: 8:51AM, 18 JAN 07 4510 RUTILE ST. Description RIVERSIDE, CA. 92509 Scope "(951) 685-1521 [L51D300 Page 1 603522.Ver5.1.3,22Ja�t999,VWn32' GantlleVered Retaoning Wai9 Design3-99 ENERCALC c:ldocuments and settin s\tmalliMm document ti Description CENTER POINT 4.'=8" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER 3' AWAY .. . Criteria Soil Data Footing Strengths & Dimensions Retained Height 4.67ft Allow Soil Bearing 1,750.0 psf Pc 2,500 psi Fy -:. -40,000 psi , Wa11 height above soil = 0.00 ft Equivalent Fluid Pressure Method Min. As % = 0.0012 Heel Active Pressure' * = 35.0 Toe Width Slope Behind Wall 0.00 1 = 0.00 ft Toe Active Pressure = 0.0 Heel Width - 3.00 Height of Soil over Toe = 0.00in. Passive Pressure. = 200.0 Total Footing Width = X06 -Soil Density. = 110.00 pcf Water height over heel . = 0.0 ft Footing Thickness , = 12.00 in " FootingilSoil Friction = 0.450 Wind on Stem = 0.0 psf Soil height to ignore Key Width = 12.00 in for passive pressure = 12.00 in Key Depth 6.00 in Key Distance from Toe = 2.00 ft Cover @ Top 3.00 in @ Btm.= 3.00 In Surcharge.Loads Lateral Load Applied. to Stem Adjacent Footing Load Surcharge Over Heel = 0.0 psf Lateral Load . = 0.0 #/ft - Adjacent Footing Load = 2,613 0 lbs Used To Resist Sliding & Overtuming ...Height to Top = 0.00 ft Footing Width = 3.25 It Surcharge Over Toe . 0.0 psf .,.Height to Bottom ` _ 0.00 ft Eccentricity = 5.50 in Used for Sliding & Overturning ' Wallto Ftg CL Dist, = 4.50 -ft Axial Load Applied to Stem Footing Type ' , Line Load I Base Above/Below Soil ' . Axial Dead Load = 0.0 lbs at Back of Wall = -1.0 ft Axial Live Load = 0.0 lbs Axial Load Eccentricity 0.0 in Desi n Summa!y LStem Construction Top Stem` .Stem OK . Total Bearing Load = 2,733 lbs Design height- . ft= 0.00 resultant ecc. = 4.03 in Wall Material Above "Ht" = Masonry . Soil Pressure @ Toe = 1,523 psf OK Thickness 8.00 Soil Pressure @ Heel = 299 psf OK- Rebar Size` _ # 5 . Allowable _ 1 750 psf Rebar Spacing = 16.00 t d PlaEd bar -ace = e Soil Pressure Less Than Allowable � Re9 Design Data ACI Factored @ Toe _ 2,092 psf fb/FB + fa/Fa = 0.858 ' ACI Factored Heel . " = 410' psf Total Force @ Section Ibs = 596.0 Footing Shear @ Toe = 0.0 psi. OK Moment....Actual ft-# _ -908.0 Footing Shear @ Heel = 23.9 psi OK Moment ...... Allowable 1,058.0 Allowable = _ 85.0 psi Wall Stability Ratios Shear ..... Actual psi = 10.6 Overturning. 2.96 OK Shear..... Allowable psi= 19.4 Sliding = 1.65 OK Bar Develop ABOVE Ht. in = 30.00 ' Sliding Calcs, (Vertical Component Used) Bar Lap/Hook BELOW Ht. in = 6:00 Lateral Sliding Force = 821.7 lbs Wall Weight" = 78.0 less 100% Passive Force = 125.0 lbs. Rebar Depth 'd' in = . 5.25 , less 100% Friction Force = - 1,229.9 lbs Masonry Data Added Force Req'd = 0.0 Ibs . OK Pm psi = 1,500 = . for 1.5: 1 Stability = 0.0 lbs OK Fs psi 24,000' Solid Grouting, = Yes Footin Desi n Results Special Inspection = No Modular Ratio'n' • = 25.78 Toe Heel Short Term Factor = 1.000' Factored Pressure = 2,092 410 psf Equiv. Solid Thick. in 7.60 Mu': Upward = .0 0 ft-# Masonry Block Type = ' Medium Weight: Mu': Downward = 0 0 ft-# Concrete Data Mu: Design = 0 1,544 ft4 Pc psi = Actual 1 -Way Shear = 0.00 23.87 psi Fy psi= Q �pFE�SjO�� Allow 1 -Way Shear . _ . 0:00 85.00 psi other Acceptable Sizes & Spacings NY S�\�F Toe Reinforcing = None Speed Tce: Not req'd, Mu < S ' Fr Q O� 4,1 Heel Reinforcing = None Speed. Heel: Not req'd,' Mu < S . Fr �� 2 Key Reinforcing = None Speed Key. Not req'd, Mu < S' Fr w CE31925 N m cc Exp. 12/31/2008 Jl CIVIC- �TFOF CA��F�� TIMOTHY S. MALLIS CIVIL ENGINEER Title - ; Job # ORCO BLOCK INC. Dsgnr:. Date: 8:51AM, 18 JAN 07 4510 RUTILE ST. Description RIVERSIDE, CA. -92509 scope (951) 685-1521 . Ree 510300 �Se�°5D335�•vu5.1.3•�,�19�•wn3z Cantilevered.Retaining.Wall Design (ci 19H3 -S9 ENERCALC Page 2 c:ldocuments and settin sMmallis\m document' ' Description CENTER POINT 4'-8"LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER T AWAY I.Summa[yof Overturning &Resisting Forces & Moments .....OVERTURNING..... .....RESISTING....: Force Distance Moment Force Distance Moment' Rem lbs ft ft-# lbs ft . ft-# Heel Active Pressure = 562.6 1.89 1;063.3 Soil Over Heel = 1,198.6 1.83 2,197.5 Toe Active Pressure = 0.33 Sloped Soil Over Heel =, Surcharge Over Toe _ 'Surcharge Over Heel = Adjacent Footing Load = 259.1 2.15 556.7 Adjacent Footing Load = .488.4 2.35. " : '1,149.3 . Added Lateral Load = Axial Dead Load on Stem = 0,00 Load @.Stem Above Soil = Soil Over Toe . SeismicLoad = Surcharge Over Toe = Total = 821.7. O.T.M. = 1,620.1 Stem Weight(s) 'Earth @ Stem Transitions 364.3. 0.33 121.4 Resisting/Overturning Ratio = 2.96 Footing Weight = 450.0 1.50 675.0 Vertical Loads used for Soil Pressure =. 2,733.1 lbs Key Weight = 75.0 2.50 187.5 Vertical component of active pressure used, for soil pressure Vert. Component 156.8 3.00 4704 . Total= 2,733.1 Ibs R.M = 4,801.1 `/lF - �n N�� S• U-1 CE31925 rn ' Exp. 12/31/2008 `fT CIVIC a�P 9TF OF C F:L1��� tIMOTHY S. MALLIS CIVIL ENGINEER ORCO BLOCK -INC. 4510 RUTILE ST. RIVERSIDE, CA. 92509 (951) 685-1521 Rev; 510300 User. KW -0603522. Ver 5.1.3.22Ji 1999. W1n32 (t) 1983-99 ENERCALC Title: Dsgnr. Description.: Scope: Cantilevered Retaining Wall Design Job # Date: 8:51 AM, 18 JAN 07 CENTER POINT 5'-4" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER T AWAY Criteria psf Retained Height = 5.33 ft Wall Height above soil' = 0.00 ft Slope Behind Wall = 0.00: 1 Height of Soil over Toe = 0.00 in Soil Density = 110.00 pcf Wind on Stem = 0.0 psf Surcharge Loads Surcharge Over Heel = 10.0 psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0-psf Used for Sliding & Overturning = 35.0 Axial Load kpplied.to Stem Axial Dead Load = 0.0 lbs Axial Live Load = 0.0 lbs Axial Load Eccentricity = 0.0 in Design Summa Soil height to ignore Total Bearing Load = 3,617 lbs " ...resultant ecc. = 4.38 in Soil Data = 1,680 psf OK Allow Soil Bearing. 1,750.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 35.0 Toe Active Pressure = 0.0 Passive Pressure = 200.0 Water height over heel = 0.0 ft FootingIISoil Friction = 0.450 Soil height to ignore = 85.0 psi for passive pressure = 12.00 in Overturning Lateral Load Applied to Stem Lateral Load = 0.0 #tft ...Height to Top = 0.00 ft :.Height to Bottom = 0.00 ft;. Soil Pressure @ Toe = 1,680 psf OK Soil -Pressure Q? Heel = 386 psf OK Allowable = 1,750 psf Soil Pressure Less Than Allowable ACI Factored @ Toe= 2,244 psf ACI Factored @ Heel = 516 psf Footing Shear @_ Toe _. 0.0 psi OK Footing Shear @ Heel = 28.5 psi OK Allowable = 85.0 psi Wall Stability Ratios 2.50 ft Overturning = 3.26 OK Sliding _ 1.85 OK - Sliding Calcs (Vertical Component Used) Lateral Sliding Force = 975:3 lbs less 100% Passive Force = - 177.8 lbs less 100% Friction Force = - 1,627.7 Itm Added Force Req'd = 0.0 lbs OK . ....for 1.5:.1 Stability = 0.0'lbs OK Footing Design Results Toe Heel Factored Pressure = ' 2;244. 516 ps Mu': Upward = 0 0 ft Mu': Downward = 0 0 ft Mu: Design = 0 2,301 ft Actual 1 -Way Shear = 0.00 28.52 psi Allow 1 -Way Shear = 0.00 85.00 psi Toe Reinforcing = None Speed Heel Reinforcing = None Speo'd Key Reinforcing = None Spec'd Page 1 Footing Strengths & Dimensions fc - 2,500 psi Fy .= 40,000 psi Min. As °% = 0.0012 Toe Width = 0.00 ft Heel Width = 3.50 Total Footing Width = ' Footing Thickness = 12.00 in Key Width = Y 12.00 in Key Depth _ 8.00 in Key Distance from Toe = 2.50 ft Cover @ Top . = 3.00 in @ Btm.= 3.00 in Adjacent Footing Load #. 4 Adjacent Footing Load = 2,613.0 lbs Footing Width = 3.25 ft Eccentricity = 5.50 in Wall to Fig CL. Dist = 4.50 ft Footing Type Line Load ' Base Above/Below Soil at Back of Wall = -1.0 ft Stem Construction # # Top Stem 2nd Stem OK Stem OK Design height ft= 2.00 0.00 Wall Material Above "Hf' = Masonry _Masonry Thickness = 8.00 12.00 Rebar Size - #. 4 # 4 Rebar Spacing = 16.00 16.00 Rebar Placed at = Edge Edge Design Data fb1FB + fa/Fa = 0.320 0.652 Total Force @ Section lbs = 309.0 740.0 Moment.... Actual it-# = 290.0 1,353.4 moment ... ..Allowable ft-# = 905.4 2,074.4 Shear ..... Actual psi = 5.4 • 7.4 Shear..:..Allowable . psi = 19.4 19.4 Bar Develop ABOVE Ht. in = 20.00 20.00 Bar Lap/Hook BELOW Ht. in = 20.00 6.00. Wall Weight. psf= 78.0 124.0 Rebar Depth 'd' in = 5.25 9.00 Masonry Data . I'm , psi= .1,500 1,500 Fs psi = 20,000 20,000 Solid Grouting = Yes Yes Special Inspection = No . No Modular Ration' = 25.78 25.78- 5.78-Short ShortTerm Factor = 1.000 1.000 f Equiv.-Solid Thick. _ in= 7.60 11.62 Masonry Block Type = Medium Weight Concrete Data" fc Fy psi = psi = 4 Other Acceptable Sizes & Spacings Toe: Not req'd, Mu < S ' Fr Heel: #4L 19.75 in, #5@ 30.50 in, #6@ 43.25 in, #7@ 48.g� 25 in�g m Key: Not req'd, Mu < S'.Fr Lu CES CExp. 12/31/2008 LP , CIVI\- OF C i IMOTHY S. MALLIS CIVIL ENGINEER Title.- Job # ORCO BLOCK INC. Dsgnr Date: 8:51 AM, 18 JAN 07 4510 RUTILE ST. Description RIVERSIDE, CA. 92509 Scope-: (951) 685-1521 Rev; 510300 Page 2 • User: KW-0603571. Ver 5.1.3.22-J� l999, WU32 (c,,963-99 ENERCALC .Cantilevered Retaining W611 Design cAdocuments and settin slimallis= document Description CENTER POINT 5'-4" LOWER TIER RETAINING WALL W/ LEVEL BACKFILL AND UPPER TIER T AWAY Summa of Overturnin &Resistin Forces & Moments .....OVERTURNING..... :....RESISTING..... Force Distance Moment Force Distance Moment it lbs ft ft_# ' lbs It ft-#. Heel Active Pressure = 701.2 2.11 1,479.5 Soil Over Heel = 1,465.8 2.25 3,297.9 } Toe Active Pressure = 0.33 Sloped Soil Over Heel = Surcharge Over Toe = Surcharge Over Heel Adjacent Footing.Load = 274.1' 2.68 734.0 Adjacent Tooting Load = 2.44 1,709.6 Added Lateral Load = - Axial Dead Load on Stem = , 0,00 Load @ Stem Above Soil = Soil Over Toe' SeismicLoad_ Surcharge Over Toe Stem Weight(s)' 507.7 0.41 210.6 Total = 975.3 O.T.M. = 2,213.5 Earth @ Stem .Transitions = . , 122.1 0.83 101.8 Resisting/Overturning Ratio = 3.26. Footing Weight = 525.0- 1.75 918.7_ Vertical Loads used for Soil Pressure = 3,617.1 lbs Key Weight = 100.0 3.00. 300.0 T Vert. Component = 195.4 3.50 684.0 Vertical component of active pressure used for sail pressure Total = 3,617.1 lbs R.M.— 7,222.6 kA CO CE31925 N m Exp. 12/31/2008 �TFOF CAUF