Loading...
BSOL2015-000878-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: Property Address: APN: Application Description Property Zoning: Application Valuation: S 40 `may 4 4v 4" COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT BSOL2014-0008 51785 AVENIDA HERRERA 773172014 11.2kW PV SYSTEM - (44) 255W PAN ELS+OPTIMIZERS/(2) INVERTERS $24,796.00 Applicant: SOLARCITY CORPORATION 3055 CLEARVIEW WAY ATTN ZOE STEELE SAN MATEO, CA 94402 L032014 L CITY OF LA OU TINTA y Ophf0 DEPARTMENT LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 {commencing with Section 7000) of Division 3 of the Business and Professions Code, and my License is in full force and effect. License Class: C46. B• C10: A License No.: 888104 n Date:40 Contractor VOICE (760) 777-7125 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 10/3/2014 Owner: JONATHAN GORGES 51785 AVENIDA HERRERA LA QUINTA, CA 92253 Contractor: SOLARCITY CORPORATION 3055 CLEARVIEW WAY ATTN ZOE STEELE SAN MATEO, CA 94402 (650)963-5100 Llc. No.: 888104 WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. _ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: OWNER -BUILDER DECLARATION Carrier: _ Policy Number: I hereby affirm under penalty of perjury that I am exempt from the Contractor's State _ I certify that in the performance of the work for which this permit is issued, I License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any shall not employ any person in any manner so as to become subject to the workers' city or county that requires a permit to construct, alter, improve, demolish, or repair any compensation laws of California, and agree that, if I should become subject to the structure, prior to its issuance, also requires the applicant for the permit to file a signed workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith statement that he or she is licensed pursuant to the provisions of the Contractor's State comply with those provisions. License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged % Date: ( Applicant exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, (_) I, as owner of the property, or my employees with wages as their sole AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE compensation, will do the work, and the structure is not intended or offered for sale. HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, apply to an owner of property who builds or improves thereon, and who does the work INTEREST, AND ATTORNEY'S FEES. himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold APPLICANT ACKNOWLEDGEMENT within one year of completion, the owner -builder will have the burden of proving that he IMPORTANT:Application is hereby made to the Building Official for a permit subject to or she did not build or improve for the purpose of sale.). the conditions and restrictions set forth on this application. (_) I, as owner of the property, am exclusively contracting with licensed contractors to 1. Each person upon whose behalf this application is made, each person at whose construct the project. (Sec. 7044, business and Professions Code: The Contractors' State request and for whose benefit work is performed under or pursuant to any permit issued License Law does not apply to an owner of property who builds or improves.thereon, and as a result of this application; the owner, and the applicant, each agrees to, and shall who contracts for the projects with a contractor(s)'licensed pursuant to the Contractors' defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and State License Law.). employees for any act or omission related to the work being performed under or (_) I am exempt under Sec. . B.&P.C. for this reason following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work Date: Owner: for 180 days will subject permit to cancellation. CONSTRUCTION LENDING AGENCY I hereby affirm under penalty.of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 309), Civ. C.). Lender's Na Lender's Address: I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above- mentio%n/e)d prop rt for inspection purposes. Date: ` V Signature (Applicant or Agen �_ .Y f�.-i. L_ t a�'S�:IC �.i w�. t'-^''`::�h1: a t.. .5i. ",L!S �ei'Y, "' eS fi'3';`:':��'i`J:'.'uC ?' .: C.S..a'.�" .ems... E�,Ss[avt'RF:S �) .E �FzrK+j•'ti 7.�}Yc•'in:' i ,s�-:.�ASrtY+•'4:5�'}'s4� ..,=i3kAhP.'� •+:E4:�!'.!? ' 31i};✓:.. 54b<k ¢ .9;1':.u-`i�.n - 2 w� Q it, R 1 : "� %,t. ''at +trls Mix L 3e� 1 lri l S + Y }l' PAID =<,Y >PAID DATE` : . i fir �r4++ $.•.., 1 ..6 4. ..LY -x •. ,�,r, nal:w[�.�* hU1.]Gstn„� �t:i..��,vt.:' 7�.���4.�,:£�i�''rt �n , l L` iv? r )d'. :6i i� z 'Y.:;; . �lx^'i�i!':'i..�•a. fF .(ri].,..�`., �.c y�.2 .(, .1 v� w_ �_ � .M.x,i�h.�... .� .'� .._£ ];93.A ��-d�'�i'4'r'�•-.. zr b ... .l t, xi. ..� tum; . 5 v ,.�f . !r�...,e�a, Fra -. Y. nit:. S Srti�Ss'd:�Fi �' BSA$ SB1473 FEE 101=0000-20306. 0 '$1.00 $0.001' a� sz":x? amzi``u-P.-,'.t.A:`'s*I:.D B-�Y':- .i r..C,L. TDBYag{ -:.:�yF" \j �rAm- r. �"r�:FS. c"�f ARM rM��'cfnE<Y :eR;.'E.G!:.^aE...asI?Pxrs^T� •...v:r� atwnr .,',:+?,:` �'' 'x.?; Jzc�T.r3'ii�t�a:t$rf.T.-'� �. �a5sn t'°r ';: Sr.+,�a"a'3r;•,r,.,.�e, Total -Paid forBUILDING;STANDARDS ADMINISTRATION BSA $1.00: ; $0.00 :'•(A-,4,-+.-_:lt� V.. ..-:':?i..iy: •1R f'.s 'a 7 r .S :'cvk ©ESCRIPTION� •�'11:'X'#SL'. ila F,i�r L, ..Z .� S.:iR ,1St. .: 'S`5'.'(r:. ,.3vi; 0, r -Ch 5 •-�yw �u y j ACCOUNT x k3.� ",-'{N -.E A' 1..u. it;',-moi^'.V ,iliifC 7.w'i �, c y- {}' i ' :'.'i�'~:%Y�"'ST�lC]'.2 J.:. i:=`''e'+':?'X'4i:: �. ' .-.k .• '• ,mss t a 1 Y r RAIDS.„ a']C51 •ia+ i-' < h -i , PAID DATE: „r�a eta_ .,,`� r %:.=`..... � _ 5..:�h'?:. Lark,...v�_F.+Y. $QtN,�AMOUNT t �Mr .:,'n�,?„� „4 r �i:."�r.�"�' a=°'.'.zK•-;R+.. L.,7r_r.,',K.. �_->__...sL.•r'x:.s::n'Lt�.i. PV SYSTEM ARRAY; FIRST 20 101-0000-42403'1 0 $23.83'� $0.00'.--''. ..:=4 row. - 3 -{ .- " x�� .rte, 3r 'i.. >,�Y E 'RECEIPT # •",i�_ 't"x a� &' tFs''li?t. M ", CFIECK,# /'?3't4"'ir ..'..'•�L: t'i� CLTD fft'20 Myr . PAI,D.'BY� q :.-.YVTaS".•Axu:,t ., t4,., .:5:....,".Ru:.v..vS-y.::.7;,ai5^.+Jr_",- h a �,s KMETHOD _ �- ..,,<.: uetiaa-.}..,Ls^t..''i,7_. ..rel. SY_, , c ,� ..:,.\'s. s .�< � 'i.,ta::`6�. K s m tits .,.:x.,.,3 :4k"y3P1... r�•P,.'"r"84;y��w(. 'S±$*: >'F 'iz!#kp y: `i:ar;�. KA',• 4 2 _2Y.'*5 .':.; ',y>,*:K'.,.: - y`Y.mY< al�2'tP%'F ,tN..u? Yr ..,J r ACCOUNT.` 3 L £5,.;?.. Y�; :;;F1.. yl2..z:-£.�rt`aF <v. F rt ;��q ` T �x�� MOUN MAN kl::b.;i.'A.."' ,4'vt?•;:' p'Y a4i- =1 � dP�D � 0 k � ,:•„�; ���-;.�;`': _ � ��.'�� ,,,_�a,� �� ]' w „Q y, kms. ; ,� „�„�-�s Y� . ✓: i'v.Fi._=n,'s_ii4•, �`�-�•, AI .�.arPAIDtDATE , 2 � riVF�=�:.5 PV SYSTEM -ARRAY, FIRST20.0C' : 101-0000-42600'`. 0 $23.83' $0.00...,..., ` z, ". , .i '.x=•'r`�.::h':` «"n&•d' 'W a;* .,±: •r.' t.. >.mi; �. -F.a s9'.; �;. "�T.��e ° f` ¢� � 4, S., IMM - ��N�:4 ..,7:-eL.t:,,:7; a .o a::+ nr{t'�S. r;�a. c; =d.`.-c`w't}=;ice. :.r.�,:. .�'- h- rz?�` � YMETHOD i �e�', .: o-`il .°3.3" a':'fa rC-_ . d, t}".,_"• f r st J� RECEIPT.#.#r�' -v"�' ..�!•t'. �' a?;x'c yTs ? ,1`Sr• ,:y., .Y t":CHECK# iF- :<� ,++.: .8 X .r2J 'r's:CLTD BY;;l- i b .7.SPL11R=6Y c fE .} z. k } lis.eu.✓_.::?.`..:.x3.s:;<:.ru...A-kt..•ws,Yi•a''.._..,e•_;�,'_'.rt.)i,.^F.rl'iS�✓_ f F 4 y Ak_ '� 4w5 �y ."..f....,..i:. .zi*.u-.d. •_C':;:;(d s••:L iz�'•�`"''gx 1r" '_ 7.trr�`..e`V5 ^1 rue a'(�e�t>,; 'rte:. *P:��';'x.: : { a ?' QTY `?. -•e" :;fes.:: i,"�. ..t%fi,�gg�......... �.- x :�=$' AMOUNT<P/>ID_'P.AID �i '?"^'vi'�z'.,t DATE ��DESCFt'IPTION��-ACCOIJN.L_ ::.i. '.`lr".:'."�--�.-v,..'�` :iy-�^•t"F ' ! "r wa'.af-�"`S.c:v,,,3:>v J;r--x;t�S4:: , Y:4o, t'r rnt ..:F'l..xw-r hf'i'2r,. �_ r m. ``�.s.F:'iz: k- 3V,i'-• . .. :.".;n s :z�n:?�,r E,._... •.c"+a^: PV SYSTEM - MISC EQUIPMENT. 101-0000-42403. 0 " $23.83.. $0.00_ ;k,yK S i3- f i^ -4-x .::?�, d k +s `i 1 h ..}"' 'w. th�'-'s�� �. C, -i _ �- �m �� '-t�J � >~• '` �c,+,t:.(�':���'�,:asr :.k �i ^� 5T35 3i i�, .., x, '`J i:s'N rF, 'r Yi '� %t � ;'-Y S , x B,m '•� r �-�rs��METHO,D�.r�:'�" ���:,`�'`.�.�� y. .tiyR •J ✓ 't' „si'.ti '.. ,,� 'i !� a. } Za.3Y'+,y RECEIP._T�#r;.�x'�� I.. a`u -.:.< M� .i'r•.arr ',� � �•� _r :Lir � �'tCH.ECK#�.� 'i ¢�CLTD�BYr' •a,. a�`�����PAID�BY. ' .'s'-�tkwav},,�rq x;:*�io�,:e.,v.,c;, e`]Fs,.-r..i^.. k4;x't.c _.. :<`r:._ ;:' i �'•i e', : xi e...Yk:. 'g" ;...r 33st�?i;:-,^` .�: .w.. _ r ,}a r' L , 3:.. �.La;•,. `� .r. -Y? . - v,;v . .e"�` -.- ,,.r. a .±'ut,ricr�.cs:'ti. .kc 1 �..a.> F. 'n '�. "'t1 .y: „%oi r...�,-.,y. •. v '-,'T�'.,-, ..^y tr-i••y w. '` a. ,M,;'.^ -k eS.1 24 y;� �y. ti _� 1 '1 z'is,:' Y t S "�a.`u::� 'S.J�f :r'.^: c:� i5`r�yj ;.. '4.'h` ri ,i .a � ° d �•"'\: .s�, - C, ', w Y s . ..4 3 Tv '3•r,a. ,.�.';. :1 '^*,X•�. -- 0 ''r DQ1T:E' FDESCRIP.,TION Nb .�y_ Ai.,li�L�]ileU`_{i:�WY3..2O,..:t1+Ri�t_�., tw_ -;r t�_�CACCOIUNT� , :.yQTI!?, �M'h'�.i'•.��'.: x7,lhnY.i.•fiis:.'.-r: [:�Aiz'_^,1.•�: eS.S_';k. rV,ti�"W<:.,f.25. 4 .) .� ..-tf 4 ,AMOUN3Tti� fix. �>'. '.)4lYttwA} y�"Ma42,IMD .;3PlAll �'`f+?+lri�l'4��4.] ,f-K}xY:;��f.',:9Y� Fri,: -4'r -''t PV SYSTEM,- MISC EQUIPMENT PC : 101-0000-42600- 0 .t% $2-183 $0.00- .:,. '.•tiK ,:.,. x.µ.Y- x,-i'.``"v Y.7.. •°(uS,�pC lk a:sE. F:�. 14 t..,r"?4'iYG<.'z:F iii'd 7 METHOD y -: 4i'.r»:1y�-v -. 4.. -Y•+1 # f .�•a -Y,i i.-_..rJy�.'4.,!,±n..L.. .�•` .Cxr.tSl� CHECK #� _ _ Su r"Y� {:.-.:-..-�+.=1'.531.:., d, ._� _'��J.•'. �.�.�.>; . ?L. "'v_?�'.1F....F�-�+ii.�'S.�S ��Y>�'�t X. :. �:_9� �..„"w�lir ..{„I�Ri v-JRECEIPT ?:t_�.=�t.e5^--«.,'.nx.+}',irs?-?.-R.$-.�-..c4:..... zCLTDrBY1 ' TotaI'Paid for ELECTRICAL: $95 32 Z:V4;:: �+T.^j ^:St`i� .htC.r.tir.j .-R .''�i St"1'`f.C'=•r )�.� `,"l,FY �_ x �•��kc t�1,F S.•F,'1y�. ��:;t:_ `�✓:>_:W,"✓.' = �,� � � '° :t4 J T,Y .: -.s _LC N -'['n `5 �r" ��� "�AI1/IOLIIVT� N$0:00 �i „YSCY ::12--i#.T:'r...i^'^��•.i+• .�R J IDsDA a'. � _ OUNT, ��, ,; .� - � t qr .ad"s�7 ,s ' r, ri><i: Y vzl::-�,] H.>;• 4 �a .ik ,_,. .:„n,,, bkK'.,'.�r..-e, :�i+�-3::,cxi�Y' x : TE_ ,. {- PERMIT ISSUANCE 1017'-0000=42404_ 0 !$90.57. $0.00 - ... 'rK.;i x. ,,:• .r, � ...c,•.;h;hr? r`aixJ""'siAK'c';Ta'.f £`< N * AI,t6 ry- s� i" r{ ::F 4�a <:�?µ�- � $..r - � fimri METFI,OD`RECEIPT�# Ise .�F' . 4� .� '•.£'G� 7. "t 5 ' "� d ^r � ".'-:h-rc"'t t ''CHECK#F �'CITD�BY� b ..!4tii�%C4.r.A, r. ,:..:3i-_','. .C.:,}. w .;��tK .h.x .'�f: ?{':?✓�..'r�S:.R�'Ca"r,.k}Zdiz=4•.:��:3n4.r+.ar �:✓'i>:2 ;?'h'h°C _ ;..' .; Total Paid.forPERMIT $90.57. $0.00. . FINANCIAL INFORMATION DESCRIPTION ACCOUNT "QTY ; AMOUNT PAID '.. CLTD PAID DATE. RECEIPT # CHECK # METHOD PAID BY BY BSAS SB1473 FEE 101-0000-20306 0 $1.00. $0.00 Total Paid for BUILDING STANDARDS ADMINISTRATION $1.00 $0.00 BSA: PV•SYSTEM - ARRAY, 101-0000-42403 0 $23.83 $0.00 FIRST 20 PV SYSTEM - ARRAY, 101-0000-42600 0 $23.83 $0.00 ' FIRST 20 PC PV SYSTEM - MISC 101-0000-42403 0 $23.83 $0.00 EQUIPMENT PV SYSTEM - MISC 101-0000-42600 0 $23.83 $0.00 EQUIPMENT PC Total Paid for ELECTRICAL: $95.32 $0.00 PERMIT ISSUANCE 101-0000-42404 1 0 $90.57 $0.00 Total Paid for PERMIT ISSUANCE: $90.57 $0.00 PARENT PROJECTS Printed: Friday, October 03, 2014 9:30:45 AM 2 of 3 Description: 11.2kW PV SYSTEM - (44) 255W PAN ELS+OPTIMIZERS/(2) INVERTERS Type: SOLAR Subtype: Status: APPROVED Applied: 8/22/2014 SKH Approved: 9/26/2014 AOR Parcel No: 773172014 Site Address: 51785 AVENIDA HERRERA LA QUINTA,CA 92253 Subdivision: SANTA CARMELITA VALE LA QUINTA Block: 60 Lot: 2 Issued: UNIT 5 AJ ORTEGA Lot Sci Ft: 0 Building Sci Ft: 0 Zoning: Finaled: Valuation: $24,796.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 E-MAIL Details: 11.2kW SOLAR ARRAY - (44) 255W KYOCERA PANELS+SOLAREDGE P300 OPTIMIZERS W/(1) 5,000W AND (1) 3,800 SOLAREDGE-US- ZB-U-AFCI INVERTERS AND (1) 125A SUBPANEL [792SF] 2013 CALIFORNIA ELECTRICAL CODE. Applied to Approved CHRONOLOGY TYPE STAFF NAME ACTION DATE CHRONOLOGY COMPLETION DATE NOTES E-MAIL AJ ORTEGA 9/12/2014 9/12/2014 COMMENTS EMAILED TO MELISSA AT SOLARCITY E-MAIL AJ ORTEGA 9/26/2014 9/26/2014 EMAILED MELISSA AT SOLARCITY PLAN IS APPROVED AND PERMIT IS READY TO ISSUE. RESUBMITTAL MARY FASANO 9/15/2014 9/15/2014 ROUTED RESUBMITTAL TO AJ CONDITIONS CONTACTS NAMETYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT SOLARCITY CORPORATION 3055 CLEARVIEW WAY SAN MATEO CA 94402 (760)250-1813 CONTRACTOR SOLARCITY CORPORATION 3055 CLEARVIEW WAY SAN MATEO CA 94402 (760)250-1813 OWNER JONATHAN GORGES 51785 AVENIDA HERRERA LA QUINTA CA 92253 (760)250-1813 Printed: Friday, October 03, 2014 9:30:45 AM 1 of 3 CRW"'. Printed: Friday, October 03, 2014 9:30:45 AM 3 of 3 cffr CVCTFMC BOND INFORMATION Y`Y�t.v ,:�_♦ _ ..rte 'Fii �ya.N.zf"J�..:...mi'. .cavi.-6..r...�-lp�. Attachment Type aGREATEDT�a ` :4 F_:._^�� ' "OWNERLi 1 1 i��tN� -- iyr.� � Z2 T"-ter �c.e^.x. SY.,.•�z K�un �� fPATHNAME {,. ..�,Ry1'N-T. n-�.1iif... ,�.. �� €, `„ -.;hDESCRIPTION t ; *SUBDIR:�3 r•IETRAKITENABLED ,EJ BSOL2014-0008 - SOLAR BSOL2014-0008 - SOLAR DOC 9/12/2014 AJ ORTEGA 1ST REVIEW 1ST REVIEW 0 COMMENTS COMMENTS.pdf BSOL2014-0008 - SOLAR BSOL2014-0008 - SOLAR DOC 9/12/2014 AJ ORTEGA 1ST REVIEW REDLINED 1ST REVIEW REDLINED 0 PLAN PLAN.pdf APPLICATION SOLAR APPLICATION SOLAR DOC 8/22/2014 STEPHANIE KHATAMI 51785 AVENIDA 51785 AVENIDA 0 HERRERA.pdf HERRERA.pdf Printed: Friday, October 03, 2014 9:30:45 AM 3 of 3 cffr CVCTFMC Bk Qtr of La Quinta Buffaft at Safety Division P.O. Box 1504,•78-495 Caffe Tampico. La..Quinta, CA 92253 -:(760) 777-7012 Building Permit-Applicadon and Tracking Sheet Permft # �OL2�14-OC� ProjectAddress:51-7 5 A veotdc, owtter's Name:. o lr � i%i c� o� ►-� A P. Ntunber 3 �'� O Z� y Addt css: 5• _i 9c v d� e Legal Description: City, ST, Zip: Lci_ S 3 Contractor SojojrTelephone_ Address: S PmjeixDesaiption: y City, $T, Tap: �. 02 Sol V a State Lia # : Y-CJI,C�.Q 22 w Arcli, Eng, Designer Address: • M • City. ST. Zip: Telephone: Construction Type:. Occupancy: State Lic. #: Name of Comet Person S Project type (circle one): New Add'n Alter Repair Demo Sq. Ft.: - # Stories: # Units: Telephone # of Contact Person ? I Estimated Value of Project: APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal RWd Ree'd TRACKIING PERMIT FEES Plan Sets J7 Plan Cheek submitted item Amount Stractund Calcs. Revlewed, ready for corrections Plan Check Deposit. . Tans Gla. Caned Contact Person Pian Check Balance Mae 24 Cates. Plans picked up Constracdaa Flood plain plan Plans rembmithd.. Mechanical Giading plan 2'! Review, ready for correctiousrhssue Electrical Subeontactor List Called Contact Person Plumbing Grant Deed Pians picked hip S.M.I. H.O.A. Approval Plans submitted Gradlog IN HOUS19-1 ''` Review; ready for car— Developer Impact Fee Planning Approval • Called Contact Person A I.P.P. Pub- Wks. Appr Date of permit issue School Feu I- I v- Total Permit Fees �J '0 `oma 2,o AUG 2 B 2014 . . r CITY OF LA QUINTA - Y COMMUNTTY_DEVELOPMENT I ABBREVIATIONS A AMPERE AC ALTERNATING CURRENT BLDG BUILDING CONIC CONCRETE DC DIRECT CURRENT EGC EQUIPMENT GROUNDING CONDUCTOR (E) EXISTING EMT ELECTRICAL METALLIC TUBING FSB Fire Set—Back GALV GALVANIZED GEC GROUNDING ELECTRODE CONDUCTOR GND GROUND HDG HOT DIPPED GALVANIZED I CURRENT Imp CURRENT AT MAX POWER Isc SHORT CIRCUIT CURRENT kVA KILOVOLT AMPERE kW KILOWATT LBW LOAD BEARING WALL MIN MINIMUM (N) NEW NEUT NEUTRAL NTS NOT TO SCALE OC ON CENTER PL PROPERTY LINE POI POINT OF INTERCONNECTION PV PHOTOVOLTAIC SCH SCHEDULE SS STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT LICENSE CA # 888104 C-10 MODULE GROUNDING METHOD: ZEP SOLAR I AHJ: La Quinta ELECTRICAL NOTES I JURISDICTION NOTES 1. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A SIGN WILL BE PROVIDED WARNING OF THE HAZARDS PER ART. 690.17. 2. EACH UNGROUNDED CONDUCTOR OF THE MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY PHASE AND SYSTEM PER ART. 210.5. 3. A NATIONALLY—RECOGNIZED TESTING LABORATORY SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ART. 110.3. 4. CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH ART. 250.97, 250.92(B) 5. DC CONDUCTORS EITHER DO NOT ENTER BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER ART. 690.31(E). 6. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. 7. MODULE FRAMES SHALL BE GROUNDED AT THE UL—LISTED LOCATION PROVIDED BY THE MANUFACTURER USING UL LISTED GROUNDING HARDWARE. 8. MODULE FRAMES, RAIL, AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS GENERAL NOTES 1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED POWER—CONDITIONING INVERTER. 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. 3. SOLAR MOUNTING FRAMES ARE TO BE GROUNDED. 4. ALL WORK TO BE DONE TO THE 2013 CALIFORNIA BUILDING CODE AND THE 2013 CALIFORNIA RESIDENTIAL CODE. 5. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2011 NATIONAL ELECTRIC CODE AS AMENDED BY THE 2013 CALIFORNIA ELECTRIC CODE. UTILITY: Imperial Irrigation District COVER SHEET CONFIDENTIAL — THE INFORMATION HEREIN JOB NUMBER JB -9221844 CONTAINED SHALL NOT BE USED FOR THE STRUCTURAL VIEWS MWNTING SYSTEM: BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENYS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE ZEP ZS Tile STile MODULES: (44) KYOCERA # KD255GX—LFB3 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. INVERTER: Multiple Inverters ALL CONSTRUCTION SHALL COMPLY WITH THE 2013 CALIFORNIA BUILDING, RESIDENTIAL, MECHANICAL, ELECTRICAL, PLUMBING, ENERGY, AND GREEN BUILDING CODES AND THE LA QUINTA MUNICIPAL CODE Digital Date: 2014.09.12 19:41:43 -06'00' 00 PREMISE OWNER GORGES, JONATHAN 51785 AVENIDA HERRERA LA QUINTA, CA 92253 APN: 7731702014 (760) 250-1813 VICINITY MAP CITY Or—LA QUINTA BUILDING & SAFETY DEPT. AP COVED FOR CONSTRUCTION DATE " 11'WIN"t BY_ t1 AVW 0 SIMMA 104�* fo*A*L— INDEX PV1 COVER SHEET PV2 SITE PLAN PV3 STRUCTURAL VIEWS PV4 UPLIFT CALCULATIONS PV5 THREE LINE DIAGRAM PV6 ONE LINE DIAGRAM PV7 ELECTRICAL CALCULATIONS PV8 ELECTRICAL CALCULATIONS Cutsheets Attached REV BY DATE COMMENTS REV A I NAME DATE COMMENTS GORGES RESIDENCE Dhrumil Desai 11.22 KW PV ARRAY T: 888.765.2489, ex 57819 A�7� PAGE NAME: SHEET: RR DATE- COVER ATECOVER SHEET PV 1 a 9/12/2014 s o' ;SolarCity. I'aS 3055 CleoNew Way San Mateo, CA 94402 T:(650) 638-1028 F:(650) 638-1029 (888)—SOL—CITY (765-2489) www.solarcity.com 4% C VENT SPANNING TRANSFORMER INFORMATION: . KVA PHASE HIGH KV LOW 120/240V —METER# 164S-101484 "PROP@ `� BI—DIRECTIONAL METER 4S-101484" CUTLE AMMER # DG222URB — AC WCONNECT: r 3 FT MAIN PANEL IN: SolarEdge aim; 5000 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION` - ' DATE BY CONFIDENTIAL — THE INFORMATION HEREIN JOB NUMBER JB -9221844 00 CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN ZEP ZS Tile- STIIe PART TO OTHERS OUTSIDE THE RECIPIENT'S MODULES ORGANIZATION, EXCEPT IN CONNECTION WITH �3 THE SALE AND USE OF THE RESPECTIVE (44) KYOCERA- # KD255GX—LFB3 • SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: - PERMISSION OF SOLARCITY INC. -� - - Multiple Inverters ALO PITCH:48 ARRAY PITCH: 18 MP1 AZIMUTH: 90 ARRAY AZIMUTH: 90 MATERIAL: Spanish Tile STORY: 1 Story PITCH: 18 ARRAY PITCH: 18 MP2 AZIMUTH: 270 ARRAY AZIMUTH: 270 MATERIAL: Spanish Tile STORY: 1 Story PITCH: 18 ARRAY PITCH: 18 MP3 AZIMUTH: 180 ARRAY AZIMUTH: 180 MATERIAL: Spanish Tile STORY: 1 Story Digit'5W fAew W Bailey, PE Date: 2014.09.12 19:42:02 -06'00' y LEGEND , O (E) UTILITY METER & WARNING LABEL' INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS © DC DISCONNECT & WARNING LABELS AC AC DISCONNECT & WARNING LABELS ' 0 DC JUNCTION/COMBINER BOX & LABELS DISTRIBUTION PANEL & LABELS Lc LOAD CENTER & WARNING LABELS , M DEDICATED PV SYSTEM METER T Q STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR ' - - --- CONDUIT RUN ON INTERIOR GATE/FENCE Q HEAT PRODUCING VENTS ARE RED +i INTERIOR EQUIPMENT IS DASHED L J ' ' ~ SITE PLAN r t N Scale: 1/8" = 1' w4�4 E 0 1' 8' 16' �. Irz MAMMA PREMISE OWNER f DESCRIPTION: DESIGN: r GORGES, JONATHAN GORGES. RESIDENCE Dhrumil Desai r" �a�t, ityp;; 51785 AVENIDA HERRERA 11:22 .KW -PV ARRAY - -- SolarC LA ' QUINTA, CA 92253 - � -T: 888.765.2489, ex 57819 3055 CIe*rdew W*y F* j;. PAGE NAME SHEET: REV: DAIS - - San Mote*, CA 94402, (760'),250-11,813 P V 2 a . 9/12/2014 T. (650) 638-1028 � F: (650) 638-1029 , . a i }SITE PLAN' (8B8)—SOL—CITY(765-2489)www.sol*rcity.com SIDE VIEW OF MPI MIN X -SPACING X -CANTILEVER Y -SPACING Y -CANTILEVER NOTES LANDSCAPE 48" 24" PORTRAIT 48" 19" TOP CHORD 2X4 @ 24" OC BOT CHORD 2x4 @24" OC PORTRAIT 48" 19" MODULES (44) KYOCERA # KD255GX—LFB3 TOP CHORD 2X4 @ 24" OC BOT CHORD 2X4 @24" OC ROOF AZI 90 PITCH 18 STORIES: 1 ARRAY AZI 90 PITCH 18 S -Tile (Cement) SIDE VIEW OF MP3 NTS MP3 X -SPACING X -CANTILEVER Y -SPACING Y -CANTILEVER NOTES LANDSCAPE 48" 24" DESIGN Dhrumil Desai PORTRAIT 48" 19" TOP CHORD 2X4 @ 24" OC BOT CHORD 2x4 @24" OC ROOF AZI 180 PITCH 18 STORIES: 1 ARRAY AZI 180 PITCH 18 S -Tile (Cement) B SIDE VIEW OF MP2 NTS MP2 X -SPACING X -CANTILEVER Y -SPACING Y -CANTILEVER NOTES LANDSCAPE 48" 24" DESIGN Dhrumil Desai PORTRAIT 48" 19" TOP CHORD 2X4 @ 24" OC BOT CHORD 2x4 @24" OC ROOF AZI 270 PITCH 18 STORIES: 1 ARRAY AZI 270 PITCH 18 S -Tile (Cement) " DIA THREADED STUD & NUT ZEP LEVELING FOOT ZEP TOP ARM ZEP ANTI—ROTATION PLATE M10 BOLTS MOUNTING BASE (E) TILE (E) ROOF DECKING (E) RAFTER " DIA STAINLESS STEEL LAG BOLT (2—j" EMBED, MIN) S1 STANDOFF Scale: 1 1/2" = 1' INSTALLATION ORDER REMOVE TILE, LOCATE & MARK (1) RAFTER LOCATION.PLACE STANDOFF BASE & DRILLPILOT OLES. 2) CLEAN PAPER AROUND PILOT HOLE. z/F SEAL PILOT HOLES AND BOTTOM OF (3) STANDOFF WITH POLYURETHANE 4) LAG STANDOFF BASE INTO RAFTER. PLACE FLASHING AND ATTACH= 5) SEALING SPACER WITH SINGLE BOLT. PLACE ZEP BAR. THEN INSTALL (6) LEVELING FOOT WITH BOLT &WASHER. t, r - LONFlDENTIAL -THE INFORMATION HEREIN CONTAINED SHALL NOT E USED FOR THE BENEFIT OF ANYONE EXCEPT SOIARgTY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION MATH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, MATHOUT THE WRITTEN PERMISSION OF SOLARgTY INC n NUMBER: J B-9221844 OO PREMISE OWNER: DESCRIPTION: GORGES, JONATHAN GORGES RESIDENCE 51785 AVENIDA HERRERA 11.22 KW PV ARRAY LA QUINTA, CA 92253 T: 888.765.2489, ex 57819 PAGE NAME (760) 250-1813 STRUCTURAL VIEWS DESIGN Dhrumil Desai ``,Za a �.�� ;SOIarCl �;,ty MOUNTING SYSTEM: ZEP ZS Tile STile MODULES (44) KYOCERA # KD255GX—LFB3 3055 CleaMew Way Son Mateo, CA 94402 (888)-SOL-CITY(765-2489) Srwiww� rcityoom SHEET: REN DATE PV 3 a 9/12/2014 INVER'ER Multiple Inverters SOLAR PANEL SOLAR MODULE MOUNTING HARDWARE (SEE STANDOFF DETAIL) ROOFING MATERIAL PLYWOOD (E) RAFTER 2" MAX VENT SPANNING DETAIL DIAMETER i NTS i i 2" MIN CLEAR SPAN _,4,TO UNDERSIDE "l OF MODULE 6" MIN. VENT _ HEIGHT FROM TOP OF ROOFING MATERIAL VENT PIPE I SPANNING PHOTOVOLTAIC MODULES OVER VENTS MINIMUM VENT HEIGHT IS 6" ABOVE THE SURFACE OF THE ROOF -PER 2007 CPC SECTION 906.1. 2013 CPC 310.5 STATES 'NO FITTING, FIXTURE, AND PIPING CONNECTION, APPLIANCE, DEVICE, OR METHOD OF INSTALLATION THAT OBSTRUCTS OR•RETARDS THE FLOW OF WATER, WASTES, SEWAGE, OR AIR IN THE DRAINAGE OR VENTING SYSTEMS IN AN AMOUNT EXCEEDING THE NORMAL FRICTIONAL RESISTANCE TO FLOW, SHALL BE USED UNLESS IT IS INDICATED AS ACCEPTABLE IN THIS CODE OR IS APPROVED IN ACCORDANCE WITH SECTION 301.1 OF THIS CODE." FROM THIS SECTION, IT IS CLEAR THAT MOUNTING SOLAR MODULES OVER A VENT IN A MANNER THAT WILL NOT HAVE A GREATER FRICTIONAL RESISTANCE TO AIR FLOW WOULD BE ACCEPTABLE. EQUATIONS: THE FRICTIONAL RESISTANCE TO FLOW IS .DIRECTLY PROPORTIONAL TO THE AREA THAT THE AIR CAN FLOWTHROUGH. IN THE VENT, THAT IS THE CROSS-SECTIONAL AREA OF THE VENT PIPE:- ' Avent = WR' WHEN THE AIR EXITS THE VENT, THE AREA IT HAS TO FLOW THROUGH IS THE CIRCUMFERENCE OF THE VENT TIMES ,THE ,VERTICAL DISTANCE BETWEEM THE VENT AND THE MODULE ABOVE (IN THIS CASE, WE ARE LEAVING THE DIAMETER BETWEEN THE°TOP OF.THE VENT AND THE BOTTOM OF THE PANEL). THIS METHODOLOGY, ASSUMES THE WORST CASE SCENARIO OF MOUNTING THE MODULES HORIZONTALLY OVER THE VENT. IN .ACTUALITY, THE MODULES WILL 'BE. TILTED'WHICH WILL OFFER MORE!AREA FOR AIR TO FLOW THROUGH. - Agap'= C*CLEARANCE = (WD)*D = (7r*2*R)*(2*R) = 4*WR2t 4*WR2 > WR2 FROM THE EQUATIONS ABOVE, IT IS EVIDENT THAT MOUNTING THE MODULES IN THIS MANNER ALLOWS FOUR TIMES THE AMOUNT OF AIR FLOW ABOVE THE VENT THAN IN THE VENT ITSELF. VENT HEIGHT WILL BE A MINIMUM OF 6 INCHES ABOVE THE ROOF, OR THE MINIMUM VALUE ALLOWED BY LOCAL BUILDING CODE. MINIMUM CLEARANCE BETWEEN THE TOP OF THE VENT AND THE BOTTOM OF THE SOLAR MODULE GLASS SHALL BE AT LEAST THE DIAMETER OF THE VENT. IN THE DIRECTION OF THE SLOPE OF THE ROOF, THERE SHALL BE A GAP OF AT LEAST 1/2 INCH BETWEEN MODULES. THE ROOF SLOPE MUST HAVE A MINIMUM INCLINATION OF 10' OR THE PANELS MUST BE SLOPED AT A MINIMUM INCLINATION OF 10'. CONFIDENTIAL - THE INFORMATION HEREIN M NUMBER: JB -9221844 OO ' - PREMISE OWNER: CONTAINED SHALL NOT BE USED FOR THE- ;GORGES, JONATHAN BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: .NOR MALL IT BE DISCLOSED IN WHOLE OR IN ZEP ZS Tile STile _51785 AVENID'A HERRERA PART TO OTHERS OUTSIDE THE RECIPIENTS NODDLES ' LA QUINTA CA 92253 TION, EXCEPT IN • CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE 44KYOCERA •# KD2` kX=LFB3 ORGANIZA() SOLARCITY EQUIPMENT, WnHOUT THE WRITTEN' NVERTER: PERMISSION OF SOLARCITY INC. Multi le .Inverters (760) 25071813 , UPLIFT CALCULATIONS : outT"PSystem 08.17.2014 SleeVersion #37.9;,solarCity. Structural Desian Software Project Information &Table Of.Contents Risk Category: II PV Syste Type SolarQty SleekMour,t"''_ - - 5panish Tile Roof Spanish Tile Roof L . ers of Com Roofin Roof Slope 18' Rafter. do ;24" O.C. PV System Module Orientation Landsca a and Portrait PV •Module Area 780 sf PV Module Width - 39" PV Module Length 65" Standoff Attad,ment Hardware SM Tile ' Reduced Ground/Roof Uve/Snow Loads: Ground Snow Load 0.09 ASCE Table 7-1 Surrounding Roof.Snow Roof Snow Over PV Modules =pg_�� 0.0 psf /�SCE_Eq _4-1� 0.0 od ASCE : 7.41 Wind Design Criteria Wind Design Code ASCE 7-10 .' Wind Design Metho— d � =Partially/Fully Enclosed Method Basic Wind�Speed V 110 mph Fig. 26.5 1A Exposure CatQgory Roof Style. - C Section 26.7Y Gable Roof rte. 30.4-2n/e/C-5A/e Mean Roof Height h 15 ftSection 26:2 _26:2 _ Effective Wind Area 1 Module A 17.7 sf .-71k-1509.7.1 Wind Pressure Calculation Coefficients' Wind Pressure. Exposure Kz 0:85 Table 30.3-1 Topographic Factor . KA 1.00 _Section 26.8 _ Wind DiWind Di �_-_-edionality Facto Kd 0.85 Section 26.6-1• Importance Factor I NA"' Velodty Pre --sure qh qh = 0.00256 (K (Krt) (Kd) (V^2) Don 30.3-1 4 yd Ext Pressure C.oe�ffiddeent (Up_) ^GCP up); -0:88. r•,y.-3o ac s /A/s D.45 I.Rg. 30.4-2A/88/C-5A%e Ext Pressure Coeff3,ent Down , , G Down Design Wind Pre -sure P p = gh GC uation 30.4-1 Wind Pressure Up _ p(up)_ -19.6 psf Wind Pressure Down down .. '16.0 Allowable Standoffs - dn' s X-Diredtilon Y -Direction Max Allowable Standoff Spadng� Max Allowable Cantllever—Landscape Landscape 48". - 24"Np 39" Standoff.Confi uration • Landscape Not-Sta"gered Max Standoff_ Trlbykry_Area - PV Assembly Dead Load Tr1b 13 sf - W -PV 3 psf Net Wind Uplift at Standoff: P�adual 1301 Uplift Capadty of Standoff T -allow 446 lbs Standoff Demand Ci DCR -29.2%, Max.Allowable Standoff SPadng: Portrait 48"_ 65" Max Allowable Cantilev-er Standoff Confi uration - Portrait Portrait Ndt-Staggered Max Standoff Tributary Area" = Trib 22 sf PV Assembly Dead Load Net Wind Uplift•at�S aandoff ' Uplift Capacity of Standoff W=pv . , 3 psf T' -@_ dual =219 (bs T -allow 446 lbs Standoff. Deman Ca 49'.G( IL , y DESMPTION: DESIGN: - - GORGES RESIDENCE Dhrumil Desai '*4 "'l, �- 11.22 KW PV ARRAY - 'i�,SolarCit Y .3055 pearNew Way PAGE NAME T: 888.765.2489, ex 57819 SHEET REV. DATE T: (650) Son Mateo, F � 94402 636-,oz9 UPLIFT' CALCULATIONS PV 4 0 9/12/2014, (888)-SOL-OTY (765-2489) www.solarcity.com y DESMPTION: DESIGN: - - GORGES RESIDENCE Dhrumil Desai '*4 "'l, �- 11.22 KW PV ARRAY - 'i�,SolarCit Y .3055 pearNew Way PAGE NAME T: 888.765.2489, ex 57819 SHEET REV. DATE T: (650) Son Mateo, F � 94402 636-,oz9 UPLIFT' CALCULATIONS PV 4 0 9/12/2014, (888)-SOL-OTY (765-2489) www.solarcity.com GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #1 GEC TO (E) LIFER AT PANEL Panel Number. Inv 1: DC Ungrounded INV 1 -(I)SOLAREDGE ISE5000A-US-ZB-U-Ip 1. A -(44)KYOCERA # KD255GX-LFB3 CA # 888104 WITH IRREVERSIBLE CRIMP Meter Number: 1B45-101484 Inv 2: OC Ungrounded Inverter, 5000W, 240v, 97.5x wA.,N d Disco and ZB, AFCI PV Module; 255W, 228.3W PTC, 40MM, Black Frame, ZEP Enabled C-10 INV 2 Underground Service Entrance Downsizing Main Breaker For Tie -In -(1)SOLAREU( QSE3800A-US-ZB-U Inverter, 3800W, 24OV, 97.5x; g wNnifed eh. and ZB, AFCI Voc: 37.6 Vpmax: 30.4 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER E) 200A CENTER -FED MAIN SERVICE N 175A/2P MAIN CIRCUIT BREAKER PANEL BRYANT Inverter 1 CUTLER -HAMMER Disconnect 9 (N) 125A Load Center 7 SOLAREDGE N)175A/2P SE5000A-US-ZB-U (E) LOADS B • C 30A/2P Lt TE SolarCity 1 2 - - - • , N A C+ S DG 1 Strings) Of 12 On MP 1 1 50A/2P m A ---- GOND _ ---- - - - - -- , o ---------------- r ' - EGG ___ DC+ GEC DG �+ OG 1 String(s) Of 11 On MP1andMP3 1 9 I 1- I Z 1 T �, N .I GND -- EC_'C--------------------------- EGC - 1 1 N I 1 , Inverter 2 EGC/GEC I 1 8 �, SOLAREDGE -� 'I SE3800A-US-ZB-U GEC 20A/2P 1 L1 zgov -Lz TO 120/240V i1 N 6 1 Strings) Of 11 On MP 2SINGLE PHASE - --------- ------------------ EGG DG . GEC ---�� DG -GND--------------------------- MDC+ 1 S1rirJ(s) Of10 On MP 2L- --------------- �-UTIUTYSERVICE -- - J QROFESS/0 e _ CITY OF LA QUINTA L�� E 1937 < M PHOTOVOLTAIC SYSTEM CONDUCTORS SHALL BE IDENTIFIED BUILDING & SAFETY DEPT. EXP yt * AND GROUPED. THE MEANS OF IDENTIFICATION SHALL BE PERMITTED BY SEPARATE COLOR CODING, MARKING TAPE, � O TR%C, TAGGING, OR OTHER APPROVED MEANS. THE MEANS OF FOR CONSTRUCTION GROUPING SHALL BE WIRE TIES OR SIMILAR MEANS AT LEAST ONCE, AND THEN AT INTERVALS NOT TO EXCEED SIX (6) Digita eVV ailey, PE FEET. Date: 2014.09.12 19:42:20 -06'00' PHOTOVOLTAIC EQUIPMENT AND SYSTEMS AND ALL DATE BY ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE Voc* =MAX VOC AT MIN TEMP INSTALLED ONLY BY QUALIFIED PERSONS POI (1 )MURRAY 8 Mp2�p PV BACKFEED BREAKER Breaker, 50A 2P, 2 Spaces B (1) CUTLER -HAMMER P DG222URS /� Disconnect; 60A, 24OVac, Non -Fusible, NEMA 3R A A (1) SolarCit 4 STRING JUNCTION BOX D 2x2 SA GS, UNFUSED, GROUNDED - (1)Ground Rod; 5/8' x 8', Copper -0) CUTLER- AMMER_Q DG100N8 Ground%Neutrol It; 60-100A, General Duty (DG) PV (44) SOLAREDGE C (I )BRYANT BR816LI25RP PowerBox ptimizer, 300W, H4, DC to DC, ZEP Load Center, 125A, 120/24OV, NEMA 3R - (1)H Breaker,3OA/YPB 2 Spaces es - (I)CUTLER-HAMM 8 BR220 Breaker, 20A 2P!2 2 Spaces I 1 AWG #, THWN-2, Black (Q)6E(1)AWG 6E (1)AWG J8, THWN-2, Red ���LLL( � (1)AWG #8, THWN-2, Block (1)AWG #8, THWN-2, Red O (1)AWG /8, THWN-2, Black Voc* = 500 VDC Isc = 30 ADC O (1)AWG 88, THWN-2, Red Vmp = 350 VDC Imp= 16.54 ADC (2)AWG 810, PV WIRE, Block O (1) AWG 810, Solid Bare Copper EGC Voc* = 500 VDC. Isc = 15 ADC Vmp = 350 VDC Imp= 8.63 ADC )AWG /8, THWN-2. White NEUTRAL Vmp 240 VAC Imp=36.66AAC L� (I) AWG 88, THWM-2, White NEUTRAL VmP =240 VAC Imp=20.83AAC 0 1tAWG /8, THWN-2,, Green .. EGC.. EMT, IJ ...... - (1) AWG #8,. TH,WN-2,• Green • , ECC/GEC - (1) Conduit. Kit .1'• EMT• • ......... .. . . .. . - (1 AWG 88,_ TH.WN-2,, Green .. ECC/GEC - (1) Conduit, Kit;. 1'. EMT• ........... 1 )AWG ( 88, THWN-2, Block • ,-(1)Conduit•Kit;.1' • • • • .. • • , (1 / AWG S8, THWN-2, Block Voc* = 500 VDC Isc = 30 ADC � (1)AWG /8, THWN-2, Red Vmp - 350 VDC Imp= 15.1 ADC ©� - (2) AWG 810, PV N1RE Black (1) AWG 0 Solid Bare O 81 , Copper EGC Voc* = 500 VDC Isc =15 ADC Vmp = 350 VDC Imp= 7.91 ADC p p= O (1)AWG #8, THWN-2, Red 8 , ... 0 )AWG A. THWN-2,, Green . , ECC • .. ,- (1) Conduit. Kit; • 1'. EMT IIIJJJ THWN-2, White NEUTRAL Vm =240 VAC Imp -15.83AAC (1) AWG 88 P p - .. _ . _ . 70 AWG 88, • THWN-2,, Preen • _ ECP/GEC.- (1) Conduit. Kit;, 1'. EMT.... _ . • .... (2) AWG 810, PV 0 Black O L'] (1) AWG 810, Solid Bare Copper EGC . Voc* = 500 VDC Isc =15 ADC Vmp = 350 VDC Imp= 7,91 ADC (2) AWG ® 810, PV WIRE Black (1) AWG 810, Solid Bare Copper EGC Voc* = 500 VDC Isc = 15 ADC Vmp = 350 VDC Imp= 7.19 ADC LTJ CONFIDENTIAL -TME INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE JOB NUMBER: JB -9221844 0 0 OWNER GORGES, JONATHAN DESCRIPTION: GORGES RESIDENCE DESIGN: Dhrumil Desai mmtpSolarCity MOUNTING SYSTEM: ZEP ZS Tile STile BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 51785 AVENIDA HERRERA 11.22 KW PV ARRAY - 00 - OUTSIDEPART TO OTHERS LA QUINTA, CA 92253 MODULES 30555 aeaMew Way San Mateo, CA 94402 ORGANI ATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE (44) KYOCERA # KD255GX-LF83 T: 888.765.2489, ex 57819 SHEET: REV: DATE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. (760) 250-1813 PAGE NAME THREE LINE. DIAGRAM PV 5 0 9/12/2014 (888) -SOL -CITY 65-2489)028 �www.solarcci29 itycom 'Multi Multiple Inverters EXISTING UNDERGROUND ELECTRICAL SERVICE ENTRANCE 200A 122 kAIC 1240V 1 PHASE 1 3 WIRE TO 120/240V SINGLE PHASE )TILITY SERVICE (E) LOADS 50A/2P ELECTRICAL ONE LINE DIAGRAM PHOTOVOLTAIC SYSTEM UTILITY DISCONNECT SWITCH CUTLER HAMMER # DG222URB 60A, 240VAC AC COMBINER PANEL BRYANT # BR816L125RP LOAD CENTER; 125A 125/240V, NEMA 3R Digitafry sign`ed-Gy—Mattliiew W Bailey, PE Date: 2014.09.12 19:42:36 -0600' ®� (1)AWG #8, THWN-2, Block (1)AWG #8, THWN-2, Red (I )AWG g8, THWN-2, White NEUTRAL Vmp =240 VAC Imp= 15.83AAC ......-_ 1 AWG , THWN-2,. Green EGC GEC —(1)Conduit Kit; 1' EMT O (1) AWG $8, THWN-2, Black (1) AWG #8, THWN-2, Red EGC I O (1)AWG #8, THWN-2, White NEUTRAL Vmp =240 VAC Imp =36.66AAC ...... 7.0) 0918, THWN72,. Green ...EGC/GEC - (1).Conduit Kit;. 1' EMT ............. CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. JOB NUMBER JB -9221844 00 MOUNTING SYSTEM: ZEP ZS Tile STile (44) KYOCERA # KD255GX-LFB3 INVERTER: Inverters 3OA/2P 20A/2P AC DC 5000 WATT UTILITY INTERACTIVE INVERTER 230 TO 600 VDC TO 120 /240 VAC 10 SOLAREDGE #SE5000A—US—ZB—U AC DC 3800 WATT UTILITY INTERACTIVE INVERTER 230 TO 600 VDC TO 120 /240 VAC 10 SOLAREDGE #SE3800A—US—ZB-U O ( 1 ) AWG #B, THWN-2, Black (1) AWG #B, THWN-2, Red Voc* = 500 VDC Isc = 30 ADC Vmp = 350 VDC Imp= 16.54 ADC © .(.1 ) AWG. A THWN-2. Green (1) AWG #8, THWN-Y, black (1) AWG #B, THWN-2, Red EGC........ . Voc* '='500 VDC Isc = 30 ADC Vmp = 350 VDC Imp= 15.1 ADC O (1) AWG . �8, THWN-2,. Green ........................................ EGC I O (1) AWG #8, THWN-2, Black (1) AND #8. THWN-2, Red ADC ADC O (I )AWG #8, THWN-2, White NEUTRAL Vmp =240 VAC Imp =20.83AAC VDC VDC — (1)AWG.B, TIiWN-2,. Green .. ,EGC/GEC - (1)Con4uit Kit; 1' EMT PV ARRAY #1 12 MODULES KYOCERA 1 # KD255GX-LFB3 255 WATT (DC) 228.3 WATT (AC) lL) PV ARRAY #3 11 MODULES PHOTOVOLTAIC SYSTEM KYOCERA JUNCTION BOX # KD255GX—LFB3 SolarCity # 4 STRING JUNCTION BOX 2x2 STRINGS, UNFUSED,255 WATTDC GROUNDED ( ) 228.3 WATT .(AC) PV ARRAY #2 11 MODULES KYOCERA 3 # KD255GX—LFB3 255 WATT (DC) 228.3 WATT (AC) l`t) PV ARRAY #2 10 MODULES PHOTOVOLTAIC SYSTEM KYOCERA JUNCTION BOX # KD255GX—LFB3 SolarCity # 4 STRING JUNCTION BOX 2x2 STRINGS, UNFUSED, GROUNDED 255 WATT (DC) 228.3 WATT (AC) 1 0 (2) AWG #10, PV WIRE, Black (1 )AWG #10, Solid Bare Copper EGC Voc* = 500 Vmp = 350 VDC VDC Isc =15 Imp= 8.63 ADC ADC O �.................... (2)AWG.$10,.PV.WIRE,.Black...... (1)AWG #10, Solid Bare Copper EGC Voc* = 500 Vmp = 350 VDC VDC Isc... =15. Imp= 7.91 ADC ADC O .................... (2)AWG #10, PV WIRE, Black (1) AWG #10, Solid Bare Copper EGC .... Voc* =500 Vmp = 350 VDC VDC ....... Isc =15 Imp= 7.91 ADC ADC ................................... 4 0 ..................................................................... (2) AWG #10, PV WIRE, Black ( 1 ) AWG #10, Solid Bare Copper EGC Voc* = 500 Vmp = 350 VDC VDC Isc =15 Imp= 7.19 ADC ADC PREMISE OMNER: DESCRIPTION: DESIGN: GORGES, JONATHAN GORGES RESIDENCE Dhrumil Desai 51785 AVENIDA HERRERA 11.22 KW PV ARRAY LA QUINTA, CA 92253 T: 888.765.2489, ex 57819 (760) 250-1813 PAGE NAE- ONE AMEONE LINE DIAGRAM SHEET: RR. DATE- PV ATEPV 6 a 9/12/2014 r '=1 ;;SolarCity 3055 Clearview Way San Mateo, CA 94402 T:(650) 638-1028 F:(650) 638-1029 (888) -SOL -CITY (765-2489) www.edarcity.com ELECTRICAL CALCULATIONS El Panel Schedule Load Breaker Air Conditioner 60A/217 Laundry 20A/1P Bathroom 20A/1P Lighting Circuit 15A/1P Lighting. Circuit 15A/1P Lighting Circuit 15A/1P Small Appliance 20A/1P Small Appliance 20A/1P Small Appliance 20A/1P Small Appliance 20A/1P Small Appliance 20A/1P Small Appliance 20A/1P Small Appliance 3 20A/1P �j e All appliances ... Ranges, wall -mounted ovens, counter -mounted cooking l II units ... Clothes dryers that are not connected to the laundry branch circuit ... ;t} CITY OF LA QUI SI A BUILDING & SAFETY DEPT. A 0 FOR CONSTRUCTION DATE BY. Digitally Date: 2014.09.12 19:42:55 -06'00' , PE Total General Load (non -A/C load) 18141 VA First 8 kVA of load at 100% 1 80001. Remainder of load at 40% 4056 General Calculated Load (non -A/C load) 12056 VA NEC 220.83(B) The larger connected load of air-conditioning or space -heating, but not both, shall be used ... [at) 100 Percent of Load " Breaker I VA +Sum of A/C Equipment 60 10800 Sum of Electric Furnaces 0 0 Max Heating and Air -Conditioning load 10800 VA Total Load Sum of General Calculated Load 22856 VA 11 & Heating and A/C Load IF95.24 A CONFIDENTIAL -THE INFORMATION HEREINJOB CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EOUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. NEC 220.83 - Residentail Load Calculation Version 3.0 NEC 220.83(B) "Existing Dwelling Unit.... to determine if the existing service ... is of �'`a'•SolarCity. .,,s N sufficient capacity ... The following percentages shall be used for existing ... loads ... First 8 kVA of load at 100%, Remainder of load at 40% NEC 220.83(B)(1) General lighting and general -use receptacles at ... 3 volt-amperes/ft2 as INVERTER: Multiple Inverters determined by 220.12. Sq Ft I VA Floor Area (3VA/sq ft) 1 15471 4641 NEC 220.83(B)(2) 1500 VA for each 2 -wire, 20 -ampere small -appliance branch circuit and each laundry branch circuit covered in 210.11(C)(1) and (C)(2). Qty I VA Small Appliance Circuits 7 10500 Laundry Circuits 1 1500 Bathroom Circuits 1 1500 NEC 220.83(8)(3) All appliances ... Ranges, wall -mounted ovens, counter -mounted cooking units ... Clothes dryers that are not connected to the laundry branch circuit ... [and) water heaters" CITY OF LA QUI SI A BUILDING & SAFETY DEPT. A 0 FOR CONSTRUCTION DATE BY. Digitally Date: 2014.09.12 19:42:55 -06'00' , PE Total General Load (non -A/C load) 18141 VA First 8 kVA of load at 100% 1 80001. Remainder of load at 40% 4056 General Calculated Load (non -A/C load) 12056 VA NEC 220.83(B) The larger connected load of air-conditioning or space -heating, but not both, shall be used ... [at) 100 Percent of Load " Breaker I VA +Sum of A/C Equipment 60 10800 Sum of Electric Furnaces 0 0 Max Heating and Air -Conditioning load 10800 VA Total Load Sum of General Calculated Load 22856 VA 11 & Heating and A/C Load IF95.24 A CONFIDENTIAL -THE INFORMATION HEREINJOB CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EOUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. mulimt JB -9221844 0 0 PREMISE OWNER. DESCRIPTION: GORGES, JONATHAN GORGES RESIDENCE 51785 AVENIDA HERRERA 11.22 KW PV ARRAY LA QUINTICA 92253 p , T: 888.765.2489, ex 57819 PACE NAME: (760) 250-1813 ELECTRICAL CALCULATIONS DESIGN: Dhrumil Desai �'`a'•SolarCity. .,,s N MOUNTING SYSIEII: ZEP ZS Tile STile MoOULEs (44) KYOCERA # KD255GX—LFB3 3055 aearview Way San Mateo, CA 94402 T.(650) 638-1028. F:(650) 638-1029 (888)-SOL-aTY (765-2489) www.solarcity.com SHEET: REY. DAIS PV 7 0 9/12/2014 INVERTER: Multiple Inverters ELECTRICAL CALCULATIONS I CITY OF LA QUINTA BUILDING & SAFE -1 Y DEPT. APPROVED FOR CONSTRUCTION DATE BY Digitally-eg-rtedb-f VMMe&'fW Bailey, PE Date: 2014.09.12 19:43:13 -06'00' Hardware Qty Model Module: 44 Kyocera KD255GX-LFB3 DC Converter: 44 SolarEdge OP300-MV Inverter A: 1 SolarEdge 5000 Inverter B: 1 SolarEdge 3800 Inverter A Stringing String 1: 12 modules Photovoltaic Module Bectrical Specifications: Kyocera KD255GX-LFB3 Power (STC)= 255 W Power (PTC)= 228.3 W Voc= 37.60 V Vmp= 30.40 V Lsc= 9.09 A Imp= 8.39 A Tvoc= -0.14 V/deg C Tvmp= -0.14 V/deg C Tisc= 8.39 mA/deg C DC Converter Bectrical Specifications SolarEdge OP300-MV Power= 300 W Efficiency Factor= 0.987 Vmin_input= 5 V Vmax-input= 60 V ]max input= 10 A Vmax output= 500 V Imax output=� 15 A Inverter A Bectrical Specifications SolarEdge 5000 Power= 5000 W Vmp_input= 350 V Vmax input= 500 V Imax input= 0.0 A Vmp-output= 240 V =Service Voltage Imp -output= 20.83 A =Icont Inv Power DC W PTC DC W STC 42.49 V 5000 2740 3060 Vmp= 3840 2511 2805 25.69 V 8840 5251 5865 Imp= 8.39 A Icont= Inverter B Stringing String 1: 11 mods Photovoltaic Source (Modules to PowerBox) Voc at Min Temp= 42.49 V Voc= 37.60 V Vmp= 30.40 V Vmp at Max Temp= 25.69 V Isc= 9.09 A Imp= 8.39 A Icont= 11.36 A Voltage Drop Calculations Version 6_0.8 Vdrop = (Imp) * (2 *Length) * (Resistance) / (Vmp) Inverter A Max. Length (ft) Wire 8.63 30 ft Input 1: MODULES: (44) KYOCERA # KD255GX-LFB3 Vdrop = (36.83 A Vdrop = 63 A * 60 ft * 0.00078 Ohms) / 350 V Inverter A t8.63 Input 2: Vdrop = 8.63 A * 20 ft * 0.00002 Ohms) / 350 V = 0.00% Imp (A) Max. Length (ft) Wire 8.63 30 ft D AWG 08 p (A) Max. Length (ft) Wire 20.83 10 ft D AWG 08 Inverter A Max. Length (ft) Wire 20.83 10 ft Output: MODULES: (44) KYOCERA # KD255GX-LFB3 Vdrop = (36.83 A Vdrop = 20.83 A * 10 ft * 0.00078 Ohms) / 240 V = Imp (A) Max. Length (ft) Wire 20.83 10 ft D AWG 08 Combined Max. Length (ft) Wire E36.183 Output: D AWG 08 MODULES: (44) KYOCERA # KD255GX-LFB3 Vdrop = (36.83 A * 0 ft * 0.00078 Of C AWG 10 90. °C:Table 310.15(B)(16) Ampacity= 40 > 14.20 A OK Corrected Ampacity= 23.20 A > 11.36 A OK Temperature Derate= 0.58 Conduit Fill Derate= 1 Inverter A Input Circuit (PowerBox to Inverter) Strung 1 Vmax= 500 V Wire Length: 30 Vmp= 350 V Imax= 15.00 A Icont= 18.75 A Imp= 8.63 A D AWG 08 90 °C:Table 310.15(B)(16) Ampacity= 55 > 18.75 A OK Corrected Ampacity= 31.90 A > 18.75 A OK Temperature Derate= 0.58 Conduit Fill Derate= 1 OCP= 20 A Inverter A output Circuit Service Voltage= 240 V Wire Length: 10 Icont= 20.83 A D AWG 08 Am pacity= Corrected Ampacity= Temperature Derate= Conduit Fill Derate= OCP= 90 °C:Table 310.15(B)(16) 55.00 > 26.04 A OK 50.05 A > 20.83 A OK 0.91 1 30 A A) Max. Length (ft) Wire E36.183 0 ft D AWG 08 Site Temperatures Record Low Temp: Max Average High Temp: 240 V =I 0.00% OF OC 14 -10 109 42.7777778 CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT E USED FOR THE BENEFIT OF ANYONE EXCEPT. SOLARCITY INC., NOR SHALL IT BE DISCLOSED IN WHOLE OR IN PART TO OTHERS EXCEPT IN THE RECIPIENT'S ORGANIZATION, IXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. .�B NUMBER JB -9221844 00 PREMISE OWNER. DESCRIPTION: GORGES, JONATHAN GORGES RESIDENCE 51785 AVENIDA HERRERA 11.22 KW PV ARRAY LA QUINTA, CA 92253 T: 888.765.2489, ex 57819 PAGE NAME: (760) 250-1813 ELECTRICAL CALCULATIONS DESIGN: Dhrumil Desai `\, / ���� �'"!' SolarCity. A, • MOUNTING SYSTEM: ZEP ZS Tile STile MODULES: (44) KYOCERA # KD255GX-LFB3 � a�7ew W01' Son T-.(650) 636-1028. C (6540638-1029 (888) -SCI -CITY (765-2489) www.8d(i.cIty.� SHEEP REV: DATE PV 8 a 9/12/2014 INVERTER. Multiple Inverters a CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: - Address: 51785 Avenida Herrera AC DISCONNECT UTILITY SERVICE INVERTER AND DC DISCONNECT INVERTER AND DC DISCONNECT r -- — — — — — — — — — -- — — — — — — — — ----- SOLAR PHOTOVOLTAIC ARRAYS)' l L--------------------------J PHOTOVOLTAIC BACK -FED CIRCUIT BREAKER IN MAIN ELEC1f6CAL PANEL IS AN A/C DISCONNECT PER NEC 690.17 OPERATING VOLTAGE = 240V CITY OF LA QUANTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY CONFIDENTIAL — THE INFORMATION HEREIN CONTAINED SHALL NOT E USED FOR THE BENEFIT BENETIT OF ANYONE EXCEPT SOLARgTY INC., NOR STALL IT BE DISCLOSED IN WHOLE OR IN ORGANIZATION, EXCEPT IPART TO OTHERS DN CONNE THE ECTION WITH THE SALE AND USE OF THE RESPECTIVE SOLARCITY EQUIPMENT. WITHOUT THE WRITTEN PERMISSION OF SOLARgTY INC JOB NUMBER JB -9221844 OO MAUx UWNGK: UMAP11UN: GORGES, JONATHAN GORGES RESIDENCE 51785 AVENIDA HERRERA 11.22 KW PV ARRAY LA QUINTA, CA 92253 T: 888.765.2489, ex 57819 PAGE NAME: (760)' 250-1813 SITE PLAN PLACARD RUM Dhrumil Desoi elm � .,�c �„�Olar�'�� MOUNTING SYSTFll: ZEP ZS Tile STile MODULES: (44) KYOCERA # KD255GX—LFB3 3055 Clearviee Way San Mateo. CA 94402 (888)—SOL—CITY '765-2489) mimsB—rofY� SHEET: REV: DATE PV 9 0 9/12/2014 INVERTER: Multiple Inverters Label Location: (C)(IC)(CB) Per Code: CRC R331.2 Label Location: (DC) (INV) Per Code: CEC 690.14.C.2 Label Location: (DC) (INV) Per Code: CEC 690.53 Label Location: (DC) (CB) Per Code: CEC 690.17 Label Location: (INV) Per Code: CEC .690.5(C) Label Location: (AC) Label Location: (DC) Per Code: CEC 690.17 Label Location: (POI) Per Code: CEC 705.12.D.7 Label Location: (POI) Per Code: CEC 690.54; CEC 690.17 Label Location: (DC)(INV)(CB) Per Code: CEC 690.35(F) TO BE USED WHEN INVERTER IS UNGROUNDED UNGROUNDED AND ENERGIZED 77 Label Location: . Label Location:CAU(D) (POI) CITY OF LA QUINTA TION PHOTOVOLTAIC AC (AC) (POI) Per Code:(AC): AC Disconnect Per Code: PHOTOVOLTAIC CEC 690.64.B.4 BUILDING & SAFETY DEPT. (C): Conduit DISCONNECT CEC 690.14.C.2 CIRCU6� V (CB): Combiner Box A (D): Distribution Panel FOR CONSTRUCTION (DC): DC Disconnect (IC): Interior Run Conduit Label Location: Label Location: (INV): Inverter With Integrated DC Disconnect MAXIMUMAC (AC) (POI) . (POI) DATE 13Y (LC): Load Center OPERATING CURRENT Per Code: DUAL POWER • - Per Code: OPERATING VOLTAGE CEC 690.54 - HOTSECOND ! CEC VLT705A2.D.7 (M): Utility Meter C SYSTEM (POI): Point of Interconnection CONFIDENTIAL - THE INFORMATION HEREIN CONTAINED SHALL NOT BE USED FOR THE BENEFIT OF ANYONE EXCEPT SOLARCITY INC., NOR SHALL IT BE DISCLOSED �`•01r,W' ®C®O® IN WHOLE OR IN PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, SC - CA Label Set_ . T EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE r I� Solarch o D»®OLmttt ® SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF SOLARCITY INC. ` solar @ SolarEdge Power Optimizer Module Add -On For North America P300 / P350 / P400 PV power optimization at the module -level — Up to 25% more energy — Superior efficiency (99.5%) — Mitigates all types of module mismatch losses, from manufacturing tolerance to partial shading — Flexible system design for maximum space utilization — Fast installation with a single bolt — Next generation maintenance with module -level monitoring — Module -level voltage shutdown for Installer and firefighter safety USA - GERMANY - ITALY - FRANCE - JAPAN - CHINA - ISRAEL - AUSTRALIA www.solaredge.us so I a r- • • SolarEdge Power Optimizer Module Add -On for North America P300 / P350 / P400 P300P350 (for 60 -cell PV (for 72 -cell PV modules) modules) INPUT Rated Input DC Power•' 300 350 .............................P......... g.........................P................................................................ Absolute Maximum In ut Volta a Voc a[ lowest tem erasure d8 60 ................................................................................................................................... MPPTOperating Range.........................................................8:48.....................8 : ......... Maximum Short Circuit Current (Isc) 10 .................................................................................................................................... Maximum DC Input Current 12.5 Maximum Efficient ............................ 99.5.......... Weighted Efficiency.............................................................. 98.8 .................................................................................................................................... Overvoltage Category II I OUTPUT DURING OPERATION (POWER OPTIMIZER CONNECTED TO OPERATING INVERTER Maximum Ouiput Current 15 ........................:........................................................................................................... Maximum Output Voltage 1 60 I OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVE Safety Output Voltage per Power Optimizer 1 I STANDARD COMPLIANCE EMC FCC Part15 Class B, IEC610046-2, .................................................................................................................................... Safety.........................................................................................IEC62109-1 (class II safety)., RoHS Yes (INSTALLATION SPECIFICATIONS _ Mazimum Allowed System Voltage 1000 .................................................................................................................................... Dimension5(W xlx H) 141x 212x40.5 /5.5528.3 .................................................................................................................................... Weight (including cablesl..................................................................................950 Input Connector MC4 / Amphenol / Tyc .................................................................................................................................... Output Wire Type/Connector Double Insulated; Amph ................................................................................................................................... OutPut Wire Length 0.95 / 3.0....... I.......................1.2 ............................................................................................. Operating Temperature Range -40: .................................................................... . Protection Rating................................IP65 / NEMAQ Relative Humidity 0- 100 .................................................................................................................................... t'�Rated Srf pwcr of nie nwdNc. Moduleal u0 to �S%paver tWenna adeatl. PV SYSTEM DESIGN USING A SOLAREDGE THREE PHASE i INVERTER SINGLE PHASE 208V P400 Minimum String Length (Power Optimizers) ..................................................................................................................... .................... ....... (for 96 -cell PV 10 18 modules) (..........P.........., Maximum S[rin Len h Power O dmizers B ............................................................................................................................................................................ 25 25 50 400 W ......................................... 5250 6000 ........... 8.: aR............. Vdc..... Parallel Strin s of Different Len hs or Orientations .......................................... Adc Yes .......................................... Adc ..................................%...... ..................................%...... I Adc RTER OFF) f Vdc IEC61000-6-3 UL3741.................. .......... .......................................... Vdc r 4x1.59mm/in .......................................... ............................. . gr / Ib ........................................ enol ... . /39 . ................... T .ft... C/ -F .......................................... PV SYSTEM DESIGN USING A SOLAREDGE THREE PHASE THREE PHASE INVERTER SINGLE PHASE 208V 480V Minimum String Length (Power Optimizers) ..................................................................................................................... .................... ....... 8 10 18 (..........P.........., Maximum S[rin Len h Power O dmizers B ............................................................................................................................................................................ 25 25 50 Maximum Power per String .................g ....................�.................................................................................................................................. 5250 6000 12750 W Parallel Strin s of Different Len hs or Orientations Yes I ., 0 SolarCity SleekMountTM - Tile with Post The SolarCity SleekMount hardware solu - •,Zep Solar, hardware and UL 1703 listed Zep , tion is optimized to achieve superior Compatible modules ' r E strength and aesthetics while minimizing • Interlock and ground devices in system UL listed roof disruption and labor. The elimination of to UL 2703 .+.. M} visible rail ends and mounting clamps, • Interlock and Ground Zep ETL listed to UL 1703 as .1 , •+ combined with the addition of array trim all "Grounding and Bonding System" contribute to a more visually appealing . No tile cutting required system. SleekMount utilizes Zep Compat- , ibleTM modules with strengthened frames .Ground Zep UL and ETL listed to uL as7 as p . that attach directly to Zep Solar standoffs, grounding device _ - effectively eliminating the need for rail and • Anodized components for corrosion resistance reducing the number of standoffs required. A c Components OA ZS Tile Roof Attachment Kit '© - ZS Tile Replacement Flashing © Leveling Foot ' ©D Lag Screw + T Q 5/16" Wood Lag Screw B Installation Instructions = • 0, DrilFpilot hole O2 Seal pilot hole O3 Place roof attachment kit E ® Install lag ;r ©5 Install flashing to jurisdiction preferences ! �•.� (see standoff detail on plans) c © Secure leveling foot to roof attachment kit using machine screw QPlace module' `'/, ,, SolarCity January 2014 o solar=ee SolarEdge Single Phase Inverters For North America SE3000A-US / SE380OA-US / SE5000A-US / SE6000A-US / SE760OA-US / SE1000OA-US / SE1140OA-US The best choice for SolarEdge enabled systems Integrated arc fault protection (Type 1) for NEC 2011 690.11 compliance Superior efficiency (98%) Small, lightweight and easy to install on provided bracket Built-in module -level monitoring Internet connection through Ethernet or Wireless Outdoor and indoor installation Fixed voltage inverter, DC/AC conversion only Pre -assembled AC/DC Safety Switch for faster installation Optional — revenue grade data, ANSI C12.1 USA -GERMANY - ITALY- FRANCE -JAPAN -CHINA -AUSTRALIA -THE NETHERLANDS -ISRAEL www.solaredge.us so I a r " • •TsSingle Phase Inverters for North America SE3000A-US / SE380OA-US / SE5000A-US / SE6000A-US / Recommended Max. DC Power— 3750 4750 6250 7500 9500 12400 14250 W (STC)................................................................................................................................................................... SE760OA-US / SE1000OA-US / SE1140OA-US Transformer less, Ungrounded Yes .................................................................................. SE3000A-US SE380OA-US SESOOOA-US SE600DA-US SE760OA-US SE1000OA-US SE1140OA-US 'OUTPUT ............................................................................... Nom. DC Input Voltage, ... , ..... ....................................................................... .................................................................. 325 @ 208V / 350 @ 240V ...... . ..................... . ... . ............. .. Vdc, ... Max. Input Current— Nominal AC Power Output 3000 9980 @ 208V 3800 5000 6000 7600 11400 VA 23.......1..30.5@2240V........34.5..........Adc.... 10000 @240V ....:......................... 30. .,,,...,,....,,...._.... ................................. 45. ......................... ... Adc.... Reverse-Polarit Protection 5400 @ 208V 10800 @ 208V Max. AC Power Output ......................................................................................................................................................................... 3300 4150 6000 8350 5450 @240V 10950 @240V 12000 VA AC Output Voltage Min. -Nom. -Max.* 98 98 98 % .............................................. CEC Weighted Efficiency 5 @ 208V 97.5 98 97. 97.5 183 - 208 - 229 Vac % ...................:............................................:........... 98 @.240V....................................97.5 @ 240V............................... AC Output Voltage Min: Nom:Max.• Nighttime Power.Consumption v/ <4 W 211-240-264 Vac . ......... . . .... . ...Hz .... ... AC Frequency Min. -Nom: Maz.` ... .... . 59.3 - 60 - 60.5 (with HI count settin 57 - 60 - 60.5) ^/......g.......... Revenue Grade Data, ANSI C12.1 Optional Max. Continuous Output Current........... ! STANDARD COMPLIANCE 1 12.5......1......16......1...21.@.240V ..1.......25.......1...... 32..........42 @ 240V...I.......47.5........... A..... GFDI1 Emissions . A ............................................................................................................................................................. Utility Monitoring, Islanding ' Protection, Country Configurable AC output conduit size / AWG ran a .................................g..... Yes 3/4" minimum / 8.3 AWG ............................... Thresholds 3/4" minimum / 1-2 strings / 24-6 AWG 3/4" minimum / 1.2 strings/ 14-6 AWG AWG ren a .......8................................................................................................................................................................. Recommended Max. DC Power— 3750 4750 6250 7500 9500 12400 14250 W (STC)................................................................................................................................................................... Transformer less, Ungrounded Yes .................................................................................. ............................................................ Max. Input Voltage 500 Vdc.... ............................................................................... Nom. DC Input Voltage, ... , ..... ....................................................................... .................................................................. 325 @ 208V / 350 @ 240V ...... . ..................... . ... . ............. .. Vdc, ... Max. Input Current— 9.5............13....... 15.5 @,240V .......1a ............. . . . 23.......1..30.5@2240V........34.5..........Adc.... ..................................................... Max.Input Short Circuit Current ............................................ ....:......................... 30. .,,,...,,....,,...._.... ................................. 45. ......................... ... Adc.... Reverse-Polarit Protection Yes Ground -Fault Isolation Detection ......................................................... 600ko Sensitivity .......................................................................................................................................................................... Maximum Inverter Efficiency 97.7 98.2 96.3 98;3 .................................................................................... 98 98 98 % .............................................. CEC Weighted Efficiency 5 @ 208V 97.5 98 97. 97.5 97.5 97 @ 208V 97.5 % ...................:............................................:........... 98 @.240V....................................97.5 @ 240V............................... Nighttime Power.Consumption < 2.5 <4 W i ADDITIONAL FEATURES 1 Supported Communication Interfaces ................................................................................................................................................................................ 85485, RS232, Ethernet, ZigB.ee (optional) Revenue Grade Data, ANSI C12.1 Optional ! STANDARD COMPLIANCE 1 Safety ................................................................................................................................................................................ UL1741, UL16998, ULi998 ,CSA 22.2 Grid Connection Standards IEEE1547 Emissions FCC part15 class B _ INSTALLATION SPECIFICATIONS 1 AC output conduit size / AWG ran a .................................g..... 3/4" minimum / 24-6 AWG ............................................ 3/4" minimum / 8.3 AWG ............................... DC input conduit size / p of strings / 3/4" minimum / 1-2 strings / 24-6 AWG 3/4" minimum / 1.2 strings/ 14-6 AWG AWG ren a .......8................................................................................................................................................................. Dimensions with AC/DC Safety 30.5 x 12.5 x 7 / 30.5 x 12.5 x 7.5 / 30.5x12.5z10.5/775x315x260 Switch (H%WXD) 775 z 315 x 172 775 x 315 x 191 mm ............................................................................................................................................... Weight,withAC/DC Safety Switch ..... ..........51.2/23.2......,....,,.....,..54.7/.24,7............................... SSA/ 40.1 ..................... .Ib/.k�.,_ Na.tural Convection Fans(userreplaceable) ........................................................................................................................................................................ ..Cooling.... Noise < 25 < 50 dBA Min. -Max. Operating Temperature -13 to+140 / 25 to+60 (CAN version**** -40 to+60) 'F /'C Ran e Protection Rating.............................................................................. NEMA 3R................................................................... • For other regional settings please contact SolarEdge support. •• Umited to 125% for locations where the yearly average high temperature is above 77'F/25'C and to 135% for locations where It Is below 77'F/25'C. For detailed Information, refer to hrto://www.wiaredge.us/files/odb//Inverter do oversixing gulde.odf ••• A higher current source may be used; the Inverter will limit Its Input current to the values stated. • ••• CAN P/Ns are eligible for the Ontario FIT and micmFIT (micnoFIT es. SE11400A-USCAN). QGO�PAT7B CCI(YO[ERa AcOMPP��O CUTTING EDGE TECHNOLOGY As a pioneer with over 39 years in the solar energy industry, Kyocera demonstrates leadership in the development of solar energy products. Kyocera's Kaizen Philosophy, commitment to continuous improvement, is shown by repeatedly achieving world record cell efficiencies. QUALITY BUILT IN • UV stabilized, aesthetically pleasing black anodized frame • Supported by major mounting structure manufacturers • Easily accessible grounding points on all four corners for fast installation • Proven junction box technology with 12 AWG PV wire to work with transformerless inverters • Quality locking plug-in connectors to provide safe and quick connections RELIABLE -1 Proven superior field performance • Tight power tolerance • First module manufacturer to pass rigorous long-term testing performed by TUV Rheinland QUALIFICATIONS AND CERTIFICATIONS UL Listing/2N QIGU.E173074 C U`. US (0 NEC 2008 Compliant, UL 1703, ISO 9001, and ISO 14001 UL1703 Certified and Registered, UL Fire Safety Class C KD 200-60 F Series KD250GX-LFB3 KD 255GX-LFB3 .-LECTRICAL SPECIFICATIONS Standard Test Conditions (STC) STC = 1000 WliW irradiance, 25'C module lempelature. An'1 1.5 specifum' KD250GX-LFB3 KD255GX-LFB3 250 255 II.R 8.39 8.39 A I KD 200-60 F Series MODULE CHARACTERISTICS Dimensions: lengthlmdth/height 36.9 37.6 V�`'j �V'� j 1 9.09 9.09 A 1 J Pmin.nce +5I-0 +5/-0 % Nominal • • VOCT= 800 KIIAlFirradiance, ITsoa-_�._-. 45 ------- --------45--_ C ------------- P_ 180 184 K_ 26.8 27.4 `W _ V Imp 6.72 6.72 A 33.7 T 34.4 __ V 1 7.36 --- 7.36 A {►TC 223.7 T 228.3T W1 CoefficientsTemperature I P , -0.46 -0.46 %rC Vm• -0.52 -0.52 %rc - --_._-- 0.0065J _ 0.0065 % rc 1 Vw -0.36 -0.36. %rC - 0.060 0.060 0(°C Operating Temp 40 to +90 40 to +90 °C Systen) Design Series Fuse Rating 15 A I Maximum DC System Voltage (UL) 600 V Hailstone Impact in (25mm) @ 51 mph (23m/s) • Subject to simulator measurement uncertainty of .1. 3%. KYOCERA reserves the right to modify these specifications without notice. NEC 2008 COMPLIANT UL1703LISTED at C �L U$ O ® wARNirG:Readtheinstruction L manual in its entirety prior Qhandfng,installingBopeat Ing Kyocera Solar modules. s. KD 200-60 F Series MODULE CHARACTERISTICS Dimensions: lengthlmdth/height 65.43 i ni38.98i ni1.57 i n (1662mm/990mm(40mm) Weight: 47.4lbs (21.Skg) PACKAGING SPECIFICATIONS Modules per pallet: 20 Pallets per 53' container. 36 Pallet box dimensions: lengthl-dthlheight 66ini40ini43in (1675mm/1005mm/1055mm) Pallet box weight: 1060lbs (480kg) 0.16- (4.0 0.36-0.47- (9-12.0 FRAME CROSS SECTION DIAGRAM 0.el" � 3 l.m-t�w L6•Nm4 LONG/SHORT SIDE STABILIZER BAR 062614 OUR VALUED PARTNER I 8 7 6 5 4 • o D 6 Al 1 KNOCRWI DIA awxmr 1 W1 TANGEN AL KNOCKOUTS FOR ]/.. 1-3 1/4 CDKWrt auArrtiir KNOCKOUTS FOR 1-1/2 CWOUR 1.Note NERBC pYEN4oN5 x911NflER5) ARE SHOWN w KEIS. Z WE RANGE Of LUGS 6 1/0-/14 COPPER OR AUNMM. E R i e w m a;UILcn-01�nAMN1eW :Z� SHM 60 AMP TYPE93R GENERA. GAIN 7 a 1-- 95-1451 i a`1 a.�yan. 8 7 6 5 4 3 2 1 1 ID IA J 19- ZepSolar ZS Comp" I Grounding and Bonding This document describes the mechanics of how the electrical bonding is accomplished between the UL Listed hardware components used in Zep Solar's ZS Comp mounting solution for composition shingle roofs. Zep Compatible -.systems do not require running copper conductors to each module. The act of physically installing each component simultaneously establishes an electrical bond, as described in the following pages. ®_ Zep Solar Interlock Interlock Zep ZS COMP I GROUNDING AND BONDING Z Key side - Part No. 850-1388 UL Listed to UL 2703 Tongueside Key Side Bonding Cutting "tooth' . Side view Interlock Module Key side in closed position Bonding locations Cutting -tooth' on Key side Forced interference during rotation of Interlock Zep causes teeth to - cut through anodization on module frame, resulting in rohnct and UL certified bondino oath Tongue Side Bonding Tongue side in closed position - F0 Cutting teeth' Module 1 -----Forced interference between mating parts from module Bonding location on rock -in motion cuts into module frame, removing Tongue side anodization and resulting in robust and UL certified bonding path Document 800.1478-001 Rev A www.zepsolar.com Document 800-1478-001 Rev A www.zepsolar.com PAGE: 2 0f 5 PAGE: I of 5 0 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications chnages without any prior notice. All rights reserved. 0 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications chnages without any prior notice. All rights reserved. Date Last Exported: June 25, 20134:45 PM Date Last Exported: June 25,20134:45 PM ®. ZepSolar Interlock, continued Part No. 850-1388 UL Listed to UL 2703 Bonding Path - Key and Tongue Module Interlock ZS COMP I GROUNDING AND BONDING . j I. l : 6 I 1 I I The Interlock bonds modules on A 4 sides to create a hyper - bonded array where every module Is structurally and electrically bonded to the surrounding modules. ( I a Tongue side - Key side Bonding Path - Array w a a a a ro Key and Tongue sides. Leveling Foot - Bonding With Module Frame W W M Al W b © Interlock "I* Bonding path 1 Down -roof Oocument 800-1478-001 Rev A www.zepsoter.com ® 20131EN Zep Solar. Inc. Zep Solar reserves the right to make specifications chnages without any prior notice. All rights reserved. Date Last Exported: June 25.20134:45 PM PAGE: 3 of 5 I i ®_ ZepSolar Leveling Foot ZS COMP I GROUNDING AND BONDING Tongueside . 4- -------- i� Key side Spring clip Part No. 850-1397 The Leveling Foot top portion (the Rockit( has a stainless steel UL Listed to UL 2703 spring clip that bonds to the adjacent module frame on both Key and Tongue sides. Leveling Foot - Bonding With Module Frame O�, Down -roof ■ Z O b b 0 1#1 a1 Key side inserts into Zep Groove (rock -in) Module in next row drops in on the Tongue side Bonding Path - North and South Modules Bonding location on / Keyside -- "- - �� ■ Leveling Foot d d . ■ ", Bonding path b b 0 1#1 a1 �• • I I 1 Bonding location on Module rotation during drop-in creates forced Down -roof Tongue side interference between Zep Groove and spring clip, cutting Into module frame, removing anodization and resulting In robust and UL certified bonding path Document 800-1478-001 Rev www.zepsolarcom PAGE: 4 of 5 © 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications chnages without any prior notice. All rights reserved. Date Last Exported: June 25.20134:45 PM ZepSOlar ZS COMP I GROUNDING AND BONDING Ground Zep Set screw ,v •*/ Key side The Ground Zep provides a single point of connection for the Equipment Grounding Conductor (EGC) from the array to a building ground. Ground wire channel �y r Part No. 8504172 _ - -�• ULListedtoUL467andUL2703' Ground Zep Installation 4,7� qOOit, •.,— .......... insert Ground Zep into Zep Groove of module frame. _ Use the Flat Too to rotate the Ground Zep 90 degrees, so that set screw Insert copper EGC into ground wire on array perimptpr C is pointing straight up. channel. Tighten set screw using torque values shown In the ZS Comp Installa-tion Manual. Bonding Path - Array to Ground A MMMM OGround Zep • Equipment Ground , Conductor Bonding path OGround Zep • Equipment Ground , Conductor Bonding path f Down -roof - Document 800.1478-001 Rev A www.zepsolor.com - - v PAGE: 50f5• O 2013fEN Zep Solar, Inc. Zep Solar reserves the right to make specificationschnages without any prior notice. All rights reserved. i`. Date Last Exported: June25.20134:45PM - _ " +_, _ -.- _ . ^�, t• _ _ - .. -.. - - - _ -' •- - - '- ' .� �, . .� _ - .._ �.. _ .. .. _ � - .. - it - - .- — .._ _ ... - •.. �. _ .. . - . - - ._ , "- .- •-_� ....-. _ ... . . An A , ♦ r Down -roof - Document 800.1478-001 Rev A www.zepsolor.com - - v PAGE: 50f5• O 2013fEN Zep Solar, Inc. Zep Solar reserves the right to make specificationschnages without any prior notice. All rights reserved. i`. Date Last Exported: June25.20134:45PM - _ " +_, _ -.- _ . ^�, t• _ _ - .. -.. - - - _ -' •- - - '- ' .� �, . .� _ - .._ �.. _ .. .. _ � - .. - it - - .- — .._ _ ... - •.. �. _ .. . - . - - ._ , "- .- •-_� ....-. _ ... . . An i SolarCity Standard Box 4J The SolarCity Standard Box 4J is a 4 -String unfused Junction Box. The box is highly configurable and adaptable using the (4) jumper blocks included in each box. A factory installed cordgrip enhances installer productivity. lb "i;"SolarCity. o October 2013 • Manufactured to meet UL 1741 Standards. • Non -Metallic, Corrosion Resistant NEMA 4X Enclosure. • Factory -Installed Cordgrip Enhances Installation Speed. • Break-Thru Skinned -Over Glands on Cordgrip Provide Weathertight Seal for All Configurations. • Easily Configurable Terminal Blocks Permit Adaptation to Site -Specific Stringing Needs. Technical Data / Specifications QA Voltage Rating [VDC] : 600V © Maximum DC Current [A]: 57A © Maximum Continuous Current [A]: 42A OD Maximum Voltage [VDC]: 600V ©E Wire Size Range [AWG]: #6 to #14 OF Enclosure Rating: NEMA 4X QG Operating Temperature Range [°C]: -40 to 50 0 Typical Overall Dimensions [in]: 8"x6"x4"