10-0201 (BLCK)r
Tiiy/ 4
`P.O. BOX 1504 ^' VOICE (760) 777-7012
78-495 CALLE TAMPICO FAX (760) 777-7011
LA QUINTA, CALIFORNIA, 92253 BUILDING & SAFETY DEPARTMENT INSPECTIONS (760) 777-7153
BUILDING PERMIT
D
Application Number: 10_0.0.0.0.0 2 ,01 Owner: ate. 3/15/10
Property Address: 52691 AVENIDA VILLA COLLINS JAIME
APN:: 773-303-022-9 000000 52691 AVENIDA VILLA
Application description: WALL/FENCE LA QUINTA, CA 92253-
Property
2253 Property Zoning: COVE RESIDENTIAL (760) 861=7240 a
Application valuation: 1225 jo�
11
7, 'J
Applicant: Architect or Engineer: HUGHES CONSTR/HOME SRVC, •
f � � PO BOX 6023 � ,.old _•`'e � r•-.
LA QUINTA, CA 92248
(760)567-5261
Lic. No.: 922421
----------------------------------------------------------------------------------------------------
LICENSED CONTRACTOR'S DECLARATION WORKER'S COMPENSATION DECLARATION -
I hereby affirm under penalty of perjury that I•am licensed under provisions of Chapter.9 (commencing with I. hereby affirm under penalty of perjury one of the following declarations: -
Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided
License Class: B License No.: 922421 for by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued.
Date: b, S C1. ,.Co� , — 1 have and will maintain workers' compensation insurance, -as required by Section 3700 of the Labor
Code, for the performance of the work for which this permit is issued. My workers' compensation
OWNER -BUILDER DECLARATION insurance carrier and policy number are:
I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the Carrier EXEMPT Policy Number EXEMPT
following reason (Sec. 7031 .5, Business and Professions Code: Any city or county that requires a permit to _ I certify that, in the performance of the work for which this permit is issued, I shall not employ any
construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the - person in any manner so as to become subject to the workers' compensation laws of California,
permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State- and agree that, if I should become subject to the workers' compensation provisions of Section -
License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or 700 of the Labor Code, I shall orthwith comply with those provisions.
that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by
any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars'($ 500).: ZDate: 0 A�t:1
(_ 1 I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and - the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The WARNING: FAILURE TO SECURE WOR KE COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL
Contractors' State License Law does not apply to an owner of property who builds or improves thereon, SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND
and who does the work himself or herself through his or her own employees, provided that the - DOLLARS Is 100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN
improvements are not intended or offered for sale. If, however, the building or improvement is sold within SECTION 3706 OF THE LABOR: CODE, INTEREST, AND ATTORNEY'S FEES. - - .•
one year of completion, the owner -builder will have the burden of proving that he or she did not build or .
' improve for the purpose of sale.). APPLICANT ACKNOWLEDGEMENT
1 _) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Seca IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the
7044, Business and Professions Code:. The Contractors' State License Law does not apply to an owner of conditions and restrictions set forth on this application.
property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed 1 . Each person upon whose,behalf this application is made, each person at whose request and for
pursuant to the Contractors' State License Law.). whose benefit work is performed under or pursuant to any permit issued as a result of this application,
(_) I am exempt under Sec. , B.&P.C. for this reason the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmlesstheCity ,
of La ouinta, its officers, agents and employees for any act or omission related to thework being -
performed under or following issuance of this permit. - -
bate: Owner: - 2. Any permit issuedasa result of this application becomes null and void if work isnot commenced
within 180 days. from date of issuance of such permit, or cessation of work for 180 days will subject
' CONSTRUCTION LENDING AGENCY 'permit to cancellation.
I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the _ I certify that I have read this application and state that the above information is correct. I agree to comply with all
work for which this permit is issued (Sec. 3097, Civ. C.). city and county ordinances and state laws relating to building construction, and hereby authorize representatives
_ - - of this counlyenter upon the above-mentioned property for inspec ' n purposes. -
Lender's Name: `
• - _ - p' ate�fA: r/j�-Tw Signature-(ADPticant_or�Agentl: -
Lender's Address:
LQPERMIT
Application Number 10-00000201
.—Permit. WALL/FENCE PERMIT
Additional desc':
Permit Fee 31.00
Plan Check
Fee
.00
Issue Date
Valuation
. . .
: 1225
Expiration.Date 9/11/10
- Qty Unit Charge 'Per
Extension
BASE
FEE
15.00
.8.00 2.0000 HND BLDG
501-2,000
16.00
------------------7-------------------------------
Speulal 1duLes aiiLl CummeuLs
---
--------------
49 LN FT X 6 FT HT BLOCK WALL EPR
CITY
- --------- --- - - -- --: _ -- STANDARDS- &- APPROVED PLANS .. " - --
-----------------------
Other Fees . . . BLDG STDS ADMIN (SB1473)
-------•-------
1.00
Fee summary Charged
Paid Credited _
Due
Permit Fee Total 31.00
------- ----------
.00
----------
.00•
31.00
Plan Check Total .00
.00
.00
.00
Other Fee Total 1.0.0
.00
.00
1.00
Grand Total 32.00
.00
.00
32.00
LQPERMIT -
-
.
Construction & Home Service
P.O. Box 6023 La Quinta, CA 92248 — (760) 567-5261 — CA Class "B" General Contractor #922421
Hopn6 l ffovmzr C.on me 'In aw KMVdei
- MffC `8, 2010
(The "Notice of Cancelation" may be sent to the address noted above)
Collins, Jaime '
52-691 Avenida Villa ,
La Quinta, CA 92253
Hughes Construction & Home Services
P.O. Boz 6023 La Quinta, CA. 92248 ~'
CA — B Classification Licensed Contractor #922421
American Contractor's Indemnity Company - Bond #SC6367 .769
Workman's Compensation - State Compensation Insurance Fund Policy #807682
'General Liability Insurance- Pro Builders Specialty Insurance Company/ #CDS-5022909, .
} GEICO Auto Insurance Policy #4070-65-53-54 ,
City of La Quinta = Business License #107185 `
Work performed at 52-691 Avenida Villa, CA 92253 to this agreement shall be commenced
within 7 days of this date or on approximately March 8th, 2010 and itens listed shall be_ ,'
substantially completed within 2 weeks or aapproxiniately March W. 2010.-
Commencement
010. Commencement of work shall be defined as the start of construction demo and or the first
material delivery.
+ Page I 1
Initials/Date: C\V
.`
Description of project, materials to be used and equipment to be installed (if applicable):
Scope of work:
Interior Drywall Patch, Texture & Paint - 2 Bedrooms & 1 Bathroom
Remove 49' of rear property -dividing wall picket fence & haul -off
Construct 49'x 6' tall back wall -Construct using 6"x8"x 16" gray block to '
match neighboring walls.
Payment: Owner agrees to pay Hughes Construction & Home Service a total cash price of
$3,500.00
Progress Payment Schedule:
10% ($350.00) —(i.e. approximate 10% Down payment) Due in 1 payment in the amount of
$350.00; due by the day materials are ordered and or labor is commenced.
80% ($2,800.00) - Due in 1 equal payments (per 1 weeks/based I on a 14 day schedule) in the
amount of $2,800.00 each; the first due March 15`h or the first day materials and or labor is
commenced. Work completed at a quicker pace may be discussed but limited to homeowner
discretion.
10% ($350.00) — Due upon completion of scope of work.
Payments shall be followed by an invoice from Hughes Construction & Home Services.
Payment Schedule: "
03/08/10 - $350.00
03/15/10 - $2,800.00
03/19/10 - $350.00
Total $3,500
Upon satisfactory payment being made for any portion of the work performed, the Contractor
shall, prior to any further payment being made furnish to the person contracting for the
residential improvement a full and unconditional release from any claim or Mechanic's Lien,
pursuant to Section 3114 of the California Civil Code, for that portion of the work for which
payment has been made
IT IS AGAINST THE LAW FOR A CALIFORNIA CONTRACTOR TO COLLECT PAYMENT
FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET DELIVERED.
HOWEVER, A CONTRACTOR MAY REQUIRE A DOWNPAYMENT.
i •
ALLOWANCES: The following items or specific prices as indicated are included in the contract
price as. allowances. The contract price shall be adjusted upward / downward based upon actual
amounts rather than estimated amounts herein:
Not applicable .:..homeowner to provide paint on site.
The terms and conditions on the following are expressly incorporated into this Agreement. This Agreement constitutes the entire
understanding of the parties. No other understanding or representations, verbal or otherwise, shall be binding unless in writing and
signed by both parties. This Agreement shall not become effective or binding upon Contractor until signed by Contractor or a
principal of Contractor. By signature below, Owner acknowledges receipt of a fully completed copy of the Agreement.
The buyer may not require a contractor to perform extra or change -order work without providing written authorization prior to the
commencement of any work covered by the new change order. Extra work or a change order is not enforceable against a buyer
unless the change order also identifies all of the following in writing prior to the commencement of any work covered by the new
change order. (1) The scope of work encompassed by the order. (2) The amount to be added or subtracted from the contract. (3) .
The effect the order will make in the progress payments or the completion date. The contractor's failure to comply with the
requirements of this paragraph does not preclude the recovery of compensation for work performed based upon legal or equitable
remedies designed to prevent unjust enrichment.
NOTICE:'Contractors are required by law to be licensed and regulated by the Contractors' State License
Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent
act or omission is filed within four years of the date of the alleged violation..A complaint regarding a latent
act or omission pertaining to any structural defects must be filed within 10 years of the date of the alleged
violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License
Board = P.O. Box 26000, Sacramento, California 95826.
You,. as Owner or Tenant, have the right to require the Contractor to have a Performance and Payment Bond. '
List of Documents to be incorporated into the Contract: (1) Notice of Right to Cancel (2) Notice of Cancellation (3)
Notice to Owner (4) Insurance Notice. A notice concerning commercial general liability insurance is attached to this
contract. A notice concerning workers' compensation insurance is attached to this contract.
You. are entitled to a completely filled in copy of this agreement, signed' by both you and the
contractor, before any work may be started.
The law requires that the contractor give you a notice explaining your right to cancel.
Initial the line if the contractor has given you a Notice of Your Right to Cancel.
THIS AGREEMENT CONSISTS OF PAGES `t' AND 0 ATTACHMENTS.
Current Bond # k i 2776 9
Expires: I o%oi d
Initials/Date�Q,.�
Owner/Buyer Signature:
X
Date: R LU)to
Owner/ Buyer Signature:
.X r
Date:
Page 3
1. CHANGES IN THE WORK. Should the Owner, construction
lender, or any public body or inspector direct any modification or
addition to the work covered by this contract, the contract price
shall be adjusted accordingly.
NOTE ABOUT EXTRA WORK AND CHANGE ORDERS.
Extra Work and Change Orders become part of the contract once
the order is prepared in writing and signed by the parties prior to
the commencement of any work covered by the new change order.
The order must describe the scope of the extra work or change, the
cost to be added or subtracted from the contract, and the effect the
order will have on the schedule of progress payments. Failure to
have written authorization shall not be deemed fatal to the
collection of the extra work.
2. RESPONSIBILITIES OF THE PARTIES. Contractor shall
promptly notify the Owner of (a) subsurface or latent physical
conditions at the site differing materially from those indicated in
this contract, or (b) unknown physical conditions differing
materially from those ordinarily encountered and generally
recognized as inherent in work of the character provided for in this
contract. Owner as added work shall pay for any expense incurred
due to such conditions.
The Owner is responsible to supply water, gas, sewer and electrical
utilities unless otherwise agreed to in writing. Electricity and water
to the site is necessary.
Owner agrees to allow and provide Contractor and his equipment
access to the property and provide toilet facilities.
The Owner is responsible for having sufficient funds to comply
with this agreement. This is a cash transaction unless otherwise
specified.
The Owner is responsible to remove or protect any personal
property and Contractor is not responsible for it or for any
driveways, lawns, shrubs, etc.
The Owner will point out and warrant the property lines to
contractor.
3. DELAYS. Contractor agrees to start and diligently pursue work
through to completion, but shall not be responsible for delays for
any of the following reasons: failure of the issuance of all
necessary building permits within a reasonable length of time,
funding of loans, disbursement of funds into funding control or
escrow, acts of neglect or omission of
Owner or Owner's employees or Owner's agent, acts of God,
stormy or inclement weather, strikes, lockouts, boycotts, or other
labor union activities, Extra Work ordered by Owner, acts of
public enemy, riots or civil commotion, inability to secure material
through regular recognized channels, imposition of government
priority or allocation of materials, failure of Owner to make
payments when due, or delays caused by inspection or changes
ordered by the inspectors of authorized governmental bodies, or for
acts of independent contractors, or holidays, or other causes
beyond Contractor's reasonable control.
4. PLANS & SPECIFICATIONS. If plans and specifications are
prepared for this job, they shall be attached to and become a part of
the agreement.
5. SUBCONTRACTS. The Contractor may subcontract portions
of this work to properly licensed and qualified subcontractors.
6. FEES, TAXES AND ASSESMENTS. Owner will pay for
taxes and assessments of all descriptions. Contractor will obtain
and pay for all
required building permits, but Owner will pay assessments and
charges required by public bodies and utilities for financing or
repaying the cost of sewers, storm drains, water service, schools
and school facilities, other utilities, hook-up charges and the like:
Initials/Date: V
7. INSURANCE AND DEPOSITS. Owner will procure at
Owner's expense and before the commencement of any work
hereunder, fire insurance with course of construction, vandalism
and malicious mischief clauses attached, such insurance to be a
sum at least equal to the contract price with loss, if any, payable to
any beneficiary under any deed of trust covering the project, such
insurance shall also name the Contractor and any subcontractors as
additional insured, and to include sufficient funds to protect
Owner, Contractor, subcontractors and construction lender as their
interests may appear. Should Owner fail to do so, Contractor may
procure such insurance as agent for and at the expenses of Owner,
but is not required to do so.
If the project is destroyed or damaged by accident, disaster or
calamity, such as fire, storm, earthquake, flood, landslide, or by
theft or vandalism, any work done by the Contractor in rebuilding
or restoring the project shall be paid by the owner as extra work.
Owner shall obtain and pay for insurance against injury to Owner's
own employees and persons under Owner's direction and persons
on the job site at Owner's invitation.
8. RIGHT TO STOP WORK: Contractor shall have the right to
stop work if any payment shall not be made, when due, to
Contractor under this agreement. Contractor may keep the job idle
until all payments due are received. This remedy is in addition to
any other right or remedy that the Contractor may have. Such
failure to make payment when due, is a material breach of this
agreement. Owner acknowledges that the additional costs for the
delay in stopping and starting the project shall be treated as an
extra and allow Contractor additional costs in accordance with
paragraph one hereof.
9. CLEAN-UP. Contractor will remove from Owner's property
debris and surplus material created by this operation and leave it in
a neat and broom clean condition.
10. LIMITATIONS. No action of any character arising from or
related to this contract, or the performance thereof shall be
commenced by either party against the other more than two years
after completion of the project or cessation of work under this
contract.
11. ATTORNEY FEES. In the event there is any litigation or
arbitration arising out of this agreement, the prevailing party shall
be entitled to its reasonable attorney fees and costs.
12. PAYMENT. Upon satisfactory payment being made for any
portion of the work performed, the Contractor shall, prior to any,
further payment being made, furnish to the persons contracting for
the improvement, a full and unconditional release from any claim
or Mechanic's Lien pursuant to Section 3114 of the Civil Code, for
that portion of the work for which payment has been made.
13. ASBESTOS AND HAZARDOUS WASTE. Unless the
contract specifically calls for the removal disturbance, or
transportation of asbestos or other hazardous substances, the
parties acknowledge that such work requires special procedure,
precautions, and/or licenses. Therefore, unless the contract
specifically calls for same, if Contractor encounters such
substances, Contractor shall immediately stop work and allow the
Owner to obtain duly qualified asbestos and/or hazardous material
contractor to perform the work or the Contractor may perform the
work at contractor's option. Said work will be treated as an extra
under the contract.
Page 14
Bin #
City of La Quinta
Building 8c Safety Division
P.O. Box 1504, 78-495 Calle Tampico
La Quinta, CA 92253 - (760) 777-7012
Building Permit Application and Tracking Sheet ;
Permit #
Project Address: _a Gq/ #Ve y/%/
Owner's Name:
A. P. Number:
Address:(a-
Legal Description:
Contractor: • NIGH%bIVTelephone:
tl� CD %�
City, ST, Zip: ,. �' ctf- �zZs3
�• s `�`�, �• a`�
Address:(p
Project Description:
City, ST, Zip: /I✓Di p ( 9�y0�
/��� % 1.(i / ' .
Telephone:Ig
i0� S6 ' �l�o
' ^«' s
`.
�:� t::.:.ss. Wr>�;
CityLic. c 15/��.WA
G�
f p L
State Lic. #
I(L Q GDNS r.
Arch., Engr., Designer.'^/�-
1A1 1 0 %r (pX 9 4-I4- Gf_k
Address:
City, ST, Zip:
Telephone: :�fy�
State Lic. #: '' ` '' £
Name of Contact Person: L -UK e'
Construction Type: Occupancy:
Pmiect type (circle one): New Add'n Alter Repair Demo
Sq. Ft.:
# Stories:
# Units:
Telephone # of Contact Person: Estimated Value of Project:
APPLICANT: DO NOT WRITE BELOW THIS UNE
#
Submittal
Req'd
Recd
TRACKING PERMIT FEES
Plan Sets
Plan Check submitted
Item Amount
Structural Caies.
Reviewed, ready for corrections
Pian Check Deposit
Truss Cala.
Called Contact Person
Plan Check Balance
Title 24 Calks.
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2"Review, ready for corrcetionsfissue
Electrical
Subcoutactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked op
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
IN HOUSE:-
Review, ready for correcttonsfissue
Developer Impact Fee
Planning Approval
Called Contact Person
A.I.P.P.
Pub. Wks. Appr
Date of permit issue
School Fees
Total Permit Fees