08169 (AR)Building
Address
4
P.O. BOX 1504
78-105 CALLE ESTADO
LA QUINTA, CALIFORNIA 92253
Mailing
Address Same
City ' Zip Tel.
La Quinta 564-0279
Address .
City Zip Tela
State'Lic. City
& Classif. Lic. #
Arch.,. Engr.,
Designer
Tel.
City Zip State..
Lic. #
LICENSED CONTRACTOR'S DECLARATION
I hereby afflrm that I am licensed under provisions of Chapter -9 (commencing with Section
7000) of Division 3 of the Business and Professions Code, and my license is in full force and
effect.
SIGNATURE DATE
OWNER -BUILDER DECLARATION
I Hereby affirm that I am exempt from the Contractor's License Law for the following
reason: (Sec. 7031.5;Buslness and Professions Code: Any city or county .which requires a
permit to construct, atter; Improve, demolish, or repair any structure, prior to Its Issuance also
requires the ,applicant for such permit lo, file a signed statement that he Is licensed pursuant to
the provfslons of the Contractor's. License Law, Chapter 9 (commencing with Section 7000) of
Division 3 -of -the Business and Professions Code, or that.he Is exempt therefrom, and the basis
,for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit
subjects the applkrant to a civil penalty of not more'than:ftve hundred dollars ($500).
❑ I;'as.:owner, of the property, or my employees with wages as their sole compensation, will
do the work, and the structure Isnot Intended or offered for sale: (Sec. 7044, Bulaness and
Professions ,Code: The Contractor's License Law does not apply to an owner of property who
bullds;.or. improves thereon and who does such work hlmeett w through his own employees,
provided that such improvements are not intended or offered /or sale. H,- however, the building
or Improvement is sold within one year of corrW/et/on; the ownerbuilder will have the burden
.of proving that he did not build. or Improve for the purposeoPsa/e.) -
❑ I, as owner of the property, am exclusively contracting with licensed contractors to con-
struct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law
does not apply to an owner of property who builds or Improves thereon, and who contracts for
such projects'wIM a contractors) licensed pursuant to the Contractor's License Law.)
❑ 1 am exempt under Sac. B. & P.C. for this reason
Date Owner
WORKERS' COMPENSATION DECLARATION
I hereby affirm, that I have a certificate of consent to self -Insure; or a certificate of
Worker's Compensation Insurance, ora certified copy thereof. (Sec. 3800, Labor Code.)
Policy No. .Company
❑ Copy Is filed with the city. ❑ Certified copy is hereby furnished.
CERTIFICATE OF. EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section ,need not be completed If the permit Is for one hundred dollars ($100) valuation
or less.)
I certify that in the performance of the work for which this permit is issued, 1 shall.not
employ any.pparson imany manner so as to become subject to the Workers' Compensation
Laws of California.
Date--:- Owner
NOTICE TO APPLICANT: If, after making this Cerliftcate of Exemptkm you should become
subject. to the Workers' Compensation provisions of the Labor Code, you must forthwith
comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction tending agency for the performance of the
work for which this permit is issued. (Seo. -3097, C1vA Code.)
Lender's Name
Lender's Address
This is a building permit when properly filled out signed and validated, and Is subject to
expiration it work thereunder Is suspended for 180 days.
I certify that I have read this application and state that, the above Information -is correct.
I agree to comply wlth.all clty and county ordinances and state laws relating to -building
construction; and hereby authorize representatives -of this city to enter the above.,
mentioned property for Inspection purposes.
Signature of applicant Date
Mailing Address
City, State, Zip
No. 08169
BUILDING: TYPE CONST. OCC: GRP.
Number 71?,
Legal Description
Project Description Rom Addition
Sq. Ft. 220 No. No. Dw.
Size Stories Units
New ❑ Add O Alter ❑ Repair ❑ Demolition ❑
Aimated Valuation 910,736
PERMIT AMOUNT
Plan Chk. Dep.
Plan Chk. Bal. 91.32
Const.
Mech.
Electrical 2255
Plumbing
S.M.I.
.37
Grading
Driveway Enc.
Infrastructure
iM�RSWMI 255.79
TOTAL
REMARKS
ZONE: BY:
Minimum Setback Distances:
Front_ Setback from Center Line
Rear Setback from Rear Prop: Line
Side Street Setback from Center Line
Side Setback from Property Line
FINAL DATE INSPECTOR
Issued by: Date srajfi.M Permit
Validated by:
Validation:
CONSTRUCTION ESTIMATE
NO. ELECTRICAL FEES
NO. PLUMBING FEES
1ST FL. SO. FT. ® $
UNITS
COLL AREA
SLAB GRADE ?/Z
Q
YARD SPKLR SYSTEM
2ND FL. SQ. FT.
BONDING
HEATING (ROUGH)
STORAGE TANK
MOBILEHOME'SVC.
BAR SINK
POR. SO. FT. ®
ROUGH WIRING,
GAR. SQ. FT. ®
POWER OUTLET
ROOF DRAINS
GAS (ROUGH)
DRAINAGE PIPING
CARP. SQ. FT. ®
HEATING (FINAL)
OTHER APP.JEQUIP.
WALL SQ. FT.
DRINKING FOUNTAIN.
SO. FT. ®-
TEMP. POLE
URINAL
ESTIMATED CONSTRUCTION VALUATION $
GROUT
WATER PIPING
NOTE: Not to be used as property tax valuation
FLOOR DRAIN
MECHANICAL FEES
WATER SOFTENER
VENT SYSTEM FAN EVAP.COOL HOOD
SIGN
WASHER(AUTO)(DISH)
APPLIANCE DRYER
GRADING
cu. yd.
$ plus x:
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
LAUNDRY TRAY -
AIR HANDLING UNIT CFM
ROOFING
9
KITCHEN SINK
ABSORPTION SYSTEM B.T:U.
TEMP USE PERMIT SVC
WATER CLOSET'
COMPRESSOR HP
POLE, TEMIPERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER, B.T.U.
SO. FT. ® c
BATH TUB
SQ. FT. ® c
WATER HEATER
MAX. HEATER OUTPUT, B.T.U.
SO. FT. RESID ® 164 c
SEWAGE DISPOSAL
SPARK ARRESTOR
SQ.FT.GAR ® iic
HOUSE SEWER
GAR. FIREWALL
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FEE
DBL
TOTAL FEES
MICRO FEE
MECH.FEE PLCK.FEE
CONST. FEE ELECT. FEE
SMI FEE PLUMB. FEE
STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR-
SETBACK
OLAR-
SETBACK 'f")
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL AREA
SLAB GRADE ?/Z
Q
ROUGH PLUMB.
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING,
DUCT WORK
ROCKSTORAGE
FOUND. REINF.
GAS (ROUGH)
METER LUOP
HEATING (FINAL)
OTHER APP.JEQUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE,
FINAL INSP.
BOND BEAM
WATER SYSTEM
FINAL INSP. / �(
GRADING
cu. yd.
$ plus x:
=$
LUMBER GR.
FRAMING O
FINAL INSP.
ROOFING
9
Q���/�
j
(/
NNNIIIN���
REMARKS:
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING �/ A
MESH
INSULATION/SOUND
FINISH GRADING
FINAL INSPECTION
CERT. OCC.
FENCE FINAL
INSPECTOR'S SIGNATURESIINITIALS
GARDEN WALL FINAL
TITLE 24 REPORT FOR:
LA QUINTA REALTY
51001 EISENHOWER DRIVE
LA QUINTA, CALIFORNIA
PROJECT DESIGNER:
MCWHIRTER DESIGN
P.,O. BOX 1480
LA QUINTA, CA 52253
OWNER:
REPORT PREPARED BY:
JOHN H HACKER CIVIL ENGINEER
4501 E SUNNY DUNES RD SUITE D
PALM SPRINGS CA;L.IF 92264
(619) 327-4.565
Job Number:
Date: 6/27/199.0
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has interim approval
and is au thorited by the California Energy Commissar n for use with the
Second Generation Nonresidential Building Energy Efficiency Standards
for Nonresidential Occupancies. Second Generation Residential Occupancies
shown to comply with this program conform to the results produced by the
Public Domain Point System, developed by the California Energy Commission.
This program developed by Gabel Dodd Associates (415) 428-0803.
Table Of Contents for Title 24 Report
Cover Page ............................................:.._. ........ 1
Table of Contents ................................. 0................. 2
Form CF' -IB Certificate of Compliance: Nonresidential ................ 3
Form MF -i Mandatory Measures Checklist ............................... 6
Form WS -1A Energy Budgets Worksheet ................................. 8
Form CF -2 Envelope Summary & Worksheet ............................... 10
Form SCM Performance Run ................. a .................... ...... 13
Farm CF -4 HVAC Summary ............. ....... ,.......................... 16
Form WS -4 HVAC System Summary Sheets ............................ ... 17
Form CF -5 Allowed Lighting Summary .... .............................. 18
HVACZone & Space Loads Summary ..................................... iS
CERTIFICATE OF COMPLIANCE (part 1 of 3) CF-1Bpage 3 of 20-
---------------------------------------------------------------------------
Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01
-- --
Designer: MCWHIRTER DESIGN Building Permit No
' --------
Location: Indio Date: 6/27/1990 t Checked By
Documentation: JOHN H HACKER CIVIL ENGINEER Date CUser # 1625)
-----------------------------------------------------------------------------
PRINCIPAL DESIGNER. The proposed building will be in substantial
compliance with the California Building Energy E"fficien"cy Standards
provided it is built according to the plans and specifications and provided
future improvements are completed according to the requirements indicated
on this Certificate. of Compliance. The plans and specifications have been
prepared to include all .significant energy conservation features required
for compliance with the Standards. Building areas that are unconditioned
and/or not subject to the standards are indicated on the plans.
Plans Dated: -__ Spens Dated:
-------------------------------
Signature: ----- Date: ------------------------
MCWHIRTER DESIGN
P.O. BOX 1480
LA QUINTA, CA 92253 Cal. License No:
------------------
OWNER. The energy conservation features and performance specifications
indicated on this document and on the plans and specifications shall apply
to future alterations, unless compliance is demonstrated anew and a new
Certificate of Compliance is submitted. A copy of this Certificate will be
retained and transmitted to future tenants, subsequent owners or others
with responsibility for making improvements or modifications to the
building. If this certificate is lost, a new Certificate may be required
before a permit is issued for alterations. Unconditioned areas are
indicated on the plans and, if these areas are conditioned in the future,
they must be made to comply with the applicable e:ner"gy standards then in
effect.
Signature: ---------------------------------- Date:
ENFORCEMENT AGENCY. The proposed building, and future alterations will
damply with the California Building Energy Efficiency Standards, provided
future alterations meet the requirements indicated on this Certificate and
all applicable mandatary measures, as long as the building occupancy type
remains unchanged.
Signature: Date:
Name:
Agency: ------
- --------------------------------------------------------------
Address:--------------------------------- -------------- _
-------------------
City/State/Zips------------------------------------------------------------
CERTIFICATE OF COMPLIANCE (part 2 of 3) CF -1B. page 4 of 20
Project: LA QUINTA REALTY t COMPLY 24 v 3.01
Designer: MCWHIRTER DESIGN Building Permit No
Location: Indio Date: 6/27/1990 ! Checked By
-----------
Documentation: JOHN H HACKER CIVIL ENGINEER 1 Date (User# 1625)
ENERGY ANALYST. The energy performance analysis summarized below was
performed using an approved CEC calculation method, with CEC approved
fixed and restricted engineering inputs for the applicable climate zone
and occupancy type, and using a reasonable representation of bui-lding
zoning and physical configuration. All significant energy conservation
features are listed below, or on an attached supplement.
Signature':. _ (�(a�19a _
- -------------------- Da'te:------- ---- -----
JOHN H HACKEF CIVIL ENGINEER
4501 E SUNNY DUNES RD SUITE D
PALM SPRINGS CALIF 52264
(619) 327-4565
GENERAL
REFERENCE
watts/sqft
CF -4
1
Unconditioned or Multi -tenant Shell`s
CF -4
0
Btu/hr
2
CEC Occupancy Type
(SSE/COP)
Office
0
3
UBC Occupancy Group/Division
-------
------
4
Climate Zone
WS -1A
15
5
Conditioned Floor Area
WS -1A
220
sqft
6
Unconditioned Floor Area
0
sqft
7
Budget Table (from Standards)
1986 ed.
Sec 2-53R
8
Allowed Energy Budget
W.S-1A
261.0
9
Calculation Method CEC Code/Date
CPO -07
6/28/1988
10
Multiplier
CEC
1.027
11
Calculated Energy Use
WS -1A
211.4
kBtu/sqft-yr
ENVELOPE
REQUIREMENTS
12
Average Roof/Ceiling Rt
CF -2
28.14
h-F-sqft/Btu
13
Average Exterior Floor Rt
CF -2
0.00
h-F-sqft/Btu
14
Average Opaque Wall Rt
CF -2
15.28
h-F-sgft/Btu
15
Glazing Area in Wall
CF -2
16
sqft
16
Average SC (Glazing in Wall)
CF -2
0.88
17
Glazing Area in Roof
CF -2
16
sgf,t
18
Average SC (Glazing in Roof)
CF -2
0.77
LIGHTING REQUIREMENTS
19 Whole Building Allowed LPD
22 Package Lighting Reduction
23 Lighting Controls Required?
MECHANICAL REQUIREMENTS
24 System Type
25 Fan Wattage Index
26 Rated Cooling Efficiency
27 Rated Cooling Capacity
28 Rated Heating Efficiency
29 Rated Heating Capacity
30 Economizer Cooling7'
CF -5 1.500 watts/sqft
WS -1A 0.000 watts/sqft
CF -5 No
-----_-------------
CF -4
0.000
watts/sqft
CF -4
8.00
(EER)
CF -4
0
Btu/hr
CF -4
0.75
(SSE/COP)
CF -4
0
Btu/hr
CF -4
Yes.
CERTIFICATE OF COMPLIANCE (part 3 of 3) CF -1B page 5 of 20
------------------------------------------------------------------------------
Project: LA QU.INTA REALTY
Designer: MCWHIRTER DESIGN
Location: Indio Date: 6/27/1990
Documentation: JOHN H HACKER.CIVIL ENGINEER
COMPLY 24 v 3.01
----------- ------
Building Permit No
------------------
ChecL:ed By
Date (User-# 1625)
Note: More than one Part 3 may be submitted", but all must reference the
same Parts 1 & 2. The person responsible for preparing the compliance
documentation for each major building system acknowledges the following
compliance statement by signing the appropriate space below.
Compliance Statement. The proposed building improvements substantially
comply with the requirements indicated on the Certificate of Compliance
for this building, .dated The plans and specifications include
the significant energy conservation features and the compliance
documentation is consistent with the plans and specifications.
ENVELOPE
1 Average Roof/Ceiling Rt
2 Average Exterior Floor
3 Average Opaque Wall Rt
4 Glazing Area in Wall
5 Average SC (Wall)
6 Glazing Area in Roof
7 Average SC (Roof)
Other Requirements:
Modeled Improvements
---------------- ---------
28.14 Plans Dated________ Specs Dated
Rt 0:44
15-.28 Signature----------------- Date
16 Name___________
-----------------------
0.88 Company---------------
.. ----------------
16 Address
0.77 City/State/'Zip________________________
Telephone_____________ License
Enforcement Agency________
LIGHTING
Modeled
Modeled
8
Basis of Allowed
LPD
Performance
9
Pa.c k: A or WS -5C
LPD
1.500
10
Package Lighting
Red.
< 0.000:
11
Allowed LPD (CF -5)
0.75
1.500
12
Lighting Control
Credits? No
Other Requirements:
18
Economizer Cooling?
Improvements
-----------------=--------
Plans Dated________ Specs Dated
Signature_________________ Date
-------
Name_____________
Company-------------------------------
Address
---------------------------------
City/State/Z.ip________________________
Telephone._____________ License _-______
Enforcement Agency____________________
MECHANICAL
Modeled
Improvements .._________________.........
13
Fan Wattage Index
0.004
Plans Dated________ Specs Dated .......
14
Rated Coaling Efficiency
8.00
15
Rated Coaling Capacity
0
Signature _______ Date
16
Rated Heating Efficiency
0.75
Name ----------------------------------
17
Rated Heating Output
0
Company_________________________
18
Economizer Cooling?
Yes
Address_______________________________
19
Simultaneous Heat/Cool?
No
City/State/Zip________________________
Other Requirements:
Telephone_____________ License
Enforcement Agency____________________
MANDATORY
MEASURES CHECKLIST (part 1 of 2)
MF -1. page 6 of 20
Project:
LA OUINTA REALTY
S
COMPLY 2.4 v 3.01
Designer:
MCWHIRTER DESIGN
------------------
Building Permit No
Location:
Indio Date:
'
6/27/1990 1
------------------
Checked By
Documentation:
JOHN'H HACKER CIVIL ENGINEER
Date (User # 1625)
ENVELOPE
MEASURES
Reference
o Certified Insulation Materials per Sec. 2-53'11(a)
o Insulation Installed to meet Flame Spread and Smoke Density
Requirements of Sec. 2-53,11(b) ----
o Urea Formaldehyde Foam Insulation Installed per Sec. 2-5311(c) ____
o Retrofit Insulation specified per Sec. 2-5313
o Air Infiltra.tiorn is minimized by specification of tested
manufactured doors and windows and proper sealing and
weatherstripping per Sec. 2-5317 __
LIGHTING SYSTEM MEASURES
o Certified Luminaires/Ballasts per Sec. 2-53.14(b.)
o Ind.epe.ndent Control within enclosed Areas per Sec. 2-53.19(a) ---------
o Manual Switching Readily Accessible per Sec. 2-5319(b)
o Reduction of Lighting Load to at least 50% per Sec. -5319(c)
(Occupancy Sensors or Programmable Timers meeting CEC
Criteria may Substitute.) ---------
o Separate Switching of Da.ylit Areas per Sec. 2-5315(d)
o Separate Switching of Display and Valance Lighting in
Retail/Wholesale Occupancies per Sec 2-5319(h)
6 Automatic Control of Display Lighting in Retail/Wholesale
Occupancies per Sec. 2-5319(h)
o Tandem Wiring of 1 and 3 Lamp Luminaires per Sec. 2-5319'(h) _____
DAYL.IGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable) Reference
o Uniform Illumination reduction to 50Y. per Sec.. 2-5319(e).1
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
o Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3
MANDATORY
MEASURES:CHECKL.IST
(part 2 of t)
MF -1* page7 of '20
Project:
LA QUINTA
REALTY
COMPLY 24 v 3.01
Designer:
MCWHIRTER
DESIGN
Building Permit No
Location:
India
Date:
6/27/1990 1
Checked By
Documentation:
JOHN
H HACKER CIVIL ENGINEER
1
------------------
Date (User # 1625)
o Step Switching Devices with Separation between On/Off Settings
per Sec. 2-5319(e).4
o Photocell Sensors with a Diffusing Cover and no Opaque Cover
per Sec. 2-5319(e).5 ------
o Manufacturer's Instructions provided for Installation and
Calibration per Sec. 2-5319(e).6
o Proper Installation of Controls including Sensor Location,
Certification of Initial Calibration and Control of Luminaires
only within Daylit Areas per Sec. 2-5319(e).8 ---------
o Visible or Audible Malfunction Alarm provided per Sec. 2-5319(g) .........
OCCUPANCY SENSING DEVICES (when applicable)
o Visible or Audible Malfunction Alarms per Sec. 2-.5319(g)
o Limits on Emisions per exceptions to Sec. 2-5319(e)
HVAC AND PLUMBING SYSTEM MEASURES
o Piping Insulated as per Sec.. 2-531
o Certified HVAC Equipment per Sec. 2-5314(a)
o Certified Plumbing Equipment per Sec. 2-5314(a)
o Heating and Cooling Equipment efficiency per Sec.. 2-5314(b) ______
o Pilotless Ignition of Gas Appl-iances per Sec. 2-5314(c)
o Automatic Controls for Off -Hours per Sec. 2-5315(a.)
o Thermostat Set Point Requirements per Sec. 2-5315(b).1
o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2
o Automatic Exhaust Fan Dampers per Sec. 2-5316(b)
o Thermostat Controls for Each Zone per Sec. 2-5315(b)
o Ventilation Provided per Secs. 2-5316 & 2-5343
o Ventilation and Recirculation Air Quality Info per 1403(b).3
o Water Heaters for Domestic Hat. Water and Pauls per Sec. 2-5318
ENERGY BUDGETS WORKSHEET (part 1 of 2) WS -1A page 8 of 20
Project: LA QUINTA REALTY S COMPLY 24 v 3.01
Designer: MCWHIRTER DESIGN 1 Building Permit No
--------
Location: Indio Date: 6/27/1990 Checked By
------------------
Documentation: JOHN H HACKER CIVIL ENGINEER i Date (User # 1625)
BUILDING ENERGY COMPLIANCE BUDGET BY FLOOR/OCCUPANCY
Cond. Budget Adj. Allowd
Perimeter (KPtu Allowd Pack A Energy Floor Energy
Flr Occupancy (ft) Ratio /sgft) LPD LPD Budget Area (MBtu)
1 Office 61 3.61 261 +(1.500 - 1.50)x 38= 261.0 x 220 = 57
TOTALS 220 57
BUILDING COMPLIANCE BUDGET 57 MBtu / 220 sqft = 261.0 KPtu/sgft
ENERGY BUDGETS WORKSHEET (part 2 of 2) WS -1A page 9 of 20
Project: LA QUI.NTA REALTY ; COMPLY 24 v 3.01
------------------
Designer: MCWHIRTER DESIGN 1 Building Permit No
' ------------------
--- -----
Location: Indio Date: 6/27/1990 1 Checked By
' -------
Documentation: JOHN H HACKER CIVIL ENGINEER Date- (User- #- 1625)----------------------------------------------------------------------------------
BUILDING ENERGY CONSUMPTION BY SPACE
Total SCM Energy Energy
Floor Floor Estimate Use
Space Name Area Mult Area (KBt.0/sgft) (MBtu)
OFFICE ADDITION 220 x 1 = 220 x 211.4 = 46.5
TOTALS 220 46.5
BUILDING ENERGY CONSUMPTION 46..5 MBtu / 220 sqft 211.4 KBtu/sqft
AREA AND MATERIALS SUMMARY FORM (past 1 of 3) CF -2.' page 10 of 20.
_Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01
Designer: MCWHIRTER DESIGN
Location: India
Date: 6/27/1990
------------------
Building Permit No
-------------------
Checked By
------------------
Documentation: JOHN H HACKER CIVIL ENGINEER a Date (User # 1625)
ROOF AREA BY TYPE AND ORIENTATION
Type N NE E SE S SW W NW Int TOTALS
Roof -1 204 204
TOTALS 204 204
ROOF R -VALUE
Winter Area /
Type Assembly Name Area R -Value R -Value
------ ---------------------------- ---- - --------1----
Roof-1 R-30 Roof/Gyp Ceiling 204 28.14 7.25
Average R -Value 204 / 7.25 = 28.14
ROOF GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE S SW W NW Int TOTALS
Sky -1 16 1.6
TOTALS 16 16
ROOF GLAZING U -VALUE AND SC
Type Assembly Name
Sky -1 Double/No Int Shades
Totals
Average U -Value
Average SC.
Winter Area x Area
Area U -Value SC U -Value x. SC
16 .0.65 0.88 10 14
16 10 14
10 / 16 = 0.65
14 / 16 = 0.88
AREA AND
----------------------------------------------------------------------------
MATERIALS
SUMMARY FORM (part 2 of 3)
CF -2." page
it of 20
Project:
LA QUINTA
REALTY
1 COMPLY 24
v 3.01
Designer: MCWHIRTER DESIGN
Location: Indio
Date: 6/27/19-90
------------------
Building Permit No
-------------
Chocked By
- -
-------
Documentation: JOHN H HACKER CIVIL ENGINEER t Dat -e - (-User---- # --16-25)
--------------------------------------------------------------------------------
ELEVATION AREA BY ORIENTATION
N NE
---------------------------------------------------------------------
E SE
S SW
W
NW Int TOTAL
220
----------------------------------------------------------------------------
100
220
100
640
OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION
Type
N NE
E SE
S SW
W
NW Int TOTALS
Wall -1
220
100
220
84
624
-------------------------------------------------------------------------------
TOTALS
220
loo
220
84
624
OPAQUE EXTERIOR WALL/DOOR R -VALUE & HEAT CAPACITY
Winter
Area /
Area
Type. Assembly Name
Area
R -Value
HC
R -Value
x HC
Wa.l l -1 R-19 Frame Wall
624
15.28
3..2
41
2017'
Totals
624
41
2017
Average R -Value
624 /
41 =
15.28
Average HC
20.17 /
624 =
3.23
AREA AND
MATERIALS SUMMARY FORM (part3 of 3)
CF -2-- page 12 of 20
Project:
LA QUINTA REALTY
S COMPLY 24 v 3.01
U -Value
SC
U -Value
Designer:
MCWHIRTER DESIGN
f iuilding Permit No
Location:
Indio Date: 6/27/1990
--------------=---
Checked By
1.6
Documentation: JOHN H HACKER CIVIL ENGINEER
Date (User # 1625)
GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE S SW W NW Int TOTALS
-------------------------------------------------------------------------------
Wind -1 16 16
TOTALS 16 1.6
GLAZING U -VALUE AND SC
Type Assembly Name
Wind -1 Single/No Int Shades
Totals
Average U -Value
Average SC
Winter
Area x
Area
Area
U -Value
SC
U -Value
x SC
16
1.10
1 . tai
i8
16
1.6
18
16
18 /
16 =
1.10
16 /
16 =
1.00
SCM 'INPUT
DATA SUMMARY (part 1 of 2)
SCM -1' page
13 of 20
Project:
LA QUINTA REALTY
1
COMPLY 24
v 3.01
Designer:
MCWHIRTER DESIGN
t
'
------------------
Building Permit No
Locaticn:
Indio Datet
6/27/1990 to
f------------------
------------------
Checked By
Documentation:
JOHN H HACKER CIVIL ENGINEER.
�
________________Documentation:
Date (User
# 1625)
Space Name:
AREAS
Exterior Wall
West Glazing
Roof
West Skylight
Door
Raised Floor
Slab
Total Conditioned Fluor
WINTER R -VALUES (including air film resistances.)
------------------------------------------------
Wall
Window
Roof
Doti r
Floor
HVAC SYSTEM
HVAC Equipment Name (CF -4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Fan Power
Air Circulation Rate
GENERAL
Heat Capacity of Exterior Wall
Lighting Power
Climate Zone
OFFICE ADDITION
624.0
sqft
16.0
sqft
104..0
sqft
16.0
sqft
0.0
sqft
0.0
sqft
110.0
sqft
210.0
sqft,
15.18
0.91
28. 14
0.00
0.00
UNDEFINED
1
Gas Fired
AC w/Ecu,nomizer
Gas Fired
0.750
8.000
0. 780
Yes
0 watts
0 CFM
3.23
1.500 watts/sqft
15
SCM INPUT
DATA SUMMARY (part 2 of 2)
SCM -1 page 14 of 20
Pro,je.ct:
LA DUINTA REALTY
S
COMPLY 24' v 3.01
Designer:
MCWHIRTER DESIGN
SC
Building Permit No
SC WFMF Wint
Summ
'
SIAmm
Location:
Indio Date:
6/27/1590 0
------------------
Checked By
Documentation:
JOHN H HACKER CIVIL ENGINEER
1
------------------
Date (User # 1625)
OTHER PHYSICAL PARAMETERS
-------------------------
Wall Absorptivity
Raaf Absorptivity
Ceiling Height
0.70
0.70
1.0. 0 f t
Exterior
Glass CEC
Shade SC
Overall
SC
SHADING COEFFICIENTS
SC WFMF Wint
Summ
Wint
SIAmm
West
1.00 0.88
-- --
0.88
0.88
Skylight
0.88 0.88
-- --
0.77
0.77
Window
Overhang
Side-Fi.n
OVERHANGS & SIDEF'INS
Height Width
Height
Depth
Distance Depth
West
4.0 4.0
0.1
2.0
-- --
SCM•ANALYSIS PERFORMANCE RESULTS SCM -2 .page 15 of 20
Project: LA QUINTA REALTY 1 COMPLY 24 v 3.01.
Designer: MCWHIRTER DESIGN
Location: Indio
Date: 6/27/1990
------------------
Building Permit No
------------------
CE�ecked By
------------------
Documentation: JOHN H HACKER CIVIL ENGINEER S Date tUser # 165)
----------------------------------------------------------------------------
Space Name:
OFFICE ADDITION
BALANCE POINT TEMPERATURES AND DEGREE DAYS
Daytime Nighttime
BPT1 =
45.75
(Winter)
BPTI =
66..04
Cooling
BPT2 -
49.98
(Summer)
BPT2 =
72.93
BPT3 -
37.68
(Economizer)
BPT3 =
70.70
Lighting
HDD -
5655
(Heating)
HDD =
79
16.8
CDD -
1.0053
(,Cooling)
CDD =
1107
BUILDING
HEAT TRANSFER
(Btu/hr-F)
Building Envelope Heat
Transfer Rate:
Winter
=
76.1
Summer
=
73.7
Overall Heat
Transfer
Factor ("K")e
Winter
=
111.2
Summer
=
106.1
ANNUAL LOADS (MBtf:As)
Heating - 6.8
Coaling = 9.6
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating = 10.0
Site Cooling = 6.9
Site Fan = 0.0
Site Lighting = 3.7
Site Receptacle = 1.2
Site Hot Water = 0.1
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sgft)
Source
Heating
= 45.7
Source
Cooling
= 54.3
Source
Fan
= 0.0
Total
Space Conditioning Energy
= 140.0 x 1.017 =
143.8
Source
Lighting
=
50.3
Source
Receptacle
=
16.8
Source
Hot Water
-
0.6
TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 211.4 KBtu/sqft
HVAC EQUIPMENT SUMMARY FORM CF -4 . page '16 of 20
----------------------------------------------------------------------------
Project: LA QUINTA REALTY COMPLY'24 v 3.01
------------------
Designer: MCWHIRTER DESIGN 0 Building Permit No
' ------------------
Location: Indio Date: 6/27/1330 � Checked By
------------------
--------
Documentation: JOHN H HACKER CIVIL ENGINEER 1 Date (User # 1625)
------------------------------------------------------------------
HVAC EQUIPMENT SUMMARY BY ZONE
No. Heating Cooling
No HVAC Zone HVAC System (WS -4) Sys KB.tu Eff KBtu Eff
1 OFFICE UNDEFINED 1 0 0.75 0 8.00
Totals 0 KBtu 0 KBtu
FAN ENERGY
No. Motor Drive Conv No. Fan
HVAC System Sys BHP Eff, Eff. Fact Fans Watts
Total 0
FAN WATTAGE INDEX 0 watts / 220 sqft = 0.000 watts/sqft
HVAC SYSTEM SUMMARY SHEET WS -4 page 17 of 20
Project: LA DUINTA REALTY COMPLY 24 v 3.01
Designer: MCWHIRTER DESIGN Building Permit No
' -
Location: India Date: 6/27/1990 1 Checked -------- By- --------
Documentation: JOHN H HACKER CIVIL ENGINEER { Date -(User # 1625)
HVAC Equipment Name:
HEATING
System Type:
Output Capacity:
Rated SSE or COP:
Supply Air Temperature:
COOLING
System Type:
Total Output Capacity:
Sensible Output Capacity:
Latent Output Capacity:
Rated EER:
Coil. Bypass Factor:
Economizer:
Supply Air Temperature:
FANS
Supply Air CFM:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
UNDEFINED'
Gas Fired
0 Btu/her
0.750
105 F
AC w/Economizer
0 Btu/hr
0 Btu/hr
0 Btu/her
8.000
0.100
Yes
55 F
0 cfm
0.0 X
0.0
0.0 X
0.0 X
ALLOWED LIGHTING SUMMARY CF -5 page 18 of 20
•---------------------------------------------------------------------------
Project: LA DUINTA REALTY COMPLY 24 v 3.01
1
------------------
Designer: MCWHI'RTER DESIGN. Building Permit No
' ------------------
Location: India Date: 6/27/1950 ; Checked By
Documentation: JOHN H HACKER CIVIL ENGINEER ' Date (.User- # 1625)
PROPOSED ADJUSTED LPD
1. Total Installed Lighting Watts (from below)
330
watts
2. Control Credit Watts (WS -5A)
0
watts
3. Adjusted Watts (Line i - line 2)
330
watts
4. Conditioned Floor Area (from CF -1)
220
sqft
5. Allowed Lighti,n.g Power Density (line 3 /
line 4)
1.500
w/sgft
INSTALLED LIGHTING POWER BY SPACE
Total
Floor Vert Horiz
Floor
Lighting Installed
Space Name Area Mult Mult
Area
(watts/sqft) wattage
OFFICE ADDITION 220 x i x 1 =
220 x
1.500 =
330
TOTALS
220
330
HVAC ZONE HEATING &
COOLING LOAD SUMMARY
0.
page 19 of 20
----------------------------------------------------------------------------
• Project: LA QUINTA
REALTY
t
COMPLY 24 v 3.01
0
8511
361
Designer: MCWHIRTER
DESIGN
0
Building Permit No
0.0 tons
0.0 tans
Location: Indio
Date:
6/27/1.990 1
Checked By
Documentation: JOHN
------------------------------------------------------------------------------
H HACKER CIVIL ENGINEER
}
Date (User # 1.6257
HVAC ZONE DESCRIPTION
HVAC Zane Name:
HVAC System Name:
System Multiplier:
Heating S"chedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES I.N THIS ZONE PEAK HEATING
OFFICE ADDITION (Jan Sam) 5743
TOTAL SPACE LOAD 5743
Bypass Ventilation Air ( 2 cfm)
Supply Duct Conduction
Supply Duct Leakage
Supply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 20 cfm)
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
OFFICE
UNDEFINED.
1
Office Heating
Office Cooling
Office Occupancy
COINCIDENT
50 X
COOLING
PEAK SENSIBLE
(Jul 4pm) 7774
7774
99 C 2 cfm)
0
0
-0
5842
893 ( 20 cfm)
0
a
-0
6735
74
0
0
0
7848
LATENT
561
561
-20
0
541
663
-.180
0.
0
0
0
0
8511
361
0.7tuns
0.0 tons
0
0
0.0 tons
0.0 tans
Project: LA QUINTA REALTY 0 COMPLY 24 v 3:01
Designer: MCWHIRTER DESIGN Building Permit No
--------
Location: Indio Date: 6/27/1990 1 Checked By
Documentation: JOHN H HACKER CIVIL ENGINEER 1 Date (User # 16255
-------------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS HEATING
Peak Hour: Jan Sam
Indoor Conditions: 70 F DB
Outdoor Conditions: 29 F DB
LOAD COMPONENT Btu/hr
Wall Conduction
1675
Window Conduction
722
Door Conduction
0
Roof Conduction
297
Skylight Conduction
426
Floor Conduction
0
Slab Conduction
2623
Interior Conduction
0
Infiltration
0
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS 574.3 Btu/hr
OFFICE ADDITION
COOLING
SENSIBLE LATENT
Jul 4pm
78 F DB 50 % RH
109 F DB 72 F WB
Btu/hr
1486
355
D
404
237
0
0
0
2979
1002
751
561
7774 Btu/hr
0.6 tons
Btu/hr
0
J o,i
56'1 Btu/hr
0.0 tons
SUPPLY AIR QUANTITIES
------------------
Heating: 5743 Btu/hr / E1.10 * (105 F Supply - 70 F TStat)] = 1.49 cfm
Cooling: 7774 Btu/ter / [1.08 * ( 78 F TStat - 55 F Supply)] = 313 cfm