Loading...
Earth Systems Southwest - Cost ProposalCity of La Quinta, CA REQUEST FOR PROPOSAL (RFP) COST PROPOSAL SHEET Earth Systems Southwest The following is a summary of costs to provide the services outlined in the Request for Proposal (RFP) for Geologic Reports Review Services and will be used as the basis for negotiating a Professional Services Agreement (PSA): Item Description Hourly Rate Associate Geologist (Geologic Services) $190.00 Senior Geologist (Geologic Services) $160.00 Clerical $75.00 Vehicle Mileage $0.90/mile Other Services Refer to the attached Earth Systems 2017 Fee Schedule NOTE: All professional geologist are salaried and exempt. Prevailing wage directives do not apply. Office clerical staff fall do not fall under prevailing wage require�n, eats, unless directed otherwise as part of the contract negotiations. ' Prime Consultant: C �_ Date Signed:11 �— f aF F �h Systems Southwest STANDARD FEE SCHEDULE (Effective January 1, 2017) Perris Office: (951) 928-9799 Bermuda Dunes Office! (760) 345-1588 www.earthsysterns, com Earth Systems Southwest presents this fee schedule for use when performing services on a time -and -expense basis from Earth Systems Southwest's Bermuda Dunes and Perris offices. Fixed -fee quotes and rates for services not listed can be provided upon request. To discuss services and fees for a specific project, please call 1-800-924-7015 or the numbers listed above. Hourly Charges for Personnel Staff Professional $105.00 Technician (includes truck & Nuclear Gauge) $83.00 Project Professional $145.00 Special Services Technician $98.00 Senior Professional $160.00 (Senior, Supervisory, Caltrans, etc.) Associate Professional $190.00 Special Inspector $99.00 Principal Professional $210.00 Clerical $75.00 Southern California Prevailing Wage Rates* Laboratory Technician $85.00 Group I (Technician/Soil & Material Tester) $98.00 Technical Assistant (Drafter, CAD, etc.) $90.00 Group II (Special Inspector) $106.00 Group III (Non Destructive Testing) $120.00 *PW rates will be adjusted per DIR mandates. Round -Trip Mileage - Billed at $0.90/mile. Travel Time (Portal to portal) at actual staff rate. Common Non -Personnel Charges Subcontracted Services Cost+20% Equipment per list below Per Diem for Out -of -Town Sites $150/day/person Concrete Mix Design (without testing) $250.00/each Concrete Mix Trial Testing $2,300/design DIR Compliance/Certified Payroll $50/week BASIS OF CHARGES Minimum Report/Letter Charge $450.00 Minimum Plan Review w/Signatures (Up to 2 Sheets, Added Sheets at Hourly Rate) $450.00 Minimum Laboratory Charge $170.00 Thermal Concrete Mix Design and Trial Batch Testing (9 points, 3 curves) $3,500.00/set DSA Lab Certification $50/month 1. Office time is billed in 1/4-hour increments. 2. Field time on non -prevailing wage projects during normal working hours is billed in 2-hour increments portal to portal from the assigning office. Field work performed on weekends, holidays, and when work starts outside of regular business hours (7 AM to 5 PM) is billed in 4-hour increments. Over -time in 1-hour increments. 3. Field services for prevailing wage projects will be charged in 4-hour increments portal to portal from the assigning office. Over -time will be billed in 1-hour increments. 4. Materials testing and special inspection services are billed in 4-hour increments. Over -time in 1-hour increments. 5. A two-hour cancellation charge will apply if scheduled inspection or testing is cancelled after 3 p.m. the day prior to the scheduled work. Requirements concerning overtime, shift work, travel time, holidays, and other factors can vary for different classifications of work under prevailing wage regulations. 6. Personnel charges for Saturdays and premium hours (after 5 PM and before 7 AM, or exceeding 8 hours on -site in one day) will be billed at 150% of normal rates; Sundays and holidays are billed at 200% of normal rates. 7. Payment is due upon invoice presentation and past due 30 days from the invoice date. Past due accounts are subject to service charges of 1.5 percent per month. 8. Fixed fees, unit rates, special billing rates, and billing options can be negotiated upon request. 9. Deposition, Hearing and Court Appearances (as Expert Witness) are billed at double the normal rates, and in four-hour increments. Stand-by for court appearances that do not require personnel to leave the office will be billed at $600 per day. STANDARD FEE SCHEDULE 2017 PAGE 1 EFFECTIVE JANUARY 1, 2017 IfeSk's Earth Systems �r Southwest Perris Office: (951) 928-9799 Bermuda Dunes Office: (760) 345-1588 www.earthsysterri STANDARD FFE SCHEDULE - SOIL TESTING AND EQUIPMENT All prices are based on California and Modified California sample sizes (2" to 2.5" diameter) unless noted otherwise. Preparation of 3" diameter samples, add $20.00 per sample. Special handling of contaminated soil will be per quote, and contaminated samples will be returned to client for proper disposal. Atterberg Limits (ASTM D 4318): a. Plasticity Index.................................................................................................... $250.00 Maximum Density and Optimum Moisture (ASTM D 1557 or D 698): a. 4" Mold............................................................................................................... $198.o0 b. 6" Mold............................................................................................................... $220.00 C. California Impact (CT 216)................................................................................... $220.00 Hydro Collapse Potential (ASTM D 5333)..............................................................:..:.......................I................ $110.00 Consolidation, one dimensional (ASTM D 2435)............................................................................................... $225.00 Consolidation, timed, per point (ASTM D 2435).................................................................................................. $60.00 Basic Corrosivity without Report (pH, Sulfate, Chloride, Resistivity, Nitrate, Ammonium, Sulfide) (ASTM D 1293, D 4327, D 1125, EPA 300, CT 417, 422, 643)__............................................................................................... $220.00 Direct Shear, 3 points (ASTM D 3080)............................................................................................................... $160.00 Expansion Index Test (ASTM D 4829)................................................................................................................ $170.00 Hydrometer Analysis, assumed specific gravity, with 200 wash (ASTM D422).............................. I .... ........ ... $215.00 Sieve/Hydrometer Analysis, assumed specific gravity, with 200 wash (ASTM D422, CT 203) .......................... $295.00 Moisture and Unit Weight Determination, from ring samples (ASTM D 2216, D 2937)...................................... $18.00 MoistureOnly (ASTM D 2216)....................................................................................._.........._..................................... $13.00 Permeability Tests, constant head, falling head (EPA 9100)....................................................................... * Per Quote R-Value (ASTM D 2844, CT 301)......................................................................................................................... $395.00 Sieve Analysis of Oversize Material (ASTM D 6913).......................................................................................... $190.00 Sieve Analysis with wash (ASTM D 6913)....................................................................................................... $110.00 Sieve Analysis 200 wash only (ASTM D 6913).................................................................................................... $60.00 Specific Gravity (ASTM D 854)........... ............................................................................... ................................. $215.00 Swell Test (ASTM D 4536, modified) Undisturbed......................................................................................................................................... $106.00 Remolded............................................................................................................................................ $212.00 Disposal Fee (hazardous samples)............................................................................ ......... Per Quote ............................ Other Tests Not Listed................................................................................................................................... Per Quote Sample Preparation....................................................................................................................................... $85.00/hr Lab certification and compliance charge for projects requiring special certification/evaluation/ accreditation (DSA, Caltrans, AMRL, OSHPD, CCRL) per project......................................................................... $75.00/month Additional Engineering charge for stamped lab reports.................................................................................... $200.00 THERMAL RESISTIVITY TESTS (IEEE 442-03 and ASTM D5334-081 Soil, per moisture point, per sample.................................................................................................................. $250.00 Soil, 3 moisture points with dry -out curve, per sample..................................................................................... $750.00 Field Testing Using Thermal Resistivity Meter (IEEE 442-03 and ASTM D 5334-08) ........ Hourly rate plus $200.00/day Concrete, 1 point and moisture content (requires special collection procedure) ........................ ............ ......... $200.00 SPECIAL EQUIPMENT (Does Not Include Personnel) Concrete and Asphalt Concrete Coring Equipment.................................................................................... $100.00/day Rebound Hammer (Schmidt Hammer), Torque/Drill/Tension Equipment ................................................... $50.00/day Skidmore Bolting Calibration Equipment..................................................................................................... $75.00/day Pulse Velocity Meter, Pachometer............................................................................................................... $75.00/day Manometer (Liquid Level)........................................................................................................ ................ $50.00/day Relative Humidity Meter.............................................,.............................................................................. $100.00/day HandAuger/Sampler.................................................................................................................................... $50.00/day Percolation Tank System and Trailer.......................................................................................................... $250.00/day Double Ring Infiltrometer (per set)............................................................................................................ $150.00/day RhinoOff -Road Vehicle............................................................................................................................... $100.00/day Pile -Driving Equipment (for Pile Load Testing)........................................................................................... $750.00/day Pile Load Testing Equipment...................................................................................................................... $250.00/day STANDARD FEE SCHEDULE 2017 PAGE 2 EFFECTIVE JANUARY 1, 2017 Earth Systems Southwest Perris Office: (951) 928-9799 Bermuda Dunes Office- (760) 345-1588 www.earthsystems.com OtherEquipment............................................................................................................................................ Per Quote Safety and Specialty Equipment for Hazardous Materials Projects................................................................ Per Quote HammerDrill.......................................................................................................... $50.00/day STANDARD FEE SCHEDULE - MATERIALS TESTING Rates for field work such as materials sampling, construction inspection, and field evaluation will be in accordance with the Personnel Rates listed in the Standard Fee Schedule. The rates listed below apply to standard ASTM test methods. An additional hourly charge ($85/hr) will be applied for cutting, capping, or other preparation of steel and non-standard samples. CONCRETE AGGREGATE Abrasion, L.A. Rattler, 100 and 500 revolutions (ASTM C 131, CT 211)............................................................. $210.00 Absorption, Coarse Aggregate (ASTM C 127, CT 206).......................................................................................... $60.00 Absorption, Fine Aggregate (ASTM C 128, CT 207)............................................................................................ $100.00 Clay Lumps and Friable Particles in Aggregate (ASTM C 142)............................ :............................................... $115.00 Cleanness Value of Coarse Aggregate (CT 277).......... :....................................................................................... $160.00 Crushed Particles, each size (ASTM D 5821).......................................................................................................$115.00 Durability Index, Coarse or Fine Aggregate (ASTM C 3744, CT 229)...... ................................... ........................ .$160.00 Flat and Elongated Particles in Aggregate (ASTM C 4791, D 4791).................................................................... $110.00 Organic Impurities in Fine Aggregate (ASTM C 40, CT 213).................................................................................. $90.00 Potential Reactivity of Aggregate by Chemical Method, each size (ASTM C 289, C 227) ............................... Per Quote Sand Equivalent (ASTM D 2419, CT 217)............................................................................................................ $150.00 Sieve Analysis, washed (ASTM C 117, C 136, CT 202)......................................................................................... $160.00 Soundness, Sodium Sulfate, 5 cycles (ASTM C 88)..................... ........................................................................ $550.00 Specific Gravity, Coarse Aggregate (ASTM C 127).................................................................. ............... . ....... $110.00 Specific Gravity, Fine Aggregate or Unit Weight of Aggregate (ASTM C 128 or C 29)........................................$215.00 CONCRETE CYLINDERS. BEAMS AND CORES Compression Test of Cast Cylinder (ASTM C 39).................................................................................................. $28.00 Compression Test of Cored Samples, cores delivered to laboratory by others (includes surfacing if necessary, max. core length 8 inches) (ASTM C 42 C 39)............................................................................... $65.00 Density of Hardened Concrete (ASTM C 642)....................................................................................................... $75.00 Shrinkage, set of 3 (ASTM C 157)........................................................................................................................ $350.00 Flexural Strength, Simple Beam with Third Point Loading (ASTM C 78, CT 523)................................................ $135.00 Concrete Slab Moisture Transmission Kit (ASTM F 1869)........................................................................... $35.00 each MASONRY Masonry Block Conformance Test [MCB test] (ASTM C 90 and C 140)..............................................................$270.00 Absorption of Block, set of 3 (included in MCB test) (ASTM C 140)................................................................... $110.00 Compression Test on Block, set of 3 (ASTM C 140).................. ................................. ....................................... - $110.00 Compression Test on Grouted Prisms, includes cutting (ASTM C 1314)............................................................$110.00 Compression Test on Masonry Cores (ASTM C 140)................................................... ........... $55.00 Compression Test, 2" x 4" Mortar Cylinders (ASTM C 270, ASTM C 780) or 3" x 3" x 6" Grout Samples (ASTM C476, ASTM C 1019)...........................................................................................................................................$35.00 Moisture Content of Block as received, set of 3 (included in MCB test) (ASTM C 90, C 140) .............................. $75.00 Shear Test on Masonry Cores, 2 faces............................................................................................................. * $150.00 Specific Gravity and Unit Weight of Block, set of 3 (included in MCB test) (ASTM C 90, C 140) ........................$110.00 FIREPROOFING TESTS Fireproofing Density Test (ASTM E 605)............................................................................................................. $110.00 Fireproof Bond Test (ASTM E 736)......................................................................................................................$65.00 SamplePreparation.........................................................................................................................................$90.00/hr STANDARD FEE SCHEDULE 2017 PAGE 3 EFFECTIVE JANUARY 1, 2017 E Southwest Perris Office: (951) 928-9799 Bermuda Dunes Office: (760) 345-1588 www.ear[hsys[erns.com ASPHALT CONCRETE Bulk Specific Gravity of Compacted Specimens & Core Samples (ASTM D 2726, 1188, CT 308, AASHTO T 166) $55.00 Compaction of Laboratory Samples, California Kneading Compactor, set of 3 (ASTM D 1559, CT 308)............ $370.00 Compaction of Laboratory Samples, California Kneading Compactor, set of 5 (ASTM D 1559, CT 308)............ $600.00 Compaction of Laboratory Samples, Marshall Method, set of 3 (50 blows per side) (ASTM D 1559)... $210.00 Compaction of Laboratory Samples, Marshall Method, set of 3 (75 blows per side) (ASTM D 1559).$255.00 Ignition Oven Binder Content and Sieve Analysis of Extracted Aggregate (ASTM D 6307 and D 5444).............$270.00 Moisture Content (ASTM D 1461)........................................................................................................................$40.00 Specific Gravity, Theoretical Maximum (ASTM D 2041).................................................................................. * $150.00 Stability and Flow, Marshall Apparatus, set of 3 or Stabilometer, Hveem S-Value, set of 3 (ASTM D 6927 or ASTMD 1560, CT 366)................................................................................................................................... * $200.00 REINFORCING AND STRUCTURAL STEEL Tensile and Bend Tests of Reinforcing Bar, #2 through #9 (ASTM A 615 or similar)......... .............................. * $110.00 Tensile and Bend Tests of Reinforcing Bar, #10 through #18 (ASTM A 615 or similar) ............................... * Per Quote Structural Steel Tensile Test, sample preparation not included (ASTM A 370)............................................... * $110.00 Structural Steel Machining/Sample Preparation.........................................................................................* cost +20% BOLT TESTS Tensile, Proof Load and Hardness (per set) (ASTM A 325 or similar).......................................................... * cost + 20% Other tests are available upon request. Call for a quote. An asterisk (*) next to the price indicates sample must be shipped to another Earth Systems laboratory for testing. Shipping charges are $50 for standard -weight sample sets (per container shipped). For dense samples, shipping will be billed at cost +20%. STANDARD FEE SCHEDULE-- HAZARDOUS MATERIALS PROJECTS EQUIPMENT (Does Not Include Personnell Concrete and Asphalt Concrete Coring Equipment.........................................................................................$40.00/hr HandAuger/Sampler............................................................................................................ $50.00/day Soil Sample Containers (Brass or Stainless Steel).......................................................................................$15.00/each Laboratory -Clean Soil Sample Containers (Glass)..........................................................................................$2.00/each Lock n' Load VOC Sample Preservation System......................................................................................$15.00/sample Disposable Bailer and Dedicated Rope.......................................................................................................$15.00/each Water Sample Bottles (per sample)...............................................................................................................$2.00/each IceChest with Ice.............................................................................•----.......................................................... $5.00/day WaterLevel Indicator................................................................................................................................... $40.00/day Nitrile Disposable Gloves (blue) per box or per pair..................................................................$30.00/box, $0.50/pair Decontamination Equipment for Sampling.................................................................................................. $10.00/day Disposable Soil Sampling Scoops .................................... ....................... ....................................................... .$3.00/each Photo -Ionization Detector................................................................................................................... Rental Cost +20% Terrain Conductivity Meter.....................................................................................................................--... $80.00/day 110-Volt Portable Electrical Generator............................................................................................... Rental Cost +20% Submersible Pump System.................................................................................................................. Rental Cost +20% Mini -Troll Groundwater Level Transducer (daily/weekly/monthly)............................................................... Per Quote Drums(each)..............................................................................................................................................$60.00/each DrumDolly ........ ................ ..... ......................................................... ,............................................................ $20.00/day Shipping and Chemical Testing by a California -Certified Laboratory ............................................................. Cost +20% Equipment and materials rented or purchased for a specific project will be billed at cost +20%. STANDARD FEE SCHEDULE 2017 PAGE 4 EFFECTIVE 1ANUARY 1, 2017