Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BSOL2015-0003
. 1 . 78-495CALLETAMPICO D LA QUINTA, CALIFORNIA 92253 COMMUNITY DEVELOPMENT DEPARTMENT Application Number: Property Address: APN: Application Description Property Zoning: Application Valuation: Applicant: SOLAR SERVICE CENTER 0 OUTSIDE CITY LIMITS LA QUINTA, CA 92253 BSOL2015-0003 53180 AVENIDA HERRERA 774054009 5.83 kW PV SYSTEM - (2F $29,150.00 BUILDING PERMIT JAN r ; 20135 CITY OF LA QUINTA COMMUNITY DEVELOPMENT DEPARTMENT LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my License is in full force and effect. License Class: License No.: :LIC -0106948 Date: I 23 I S Contractor: OWNER -BUILDER DECLAR TION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division of the Business and Professions Code) or that he or she is exempt therefrom and the a basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). (_J I am exempt under Sec. _ . B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Lender's Address: VOICE (760) 777-7125 . FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 1/23/2015 Owner: MARIA CRUZ 53180 AVENIDA HERRERA SUB LA QUINTA, CA 92253 Contractor: SOLAR SERVICE CENTER 0 OUTSIDE CITY LIMITS LA QUINTA, CA 92253 (888)760-7650 Llc. No.: :1_1C-0106948 WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier: _ Policy Number: _ I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to theme workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Date: (1231(5 Applicant: WARNING: FAILURE TO SECURE WORKERS' COMPEN ATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT: Application is hereby made to the Building Official for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application , the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work Is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above- mentioned property for inspection purposes. Date: 2-3 ( Signature (Applicant or Agent): jr Z /D E ,1 JAN 14 2015 N A New Photovoltaic System For Maria Cruz Residence C -I-- d Index: , � f _AyEPPMT OCkTitle Sheet cr L n-- Ott 4ti#tiR - 001 Site Plan 002 Single Line Diagram i� 101 wntin , Details _aE cn,-„mu \' tt ! .. O4 c >m io ` U iI NTA 4 A : L11LC�?�dtigE`}TY DEPT. !)"RUM, N _% 51, FMCOJIS TION 06ft h,vcrtcr SpccificaNrn, Shccr F Ic Spec,fiavua Wi 9hB. 011 Phots h, is Signage Diagram �riculity Nhp 012 Tile Trac Specification, Sheer 013 Structural Engineer Repos I. All electrical ,v, rk .hall be in accordance ivirk the 201. ' ' 2013 National Electric Code (NEC), heal municipal code, and local t dis e, "ions. _. All et ai anent shall be listed and labeled per recognize eco �nize lectnc testis laboratory 1 P F •p, i and installed per the listing requirements and the man c�'insmictions. 3. All inverters shall be UL98 standard and ULI741 Itste nt and shall be inspected by local utility before commissioning, testing erasion of the system. All outdoor hal i im. NE 3 outdoor mounted 4 fi r s. l be minima MA . R d transition boxes combiner boxes, and switches. rr 250 5 All equipment .meat hall b e properly r m I =d per the m t meats of NEC.. _ t 690. { P s P Pe Yg P q = 6. NEC Art. 6909 (a), all chants coni -ted r, more rha n s ouit. hall h„c overcurreut devices located so as t, pr- de overcurrenr I mrrcnon rom all ,,,i rces. 7. NEC Art. 690.18 due to the fact that PV n o dales .tie c ner_i cd ,h-wiar thoi are exposed io i0it.I'Vcontr,ictor sh II b.able the array,itillit1 -vice by short circum , open ..ircuiunk rvrine the arrai ,cith in of ,qu, anuing. 8. Photovoltaic system shall be backfeedthedistribution --n on +ire per the requirements of NEC Art. 690.64(b). All backfeed betake r..hTli be identified as such and shall be secured in place by an additional fastener per the- rcquirennrenrs of NEC 408, 16(0(408, 3T, (d in _JI I NEC. 9. Fall arrest hruteaion per OSHA requirements shall be prtwided for all roofwork. 10. All nmducnIT, and terminations shall he rated for 90°C minimum. 1.1. NEC An. o90. (I) a placard shall be provided on the exterior and the interior of the utility mai-i -ice disconnect location with the following ten: "Caution Solar Photovnhai: (PV) System Installed, when lower disconnected, solar PV modules and whin=_ in-iiduit to ini, rier m,r remain energized during daylight hours. phot-, 4itic y,ten, di- 'n -t, are located in the PV equipment room. 12. NEC An. 690.14 each IPC. disconnect shall be labeled with: "Solar Ph >owvltai< Power System Emergenoc Ill: Disconnect". Label shall be 1"x4" minimum wiih 11\" resi,t:uu white letters on -1 background. 13. Ba k t I breaker hall I r I I tr. m f rh I .1I11M " rnd „t I, " " 1. 0 rl i, i. , r 1 't L r lir II k r,virho ut.hut;, mxrhine,'T' F rn n Grc the pat cl h, ll J-1 in,m 1_0 „t M)",,. 14 \„ avechment h ll 1e n iJ n , 6 of any 15 1'ermanent labels shrill I.o pr., Jrd, na sharpie nnr ifl be ilLnrrd «Thlt any Janice p inel(s)." General Notes: I& NEC An. 690.17 each ac disconnect shall also tie labeled with: 'Warnin 'Warning - Electrical Electrical Sho. k H: rd I, \ r T,och Terinin.ils. Terminals on both line and ],,ad side may ler_ d i , rh, of 1 n ...... Label shall be 1"x4" minimum th I Y resistant ,chits letters on red background. I I I i � nnect r th � inverter will be readily accessible after the installation s 7 y -niplet,. per 2013 CEC. Arc690.14 h .r terminals of the disconnecting mean, „ k, energized in the open 1,,,,i i wn. Provide a warning ,sign of the ha --J, pro 2013 CEC An. 690.17 18 Cont tar to provide ground fault protection for roof mounted phorovoltaic army k,ited on dwellings per 2013 CEC Art.690.45 I9. Whvre more than one nominal voltage systems exists, the diftrrent *Ystems shall be identified by phase and system per 2013 CEC Arc. 690 I S. 20. Provide an accessible disconnect device that is lockable in pan position and is located within 5'-0" of the meter per loce1 electrical urilin regulations. 21, Photovoltaic source cnnents must be r,trd .n both 125% of the parallel module and at a contimaar lord of another 125";, fx a n,ril if 156% ofthe load. 22. Pt id, permanent phquc ,1r J-- 111,"1,11ne rhe location of the service disconnecting mean, .nxd ncc phorucolrai, xpsinn d isconnect means if they are not in the same location per 2011 NEC 'ko,690.56. CEC 705.10 23. Installation of PV pine( arrays should resist sliding and pop-up resulting from seismic events and should comply with CHC section '1613A mod ASCE standard 7-05 chapter 13, 24. It is recommended to install the PV array such that general shading of the PV modules between 9;00am,3:00pm solar time i- iiiinitnizeil and localised shading due to pluming or air vents is minimized. 25. OtTi, nis, in -,acral arc diagrammatic and indicate general arrangement of the eyuq=men, .,nd ,caro Included. T t t th, dr-inoi_ t indicate siu, capacity, approximate location 1 ncr it i vi -h l I w not ex,wrderail or physical placement. I i h lt.' s r nywrc~<{ of rhe main rvrtchhaard tnnn b,:r i Ln cnnp,n, 8. Persection non R3I4an } I of CRC 2(13 a q is required that �c R31 S smoke chem and carbon m an. ei I - d i - rs are retrofitted in t o rhe existing dwelling fora 1 -nit „ ih repairs or additions exceeding $1000. 29. W rkmg clearance ar Bund die exfsri I, trical equipmentas wella, d 1-ncd equipment will be maintained in accord.-,-idh t IJA1026 30. Adc,qu , .I - n_ must be maintained between any plundling sewer vent-t-dii,,_ through the roof and the underside of the ph o-ltaic p,nds (6" min recommended), Contact Information: Homeowner- Maria Cruz -53180 Avenida Herrera, La Quinta, CA, 92253 -Tel: 760.564-5250 Designer/Contractor- Cole B Williams -72227 Adelaid St. Thou,and fain,, CA. Q' C)ccupnnq (roup: ht C Co n'rructi„n Typo. VR 1 r )c t shall C inph With: 101 ;CBC' 01 Ch{C 01 101 ; k 'Ec, 201 ; CRC _011 lnl '4Encr,tmd;., I ('11 NEC: I0] slit"n" i Fit' C:nd, CIC _'01 3 5.83 KW -DC AI'N 774=054-019-2 LQT * 1(+ I'r.,xa \,,. 14-199? Shccr �', 000 l 1�1 Driveway 4� 1.W -I— — — — — — — —.-I . �I � L �I �o CITE(=OF LA QUINT)Q) �osO I IV . MQV u" ` ng 225 -amp Electrical Panel 7 Isis Utility Lockable AC Disconnect V ent to the Main Electrical Panel �� 125 Amp Sub -Panel for Solar Contractor: Enphase Microimverters Coe B. Williams i-60-2LL-S22-IG -isio„s 2 Revision .I Revision .2 CITE(=OF LA QUINT)Q) N BUILWG & SAFETY DEPT. V PROVE® U F041 CONSTRUCTION n 2 DATE �-13 c .- o U Cz a o .0 Czo Q ----� -Z o Location for solar electric array 22 Sun Edison/Silvantis P-4 ff') F -Series SE-F265CzD-3y 265 -Watt solar panels are shown. Legal Description: Panels face azimuth 180° APN.774-054-009.2 Tilt 21° LOT. 16 TRACT. N/A App --is Date 5.83 KW -DC System Rating (5.13 KW -AC) n e,: I.. amine_ 01-12-15 V Siena,we Panels to be located on a single story roof with a sloped Chec r<l: L. Figueroa 01.12-15 concrete tile surface, roof mounting racks for solar S gnarn re modules are professional solar products "roof-trac” see"lev 1"=20' attached sheets for mounting rack engineering details. Project No. - 14-1992 Sheet No. Calculations Parameters @25°C Isc=9.35V Sc Voc= 37.7\1 NEC Table 310.16 Ampaciries x 1.0-40A Temps: 42°C, Min-I°C, Conduir 3" Above Roof 68"G22"C(Ampacity) NEC Table 310.16 Correction Factors, 41.45°Cat 90°(TRC)= 0.58 NEC Table 310.15(13)(2)(a) carrying conductors 4-6= 80%=.80 q#10 at90°C= 40X.58X.80- 18.5 Antps> 12.3 Amps O.K Atq&# 10 at 90°C= 40X.87- 34.8 Amps>24.7 Amps OX Grounding method Typical Module Connection ILSCO Ground Lug (II modules total) GEI_ADBT L,x-.vion Wire anJ Conduit Schedule Amps MnldpLe Req. Wirc Amp, Gauge Ty Type cnminrn,r Au,p Hang Rab l,cr NEC ab , 110,16 cnr eti n paaor Gm, uic I i 1.4nrtin Adi,.- •r NEC nlle 310.16:m 1 1'acmr per NEC 041 G,n.lucmr S 310.15 R 2 A Ratm, "tlO1f vl*• Conduit 5:e Mrnlule n, Micruinva - 0.9.,1- 0.9 Ali-in-rrer,,)-B--0.9.,11- 9.9 1.25 1.25 1.13 12.3 Enphasa Enu,te Wire 30A?IP 30ANIP 0.57' 0.87 N/A N/A 26.1 AMP 26.1 AMP N/A N/A N/A N/A J-Bn., to std,panel 9.9 1.25 12.3 No. 10 Tm\N.2 40AMP 0.58 0.80 EMT 3/4 Sul,Panel ro perf. Mere, 19.8 1.25 24.7 NO. 10 TI MIQ 40AMP 0.87 N/A 34,8ANII, EMIT 3/4 perf.Mere,cnACDiscom,ec, 19.8 1.25 24.7 NO. 10 IVXN-11 40AMP 0.87 N/A 14 • 1: IT 1/4 AC Disconnect to Main Panel 9.8 1.25 24.i NO.10 wxN.2 40AMP 0.87 N/A n c AMP I EMT 3/4 G.E.C. l a6 TH\VN-2 GRD 5,830 Watt DC (5,136 WattAC) 22Iel Enphase Microinverter Solar Electric Array M215-60-2LL-S22-IG 22 Sun Edison-Silvantis F -series Modules Grid -Tie Inverter 265 -Watt Modules 0 ea. Per Module) Model No.F265CZD-3y Input 16 to 48 V Individual Module Rating: Output 215 Watts Mas Ptc=241.9 Watts Output Efficiency: 96.5% Voc=37.7 VDC 240 VAC, 0.9 Amps max Isc=9.35 Amps integrated GFCI and ' DC/AC disconnects Main 11-4, InSau rhe opp,9i,c END bwba, New Solar Subpancl 120",. Rule: 225 Amp Electrical Somite X 120%.- 270 An,1r225 Amp Main Breaker- 45A>25Adp Breaker O.K Method of Connection Backfed Breaker Enpl,ase 125A 30 Amp, 250 VAC 225A Main G,gaEc Wirc unction Box I Q 240/140 VAC Solar Performance Utility Lockable Bussbar A 3# 1OTH\VN-2 225A Main Meter Knife Blade Type T,•r",1",rut ta. , Breaker i- Im 15A 2-P 120/240 Meter Fused (AC) Disconnect -1 "r.:,nl,• 1#6 A\VG GRD 0.17) Typical Module Coni coon ® 4�wu m1-11 N-2 25A 2-P 0 I. modules tot, ) ISA LP o-acnwc eau Existing unction Box 2 Main Had Enph. e Center E,pgl WircF 3a10THWN-2 Envoy Communications Gateway Irreversible © m I Crimp Connection T.m,1n.,,urc, Ia6A GG )to existing 3/4"EMT Ethcm.Ca, 'nl"rm^I° G.E Cnnduir to Broadband R %� �.0 CITY CiISV ♦I`rc IQUINTA BUILDING &'SAFETY DEPT. APPROVED FOR CONSTRUCTION Electrical Notes: 1. See Photovoltaic Signage Diagram for verbiage and signage locations. DATE BY 2. All electrical work to be done in accordance with latest edition of the California Electrical Co 3. All electrical conductors exposed to the sun shall be approved for exposure to sunlight (NEC 300.6C1., 310.8D) 4. All electrical utilization equipment on DC side of system shall be listed for use in DC circuits. 5. All conduit will be external, attic space will not be altered in any way. 6. All photovoltaic system conductors of the roof will be 90°C rated. 7. Notify serving utility before activation of PV system. 8. When a backfed breaker is the method of utility interconnection, breaker shall not read "Line and Load". 9. Photovoltaic grounding electrode conductor shall be routed separately from all other conductors. 10. Project shall comply with 2013 CBC, CMC, CRC, CPC, CRC, 2011 NEC, and 2013 CEC. Utility Grid 120/240 Input Utility Bidirectional Meter P yJ Qi.pN -z +o V ILAn _LD CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVEDontractor: FOR CONSTRUCTION Cole B. Williams Revisions Dare Recision "I Revision .2 DATE BY 8.n Trusses @ 24" O.C. O 0 M Ci� ^� N I I I I I I I I I I I I I I I I I I I I N u �I I I I I I I I 48.0C. I I I I l l it I1 I I I I 16. II Cf)r 0 I I I I I I I I 48.0 I I I I I I I I I I I I I� I I I I I I I I I I I I I I I I I -• U y I I I I I I I I I I I I I I I I I I Iu z O I I I I I I I I I I I I I I I I I I I I O0 I l l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 0 --C� Lo I I I I I I I I I I I I I I I I I I I I I I I I I I I I . I I I I I 1 1 1 1 1 1 1 Legal Description: APN774-054-0M2 Professional Tiletrac Professional solar LOT 16 TRACTR NIA stantionr attached to products aluminum is Appro+:Js Darc trusses using %6" x 3-1/2" support rails, attached D n,,: L Na: rine- 01-12.15 signan1 nz ch« ea: L. rigneroa 01-12.155 SS lag bolts to Tiletrac stantion Sienarnrel scale: NTS Nojw No. 1 ^^' 1 7 7 2 eet No. r003 Note: Roof drainage shall not be obstructed by G o panels/supports. wk, A minimum of 4 inch clearance between roofu,cs' 101 W �:��W�,�.'. and panels. m W lJ' �� 0" 5/16" SS BOLT Contractor: CO hJ - CO--' Cole B. Williams Solar Panel Re'isions D�- Revision #1 Revision ? Channel Nu:IrConcreteTile xtruded Aluminum Support Rail 0 I1 4 Poly -urethane roofing /8" SS All -Thread 4-j � N 0U U U Q sealant at hole in the +�' Q U �--+ p _ Cy a� U "Tiletrac" stinchion Mastic roofing sealant Cf) Q U v under Tiletrac U (, C, U Plywoodp Cz ;. ¢o 0 -• � p Roofing1 p�per —C., Ln Lcpd D.aiprion: Af N n 774-054-009-2 5/16" x 3 1/2" SS Lag LOT= 16 BOIL TRACT: N/A Approads Dnre Top chord n v.,: 1. MAO,— 01-12.15 Of wood Signm'— Che ked: L. Fie,—wma 01.12-15 roof truss sign:.rnre S06 NTS rrojcer No. 14-1992 Sheer No. 00 WEIGHT LOADING ANALYSIS Solar Electric Installation For Maria Cruz Residence, 53180 Avenida Herrera, La Quinta, CA, 92253 Contractor: Solar Service Center January 12, 2015 Roof Information Roof is a single story roof with a sloped concrete tile surface and standard wood framing Wood trusses twenty four inches on center Solar panel stantions on sloped area are spaced 4' on center. Analvsis of dead load weieht added to roof by installation of solar arra Sun Edison/Sihvantis 265W - solar module weight 42.5 pounds No. of solar modules 22 Total weight of modules 935 pounds Weight of each Professional Solar Products 'Roof Trac" rack set 18 pounds No. of rack sets 5.5 Total weight of rack sets 99 pounds Total weight of solar array Height of each module Width of each module Area of one module Area of entire solar array Weight of solar array per unit area of roof No. of stantions connected to trusses with lag bolts Weight loading per stantion 1,034 pounds 5.4 feet 3.3 feet 17.5 square feet 384.5 square feet 2.71pounds/square foot 1 441 pounds/connection See.attached sheets for engineering information on the Professioal Solar Products "Roof -Trac" racks. 1/12/2015 005- WEIGHT LOAD -CRUZ -LA QUINTA No. of DC and modules, DC and AC Inverter AC watts of inverters rating of module efficiency system 22 265 5,830 watts -DC 241.9 96.5% 5,136 watts -AC Inverter nameplate Inverter efficiency 22 215 96.5% 240vac 0 215 96.5% 208vac Note: total watts -AC of system cannot exceed the total nameplate watt rating of the inverters TOTAL DC WATTS 5,830 watts -DC TOTAL AC WATTS 5,136 watts -AC 1/12/2015 006 -SYSTEM WATT RATING -CRUZ -LA QUINTA DC and AC kW of system 5.8 kW -DC -5.1 MAC 5.8 kW -DC 5.1 MAC C HU 1 1v-ncc ing use with all 3unEdison providing ,e ,e. �SunEdison SILVANTIS ADVANTAGE • 16.8% module efficiency with positive power tolerance • PID -free: compatible with transformerless and multi-MPPT inverters • Tariff -free: not subject to U.S. countervailing or antidumping tariffs • Higher return on investment with more watts -per -module • Utility -grade manufacturing: ISO 14001, ISO 9001 and 100% EL inspection QUALITY 6 SAFETY • Industry leading PID test conditions: » 96 hours, 85 C, 85% relative humidity, —11 kV • IEC certified by TUV SOD: » 61730 to ensure electrical safety » 61215 long-term operation in a variety of climates including snow loading up to 5400 Pa and hail testing » 61701 Level 1 salt mist corrosion resistant for marine regions » 62716 ammonia testing for agricultural environments • Manufactured to AOL 0.4 Level II quality and tested up to 3x beyond IEC standards • CSA listed to UL 1703 for 1,000 V systems in the US and Canada • MCS certified by BABT for the UK Lw cC10-PV CYCLE C E oma, � ' epgKa ••aaase ' se"'Cb 11 ROBUST b AESTHETIC DESIGN • Black anodized corrosion resistant aluminum frame » White back sheet: SE-F2xxCzD-3y » Black back sheet: SE-F2xxKzD-3y • Low glare anti -reflective coated (ARC) tempered glass • Reliability tested beyond international standards SUNEDISON WARRANTY • 25 -year limited warranty for materials and workmanship for residential applications • 25 -year linear power warranty at STC: » Year 1: < 3.5% of rated power » After year 1: < 0.7% rated power degradation per year 0 1 2 3 a 6 0 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2e 25 Ywn A W—ty Cw ' SunEdisori SILVANTIS F -SERIES: 255W TO 275W PHYSICAL PARAMETERS ivioawe ulmenslons I J:W)b mm x yyu mm x 5u mm Module Weight 1 19.3 kq Number of of Cells�60 i -40 C to +85 C Frame Material 'Black Anodized Aluminum Tempered ARC Glass Thickness 3.2 mm TEMPERATURE COEFFICIENTS AND PARAMETERS' [ Nominal Operating Cell Temperature (NOCT) 45C -- 2C Temperature Coefficient of Pmax -0.45 %/C Temperature_ Coefficient of Voc _ _ - -0.34 %/C ] Temperature Coefficient of Isc +0.06 %/C Operating Temperature_ i -40 C to +85 C Maximum System Voltage 1000 V (UL b IEC) Limiting Reverse Current ! 9.20 A Maximum Series Fuse Rating 15 A Pmax Production Tolerance 0 W to +5 W Junction Box Rating IP67 IEC 61730 Application f Class A Module Fire Performance Type 2 Module Fire Resistance Rating -Class C ] Packaging Specifications 20 modules per pallet 520 modules per 40' high -cube container [ Wind and Snow Front Load Up_to 5,400 Pa Wind Back Load 2,400 Pa Reduction of STC efficiency from 1000 W/m2 to 200 W/m2 (Relative) < 4% STC ELECTRICAL CHARACTERISTICS2 275 Model# F255 F260 F265 F270 F275 F255 F260 F265 F270 F275 (e.g. F2xxCzD-3y)3 CzD CzD CzD I CzD CzD KzD KzD KzD KzD _ _KzD Rated Maximum 255 260 265 270 275 255 260 265 270 275 Power Pmax (W) Open -Circuit Voltage 37.5 37.6 37.7 37.8 37.9 137.5 37.6 37.7 37.8 37.9 Voc (V) I 1 II i Short -Circuit Current 9.25 9.30 9.35 9.40 9.45 9.15 9.20 9.25 9.30 9.35 Ise (A) Module Efficiency (%) 15.5 115.8 _ 16.1 16.4 1 16.8 15.5 15.8 16.1 16.4 16.8 Maximum Power Point 29.9 30.0 i 30.1 30.2 30.3 29.9 30.0 30.1 30.2 30.3 Voltage Vmpp (V) 6.78 6.90 7.02 7.14 7.26 6.73 6.85 6.97 7.09 7.21 Maximum Power Point 8.53 8.67 1 8.81 8.94 9.08 ; 8.53 8.67 8.80 ! 8.94 9.08 Current Impp (A) I i NOCT ELECTRICAL CHARACTERISTICS° Model# F255 F260 F265 F270 F275 F255 F260 F265 F270 F2751 (e.g. F2xxCzD-3y)3 CzD CzD CzD CzD CzD KzD KzD KzD KzD KzD Rated Maximum 185.7 189.4 193.0 196.6 200.3 184.1 187.7 191.3 194.9 198.5 Power Pmax (W) Open -Circuit Voltage 34.7 34.8 34.8 34.9 j 34.9 134.6 1 34.7 34.7 34.8 34.8 1 Voc (V) 1 i Short -Circuit Current 7.52 7.55 7.58 7.61 -`- 7.64 7.32 7.35 7.38 7.41 7.44 Ise (A) Maximum Power Point 27.4 27.5 27.5 27.6 1 27.6 27.4 ' 27.4 27.5 27.5 27.6 Voltage Vmpp (V) Maximum Power Point 6.78 6.90 7.02 7.14 7.26 6.73 6.85 6.97 7.09 7.21 Current Impp (A) 1 F -SERIES SOLAR MODULE DIMENSIONS atm [inch] 08.aX14.0J - MOUNrrNG SLOTS a PLACES 6 PLACESUNDING MOLE `�I 7.1- nz>1P 1 `JUNCTION BOX -- /Ir MODULEWEL - / _ __ --A B _.__.__ 1---. -i -a_.------ r i� I I SECTION DETAIL 4Jz DETAIL B � wuxlwcrmr: Module Dimensions A - 990139.01 B - 1, 658 165.31 C - 50 12.01 D - 3011.181 Mounting Hole Spacing E - 950 137.41 F - 994 139.11 Cable Length *L - 1,000 151.21 Junction Box Dimensions 101.5 x 60.0 x 25.5 13.99 x 2.36 x 1 .01 *L - Other options available upon request, please contact your local sales representative for more information. IV CURVES AT MULTIPLE IRRADIANCES [25C] 10, 6 a 6 J 4 r 0 5 10 15 20 25 30 35 40 voltage (v) - 1000 Wtm� - 800W/ma - 600 W/m - 40OW/m% - 200 W/m' IV CURVES AT MULTIPLE TEMPERATURES [1000 W/mz] Listed specifications are subject to change without prior notice. e 'Temperature coefficients may vary by ± 10% 'All electrical data at standard test conditions (STCJ: 1000 W/m2, AM 1.5, 25 C; electrical characteristics may vary by ±5016 and power measurement tolerance by ±3% Pmax Production Tolerance: factory -measured module performance is warranted to meet or exceed the stated panel STC power rating by 0 W to +5 IN 3y indicates connector type: -34 = BizAnk 5418; -38 = Amphenol Helios H4 z indicates manufacturing location: M = Malaysia, X = Mexico , 'NOCT electrical characteristics measured under normal operating conditions of cells: 800 W/m', 20 C, AM 1.5, wind 1 m/s g For more information about SunEdison's Silvantis modules, please visit 0 www.sunedison.com 62014 SunEdison Products Singapore Pte. Ltd.: A SunEdison Company. All rights reserved. SunEdison and the SunEdison logo are registered trademarks or trademarks of SunEdison Products Singapore Pte. Ltd. and/or its affiliates in the United States and certain other countries. All other trademarks mentioned in this document are the property of their respective owners. 5 LO Is 20 n W ss +O voltage M UNI -19168 TF_F60_Vega_ 46_DS_50mm_v11 122014 Enphase® Microinverters Enphase@M215 The Enphase® M215 Microinverter with integrated ground delivers increased energy harvest and reduces design and installation complexity with its all -AC approach. With the advanced M215, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required for the microinverter. This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M215 integrates seamlessly with the Engage® Cable, the Envoy® Communications Gateway", and Enlighten®, Enphase's monitoring and analysis software. PRODUCTIVE SIMPLE - Maximizes energy production - No GEC needed for microinverter - Minimizes impact of shading, - No DC design or string calculation dust, and debris required - No single point of system failure - Easy installation with Engage Cable enphase® E N E R G Y RELIABLE - More than 1 million hours of testing and millions of units shipped - Industry-leading warranty, up to 25 years SA® c us Enphase® M215 Microinverter // DATA INPUT DATA (DC) M215-60-2LL-S22-IG / S23 -IG / S24 -IG LRecommended input power (STC) Maximum input DC voltage Peak power tracking voltage 190 - 270 W 48V 27 V - 39 V I Operating range 16 V - 48 V Min/Max start voltage 22 V / 48 V Max DC short circuit current 15 A F IZ input current 10A , OUTPUT DATA (AC) @208 VAC @240 VAC Peak output power 225 W 225 W J Rated (continuous) output power Nominal output current Nominal voltage/range Nominal frequency/range ~ ~� V Extended frequency range' 215 W 1.1 A (A rms at nominal duration) 208 V / 183-229 V 60.0 / 57-61 Hz 57-62.5 Hz 215 W 0.9 A (A rms at nominal duration) J 240 V / 211-264 V r 60.0 / 57-61 Hz 57-62.5 Hz Power factor >0.95 >0.95 Maximum units per 20 A branch circuit 25 (three phase) 17 (single phase) Maximum output fault current 850 mA rms for 6 cycles 850 mA rms for 6 cycles EFFICIENCY CEC weighted efficiency, 240 VAC 96.5% CEC weighted efficiency, 208 VAC 96.5% Peak inverter efficiency 96.5% ; Static MPPT efficiency (weighted, reference EN50530) 99.4% I Night time power consumption 65 mW max I MECHANICAL DATA L Ambient temperature range - _ _ -40°C to +65°C� Dimensions (WxHxD) 171 mm x 173 mm x 30 mm (without mounting bracket) Weight 1.6 kg (3.4 lbs) Cooling Natural convection - No fans I Enclosure environmental rating Outdoor - NEMA 6 I FEATURES Compatibility _ Compatible with 60 -cell PV modules; Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 690.35. Equipment ground is provided in the Engage Cable. No additional GEC or ground is required. Ground fault protection (GFP) is integrated into the microinverter. Monitoring Enlighten Manager and MyEnlighten monitoring options Compliance UL1741/IEEE1547, FCC Part 15 Class B, CAN/CSA-C22.2 NO. 0-M91, 0.4-04, and 107.1-01 j ' Frequency ranges can be extended beyond nominal if required by the utility To learn more about Enphase Microinverter technology, r l enphase® visit enphase.com e E N E R G Y © 2014 Enphase Energy. All rights reserved. All trademarks or brands in this document are registered by their respective owner. (9G8@A@(9 CSW dC 8 Qo�o CIOS The Engage Cable is length NGAGE a continuous of 12AWG cable with pre-installed ; .SYS TE M connectors for Enphase Microinverters to plug into. The cable is handled -Quick installation like standard outdoor -rated electrical FAST _ Large branch capacity wire, allowing it to be cut, spliced and extended as needed. - Simple design FLEXIBLE - No additional cables The Engage Accessories complement the Engage Cable and give it the ability to r - No high voltage DC adapt to any installation. S A F E L _ Reduced fire risk CIOS CABLING ACCESSORIES' DETAILS and SPECIFICATIONS TypesCable Voltage Connector Spacing Accommodates PV module orientation 240VAC, 4 conductors 1.025 meter (40") Portrait 240VAC, 4 conductors 1.7 meter (67") Landscape 208VAC, 5 conductors 1.025 meter (40") Portrait 208VAC, 5 conductors 1.7 meter (67") Landscape Cable Specifications Cable Length •• • Description Rating Model Number Orientation # Connectors Approx weight Cable temperature rating 90°C (194°F) wet/dry ET107240-40 Portrait 40 40 lbs Cable insulator rating THWN-2 ET17-240-40 ' Landscape 40 45 lbs UV exposure rating UL 746 C, F1 ET10-208-30 Portrait 30 30 lbs Conductor gauge 12AWG ET17-208-30 Landscape 30 35lbs Compliance UL1741; CAN/CSA C22.2 Nos. 0, 21, 42, 65, 153, *additional lengths available through Enphase authorized 182.1, 182.2, and 182.3; IEC distributors. 60529IP67 Engage Accessories Branch Terminator Disconnect tool One terminator needed per branch circuit Plan to use at least one per installation ET -TERM -10 (quantity 10) ET -DISC -05 (quantity 5) Watertight sealing cap Cable clip One needed to cover each unused _-� Many needed to fasten cabling to the connector on the cabling. racking or to secure looped cabling. ET -SEAL -10 (quantity 10) ET -CLIP -100 (quantity 100) 142-00013 Rev 01 Enphase Energy, Inc. 201 1 st Street Petaluma, CA 94952 Phone: 877-797-4743 Fax: 707-763-0784 info@enphaseenergy.com http://www.enphase.com SCREW: E1276 CAT. NO.: MASS:.052 LBS. SURFACE AREA: 2.738 IN2 STUFFER SHT: FORM 12 .375 ±.015 CL [9.53±.381 .213 — [5.41] 1 MATERIAL:COPPER, XOC7309 PLATING: SEE CHART MARKING: 0 GBL-4DB, 4-14, CU, DB CELL: ABM TOLERANCES -UNLESS OTHERWISE SPECIFIED DWG. NO. 2 PL. DEC. *.015 3 PL. DEC. *.010 TRUE C.L. *.015 ANGLES *1 G0977 DRAWN BY:CLH TsCALE: 3:1 SHEET 1 OF 1 DATE: 7/27/2007 1 SIZE: A I LI.v'J r� CORP. Cat #: GBL-4DB 0.218 THRU GBL -4 D BT L- j )05 13] IUMBER G0977AOOB G0977AOOT E1276 PLATING BRIGHT DIP EL -TIN CALE 1 : 1 MARKING ;BL-4DB,4-14, CU, DB BL-4DBT,4-14, CU, DB THE INFORMATION CONTAINED WITHIN THIS DOCUMENT IS PROPRIETARY TO ILSCO AND MAY NOT BE DISCLOSED WITHOUT PRIOR WRITTEN CONSENT PHOTOVOLTAIC SIGNAGE REQUIREMENTS PER NATIONAL ELECTRICAL CODE NEC 690 METER S�QV1G sti/PLIES when applicable Note: Signage on junction box is only required if there are overcurrent devices in the UNCTION box. BOX 'C6TY OF LA QUINTA BUILDING & SAFETY DEPT, APPROVED FOR CONSTRUCTION DATE BY - TF A permanent plaque or directory is always required, denoting all electric power sources on or in the premises, shall be installed at each service equipment location and at locations of all electric power production sources capable of being interconnected. ( NEC 705.10) NEC 690.17 Marking Is required only on all Interior and -exterior DC conduit, raceways, enclosures, cable assemblies, and junction boxes. Markings shall be placed every 10 feel, at turns, and above and/or below penetrations, and at all DC combiner and junction boxes. Recommended signage or labeling specifications: A. Red background with white lettering B. 3/8" letter height C. All capital letters D. Arial or similar font E. Weather resistant material ( i.e. metal or plastic engraved or electro -photo plating) F. Material used for marking shall be weather resistant. UL969 shall be used as standard for weather rating. G. Marking is required on all interior and exterior DC conduit, raceways, enclosures, cable assemblies, and junction boxes. Markings shall be placed every 10 feet, at turns, and above and/or below penetrations and at all DC combiner and junction boxes. Thi��d Pyr Tj I ° Lab Tested oTrci c 740 Lbs. Patent #5,746,029 Valu 1>' p,1llot't Tile Roof Structural Attachment r professional SOLAR pro_du?�rn (805) 486-4700 (805) 486 -4799 -fax 1551 S. Rose Ave. Oxnard, CA 93033 View more info on our website at: www.prosolar.com The patented TileTrac® attachment allows for a structural roof rafter connection with optimal attachment stud location adjustability. Design results in the best looking systems in the industry. Tile Ti ac ° for s -curve concrete tile (6" Tall Threaded Stud) Part # TT -18d6 Tile r ac ° for flat concrete tile 0" Tall Threaded Stud) Pari # TT -18-T4 Benefits of the TileTrac • Industry's most cost effective tile • Aluminum and Stainless Steel components for attachment product corrosion resistance and strength • Minimal install labor and time • 1,740 lbs of 3rd party lab tested pullout strength • Over 12 years of industry • Water -tight seal lab tested for 7 days under 34 referred design inches of water, zero leakage • Requires only one Stainless Steel • 10 sq. inches of base area evenly distributes roof lag bolt (included) load and provides sufficient sealant bonding area The Tile Trac- Design Structurally attaches to roof rafter and allows the rail attachment stud to be located at the strongest point of the tile (the crown) where water does not flow. Without TileTrac° iter - -- - - . - --- -- -- - -- -- With TileTrac° Water Flows High Point/ in the Valle Crown Support Rail Y (a the Tile of the Tile (optimum) TileTrac® assembly structurally attached Rafter to the rafter 6Z0`Mi # 'lud j3pun paiano:) PUB j.iUurapUzi p .Tansft)j 13 sr® rjjl )jr j, •800Z aun j •:)uj 1s3:)npozd .TrjoS iuuolssapj(jg •sal!} 9101s Jo doh sof p9puawwOD8J ION. •umoys so sjaysom/slnu „gA jaddn pun iamol 41!m I!oj ualso j :Zl da1S •Iaysom to dol punouo luolnas paloi An Alddn •iaysnm „g/£ •ua14611 pun say)uajm „glib 6u!sn (papnl)u!) slnu „g/£ om1 o qpm ssaidwo) pun al!j pun asoq pnls uaamlaq luolnas pu!8 •asoq 41lm pnls a6o6ua 01 say)uaim JI/6 41!m ua14611 paloi An Alddn -pn1s woil anowai pun slnu pu!qun :ll da1S pun al!l ay{ y6noiyl pnls papoaiyl ay pasul :01 dais •spnlap jol woriolosoid•mmm 10 oap!e auwluo aaS •apt ay1 y6nayl ipip'apow jawwoy w j118o H3wwvH A8tl10N pun 1!q Iiup ap!gio) „g/£ o 6u!sn :6 da1S •saloq Auo 6u1I08s piomino moll pinoys lunloas ayl •ua1y6!paAo iou 00 •paloas I!1un 11oq Bol ay Ilolsw'1a1aos „Z/10 6uwsn.:g da1S •anogn apt ay1 uo 1u!od amaialai o liaW •ialua) iallw aq1 apol 'suoaw iaylo Jo '(popuawwo)ai) iapuwl pnls nuojpala no Bum :£ d31S •81!1 ay1 to aIpp!w ay1 ioau 96own) iaddn ay1 ap!ls -Al6u!piono uopo)ol ll!'p ay1 jiow pun 'aI!11o13 joj •aly aq1 to umon ay} iapun uo!1!sod pa»o) ay1 olui sau!l dous ay1 do 6u!u!1 Aq apt ay; woldq :g da1S a6owo) jaddn ay! ap!Is'}ooi 94101 asoq a416w1109 1911V :L da1S asoq ay1 of woloas ainlwadwal wool ysail Alddo pun p)oilal!l ay1 gBnojy1 jaysom pun yoq bol ayl pasul :S da1S •I!ou Mows o Aq amld w play Allow s! 11 •6u!ilnd pun 6u!ysnd Aq al!1 a41 anoway :Z MS ia}uaa iagoi 041 Buolo aloq 1ol!d II!'p '(II!'0-fj) ap!n6 II!'p pun ►!g II!'p „91/£ o 6wsn -aloq I!ou al!I Ioiqui ay IoaS :0 da1S ialloJ low 041 10 0810 041 u1 apt o p018S :I d31S VINCI & ASSOCIATES Structural Engineers CLIENT: Professional Solar Products, Inc. 1551 S. Rose Ave., Oxnard, CA 93033 Tel: 805-486.4700 Subject: Static load test results for the following: Mountin S stem g y Maximum Frame Maximum Frame Load Equivalent Wind Speed Length!_(in.) Width* (in.) (lbs/ft') (mph)** RoofTrac ® 65 (77**) 40 55 135 (115**) TESTSEfUP (as shown in attached drawing detaiD: Three modules, as specified above, were bolted to 136"x1.5"x1.5" Professional Solar Products (PSP) patented RoofTrac® support rails using an assembly of 5/16" Stainless Steel (SS) bolts,SS lock washers and proprietary aluminum clamps and inserts. The RoofTrac® support rail was attached to the PSP RoofTrac® structural attachment device with a 3/8" SS nut and SS washer at six attachment points. The setup was attached to 2"x6" wooden rafters using 5/16" x 3-1/2" SS lag bolts. The attachment spans consisted of 48" front to rear with structural attachments spaced 48" on center. TEST PROCEDURE (as shown in attached drawing detain: The test set up was top loaded to 55 Ib/ft2. The setup remained loaded for an approximate period of 30 minutes. The maximum deflection and any signs of permanent deformation were recorded. The test setup was then inverted and loaded to simulate the uplift condition. The test set up was re -loaded to 55 Ib/ft2. The setup remained loaded for an approximate period of 30 minutes. The maximum deflection and any signs of permanent deformation were recorded. TEST RESULTS: The maximum top load deflection was recorded at 0.469", with no permanent deformation. The maximum.uplift deflection was recorded at 0.313", with no permanent deformation. This document certifies the RoofTrac® mounting system used with modules, as specified above, withstand the stated static pressure load, equivalent to the stated wind speeds**. The mounting system performed as expected. Sincerely, James R. Vinci, S.E. This engineering report verifies that Vinci & Associates has provided independent observation for load testing as described in this report. The results of this load test reflect actual deflection values and are generally accepted as the industry standard for testing module mounting systems. Vinci & Associates does not field check installations or verify that the mounting system is installed as described in this engineering report. Structural attachment: Lag bolt attachment should be Installed using the proper pilot hole for optimum strength. A 5/16" lag bolt requires a 3/16" pilot hole. It is the responsibility of the installer to insure a proper attachment is made to the structural member of the roof. Failure to securely attach to the roof structure may result in damage to equipment, personal injury or property damage. The purposed racking system may be installed on any roof up M maximum of 24 foot above grade without further analysis. Racking can be installed at any location on the roof. Racking shall be installed Into abei or blocking with a 5/16" diameter screw at each Fast -jack location. Screws shall have minimum of 2 35 penetration into framing member for zominimum of 3" penetration into framing member for zone 3. (Zone 3 is defined as the approximately 4'-0" square at each corner of the roof) This office does not express an opinion as to the load bearing characteristics of the structure the mounting system/modules are being installegl op. ICC accredited laboratory tested structural attachments manufactured by Professional Solar Products (including FastJackm , TileTracO, and FoamJacko) can be interchanged with this system. Check with local building department or AHJ for site specific requirements. C *Modules measuring within stated specifications and tested to UL1703, or equivalent, are included in this &S y engineering. **Wind loading values relative to defined load values using wind load exposure and gust factor coefficient c3 No 1 L*r "exposure C' as defined in the 2012(IBC) /2013 (CBC). For 77" x 40" module, equivalent wind speed p, 2/ 1/ 5 �l derated to 115 mph. *** Module tested: 64.6" x 39.1" x 1.8' (shrp) ****Est. snow load rating of 30 Ib/ft2 based on 1.5 safetyfactor. (20 Ib/ft2 for 77' x 40" module) 1337 E. Thousand Oaks Blvd, Ste 114 • Thousand Oaks, CA 9136 Page 1 of 3 \-/ :,ZT_4 Module Area = 18 ft2 each Total module.(45 lbs ea.) and rail.•(.10 lbs ea.) weight: 155 lbs Number of -'attachments: 6 ea Weight / attachment point: 26 lbs Area: 54 ft2 Distributed weight: .2.9 Ib/ ft2 5/16" Stainless Steel Hex bolt' 5/16" Stainless Steel Lock Washer 2,984 lbs / I 55 psf i GO R E B LL Top Load •Deflection: 0.469" 2;98411is.%• 55 psf CO RE LLA T Aluminum ProSolar Inter -Module Clamp H Li Ll Aluminum ProSolar Up lift Deflection: 0.313" Channel Nut 10 Aluminum ProSolar RoofTrac® Support Rail 3/8" Stainless Steel Hex Bolt and Flat Washer Aluminum. ProSolar patented Fastjack® Roof Attachment* c� N: 11._. 5/16" Stainless Steel Lag Bolt ' P 1 * 1/15 and Flat .Washer ,,A� ; *� *Lab tested structural attachments manufactured by Professional Solar Products (including Fast lackO , TileTract., and FoamJack®) can .be. interchanged with this system. Professional Solar Products'146of7ra& Patent# 6,360,499 Photovoltaicmountng system Rooffrac® Solar Modules' Static load test Page 2 of '3 RTA FastJack® 2X bracket only to be used between two rows of modules to maintain approx. 48"upper to lower RoofTrac® support rail spacing FastJack® 2X bracket Assembly side view I Approx 20" max [---Ioverhang 5/16" Stainless Steel Hex bolt and slit lock washer Aluminum ProSolar Inter -Module Clamp Aluminum ProSolar I I Channel Nut t Aluminum ProSolar RoofTrac® Support Rail 3/8" Stainless Steel Hex Bolts and Flat f Washers ! ! Aluminum ProSolar FastJack® 2X Bracket I (only used between two rows of modules) Aluminum ProSolar Patented 2 pc FastJack® Roof Attachment 5/16" Stainless Steel Lag Bolt and Flat Washer *Lab tested structural attachments manufactured by Professional Solar Products (including FastJackm , TileTracO, and FoamJackm) can be interchanged with this system **Check span suitability with AHJ as necessary Professional Solar Products RoofTraco Patent# 6,360,491 Photovoltaic mounting system Page 3 of 3 1, 4s" Module Area = 18 ft2 each Total module (45 lb/ea.) and rail (10 Ib/ea.) weight : 310 lbs Number of attachments: 9 ea Weight / attachment point: 35 lbs Area: 108 ft2 Distributed weight: 2.9 Ib/ ft2 Roofrrac® Solar Modules Static load test RT -4 5 J� Bin # City of La Quinta 0096 Building 8T Safety Division P.O. Box 1504, 78-495 Calle Tampico La Quinta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Permit Project Address: 53180 Avenida Herrera, La Quinta Owner's Name: Maria Cruz A. P. Number: 7774-054-009-2 Address: 53180 Avenida Herrera Legal Description: Contractor:;,. Solar Service Center, Inc. City, ST, Zip: La Quints Ca. 92253 Telephone: •:s::>:;::.:::.:::::•.:.;.::,:• Address: 72227 Ade l a i d St. #A Project Description: City,ST,Zip: Thousand Palms,Ca. 92276 Photovoltaic System Installation Telephone: 760-391-7270.1 :.>;::::•;:.,;s;:;.:•::..?,.:.::::.:l;::..<::.:;;; State Lic. # : 961939 Arch., Engr., Designer: City Lic. #•: 10 6 94 8 Address: City., ST, Zip: Telephone: y ;jt,:;.4:;>sr>,>:::yrryf?;kt> Construction Type: Occupancy: State w. :. ''>•'<a'"'"""" '"`'" ''` `°' .`.. :. . wN;;::.; .•:;.,::;>.; Project Type (circle one): New Add'n Alter Repair Demo Name of Contact Person: Liliana Figueroa Sq. Ft.: #Stories: #Units: Telephone # of Contact Person: Estimated Value of Project: 2 Sfl APPLICANT: DO NOT WRITE BELOW THIS LINE # Submittal Req'd Recd TRACKING PERMIT FEES Plan Sets 3 Plan Check submitted I Item Amount Structural Calcs. Reviewed, ready for1S RSSuE ? p Plan Check Deposit Truss Calcs. Called Contact Person Zv Plan Check Balance. Title 24 Calcs. Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2' Review, ready for corrections/issue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- '"' Review, ready for corrections/issue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees FINANCIAL •• • DESCRIPTION - ACCOUNT QTY AMOUNT PAID PAID DATE BSAS SB1473 FEE 101-0000-20306 0 $2.00 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY Total Paid forBUILDING STANDARDS ADMINISTRATION BSA: $2.00 $0.00 DESCRIPTION ACCOUNT QTY_ AMOUNT PAID PAID DATE PV SYSTEM - ARRAY, FIRST 20 101-0000-42403 0 $24.17 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - ARRAY, FIRST 20 PC 101-0000-42600 .0 $24.17 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - MISC EQUIPMENT 101-0000-42403 0 $24.17 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - MISC EQUIPMENT PC 101-0000-42600 0 $24.17 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY Total Paid for ELECTRICAL: $96.68 $0.00 DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PERMIT ISSUANCE 101-0000-42404 0 $91.85 $0.00 PAID BY METHOD RECEIPT # CHECK # CLTD BY Total Paid for PERMIT ISSUANCE: $91.85 $0.00 TOTALS:•• i 00 Description: 5.83 kW PV SYSTEM - (22) 265W PANELS W/ MICRO-INV/125A SUB Type: SOLAR Subtype: Status: APPROVED Applied: 1/14/2015 PJU Approved:,1/20/2015 JFU Parcel No: 774054009 Site Address: 53180 AVENIDA HERRERA LA QUINTA,CA 92253 Subdivision: SANTA CARMELITA VALE LA QUINTA Block: 217 Lot: 16 Issued: UNIT 21 Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: Valuation: $29,150.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 STAFF NAME Details: 5.83 kW SOLAR ARRAY - (22) 265W SUNEDISON SILVANTIS F -SERIES SE-F265CzD-3y MODULES W/ ENPHASE M215 MICROINVERTERS AND (1) 125A SUBPANEL [352SF] 2013 CALIFORNIA ELECTRICAL CODE. Printed: Friday, January 23, 2015 8:22:03 AM 1 of 2 CR SYSTEMS ADDITIONAL CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES NOTIFIED LILIANA W/ SOLAR SERVICE CENTER PLANS WERE TELEPHONE CALL JAKE FUSON 1/20/2015 1/20/2015 APPROVED AND PERMIT READY TO ISSUE. CONDITIONS CONTACTS NAME TYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT SOLAR SERVICE CENTER 0 OUTSIDE CITY LIMITS LA QUINTA CA 92253 CONTRACTOR SOLAR SERVICE CENTER 0 OUTSIDE CITY LIMITS LA QUINTA CA 92253 OWNER MARIA CRUZ 53180 AVENIDA LA QUINTA CA 92253 HERRERA Printed: Friday, January 23, 2015 8:22:03 AM 1 of 2 CR SYSTEMS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE -RECEIPT # CHECK # METHOD PAID BY CLTD BY BSAS S81473 FEE 101-0000-20306 0 $2.00 $0.00 Total Paid forBUILDING STANDARDS ADMINISTRATION $2.00 $0.00 BSA: PV SYSTEM - ARRAY, 101-0000-42403 0 $24.17 $0.00 FIRST 20 PV SYSTEM - ARRAY, 101-0000-42600 0 $24.17 $0.00 FIRST 20 PC PV SYSTEM - MISC 101-0000-42403 0 $24.17 $0.00 EQUIPMENT PV SYSTEM - MISC 101-0000-42600 0 $24.17 $0.00 EQUIPMENT PC Total Paid for ELECTRICAL: $96.68 $0.00 PERMIT ISSUANCE 101-0000-42404 1 0 $91.85 $0.00 Total Paid forPERMIT ISSUANCE: $91.85 $0.00 TOTALS:•0 00 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED I COMPLETED RESULT REMARKS NOTES DATE DATE SOLAR FINAL** PARENT PROJECTS Printed: Friday, January 23, 2015 8:22:03 AM 2 of 2 CR? SYSTEMS