Loading...
05323 (SFD)4 P.O. BOX 1504 No. 05323 Building '" --- ` 78-105 CALLE ESTADO Address 54-400 HERRM LA QUINTA, CALIFORNIA 92253 Owner C OA i.LA MALI% LA. Mailing " BUILDING: TYPE CONST. OCC: GRP. Address 247 R. TARQUM f2 A.P: Number 774-251-008 City Zip Tel. LOT 17 'BIK 291 T111T 27 Pt'�,I$ ��aIi�s 9.2202, _ 32��i€3..fl. _ Legal Description Contractor Project Description SFD STA�it CONSTRUCTION. Address SAID City Zip Tela State Lic. City & Classif. 387934 Lic. # 895 Sq. Ft. 1410 No. No. Dw. Arch., Engr., Size Stories Units Designer New ❑ Add ❑ Alter ❑ Repair ❑ Demolition ❑ Address Tel. City Zip State Lic. # LICENSED CONTRACTOR'S DECLARATION I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and r SIGNATURE "DATE OWNEWBUILDER DECLARATION Estimated Valuation I hereby affirm that I am exempt from the Contractor's License Law for the following 76,360 reason: (Sec. 7031.5,13usiness and Professions Code: Any city or county which requires a permit to construct, alter, improve, demolish, or repair any structure• prior to Its issuance also requires the applicant for such permit to fae a signed statement that he is licensed pursuant to PERMIT AMOUNT the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code• or that. he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit Plan Chk. Dep. 2:50.00 �s sf subjects the applicant to a civa penalty of not more than five hundred dollars (8500). Plan Chk. Bal. a. I2.- 7ty ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and Const. 536.00 Professions Code: The Contractor's License Law does not apply to an owner of property who Cti builds or inproves thereon and who does such work himself or through his own employees, Mech. 53.50 provided that such improvements are not intended or offered for sale. If, however, the building a or improvement is sold within one year of completion, the owner -builder will have the burden Electrical 1©6.41 of proving that he did not bund or improve for the purpose of sale.) ❑ I, as owner of the property, am exclusively contracting with licensed contractors to con- Plumbing 157.50 struct the project. (Sec. 7044• Business and Professions Code: The Contractor's License Law .q! does not apply to an owner of property who bums or improves thereon, and who contracts for S.M.I. 5.33(91 such projects with a contractor(s) licensed pursuant to the Contractor's License Law.) Grading 2Q . yy ❑ 1 am exempt under Sec B. & P.C. for this reason Driveway Enc. 20.00 Date Owner Infrastructure 1,679.35 WORKERS' COMPENSATION DECLARATION I hereby affirm that I have a certificate of consent to self -insure, or a certificate of Worker's Compensation Insurance, or a certified copy thereo 800, Labor Code.) Policy No Company ❑ Copy is filed with the city. ❑ Certified copy is hereby furnished. TOTAL i "� f . Lt CERTIFICATE OF EXEMPTION FROM REMARKS WORKERS' COMPENSATION INSURANCE y. } 4 y ( t] c�s ? (This section need not be completed ff the permit is for one hundred dollars ($100) valuation ;V5i!4 40 .45;�y-Aa'—99-3!?'M rw4 10 or less.)s­­. � . -u . _>,_ - _ I I certify that in the performance of the work for which this permit is issued, I shall not m employ anyperson in any manner so as to become subject to the Workers' Compensation Laws of California. Date Owner NOTICE TO APPLICANT: ff• after making this Certificate of Exemption you should become ZONE: BY: subject to the Workers' Compensation provisions of the Labor Code, "you must forthwith comply with such provsions or lids permit shall be deemed revoked. Minimum Setback Distances: Front Setback from Center Line Rear Setback from Rear Prop. Line CONSTRUCTION LENDING AGENCY Side Street Setback from Center Line I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued. (Sec. 3097, Civil Code.) Side Setback from Property Line Lender's Name Lender's Address This is a building permit when property filled out, signed and validated, and is subject to FINAL DATE INSPECTOR expiration if work thereunder is suspended for 180 days. 217 `89 1 certity that I have read this application and state that the above information is correct. Issued by: Date Permit I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives -of this city to enter the above-, mentioned property for inspection purposes. Validated by: Signature of applicant Date Mailing Address Validation: City, State, Zip CONSTRUCTION ESTIMATE NO. ELECTRICAL FEES NO. PLUMBING FEES 1ST FL. SO. FT. ® $ UNITS SLAB GRADE '1-6 – ROUGH PLUMB. BONDING YARD SPKLR SYSTEM 2ND FL. SO. FT. @ FORMS SEWER OR SEPTIC TANK ROUGH WIRING MOBILEHOME SVC. BAR SINK POR. SO. FT. ® GAS (ROUGH) METER LOOP HEATING (FINAL) POWER OUTLET ROOF DRAINS GAR. SO. FT. ® TEMP. POLE GROUT DRAINAGE PIPING CAR P. SO. FT. FINAL INSP. WALL SO. FT. ® WATER SYSTEM DRINKING FOUNTAIN GRADING cu. yd. $y plus x$ =$ URINAL SO FT ® FINAL INSP. FRAMING ESTIMATED CONSTRUCTION VALUATION $ WATER PIPING NOTE: Not to be used as property lax valuation REMA RKS. FLOOR DRAIN MECHANICAL FEES WATER SOFTENER VENT SYSTEM FAN EVAP.COOL HOOD SIGN WASHER(AUTOXDISH) APPLIANCE DRYER GARBAGE DISPOSAL FURNACE UNIT WALL FLOOR SUSPENDED LAUNDRY TRAY AIR HANDLING UNIT CFM SPARK ARRESTOR KITCHEN SINK ABSORPTION SYSTEM B.T.U. TEMP USE PERMIT SVC WATER CLOSET' COMPRESSOR HP POLE, TEM/PERM LAVATORY HEATING SYSTEM FORCED GRAVITY AMPERES SERV ENT SHOWER BOILER B.T.U. SO. FT. ® c BATH TUB I SULATION/SOUND —J0 Cl SO. FT. ® c WATER HEATER MAX. HEATER OUTPUT, B.T.U. SO. FT. RESID ® 11/. c SEWAGE DISPOSAL SO.FT.GAR ® V4c HOUSE SEWER GAS PIPING PERMIT FEE PERMIT FEE PERMIT FEE DBL TOTAL FEES MICRO FEE MECH.FEE PL.CK.FEE CONST. FEE ELECT. FEE SMI FEE PLUMB. FEE STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR LSETBACK '/— 6-1-5 O OUND PLUMB IN –/ UNDERGROUND A.C. UNIT COLL. AREA SLAB GRADE '1-6 – ROUGH PLUMB. BONDING HEATING (ROUGH) STORAGE TANK FORMS SEWER OR SEPTIC TANK ROUGH WIRING DUCT WORK ROCK STORAGE FOUND. REINF. GAS (ROUGH) METER LOOP HEATING (FINAL) OTHER APPJEOUIP. REINF. STEEL GAS (FINAL) TEMP. POLE GROUT WATER HEATER SERVICE FINAL INSP. BOND BEAM WATER SYSTEM GRADING cu. yd. $y plus x$ =$ LUMBER GR. FINAL INSP. FRAMING FINAL INSP. ROOFING U C 0 1 / \ � • � I �{- '� REMA RKS. VENTILATION FIRE ZONE ROOFING FIREPLACE SPARK ARRESTOR GAR. FIREWALL CJ.ATHING MESH I SULATION/SOUND —J0 Cl — FINISH GRADING FINAL INSPECTION CERT. OCC. FENCE FINAL INSPECTOR'S SIGNATURESJINITIAIS GARDEN WALL FINAL t I)i r 0 RECEIPT NO. �v - Issued By "" " Date DISTRICT: ❑ Riverside, L7 Indio ❑ Hemet ❑ Perris ❑ Rancho Calif. ❑ Blythe DOH SAN 122 (Rev. 5/88) DISTRIBUTION: WHITE - Office file YELLOW - Applicant PINK - Bldg. Dept. GOLDENROD - Plans/Records COUNTY OF RIVERSIDE DEPARTMENT OF HEALTH/_ `ors Parcel �S1 - 00 ENVIRONMENTAL HEALTH SERVICES PERMIT APPLICATION FOR A SUBSURFACE SEWAGE DISPOSAL SYSTEM Applicant: Submit this form with four copies of a scaled plot plan (1-20 scale) drawn to County speculations as indicated on the attached checklist A non-refundable filing fee (see below) is required when the application is submitted. Check must be made payable to the County of Riverside. Approval of this application shall remain valid for a period not to exceed one year from date of approval. Q VERIFY ITEMS IN SECTION A FROM BUILDING & SAFETY APPLICATION BUILDING DEPARTMENT APPLICATION LOG'* Z O Agent, Contractor, Contact PersonPhone Address & Phone v 5'1,4.4 At da r. 6 Af LLI (1) Owner Phone ? Z • /o a e Mailing Address 24r,70 ?'.p'o/47u , r c. City ?i;�hwf SPEPIJaS State CA- Zip 9:z4T- Job Property Address?4,M",-� X-lVaooifseAtA'09Iq Legal Description Prop. (PM, Tract, Lot) LpT/7 dtK .29t Lot Size ater A Use of Permit P/P, CU, etc. 349 Other So x !Co ATt=4e-w 9R ^ .p.� Dwel' MH Site Pref, etc. 6/�t-> Signature of Applicant r - Date CATEGORY: REV CODE CATEGORY: REVCODE FEE SUBSURFACE DISPOSAL 1238 ❑ SITE EVALUATION UPON REQUEST 7349 $42.00 ❑ MULTIPLE PARCELS WITHIN SAME (NO PLOT PLAN) m LAND DIVISION ❑ SEWER/SEPTIC VERIFICATION 7348 $11.00 Z O a. 1 st 4 Parcels (Each) 1238 $45.00 (Less than 1 year) H b. Each Parcel after 4 7344 $16.00 ❑ PRELIMINARY ELECTIVE 7352 $45.00 W ❑ Rereview (2nd review same parcel) 7344 $16.00 EVALUATION (Attach DOH SAN 53) N ❑ Site Evaluation in Conjunction with ❑ HOLDING TANK 7351 $45.00 Critical Area 7346 $86.00 ❑ ALTERNATIVE/EXPERIMENTAL 7345 $132.00 ❑ Site Evaluation Lot Less than SYSTEM e' 10,000 Sq. Ft. 7347 $86.00 I a Holding Tank Agreements Completed ❑ Yes -11 � 9 Certification of Existing S.D. System Required ❑ Yes WQCB Clearance required. (Attach Form ❑ Yes No DOH SAN 007, Santa Ana Region Only) Soils Percolation Report Required. ❑ Yes Special Feasibility Boring Report Required. ❑ Yes Detailed Contour Plot Plans Required (1 to 5 ft interval) ❑ Yes o Other ❑ Yes 6 Staff Specialist Lot Inspection Required ❑ Yes No Lot Inspection Date Soils boring report by 01Project # Date Soils Map Page i Soil Type Approved by"/E- Date- a� U No. of Systems T of S em(s) No. Dwelling Units f (1) Septic Tank Soil Rate Grease/Sand Z O ding Tank ❑ Existing ❑ nt Bedrooms,+Pl to 136/2A r Intop 0 3 • 4* _Leve Line Sq. Ft Sidewall allowance Ir>sfall s) R long ft wide with Leach Bed sq. ft h area fL ra ck/ sq. ft. min. inches rai ,—or per running ft Leachlines/bed special design for slope: (3) Pit Diameter No. Pits Pit Below h otal Depth Seepage Ph? r. Applicable jr Inlet (BI _J 4` N/A Overburden facto !�S' f 6 JLL / 7 Max. le able Depth No. 2 System Nif� REMARKS: y' r G+ ,: �/// i.. 2.l,,', rr /07 U ;: Qa This application i i;b' for the category checked in SECTION B above, regarding the design of a subsurface disposal system as indicated on the accompanied plot plan, using the requirements set forth in SECTION C above. A building permit is necessary for the installation of the Oabove -designed system. No construction is permitted in the required reserved 100% a pansion area. / �'�`� 1 Septic tank and sewer lines must be 50' minimum from any well ?►' r�>� f ��/"�jQ/' "?'�`A, Leach lines must be 100' minimum from any wells, including expansio ar %rli27X{�i ; �i`�a 69 Seepage pits must be; 150' minimum from any wells, including expans on areae ;L) Si nature of Health Official / O Dat RECEIPT NO. �v - Issued By "" " Date DISTRICT: ❑ Riverside, L7 Indio ❑ Hemet ❑ Perris ❑ Rancho Calif. ❑ Blythe DOH SAN 122 (Rev. 5/88) DISTRIBUTION: WHITE - Office file YELLOW - Applicant PINK - Bldg. Dept. GOLDENROD - Plans/Records ' ...F t .. .... ... .. TITLE 24 REPORT FOR4 'lar! A Ly Qunita, Ca. P :l _ri_!_ T DESIGNER:: OWNER REPORT PREPARED BY,�. jann Conlon Custom Aire P.O. Bcx 2751 Palm Desert, Ca. 92261. 619 341 9533 job Number: Date: 3/24/1989 The COMPLY 24 computerprogram r`!at•.: bc_er! :_i_>;_d to IY'=r-'poI'rn.+_•i•-!e calculations summarized in this compliance report-. This program has interim approval and is authorized by the California E1''1ei'''=y Commission for use with the Second Generation N_r..!t`e::-;7i"et' .'I_:I.a.l Building I'; I' .! e Y.. ,:t y Efficiency Standards for Nonresidential O__-:-cte=. Second Generation Residential Occupancies _._!owr..l comply w.L'.h this program conform to i::f-!e I'-es!.J1'f:•'_ pr o 1-a-- ='d by, .f.•l..!e Public Domain Point System. developed by the California Energy Commission. This Program developed by Michael Gabel Associates (41 5) 428-•0803. Table Of Contents for Title 24 Report � ------------------------------------- CoverPage ...................................~...................... I Table of Contents .......................................... 1........ Form CF -1R Certificate of Compliance: Residential ................... 3 Form MF -1R Mandatory Measures 'hecklist: Residential ................ 6 Form P -2R Points System Summary .............. ,...................... 8 Form CF -3 Construction Assemblies ......,............................ 9 Form WS -1R Points Thermal Mass Worksheet ............................ 14 Form WS -2R Interpolation Worksheet .... ................. .'............ 15 6DomeForm S Shading Coefficient (SN Worksheet ...............,........... 16:- Domestic stic Hot Water Worksheet` ........................................ 17 � HVACZone & Space Loads Summary ..................................... 1E., R CERTIFICATE OF COMPLIANCE: Residential (f-ar...;_ 1 of 3) CF --1R page 3 of 19 Project: Plan A ; i_1_tlyPLY 24 v Designer: ' , Building F' � � r" m i t N Location: Indio . La Quin ='. Date: 3/24/1989 , Checked By Documentation: •? ann Conlon {; u'_::'k;.i ,i•{} Aire i I;at_.e � �_!'_•� r" �� 1 F= 11 ) PROjECT ADDRESS La Qunita, i_a! GENERAL INFORMATION Compliance Method: Climate Zone: . Total Conditioned Floor Areag Building i i c u p a n 'y Front int• Errery Orientation,,; Floor Construction ction Type. .Infiltration Control e BUILDING SHELL INSULATION i_omF,onent. Area R-11 Frame Wall 1340 R-38 Roof/Gyp Ceiling 1410 Carpeted '_plat_, 937 Exposed :Flab 47 Point "_?':f'_:t em .L ... 1410 ._ q f t. Single Fam Det CJ_r•t,h/Easa::.i'f__.a_h/W .. _. (circle one) Standard I -Value Location/Comments 0.0978 Whole House 0.0290 Whole House 0. 7200 While House _ / Slab ("•2 11a1 0. 9000 *Whole House /Slab F2 Val THERMAL MASS Thick Mass Material Area (in) Type Location/Description i=r,r.cr••et.e, Hea!vyweaght_. 937 4a000 Covered Whole o se 'Int. Mass Concrete. Heavyweight 473 4.000 Exposed Whole House /Int• Mass CERTIFICATE OF --------------------------------------------------------------------------- COMPLIANCE: Residential (Part 2 of S) CF -!R Page 4 of 19 Project: Plan A Framing Type 0.84 2.0 1 COMPLY 24 v 2.20 Designer: O.81 2.0 Metal Wo Mullions -------------- K'Building Permit No . Location: Indio Z La @ginta 0.84 Date: �----------��.��-- 9324«1989 1 Checked By Documentation: ------------------------------------------------------------------ Jann Conlon . Custom Aire -----------.--__-- 1 Date (User 4 1260) SHADING COEFF GLAZING Glass Glass Glass wxlnt Orientation Area Type U -Val Only Shade Description . . North 32.0 Single 1.10 1.00 0.34 Single/Light Blinds East 12.0 Single 1.10 1.00 0.34 Single/Light Blinds South 18.0 Single 1.10 1.00 0.34 Single/Light Blind§ West 86.0 Single 1.10 1.00 0.34 Single/Light Blinds SHADING (for Glazing above) Orientation Exterior Device North SO 3 Bug Screen East 50 % Bug Screen. South 50 3 Bug Screen West 50 2 Bug Screen Over- verSC so hang Framing Type 0.84 2.0 Metal w/o Mullions O.81 2.0 Metal Wo Mullions 0.84 2.0 Metal w/o Mullions 0.84 2.0 Metal w/o Mullions CERTIFICATE OF COMPLIANCE: Residential (partof =) CF -IR page c of 19 Pr oje t: Plan r=1 ; COMPLY 24 v 2.21*-'' ------------------ Designer. Building Permit N I._��cat.i.+_+n: Indio La !-!�..;:inta Date; 3/24/1989 1 GE'++_I::+;�-B--------- i l'- - L;r,+_�_�rn�_r..�.�•a._ i � �r..� : •.. f;!���r� !_+_Ir��. +._+r-� Custom h'+7. r+=' 1 t!e! i.+_ _ aCr 4 1860) --------------------------------------------------------------------------- HVAC SYSTEMS Min Output z?u:-.-!_ Duct Manufacturer/Model No. Sy'_;'!_.em Tyke I_ff (Ettuh) Location F:Va1 (or- appr'i+ved equal) I- ea'!_ Pump 7.000 000 3 3'200 Vent. Attic 'pace 4.5 _Tanitr of CP36_1D Max.Heat Pump 9.000 34001D Furnace Ourf_.i_n_at: 45000 Bt•uh .r. E(76% 71%) x 70001 = 2 51 Btu_ h Cooling '::+_e!=''F.ion: ------ !_h"M I_:i_++=+1ing ('_ee Load !_d1+__) requires Bt.l-h I'-IOT WATER SYSTEMS Tank: Manufacturer/Model N +. 4 of Energy 4 of System type Volume (or- approved d +_.ral_ al) Units Credits Pumps Heat. Pump 48.0 American HP452 (HPWH) 1 i r 1:1 PECIAL_ FEATURES/REMARKS (Add extra shee:!_s if necessary) COMPLIANCE STATEMENT, This Certificate of Compliance lists !_he building features and performance, specifications needed to comply with Title 24, Chapter 2-53 and Title sir, Chapter 2, Subchapter 4.'Article 1 of the'Califokil'Administrativi Code.. This certificate has beer) signed by the individual with overall design responsibility and the building owner, who shall retain a +_+::+Py of it and t.ransmit the certificate to arra subsequent purchaser of the building. When this Certificate of Compliance is submitted for a singli building plan to be built in multiple orientations. all building conservation features which vary are indicated in'the Special Features/Remarks section. DESIGNER STARR CONSTRUCTION CO. Licer-ise I - • 38793434 r:+O I M ITAT I ON AUTHOR R ...Jann Conlon Custom Aire ..a...•!. a_..,. P.O. Box 2751 : r Palm Desert., Ca. 9226-11 619 341 95:3:3 BUILDING OWNER ENFORCEMENT AGENCY Name: MANDATORY MEASURES i CHECKLIST (Fart• 1 of ;_) • _ PIF -1R F'a'de 6 of 19 Pr..r,j1=1_..to flan A 1 CiIi•}'PLY 24 v 2.211 1 Designers � l�Lai ldirl,a F'�r"rni't• hd� 1 Locations Indio / La QI-•I'i n•}_.to Date: 3/24/1989 e i_ Ill=r�=1•::1= IMl-Fiv--- 1 D Icumentat• i on v _Tann Conlon Custom A i r e, i Late (I }sel' E� 1 Frl l i Ni I'T'E: Li �wr" i'_.. residential bui.l iI' 1' I _ subject to the Standards roust. contain these measures regardless of th-ie• compliance approach used. Items marked with an asterisk ('r') may be sl..•Irll::'er•_:•I:el..il_d by more : tr-ir-gent. compliance requirement's listed I_In the Certificate of Compliance. When this checklist :is incorporated porat.ed int. 1 the permit. documents, the features no•}_ed shall be considered by all part•i%'_, as binding minimum m cernp1_Inent. performance specifications for the mandatory rnec_t=ure'_ wh.et.h"iet- .they are shown elsewhere in the documents or on this checklist only. :BUILDING ENVELOPE MEASURES Enforcement cement. ii 'i1_1_. -5352(a): Minimum ceiling iI'sU1at•iIIrl R-19 weighted average. :,: o S1_1_. 2-5352(b): 1-u_IsN o L_ _ fill insulation rnar_afactI_arers labelled R!Va11_aer. o Sec. 2-5352(i_); Minimum wall insulation in framed walls R-11 Weighlt'.ed average (does not apply to exterior mass walls). MEr _ '•`�' 3.x1• 't '�f'"w' "}�X :• :;;=- ..?. -I•�''.. ...r'. E."a�"!"'r:. .e'_t it diel_.' 1-6352(k): Slab-Idge'"insulatiXOtwater absorption rate e no greater than 0.34 water , vapor transmission rate no greater- than 2.0 Perm/inch. 1_1 Sec. _-C 1 1 n Insulation _F11iFied or installed n eet s _ California Energy Commission (CEC) quality standards. Indicate t•'y'pe and form. m . -1 o ',el.. 2-5352(f): ) Vapor _'I:::Irr].er= mandatory in Climate Zones 14 and 16 only. o Sec. 2-5317: Inf i ltr•at•i n/E fi.1't.ra•t.io n Controls a. Doors - - r':-• ca l'..li windows rlws 'l1= :Vdfeerl conditioned c41`ld unconditioned spaces designed to 1irn:it ail leakage. b. Doors and 'window_. certified. 1_. Doors ctnd:W].I'IdoW'a wecit'•heI's.:r"_.pp.._d; all joints and penetration'_ 1_c+ulk:ed and =:1_'r.:i.led. i:1 Sec. 2-5352(e): Special irhi1tra_icrbarrier installed to , comply with_-_-. 2-5351 nSN_s E _ quality standards.,. ,. "----------- • o Sec. 352(d). Installationdf Fireplaces 1. Masonry and factory -built fireplaces have. a. Tight fitting, closeable metal I=II'- glass door b. Outside air intake with damper and control c. Flue damper" and control .._. No continuous turning rias pilots allows;d. MANDATORY --------------------------------------------------------------------------- MEASURES CHECKLIST (part 2 of -2) MF -1R page 7 of 1'_- Pr..oje1.._t: Plan 0 1 COMPLY ih'II:L_Y 24 v 2.211 1 Designer: 1 ------------------ 1 Building Permit NI_� L M_ __ i ore Indio :_L__]rr; � Date: _%_4:l9__ 1 WOMAN; 1 D1.1cL.arnent•at•:ion: --------------------------------------------------------------------------- _far..n Conlon 1=:L.ast1_:m Aire I-IVi=1C AND i='I_iIMBIP,G S`'r'''==,Ti:-M MEASURES Enforcement. IMI Sec. 2-53520) and2-5303: Space e i _f il' II:J].?'•11-11'"ilr"Ig equipment sizing: attach calculations. o Sec. 2-5352(h) and 2-5315: Setback thermostat on all applicable I"I+=_<::at.:ing systems. fi 'moi=l_.. 2-5316(a): !_!I_.I1_'t'_ constructed. installed and insulated per Chapter 10, 1976 UMC. * r-1 =;1=_1_. 2-5316(b): Exhaust systems have dt=arnper- controls. IMI Sec. 2-5314(c): Gas-fired pace heating equipment has s intermittent ent. ignit.ion devices. IMI til=l=. 2-5314; F-IVAl_: ega_J:iPmen'1=, water- heaters, s, shx_wF_+riteads and faucets certified I_'1y the Ie 1_:L.1_ . _ Sec. i-5 5i(i). Water heater in _1ati`n blanket (R-12 or greater) or combined interior/exterior insulation (1-t-16 or greater); fir'_S'I_ 51 f1_i'I_ 1- 1f....A]-Re•:.•. closest to 'tank insulated ' (R-3 � ter- greater). _ Sec. 5312 (E:. _.=F i _n I) . Pipe insulation on steam and steam condensate return & recirculating piping. IMI Sec. +_ 531;_; (IJ) . Sw1mrning Pool Heating •1 g 1. System has: a. On/off switch 1_1n I'I!=ai_er-. I-'. Wea.rI'"1er..t_.,r..00f instruction pl-.'I::F= on heater. c. Plumbed to allow for solar. . 2. 75 percent thermal efficiency.� :>. P1111l 1_1_1ver". 4. Time clock. •._I. Directional wc:li_er inlet. LIGHTING ANI' APPLIANCE MEASURES IMI Sec. ,-1. � _l i_ : i � ) Lighting •a I`�I i. 1 rra "' L °=1lumens/watt ,� or I' gI'ecit'.er" f i 1 r ' eneral .1ight•ir-g in kitchens and Llathriiilrrs. _ QV M _ -i y �14(i). _a_fired appliances equipped with . intermittent ignition devices. '-' �� 1 _:1� .2-5314(a): Refrigerators. refrigerator -freezers, freezersfreezerand fluorescent lamp ballasts certified Fie the CEC. Indicate rnai.:e an1_, model number. POINTS SYSTEM SUMMARY: CLIMATE ZONE -15 . P -2R . page 8 of l'=? Project: Plan A 1 COMPLY 24 v 2.2i1 Designer: 1 Building Permit No 1 ------------------ Location: Indio / Lai:!u i nt•a Date: 3/24/1989 1 Chep_ k:ed BY I`ocumentat.ione •1ann Conlon Custom Aire 1I:at.e �L15.r �� I F.II j Bi I I L_I, I NG DATA Conditioned Floor Area 1410 sqft Occupancy Type Single Fa:+.m Det SCORE .:ARE) Measure 1. Roof Insulation 0.0290 Number of Stories 1 P1 i nt s (I -I' -Value) Ii 2. Wall Insulation 0.0978 (I-I.._L'a1ue) -7 3. Raised Floor Insulation 0.0000 (U -Value) :=,a. Controlled Vent. Crawl pace rill (R -Value) . 1 -1 4. Slab Edge Insulation 0.8055 02 factor) 1 5. I r. f i. l t. r" a t. io n Standard c. i i 6. Glass Heat Loss 1.10 10.5% - _ X 0. 80 = _ r . i Q Sum 1- h. 11 7. Shade Open . Area :"-%, Gla s 1 :'s - - . OH Ef f X, Point Total: b. East_ 12.0 0.9 x 0.81 .. 0.74 = 0.5 II c. South 18.0 1.3 ., 0. 81 X 0. 80 = ii. = Q d. We',t. 86.0 6.1 ., 0.81 x 0.85 = 4.2 1 e. Skylight 0.0 0.0 x 0. ilii = 0.0 0 _. shade Closed Area % Glass Sc OH Eff a:;. North 32.0 2.3 x 0.29 0.7 it b. East. 124 0.9 ., 0.29 ., 0.61 = 0.1 4 d. West 86.0 6.1 ., 0.29 x 0.78 = 1.4 Cl e. Skylight 0.0 0.0 x 0.00 = 0.0 it 9. Inter..ior" Thermal Pyla.;'_ 2.7'% 1 Iii. Exterior- Wall Mass 0.011 Cl .11. . _ , Sum .7-10 Heating System 7.000 HSPF x 0.82 Duct. Eff 5.76 Eff HSPF Zonal Control: No 12. Cooling System 9.000 ::::EER x 0. 81 Duct Eff 7.32 Eff SEER 13. Water- Heating (see DHW Worksheet) _ Point Total: CONSTRUCTION ASSEMBLY COMPLIANCE FORM i= F-:; Page 9 of 19 Projects Plan A ; COMPLY IMPLY 24 v 2.20 ------- De igner: 1 Building Permit. No Locat iona Indio f La Quint. a Date. 3/24/1989 1 Checked By ------------------ Documentation: •.. ann Conlon Custom Aire 1 Date (User 4 1 = 60 ) --------------------------------------------------------------------------- A_sembly Name: R--11 Frame Wall Assembly Type: Wal. 1 Assembly I :i 1ta '_:ii deg (Vertical) ------------------------------- � e 1 Sketch b f i_ o`n ± t• r- ut. i on A -:e mQ l y Calculation for Framing Adjustment. _simmer- i t -Value 0.0793 17`• 3 x 0.85 + 0.1969 x 0.15 = 0.0969 Winter U -Value 0.0798 „ 0.85 0.2III10 „ 0. 15 = 0.097'8, OVERALL VALUES ADJUSTED FOR FRAC*1ING Absorptivity: 6.70 Roughness: Stucco, Wood Shingles Weight: 12.3 lb/sgf-k. Heat. Capacity: . - - R -Value 10.32 10.22 U -Value 0.0969 0.0978 Th R- V a l u e Construction Components Fr (in) Summer Winter Outside• Air- Film , 0.25 0.17 1. Stucco 0. 875 0. 17 0. 17 ,_. Membrane. Vapor -Permeable Felt 0. 010 0. 06 0. 061 3. insulation, Mineral Wool. R--11 + :1,500 11.00 11.011 4. Gypsum or Plaster Board 5. 0.500 0.45 0.45 6. .. 7. 8. Inside Air- Film ----------------------------------------------------------------------------- 0.68 0.6:_: Framing Fercentagei 15.0 % Framing Material: Softwood. Douglas Fi.r--Larch.. ------------------------------- � e 1 Sketch b f i_ o`n ± t• r- ut. i on A -:e mQ l y Calculation for Framing Adjustment. _simmer- i t -Value 0.0793 17`• 3 x 0.85 + 0.1969 x 0.15 = 0.0969 Winter U -Value 0.0798 „ 0.85 0.2III10 „ 0. 15 = 0.097'8, OVERALL VALUES ADJUSTED FOR FRAC*1ING Absorptivity: 6.70 Roughness: Stucco, Wood Shingles Weight: 12.3 lb/sgf-k. Heat. Capacity: . - - R -Value 10.32 10.22 U -Value 0.0969 0.0978 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page Iii of 1'51 Project: Plan A ; COMPLY 24 v 2.21:1 1 '------------------ 1 ---------- -- ; Building Permit No ------------------ L at.iono Indi1.1 / La Quint_. Date: 3/24/1989 19_9 ; Checked By 1 ' ------------------ Documentation: ---------- IJi 11;ument.ationo Jar - n Conlon Custom Aire 1 Date (User 4 1 FII ) --------------------------------------------------------------------------- Assembly Name: R-38 Roof/Gyp Ceiling Assembly Type: Roof Assembly Tilt: 0 deg (Horizontal f;;o1-f Framing Percentage: lila ii Framing Material: Softwood. Douglas Fir -Larch 1 / 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - 1 1 1 1 1 1 1 1 1 1 Sketch of Construction Assembly Calculation in fi1r- 'Framing AIjjust•rnent. Summer I I-Vali_ e 0.0241 .. 0.9II v 0,0674 x 0.I0 = 0.0284 Winter I I •- V a l u e 0.0245 •• 0.90 + 0.0702 m 0.10 = 0.0290 OVERALL VALUES IE_ ADJUSTED FOR FRAMING R --Value 35.15 � 34.43 Absorptivity: 0. 71-*' Roughness: Concrete, Asph. shingle'_ Weight: 9.9 lb/sgf•t Heat Capacity: 2. 9 - Th R•• -Value .Construction Components f_ -r- (in) Summer Winter ---------------------------------------------------------------------------- iii hs de Air Film 0.25 0.17 1. Roofing, A_,bestos--i_:emenF•. :=Singles 0.250 0.21 0. 21 2. Plywo1_II_I 0.500 0.63 ii. f,_; 3. Air- Space 12.000 1.00 0.811 4. Insulation, Mineral Wool, R-_ Q 11.500 5i :;_:,ilii 38.01-1 `I. Gypsum or Plaster Board 0.500 0.45 0.45 6. 7. 8. 9. Inside Air Film 0.92 0.61 :: w T It•.al 41.46 40. 87 Framing Percentage: lila ii Framing Material: Softwood. Douglas Fir -Larch 1 / 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 - 1 1 1 1 1 1 1 1 1 1 Sketch of Construction Assembly Calculation in fi1r- 'Framing AIjjust•rnent. Summer I I-Vali_ e 0.0241 .. 0.9II v 0,0674 x 0.I0 = 0.0284 Winter I I •- V a l u e 0.0245 •• 0.90 + 0.0702 m 0.10 = 0.0290 OVERALL VALUES IE_ ADJUSTED FOR FRAMING R --Value 35.15 � 34.43 Absorptivity: 0. 71-*' Roughness: Concrete, Asph. shingle'_ Weight: 9.9 lb/sgf•t Heat Capacity: 2. 9 - CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-: t page 11 of 19 Project: Plan A 1 COMPLY 24 v 2. iii I:'esigner: 1 Building Permit. N , ' ------------------ L._,_„cat-i,_�n: India / La Q�_ai.nt.a Date:/ 4/1'_x_;>� 1 Checked By , ------------------ Documentation: ------------------ .f.:o!_ume•r-,•F:.ati.on: :?ann Conlon Custom Air,.--. 1 Date (User- 4 1 60 --------------------------------------------------------------------------- A'ssefflbly Name: Carpeted Slab Assembly Tyeee Floor Assembly T :i 1. t N 180 0 deg (Horizontal Floor) Framing Percentage: 0.0 % Framing Material: NONE OVERALL VALUES ; AI: j STED FOR FRAM I NI -3 Absorptivity: 0. 71-1 Roughnes a Concrete, A:=:;ph . Shingles Weight: 40.9 lb/ sqf?'• Heat Capacity: 9.01 R --Value .22 _;.4 U --Value 0.3106 0.289'? 11'1 F. -Value Construction Components Fr (in) rummer . Winter --------------------------------------------------------------------------- I ut.• ide Air Film 0.25 0.17 1. Concrete. 140, Lb, Not Dried 3.500 0. 28 0. 2::-:: . Flooring, Car'F•e'I. and Fibrous Pad 0.250 2.08 2.0:.--.': 4. L 6. 7. 8. Inside Air Film 0.61 0.92 J ." .. a z"' . Y' �N'�.,.o. y"'eueve`-:? ` 1, s-; r ,`tF.. ToQ1 .. .. - 3. Framing Percentage: 0.0 % Framing Material: NONE OVERALL VALUES ; AI: j STED FOR FRAM I NI -3 Absorptivity: 0. 71-1 Roughnes a Concrete, A:=:;ph . Shingles Weight: 40.9 lb/ sqf?'• Heat Capacity: 9.01 R --Value .22 _;.4 U --Value 0.3106 0.289'? CONSTRUCTION N ASSEMBLY r:a=UY PLIr=1NCE FORM CF -3 page 12 of 19 Pr ject.o Plan A 1 COMPLY 24 v 2.20 Designers � E'�_aildirra-F'�rrnit. Pd Location: Indio o Quinta Dateg 3/24/1989 i_ f• ecked By Documentation; --------------------------------------------------------------------------- _Tann Conlon Custom Aire ; Leat._ -(User --4 , -i-e_,ir) Assembly Name; Exposed Slab Assembly Type: Floor Assembly Tilt: 1� 0 deg (Horizontal Floor) Th R--Va l ue Construction Components F r- Ain) Summer Winter- --------------------------------------------------------------------------- Outside Air Film 0.25 0.17 1. Congrete. 1.40 1b. Not. Dried 3.500 0,2= ii, 2. Flooring, Asphalt, Lino, V:LI'"i'yl or Rubber 0.010 0.05 0.0!---'; 5. fop 7. S. Inside Air 1=i.1.rn 0.61 0.92 Framing Percentage: 0.0 Framing Material: I`di=NE Sketch of Construction Assembly T� �t.a 1 1.19 1.42 OVERALL VALUES ADJUSTED FOR FRAMING Absorptivity- 0.0D . � - 1_.� �c..a�_•l•rrt"i�['Ws: i_:r:ncr-e•t•e, r•a:_::ph. Sh:in�.a.i�_,:-;. Weight: 40.,-f....lb/ qft. Meat. i:apa,_:ii_.y: 9.00 R -•Value U -Value 0.8403 0. 704 ' �t ` . � ' CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 13 of 19 --------------------------------------------------------------------------- � Project: Plan A 1 COMPLY 24 v 2.20 ' ' | _____�-____________ Designer: � | Building Permit No | __________________ Location: Indio / La Quinta Date: 3/24/1989 | Checked By � | __________________ Documentation: Jann Conlon Custom Aire | Date (User # 1860) -------------------------------------------_--_------_--------------------- Assembly Name: Single/Light Blinds Assembly Type: Glazing ------------------------------- � | | � | . | | � | � | | | | � | � | � | | � . . ------------------------------- - ' Sketch of Construction Assembly Visible Transmittance: 0.91 Winter Shading Coefficient: 1�.00 Summer Shading Coefficient: 0.34 OVERALL VALUES ADJUSTED FOR FRAMING R -Value U -Value 0.99 0.91 1.0110 1.1000. . Th R -Value Construction Components Fr (in) Summer Winter- inter ---------------------------- -------------------------------------_----------------------------_----_--- Outside Air Film 0.25 � 0.17 1. CEC Single Glazing 0.125 0.06 0.06 2. 3. 4. 6. `. toil 7. S. 9. Inside Air Film ------------------------_-------------------------------------------------- 0.68 0.68 Total� �.��.�� 0.99 � 0.91 � Framing Percentage: 0.0 % Framing Material: NONE ' ------------------------------- � | | � | . | | � | � | | | | � | � | � | | � . . ------------------------------- - ' Sketch of Construction Assembly Visible Transmittance: 0.91 Winter Shading Coefficient: 1�.00 Summer Shading Coefficient: 0.34 OVERALL VALUES ADJUSTED FOR FRAMING R -Value U -Value 0.99 0.91 1.0110 1.1000. . THERMAL MASS WORKSHEET ---------------------------------------------------------- .!`� ��'�� �.''.^./ WS -1R page 14 of 19 Project: Plan A . ----------------- | COMPLY 24 v 2.20 Designer: ' | � -��--�----�--�---�� Location: Indio / La Quinta Date: 3/24/1989 � __________________ | Checked By Documentation: Jann Conlon Custom --------------------------------------------------------------------------- Aire : __________________ ; Date (User # 1860) INTERIOR THERMAL MASS Interibr Interior Sides Wall Mass Mass Mass Mass Material Thick ---------------------- Exposed U -Value Area Factor Capacity ----- Concrete, Heavyweight 4.00 ------- ------- ------ 0 937.0 -------- x 1.8 = -------- 1705.3 Concrete, Heavyweight 4.00 1 473.0 x 4.7 = 2223.1 ------- TOTAL 3928.--l- 928.4INTERIOR INTERIORMASS FACTOR 3928.4 IMC / 1410 sqft = 2.79 * Mass listed above with a Wall U -Value denotes the Interior Mass credit for Exterior Mass Walls, and are repeated below for Exterior Mass credit. 0 Sides Exposed indicates mass covered with surface material >= R-2. EXTERIOR MASS WALLS Exterior Exterior Sides Wall Mass Mass Mass Mass Material Thick ---------------------- Exposed U -Value Area Factor Capacity ----- NONE ------- ------- ------ -------- -------- 1r4 1 INTERPOLATION, WEIGHTED AVERAGE AGE ': ADDITION WORKSHEET WS -2R page 15 of 19 Project: PlanA ; COMPLY 24 v .til Designers � L��_ai ldir�� F'errnl+• �I _ Location: Indio � / La Qu into Dater 3/24/1989 1 ' ---------------------- D ncul'nentation: jal' n Conlon Custom Aire 1 Date (_ser 4 1860) ---------------------------------------------------------------------------- I NTERPI iLAT I i N Point. Point. Point. Score Actual Value s=core Score Value Value Point I tern 1 Value 1 2 1 2 1 Score Roof 4 +( 0.0290 - 0.02) 1 12) .. ( -4 '-• 4) i i 0.04 -• 0.02) = I 1 Wall -3 +( 0.0978 -- 0.08) „ ( - -- -3) ( 0.10 - 0.08) _ -7 Slab Edge --1 +( 1I.8055 - 0. 80) ., ( -3 _. , -1) i 0.90 - 0. 80) = -1 Glass Type 1. .,_. +(10.4965 -10.00) .. ( =5 - -2) 011.00 -10.00) = _ N Shade Open ii +( 1.8492 - 1.00) „ is Ii - 0) i 2.00 - 1.00) = E ._bade Open Ii +( 0.5161 -- 0. IIIi) ' x ( ii - 0) / ( 1.00 - 0.00) = it S Shade Open -1 +( 0.8316 - .Ilii) .. ( 0 - -1) /( 1.1111 - 0.00) = -1:1 W Shade Open 1 +( 4.2424 •- 4.00) .. ( 1 -- 1) / ( 5.00 •-. 4.00) = '1 N Shade I_ l =-•d 1 +( 0.6519 - 0.00) ;; ( ii - 1) / ( 1.00 - 0.00) = ii E shade l lsd 4 +( 0. 1484 -- 0.00) .. ( 1 -. 4) 1 ( 1.1111 - 0. 00) = 4 S Shade C1sd 6 +( 0.2182 - 1I.II0) .. ( 2 -- 6) /( 1.00 •- 0.00) = 5 W Shade i: l s d 2 +( 1.3750 - 1.00) 10) m( -3 - 2) /( 2.00 - 1.00) = 1=1 Int Mass 0 +( 2.7861 •- 2.50) .. ( 1 - 11) % l 3.00 •- 2.50) = 1 Heating I +( 5.7600 - 5.50) x ( 4 .-. 1) / ( 6.42 - 5.50) = 2. Cooling ii +( 7.31:07 - 7.00) x ( 10 •- 0) ( 8.1111 - 7.00) = =1 w is WEIGHTED HTEI' AVERAGE . P I I IVT'; Tape i Type 2 Type =+ Total Average It•ern Point_ Area Points Area Points Ar ea Area Points HARING COEFFICIENT (S1_: 1; WI_ItaK`_,HEE1. Fi vm 0 page 1F_'. of 1 Project: Plan A 1 COMPLY 24 v 2.21-1 ------------------ De= i•_-1nere 1 Building Fermi No i Loi =-lt:•i� �r'1i Indio / Li=t I Iui nta Date: : / 4/19 9 1 Checked By Documentation: Jrann Conlon Custom Aire 1 Date (User 4 1; 6I) I -------------------------------------------------------------------------- 6ENERAL INFORMATION I. .Glazing Type: Single OH Factor Depth(t�v� ... Framing ng Type: Metal w/o Mullions 5. Framing/Mullion Factor: ii...._ (from Table G-10) 6. Interior Shade T: -peg Single/Light ( 0.1 Blinds 7. SC Shade Open: 1.00 (f rom .iuabie G--9 or _•h ow calculation) Table S. 1. Shade Closed; 0.'" l (from Table 1_a--9 or show calculation) Gl._r=t _ I Nla , INTERIOR SHADE & FRAMING 9a. 1.00 Sl_ 4 / ) x 0.88 . (1='MI:: 45) = 0.88 'i;_ Shade Open 1i a.ii.` 4' (` C 48) x 0.88 (FIiF 45) = ii.: 0 SC Shade Closed EXTERIOR SHADE Exterior Shade Type: 50 X Bug Screen 11. Sl_ Exterior Shade: G. '4 (from Table 6--11 or manufacturer's data) 12. E(0.88 (:=;1_: 4 -'6) x 1.25) + 0.751 „ "i I 1 _ 4 . (SI_ 41 1) - . 0.81 . 1 S1_ Shade Open, 13. [(0.84 (:=il_ 4 1 1) x 0.25) 25) 0.753 x 0.30 ( ?C 4 1 0 a) = 0.29 SC Sha'de e I li-'en ---------------------------------------------------------------------------- 1_IVERHANG FACTOR Glass Orientation Area East 12.0 s i_a i_ 1 i 1800 West 86.0 Ovr'hng Dist Glass Pr -o j OH Factor Depth(t�v� Height Ratio SF=e Open2.0 / ( 0.1 + 4.0) = 0.49 0.85 OH Factor- 0.61 0. 59 I1. %,_ DHW WORKSHEET THREE: HEAT PUMP WATER HEATERS page 17 of 1' Pr- ject: Plan A 1 COMPLY 24 v 2.21-1 ------------ Building Per -1100. ------------------ ol._,-tion° Indio / La t uin•F:a Date" 3/24/1989 1 Checked ------------------ Documentation: ------------------ Document at_•ione :Tann Conlon Custom Aire i Date (User 4 18 6 I) --------------------------------------------------------------------------- A EQUIPMENT DATA I bi�,�h�.�=r-heater type -'i;Jr•�i :, er- Heat Pump Water Heater 2 Manufacturer ::::i Model l number American E-IF'452 (HPWH ) 4 Ignition device IID I l:D, int. ignition device 5 Energy !=i_ictot`• 2.70 From t.: AMA Directory . 6 Number.. of Heaters _•J 1 From building -plans (total) 8 OPERATING DA I fl 1 Climate Zone 15 See Appendix I:• - Water heating budget 18700 I:::Btu/yri`uni t. see Table 1 3 Tank: set. temp. 140 F. fixed input 4 Water mein temp. 70.0 F. see Table 1 5 Daily hot wat: er :load `:pit it_t or 35 gallons/unit, see Table 1 6 Ambient air temp. N/A F, see Table 1 7 No. dwelling units 1 From building Flans (total) Number of pumps 0 From building g p•1ans 9 Pumping energy 0.0 Watt-hr/yr /yr- per- Pump, see Table 3 10 Adj Energy Factor 2.62 Hea§ i=ump_. i nly, See Table 4 C WATER .HEAT I Na ENERGY CREDITS 1 Credit r-� a rn e _ _ _ -_+inti r- _, � `fable 5 _� See 2 Annual savings KOt•u/yr/dwel •1 ing ur-pit•, see Tables_ b D CALCULATE ANNUAL WATER HEATING ENERGY (KBt_ u/yr ) aRecovery load 10539.4 105 „ _e-_„(1=0-r4):!r_,. 0e0011—C2: ,. B7 2 Recovery energy 4030.4 DI / Eli_'t 3 Pumping energy 0.0 B8 x B9 x 3.413 „ 3 „ 0. 001 4 Total energy 12091.1 1 02 x 3) D33 / B7 6 Wat.er heating budget comparison F, 6 8 . 9 K B t_ u_v r- / un i• t. P2 - D4 7 Water- heating budget 9.4 Points (D6 / Floor Area) x 2 x B7 HVAC ZONE HEATING .. COOLING LOAD SUMMARY - to page 18 of 19 Pro_j =ct: Plan A 1 COMPLY 24 v 2.21:1 Designer; ; Building Permit No ------------------ L- at•ioof Indio i La 1_ uir,ta Date; 124/1989 1 Checked By . ------------------ Documentation: ----------------- D icumer_tatigar,: jann Conlon Custom �'m 'Aire 1 Date (User 4 1 86 HVF-11_: ZONE DESCRIPTION HVAC Zone Name: Whole House HVAC System Name- _rani tro l i :P3 ;-11:1 System Multiplier:: 1 Heating Sch-,ecJu :les Residential HeaQi m_I Cooling Schedule., Residential Cooling Far, Schedule: Residential I-'I'VAI: & Fan_'. Sizing Met.hode COINCIDENT Relative Humidity. 51 COOLING SPACES IN THIS ZONE PEAK HEATING PEAK SENSIBLE LATEN-f Wh-,ole, House (_fan 12am) 30291 (Aug .'_'Pm) 20r900 4 634 ------- TOTAL SPACE LOAD 30291 20900 -1 63-1 Bypass Ventilation Air ( 0 cfm) 0 ( ii cfm) 0 -I_I ;,_apply Duct. Conduction 1:1 ' . 0 Supply Duct, Leakage 1515 y„' 104.`_° .lig Supply Far-, Heat. Gain' EFFECTIVE PACE !_.MAI: 31806 21945 666 Ventilation ( ii cfm) ii ( ii cfm) 0 i _0 Return Air- Lighting Gait-, 0 Return Duct Conduction 11 Return Duct Leakage 1°;_ ii 1097 33 Return Fan Heat Gain _it -------- -•-----..I ------ TOTAL I.1TF•11... SYSTEM LOAD 333916 23042 1,9 ions 0.1 tains SYSTEM PERFORMANCE E 2 j1' ;I I 25924 469:.'": (-'..I_ DESIGN CONDITIONS 2. 2� tons 0.4 4 t.. Irl s TAN SPACE HEATING & COOLING LOAD SUMMARY page 19 � � f 1 _; Pr•oje te Plan fl 1 I_iiMI'-''LY 24 v .,_.iii ------------------- Designer : ; Building Permit No Location: Indio / La t"ui.nta I`,.ateu 3/24/1989 ' MONTH '-------------- Documentation: .J'ann Conlon Custom om i ~.i.r e 1 Data_ (User Iser- 4 1 6 I ) --------------------------------------------------------------------------- I Ir%IMARY OF PF.::AK HOUR LOADS FOR , ;('i= CE Space Name: DESIGN CONDITIONS HEATING Peak: Hour-. _ian 12ai.m Indoor Conditions,. 70 F DB Outdoor I: and i't: i. on's Z 29 F- DD I_IAD COMPONENT Wall Conduction Window Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction Int.erigg Conduct.ign - Infilti`aa.ion Solar- wain Lighting Equ :i � �men-1:. Occupants SPACE LOADS Whole House COOLING SENSIBLE LATENT Aug 2prn 1 1 2 F=' DB 7 5 F= W.B. SUPPLY AIF; QUANTITIES ---------------------- Heap_ ingo 30291 Btu/hr . L1.10 '*' (105 F Supply - 65 1= T_tat.) l = 688 cfm Cooling: 2090II Btu/hr / 11.08 .*. ( 78 F TSt; t -- 55 F:: Supply)] - 841 c0i) 5 37:1._;.I..1. t _, 6 7 F5 II 5087 16 75t 11 II 2I l l i F_•, IJ ii 1032C) A it . 19 _,. 9r= 1: 0:3 635 it 63! 3iI291 Btu/hr 20900 Btu/hr 634 Btu/hr 1.7 tons 0.1 1 t•ons SUPPLY AIF; QUANTITIES ---------------------- Heap_ ingo 30291 Btu/hr . L1.10 '*' (105 F Supply - 65 1= T_tat.) l = 688 cfm Cooling: 2090II Btu/hr / 11.08 .*. ( 78 F TSt; t -- 55 F:: Supply)] - 841 c0i)