Loading...
04-5359 (RC)i T44f 4 4 Q" P.O. Box 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number Property Address APN: Tenant nbr, name . . . Application description Property Zoning . . . . Application valuation . Owner BUILDING PERMIT BUILDING & SAFETY DEPARTMENT (760).777-7012 FAX (760) 777-7011 INSPECTION REQUESTS (760) 777-7153 . . . 04-00'005359 . . . 50981 WASHINGTON ST 770-020-020-6 -000000- . . . DYSON & DYSON TI, . REMODEL - COMMERCIAL NEIGHBORHOOD COMMERCIAL . . . 100000 LQ INV C/0 ROSETTE CADRY 401 S BARRINGTON AVE 100 LOS ANGELES CA 90049 Contractor Date 12/01/04 '_90U COAST DEVELOPMENT 7895 ANNANDALE AVE DESERT HOT SPRINGS CA 92240 (760) 251-1421 WCC: EXEMPT WC: EXEMPT 04/30/0E CSLB: 339507 03/31/06 CCC: B -C20 -C36 ------ Structure Information COMMERCIAL ADDN, CHANGE OF USE, TI ----- Construction Type . . . . . TYPE V - NON RATED Occupancy Type . . . . . . BUSINESS <50 Flood Zone . . . . . . . . FLOOD ZONE AO Other struct info . . . . . CODE EDITION 2001 FIRE SPRINKLERS NO MIXED-USE OCCUPANCY B OCCUPANT LOAD 48.00 ----------------------------------------------------------------------------- 1ST FLOOR SQUARE FOOTAGE 1192.00 Permit . . . . . . BUILDING PERMIT Additional desc Permit Fee 639.50 Plan Check Fee 415.68 Issue Date . . . . Valuation . . . . 100000 Qty Unit Charge Per Extension BASE FEE ._ 414.50 50.00 4.5000 --------------------------------------------- THOU BLDG 50,001-100,000��'9 225.00 Permit . . . . . . ----_---------------------------- ELECT - ADD/ALT/REM„ Additional desc . Permit Fee . . . . 38.84 Plan Check Fee 9.71 Issue Date . . . . Valuation . . . . 0 Qty Unit Charge Per Extension BASE FEE 15.00 1192.00 .0200 ELEC GARAGE OR'NON-RESIDENTIAL 23.84 ------.---------------------------------------------------------------------- Permit . . . . . . MECHANICAL P.O. Box 1504 • VOICE (760) 777-7012 78-495 CALLE TAMPICO FAX (760) 777-7011 LA QUINTA, CALIFORNIA 92253 INSPECTIONS (760) 777-7153 BUILDING & SAFETY DEPARTMENT Application Number: 0 J 3 5 Applicant: Applicant's Mailing Address: Date: /;"-/—o Architect or Engineer: Architect or Engineer's Address: Lic. No.: BUILDING PERMIT DECLARATIONS LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my Lir se i� i�ljorceCap� tact. �7 License Class C VI s l� License No. J Date Contractor O x, etJ� L& rD M e r..� OWNER -BUILDER DECLARATION I hereby affirm under penalty of pedury that I am exempt from the Contractors' State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).): U I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself or through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). U I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). U I am exempt under Sec. , BA P.C. for this reason Date WORKERS' COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. _ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is /�.ssu d. My wor ers' compensation insurance carrier angrl}• y nur?er are: Carrier .� suz.– 1—J w p,l -Policy Number j 1 "I S J 0-- _ I certify that, in the perfor ance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Date Applicant_--� �2 ^ �� WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name Lender's Address APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall, defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance -of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this county to nter upon the above-mentioned property for inspection purposes. Date—1 2- 11anon Signature (Applicant or Agent): i Page 2 Application Number . . . . . 04-00005359 Date 12/01/04 Additional desc Permit Fee . . . . 24.00 Plan Check Fee 6.00 Issue Date . . . . Valuation . . . . 0 Qty Unit Charge Per Extension .BASE FEE 15.00 2.00 4.5000 EA MECH VENT INST/ DUCT ALT 9.00 ---------------------------------------------------------------------------- Permit PLUMBING Additional desc Permit Fee . . . . 21.00 Plan Check Fee 5.25 Issue Date . . . . Valuation 0 Qty Unit Charge Per Extension BASE FEE 15.00 1.00 3.0000 EA PLB WATER INST/ALT/REP 3.00 1.00 3.0000 EA PLB FIXTURE DRAIN/VENT REP/ALT 3.00 ------------------------------`---------------------------------------------- Special Notes and Comments CHANGE OF OCCUPANCY TO "B" (A-3 PREVIOUSLY) AND 1192 SQ.FT. ADDITION TO EXISTING BUILDING. TYPE V -N CONSTR. "B" OCC. 48 OCCUPANT LOAD. 2001 CODES **CHANGE OF OCCUPANCY FROM A-3 TO B.WAS NOT PERMITTED. EXISTING OFFICE LAYOUT IS BEING VERIFED AND APPROVED THROUGH FIELD INSPECTIONS AND FIELD REVISIONS** ---------------------------------------------------------------------------- Other Fees . . . . . . ART IN PUBLIC PLACES -COM 480:00 DIF CIVIC CENTER - COMM 64.36 ENERGY REVIEW FEE 41.57 DIF FIRE PROTECTION -COMM 69.13 STRONG MOTION (SMI) - COM 13.27 DIF STREET MAINT FAC -COMM 33.37 DIF TRANSPORTATION - COMM 2522.27 Fee summary Charged Paid Credited --------------------------------------------------------- Due - Permit Fee Total 723.34 .00 .00 723.34 Plan Check Total 436.64 .00 .00 436.64 Other Fee Total 3223.97 .00 .00 3223.97 Grand Total 4383.952 .00 .00;, 4383.95 7 A X City of La Quinta Building & Safety Division rmlt - P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 D�-�3Sq Building Permit Application and Tracking Sheet Project Address: / Owner's Name: L . �� �� S L•L• Address: S A. P. Number: Legal Description: eCity. ST. Zip: I✓jA/ C Contractor:-' 7b Address: FTelephone: ' = ` ` :•"..� "'Project Description: City. ST, Zip: rl.9P r lo lzoG Telephone: f/jpy 3 A State Lic. # : Citv Lic. #: Arch., Engr., Designer: Address: ?, . 05-0 tG '45; p City. ST, Zip:)%W W-PbScAT Q4. 92 or. Telephone: o 7 G • 8 State Lic. #: G' 8 3 Name of Contact Person: 4. AIIAW0 Construction Type: `/-Al Occupancy: Project type (circle one): New _dd' Alter Repair Demo Sq. Ft.: 2 # Stories: # Units: Telephone # of Contact Person: Estimated Value of Project: tj 'i APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req'd Rec'd TRACKING PERMIT FEES Plan Sets Plan Check submitted �N �� Item Amount Structural Calcs. Reviewed, ready for corrections Plan Check Deposit Truss Calcs. i Called Contact Person v p >; Plan Check Balance Energy Calcs. Plans picked uptruction Flood plain plan Plans resubmitted Mechanical Grading plan god Review, ready for correcti ns/issue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up SAI.1. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- '"' Review, ready for corrections/issue Developer Impact Fee Planning • Approval Called Contact Person A.I,P,P. Pub.'Wks. Appr Date of permit issue School Fees Total Permit Fees els- c-Jf-� Vt �j�'''d sat -710 'CAP. 10/(f s�-� Bin #- C Cit of LaQuinta Y Building a Safety Division P:O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit: 44 �a o ICS 5j l S`' Project Address:' O 9 a 71a Owner's Name: ✓C tars A. P. Number: 770 . D Zo • alp • 6 Address: Of �V 00 Legal Description: City, ST, Zip: 46 14661,43 G+ cjD� Contractor: 4,215-1y v llm o/° Telephone: �7/ 222-/6'S'0 Address: 7896' /1*JV)44 rr eYS Project Description: *nP &0 • eii City, ST, Zip: tXtseAr /WIGSrA. 1722AI0 Ga 5,P/ 9 IV G'tYVN6G%%A�i .Telephone: " 261-1t121 CityLic. #: R Ce ro a X%SrAvG State Lid. # : Arch., Engr., Designer: Address: 73.359 EL iWSO 6WIV ?6-7 City, ST, Zip: liftV mSSEN r, 4C4. 92 2-40. Telephone: 60776;,R#-Z' 'ass State Lic. #: G' 3 Name of Contact Person: c5 ��jQ,7 Construction Type: ,A/ Occupancy: Project type (circle •one): New (d d"' Alter Repair Demo Sq. Ft.: L, # Stories: #Units: Telephone # of Contact Person: 7 6• 7 Estimated Value of Project: Q APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req'd Recd TRACMG . PERMTT FEES Z Plan Sets Plan Check submitted Item Amount Structural Cates. Reviewed, ready for corrections d Plan Check Deposit Z Truss Calcs. Called Contact Person Plan Check Balance Energy Calcs. Plans picked up Construction Flood plain plan Plans resubmitted FI/a, Mechanical Grading, plan 2nd Review, ready for correction ssue '41'1010 Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE: ?'° Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue A X� v School Fees 2 Total Permit Fees 2a� O G , `11,2 ---)' t1_ke11NAJ1P_ I an Z� 6D D DIeA . �jdbD� Et�'�`11' AY1S Uzi -7>ZAP?r, s/� -79 t1210v60 `Bin #I'%,- pep DV7 ' 53�1 Permit # I-- C� Project Address: j0 g A. P. Number: Legal Description: Contractor: x CO T E Address: City. ST. Zip: Y_ Telephone: x State Lic. # : X, Arch., Engr.. Designer: Address: City, ST, Zip: -rps SE Telephone: � �o 1 iO a State Lic. #: C'/ 63 89 Name of Contact Person: Telephone # of Contact Person: 1 # Submittal Plan Sets Structural Calcs. Truss Calcs. Title 24 Calcs. Flood plain plan Grading plan Subcontactor List Grant Deed H.O.A. Approval IN HOUSE: - Planning Approval Pub. NVks. Appr School Fees 'd �1i City Of La Quinta Building 8t Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Owner'sName: X Address: X I I Cos City. ST. Zip: KAl n1 �aI (Ey Telephone: I c� -2+1 Project Description:.- 6TiROCIOPA•L RUdI61a, F�►2 FD"NRl - 2t -b 6TDRY Avoj T City Lic. #: Sv ITF 20-7 S O `ZZco 3Zq— oS-6a construction ' ctt on T Y Pe: V Occupancy: P an y. Project l e on hPe (circle rce). New Add'n Alter Repair Demo 15�Rrj FW -t> Sq. Ft. # Stories: I # Units: Estimated Value of Project: x APPLICANT: DO NOT'WRITE BELOW THIS LINE Rec'd yReviewed, TRACKING'PE Plan Check submitted ready -for corrections PERMIT FEES ,49, Item °Amount 'Q Plan Check Deposit Called Contact Person , Plan Check Balance ?j Plans picked up ( 3 Construction Plans resubmitted 2"d Review, ready for corrections/issue --------------- Called Contact Person !��! s Mechanical f7 Electrical Plumbing Plans picked up S M.l Plans resubmitted Grading OF Review, ready for corrections/issue Developer Impact e Called Contact Person A.I.P.P. Date.of permit issue ��. i Vo- rtc d CA -11 Pl,, c lo •� h9. ZC 3� Total Permit Fees Z(� Ns - RFC . '%STh�fi�1"�v�� �L° ro'2o•� Comments At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patios/walkways, residential additions under 5 00 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooling, eating or sanitation) or replacement mobile ho mes. It has been determined that the above-named owner is exempt from paying school fees at this time due to the following reason: Commercial Addition EXEMPTION NOT APPLICABLE This certifies that school facility fees imposed pursuant to Education Code Section 17620 and Government Code 65995 Et Seq. in the amount of $0.36 X 1,192 S.F. or $429.12 have been paid for the property listed above and that building permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued. Fees Paid By C/C-Guaranty Bank, Don Snook Check No. 2859855 Name on the check Telephone 802-7785 Finding Commercial By Dr. Doris Wilson Superintendent Fee collected Signature Barbuzza Payment Recd $429.12 $0.00 Over/Under NOTICE: Pursuant to Government Code SectiorOM20(d)(1), this will. serve to notify you that the 90 -day approval period in which you may protest the fees o r other payment identified above will begin to run from the date on which the building or installation permit for this project is issued, or from the date on which those amounts are paid to the District(s) or to another public entity authorized to collect them on the District('s) behalf, whichever is earlier. NOTICE: This Document NOT VALID if Duplicated Embossed Original -Building Department/Applicant Copy -Applicant/Receipt Copy -Accounting oto CERTIFICATE OF COMPLIANCE Desert Sands Unified School District 47950 Dune Palms Road < BERMUDA DUNES O Date 12/1/04 La Quinta, CA 92253 V RANCHO MIRAGE INDIAN WELLS No. 26664 (760) 771-8515 d PALM DESERT .��, LA INDIO Q �� �O Owner La Quinta Investments, LLP APN # 770-020-020 Address 50-981 Washington St. Jurisdiction La Quinta City La Quinta Zip 92253 Permit # Tract # Study Area Type Commercial Addition No. of Units Lot # No. Street S.F. Lot # No. Street S.F. Unit 1 50981 Washington St. 1192 Unit 6 Unit 2 Unit 7 Unit 3 Unit 8 Unit 4 Unit 9 Unit 5 Unit 10 Comments At the present time, the Desert Sands Unified School District does not collect fees on garages/carports, covered patios/walkways, residential additions under 5 00 square feet, detached accessory structures (spaces that do not contain facilities for living, sleeping, cooling, eating or sanitation) or replacement mobile ho mes. It has been determined that the above-named owner is exempt from paying school fees at this time due to the following reason: Commercial Addition EXEMPTION NOT APPLICABLE This certifies that school facility fees imposed pursuant to Education Code Section 17620 and Government Code 65995 Et Seq. in the amount of $0.36 X 1,192 S.F. or $429.12 have been paid for the property listed above and that building permits and/or Certificates of Occupancy for this square footage in this proposed project may now be issued. Fees Paid By C/C-Guaranty Bank, Don Snook Check No. 2859855 Name on the check Telephone 802-7785 Finding Commercial By Dr. Doris Wilson Superintendent Fee collected Signature Barbuzza Payment Recd $429.12 $0.00 Over/Under NOTICE: Pursuant to Government Code SectiorOM20(d)(1), this will. serve to notify you that the 90 -day approval period in which you may protest the fees o r other payment identified above will begin to run from the date on which the building or installation permit for this project is issued, or from the date on which those amounts are paid to the District(s) or to another public entity authorized to collect them on the District('s) behalf, whichever is earlier. NOTICE: This Document NOT VALID if Duplicated Embossed Original -Building Department/Applicant Copy -Applicant/Receipt Copy -Accounting oto Craig E. Anthony Fire Chief Proudly serving the unincorporated areas of Riverside County and the Cities of: Banning Beaumont Calimesa Canyon Lake E+ Coachella Desert Hot Springs :- Indian Wells -c- Indio •.. Lake Elsinore La Quinta Moreno Valley e• Palm Desert �i Perris Rancho Mirage 4� San Jacinto Temecula Board of Supervisors Bob Buster, District 1 John Tavaglione, District 2 JeffStone, District 3 Roy Wilson, District 4 Marion Ashley, District 5 RIVERSIDE COUNTY FIRE DEPARTMENT 210 West San Jacinto Avenue • Perris, California 92570 • (951) 940-6900 . Fax (951) 940-6910 DateP— City of La Quinta Building Department The Riverside Cjgy Fire ep tment is granting the Fire clearance for the following location 0 1 Please call if you sl5uld have questions 760-863-8886 v Respectfully By �® _ Terry nY y Fire Systems Inspector TITLE 24 REPORT Title 24 Report for: Dyson & Dyson -Office Expansion 50981 Washington La Quinta, Ca 92253 Project Designer: John Stanford, Architect 73-350 EI Paseo Palm Desert, Ca 92260 (760) 776-8478 Mpl-'- Report Prepared By: w Tim Scott H & H Air Conditioning 74-991 Joni Drive #20 Palm Desert, CA 92260-2043 j (760) 340-3088 Job Number: Date: 3/29/06 CITY OF � SID PA BUILDING APPROVED FOR CONSTRUCTION �?eis �v�c� MAM r VBY� 1n\ APR 11 7.�06 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is rf authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: User Number: 5533 41 0Prlcr'— ,r 6-0/ / J TABLE OF CONTENTS Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM Envelope Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary Room Load Summary Room Heating Peak Loads Room Cooling Peak Loads Room Cooling Coil Loads EnergyPro 3.1 By EnergySoft Job Number: 1 2 3 13 17 ' 19 20 21 22 24 User Number: 5533 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 ROJECT NAME DATE ' Dyson &Dyson -Office Expansion 3/29106 =SS 50981 Washington La Quinta GNER-ENVELOP John Stanford, Architect (DOCUMENTATION AUTHOR H & H Air Conditioning 'BUILDING TYPE NONRESIDENTIAL PHASE OF CONSTRUCTION F-� NEW CONSTRUCTION Building Permit # (760) 776-8478 Checked by/Date -3088 Enforcement Agency Use 1,192 Sq.Ft. I 15 HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM {i 1X ADDITION R ALTERATION M EXISTING + ADDITION ;This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 16, of the State Building Code. This certificate applies only to a Building u ing the pe ormance compliance approach. 00CUMENT-ATION-AUTHOR SIGNATU DATE Tim Scott 06_ iThe-- Principal Designers hereby certify that the proposed building design represented in the construction documents and Odell _d +for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this i ,permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 124, Part 6. 1 ENV. LTG. MECH. • ` _ J F-] F-] 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. I 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section - 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. i-1 n E] 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) • Indicate location on plans of Note Block for Mandatory Measures i Required Forms ENVA PRIN-CIPAL-ENVELOPE-DESTGNER - NAM Si- T LIC-NO— John Stanford, Architect C�GS%3 Indicate location on plans of Note Block for Mandatory Measures Required Forms j LTG -1 ;PRINCIPAL LIGHTING DESIGNER - NAME III SIGNATURE LIC. NO. DATE i I Indicate location on plans of Note Block for Mandatory Measures Required Fo ms MEC -1, MECH-2, MECH-3 __ _ PRINCIPAL MECHANICAL DESIGNER -NAME Conditioning SIGN LIC. NO. S/ c1S61� DATE _129_%%6 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 25 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 • . PERF -1 Dyson & Dyson -Office Expansion 3/29/06 ANNUAL SOURCE ENERGY USE SUMMARY u sq -yr • ENERGY COMPONENT Standard Design Proposed Design Compliance Margin (-s�ada�d�_� r ;P�oposed Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process TOTALS: 1.26 1.01 0.25 �w , � � �, i$''� �1���a£ �-• 70.72 61.41 9.31``"8 24.66 26.93 -2.27xT 0.00 0.00 0.00 0.00 0.00 0.00 8.64 8.64 0.00 35.23 28.19 7.05 22.65 22.65 0.00 0.00 0.00 0.00 163.17 148.83 14.35 10r 20 F: 30 ra40 50fi070< INAR GENERAL INFORMATION Building Orientation (Nath) 0 deg Conditioned Floor Area 1,192 sqft. Number of Stories 1 Unconditioned Floor Area o sqft. Number of Systems 1 Conditioned Footprint Area 1,192 sqft. Number of Zones 1 Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (North). 75 sqft. 18 sqft. 24.0% Left Elevation (East) 240 sqft.. 72 sqft. 30.0% Rear Elevation (South) 610 sqft. 177 sqft. 29.0% Right Elevation (West) 320 sgft. 36 sqft. 11.2% Total 1,245 sgft. 303 sqft. Roof 1,192 sqft. sqft. 0.0% 'Standard Proposed Lighting Power Density, 1.200 wisgft. 0.961 wisgft. Prescriptive Env. Heat Loss 296 352 Prescriptive 'Env. Heat Gain 37,310 46,094 Remarks: Run InitiationTime: un Code: 1143665672 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: PageA of 25 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 1 Dyson & Dyson -Office Expansion 1 3/29/06 I IIC IVla1 CII-VII.CIIICI... CIR.y 1IIUUIY Flay DPVC Ial allC11u VJI IV LIIV ILVIIIJ .IP=WIICu III LIIID l.1 NIC%IIDlI1 . I IICDC IlC1D icqu11C bpvwa1 WIIIICII justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification ina aocumemaaon suomittea. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. •Authorized Signature or Stamp Kurt Initiation I Irne: US/19/Ub 1'1:54:3'1 Kurt yocie: 114JIbbbb/1 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:5 of 25 Floor Area System Name Zone Name Occupancy Type (sqft.) Inst. LPD (W/sf)1 Port. LPD (W/sf)1 Ctrl. Credits (W/sf)2 lailoreci Proc. Loads (W/sf) (W/sf)3 HVAC -1 1st Floor Comp Bldg Office 1,192 0.961 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation I IIC IVla1 CII-VII.CIIICI... CIR.y 1IIUUIY Flay DPVC Ial allC11u VJI IV LIIV ILVIIIJ .IP=WIICu III LIIID l.1 NIC%IIDlI1 . I IICDC IlC1D icqu11C bpvwa1 WIIIICII justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification ina aocumemaaon suomittea. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. •Authorized Signature or Stamp Kurt Initiation I Irne: US/19/Ub 1'1:54:3'1 Kurt yocie: 114JIbbbb/1 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:5 of 25 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 ROJECT NAME DATE Dyson & Dyson -Office Expansion 3/29/06 OPAQUE 5UKFA(;F-5 SHGC Glazing Type Location / Comments 1 Window 18 0.870 0 0.59 # Surface Type Framing Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 1 Roof Wood 1,192 0.035 0 0 X I I R-30 Roof(R.30.2x12.16) 1st Floor 2 Wall Wood 57 0.065 0 90 X1 JR-19Wall (W.19.2x6.16) 1st Floor 3 Wall Wood 136 0.065 90 90 X R-19 Wall (W.19.2x6.16) 1st Floor 4 a o0 32 Double Metal Tinted Default 1st Floor X a x6.16) Ist Floor 0.59 aWood 1st Floor 9 Window 42 0.720 180 X a x -sf FVoor 6 a o0 180 65 2 1st Floor X a x6.16) Ist Floor 7 a o0 1st Floor 5 12 Window 18 0.870 X a x1st Floor 1st Floor WWI— Wood 18 0.870 315 0.59 Dual Metal Tinted X a x6.16) 1st Floor # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Hgt. xt. xt. Dist. Len. Fin Right Fin Hgt. D ist. Len. H gt. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 3.0 7.0 2.0 0.1 2.0 2.0 6 None 0.76 3.0 7.0 2.0 0.1 2.0 2.0 7 None 0.76 8 None 0.76 9 None 0.76 10 None 0.76 11 None 0.76 12 None 0.76 • 13 None 0.76 6.5 9.0 0.0 0.0 0.0 0.0 Site Assembled Glazing [] l.11eGK UUA II DUIIUIng IS iuv,vuv syn of t,rm anu iu,uvu sgrt verucai giazmg rnen iNirra, L eruncauon is requires. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area JU-Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 18 0.870 0 0.59 Dual Metal Tinted 1st Floor 2 Window 42 0.850 90 0.59 Double Metal Tinted Default 1st Floor 3 Window 12 0.720 90 0.59 Dual Metal Tinted 1st Floor 4 Window 18 0.870 135 0.59 Dual Metal Tinted 1st Floor 5 Window 21 0.870 180 0.59 Dual Metal Tinted 1st Floor 6 Window 21 0.870 180 0.59 Dual Metal Tinted 1st Floor 7 Window 21 0.850 180 0.59 Double Metal Tinted Default 1st Floor 8 Window 18 0.870 180 0.59 Dual Metal Tinted 1st Floor 9 Window 42 0.720 180 0.59 Dual Metal Tinted 1st Floor 10 Window 36 0.720 180 0.59 Dual Metal Tinted 1st Floor 11 Window 18 0.870 225 0.59 Dual Metal Tinted 1st Floor 12 Window 18 0.870 270 0.59 Dual Metal Tinted 1st Floor 13 Window 18 0.870 315 0.59 Dual Metal Tinted 1st Floor # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Hgt. xt. xt. Dist. Len. Fin Right Fin Hgt. D ist. Len. H gt. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 3.0 7.0 2.0 0.1 2.0 2.0 6 None 0.76 3.0 7.0 2.0 0.1 2.0 2.0 7 None 0.76 8 None 0.76 9 None 0.76 10 None 0.76 11 None 0.76 12 None 0.76 • 13 None 0.76 6.5 9.0 0.0 0.0 0.0 0.0 Run Initiation Time: 03/29106 12:54:32 Run ode: 1143665672 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:6 of 25 • is CERTIFICATE OF COMPLIANCE Performance MECH-1 Dyson & Dyson -Office Expansion 3/29/06 CODE TABLES. Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: NoVENTILATION ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES MEGHANIGAL 5Yb I tM5 ELECTRIC HEAT? NOTE TO FIELD SYSTEM NAME DHW Heater I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? HVAC -1 HEAT AND COOL SUPPLY RESET? OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Outdoor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? Programmable Switch NOTES TU FIELD - For building Department n/a ^��r�,rr,rrrr-ar: x �1e TIME CONTROL SETBACK CONTROL n/a Heating & Cooling Requir ISOLATION ZONES n/a n/a HEAT PUMP THERMOSTAT? n/a Yes ELECTRIC HEAT? n/a 0.0 kW FAN CONTROL n/a Constant Volume VAV MINIMUM POSITION CONTROL? n/a No SIMULTANEOUS HEAT/COOL? n/a No HEATING SUPPLY RESET n/a Constant Temp COOLING SUPPLY RESET n/a Constant Temp HEAT REJECTION CONTROL n/a n/a VENTILATION n/a Air Balance OUTDOOR DAMPER CONTROL n/a Auto ECONOMIZER TYPE n/a No Economizer DESIGN O.A. CFM (MECH-3, COLUMN I) n/a 143 cfm HEATING EQUIPMENT TYPE Gas Fired Heat Pump HEATING EQUIPMENT EFFICIENCY 78% 7.20 HSPF COOLING EQUIPMENT TYPE Existing DWH Split DX COOLING EQUIPMENT EFFICIENCY n/a 12.0 SEER / 10.2 EER OUJAUbUb MAKE AND MODEL NUMBER n a PIPE INSULATION REQUIRED? Yes Yes PIPE/DUCT INSULATION PROTECTED? Yes Yes HEATING DUCT LOCATION R -VALUE n/a n/a Ducts in Attic 4.2 COOLING DUCT LOCATIO R -VALUE n/a n/a Ducts in Attic 4.2 CEILING/ROOF SPACE n/a No CODE TABLES. Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: NoVENTILATION ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Outdoor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC NOTES TU FIELD - For building Department Use Only ^��r�,rr,rrrr-ar: x �1e Kun Inlilailon I Ime: uatzmuo ic.aun vvuc. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:9 of 25 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 Dyson & -Office Expansion DATE 3/29/06 �i Energy Factor or Recovery Efficiency Efficiency Tons PUMPS System Type Distribution Type i Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control 50 0.52 n/a 12 l— 77.0% 100.0% none 1. II J I EATING COOLING System Name - Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type ,CARRIER 50JX0605 -- --J I �i CENTRAL SYSTEM FAN SUMMARY Energy Factor or Recovery Efficiency Standby Loss or Pilot TANKINSIIL. System Name System Type Distribution Type Qt Rated Input Vol. (Gals.) Ext. R -Val. Existing DWH Small Gas Standard 1 40,000 50 0.52 n/a 12 l— 77.0% 100.0% none 1. II J I EATING COOLING System Name System Type Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type ,CARRIER 50JX0605 Split DX 1 57,000 0.0 7.20 HSPF 60,000 42,00012.0 SEER / 10.2 EERNo Economizer —1 I CENTRAL SYSTEM FAN SUMMARY i SUPPLY FAN RETURN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive' Eff. ICAR RIER 50 X016105 Constant Volume Draw -Through 2,000 0.75 77.0% 100.0% none i I EnergyPro 3.1 By EnergySofl User Number: 5533 Job Number: Page: 10 of 25 4 r-4 L MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECE2: PROJECT NAME Dyson & Dyson -Office Expansion DATE 3/29/06 ONE TERMINAL SUMMARY Zone Name System Type Qty. Min. CFM Ratio Reheat Coil CFM BHP Motor Eff. Drive Eff. Type Output Type DeltaT Room Name Qty. CFM BHP Motor Eff. Drive Eff. Room Name Qty. CFM BHP Motor Eff. Drive Eff. Un Initiation Time: Un Code: 1143665672 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 11 of 25 MECHANICAL VENTILATION MECH-3 1 Dyson & Dyson -Office Expansion I - 3/29/06 a ©© o 0 0© o a a o AREA BASIS COND. MIN. AREA CFM CFM (SF) PER SF (B x C) 1,192 0.15 179 OCCUPANCY BASIS NO. CIF MIN. OF PER CFM PEOPL PERSON (EXF) Total REQ'D O.A. (MAX OF DORG) 179 179 DESIGN OUTDOOF VAV TRANS. AIR MIN. FER CFM RATIO AIR 143 36 143 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:12 of 25 is ENVELOPE MANDATORY MEASURES ENV -MM Dyson & Dyson -Office Expansion 3/29/06 DESCRIPTION Designer Enforcement, U§ 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. [X §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. XX] §117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). LXJ § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. I r EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:13 of 25 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM Dyson & Dyson -Office Expansion 3/29/06 DESCRIPTION IDesigner JEnforcement Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. j� § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with j Standards Section 123. L"J § 124 Air handling duct systems shall be installed and insulated in compliance with t Sections 601, 603 and 604 of the Uniform Mechanical Code. j Controls § 122(e) Each space conditioning system shall be installed with one of the following: U§ 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different I schedules for weekdays and weekends; incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or i § 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall -be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. u § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. `� § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. Fj§ 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 17 of 25 1 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM •PROJECT NAME DATE Dyson & Dyson -Office Expansion 3/29/06 .a Description Designer Enforcement Ventilation § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. U§ 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 1��0 All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. § 121(f)l Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(02 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design'of the ventilation system; or �J § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or IJ § 121(f)4 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. L"_J § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. [X] § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per i minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 18 of 25 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME Dyson & Dyson -Office Expansion lJTJ I tM NAMt HVAC -1 Number of Systems !Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sqft) 47.8 ;Cooling System Output per System 60,000 Total Output (Btuh) Total Output (Tons) 60,000 5.0 Total Output (Btuh/sqft) 50.3 i Total Output (sgftrron) 238.4 lAir System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.68 Airflow (cfm/Ton) 400.0 1 Outside Air (%) 7.2 j Outside Air (cfm/sqft) 0.12 ! Note: values above given at ARI conditions 26.0 of ! Outside Ai 143 cfm i 69.4 OF 107.0/73.6OF i�� i Outside Ai i 143 cfm 74.8 / 63.6 of 66.3 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD DATE 3/29/0.6 _ FLOOR AREA 1,192 COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent CFM Sensible 2,274 36,157 3,497 1,832 25,920 56.1% R.H. ROOMS 0 74.0 / 63.4 of 1,296 0 1,808 0 143 4,894 147 143 6,605 0 0 1,808 1,296 ",666T773,644 35,117 CARRIER 50JX0605 40,316 13,852 37,488 Total Adjusted System Output 40,316 13,852 37,488 (Adjusted for Peak Design Conditions) i TIME OF SYSTEM PEAK Sep 3 pm Jan 12 am Heating Coil 83.9 of 83.9 of _�Tf Supply Fan 2000 cfm Rotiirn Air niirtc 77.1 164.4 of . 58.2 / 57.2 of Cooling Coil Supply Air Ducts 83.3 of ROOMS! J 70.0 of ! 58.2 / 57.2 of Supply Air Ducts k Return Air Ducts 4 ! EnergyPro 3.1 By Energysoft User Number: 5533 Job Number: Page: 19 of 25 Supply Fan 59.1 / 57.5 of 2000 cfm 56.1% R.H. ROOMS 74.0 / 63.4 of k Return Air Ducts 4 ! EnergyPro 3.1 By Energysoft User Number: 5533 Job Number: Page: 19 of 25 ROOM LOAD SUMMARY PROJECT NAME Dyson & Dyson -Office Expansion DATE 3/29/06 SYSTEM NAME HVAC -1 FLOOR AREA 1,192 IROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE 1st Floor I—st Floor 1 2,274 36,157 3,497 2,274 36,157 3,497 1,832 25,920 PAGE TOTAL 2,274 36,157 3,497 1,832 25,920 TOTAL 1 2,274 36,157 3,497 1,832 25,920 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:20 of 25 ROOM HEATING PEAK LOADS on & Dyson -Office Expansion 3/29/06 Room Information Design Conditions Room Name 1st Floor Time of Peak Jan 12 am Floor Area 1,192 Outdoor Dry Bulb Temperature 26OF Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value AT of Btu/hr R-30 Roof (R.30.2x12.16) 1,192.0 X 0.0347 X 44.0 = 1,B21 R-19 Wall (W.19.2x6.16) 942.0 x 0.0655 x 44.0 = 2,713 Dual Metal Tinted 150.0 X 0.8700 X 44.0 = 5,742 Double Metal Tinted Default 63.0 x 0.8500 X 44.0 = 2,356 Dual Metal Tinted 90.0 X 0.7200 X 44.0 = 2,851 Slab -On -Grade perimeter= 130.0 x x 44.5 = 5,785 X X = I X X = x X = X X = X X = X X = X X = X X = X X = x X X x X X X X X x X X = X X X X j X X X X X x = X X = X X x X X X = X X = x X x X = X X = x X x X = x X = X X = X X = Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 21,269 Infiltration: [ 1.00 X 1.064 X 1,192 X 10.00 X 0.50 / 6] X Schedule Air ensi a Area Ceili�eig t AC pT Fraction • TOTAL HOURLY HEAT LOSS FOR ROOM 25,920 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 21 of 25 ROOM COOLING PEAK LOADS F Dyson & Dyson -Office Expansion 1 3/29/06 1 Room Name 1st Floor Time of Peak Sep 3 pm :Floor Area 1,192 Outdoor Dry Bulb Temperature 107 � Indoor Dry Bulb Temperature 74`� Outdoor Wet Bulb Temperature 74 • Conduction R-30 Roof(R.30.2x12.16) R-19 Wall (W.19.2x6.16) Dual Metal Tinted 12-19 Wall (W.19.2x6.16) Double Metal Tinted Default i - Dual Metal Tinted R-19 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) Dual Metal Tinted Area 1,192.0 57.0 108.0 136.0 63.0 54.0 32.0 341.0 42.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0347 0.0655 0.8700 0.0655 0.8500 0.7200 0.0655 0.0655 0.8700 Orientation Area SGF SC X X X X x X x X X DETD 1 = = = = = 50.0 30.7 22.1 32.8 22.1 29 0.657 (East) 12.0 (North) 18.0 X X X X X X x X x X 29 X X X x X X X X X X 0.657 (East) 42.0 29 0.657 (East) 12.0 29 0.657 (Southeast) 18.0 29 0.657 (South) 21.0 42 0.657 (South) 21.0 42 0.657 (South) 21.0 125 0.657 (South) a 18.0 125 0.657 (South) 42.0 125 0.657 (South) 36.0 1251 1 0.657 Page Total Weighting Factor X 0.766 = X 2.093 = X 2.093 = X 2.822 = X 0.782 = X 0.782 = X 0.842 = X 0.842 = X 0.842 c X 0.842 = Page Total Btu/hr 2,068 115 2,078 292 1,184 890 71 995 808 8,501 Btu/hr 262 1,674 478 967 457 457 1,451 1,244 2,902 2,487 12,380 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.0 x 1,192 x 0.961 Watts/sqft x 3.41Btuh/Watt x 0.998 = 3,900 Occupants 1.00 X 1,192 X 300 Btuh/OCc. / 12 sgft/OCc. X 1.00 = 2,861 Receptacle 1.00 X 1,192 X 0.000 Wattslsgft x 3.41 Btuh/Watt X 1.00 = 0 Process X 1,192 X 0.000 Watts/sgft x 3.413 Btuh/VVatt x 1.00 = 0 Infiltration: 1.0o X _ 1.064 X 1,192 X _10_00 X 0.50 / 60] X 38 = 4,017 the u e Air Sensible Area eiling Heigh ACN pT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupan st 1.00 X 1,192 X 300 Btuh/OCc. / 125 sgft/OCc. Receptacle 1.00 x 1,192 x 0.000 Watts/sgft xj 3.413 Btuh/Watt = 0 Process 1.00 X 1,192 X 0.000 Watts/sgft x 3.413 Btuh/Watt = 0 Infiltration: X 4771 x 1 192 x _ 10.00 X 0.50 / 60� x 0.00134 = 636 Lch-e-IR310], Ai"r � en Area eiling Neigh AC Qyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,491 EnergyPro 3.1 By EnergySoft User Number: 5533 Page:22 of 25 ROOM COOLING PEAK LOADS Dyson & Dyson -Office Expansion 3/29/06 (Room Name 1st Floor ,Floor Area 1,192 Indoor Dry Bulb Temperature 74�: Time of Peak Sep 3 pm Outdoor Dry Bulb Temperature 107 `k Outdoor Wet Bulb Temperature 74 Conduction Area X X X X X X X X X U -Value X X X X X X X X X DETD 1 = = = = = = = = = Btu/hr Dual Metal Tinted 36.0 0.7200 22.9 594 R-19 Wall (W.19.2x6.16) 92.0 0.0655 53.8 324 R-19 Wall (W.19.2x6.16) 172.0 0.0655 51.1 576 R-19 Wall (W.19.2x6.16) 112.0 0.0655 37.0 271 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total 1,764 Solar Gain Orientation Area X X X X X X X X X X SGF X x X X X X X X X X SC (Southwest) 18.0 260 0.657 (West) 18.0 238 0.657 (Northwest) 18.0 73 0.657 Weighting Factor X 0.437 = X 0.356 = X 0.447 = X = X = X = X = X = X = X Page Total Btu/hr 1,345 1,002 386 2,733 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.0( x 1,192 x 0.961 Watts/sgft x 3.413 BtuhlWatt x 0.998 = 3,900 Occupants 1.0 X 1,192 x 300 Btuh/occ. / 125 sgft/occ. x 1.00 = 2,861 Receptacle 1.00 X 1,192 X 0.000 Watts/sgft x 3.413 Btuh[Watt x 1.00 = 0 Process LIN-e--d-ul]e 010 X 1,192 X 0.000 Watts/sgft X 3.413 Btuh/Watt x 1.00 = 0 Infiltration: 1. x _ 1.064 x 1,192 X g 10.9 O x 0.50 / 6� x A'ir Sensi6 a Area Ceilin Hei -h C Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 x 1,192 X 300 Btuh/occ. / 125 SgftloCC. = 110 Receptacle 1.00 X 1,192 X 0.000 Watts/sgft X 3.413 Btuh/WattProcess 1.00 x 1,192 x 0.000 Watts/sgft x 3.413 BtuhlWatt • ` Infiltration:Lch�-elauooe X 4771 X 1 192 X 10.00 x 0.50 /6 X 636 Air l -a n Area Ceiling Heigh C Qyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 23 of 25 ROOM COOLING COIL LOADS 1 Dyson & Dyson -Office Expansion 1 3/29/06 11 lRoom Name 1st Floor Time of Peak Sep 3 pm Floor Area 1,192 Outdoor Dry Bulb Temperature 107 Ilndoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 74 `l Conduction -30 Roof(R.30.2x12.16) -19 Wall (W.19.2x6.16) ual Metal Tinted -19 Wall (W.19.2x6.16) ouble Metal Tinted Default ual Metal Tinted -19 Wall (W.19.2x6.16) -19 Wall (W.19.2x6.16) ual Metal Tinted Area 1,192.0 57.0 108.0 136.0 63.0 54.0 32.0 341.0 42.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0347 0.0655 0.8700 0.0655 0.8500 0.7200 0.0655 0.0655 0.8700 Orientation Area SGF SC X X X X x x X X X DETD 1 = = = = = = = = = 50.0 30.7 22.1 32.8 22.1 22.9 34.0 44.6 22.1 (North) 18.0 X X x X X X X X X X 29 X x X X X X X X X X 0.657 (East) 42.0 29 0.657 (East) 12.0 29 0.657 (Southeast) 18.0 29 0.657 (South) 21.0 42 0.657 (South) 21.0 42 0.657 (South) 21.0 125 0.657 (South) 18.0 125 0.657 (South) 42.0 125 0.657 (South) 36.0 125 0.657 Page Total Weighting Factor X 0.766 = X 2.093 X 2.093 = X 2.822 = X 0.782 = X 0.782 = X 0.842 = X 0.842 = X 0.842 = X 0.842 = Page Total Btu/hr 2,0681 115 2,078 --__- 292 1,184 -- 890 71 995 808 8,501 Btu/hr 262 1,6_74 478 967 457 4571 1,4511 1,244 2,902 2,487 18321 832 0, Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.00 X 1,192 X 0.961 Watts/sqft X 3.413 Btuh/Watt X 0.998 = 3,900 Occupants 1.0 X 1,192 X 300 Btuh/occ. / 125 sgft/occ. X 1.00 = 2,861 Receptacle 1.0 x 1,192 X 0.000 Watts/sgft X 3.41 Btuh[Watt X 1.00 = 0 Process 1.0 X 1,192 X 0.000 Watts/sqft x 3.413 Btuh/Watt X 1.00 = 0 Infiltration: 1.00 X 1.064 x 1,192 x _10_00 x 0.50 / 6] x 38 = 4,017 S�edule Air Sensible Area ening Neigh ACH J p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1,192 X 300 Btuh/OCC. I 125 sgft/OCC. = 2,861 Receptacle 1.00. X 1,192 X 0.000 Watts/sgft X 1 3.4131 BtuhlWatt 0 lProcess 1.00 x 1,192 x 0.000 Watts/sgft x 1 3.4131 BtuhfWatt = 0 Infiltration: Lcfhielcioe x x x x 160X 4 771 1 192 10.00 0.50 ] 000134 = L 636I Air Lat n Area ei mg Heeggf, ACH QW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 I EnergyPro 3.1 By EnergySoft User Number: 5533 Page:24 of 25 ROOM COOLING COIL LOADS project Title Date Dyson & Dyson -Office Expansion 3/29/06 IROOM INFORMATION DESIGN CONDITIONS Room Name 1st Floor Time of Peak Sep 3 pm Floor Area 1,192 Outdoor Dry Bulb Temperature 107 1: Indoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 74 c� Conduction Dual Metal Tinted R-19 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) Area X X X X X X X X X U -Value X X X X X X X X X 36.0 0.7200 92.0 0.0655 172.0 0.0655 112.0 0.0655 238 0.657 (Northwest) 18.0 73 0.657 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Orientation Area X x X x X X X X X X SGF x X x x X X x X X X SC (Southwest) 18.0 260 0.657 (West) 18.0 238 0.657 (Northwest) 18.0 73 0.657 DETD 1 22.9 = 51.1 = 37.0 = Page Total Weighting Factor x 0.437 = x 0.356 = X 0.447 = X x = X = X = x X = X = Page Total Btu/hr 594 324 576 271 1,764 Btu/hr 1,345 1,002 386 L�j 2,733 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor Lights 1.00 X 1,192 X 0.961 Wattslsgft X 3.413 Btutt x 0.998 = 3,900 Occupants x 1,192 X 300 Btuh/OCC. / 125 sgft/OCc. x 1.00 = 2,861 Receptacle 1.0( x 1,192 X 0.000 Watts/sgft x 3.413 Btuh[Watt x 1.00 = 0 Process 1.00 x 1,192 X 0.000 Watts/sgft x 3.413 Btuh/Watt x 1.00 = 0 Infiltration:Lch�i-elul. X _ 1.064 X 1,192 X 10.00 x 0.50 / 6] X 38 = 4,017 A'ir Sens.b a Area ceilm" g Heigh AC p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1,192 X 300 Btuh/OCC. I 125 SgftIOCC. = 2,861 Receptacle 1.00 X 1,192 X 0.000 Watts/sgft X 1 3.4131 BtuhMatt = 0 Process 1.00 X 1,192 X 0.000 Watts/sqft X3.4131Btuh/Watt = o Infiltration: 1.00 X 4 771 x 1 192 x 10.00 X 0.50 I 6 l X 0.00134 = 636 the u e Air La en Area ceiling eig AC J QW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 EnergyPro 3.1 By EnergySoft User Number: 5533 Page:25 of 25 0 TITLE 24 REPORT Title 24 Report for: Dyson & Dyson -Office Expansion 50981 Washington La Quinta, Ca 92253 'ITS;' OF LA QUINT/ buILDING & SAFETY DEPT. FOR CONSTRUCTIQN Project Designer: John Stanford, Architect 73-350 EI Paseo Palm Desert, Ca 92260 (760) 776-8478 Report Prepared By: Tim Scott H & H Air Conditioning 74-991 Joni Drive #20 Im Desert, CA 92260-2043 (760) 340-3088 A�Vj�i� 4 Pub & UAP04 Job Number: Date: 8/30/05 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. I This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3_1 _By EnergySoft Job Number: ^___ _' User Number: 5533` J Id I TABLE OF CONTENTS I Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM Envelope Mandatory Measures Form LTG -4 Tailored LPD Summary and Worksheet Form LTG -5 Room Cavity Ratio Worksheet Form LTG -MM Lighting Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary Room Load Summary Room Heating Peak Loads Room Cooling Peak Loads Room Cooling Coil Loads 1 2 3 13 14 15 16 17 19 20 21 22 24 EnergyPro 3.1 By EnergySoft Job Number: User Number: 5533 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME Dyson & Dyson -Office Expansion This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and DATE 8/30/05 PROJECT ADDRESS 50981 Washington La Quinta The Principal Designers hereby certify that the proposed building design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this Building Permit # PRINCIPAL DIG ESNER - ENVEL6PE TELEPHONE John Stanford, Architect (760) 776-8478 DOCUMENTATION AUTHOR — H & H Air Conditioning TELEPHONE (760) 340-3088 Checked by/Date Enforcement Agency Use KUn Initiation I Inle: Ut$/.5U/U5 UU:4U:ss KUn GOae: IlZb4ZUUss jEnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 25 1 This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buildin using th performance compliance approach. UUCUMENTATfON AUTROK SIGNAT — DAT Tim Scott — Nn?/Q5 The Principal Designers hereby certify that the proposed building design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this 1,192 Sq.Ft. 15 ' BUILDING TYPE NONRESIDENTIAL 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION E] NEW CONSTRUCTION U ADDITION E] ALTERATION ❑ EXISTING + ADDITION KUn Initiation I Inle: Ut$/.5U/U5 UU:4U:ss KUn GOae: IlZb4ZUUss jEnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 25 1 This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buildin using th performance compliance approach. UUCUMENTATfON AUTROK SIGNAT — DAT Tim Scott — Nn?/Q5 The Principal Designers hereby certify that the proposed building design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. i lI—�� o 1 Ei 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section U 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. r� � 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) Indicate location on plans of Note Block for Mandatory Measures Required Forms ENVA 12 PRINCIPAL ENVECOFE-DESIGNER-NAME SIGN — LIC... DATE John Stanford, Architect �c G893 ILIGHTING COMPLIANCE Indicate location on plans of Note Block for Manda ry Measures • Required Forms 1 LTG -1 _ PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE 1 Indicate location on plans of Note Block for Mandatory Measures ECH-1, MECH-2, MECH-3 Requir Forms PRINCIPAL MECHANICAL DESIGNER - NAME SI URE LIC. NO. DATE H & H Air Conditioning /Dsb6 w -zo0 KUn Initiation I Inle: Ut$/.5U/U5 UU:4U:ss KUn GOae: IlZb4ZUUss jEnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 25 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PER Dyson & Dyson -Office Expansion DATE 8/30/05 ANNUAL 5OURGF_ F_NF_RGY USE SUMMARY u sq -yr ENERGY COMPONENT Standard Design Proposed Design Compliance Margin fiSraoda�d s i■eroposea..r Space Heating Space Cooling70.72 Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process TOTALS: 1.26 1.01 0.25 ` m'9�ce0o� U. 1dptl�� g"a`IX OHNE INP -Mi, �� x 61.41 9.31 24.66 26.93 -2.27 0.00 0.00 0.00ao°°" 0.00 0.00 0.00 8.64 8.64 0.00 35.23 28.19 7.05 22.65 22.65 0.00 0.00 0.00 0.00 163.17 148.83 14.35 �., n 0 ?i 60� r,kt er'kenisy"Y `: -� x GENERAL INFORMATION Building Orientation (North) 0 deg Conditioned Floor Area 1,192 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 1 Conditioned Footprint Area 1,192 sqft. Number of Zones 1 Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (North) 75 sqft. 18 sqft. 24.0% Left Elevation (East) 240 sqft. 72 sqft. 30.0% Rear Elevation (south) 610 sqft. 177 sqft. 29.0% Right Elevation (West)l 320 sqft. 36 sqft.11.2% Total 1,245 sqft303 sqft. 24.3% Roof 1,192 sqft. sqft. Eiig Standard Proposed Lighting Power Density 1'.200 wisgft. 0.961 wisgft. Prescriptive Env. Heat LOSS 296 352 Prescriptive Env. Heat Gain 37,310 46,094 Remarks: un Initiation Time: uno e: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:4 of 25' PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Dyson & Dyson -Office Expansion DATE 8/30/05 System Name Zone Name Occupancy Type Floor Area (sqft.) Inst. LPD (W/sf)1 Port. Ctrl LPD Credits (W/sf)1 (W/sf)2 lat ore Proc. Loads (W/sf) (W/sf)3 HVAC -1 1st Floor Comp Bldg Office 1,192 0.961 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTGA Items a ove require special documentation lie iocai enrorcement agency snouia pay special attention to the items specitnea in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run InitiationTime: 08/30105 un Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:5 of 25 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME Dyson & Dyson -Office Expansion DATE 8/30/05 OPAQUE SHGC SUKI-AL;tb Location I Comments 1 Window # Surface Framing Type Type Act. Area U -Fac. Azm. Solar Gains Tilt y/N Form 3 Reference Location / Comments 1 Roof Wood 1,192 0.035 0 0 X R-30 Roof (R.30.2x12.16) Double Metal Tinted Default 1st Floor 1st Floor 2 Wall Wood 57 0.065 0 1 90 X I I R-19 Wall (W.19.2x6.16) 1st Floor 1st Floor 3 Wall Wood 136 0.065 90 90 X I JR-19Wall (W.19.2x6.16) 1st Floor 4 a o0 32 65 135 90 X a x1st Floor -3-Wa-11 Window WoodX 180 a x St Floor 1st Floor a o0 5 X a x1st Floor 7a 8 oo . 5 270 90 X a x1st Floor Dual Metal Tinted aWood 9 Window X a x6.16) 1st Floor 0.59 Dual Metal Tinted 1st Floor 10 Window 36 0.720 180 0.59 Dual Metal Tinted 1st Floor 11 Window 18 0.870 225 0.59 Dual Metal Tinted 1st Floor 12 lWindow 18 0.870 270 0.59 Dual Metal Tinted 1st Floor 13 Window 18 0.870 315 0.59 Dual Metal Tinted 1st Floor # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Hgt. LExt.RExt. Dist. Left Fin Right Fin Len-.-R-gt. Dist. Len. HgF 1 None 0.76 2 None 0.76 3 Site Assembled Glazing �'.ecK uux �� oununiy is iuv,uvu syn vi k rm au iu,uuv sgrr verucai giazmg rnen ivrrck, uerunca[ion is requires. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location I Comments 1 Window 18 0.870 0 0.59 Dual Metal Tinted 1st Floor 2 Window 42 0.850 90 0.59 Double Metal Tinted Default 1st Floor 3 Window 12 0.720 90 0.59 Dual Metal Tinted 1st Floor 4 Window 18 0.870 135 0.59 Dual Metal Tinted 1st Floor 5 Window 21 0.870 180 1 0.59 Dual Metal Tinted 1st Floor 6 Window 21 0.870 180 0.59 Dual Metal Tinted 1st Floor 7 Window 21 0.850 180 0.59 Double Metal Tinted Default 1st Floor 8 Window 18 0.870 180 0.59 Dual Metal Tinted 1st Floor 9 Window 42 0.720 180 0.59 Dual Metal Tinted 1st Floor 10 Window 36 0.720 180 0.59 Dual Metal Tinted 1st Floor 11 Window 18 0.870 225 0.59 Dual Metal Tinted 1st Floor 12 lWindow 18 0.870 270 0.59 Dual Metal Tinted 1st Floor 13 Window 18 0.870 315 0.59 Dual Metal Tinted 1st Floor # Exterior Shade Type SHGC Window Hgt. Wd. Len. Overhang Hgt. LExt.RExt. Dist. Left Fin Right Fin Len-.-R-gt. Dist. Len. HgF 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 3.0 7.0 2.0 0.1 2.0 2.0 6 None 0.76 3.0 7.0 2.0 0.1 2.0 2.0 7 None 0.76 8 None 0.76 9 None 0.76 10 None 0.76 11 None 0.76 12 None 0.76 13 None 0.76 6.5 9.0 0.0 0.0 0.0 0.0 Run Initiation Time: 08/30/05 09:40:33 Run Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:6 of 25 LIGHTING COMPLIANCE SUMMARY Part 1 of 2 LTG -1 Dyson & Dyson -Office Expansion 1 8/30/05 1 LAMPS EAI I ARTS, Luminaire Code LUMINAIRE DESCRIPTION TYPE DESCRIPTION # Watts Per Lamp DESCRIPTION # (Lamp+BallasilTotal Watts # Watts Portfolio #C6032-6000 CFQ26W/G24d-3 1 26 Magnetic Standard 1.0 5 37.0 185 C Metallux #2G-3-32EB F32T8 3 32 Electronic 1.0 10 96.0 960 Lighting Schedule on Plans Shows Exterior Lighting Subtotal from this Page 1,145 Meets Total 1,145 Efficacy and Control Requirement of§130(c) Portable Lighting (From LTG -1) Control Requirements ofg131(f) Less Control Credit Watts (From LTG -3) Adjusted Actual Watts 1,145 CONTROL LOCATIO (Room # or Dwg. #) CONTROLIII CONTROL TYPE LUMINAIRES CONTROLLED IDENTIFICATION (Occupant, Daylight, Dimming, etc.) I ITVt i # UF LUMINATRi NOTE TO FIELD NOTE TO FIELD - For k3udding Uepartment Use Unly Run Initiation Time: un Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:7 of 25 LIGHTING COMPLIANCE SUMMARY Part 2 of 2 LTG -1 Dyson & Dyson -Office Expansion 1 8/30/05 1 I o 0 0 RQUIVI 1; DEFAUET OR ZONE ID (W/sgft) AREA oTAL WA l I (SF) (B X C) BUILDING TOTAL 1,192 0 TOTAL 0 0 F a o o a o 0 LUMIN. TASK # OF TOTAL TOTAL ROOM # PORTABLE LIGHTING # OF WATTS PER AREA TASK AREA (SF) WATTS ROOM # TOTAL AREA OR ZONE ID (SF) TOTAL 0 Designer needs to provide detailed documentation that the ligi level provided by the overhead lighting meets the needs of the space. The details include luminaire types, CU, and mounting locations relative to work areas. BUILDING SUMMARY TOTAL FROM TABLES IA(51a+1C ( ) TOTAL WATTS (FROM TABLES 1A+16) BUILDING TOTAL 1,192 0 Run Initiation Time: 05 un Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:8 of 25 CERTIFICATE OF COMPLIANCE Performance MECH-1 Dyson & Dyson -Office Expansion 1 8/30/05 1 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN I HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE Tb IN CEILING/ROOF SPACE ENS DHW Heater HVAC -1 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Gas Fired 78% Existing DWH n/a n/a Yes Yes n/a n/a n/a n/a n/a Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 143 cfm Heat Pump 7.20 HSPF Split DX 12.0 SEER / 10.2 EER TE Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Run Initiation Time: 08/30105 09:40:33 Run Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Pagel of 25 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it 13alance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural Auto G: Gravity it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Outdoor Air CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC NOTF-5 TO FIELD - or building Department Use Only Run Initiation Time: 08/30105 09:40:33 Run Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Pagel of 25 I MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME Dyson &Dyson -Office Expansion DATE 8/30/05 — _ Equipment Name__1 Energy Factor or Recovery Efficiency Standby Loss or Pilot Efficiency Tons Standard 1 40,000 PUMPS 0.52 n/a Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control 60,000 42,00012.0 _ SEER / 10.2 EEI No Economizer - -- ! _— Rated Vol. System Name System Type Distribution Type Qty Input (Gals.) Energy Factor or Recovery Efficiency Standby Loss or Pilot Existing DWH Small Gas Standard 1 40,000 50 0.52 n/a BHP Economizer Type CARRIER 50JX0605 Split DX 1 57,000 0.0 7.20 HSPF 60,000 42,00012.0 _ SEER / 10.2 EEI No Economizer - -- TANK INSUL] Ext. 1 R -Val. - j 1221 L=___ Run Initiation Time: 08/30/05 09:40:33 Run Code: 1125420033 ! EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 10 of 25 HEATING COOLING --� System Name System Type Qty. Output Aux. kW I Eff. Output SensibleEfficiency BHP Economizer Type CARRIER 50JX0605 Split DX 1 57,000 0.0 7.20 HSPF 60,000 42,00012.0 _ SEER / 10.2 EEI No Economizer - -- i ' s Run Initiation Time: 08/30/05 09:40:33 Run Code: 1125420033 ! EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 10 of 25 SUPPLY FAN RETURN FAN System Name Fan Type Motor Location CFM BHP Motor Eff. DriveMotor Eff. CFM BHP _ Drive ; Eff_ Eff [CARRIER 50JX0605 —'— Constant Volume Draw -Through 2,000 0.75 -- 77.0% - - --- 100.0% -- none -- - -- --i J Run Initiation Time: 08/30/05 09:40:33 Run Code: 1125420033 ! EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 10 of 25 MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME Dyson & Dyson -Office Expansion DATE 8/30/05 ZONE TERMINAL SUMMARY Zone Name System Type Qty. Min. CFM Ratio Reheat Coil CFM BHP Motor Eff. Drive Eff. Type Output lype DeltaT Room Name qty, CFM BHP Motor Eff. Drive Eff. Room Name qty, CFM BHP Motor Eff. Drive Eff. Run InitiationTime: 0 un Code: 1125420033 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 11 of 25 MECHANICAL VENTILATION MECH-3 Dyson & Dyson -Office Expansion 8/30/05 o a© o a o© n n n n ZONE/SYSTEM 1st Floor HVAC -1 AREA CFM CFM (SF) PER SF (B x C) 1,192 0.15 179 OCCUPANCY BASIS OFPER CFM PEOPI PERSON (ExF) T REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOOF AIR CFM VAV MIN. RATIO TRANS. FER AIR 179 143 36 179 143 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 12 of 25 ENVELOPE MANDATORY MEASURES ENV - I•1_1 Dyson & Dyson -Office Expansion 8/30/05 DESCRIPTION Designer Enforcement L] §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. �( §118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. U§ 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). L_J § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. I I I i i EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 13 of 25 TAILORED LPD SUMMARY and WORKSHEET Part 1 of 3 LTG -4 Dyson & Dyson -Office Expansion 1 8/30/05 -Illuminance a egories , ana U anO Uross 5aleS Area FA] a © 1. Watts for Illuminance Categories A -D (from column G) 0 watts 2. Watts for Illuminance Categories E -I (from LTG -4 Part 2) 0 watts 3. Watts for Display Lighting (from LTG -4 Parts 2 & 3) 7-01+1 OI + — 0 watts Public Area Display Sales Feature Floor Display Sales Feature Wall Display 4. Total Allowed Watts (lines 1+2+3) 0 watts a a -Illuminance a egories , ana U anO Uross 5aleS Area FA] a © o a a ROOM NAME TASKIACTIVITY ILLUMINANCE CATEGORY ROOM CAVITY RATIO FLOOR AREA ALLOWED LPD ALLOWED WATTS (E x F) list Floor A 1.50 0 0.20 0 BUILDING PAGE TOTAL TOTAL 01 1,192 SF WATTS 3.1 By EnergySoft User ROOM CAVITY RATIO WORKSHEET (RCR>=3.5) LTG -5 Dyson & Dyson -Office Expansion 1 8/30/05 O © a a o Room Name Task/Activity Description Room Area (A) Room Perimeter (P) Room Cavity Height (H) Room Cay. Ratio 2.5 x H x P /A EnergyPro 3.1 By Energysoft User Number: 5533 Job Number: Page: 15 of 25 LIGHTING MANDATORY MEASURES LTG -MM PROJECT NAME DATE Dyson & Dyson -Office Expansion 8/30/05 DESCRIPTION IDesigner lEnforcement § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. § 131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. l'J § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. fx- § 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling ;j l walls. `X I �I § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. [XI § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. § 131(f) Control of Exterior Lights: Exterior mounted fixtures served from the electrical panel inside the building are controlled with a directional photo cell control on the roof and a corresponding relay in the electrical panel, or uses an astronomical time clock. U § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. § 130(c) Efficacy of Exterior Lights: Exterior mounted fixtures with lamps over 100 Watts served from the electrical panel inside the building have a source efficacy of at least 60 lumens per Watt, or are controlled by a motion sensor. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 16 of 25 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM DA Dyson & Dyson -Office Expansion 8/30/05 DESCRIPTION V Designer Enforcement Equipment and Systems Efficiencies nc] §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. LX] § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. U§ 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: LXJ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or § 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the — system. U § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation r zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall 1 be controlled by a time control device as described above. 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. LX1 § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. i EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 17 of 25 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM EGT NAME DATE Dyson & Dyson -Office Expansion 8/30/05 Description Designer Enforcement Ventilation I [XI § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. [XI § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. Lj§ 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as J shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or U § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or u remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or U§ 121(f)4 Another method approved by the Commission. Service Water Heating Systems I § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of I automatically turning off the circulating pump(s) when hot water is not required. [X] I _ LJ § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the -- outlet temperature to 110 degrees F. i [Xl § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. I Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 18 of 25 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Dyson & Dyson -Office Expansion HVAC -1 Number of Systems i (Heating System i Output per System Total Output (Btuh) Output (Btuh/sqft) ---- !Cooling System i I Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sgft/Ton) I iAir System CFM per System I I Airflow (cfm) Airflow (cfm/sqft) J , Airflow (cfm[Ton) �I i Outside Air (%) j i Outside Air (cfm/sqft) I ' Note: values above given at ARI conditions 26.0 OF Outside E 143 cfm 69.4 OF 1107.0/73.6 OF i Outside Ai 143 cfm I 74.8 / 63.6 °F 57 57 47 Total Room Loads Return Vented Lighting Return Air Ducts .Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK ;FM Sensible Latent DATE 8/30/05 FLOOR AREA 1,192 COIL HTG_PEAK CFM I Sensible 44,666 3,644 ,000 CARRIER 50JX0605 40,316 — 13,852 1.68 00.0 Total Adjusted System Output 7'2 (Adjusted for Peak Design Conditions) 40,316 13,852 0.12 TIME OF SYSTEM PEAK Sep 3 pm iIGS (Airstream let 66.3 OF 83.9 OF Heating Coil me of Heatin—g 35,117 37,488 37,488 I Jan 12 ami 83.9 OF O Supply Air Ducts Supply Fan 83.3 OF 2000 cfm ROOMS_ 70.0 OF Return Air Ducts 2/57.2 OF 58.2/57.2 OF O Supply Air Ducts i Supply Fan 59.1/57.5 of I 2000 cfm56.1% R.H. ROOMS 74.0/63.4 OF I Return Air Ducts I EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: — PageA9 of 25 ROOM LOAD SUMMARY PROJECT NAME DATE Dyson & Dyson -Office Expansion 8/30/05 SYSTEM NAME FLOOR AREA HVAC -1 1,192 KUUIVI LUAU JUIVIIVIAKT ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE St oor 1st Floor 1 2,274 36,157 3,497 2,274 36,157 3,497 1,832 25,920 PAGE TOTAL TOTAL 2,274 36,157 3,497 11 1,832 25,920 2,274 36,157 3,497 1 1,832 25,920 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:20 of 25 ROOM HEATING PEAK LOADS JDyson & Dyson -Office Expansion 18/30/05 Room Information Design Conditions Room Name 1st Floor Time of Peak Jan 12 am Floor Area 1,192 Outdoor Dry Bulb Temperature 26OF Indoor Dry Bulb Temperature 70 OF Conduction Area U -Value AT of Btu/hr !R-30 Roof(R.30.2x12.16) 1,192.0 X 0.0347 X 44.0 = — 1,821 !R-19 Wall (W.19.2x6.16) 942.0 X 0.0655 x 44.0 = 2,713 Dual Metal Tinted 150.0 X 0.8700 X 44.0 = 5,7421 !Double Metal Tinted Default 63.0 x0.8500 X 44.0 = 2,356 Dual Metal Tinted 90.0 X 0.7200 X 44.0 = 2,851 (Slab-on_Grade _--_— perimeter= 130.0 x x 44.5 = 5,785 X X = X X = - -- X X = X X X X X X = X X = '- - - ---- X X = X X c X X = X X = ! X X - --I X X = i X X - -- - X X _ ---- I - --- -- X X X X I- -- - - ----- X X I x X - _-----_-- 1 h--- - -- -- ---- _ X X = X X = X X = I X X = X X = X X = - - ---- x X = X X_ - x X = X X = -- - — ---------- ---- - - ---I X X = ----� Items shown with an asterisk (') denote conduction through an interior surface to another room. r- - - -- Page Total: 21,269 Infiltration: 1.00 x 1_064 x 1,192 X r 10.00 x o.so / 61� x �� = L— a,651� LSchedule AiT Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 25,920 I- EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:21 of 25 ROOM COOLING PEAK LOADS (Project Title - Dyson & Dyson -Office Expansion Room Name ;Floor Area Ilndoor Dry Bulb Temperature Conduction R-30 Roof(R.30.2x12.16) R-19 Wall (W.19.2x6.16) Dual Metal Tinted R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Dual Metal Tinted 1 - -- - - R-19 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) ----- - Dual Metal Tinted 1st Floor ITime of Peak 1,192 Outdoor Dry Bulb Temperature 74'� Outdoor Wet Bulb Temperature Area 1,192.0 X 57.0 X 108.0 X 136.0 X 63.0 X 54.0 X 32.0 X 341.0 X 42.0 X 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain K_ . --- - -- -- -- B (Window --- Window D2 C I U -Value 0.0347 0.0655 0.8700 0.0655 0.8500 0.7200 0.0655 0.0655 0.8700 Orientation Area SGF SC 8/30/05 X X X X X X X X X DETD 1 = = = = = = = = = 50.0 30.7 22.1 32.8 22.1 22.9 --34.0 44.6 22.1 Page Total (North) 18.0 X X x X X X X x x X 29 X X X X x X X X x X 0.657 (East) 42.0 29 0.657 (East) 12.0 29 0.657 (Southeast) 18.0 29 0.657 (South) 21.0 42 0.657 (South) 21.0 42 0.657 (South) 21.0 125 0.657 (South) 18.0 125 0.657 (South) 42.0 125 0.657 (South) 36.0 125 0.657 Weighting Factor X 0.766 = X 2.093 = X 2.093 = X 2.822 = X 0.782 = X 0.782 = X 0.842 = X 0.842 = X 0.842 = x 0.842 = Page Total Sep 3 pm 107 74 Btu/hr -2,068 115 2,078 292 1,184 890 71 -- 995; 8081 Btu/hr 262 1,674 478 -- - --967, -- - - -45-7-: --_4571 1,451 1,244 2,902 2,487 12,380 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor Lights -- 1.00 X 1,192 x 0.961 Watts/sqft x 3.413 BtuhlWatt x 0.998 = 3,9001 ;Occupants 0 X 11192 X 300 Btuh/occ. / 1 5 sgft/occ. xE01 = 2,861 Receptacle 1.00 X 1,192 X 0.000 Watts/sqft x 3.41 Btuh/Watt X=0Process� 01 X 1,192 x 0.000 Watts/sqft x 3.413 Btuh/Watt X = -0, -__ Infiltration: Schedule X Air Se106e X Area192 X Ceiling H0.9 0 X ACH 50 / 60] X QT 38 = 4,017 Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Latent Gain Frac. Area Heat Gain Btu/hr O cc upants 1.00 X 1,192 X 300 Btuh/OCC. I 125 sgft/occ. Receptacle 1.00 x 1,192 X 0.000 Watts/sgft X 1 3.413 Btuh/Watt = 0 !Process r 1.00 X 1,192 X 0.000 Watts/sqft X 3.413 BtuhfWatt = o Infiltration: I 1.00 X _ 4771 X 1x192 X _ -10.00 x 0.50 /6� X OQ00134 = _ 636 -Schedule Air Latent Area ening Heigt ACH Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 I EnergyPro 3.1 By EnergySoft User Number: 5533 - _-- Page: 22 of 25 _ - ROOM COOLING PEAK LOADS j0roject Title _ L Dyson & Dyson -Office Expansion IROOM INFORMATION DESIGN CONDITIOW_ '1Room Name 1st Floor Time of Peak Floor Area 1,192 Outdoor Dry Bulb Temperature Ilndoor Dry Bulb Temperature 74CIz Outdoor Wet Bulb Temperature L._.. --- Conduction Dual Metal Tinted R-19 Wall (W.19.2x6.16) IrR-19 Wall (W.19.2x6.16) - - R-19 Wall (W.19.2x6.16) f� Area 36.0 92.0 172.0 112.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain 8/30/05 Sep 3 prn ' 107 74 _ 1 x x x x x X X x U -Value X X X X x x x X x DETD 1 Btu/hr = ---- -594'1 = 3241 = 9576X = = -- = = -� _ 0.7200 22.9 0.0655 53.8 0.0655 51.1 0.0655 37.0 0.657 (Northwest) 18.0 73 0.657 Orientation Area x x X x x x x x x x SGF x x x x x x x x x x SC (Southwest) 18.0 260 0.657 (West) 18.0 238 0.657 (Northwest) 18.0 73 0.657 _ x x x Page Total F1,764' Weighting Factor 0.437 = 0.356 = 0.447 = Page Total Btu/hr 11,345 r� ,002 386! Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lig 1.00 x 1,192 x 0.961 Watts/sgft x 3.413 Btuh/Watt x 0.998 = 3,900 Occupants � X 1,192 x 300 Btuh/OCC. / 125 sgft/occ. x 1.00 = 2,861 Receptacle 1.0 x 1,192 X 0.000 Watts/sqft x 3.413 Btuh[Watt x 1.00 = 0 Process 1.0 x 1,192 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.0o x _ 1.064 x 1,192 X _ _10.00 X 0.50 / 60] x 38 Fraction a Air Sensible Area Ceiling Reigh AC pT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Latent Gain Frac. Area Heat Gain Btu/hr 'Occupants - 1.00 X 1,192 x 300 BtuhIOCC. / 125 sgft/OCC. = io. Receptacle _ 1.00 x 1,192 x 0.000 Watts/sqft X 3.413 Btuh/Watt = jProcess1.00 x 1,192 x 0.000 Watts/sgft x3.413 Btuh/Watt Infiltration: 1.00 x 4 7714 771 x 1 191 192 x 10.00 x 0�.50 / 60 x 0.00134 6361 -Sche� LAir-Latent Area eilinC g Flei'gfit' gCR Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 L_ EnergyPro 3.1 By EnergySoft User Number: 5533 Page:23 of 25 , ROOM COOLING COIL LOADS Project Title Date Dyson & Dyson -Office Expansion 8/30/05 IROOM INFORMATION DESIGN CONDITIONS D Room Name 1st Floor Time of Peak Sep 3 pm i Floor Area 1,192 Outdoor Dry Bulb Temperature 107 `k t Ilndoor Dry Bulb Temperature - 74�: Outdoor Wet Bulb Temperature 74 Conduction R-30 Roof(R.30.2x12.16) ,R-19 Wall (W.19.2x6.16) Dual Metal Tinted - L_ R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Dual Metal Tinted R-19 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) Dual Metal Tinted `-- - - Area 1,192.0 57.0 108.0 136.0 63.0 54.0 32.0 341.0 42.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain A -- - 1K Window Window D2 C I J U -Value 0.0347 0.0655 0.8700 0.0655 0.8500 0.7200 0.0655 0.0655 0.8700 Orientation Area SGF SC (North) --- -- (East) I ___18.0 42.0 X X X X X X X x x x 29 29 x X X X X X X X x X _0.657 0.657 (East) 12.0 29 0.657 (Southeast) 18.0 29 0.657 (South) 21.0 42 0.657 (South) 21.0 42 0.657 (South) 21.0 125 0.657 (South) 18.0 125 0.657 (South) 42.0 125 0.657 (South) 36.0 125 0.657 DETD 1 50.0 = 30.7 = 22.1 = 32.8 = 22.1 = 22.9 34.0 = 44.6 = 22.1 = Page Total Weighting Factor x 0.766 = X 2.093 = X 2.093 = x 2.822 = X 0.782 = x 0.782 = X 0.842 = X 0.842 = X 0.842 = x 0.842 = Page Total Btu/hr X2,068 r--- - .. 115 j 2,078 292 1,184 890 71 995 808 8,5011 Btu/hr 2621 1,674 478 967 457 4571 1,451 1,244 E487 12,380 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights01 X 1,192 X 0.961 Wattslsgft x 3.413 Btuh[Watt x 0.998 = 3,900] Occu~ pants .0 x 1,192 X 300 Btuh/OCC. I 125 sqft/occ. x Lj =Receptacle 1.00 x 1,192 X 0.000 Watts/sqft x 3.413 BtuhfWatt x = 01 rocess - 1LS.61��.,d­uu 01 Q x 1,192 x 0.000 Watts/sgft x 3.413 Btuh[Watt x = Oj Infiltration: x 1.064 x 1192 x _10.00 x 0.50/60J x 4,017Air Sensible Area Ceiling Heigh ACEI p•T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Latent Gain Frac. Area Heat Gain Btulhr Occupants 1.00 x 1,192 x 300 Btuh/OCc. / 125 sgft/OCC. =ffN� Receptacle 1.00 x 1,192 x 0.000 Watts/sgft x 3.413 Btuh[Watt =�Process 1.00 x 1,192 x 0.000 Wattslsgft x3.413 Btuh/Watt =) Infiltration: 1.00 x - 4,771 x 1,192 x -10.00 x 0.50 / 6] x 0.00134 = 636 Schedule Air Latent - Area Ceiling Neigh AC Dyy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 _EnergyPro 3.1 By EnergySoft User Number: 5533 _ - Page: 24 of 25 - ROOM COOLING COIL LOADS iProject Title �J_Date Ii Dyson & Dyson -Office Expansion 8/30/05 IROOM INFORMATION DESIGN CONDITIOWr- Room Name 1st Floor Time of Peak Sep 3 pm Floor Area 1,192 Outdoor Dry Bulb Temperature 107 9: Indoor Dry Bulb Temperature 749: Outdoor Wet Bulb Temperature 74 �: _.J Conduction Dual Metal Tinted R-19 Wall (W.19.2x6.16) R -19 -Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) L i I_ Area 36.0 - - 92.0 172.0 112.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain X X x X X X X X I U -Value X X X X X X X X DETD 1 = = = = = = Btu/hr 594, i -324 I 576 271 0.7200 22.9 -- 0.0655 -53.8 0.0655 51.1 0.0655 37.0 (Northwest) 18.0 73 0.657 Orientation Area x x X x X X x X x x SGF x x x x x X x x x x SC (Southwest) 18.0 260 0.657 (West) 18.0 238 0.657 (Northwest) 18.0 73 0.657 Page Total E: 1,764 Weighting Factor 0.437 = 0.356 = 0.447 = Page Total Btu/hr 1,345 1,002 386 �L- - --� 2,733 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1. x 1,192 X 0.961 Watts/sqft x 3.413 Btuh/Watt x 0.998 = 3,900 Occupants 1.00 X 1,192 x 300 Btuh/occ. / 125 sgft/occ. X 1.00 = 2,861A Receptacle 01 0 X 1,192 X 0.000 Watts/sgft x 3.413 Btuh[Watt X 1.00 = I 0 Process lrs:.�ed0u. 1.0� X 1,192 X 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Infiltration: x 1.064 x 1,192 x - _10.00 x 0.50 / 60� x 38 Aii Sensible Area ening Heigfit ACH &T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 36,157 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants _ 1.00 X 1,192 X 300 Btuh/OCC. I �25 sgft/oCC.Lj Receptacle - 1_00x 1,192 x 0.000 Watts/sgft X 3.4Btuh/V11att =[Process - - --1_00 x L 1,192 x 0.000 Wattslsgft x 3.4BtuhlWatt = Infiltration:1.00 x _ en 4,771 x 1,192 X _ -10.00 x 0.50 / 60� X 0.00134 = 636 Sche-dule Air LatArea Ceiling Height ACFI �yy Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 EnergyPro 3.1 By EnergySoft User Number: 5533 Page:25 of 25 TITLE 24 REPORT Title 24 Report for: Dyson & Dyson -Office Expansion 50981 Washington La Quinta, Ca 92253 Project Designer: John Stanford, Architect 73-350 EI Paseo Palm Desert, Ca 92260 (760) 776-8478 Report Prepared By: Tim Scott H & H Air Conditioning 74-991 Joni Drive #20 Palm Desert, CA 92260-2043 (760) 340-3088 Job Number: 0 Date: 9/16104 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE f� 2 BY The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is I authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC (415) 883-5900. EnergyPro 3.1 By EnergySoft Job Number: _- _ - User Number: 5533 "ACFIC���o% I TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 13 Form LTG -4 Tailored LPD Summary and Worksheet 14 Form LTG -5 Room Cavity Ratio Worksheet 15 Form LTG -MM Lighting Mandatory Measures 16 Form MECH-MM Mechanical Mandatory Measures 17 HVAC System Heating and Cooling Loads Summary 19 Room Load Summary 20 Room Heating Peak Loads 21 Room Cooling Peak Loads 22 Room Cooling Coil Loads 24 EnergyPro 3.1 By EnergySoft Job Number: _ User Number: 5533 J ]PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 PROJECT ADDRESS 50981 Washington La Quinta Building Permit# FRIWCIP_AL_MTGRER-ENOEC0PE TELEPHONE John Stanford, Architect (760) 776-8478 DOCUMENTATION AUTHOR TELEPHONE Checked by/Date H & H Air Conditioning (760) 340-3088 Enforcement Agency Use ISTATEMENT OF COMPLIANCE I This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buil mg usin the performance compliance approach. IGN- DATE UOGUMENTATION-AUTROrllll��-'Is4LU_tf Tim Scott �q The Principal Designers hereby certify that the proposed building design represented in the construction documents an modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 1,192 Sq.Ft.7 ENV. LTG. MECH. 15 BUILDING TYPE �( NONRESIDENTIAL mechanical engineer, electrical engineer or architect. HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION NEW CONSTRUCTION �( ADDITION ❑ ALTERATION EXISTING + ADDITION ISTATEMENT OF COMPLIANCE I This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Buil mg usin the performance compliance approach. IGN- DATE UOGUMENTATION-AUTROrllll��-'Is4LU_tf Tim Scott �q The Principal Designers hereby certify that the proposed building design represented in the construction documents an modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. ❑ ❑ ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. o ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) Indicate location on plans of Note Block for Mandatory Measures Required Forms ENVA RINCIPAL ENVECOPFDESTGNER - NAM ILIU. NU. DATE --- John Stanford, Architect Indicate location on plans of Note Block for Manda ory Measures Required Forms LTG -1 PRINCIPAL LIGHTING DESIGNER - NAME Hegge SIGNATURE LIC. NO. 7C18/ DATE %'° "' { Electrical Contracting, Inc. ? / • Indicate location on plans of Note Block for Mandatory Measures Require Forms ECH-1, MECH-2, MECH-3 PRINCIPAL MECHANICAL DESIGNER - NAMESIG LIC. NO. DA H& H Air Conditioning�I0�6 b I q I I b (� M�a EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:3 of 25 PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERF -1 Dyson & Dyson -Office Expansion I DATE 9/16/04 7 ANNUAL SOURCE F -NF -RG= SUMMARY u sq -yr Standard Proposed Compliance ENERGY COMPONENT Design Design Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process 1.01 0.50 0.50 73.99 75.76 -1.76 33.72 33.47 0.25 0.00 0.00 0.00 0.00 0.00 0.00 8.64 8.64 0.00 35.23 28.19 7.05 22.65 22.65 0.00 o.00 o.00 o.00 TOTALS: 175.25 169.21 6.04 _. tanda rop°s RnoeP�arJ" x 0 10 20 30 40 50 60 70 ketulsgft-pr GENERAL INFORMATION Building Orientation (North) 0 deg Conditioned Floor Area 1,192 sgft. Number of Stories 1 Unconditioned Floor Area 0 sqn. Number of Systems 1 Conditioned Footprint Area 1,192 sqn. Number of Zones 1 Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (North) 75 sqft. 18 sgft. 24.0% Left Elevation (East) 240 sgft. 72 sgft. 30.0% Rear Elevation (south) 610 sgft. 135 sgft. 22.1% Right Elevation (west) 320 sgft. 36 sgft. 11.20% Total 1,245 sqn. 261 sgft. Roof 1,192 sgft. sqn. 0.0% Standard Proposed Lighting Power Density 1.200 wisgft. 0.961 w/sgft. Prescriptive Env. Heat Loss 278 257 Prescriptive Env. Heat Gain 34,011 35,383 emar s: Run InitiationTime: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: PageA of 25 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Dyson & Dyson -Office Expansion DATE 9/16/04 System Name Zone Name Occupancy Type Floor Area (sqft. Inst. MI LPD f)1 Port. LPD (W/sf)1 Ctrl. Credits (W/sf)2 failored Proc. Loads (W/sf) (W/sf) 3 HVAC Addition Comp Bldg Office 1,192 0.961 0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation he iocai emorcement agency snouwa pay special attention to the items specitied in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run Initiation Time: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:5 of 25 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME Dyson & Dyson -Office Expansion Area U -Fac. Act. Azm. DATE 9/16/04 Glazing Type Location / Comments 1 Window 18 0.530 0 0.46 Mtl Thermal Brk Tinted-Fleetwoc4ddition # Surface Framing Type Type Act. Area U -Fac. Azm. Solar Gains Tilt Y/N Form 3 Reference Location / Comments 1 Roof Wood 1,192 0.035 0 0 X1 jR-30Roof(R.30.2x12.16) Mtl Thermal BrkTinted- leetwo Addition 2 Wall Wood 57 0.065 0 90 X R-19 Wall (W.19.2x6.16) Addition 3 Wall Wood 136 0.065 90 90 X -1 a I .19.2x .16 Addition 4 Wall Wood32 Mtl ThermalBrk Tinted- leetwo X a x Addition Wal oo ddition X a x Addition 0.46 a oo 9 Window 18 0.530 a x . Addition T-Wa-fF--VVo-o-T-X -IFWa ddition 10 Window 18 0.530 270 a x Addition ition 11 Window oo 315 0.46 a x . Addition # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Fin Right Fin Hgt. xt. xt.is6'st.Len. Rgt. Dist. Len. gt. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 6 one 0.76 7 one 0.76 8 None 0.76 9 None 0.76 Site Assembled GlazingL;necK Dox it ttunamg is - iuu,uuu sgrt or U1 --A ana - iu,uuu sqn verticai glazing tnrra en rv; uemrication is requirea. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 18 0.530 0 0.46 Mtl Thermal Brk Tinted-Fleetwoc4ddition 2 Window 42 0.850 90 .59 Double Metal Tinted Default ddition 3 Window 12 0.450 90 0.46 Mtl Thermal BrkTinted- leetwo ddition 4 Window 18 0.530 135 0.46 Mti Thermal Brk Tinted-Fleetwoc Addition 5 Window 21 0.850 180 0.59 Double Metal Tinted Default ddition 6 Window 18 0.53 180 .4 Mtl ThermalBrk Tinted- leetwo d ition 7 Window 42 0.45W-180 Mtl ThermalBr Tinted-Fleetwo ddition 8 Window 36 0.450 180 0.46 Mtl Thermal Brk Tinted-Fleetwo ddition 9 Window 18 0.530 225 0.46 Mtl Thermal Brk Tinted-Fleetwo ddition 10 Window 18 0.530 270 0.46 t Thermalr anted -F eetwo ition 11 Window 18 0.530 315 0.46 Mtl Thermal BrkTinted- eetwo ddition # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Len. Left Fin Right Fin Hgt. xt. xt.is6'st.Len. Rgt. Dist. Len. gt. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 5 None 0.76 6 one 0.76 7 one 0.76 8 None 0.76 9 None 0.76 10 None 0.76 11 None 0.76 6.5 9.0 0.0 0.0 0.0 0.0 Run Initiation 7F -e09/16/04 08:51:53 Run Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:6 of 25 LIGHTING COMPLIANCE SUMMARY Part 1 of 2 LTG71 PROJECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 LAMPS I BALLASTS Luminaire Code LUMINAIRE DESCRIPTION TYPE DESCRIPTION# SPACE CONTROLLED Watts er Lamp DESCRIPTION # tLarnp # T canes Watts FTotal Watts Portfolio #C6032-6000 CFQ26W/G24d-3 1 26 Magnetic Standard 1.0 5 37.0 185 C Metallux #2G-3-32EB F32T8 3 32 Electronic 1.0 10 96.0 960 - or tsuilding Uepartmen se Unly Run InitiationTime: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number. Pagel of 25 Lighting Schedule on Plans Shows Exterior Lighting Subtotal from this Page 1,145 Meets Total 1,145 Portable Lighting (From LTG -1) �0 Efficacy and Control Requirement of§130(c) Less Control Credit Watts (From LTG -3) Control Requirements of§131(f) Adjusted Actual Watts 1,145 CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Exterior, etc.) SPACE CONTROLLED NOTE TO FIELD NOTE TO FIELD CONTROL LOCATION (Room # or Dwg. #) CONTROL IDENTIFICATION CONTROL TYPE (Occupant, Daylight, Dimming, etc.) LUMINAIRES CONTROLLED # OF LUMI1 NOTE TO FIELD - or tsuilding Uepartmen se Unly Run InitiationTime: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number. Pagel of 25 LIGHTING COMPLIANCE SUMMARY Part 2 of 2 LTG -1 Dyson & Dyson -Office Expansion 1 9/16/04 OR ZONE ID (W/sqft) (SF) (B X C) TOTAL 0 0 A] a a o a a a LUMIN. TASK # OF TOTAL TOTAL ROOM # PORTABLE LIGHTING # OF WATTS PER AREA TASK AREA (SF) WATTS EnergyPro 3.1 By EnergySoft User Number: 5533 goo Numoer: rayc.o V1 LU ROOM # OR ZONE ID TOTAL AREA (SF) Designer needs to provide detailed documentation that the lightin level provided by the overhead lighting meets the needs of the space. The details include luminaire types, CU, and mounting locations relative to work areas. TOTALI 0 BUILDING SUMMARY TOTAL AREA (SF) (FROM TABLES 1A+1B+1C) TOTAL WATTS (FROM TABLES 1A+1B) BUILDING TOTAL 1,192 0 un Initiation Time: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 goo Numoer: rayc.o V1 LU CERTIFICATE OF COMPLIANCE Performance MECH-1 Dyson & Dyson -Office Expansion 9/16/04 SYSTEM NAME TIME CONTROL SETBACK CONTROL ISOLATION ZONES HEAT PUMP THERMOSTAT? ELECTRIC HEAT? FAN CONTROL VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT/COOL? HEATING SUPPLY RESET COOLING SUPPLY RESET HEAT REJECTION CONTROL VENTILATION OUTDOOR DAMPER CONTROL ECONOMIZER TYPE DESIGN O.A. CFM (MECH-3, COLUMN 1 HEATING EQUIPMENT TYPE HEATING EQUIPMENT EFFICIENCY COOLING EQUIPMENT TYPE COOLING EQUIPMENT EFFICIENCY MAKE AND MODEL NUMBER PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? HEATING DUCT LOCATION R -VALUE COOLING DUCT LOCATIO R -VALUE CEILING/ROOF SPACE MECHANICAL SYSTEMS DHW Heater HVAC n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Gas Fired 78% Existing DWH n/a na Yes Yes n/a Na n/a Na n/a Programmable Switch Heating & Cooling Requir n/a Yes 0.0 kW Constant Volume No No Constant Temp Constant Temp n/a Air Balance Auto No Economizer 143 cfm Heat Pump 7.00 HSPF Packaged DX 10.0 SEER / 8.6 EER Existing Bryant HVAG Uni Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Run Initiation Time: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:9 of 25 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No ? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT / COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? it Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural 11 Auto G: Gravity 1 it W: Water N: Not Required EC: Economizer Control See Section 144(e)3 Enter Outdoor it CFM. Note: This shall be n less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPAC - or building Department Use Only Run Initiation Time: un Code: 1095349913 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:9 of 25 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME Dyson & Dyson -Office Expansion DATE 9/16/04 — System Type Efficiency Tons PUMPS Eff. Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. _- Pump I) Control 7.00 HSPF 57,500 40,25010.0 SEER / 8.6 EER No Economizer , f, J I Energy Factor or Recovery Efficiency Standby Loss or Pilot TANKINSUL. System Name System Type Distribution Type Qt Rated Input Vol. (Gals.) Ext. R -Val. Existing DWH Small Gas Standard 1 40,000 50 0.52 Na 12 CENTRAL SYSTEM FAN SUMMARY EATIt1G COOLING System Name System Type Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type I Existing Bryant HVAC Uri Packaged DX 1 57,000 0.0 7.00 HSPF 57,500 40,25010.0 SEER / 8.6 EER No Economizer , I - f CENTRAL SYSTEM FAN SUMMARY System Name Fan Type SUPPLY FAN Motor Drive Motor Location CFM BHP Eff. Eff. RETURN FAN__ Motorl Drive CFM BHP Eff. Eff. Existing Bryan VAC -U its Constant Volume Blow -Through 2,000 1.00 82.5% 100.0% 1 none - f EnergyPro 3.1 By EnergySoft User Number. 5533 Job Number: Page: 10 of 25 j MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 Dvson &Dvson-Office Expansion DATE 9/16/04 1 Zone Name Kun initiation iIsle: UU/1b/U4 UtS:al:SS Kun �,oae:-iuuas4uu-i.3 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:11 of 25 Room Name qty. CFM BHP Motor Eff. Drive Eff. Room Name qty. CFM System Type Qty. Min. CFM Ratio Reheat Coil CFM BHP Motor Eff. Drive Eff. Type Output Type DeltaT 'I i i r7t—1 i i I Kun initiation iIsle: UU/1b/U4 UtS:al:SS Kun �,oae:-iuuas4uu-i.3 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:11 of 25 Room Name qty. CFM BHP Motor Eff. Drive Eff. Room Name qty. CFM BHP Motor Eff. Drive Eff. 'I i i r7t—1 i i I Kun initiation iIsle: UU/1b/U4 UtS:al:SS Kun �,oae:-iuuas4uu-i.3 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page:11 of 25 MECHANICAL VENTILATION MECH-3 PROJECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 a ©© o 0 0© a o a o ZONE/SYSTEM Addition HVAC AREA BASIS COND. MIN. AREA CFM CFM (SF) PER SF (B x C) 1,192 0.15 179 OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOOF AIR CFM VAV MIN. RATIO TRANS. FER AIR 179 143 36 179 143 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 12 of 25 ENVELOPE MANDATORY MEASURES ENV -MM PROJECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 DESCRIPTION IDesigner lEnforcement �( §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. u §118(c) All Insulating Materials shall be Installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §117(a) All Exterior Joints and openings In the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. F] § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). U § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls In nonresidential buildings shall have Insulation with an Installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 13 of 25 TAILORED LPD SUMMARY and WORKSHEET Part 1 of 3 LTG -4 Dyson & Dyson -Office Expansion 1 9/16/04 1. Watts for Illuminance Categories A -D (from column G) 0 watts 2. Watts for Illuminance Categories E -I (from LTG -4 Part 2) Q watts 3. Watts for Display Lighting (from LTG -4 Parts 2 & 3) 0 + 01+ 0 = 0 watts Public Area Display Sales Feature Floor Display Sales Feature all Display 4. Total Allowed Watts (lines 1+2+3) 0 watts uminance a egorles , ana u ana uross bales Area FA] © a a o a ROOM NAME TASK/ACTIVITY ILLUMINANCE CATEGORY ROOM CAVITY RATIO FLOOR AREA ALLOWED LPD ALLOWED WATTS (E x F) Addition A 1.50 0 0.20 0 BUILDING PAGE TOTAL TOTAL 1,1921 1 01 SF WATTS Job Number: IROOM CAVITY RATIO WORKSHEET (RCR>=3.5) LTG-5 PROJECT NAME DATE Dyson & Dyson -Office Expansion 1 9/16/04 Room Name Task/Activity Description Room Length (L) Room Width (W) Room Cavity Height (H) Room Gay. Ratio 5xHx(L+W) /(LxW) Room Name Task/Activity Description Room Area (A) Room Perimeter (P) Room Cavity Height (H) Room Cay. Ratio 2.5 x H x P /A [LIGHTING MANDATORY MEASURES LTG -MM Dyson & Dyson -Office Expansion 9/16/04 DESCRIPTION Designer Enforcement �( § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. ! § 131(d)20verride for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. [XIU § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. § 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. _ § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. I� -----{ [X] § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 j square feet and more than 0.8 watts per square foot of lighting load shall be j controlled with bi-level switching for uniform reduction of lighting within the room. U§ 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. § 131(f) Control of Exterior Lights: Exterior mounted fixtures served from the electrical panel inside the building are controlled with a directional photo cell control on the roof and a corresponding relay In the electrical panel, or uses an astronomical time clock. 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. § 130(c) Efficacy of Exterior Lights: Exterior mounted fixtures with lamps over 100 Watts I served from the electrical panel Inside the building have a source efficacy of at least 60 lumens per Watt, or are controlled by a motion sensor. i EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 16 of 25 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM ECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 DESCRIPTION Designer Enforcement Equipment and S stems Efficiencies Y U§111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. r§ 115(a) Fan type central furnaces shall not have a pilot light. § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and Insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls -------i § 122(e) Each space conditioning system shall be installed with one of the following: �( § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; Incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ § 122(e)1B An occupancy sensor to control the operating period of the system; or F§ 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with Isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall i be controlled by a time control device as described above. I u § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat I that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. ❑ § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat j pump alone. I� EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: — Page: 17 of 25 i IMECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 Description Designer Enforcement Ventilation § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers In all openings to the outside, except for combustion air openings. —_—I § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or §121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or § 121(03 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or § 121(f)4 Another method approved by the Commission. i Service Water Heating Systems —,-- -j § 113(b)2 If a circulating hot water system Is Installed, it shall have a control capable of I C automatically turning off the circulating pump(s) when hot water is not required. § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. § 113(b)3C Lavatories In restrooms of public facilities shall be equipped with one of the --- -- --- - following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum 1 of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Page: 18 of 25 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Dyson & Dyson -Office Expansion 9/16/04 SYSTEM NAME FLOOR AREA HVAC 1,192 26.0 of 66.4 OF Outside Air Q 143 cfm Supply Fan 2000 cfm 69.5 OF 112.0 / 77.9 of Outside Air 143 cfm 74.7/65.7 of 66.4 of Total Room Loads teturn Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK ' , AFM Sensible Latent CFM Sensible 2,373 30,299 4,726 r 1,5161 21,74& 1,515 0 5,674 929 0 1,515 39,060 5,6551 30,5431 cisting Bryant HVAC Units 34,302 18,178 37,488; 'i Total Adjusted System Output 34,302 18,178 37,488; (Adjusted for Peak Design Conditions) _ TIME OF SYSTEM PEAK Aug 3 pm Jan 12 ami Heating Coil m Temperatures at Time o ea ing 84.0 of �, Return Air Ducts Y m I empera ures at Time 77.4/66.6OF 77.4/66.6OF. 61.3/60.4OF ---(,Y Supply Fan 2000 cfm Cooling Coil �, Return Air Ducts Y EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: Supply Air Ducts 83.5 of _ROOMS 70.0 of Supply Air Ducts 62.0 / 60.7 of 63.9% R.H. ROOMS 74.0 / 65.4 OF IROOM LOAD SUMMARY PROJECT NAME Dyson & Dyson -Office Expansion DATE 9/16/04 S STEM NAME HVAC FLOOR AREA 1,192 IROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Addition i ion 1 2,418 30,872 3,497 2,373 30,299 4,726 1,516 21,748 PAGE TOTAL 2,373 30,299 4,729 1,516 21,748 TOTAL 1 2,373 30,299 4,726 1,516 21,748 EnergyPro 3.1 By Energysoft User Number: 5533 Job Number: Page:20 of 25 I -ROOM HEATING PEAK LOADS Dyson & Dyson -Office Expansion Room Information Room Name Floor Area Indoor Dry Bulb Temperature Conduction 15ill 9 6/04 Design Conditions edition Time of Peak Jan 12 am 1,192 Outdoor Dry Bulb Temperature 260F 70 OF Area U -Value AT of Btu/hr 1,192.0 x 0.0347 x 44.0. = 1,8211 984.0 X 0.0655 X 44_0 = 2,834- 108.0 X — 0.5300 X 44.0 = ` 2,519 63.0 X 0.8500 X 44.0 = I_ 2,356 90.0 X 0.4500 X 44.0 = 1,782 perimeter =130.0 X x 44.5 = 5,785 x x = x x = x x = x x — - -- — x x ----- x x = x x x x = x x x X x x = I--- --- -- ; x x x x = x x = x x = x x = x x = x x - x x = I ----— x x =1 ----- x x x x x x x x x x = x x x x = I I x X Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 17,097 Infiltration: [ 1.0o x _ 1.osa x 1,1x2 x 10.0o x 0.5o 160] x �� _ �__ _� a,sslj Sche u e Air Sensible Area Cei1'ng Relght 6�CR pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 21,748 EnergyPro 3.1 By EnergySoft User Number: 5533 Job Number: — – - -- Page:21 of 25– Project Title Date 0 Dyson & Dyson -Office Expansion 9/16/04 Zoom Name Addition Time of Peak Sep 3 pm Boor Area 1,192 Outdoor Dry Bulb Temperature 107 ndoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature 74 cl� Conduction -30 Roof(R.30.2x12.16) R-19 Wall (W.19.2x6.16) Mtl Thermal Brk Tinted -Fleetwood -19 Wall (W.19.2x6.16) ouble Metal Tinted Default ti Thermal Brk Tinted -Fleetwood -19 Wall (W.19.2x6.16) -19 Wall (W.19.2x6.16) Mtl Thermal Brk Tinted -Fleetwood Area 1,192.0 57.0 108.0 136.0 63.0 12.0 32.0 383.0 42.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0347 0.0655 0.5300 0.0655 0.8500 0.4500 0.0655 0.0655 0.4500 x x x x x x x x x DETD 1 = = = = = = 50.0 30.7 23.8 32.8 22.1 23.8 0.657 (East) 12.0 Orientation Area SGF SC (North) 18.0 X X X X X X X x X X 29 x X x x x X X x x X 0.512 (East) 42.0 29 0.657 (East) 12.0 29 0.512 (Southeast) 18.0 29 0.512 (South) 21.0 125 0.657 (South) 18.0 125 0.512 (South) 42.0 125 0.512 (South) 36.0 125 0.512 (Southwest) 18.0 260 0.512 (Vilest) 18.0 238 0.512 Page Total Weighting Factor x 0.765 = X 2.092 = x 2.092 = x 2.820 = x 0.841 = X 0.841 = X 0.841 = x 0.841 = x 0.437 = X L 0.3561 Page Total Btu/hr 2,068 115 1,362 292 1,1,1-84� 129 I-- 711 -.-1,1 17 4501 6,787 Btu/hr (- -- -- 2oa 1,6741 373 754 1,450 --- - 969 2,260 1,937 1 1,0481 r- 11,4491 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor fights 1.0 x 1,192 X 0.961 Watts/sgft x 3.413 Btuh/Watt x 0.998 = r 3,900 (---- Occupants 1.0 x 1,192 X 300 Btuh/occ. / 12 sgft/occ. x 1.00 = I 2,861 Receptacle i.0c x 1,192 X 0.000 Watts/sgft X 3.41 BtuhfWatt X 1.00 = 0 rocess 1.0 x 1,192 x 0.000 Watts/sqft x 3.41 BtuhlWatt x 1.00 = - 01 Infiltration: I 1.00 x 1.064 x 1,192 x J_F 10.00 x 0.50 16; x 38 = 4,017c e u e AirSensible rea ning Fleig, Acri Q Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 30,872 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1,192 x 300 Btuh/occ. / 125 sgft/OCc. = 2,861 Receptacle 1.00 X 1,192 x 0.000 Watts/sqft X 3.413 Btuh/Watt _ 0 Process 1.00 x 1,192 x 0.000 Watts/sgft x 3.413 BtuhIVllatt Infiltration: 1.00 X 4771 x 1 1921 192 X 10.00 X 0.50 / 6] X 0.00134 6361 c e u e Air Late Area Ceibng Height �� �� Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 EnergyPro 3.1 By Energysoft User Number: 5533 _- - _Page:22 of 25 -„ - ROOM COOLING PEAK LOADS Dyson & Dyson -Office Expansion 1 9/16/04 1 loom Name Addition Time of Peak Sep 3 pm 9oor Area 1,192 Outdoor Dry Bulb Temperature 107 ndoor Dry Bulb Temperature 74�: Outdoor Wet Bulb Temperature 74 Conduction Mtl Thermal Brk Tinted -Fleetwood 09 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) 111-19 Wall (W.19.2x6.16) Area X X X X X X X X X U -Value X X X X X X X X X 36.0 0.4500 92.0 0.0655 172.0 0.0655 112.0 0.0655 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Orientation Area SGF SC (Northwest) 18.0 X 73 X 0.512 X X X X X X X X X X X x X X• X x X x DETD 1 Page Total Weighting Factor X 0.447 = X = X X = X X X X = X X I= Page Total Btu/hr F-7. 3ss� 3241 5761 i- 2711 1,557 Btu/hr 301 -i I I Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor fights 1.0 x 1,192 x 0.961 Watts/sqft x 3.41 Btuh[Watt x 0.998 = 3,900 Occupants 1.0 X 1,192 X 300 Btuh/occ. / 12 sgft/occ. x 1.00 = 2,861 eceptacle 1.0 X 1,192 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 rocess 1.0 X 1,192 X 0.000 Watts/sqft X 3.41 BtuhlWatt�I X 1.00 = - 0 Infiltration: �iuo.o x 1.064 x 1,192 x 10.00 x 0.50 / 60] x c it sense a Area ening He,gfS ACFI p Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 30,872 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00X 1,192 X 300 Btuh/occ. / 125 sqft/occ. 2,8611 Receptacle 1.00 X 1,192 x 0.000 Watts/sgft x 3.413 BtuhlWatt = 0 Process 1.00 X 1,192 X 0.000 Watts/sgft x 3.413111Btuh/V11att = ! - o Infiltration: 1.00 x 4771 X 1 192 x 10.00 x 0.50 / 601 x 0.00134 = 636 IFS -c e u e ATr t_a en Area ening Neigfit ACEI J QW Fraction TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 3,497 EnergyPro 3.1 By EnergySoft User Number: 5533 Page: 23 of 25 ROOM COOLING COIL LOADS Project Title Date Dyson & Dyson -Office Expansion 9/16/04 Room Name Floor Area Indoor Dry Bulb Temperature Conduction 1-30 Roof(R.30.2x12.16) -19 Wall (W.19.2x6.16) tl Thermal Brk Tinted -Fleetwood R-19 Wall (W.19.2x6.16) Double Metal Tinted Default Mtl Thermal Brk Tinted -Fleetwood -19 Wall (W.19.2x6.16) -19 Wall (V11.19.2x6.16) Mtl Thermal Brk Tinted -Fleetwood Addition Time of Peak 1,192 Outdoor Dry Bulb Temperature 74 `k Outdoor Wet Bulb Temperature Area 1,192.0 57.0 108.0 136.0 63.0 54.0 32.0 383.0 36.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0347 0.0655 0.5300 0.0655 0.8500 0.4500 0.0655 0.0655 0.4500 DETD 1 61.6 = 36.6 = 27.9 = 38.9 = 26.1 = _--28.7 = 39.2 = 1 44.9' C_ - 28 -i -J Page Total Aug 3 pm 112 78 , Btu/hr 2,548 137 _ 1,596 346 _ 1,398 696 ---- � g21 --1 1,126! 464; 8,394! Orientation Area x x x x X x x X X X SGF x x x x X x x x X X SC _ _0.512 0.657 0.512 0.512 Weighting x x x x X x x x X X Factor Btu/hr 0.738 _ - 2591 - -- 1.875 = 1,966; 1.875 = 438' 1.966 = I- 689 0.865 = 954 0.865 = 638 0.865 = 1,488 0.86_5 __ 1,276 0.423 = 881 0.367 808 ----. = L-- - ---.. (North) 18.0 38 (East) 42.0 38 (East) 12.0 _ 38 38 (Southeast) 18.0 (South) 21.0 80 0.657 (South) 18.0 80 0.512 (South) 42.0 80 0.512 (South) 36.0 80 _0.512 0.512 (Southwest) 18.0 226 (Vilest) 18.0 239 0.512 Page Total j 9,3971 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr ights 1.0 x 1,192 x 0.961 Watts/sgft x 3.41 BtuhMatt x 0.998 = I 3,9001 Occupants 1.0 x 1,192 x 300 Btuh/occ. / 125 sgft/occ. x 1.00 = 2,8611 eceptacle 1.0 x 1,192 x 0.000 Wattslsgft x 3.413 BtuhlWatt x 1.00. = 0 rocess x 1,192 x 0.000 Watts/sqft x 3.413 BtuhlWatt x o = i_ 01 Infiltration: 1.00 x 1.064 x 1 192 x 10.00 x 0.50 / 601 x ( 381 = 4,017' c e u e Air Sensib a Area eilm Hei ht ACH J - Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 30,299 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccupants 1.00x 1,192 X 300 Btuhlocc. / 125 sgft/occ. 2,861 Receptacle 1.00 x 1,192 x 0.000 Watts/sgft x 3.413 Btuh/Watt = E__- 0 Process 1.00 x 1,192 x 0.000 Watts/sgft x 1 3.413 BtuhlWatt =I 01 Infiltration: I 1.00 x 4771 x 1 192 x 10.00 x 0.50 / 60� x 0.00394; _ ' ~ T 1,8.65 cchedule LA -,r La en Area ening Heigh ACH pw -- - ITOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4,726 EnergyPro 3.1 By EnergySoft User Number: 5533 Page:24 of 25 ROOM COOLING COIL LOADS Project Title Date _l Dyson & Dyson -Office Expansion 9/16/04 oom Name Addition Time of Peak loor Area 1,192 Outdoor Dry Bulb Temperature idoor Dry Bulb Temperature 74c� Outdoor Wet Bulb Temperature Conduction IR -19 Wall (W.19.2x6.16) R-19 Wall (W.19.2x6.16) 4-19 Wall (W.19.2x6.16) Area X X X X X X X X X U -Value X X X X X X X X X 92.0 0.0655 172.0 0.0655 112.0 0.0655 55.5 =334: X 56.3 = I 31 6 33-1 3 45.1 = - _ I 3311 - = I 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain Orientation Area SGF SC (Northwest) 18.0 X 111 X 0.512 X X X X X X X X X X X x X x X x X x Weighting Aug 3 pm 112 Factor 78 X 0.421 = DETD 1 Btu/hr 55.5 =334: X 56.3 = I 31 6 33-1 3 45.1 = - _ I 3311 - = i _ X = Page Total 1,299 Weighting Factor Btu/hr X 0.421 = r 431 X X----- I X - _ -- X 1 = I 1 X - X = X �j X Page Total 4311 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights 1.00 x 1,192 x 0.961 Watts/sgft x 3.413 Btuh/Watt x 0.998 = IF 3,900 Occupants 1.0 X 1,192 X 300 Btuh/OCC. / 12d. sgft/occ. X 1.00 =2,861 Receptacle 1.0 x 1,192 x 0.000 Watts/sgft x 3.41 BtuhlWatt x 1.00 = 0 rocess 10 x 1,192 x 0.000 Watts/sqft x 3.413 Btuh/Watt x 1.00 = 0 Infiltration: 1.00 x 1.064 x 1,192 x 10.00 x 0.50 16071 x 38 = _::4:,o1 7 Schou a Air Sensible Area L7,, Fi—eigh AC JJJ Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 30,299 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X[A1,192 X 300 Btuh/oCc. / 125 sqft/occ. = I 2,861: Receptacle 1.00 x x 0.000 Watts/sgft x 3.413 Btuh/Watt = i_ 0 Process 1.00 x x 0.000 Watts/sgft x 3.413 BtuhlVUatt 0 �— — — --� Infiltration: r x x x x / 60� x - 1.00 — 4771 1192 —10.00 0.50 -� C_ 0.00394 = . . - 1,865: c e u e Arr Late Area Ceiling Reigfit ACR AW _TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4,726 EnergyPro 3.1 By EnergySoft User Number: 5533 Page:25 of 25