Loading...
08169 (AR)Building Address 4 P.O. BOX 1504 78-105 CALLE ESTADO LA QUINTA, CALIFORNIA 92253 Mailing Address Same City ' Zip Tel. La Quinta 564-0279 Address . City Zip Tela State'Lic. City & Classif. Lic. # Arch.,. Engr., Designer Tel. City Zip State.. Lic. # LICENSED CONTRACTOR'S DECLARATION I hereby afflrm that I am licensed under provisions of Chapter -9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. SIGNATURE DATE OWNER -BUILDER DECLARATION I Hereby affirm that I am exempt from the Contractor's License Law for the following reason: (Sec. 7031.5;Buslness and Professions Code: Any city or county .which requires a permit to construct, atter; Improve, demolish, or repair any structure, prior to Its Issuance also requires the ,applicant for such permit lo, file a signed statement that he Is licensed pursuant to the provfslons of the Contractor's. License Law, Chapter 9 (commencing with Section 7000) of Division 3 -of -the Business and Professions Code, or that.he Is exempt therefrom, and the basis ,for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit subjects the applkrant to a civil penalty of not more'than:ftve hundred dollars ($500). ❑ I;'as.:owner, of the property, or my employees with wages as their sole compensation, will do the work, and the structure Isnot Intended or offered for sale: (Sec. 7044, Bulaness and Professions ,Code: The Contractor's License Law does not apply to an owner of property who bullds;.or. improves thereon and who does such work hlmeett w through his own employees, provided that such improvements are not intended or offered /or sale. H,- however, the building or Improvement is sold within one year of corrW/et/on; the ownerbuilder will have the burden .of proving that he did not build. or Improve for the purposeoPsa/e.) - ❑ I, as owner of the property, am exclusively contracting with licensed contractors to con- struct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and who contracts for such projects'wIM a contractors) licensed pursuant to the Contractor's License Law.) ❑ 1 am exempt under Sac. B. & P.C. for this reason Date Owner WORKERS' COMPENSATION DECLARATION I hereby affirm, that I have a certificate of consent to self -Insure; or a certificate of Worker's Compensation Insurance, ora certified copy thereof. (Sec. 3800, Labor Code.) Policy No. .Company ❑ Copy Is filed with the city. ❑ Certified copy is hereby furnished. CERTIFICATE OF. EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section ,need not be completed If the permit Is for one hundred dollars ($100) valuation or less.) I certify that in the performance of the work for which this permit is issued, 1 shall.not employ any.pparson imany manner so as to become subject to the Workers' Compensation Laws of California. Date--:- Owner NOTICE TO APPLICANT: If, after making this Cerliftcate of Exemptkm you should become subject. to the Workers' Compensation provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction tending agency for the performance of the work for which this permit is issued. (Seo. -3097, C1vA Code.) Lender's Name Lender's Address This is a building permit when properly filled out signed and validated, and Is subject to expiration it work thereunder Is suspended for 180 days. I certify that I have read this application and state that, the above Information -is correct. I agree to comply wlth.all clty and county ordinances and state laws relating to -building construction; and hereby authorize representatives -of this city to enter the above., mentioned property for Inspection purposes. Signature of applicant Date Mailing Address City, State, Zip No. 08169 BUILDING: TYPE CONST. OCC: GRP. Number 71?, Legal Description Project Description Rom Addition Sq. Ft. 220 No. No. Dw. Size Stories Units New ❑ Add O Alter ❑ Repair ❑ Demolition ❑ Aimated Valuation 910,736 PERMIT AMOUNT Plan Chk. Dep. Plan Chk. Bal. 91.32 Const. Mech. Electrical 2255 Plumbing S.M.I. .37 Grading Driveway Enc. Infrastructure iM�RSWMI 255.79 TOTAL REMARKS ZONE: BY: Minimum Setback Distances: Front_ Setback from Center Line Rear Setback from Rear Prop: Line Side Street Setback from Center Line Side Setback from Property Line FINAL DATE INSPECTOR Issued by: Date srajfi.M Permit Validated by: Validation: CONSTRUCTION ESTIMATE NO. ELECTRICAL FEES NO. PLUMBING FEES 1ST FL. SO. FT. ® $ UNITS COLL AREA SLAB GRADE ?/Z Q YARD SPKLR SYSTEM 2ND FL. SQ. FT. BONDING HEATING (ROUGH) STORAGE TANK MOBILEHOME'SVC. BAR SINK POR. SO. FT. ® ROUGH WIRING, GAR. SQ. FT. ® POWER OUTLET ROOF DRAINS GAS (ROUGH) DRAINAGE PIPING CARP. SQ. FT. ® HEATING (FINAL) OTHER APP.JEQUIP. WALL SQ. FT. DRINKING FOUNTAIN. SO. FT. ®- TEMP. POLE URINAL ESTIMATED CONSTRUCTION VALUATION $ GROUT WATER PIPING NOTE: Not to be used as property tax valuation FLOOR DRAIN MECHANICAL FEES WATER SOFTENER VENT SYSTEM FAN EVAP.COOL HOOD SIGN WASHER(AUTO)(DISH) APPLIANCE DRYER GRADING cu. yd. $ plus x: GARBAGE DISPOSAL FURNACE UNIT WALL FLOOR SUSPENDED LAUNDRY TRAY - AIR HANDLING UNIT CFM ROOFING 9 KITCHEN SINK ABSORPTION SYSTEM B.T:U. TEMP USE PERMIT SVC WATER CLOSET' COMPRESSOR HP POLE, TEMIPERM LAVATORY HEATING SYSTEM FORCED GRAVITY AMPERES SERV ENT SHOWER BOILER, B.T.U. SO. FT. ® c BATH TUB SQ. FT. ® c WATER HEATER MAX. HEATER OUTPUT, B.T.U. SO. FT. RESID ® 164 c SEWAGE DISPOSAL SPARK ARRESTOR SQ.FT.GAR ® iic HOUSE SEWER GAR. FIREWALL GAS PIPING PERMIT FEE PERMIT FEE PERMIT FEE DBL TOTAL FEES MICRO FEE MECH.FEE PLCK.FEE CONST. FEE ELECT. FEE SMI FEE PLUMB. FEE STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR- SETBACK OLAR- SETBACK 'f") GROUND PLUMBING UNDERGROUND A.C. UNIT COLL AREA SLAB GRADE ?/Z Q ROUGH PLUMB. BONDING HEATING (ROUGH) STORAGE TANK FORMS SEWER OR SEPTIC TANK ROUGH WIRING, DUCT WORK ROCKSTORAGE FOUND. REINF. GAS (ROUGH) METER LUOP HEATING (FINAL) OTHER APP.JEQUIP. REINF. STEEL GAS (FINAL) TEMP. POLE GROUT WATER HEATER SERVICE, FINAL INSP. BOND BEAM WATER SYSTEM FINAL INSP. / �( GRADING cu. yd. $ plus x: =$ LUMBER GR. FRAMING O FINAL INSP. ROOFING 9 Q���/� j (/ NNNIIIN��� REMARKS: VENTILATION FIRE ZONE ROOFING FIREPLACE SPARK ARRESTOR GAR. FIREWALL LATHING �/ A MESH INSULATION/SOUND FINISH GRADING FINAL INSPECTION CERT. OCC. FENCE FINAL INSPECTOR'S SIGNATURESIINITIALS GARDEN WALL FINAL TITLE 24 REPORT FOR: LA QUINTA REALTY 51001 EISENHOWER DRIVE LA QUINTA, CALIFORNIA PROJECT DESIGNER: MCWHIRTER DESIGN P.,O. BOX 1480 LA QUINTA, CA 52253 OWNER: REPORT PREPARED BY: JOHN H HACKER CIVIL ENGINEER 4501 E SUNNY DUNES RD SUITE D PALM SPRINGS CA;L.IF 92264 (619) 327-4.565 Job Number: Date: 6/27/199.0 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has interim approval and is au thorited by the California Energy Commissar n for use with the Second Generation Nonresidential Building Energy Efficiency Standards for Nonresidential Occupancies. Second Generation Residential Occupancies shown to comply with this program conform to the results produced by the Public Domain Point System, developed by the California Energy Commission. This program developed by Gabel Dodd Associates (415) 428-0803. Table Of Contents for Title 24 Report Cover Page ............................................:.._. ........ 1 Table of Contents ................................. 0................. 2 Form CF' -IB Certificate of Compliance: Nonresidential ................ 3 Form MF -i Mandatory Measures Checklist ............................... 6 Form WS -1A Energy Budgets Worksheet ................................. 8 Form CF -2 Envelope Summary & Worksheet ............................... 10 Form SCM Performance Run ................. a .................... ...... 13 Farm CF -4 HVAC Summary ............. ....... ,.......................... 16 Form WS -4 HVAC System Summary Sheets ............................ ... 17 Form CF -5 Allowed Lighting Summary .... .............................. 18 HVACZone & Space Loads Summary ..................................... iS CERTIFICATE OF COMPLIANCE (part 1 of 3) CF-1Bpage 3 of 20- --------------------------------------------------------------------------- Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01 -- -- Designer: MCWHIRTER DESIGN Building Permit No ' -------- Location: Indio Date: 6/27/1990 t Checked By Documentation: JOHN H HACKER CIVIL ENGINEER Date CUser # 1625) ----------------------------------------------------------------------------- PRINCIPAL DESIGNER. The proposed building will be in substantial compliance with the California Building Energy E"fficien"cy Standards provided it is built according to the plans and specifications and provided future improvements are completed according to the requirements indicated on this Certificate. of Compliance. The plans and specifications have been prepared to include all .significant energy conservation features required for compliance with the Standards. Building areas that are unconditioned and/or not subject to the standards are indicated on the plans. Plans Dated: -__ Spens Dated: ------------------------------- Signature: ----- Date: ------------------------ MCWHIRTER DESIGN P.O. BOX 1480 LA QUINTA, CA 92253 Cal. License No: ------------------ OWNER. The energy conservation features and performance specifications indicated on this document and on the plans and specifications shall apply to future alterations, unless compliance is demonstrated anew and a new Certificate of Compliance is submitted. A copy of this Certificate will be retained and transmitted to future tenants, subsequent owners or others with responsibility for making improvements or modifications to the building. If this certificate is lost, a new Certificate may be required before a permit is issued for alterations. Unconditioned areas are indicated on the plans and, if these areas are conditioned in the future, they must be made to comply with the applicable e:ner"gy standards then in effect. Signature: ---------------------------------- Date: ENFORCEMENT AGENCY. The proposed building, and future alterations will damply with the California Building Energy Efficiency Standards, provided future alterations meet the requirements indicated on this Certificate and all applicable mandatary measures, as long as the building occupancy type remains unchanged. Signature: Date: Name: Agency: ------ - -------------------------------------------------------------- Address:--------------------------------- -------------- _ ------------------- City/State/Zips------------------------------------------------------------ CERTIFICATE OF COMPLIANCE (part 2 of 3) CF -1B. page 4 of 20 Project: LA QUINTA REALTY t COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN Building Permit No Location: Indio Date: 6/27/1990 ! Checked By ----------- Documentation: JOHN H HACKER CIVIL ENGINEER 1 Date (User# 1625) ENERGY ANALYST. The energy performance analysis summarized below was performed using an approved CEC calculation method, with CEC approved fixed and restricted engineering inputs for the applicable climate zone and occupancy type, and using a reasonable representation of bui-lding zoning and physical configuration. All significant energy conservation features are listed below, or on an attached supplement. Signature':. _ (�(a�19a _ - -------------------- Da'te:------- ---- ----- JOHN H HACKEF CIVIL ENGINEER 4501 E SUNNY DUNES RD SUITE D PALM SPRINGS CALIF 52264 (619) 327-4565 GENERAL REFERENCE watts/sqft CF -4 1 Unconditioned or Multi -tenant Shell`s CF -4 0 Btu/hr 2 CEC Occupancy Type (SSE/COP) Office 0 3 UBC Occupancy Group/Division ------- ------ 4 Climate Zone WS -1A 15 5 Conditioned Floor Area WS -1A 220 sqft 6 Unconditioned Floor Area 0 sqft 7 Budget Table (from Standards) 1986 ed. Sec 2-53R 8 Allowed Energy Budget W.S-1A 261.0 9 Calculation Method CEC Code/Date CPO -07 6/28/1988 10 Multiplier CEC 1.027 11 Calculated Energy Use WS -1A 211.4 kBtu/sqft-yr ENVELOPE REQUIREMENTS 12 Average Roof/Ceiling Rt CF -2 28.14 h-F-sqft/Btu 13 Average Exterior Floor Rt CF -2 0.00 h-F-sqft/Btu 14 Average Opaque Wall Rt CF -2 15.28 h-F-sgft/Btu 15 Glazing Area in Wall CF -2 16 sqft 16 Average SC (Glazing in Wall) CF -2 0.88 17 Glazing Area in Roof CF -2 16 sgf,t 18 Average SC (Glazing in Roof) CF -2 0.77 LIGHTING REQUIREMENTS 19 Whole Building Allowed LPD 22 Package Lighting Reduction 23 Lighting Controls Required? MECHANICAL REQUIREMENTS 24 System Type 25 Fan Wattage Index 26 Rated Cooling Efficiency 27 Rated Cooling Capacity 28 Rated Heating Efficiency 29 Rated Heating Capacity 30 Economizer Cooling7' CF -5 1.500 watts/sqft WS -1A 0.000 watts/sqft CF -5 No -----_------------- CF -4 0.000 watts/sqft CF -4 8.00 (EER) CF -4 0 Btu/hr CF -4 0.75 (SSE/COP) CF -4 0 Btu/hr CF -4 Yes. CERTIFICATE OF COMPLIANCE (part 3 of 3) CF -1B page 5 of 20 ------------------------------------------------------------------------------ Project: LA QU.INTA REALTY Designer: MCWHIRTER DESIGN Location: Indio Date: 6/27/1990 Documentation: JOHN H HACKER.CIVIL ENGINEER COMPLY 24 v 3.01 ----------- ------ Building Permit No ------------------ ChecL:ed By Date (User-# 1625) Note: More than one Part 3 may be submitted", but all must reference the same Parts 1 & 2. The person responsible for preparing the compliance documentation for each major building system acknowledges the following compliance statement by signing the appropriate space below. Compliance Statement. The proposed building improvements substantially comply with the requirements indicated on the Certificate of Compliance for this building, .dated The plans and specifications include the significant energy conservation features and the compliance documentation is consistent with the plans and specifications. ENVELOPE 1 Average Roof/Ceiling Rt 2 Average Exterior Floor 3 Average Opaque Wall Rt 4 Glazing Area in Wall 5 Average SC (Wall) 6 Glazing Area in Roof 7 Average SC (Roof) Other Requirements: Modeled Improvements ---------------- --------- 28.14 Plans Dated________ Specs Dated Rt 0:44 15-.28 Signature----------------- Date 16 Name___________ ----------------------- 0.88 Company--------------- .. ---------------- 16 Address 0.77 City/State/'Zip________________________ Telephone_____________ License Enforcement Agency________ LIGHTING Modeled Modeled 8 Basis of Allowed LPD Performance 9 Pa.c k: A or WS -5C LPD 1.500 10 Package Lighting Red. < 0.000: 11 Allowed LPD (CF -5) 0.75 1.500 12 Lighting Control Credits? No Other Requirements: 18 Economizer Cooling? Improvements -----------------=-------- Plans Dated________ Specs Dated Signature_________________ Date ------- Name_____________ Company------------------------------- Address --------------------------------- City/State/Z.ip________________________ Telephone._____________ License _-______ Enforcement Agency____________________ MECHANICAL Modeled Improvements .._________________......... 13 Fan Wattage Index 0.004 Plans Dated________ Specs Dated ....... 14 Rated Coaling Efficiency 8.00 15 Rated Coaling Capacity 0 Signature _______ Date 16 Rated Heating Efficiency 0.75 Name ---------------------------------- 17 Rated Heating Output 0 Company_________________________ 18 Economizer Cooling? Yes Address_______________________________ 19 Simultaneous Heat/Cool? No City/State/Zip________________________ Other Requirements: Telephone_____________ License Enforcement Agency____________________ MANDATORY MEASURES CHECKLIST (part 1 of 2) MF -1. page 6 of 20 Project: LA OUINTA REALTY S COMPLY 2.4 v 3.01 Designer: MCWHIRTER DESIGN ------------------ Building Permit No Location: Indio Date: ' 6/27/1990 1 ------------------ Checked By Documentation: JOHN'H HACKER CIVIL ENGINEER Date (User # 1625) ENVELOPE MEASURES Reference o Certified Insulation Materials per Sec. 2-53'11(a) o Insulation Installed to meet Flame Spread and Smoke Density Requirements of Sec. 2-53,11(b) ---- o Urea Formaldehyde Foam Insulation Installed per Sec. 2-5311(c) ____ o Retrofit Insulation specified per Sec. 2-5313 o Air Infiltra.tiorn is minimized by specification of tested manufactured doors and windows and proper sealing and weatherstripping per Sec. 2-5317 __ LIGHTING SYSTEM MEASURES o Certified Luminaires/Ballasts per Sec. 2-53.14(b.) o Ind.epe.ndent Control within enclosed Areas per Sec. 2-53.19(a) --------- o Manual Switching Readily Accessible per Sec. 2-5319(b) o Reduction of Lighting Load to at least 50% per Sec. -5319(c) (Occupancy Sensors or Programmable Timers meeting CEC Criteria may Substitute.) --------- o Separate Switching of Da.ylit Areas per Sec. 2-5315(d) o Separate Switching of Display and Valance Lighting in Retail/Wholesale Occupancies per Sec 2-5319(h) 6 Automatic Control of Display Lighting in Retail/Wholesale Occupancies per Sec. 2-5319(h) o Tandem Wiring of 1 and 3 Lamp Luminaires per Sec. 2-5319'(h) _____ DAYL.IGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable) Reference o Uniform Illumination reduction to 50Y. per Sec.. 2-5319(e).1 o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 o Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3 MANDATORY MEASURES:CHECKL.IST (part 2 of t) MF -1* page7 of '20 Project: LA QUINTA REALTY COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN Building Permit No Location: India Date: 6/27/1990 1 Checked By Documentation: JOHN H HACKER CIVIL ENGINEER 1 ------------------ Date (User # 1625) o Step Switching Devices with Separation between On/Off Settings per Sec. 2-5319(e).4 o Photocell Sensors with a Diffusing Cover and no Opaque Cover per Sec. 2-5319(e).5 ------ o Manufacturer's Instructions provided for Installation and Calibration per Sec. 2-5319(e).6 o Proper Installation of Controls including Sensor Location, Certification of Initial Calibration and Control of Luminaires only within Daylit Areas per Sec. 2-5319(e).8 --------- o Visible or Audible Malfunction Alarm provided per Sec. 2-5319(g) ......... OCCUPANCY SENSING DEVICES (when applicable) o Visible or Audible Malfunction Alarms per Sec. 2-.5319(g) o Limits on Emisions per exceptions to Sec. 2-5319(e) HVAC AND PLUMBING SYSTEM MEASURES o Piping Insulated as per Sec.. 2-531 o Certified HVAC Equipment per Sec. 2-5314(a) o Certified Plumbing Equipment per Sec. 2-5314(a) o Heating and Cooling Equipment efficiency per Sec.. 2-5314(b) ______ o Pilotless Ignition of Gas Appl-iances per Sec. 2-5314(c) o Automatic Controls for Off -Hours per Sec. 2-5315(a.) o Thermostat Set Point Requirements per Sec. 2-5315(b).1 o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2 o Automatic Exhaust Fan Dampers per Sec. 2-5316(b) o Thermostat Controls for Each Zone per Sec. 2-5315(b) o Ventilation Provided per Secs. 2-5316 & 2-5343 o Ventilation and Recirculation Air Quality Info per 1403(b).3 o Water Heaters for Domestic Hat. Water and Pauls per Sec. 2-5318 ENERGY BUDGETS WORKSHEET (part 1 of 2) WS -1A page 8 of 20 Project: LA QUINTA REALTY S COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN 1 Building Permit No -------- Location: Indio Date: 6/27/1990 Checked By ------------------ Documentation: JOHN H HACKER CIVIL ENGINEER i Date (User # 1625) BUILDING ENERGY COMPLIANCE BUDGET BY FLOOR/OCCUPANCY Cond. Budget Adj. Allowd Perimeter (KPtu Allowd Pack A Energy Floor Energy Flr Occupancy (ft) Ratio /sgft) LPD LPD Budget Area (MBtu) 1 Office 61 3.61 261 +(1.500 - 1.50)x 38= 261.0 x 220 = 57 TOTALS 220 57 BUILDING COMPLIANCE BUDGET 57 MBtu / 220 sqft = 261.0 KPtu/sgft ENERGY BUDGETS WORKSHEET (part 2 of 2) WS -1A page 9 of 20 Project: LA QUI.NTA REALTY ; COMPLY 24 v 3.01 ------------------ Designer: MCWHIRTER DESIGN 1 Building Permit No ' ------------------ --- ----- Location: Indio Date: 6/27/1990 1 Checked By ' ------- Documentation: JOHN H HACKER CIVIL ENGINEER Date- (User- #- 1625)---------------------------------------------------------------------------------- BUILDING ENERGY CONSUMPTION BY SPACE Total SCM Energy Energy Floor Floor Estimate Use Space Name Area Mult Area (KBt.0/sgft) (MBtu) OFFICE ADDITION 220 x 1 = 220 x 211.4 = 46.5 TOTALS 220 46.5 BUILDING ENERGY CONSUMPTION 46..5 MBtu / 220 sqft 211.4 KBtu/sqft AREA AND MATERIALS SUMMARY FORM (past 1 of 3) CF -2.' page 10 of 20. _Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN Location: India Date: 6/27/1990 ------------------ Building Permit No ------------------- Checked By ------------------ Documentation: JOHN H HACKER CIVIL ENGINEER a Date (User # 1625) ROOF AREA BY TYPE AND ORIENTATION Type N NE E SE S SW W NW Int TOTALS Roof -1 204 204 TOTALS 204 204 ROOF R -VALUE Winter Area / Type Assembly Name Area R -Value R -Value ------ ---------------------------- ---- - --------1---- Roof-1 R-30 Roof/Gyp Ceiling 204 28.14 7.25 Average R -Value 204 / 7.25 = 28.14 ROOF GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE S SW W NW Int TOTALS Sky -1 16 1.6 TOTALS 16 16 ROOF GLAZING U -VALUE AND SC Type Assembly Name Sky -1 Double/No Int Shades Totals Average U -Value Average SC. Winter Area x Area Area U -Value SC U -Value x. SC 16 .0.65 0.88 10 14 16 10 14 10 / 16 = 0.65 14 / 16 = 0.88 AREA AND ---------------------------------------------------------------------------- MATERIALS SUMMARY FORM (part 2 of 3) CF -2." page it of 20 Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN Location: Indio Date: 6/27/19-90 ------------------ Building Permit No ------------- Chocked By - - ------- Documentation: JOHN H HACKER CIVIL ENGINEER t Dat -e - (-User---- # --16-25) -------------------------------------------------------------------------------- ELEVATION AREA BY ORIENTATION N NE --------------------------------------------------------------------- E SE S SW W NW Int TOTAL 220 ---------------------------------------------------------------------------- 100 220 100 640 OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION Type N NE E SE S SW W NW Int TOTALS Wall -1 220 100 220 84 624 ------------------------------------------------------------------------------- TOTALS 220 loo 220 84 624 OPAQUE EXTERIOR WALL/DOOR R -VALUE & HEAT CAPACITY Winter Area / Area Type. Assembly Name Area R -Value HC R -Value x HC Wa.l l -1 R-19 Frame Wall 624 15.28 3..2 41 2017' Totals 624 41 2017 Average R -Value 624 / 41 = 15.28 Average HC 20.17 / 624 = 3.23 AREA AND MATERIALS SUMMARY FORM (part3 of 3) CF -2-- page 12 of 20 Project: LA QUINTA REALTY S COMPLY 24 v 3.01 U -Value SC U -Value Designer: MCWHIRTER DESIGN f iuilding Permit No Location: Indio Date: 6/27/1990 --------------=--- Checked By 1.6 Documentation: JOHN H HACKER CIVIL ENGINEER Date (User # 1625) GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE S SW W NW Int TOTALS ------------------------------------------------------------------------------- Wind -1 16 16 TOTALS 16 1.6 GLAZING U -VALUE AND SC Type Assembly Name Wind -1 Single/No Int Shades Totals Average U -Value Average SC Winter Area x Area Area U -Value SC U -Value x SC 16 1.10 1 . tai i8 16 1.6 18 16 18 / 16 = 1.10 16 / 16 = 1.00 SCM 'INPUT DATA SUMMARY (part 1 of 2) SCM -1' page 13 of 20 Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN t ' ------------------ Building Permit No Locaticn: Indio Datet 6/27/1990 to f------------------ ------------------ Checked By Documentation: JOHN H HACKER CIVIL ENGINEER. � ________________Documentation: Date (User # 1625) Space Name: AREAS Exterior Wall West Glazing Roof West Skylight Door Raised Floor Slab Total Conditioned Fluor WINTER R -VALUES (including air film resistances.) ------------------------------------------------ Wall Window Roof Doti r Floor HVAC SYSTEM HVAC Equipment Name (CF -4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Fan Power Air Circulation Rate GENERAL Heat Capacity of Exterior Wall Lighting Power Climate Zone OFFICE ADDITION 624.0 sqft 16.0 sqft 104..0 sqft 16.0 sqft 0.0 sqft 0.0 sqft 110.0 sqft 210.0 sqft, 15.18 0.91 28. 14 0.00 0.00 UNDEFINED 1 Gas Fired AC w/Ecu,nomizer Gas Fired 0.750 8.000 0. 780 Yes 0 watts 0 CFM 3.23 1.500 watts/sqft 15 SCM INPUT DATA SUMMARY (part 2 of 2) SCM -1 page 14 of 20 Pro,je.ct: LA DUINTA REALTY S COMPLY 24' v 3.01 Designer: MCWHIRTER DESIGN SC Building Permit No SC WFMF Wint Summ ' SIAmm Location: Indio Date: 6/27/1590 0 ------------------ Checked By Documentation: JOHN H HACKER CIVIL ENGINEER 1 ------------------ Date (User # 1625) OTHER PHYSICAL PARAMETERS ------------------------- Wall Absorptivity Raaf Absorptivity Ceiling Height 0.70 0.70 1.0. 0 f t Exterior Glass CEC Shade SC Overall SC SHADING COEFFICIENTS SC WFMF Wint Summ Wint SIAmm West 1.00 0.88 -- -- 0.88 0.88 Skylight 0.88 0.88 -- -- 0.77 0.77 Window Overhang Side-Fi.n OVERHANGS & SIDEF'INS Height Width Height Depth Distance Depth West 4.0 4.0 0.1 2.0 -- -- SCM•ANALYSIS PERFORMANCE RESULTS SCM -2 .page 15 of 20 Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01. Designer: MCWHIRTER DESIGN Location: Indio Date: 6/27/1990 ------------------ Building Permit No ------------------ CE�ecked By ------------------ Documentation: JOHN H HACKER CIVIL ENGINEER S Date tUser # 165) ---------------------------------------------------------------------------- Space Name: OFFICE ADDITION BALANCE POINT TEMPERATURES AND DEGREE DAYS Daytime Nighttime BPT1 = 45.75 (Winter) BPTI = 66..04 Cooling BPT2 - 49.98 (Summer) BPT2 = 72.93 BPT3 - 37.68 (Economizer) BPT3 = 70.70 Lighting HDD - 5655 (Heating) HDD = 79 16.8 CDD - 1.0053 (,Cooling) CDD = 1107 BUILDING HEAT TRANSFER (Btu/hr-F) Building Envelope Heat Transfer Rate: Winter = 76.1 Summer = 73.7 Overall Heat Transfer Factor ("K")e Winter = 111.2 Summer = 106.1 ANNUAL LOADS (MBtf:As) Heating - 6.8 Coaling = 9.6 ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating = 10.0 Site Cooling = 6.9 Site Fan = 0.0 Site Lighting = 3.7 Site Receptacle = 1.2 Site Hot Water = 0.1 ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sgft) Source Heating = 45.7 Source Cooling = 54.3 Source Fan = 0.0 Total Space Conditioning Energy = 140.0 x 1.017 = 143.8 Source Lighting = 50.3 Source Receptacle = 16.8 Source Hot Water - 0.6 TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 211.4 KBtu/sqft HVAC EQUIPMENT SUMMARY FORM CF -4 . page '16 of 20 ---------------------------------------------------------------------------- Project: LA QUINTA REALTY COMPLY'24 v 3.01 ------------------ Designer: MCWHIRTER DESIGN 0 Building Permit No ' ------------------ Location: Indio Date: 6/27/1330 � Checked By ------------------ -------- Documentation: JOHN H HACKER CIVIL ENGINEER 1 Date (User # 1625) ------------------------------------------------------------------ HVAC EQUIPMENT SUMMARY BY ZONE No. Heating Cooling No HVAC Zone HVAC System (WS -4) Sys KB.tu Eff KBtu Eff 1 OFFICE UNDEFINED 1 0 0.75 0 8.00 Totals 0 KBtu 0 KBtu FAN ENERGY No. Motor Drive Conv No. Fan HVAC System Sys BHP Eff, Eff. Fact Fans Watts Total 0 FAN WATTAGE INDEX 0 watts / 220 sqft = 0.000 watts/sqft HVAC SYSTEM SUMMARY SHEET WS -4 page 17 of 20 Project: LA DUINTA REALTY COMPLY 24 v 3.01 Designer: MCWHIRTER DESIGN Building Permit No ' - Location: India Date: 6/27/1990 1 Checked -------- By- -------- Documentation: JOHN H HACKER CIVIL ENGINEER { Date -(User # 1625) HVAC Equipment Name: HEATING System Type: Output Capacity: Rated SSE or COP: Supply Air Temperature: COOLING System Type: Total Output Capacity: Sensible Output Capacity: Latent Output Capacity: Rated EER: Coil. Bypass Factor: Economizer: Supply Air Temperature: FANS Supply Air CFM: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: UNDEFINED' Gas Fired 0 Btu/her 0.750 105 F AC w/Economizer 0 Btu/hr 0 Btu/hr 0 Btu/her 8.000 0.100 Yes 55 F 0 cfm 0.0 X 0.0 0.0 X 0.0 X ALLOWED LIGHTING SUMMARY CF -5 page 18 of 20 •--------------------------------------------------------------------------- Project: LA DUINTA REALTY COMPLY 24 v 3.01 1 ------------------ Designer: MCWHI'RTER DESIGN. Building Permit No ' ------------------ Location: India Date: 6/27/1950 ; Checked By Documentation: JOHN H HACKER CIVIL ENGINEER ' Date (.User- # 1625) PROPOSED ADJUSTED LPD 1. Total Installed Lighting Watts (from below) 330 watts 2. Control Credit Watts (WS -5A) 0 watts 3. Adjusted Watts (Line i - line 2) 330 watts 4. Conditioned Floor Area (from CF -1) 220 sqft 5. Allowed Lighti,n.g Power Density (line 3 / line 4) 1.500 w/sgft INSTALLED LIGHTING POWER BY SPACE Total Floor Vert Horiz Floor Lighting Installed Space Name Area Mult Mult Area (watts/sqft) wattage OFFICE ADDITION 220 x i x 1 = 220 x 1.500 = 330 TOTALS 220 330 HVAC ZONE HEATING & COOLING LOAD SUMMARY 0. page 19 of 20 ---------------------------------------------------------------------------- • Project: LA QUINTA REALTY t COMPLY 24 v 3.01 0 8511 361 Designer: MCWHIRTER DESIGN 0 Building Permit No 0.0 tons 0.0 tans Location: Indio Date: 6/27/1.990 1 Checked By Documentation: JOHN ------------------------------------------------------------------------------ H HACKER CIVIL ENGINEER } Date (User # 1.6257 HVAC ZONE DESCRIPTION HVAC Zane Name: HVAC System Name: System Multiplier: Heating S"chedule: Cooling Schedule: Fan Schedule: Peak Load Method: Relative Humidity: SPACES I.N THIS ZONE PEAK HEATING OFFICE ADDITION (Jan Sam) 5743 TOTAL SPACE LOAD 5743 Bypass Ventilation Air ( 2 cfm) Supply Duct Conduction Supply Duct Leakage Supply Fan Heat Gain EFFECTIVE SPACE LOAD Ventilation ( 20 cfm) Return Air Lighting Gain Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS OFFICE UNDEFINED. 1 Office Heating Office Cooling Office Occupancy COINCIDENT 50 X COOLING PEAK SENSIBLE (Jul 4pm) 7774 7774 99 C 2 cfm) 0 0 -0 5842 893 ( 20 cfm) 0 a -0 6735 74 0 0 0 7848 LATENT 561 561 -20 0 541 663 -.180 0. 0 0 0 0 8511 361 0.7tuns 0.0 tons 0 0 0.0 tons 0.0 tans Project: LA QUINTA REALTY 0 COMPLY 24 v 3:01 Designer: MCWHIRTER DESIGN Building Permit No -------- Location: Indio Date: 6/27/1990 1 Checked By Documentation: JOHN H HACKER CIVIL ENGINEER 1 Date (User # 16255 ------------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS HEATING Peak Hour: Jan Sam Indoor Conditions: 70 F DB Outdoor Conditions: 29 F DB LOAD COMPONENT Btu/hr Wall Conduction 1675 Window Conduction 722 Door Conduction 0 Roof Conduction 297 Skylight Conduction 426 Floor Conduction 0 Slab Conduction 2623 Interior Conduction 0 Infiltration 0 Solar Gain Lighting Equipment Occupants SPACE LOADS 574.3 Btu/hr OFFICE ADDITION COOLING SENSIBLE LATENT Jul 4pm 78 F DB 50 % RH 109 F DB 72 F WB Btu/hr 1486 355 D 404 237 0 0 0 2979 1002 751 561 7774 Btu/hr 0.6 tons Btu/hr 0 J o,i 56'1 Btu/hr 0.0 tons SUPPLY AIR QUANTITIES ------------------ Heating: 5743 Btu/hr / E1.10 * (105 F Supply - 70 F TStat)] = 1.49 cfm Cooling: 7774 Btu/ter / [1.08 * ( 78 F TStat - 55 F Supply)] = 313 cfm