04-4101 (SFD) Soil Engineer Reporta
�.
.�
�.
�•�
.�
�-
,.
�.
,•
��
�
�
,
Sladden
Engineering
6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562) 864-4121 (714) 523-0952 Fax (714) 523-1369
39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895
February 7, 2002 Project No. 544-1419
02-02-083
Mr. Jeffrey P. Schley
Project: Schley Residence
Lot 38 -Tract 24890-4
78-850 Lima - Citrus Golf Club
La Quinta, California
Subject: Geotechnical Update
Ref: 1. Soil Engineering Report prepared by Buena Engineers, Inc. dated February 25, 1986,
Job No. B -16006-P1, Report No. 86-02-271.
2 Rough Grading Report prepared by Buena Engineers, Inc. dated July 17, 1986, Job
No. B -16006-P1, Report No. 86-07-223.
3. Rough Grading Report prepared by Soil and Testing Engineers, Inc. dated May 21,
1990, Project No. STE 8931087, Report No. 8.
4. Geotechnical Update Report prepared by Sladden Engineering dated October 1,
1997, Project No. 544-7032.
As requested, we have reviewed the above referenced geotechnical reports as they relate to the
design and construction of the proposed single family residence. The project site is located on
Lot 38 along Lima within the Citrus Golf Club development in the City of La Quinta, California.
It is our understanding that the proposed residence will be a relatively lightweight wood frame
structure supported by conventional shallow spread footings and concrete slabs on grade.
The previous reports indicate that the lot was previously graded in 1986 during the initial rough
grading of the Citrus project site. - The rough grading included overexcavation of the native
surface soils along with the placement of engineered fill material to construct the building pad.
The lot was regraded in 1990. The site grading is summarized in the referenced Rough Grading
Reports along with the compaction test results.
The referenced reports include recommendations pertaining to the construction of residential
structure foundations. Based upon our review of the referenced reports, it is our opinion that the
structural values included in the referenced grading report remain applicable for the design and
construction of the proposed residential structure foundations.
February 7, 2002 -2- Project No. 544-1419
02-02-083
Because the lot has been previously rough graded, the remedial grading required at this time
should be minimal. The building area should be cleared of surface vegetation, scarified and
moisture conditioned prior to precise grading. The exposed surface should be compacted so that
a minimum of 90 percent relative compaction is attained prior to fill placement. Any fill material
should be placed in thin lifts at near optimum moisture content and compacted to at least 90
percent relative compaction.
Allowable Bearing Pressures: The allowable bearing pressures recommended in the grading
report prepared by Sladden Engineering remain applicable. Conventional shallow spread footings
should be bottomed into properly compacted fill material a minimum of 12 inches below lowest
adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings
should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed
utilizing allowable bearing pressures of 1700 psf. An allowable increase of 300 psf for each
additional 6 inches of depth may be utilized if desired. The maximum allowable bearing pressure
should be 2500 psf. The recommended allowable bearing pressures may be increased by one-
third for wind and seismic loading.
The bearirig soils are non -expansive and fall within the "very low" expansion category in
accordance with Uniform Building Code (UBC) classification criteria. Pertinent 1997 UBC
Seismic Design parameters are summarized on the attached data sheet.
If you have questions regarding this letter or the referenced reports, please contact the
undersigned.
Respectfully submitted,
SLADDEN ENGINEERING
Brett L. Ande'rso`n
Principal Engineer
Copies: 4/Mr. Jeffrey Schley
Sadden Engineering
February 7, 2002 -3- Project No. 544-1419
02-02-083
1997 UNIFORM BUILDING CODE INFORMATION
The International Conference of Building Officials 1997 Uniform Building Code contains
substantial revisions and additions to the earthquake engineering section in Chapter 16. Concepts
contained in the updated code that will be relevant to construction of the proposed structures are
summarized below.
Ground shaking is expected to be the primary hazard most likely to affect the site, based upon
proximity to significant faults capable of generating large earthquakes. Major fault zones
considered to be most likely to create strong ground shaking at the site are listed below.
Fault Zone
Approximate Distance
From Site
Fault Type
1997 UBC
San Andreas'
11 km
A
San Jacinto
30 km
A
Based on our field observations and understanding of local geologic conditions, the soil profile
type judged applicable to this site is So, generally described as stiff or dense soil. The site is
located within UBC Seismic Zone 4. The following table presents additional coefficients and
factors relevant to seismic mitigation for new construction upon adoption of the 1997 code.
Sladden Engineering
Near -Source
Near -Source
Seismic
Seismic
Seismic
Acceleration
Velocity
Coefficient
Coefficient
Source
Factor, N,,
Factor, N,,
Ca
C„
San Andreas
1.0
1.2
0.44 N,
0.64 N„
San Jacinto
1.0
1.0
0.44 Na
0.64 N,,
Sladden Engineering
• Lo� -gig
16*
•
• �u�ta
• CitY °f L�►
•
r,
• � BL1C
• P� ROUGH GRADE REPORT
• PHASE I, TRACT 24890
AVENIDA 52 &JEFFERSON STREET
LA QUINTA, CALIFORNIA
• i
•
•,
0
5
•
•
•
SUBMITTED TO:
•
J. M. PETERS COMPANY
12526 HIGH BLUFF DRIVE, SUITE 780
SAN DIEGO, CALIFORNIA 92130
•
•
SUBMITTED BY:
Soil and Testing Engineers, Inc.
•
79-607 Country Club Drive, #5
•
Bermuda Dunes, California 92201
•
•,
0
5
SOIL end TESTING
ENGINEERS INC.
0 ORANGE COUNTY 167 W. ORANGETHORPE sr'PLACENTA CALIFORNIA 92670 0 (714) 524-9130
■ COACHELLA VALLEY 79-607 COUNTRY CLUB, N5 ;: BERMUDA DUNES. CALIFORNIA 92201 19 (619) 345-8869
0 SAN BEANAADINO 1894 COMMERCENTER WEST, SUITE 305 i�. SAN BERNARDINO. CALIFORNIA 92408 19.(714)381--.d528
I
May 21, 1990
5
J.M. Peters Company STE 8931087
12526 High Bluff Drive, Suite 780 Report No. 8
San Diego, California 92130
Subject: .Rough Grade Report, Phase I, Tract 24890,
Avenue 52 & Jefferson Street,. La Quints,
.California
References: 1) Soil Engineering Report, La Quinta Lodge,
Prepared by Buena Engineering Inc, dated
February * 25, 1986.
2) Geotechnical Grading Plan R-aview,*.Tract
24890, Prepared by Soil and Testing
Engineers, Inc., dated January 24, 1990.
3) Remedial Grading Recommendation Tract
24890, Prepared by Soil and Testing
Engineers, Inc., dated February 7, 1990.
,Gentlemen:
In accordance with your. request, this report has been
prepared to present the results of the field observations and
relative compaction tests�'performed at the subject site by
Soil ,and Testing Engineers, Inc. These services were
performed between.February 21, 1990 and April 10, 1990.
•
STE 8931087 May 21, 1990
For the purpose of this report, Phase I consists of:
Page 3
Sheet No. Lot Nos.
4 All Lots
5 All Lots
6 Lots 10-29
7 All Lots
11 Lots 2-12 & 36-31
16 Lots 27-35-& 45-53
19 All Lots
Copies of these sheets of the grading plans are included with
this report as Plate nos. l.through 7.
SITE DESCRIPTION
The project site consists of 418acres of typical sandy
desert including minor duning. The site is bounded to the
south by Avenue 52, to the north by the extension of Avenido
Ultimo, to the east by Jefferson Street and to the west by
...Calle Rondo, in the City of,La Quinta, California. The site
had been previously utilized for agricultural. purposes,
mainly for the production�of ctirus and date crops.
PROPOSED CONSTRUCTION
The proposed construction on the site is to be that of single
story, wood frame and stucco. type homes with continuous
footings placed to a depth of 12 inches.
AVAILABLE PLANS
'To assist us in defining the limits of the proposed
improvements and the locations and elevations of our field
STE 8931087
May 21, 1990
Page 4
density tests, we were.provided with a grading plan prepared
by Morse Consulting Group dated January 16, 1990.
PREVIOUS GRADING
Approximately one-half .of this site had been previously mass
graded four years prior to the current grading operation.
Certification of this fill was provided by Buena Engineers,
Inc. in their report.dated July 17, 1986. Testing by this
firm during the intitial stages of. grading indicated that
these existing fills did possess the required 90% relative
compaction.
BURIED DEBRIS
It is our understanding based on a review of the July 1986
report by Buena Engineers, Inc. that organic debris.had been
buried in the vicinity of Lots 27-34 of Tract 6. Prior to.
the mass grading of these lots three trenches were'dug with
a D6 Dozer in an attempt to locate this debris. The trenches
were, excavated to depths of up to fifteen feet below proposed
pad elevation in Lots 31, 32 and 34. No debris of a
deleterious nature was encountered in the exploratory
trenches and it is our -conclusion that the buried debris is
contained in the existing golf course area.
SITE PREPARATION
On February 21, 1990, Soil and Testing Engineers, Inc. was
requested to observe the on-going mass grading at the subject
site. Prior to the commencement of grading operations, citrus
groves had been removed from portions of the residential
Tracts. It should be noted that existing irrigation pipes of
various sizes and depths have been left in place beneath the
graded pads in various locations. These irrigation pipes are
to be grouted at a later date.
S ® �
STE 8931087 May 21, 1990 Page 5
Approximately half of the subject site had been previously
mass graded four years prior to the current grading
operation. In these previously mass graded areas testing was
conducted at various depths. 'It has been determined that
these previously documented fill soils are densified to over
90% of maximum dry density.
The native soils that had not been previously mass graded
were overexcavated to a deptyh of two and one-half feet below
the bottom of the footings (assuming a twelve inch footing),
or in fill areas to two feet below original grade, 'whichever
was deeper, as per referenced soils report by Buena
Engineers. The exposed surface was'disced, watered, and
compacted with the use of heavy equipment to'a minimum of 90%
of maximum density. Due to numerous citrus roots present in
the native soils, root pickers were employed to remove all
visible roots larger than one-half inch in diameter. This
process was accomplished to at least five feet beyond all
building limits. The previously : removed soils were
subsequently replaced in shallow lifts, moisture treated and
compacted to•at least 90%.
The grading operation is being performed by Nuevo Engineering
Inc. The following equipment is being used to perform this
operation; although not all equipment has been operating at
the same time:
10 Scrapers.
3. Water Trucks
2 Dozers
2 Tractors with*Discs
FIELD OBSERVATION AND TESTING
1 Front End Loader
4 Laborers (root removal)
4 -Graders -
1 Water Pull
Observations and' field density tests were performed by a
representative of Soil and Testing Engineers, Inc. during the
STE 8931087 May 21, 1990 Page 6
rough grading operations. The density tests were taken
according to ASTM Test 1556-74 and D 2922-81 the results of
those tests are shown on the attached Plate No. 8, pages 1-
24. The locations and elevations of the in-situ tests were
determined 'in accordance with their importance and the
accuracy and proximity of the survey control provided by
other than Soil and Testing Engineers, Inc. representatives.
Unless otherwise noted, their locations and elevations were
determined by pacing and hand level methods and should be
considered accurate only to the degree implied by the method
used. ,
LABORATORY TESTS
Six maximum 'dry density determinations were performed on
representative* samples of the soils used in the compacted
fills according to ASTM Test 1557, Method A. This method
specifies that a four (4) inch diameter cylindrical mold of
1/30 cubic foot volume be used and that the soil tested be
placed in five (5)'equal layers with each layer compacted by
twenty-five (25) blows of a 10 pound hammer with an eighteen
(18) .inch drop. The results of these tests,.as presented on
P1ate.No. 9, were used in conjunction with the field density
tests.to determine the degree of relative compaction of the
compacted fill.
Several representative samples of the encountered soils were
tested to evaluate the soluble sulfate content. The results
of these tests indicated a maximum soluble sulfate content of
0.07%. Based on these results, it is our opinion that Type
5 cement will not be required at this site.
EXPANSIVE SOILS
Some highly expansive soil was encountered during the grading
of Lots 44-47 in Tract' 6.- These soils were subsequently
I
a
STE 8931087
May 21, 1990
Page 7
mixed and blended with the nonexpansive sandy materials.
Based.on our review of the finished soil conditions, it is
our opinion that these four lots .should be designed for a low
expansive condition. Final foundation recommendations for
these lots are provided below:
1) All footings should be founded at least 12 or 18
inches below lowest adjacent finished grade for one..
or two story construction, respectively.
2) All living area slabs should possess a minimum
thickness of four inches and be reinforced with
6X6-W1.4XW1.4 wire mesh. We further recommend that
a two inch clean sand blanket be provided beneath
these slabs.
3) We recommend that the subgrade soils beneath all
areas to support concrete slabs be presaturated to
at least 120% of optimum to a depth of 18 inches.
4.) All surface drainage should be directed away from
building foundations and exterior flatwork. Ponding
of water adjacent to these areas should not be
allowed.
CONCLUSIONS AND RECOMMENDATIONS
Based on field observations and the density test results, it
is the opinion of Soil'and Testing Engineers, Inc. that the
on-site.soils have been overexcavated, moisture conditioned
and densified basically in accordance with the Referenced
Reports of Geotechnical Investigation and local grading
ordinances. We further recommend that the following criteria
be complied with to assure, that all future work is
geotechnically_suitable.
STE 8931087 May 21, 1990
1) FOOTING EXCAVATION INSPECTION
Page 8
Prior to the placement of reinforcing steel, the
foundation excavations should be examined by a
representative of this firm. Any soils loosened or
disturbed during excavation should be removed to competent
material. Soils obtained from the footing excavations
should not be spread in the slab on -grade areas unless
they are compacted -and tested.
2) TRENCH BACKFILL
All utility trench backfills should be placed in lifts,
moisture treated to at least 2% above optimum and be
densified. In building areas and beneath pavements, a
relative compaction 'of 901% will be required. In
"nonstructural" areas, 85% relative compaction will be
suitable for the backfill materials. Sufficient
observation and testing will be required during the
backfilling to confirm that the required degree of
compaction has been achieved.
3) FUTURE GEOTECHNICAL OBSERVATION AND TESTING
Observation and testing should be performed by Soil'and
Testing Engineers during all future grading, backfilling
and pavement construction operations. The intent of these
services will be to document that suitable soils are
properly placed Iand compacted to the.recommended density
and moisture content and that structural elements are
founded on competent materials.
4) DRAINAGE AND EROSION
Positive drainage should be provided throughout the site
to minimize water infiltrating into the underlying soils.
STE 8931087 : May 21, 1990 Page.9
Finished subgrade adjacent to exterior footings should be
sloped down and away to facilitate surface drainage..
Ponding of water should not be allowed.
5) TIME LIMITS
The building site has been constructed in substantial
conformance with available plans, specifications and soil
and geologic recommendations during rough grading. Due to
Possible weathering of the surface soils, we .recommend
that no structures be constructed without first consulting
this firm if a significant time period elapses before
construction begins.
This report covers only the work performed between February
21 and April 10, 1990. The completed work has been reviewed
and in our opinion is geotechnically suitable for the
proposed construction.
Our o inions
P presented herein are based on our observations
and the relative compaction tests results. Due to possible
variations in the uniformity of'compacted fills, we only
warrant that our work was performed in accordance with the
currently accepted" standards of practice and in such a manner
as to have reasonable certainty that the rough grading
complies with 'the, job requirements. No other warranty,
express or implied is given or intended.
If you should have any questions after reviewing this report,
please do not hesitate to ,contact this office.
STE 8931087: May 21, 1990 Page 10
This opportunity to be of professional service is sincerely
appreciated.
Respectfully submitted,
SOIL AND TESTING ENGINEERS, INC.
Q�OfES10
R Nq�
Robert R. Russell, GE 2042 X00 Gf���c
l
RRR/MGB/af, N0. 2042
E7.? i-3 - z
cc: (3) Submitted
(1) STE-Placentia
TE424,2i-90
TESTING ENGINEERS,- INC.
RESULTS
OF FIELD DENSITY TESTS
N'OCATION'
Plate No. 8
1t
TEST MOIST.
DRY
32,
Tract
1
2
2-21-90
Lot
33,
Tract
1
3
2-21-90
Lot
31,.Tract
1
4
2-21-90
Lot
32,
Tract
1
5
2-22-90
Lot
36,
Tract
1
6
.2-22-90_
Lot
33,
Tract
1
7
2-22-90
Lot.34,
103.5
Tract
1
8
2-22-90
Lot
37,
Tract
1
9
2=23-90
Lot
27,.
Tract
1
10
2-23-90
Lot
29,
Tract
1
11
2-23-90
Lot
28,
Tract
1
12
2-23-90
?got
30, .
Tract
1 ,
13
2-23-90
Lot
36,
Tract
1
SOIL AND
TESTING ENGINEERS,- INC.
RESULTS
OF FIELD DENSITY TESTS
Plate No. 8
TEST MOIST.
DRY
REL.
ELEVATION CONT.
DENSITY
SOIL
"COMP.
FEET
PCF
TYPE
29.5
17.6
109.5
1
99..
30.5
966
100..6
1
91
28.4
10.5.
103.3
1
93
31.6
13.6
104.5
1.
94
28.9
17.0
103.5
1
93
31.9
13.6
102.2
1
92
29.4
18.7
103.1
1
93
30.9
10.5
103.6
1
93
28.6
10.1
109.1
1
98
12.5
111.7
2
93
29.4
31.3
11.1
112.5
2
93
31..6
13.8
111.8
2
93
32.9
11.0
102.9
1
93
STE 8931087
Page No. 1
MARKS
r
TEST
MOIST:
COLT.
%
DRY
DENSITY
PCF
SOIL
TYPE
.No
DATE
LOCATION
14
2-23-90
Lot 34,
Tract 1
15
2-23-90
Lot 25,
Tract 1
16
2-23-90
Lot 26,
Tract 1
17
2-23-90
Lot 24,
Tract 1
18
2-23-90
• Lot, 22,
Tract , l
192-23-90
94
Lot 23,
Tract 1
20
2-23-90
I,6t 21,
Tract 1
21
2-26-90
Lot 22,
Tract 1
22
2-26-90
Lot 23,
Tract 1
23
2-26-90
Lot 19,
Tract 1.
24
2-26-90
Lot 20,
Tract I
25
2-26-90
Lot 17,
Tract 1
26
2-26-90
Lot 18,
Tract 1
27
2-26-90
Lot 20,
Tract 1
SOIL AND TESTING ENGINEERS, INC.
RESULTS OF FIELD DENSITY TESTS
Plate No. 8
TEST
ELEVATION
FEET
MOIST:
COLT.
%
DRY
DENSITY
PCF
SOIL
TYPE
REL.
COMP.
<<
REMARKS
31.4
9.9
101.0
1
91
28.0
13.7
106.4
1
96
30.6
14.7
105.9
1
95,
28.1
-27.0 -
29.3
12.4
11.6---
15.5
104.8
--102.9
106.3
1
1
1
94
� 93- -
96
29.1
30.0
29.6
13.4
11.6
12.3
101.1
101.4
107.4
1
1
3
91
91
91
27.0 9.5
27.1 10.9
:27.7::: 12.0
29.9 14.0
28.9 12.9
106.8
104.9
107.9
112.7
107.4
3
1
3
3
3
91
94
92
96
91
STE 8931087
Page bb . 2
0
TEST
NO
DATE
-LOCATION
28
2-26-90
Lot
ll,
-Tract 1
29
2-26-90
Lot
8,
Tract
1
30
2-26-90
Int
4,
Tract
1
31
2-26-90
Lot
14,
Tract
1-
32
2-26=90
Lot
13,
Tract
1
33
2-26-90
Lot
9,
Tract
1
34
2-27-90
Int
28
Tract
1
35
2-27-90
Lot
30,
Tract
1
36
2-27-90
Lot
32,
Tract
1
37
2-27-90
Int
35,
'Tract
1
38
2-27-90
Lot
37,
Tract
1
39-#2-27-90
Lot
26,
Tract
1
40
Lot
26,
Tract
1
41
Lot
24,
Tract
1
r
SOIL AND TESTING ENGINEERS, INC.
RESULTS OF FIELD DENSITY TESTS
Plate No. 8
TEST MOIST. DRY
ELEVATION CONT. DENSITY SOIL
FEET PCF TYPE
29.7 14.7 101.6 1
.30.5 15.7 101.9 1
30.0 12.5 .105.5 1
29.0 12.0 102.6 1
30.7 14.3 104.6 1
STE 8931087
Page No. 3
REL.
COMP.
7 REMARKS
91
92
95
92
94
31.8
11.5
106.2
1
96
33.3
11.8
103.8
1
93
33.1
14.0
107.5
1
96
32.6
13.4
105.7
1
94
32.9-
8.9
101.4
1
90
33.4
8.3
104.2
1
93
30.0
15.7
100.4
1
90
31.5
15.2
103.5
1
.93
29.5
7.5
106.5
1
95
SOIL AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 4
.Plate No 8
TEST
NO
DATE
LOCATION
TEST
ELEVATION
FEET
MOIST.
CONT.
%
DRY
DENSITY
PCF
SOIL
TYPE
REL.
COMP.
%
92
REMARKS
42
2-27-90
-Lot 24; Tract 1
31.0
13.0
103.0
1
43 _
2-27-90
Lot 6, Tract 1
25.0
15.6
105.3
1
94
44
2-27-90
Lot 6, Tract 1
26.5
16.9
100.8
1
90-
45
2-27-90
LDt 4, Tract 1
25.5
15.6
101.6
1
91
46
2-27-90
lot 4, Tract 1
27.0
15.9
100.9
1
90
47
2-27-90
'Lot 2, Tract 1
25.0
15.1
101.5
1
91
48
2-27-90
Lot 2, Tract1
26.5
16.9
102.5
1
92
49
2-27-90
lot 6/7, Tract 1
25.0
16.1
103.9
1-
93
50 .,
2=27-90
Lot 6/7, Tract 1
26.5
23.3
100.5
1
90
51
2-27-90
Lot 5, Tract 1
26.0
19.0
107.9
1
96
52
2-27-90
Lot 5, Tract 1
27.5
22.5
94.5
1
84
53
2-27-90
Iot -2/3, Tract 1
26.0
-15.6
102..7
1
92
54
2-27-90
Lot 2/3, Tract 1
27..5
18.6
97.0
1
86
55
2-27-90
Lot 5, Tract 1 -
2.7.5
18.1
102.4
1
91
w
C-
TEST
NO DATE LOCATION
56 2-27-90 Lot 2/3, Tract 1
57
2-28-90
Lot
26, Tract 1
58
2-28-90
Lot
24, Tract 1
59
2-28-90
Iot
24,.Tract 1
60
2-28-90
Lot
3,
Tract 1
61
2-28-90
lot
5,
Tract 1
62
2-28-90
Lot
1,
Tract 1 -
63
2-28-90
Lot
1,
Tract 1
64
2-28-90
Lot
3,
Tract 1
65
2-28-901
Lot
3,
Tract 1
66
2-28-90
Lot
6,
Tract l
67
2-28-90
Lot
6,
Tract 1
68
2-28-90
Lot
22,
Tract 1
69
2-28-90
lot
21,
Tract 1
101.1
1
91
30.6
12.1
SOIL AND TESTING ENGINEERS,
INC.
STE 8931087
RESULTS OF FIELD DENSITY TESTS
Plate No. 8
Page No. 5
c
TEST
MOIST.
DRY
REL.
ELEVATION.
CONT.
DENSITY
SOIL
COMP.
FEET
%
PCF
TYPE
7 REMARKS
27.5
16.5
102.9
1
92
J
33.1
14.2
106.9
1
96
32.1
16.4
98:9
-1
89
32.1
13.2
102.5
1
92
29.0
17.9
.106.9
1
96
28.5
12.6
103.9
1
93
30.2
11.9
104.1
1
93
31.2
16.1
101.1
1
91
30.6
12.1
104.6
1
94
31.6
10.5
105.8
1
95
30.9
14.6
100.1
1
90
31.9
13.3
100.2
1
90
31.5
13.3
101.2
1
91
'31.1
13.8
105.0
1
94
SOIL AND TESTING ENGINEERS, INC.
-RESULTS OF FIELD DENSITY TESTS
SM 8931087
_
Page No. 6
Plate No. 8
ST
_
TEST
MOIST.
DRY
REL.
0
DATE
LOCATION
ELEVATION
CONT.
DENSITY
SOIL
COMP.
0
3"2-90
Lot 1, Tract 1
FEET
PCF
TYPE
%
REMARKS
32.2
18.5
100.1.
1
90
1
3-2-90
Lot 3, Tract 1
32.6
11.0
106,6
1
•
96
2
3-2-90
- Lot 5, Tract 1
33.1
16.7
104.8
1
94
3
3-2-90
Lot 7, Tract 1
33.7
17.1
97.3
1
87
3-2-90
Lot 7, Tract 1
89
33.7
15.0
99.4.
1
5
3--2-90
Lot 71 Tract 133:7
91
13.6
101.4
1
5
3-2-90
Lot 9, Tract 1
31.3
12.6
107.8
1
97
7
3-2-90
Lot 9, Tract 1
.32.3
15.5
.107.2
1.
96
3.
3-2-90
Lot 140, Tract 1
30.0
21.2
102.4
1
92
3
3-6-90
Clubhouse, North half,
East Section
-Aftk
8
13.6
108.2
1
97
3-6-90'
Clubhouse, North half
East Section
-7'
11.3'
107.5
1
96
L
3-6-90
Clubhouse, West Section
-7
11.4
108.9
1
98
3-6-90
Clubhouse, West Section
-6'
9.4
108.7
1'
98
SOIL AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 7
Plate No. 8
TEST
NO
DATE
LOCATION
TEST
ELEVATION
FEET
MOIST.
CONT.:
%
DRY
DENSITY
PCF
SOIL
TYPE
REL.
COMP.
%
REMARKS .
83
3-6-90
Clubhouse, East Sectio
-5'
10.1
107.0
1
96
84
3-6-90
Clubhouse, East Sectio
-4'
10.7
102.6
1
92
85
3-6-90
Clubhouse, East Section
-3'
13.8
.103.2
1
92
86
3-6-90
Clubhouse, West Section
-5
11.6
107.4
1
96
87
3-6-90
Clubhouse, West Section
-4
9.2
108.8
1
98
88
3-6-90
Clubhouse, West Section
-3
7.1
111.9
1
100
89
3-6-90
Lot 11, Tract 1
31.7
13.1
110.2
1
99
90
3-6-90
Lot 13, Tract 1
31.2
14.6
107.8
1
97
91..
3-6-90
Lot 16, Tract 1
29.3
17:7
106.3
1
95
92
3-6-90
Lot.19, Tract 1
28.3
11.5
106.3
1
95
93
3-6-90
Lot 19, Tract 1
29.3
12.4
106.5
1
95
94
3-6-90
Lot 1, Tract 1
33.2
11.8
106.6
1
96
95
3-6-90
Lot 3, Tract 1
33.6
12..3
110.3
1
99
"
96
3-6-90
Lot 5, Tract 1
" 34.1
7.7
109.7
1
98
' SOIL- AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 8
Dl =+-o U., Q
TEST
NO
DATE
LOCATION
TEST
•ELEVATION
FEET
MOIST.
CONT.
%
DRY:
DENSITY
PCF
SOIL
TYPE
1
REL.
COMP.
%
94
REMARKS
97
3-6-90:
Lot 7, Tract 1
_ 34.7
13.5
105.3
98_
3-6-90
Lot 16, Tract 1
30.3
10.5
102.7
1
92
99
3-6-90 _
Lot 16, Tract 1
31.3
20.8
100.5
1
90
100
3-6-90
Lot 8, Tract 1
33.5
10.6
103.1
1
92
101
3-6-90
Lot 81 Tract 1
34.5
12.6
106.2
1
95
102
3-6-90
Lot 10, Tract 1
33.0
11.9
102.9
1
92
103
3-6-90
lot 10, Tract 1
34.0
11.8
106.0
1
95
104.
3-6-90
Lot 12, Tract 1
32.5
13.1
103.8
1
93
105 ..
3-6-90.
Int 12, Tract 1
33.5
13.0
104.7
1
94
-
106
3-7-90
Int 19, Tract 1
30.3
14.1
108.7
1
97
107
3-8-90
Perimeter wall,
31.0
13.7
103.0
1
92
108
3-8-90
Perimeter wall, @ Lot 54
32.0
9.6
104.9
1
94
109
3-8-90
Perimeter wall, @ Ict 54
33.0
19.2
103.0
1
92
110
3-8-90
Perimeter wall, @ Lot 51
''32:0
8.2
106.3
1
95
i
11
0
TEST
NO DATE LOCATION
111 3-8-90 Perimeter wall, @ jot,5
112 3-8-90 Perimeter wall,@ Lot 51
113 3-9-90 Lot 14, Tract 1
114 3-9-90 Lot 16, Tract 1
115 3-9-90 Lot 18,.Tract 1
116 3-9-90 Lot 20, Tract 1
117 3-12-90 Loot 57, Tract 4
118 3-12-90 Lot 59, Tract 4
119 3-12-90 .Lot 59, Tract -4
120 3-12-90 lot 59, Tract.4
121 3-12-90 Lot 58, Tract 4
122F3-13-901
Lot 58, Tract 4
123 Lot 39, Tract 4
129Lot 57, Tract 4
SOIL AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 9
Plate No. 8
c -
TEST MOIST. DRY REL.
ELEVATION CONT. DENSITY SOIL COMP.
FEET % PCF TYPE % REMARKS
1 33.0
12.6
104.1
1
93
34.0
14.0.103.2
1
93
33.0
10.0
i1Q.0
1
99
32.3
10.5
105.7
1
95
31.4
11.5
105.2
1
94
30.9
12.5
108.2
1
97
24.3
11.0
-107.5
1.
96
26.0
12.0
103.2
1
93
27.0
10.6
104.0
1
93
28.0
15.0
98.5
1
88
26.0
8.0
110.5
1
99
27.0'
14.5
101.3
1
91
37.0
7.4
'106.7•
1
96
29.0
15.9
108..1
1
97
TEST
NO
DATE
LOCATION
125
3-13-90
lot
57,
Tract
4
126
3-13-90
Lot
59,
Retest of #120
127
3-13-90
Lot
59,
Tract
4
128
3-13-90
Lot
59,
Tract
4
129
3-13-90
Lot
13,
Tract
2
130
3-13-90
Lot
13,
Tract
2
131
3-13-90
Lot
13,
Tract
2
132
3-13-90T
lot
13,
Tract
2
133-
3-14-90
Lot
14,
Tract
2
134
3-14-90
lot
14,
Tract
2
135
3-14-90
Lot
14,
Tract
2
136
3-14-90
Iot:
17,
Tract
2
137
3-14-90
Lot
17,
Tract
2
138
3-14-90
Lot
17,
Tract
2-
SOIL AND TESTING ENGINEERS,
-INC.
STE 8931087
RESULTS OF FIELD DENSITY TESTS
Plate No. 8
Page No.. 10
TEST
ELEVATION
FEET
MOIST.
CONT.
%
-DRY
DENSITY
PCF
SOIL
TYPE
REL.
COMP.
X REMARKS
30.0
28.0
14.8
19.5
108.9
105:8
1
1
98
95
29.0
29.0
104.3
_1
94
30.0
15.8
106.2
1
95
31.4
18.8
100.0
4
90
32.4
17.6
100.0
4
90
33.4
14.9
97.2
4
88
34.4
14.9
97.4
4
88
-
30.8
23.0
99.0
.4
90
31.8
17.4
99.3
4
90
32.8
16.2
103.5
4
94
32.3
13.5
108.7
4
98
31.3
19.9
.103.1
4
93
433.3
8.7
104.0
4
94
TEST
NO DATE LOCATION
139 3-15-90 rot 13, Tract 2
'140 3-15-90 Iot 13, Tract 2
141 3-15-90 Lot 21, Tract 2
142 3-15-90 Lot 21, Tract 2
143 3-15-90 Lot 21, Tract 2
144 3-15-90 Lot 21, Tract 2
145 3-15-90 Lot 29, Tract 4
146 3-15-90 Lot 29,Tract 4
147.. 3-15-90 Lot 42, Tract 4
148 3-15-90 Lot 40, Tract 4
149 13-15-901 Lot 31, Tract 4
150 3-15-90 lot 32, Tract 4
151 3-16-90 Lot 24, Tract 2
152 3-16-90 Lot 24, Tract 2
SOIL AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 11
Plate No.. 8 -
•TEST
TES ' T
ELEVATION
(FEET)7
MOIST.
CONT.
DRY
DENSITY
PCF
SOIL
TYPE
REL:
COMP.
M
REMARKS
33.4
13.4
100.0
4
91
34.4
16.4
101.3
4
92
..I
32.2
13.0
99.5
4
90
33.2
13.3
101.0
4
91
34.2
14.8
98.6
4
90
35.2
33.0
34.0
8.2
100.3
4
91
19.2
103.0
4
93
17.7
108.2
4
98
37.0
10.6
100.7
4
91
36.6
13.1
.106.5
4
96
36.3
15.7
108.7
'4
98
36.1
9.9
108.6
4
98
33.0
15.2
103.3 1
4 1
94
34.0
15.1
104.3
4
94
iv
h
000000000000000000000000'000100000000000000004
N
TEST
NO DATE LOCATION
153 ` 3-16-90. L� 24, Tract 2
154. 3-16-90 Lot 24, Tract 2
155 3-16-90 Int 29, Tract 2
156 3-16-90' Lot 291.Tract 2
157 3-16-90 Lot 29, Tract 2-
158 3-16-90 Lot 29, Tract 2
159 3-16-90 Lot 21, Tract 4
160 3-16-90 Lot 21, Tract.4
161 3-16-90 Lot 28, Tract 4
162 3-16-90 Lot 30, Tract 4
163 3-16-90 -Lot 33, Tract 4
164 3-16-90 Lot'33 Tract'4'
165 3-19-90 Lot 2, Tract 8
166 3-19-90 Int 2, Tract 8
SOIL AND TESTING ENGINEERS, INC.
RESULTS OF FIELD DENSITY TESTS
STE 8931087
Page No. 12
TESTMOIST,
ELEVATION CONT
FEET 7
35.0 12.8
DRY
DENSITY
PCF
103.6
SOIL
TYPE
4
REL.
COPiP,
2
94
REMARKS
36.0 13.7
34.0 11.7
104.5•
101.3
4
4
94
92
35.0 12.8
36.0 16.8
-37.0 17.7
37.1 14.0
37.1 15.6
105.4
4
95
100.6
.4
91
101.4
4
92
101.6
4
92
.101.9
4
92
'37.0 11.4
102.4
4
93
36.6 15.7
108.4
4
98
33.5 20.2
105.1
4
95
34.5 12.7
99.64
90
35.6 14.1
97.1
5
95
36.6 6.4
101.4
4
92
SOIL AND TESTING ENGINEERS,
INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 13
Plate. No. 8
TEST
TEST
MOIST.
DRY
REL.
N0
DATE
LOCATION
ELEVATION
CONT..
DENSITY
SOIL COMP.
FEET
PCF
TYPE % REMARKS
167
3-19-90
Lot 2,
Tract,
8
37.6
15.7
94.7
4
168
3-19-90
Lot 34,
-Tract
2-34.
10.1
-95
97.2
,5
169
3-19-90
Lot 34,
Tract
2
35.6
9.7
100.5
4
170
3-19-90
Lot 34,
Tract
2.
36.6
11.8
100.0
171
3-19-90
lot 34,
Tract
4
36.8
12.8
10 0.5
172
3-19-90
Lot 22,
Tract
2
36.6
15.2
105.6
96
173
3-19-90
Lot 20,
Tract
2
36.2
12.3
105.0
4 95
174
3-19-90
Lot 58,
Tract
4
31.0
13.0
104.0
175.
3-19-90
Lot 58,
Tract
4
32.0
10.4
101.2
4
C0
176
3-19-90
Lot 24,
Tract
2
37.0
13.1
108.8'
4
gs
177
3-19-90
Lot 17,
Tract
2
35.3
11.5
108.2
4
178
3-19-90_
Lot 51,
Tract
4
37.2
15.7
107.5
4
179
3-20-90
Lot 45, Tract
4
35.5
14.2
103.5
4
180
3-20-90
Lot 45, Tract.4
38.5
14.3106.1
4
TEST
.NO,
181
DATE-
3-20-90
LOCATION
Lot 15, Tract
2
182
183
3-20-90
3-20-90
Lot
Lot
13
10,
Tract
Tract
2.
2
184
3-20-90
Wt
45,
Tract
4
185
3-20-90
Lot
57,
Tract
4
186
3-20790
Lot
57,
Tract
4
187
3-20-90
Lot
31,
Tract
2
188
3-20-90
Lot
28,
Tract
2
189...
3-21-90
Lot
53,
Tract
4
190
3-21-9
Lot
57,
Tract
4
..191
-3-21-9C
Lot
57,
Tract
4
192
3 -21 -9C
-Lot
65,
Tract
9
193
3-22-90
Lot
55,
Tract
4
194
3-22-9
Lot
56,
Tract
4
SOIL AND -TESTING ENGINEERS, INC.
RESULTS OF FIELD DENSITY TESTS
Plate. No. 8
STE 8931087
Page No.. 14
_
4
TEST
ELEVATION
(FEET)__PCF
MOIST.
CONT.
DRY
DENSITY
SOIL
TYPE
REL.
COMP.
__(%) REMARKS
34.8
13.5
106.6
4
97
34.4
13.7
108.5
4
98
34.1 -
11.0
105.9
4
96
37.5
11.2
108.8
4
99
32.0
15.7-
101.7
4
92
33.0
17.8
105.9
4:
96
38.7
15.2
103.9
4
94
37.9
7.8
103.0
4
93
36.7
15.8
104.3
4-
94
34.2
18.5
108.7
4
98
35.2
15.1
110.1
4
100
36.1
5.5
1014
4
92
37.5
14.3
108.9
3
92
X7.5
14.3
111.3
3
94
N
SOIL AND TESTING ENGINEERS.
INC.
S'I'E 8931087
RESULTS -OF
FIELD DENSITY TESTS
Page No. 15
Plate No. 8
TEST
TEST
MOIST.
DRY
REL.
NO
DATE
LOCATION
ELEVATION
CONT.
DENSITY
SOIL
COMP.
195
FEET
%
PCF
TYPE
z REMARKS
3-22-90
lot 57,
Tract
9
37.2
12.8
107.3
3
91
19.6
3-22-90
Lit
18,
Tract
9
36.5
11.5
104.8
4
95
197
.3-23-90
Lot
63,
Tract
4
37.0
10.2
106.4
4
96
198
3-23-90
lot
61,
Tract
4
37.4
9.1
109.5
4
99
199
3-23-90
lot
59,
Tract
4
36.9
9.9
102.7
4
93
200
3-23-90
Lot
18f
Tract
9
37.5
15.5
106.0
4
96
201
3-23-90
Lot
18,
Tract
9
38.5
12.8
106.7
4
97
202
3-23-90
Lot
65,
Tract
4
32.0
10.6
93.9
5
92
203h3-23-90
lot
65,
Tract
4
33.0
17.3
101.9
4
92
204
Lot
65,
Tract
4
34.0
18.6
101.5
4
92
205
Lot
65,
Tract
4
35.0
14.0
97.6
5
95
206
Lot
12,
Tract
9
36.0
7.1
94.7
5
92
207
-Lot
12,
Tract
9
37.0
6.8
94.9
5
92
208
Lot.12,
Tract
9
38.0
11.8
98.2
5
96
11-M
SOIL AND 'TESTING ENGINEERS,_
INC.
STE 8931087
RESULTS OF FIELD DENSITY TESTS
Page lb. 16
Plate No. 8
TEST
-.
TEST
MOIST.
DRY
REL.
NO
DATE
LOCATION
- ELEVATION
CONT.
DENSITY
SOIL
COMP.
FEET
%
PCF
TYPE
REMARKS
209
3-23-90
Lot
12, Tract 9
39.0
8.5
102.1
4
92
210
3-27-90
Lot
36, Tract 9
33.5
15.7
99.6
4
90
211
3-27-90
Lot
36, Tract 9
34.5
8.5
106.6
4
97
212
3-27-90
-Lot
2, Tract 8
37.6
14.5
103.7
4
94
213
3-27-90
.Lot
2, Tract 8
38.6
20.5
99.8
4
90
214
3-27-90
Lot
28, Tract 3
32.2
13.1
97.5
5
95
215
3-27-90
Lot
28, Tarct 3
33.2
12.7
95.0
5
93
216
3-27-90
Int
7, Tarct 8
36:.9
11.7
94.0
5
I
92
217.
3-27-90
Int
7, Tract 8
37.9
7.7
94.0
5
92
218
3-28-90
Lot.65,
Tract 4
36.1
14.3
97.7
5
95
219
3-28-90
Lot
36, Tract 9
35.5
15.9
97.9
5
95
220
3-28-90
Lot
21, Tract 9
36.5
6.1
106.3
4-
96
221
3-28-90
Int
18, Tract 9.
40.1
5.3
97.9
5
95
-T
222
3-28-90
Lot
14, Tract 9
39.8
10.1
104.0
4
94
11-M
X0000000.•••••0•••••••••••••• 000000•••••••••
TEST,
NO DATE LOCATION
223 3-28-90 Lot 14, Tract 8
224 3-28-90 Lot 69, Tract 4
225 3-28-90 Lot 28, Tract 3
226 3-28-90 Lot 29, Tract 3
227 3-28-90 ,Lot 25, Tract 3
228 3-28-90 Lot 26, Tract 3
229 3-28-90 Lot 45, Tract 3
230 3-28-90 lot 40, Tract 3
231 3-28-90 Lot 47, Tract 3
2323-29-90 Lot 12, Tract 8
233 3-29-90 Lot 12, Tract 8
234 3-29-90 lot 7, Tract 8
235 3-29-90 Lot 7, Tract 8
236 3-29-90 Iot 15, Tract 8
SOIL AND TESTING ENGINEERS, INC. SM 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 17
Plate No. 8
TEST
ELEVATION
FEET
MOIST.
CONT.
2
DRY
DENSITY
PCF.
SOIL
TYPE
REL.
COMP.
%
REMARKS
37.3
13.9
99.6
4
90
40.4
5.1
108:7
4
98'
'34.2
13.3
11049
4
100
34.9
8.7
100.0
4
91
34.5
9.6'
106.8
4
97
35.8-
9.9
88.8
4
80
33.0
3.1
120.0
2
99
29.3
7.5
101.7
4
92
34.2
8.7
102.6
4
93
36.9
10.2
100.8
4
91
37.9
7.7
105.5
4
96
37.8
8.8
104.0.
4
94
38.8
8.8
108.9
.4
99
37.2
13.2
108.0
4
98
SOIL AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 18
Dla+-c ATn- A
TEST
NO
DATE
.LOCATION
TEST
ELEVATION
FEET
MOIST.
CONT-.
Z
DRY-
DENSITY
PCF
SOIL
TYPE
REL.
COMP.
%
92
REMARKS
237
3-29-90
-Lot 15, Tract 8
38.2
13.7
101.2
4
238
3-29-90
Lot 26, -Tract 3.
35.8 _
10.2
98.2
6
92
_239
3-29-90
Lot 23, Tract 3
28.1
8.7
103.5
4
94
240
3-29-90
Lot 21, Tract 3
28.4
17.9
93.6
5
91
241
3-29-90
Lot 14, Tract 8
38.7
9,0
- 102.4 _
4'
93
242
3-29-90
Lot 14, Tract 8
39.7
13.5
101.8
4
92
243
3-29-90
Lot 18, Tract 8
37.0
9.7
114.8
3
97
244
3-30-90
-Lot 30, Tract -6
32.7
11.5
101.8
4
92
245-•
3-30-90
Lot 30, Tract 6
33.7
10.1
103.4
4
94
246
3-30-90
Lot 43, Tract 8
36.8
8.9
105.2
4
95
247
3-30-90
Lot 43, Tract 8
37.8
9.6
100.5
4
91
248
3-30-90
Lot -43, Tract 8
38.8
8.9
98.4
6
92
249
3-30-90
Lot 40, Tract 8
37.3
5.8
100.6
4
91
250
3-30-90
lot -33, Tract 6
30.8
10.0
110.4
4
100
Cil
try
SOIL AND TESTING ENGINEERS,
INC.
STE 8931087
RESULTS OF
FIELD DENSITY . TESTS
Page No. 19
Plate No. 8
TEST
TEST
MOIST.
DRY
REL.
NO
DATE
LOCATION
ELEVATION
CONT.
DENSITY
SOIL
COMP.
FEET
2
PCF
TYPE
REMARKS
251.
3-30-90
Lot 33,
Tract 6
32.3
7.5
103.2
4
93
252
3-30-90
Lot
33,
Tract
6
33.8
11.1
98.6
6
92
253
3-30-90
Lot
18,
Tract
3
29.0
6.3
104.9
4
95
254
3-30-90
Lot
16,
Tract
3
30.5
8.7
105.9
4
96.
255
3-30-90
Lot
46,
Tract
3
35.2
10.7
103.4
4
94
256
4-2-90
Lot
52,
Tract
8
36.5
9.5
97.8
6
91
257
4-2-90
Lot
52,
Tract
8
37_.5
5.9
100.2
6
93
258
4-2-90
Lot
52,
Tract
8
38.5
7.4
101.9
6
95
259
4-2-90
Irot
48,
Tract
8
37.0
6.0
102.3
6
95
260
4-2-90
Lot
48,
Tract
8
38.0
6.9
105.7
6
98
261
4-2-90
Lot
48,
Tract
8
39.0
8..6
104.4
6
.97
262
4-2-90
Lot
21,
Tract
3
29.0
9.7
104.1
6
97
263
4-2-90
Lot
21,
Tract
3
30.0
8.5
102.0
6
95
:26:4
4-2-90
Lot
21;
7Yact
21.
31.0
10.6
97.7
6
91
TEST
N.0
265
DATE
.4-2-90
_
LOCATION
Iot 39, Tract
6
266
267
268
269
4-2-90
4-2-90
4-2-90
4-2-90 ..Tot
lot.
Lot
Lot
39,
14;
14,
14,
Tract
. Tract
Tract
Tract
6
3
3
3
270 .
4-3-90
Iot.22,
15.0
Tract
8
271
4-3-90
Lot
22,
Tract
8
272
4-3-90
Lot
16,
Tract
8
273..
4-3-90
Lot
14,
Tract
8
274 4-3-90
Lot
121.Tract
35.9
8
275 4-3-90
Lot
8, Tract 8
90
276 4-3-90
Lot
5, -Tract 8
96.2
277 4-3-90
Lot
67,
Tract
4
278 1 4-3-90 r
Lot
2, Tract 8
93
SOIL AND TESTING ENGINEERS, -INC.
RESULTS OF.FIELD DENSITY TESTS
Plate No. 8;
TEST
ELEVATION
FEET
31.1
MOIST.
CONT.
%
DRY
DENSITY
PCF'
SOIL
TYPE
REL.
COMP.
%
14.8 .
97.8
6
91
32.1
30.0
31.0
32.0
15.0
97.4
6
.91
9.8
97.2
6
91
12.2
96.9
6
90
.9.8
92.6
6.
86
34.9
9.5
101.3
4
92
35.9
10.6
97.8
6
90
40.5
7.4
96.2
6
90
41.3
6.5
103.8
4
93
41.4
8.9
106.5
4
96
40.9
10.9
109.8
4.
99
40.5
6.8
103..5
4
93
39.7
8.6
103.7
4
93
39.6
16.9
108.0 1
4 1
98
STE 8931087
Page No. 20
REMARKS
TEST
RESULTS OF FIELD DENSITY TESTS Page No. 21
Plate No.. 8
NO
DATE
LOCATION
279
4-3-90
Lot
48,
Tract
6
'280
4-3-90
Lot
46,
Tract
6
281
4-3-90
Lot
38,
Tract
3
282
4-3-90
lot
38,
Tract
3
283
4-4-90
lot
37,
Tract
6
284
4-4-90
lot
37,
Tract
6
285
4-4-90
Lot
17,
Tract
3
286
4-4-90
Lot
17,
Tract
3
287
4-4-90
Lot
17,
Tract
3
6
91
Lot
42,
Tract
6
94.6
5
Lot
42,
Tract
6
100.0
A4-4-90
Lot
42,
Tract
6
100.6
6
Lot
43,
TraC-t
8
105.6
6
lot
47,
Tract
8
SOIL AND TESTING ENGINEERS, INC. STE 8931087
RESULTS OF FIELD DENSITY TESTS Page No. 21
Plate No.. 8
TEST
MOIST.
DRY
REL.
ELEVATION
CONT.
DENSLTY
SOIL
COMP.
FEET
%
PCF
TYPE
2
REMARKS
29.8
12.3
101.0
4
91
29.5
11.8
106.0
4
96
31.2
8.6
94.3
5
92
-32.2
5.8
97.4
5
95
33.0
12.8
97.2
6
91
34.0
7.9
94.6
5
92
300'2
11.2
100.0
6
93
31.2
12.2
100.6
6
94
32.2
12.5
105.6
6
98
30.6
11.4
100.0
6
93
.31.6
11.3
100.5
.6
94
32.6
8.3
101.4
6
94
40.8
9.9
103.2
4
93
+40.6
17.7
99.7
4
90-
n
W
0
SOIL AND TESTING ENGINEERS.
INC.
STE 8931087
RESULTS OF FIELD DENSITY TESTS
Page No. 22
Plate No. 8
TEST
TEST
MOIST.
DRY
REL. -
NO
DATE
LOCATION
ELEVATION
CONT.
DENSITY
SOIL
COMP.
FEET
z
PCF
TYPE
% REMARKS
293
4-4-90
Lot
51,
Tract
8
41.0
9.1
102:2
4
93
294
4-4-90
Lot
53,
Tract
8
40.5
8.6
103.7
4
94
295
4-4-90
lot
33,
Tract
8
36.0
12.8
-99.6
4-
90
296
4-4-90
Lot
46,
Tract
6
37.0
14.0
106.2
4
96
297
4-4-90
Lot
46,
Tract
6
38.0
9.8
105.1
4 ..
95
298
4-4-90
Lot
35,
Tract
3
28.8
14.7
100.7
4
91
299
4-4-90
Lot
35,
Tract
3
29.8
10.3
98.6
6
92
30.0
4-5-90
lot
42,
Tract'2
34.9
11.0
101.8
4
92
301 •.
4-5-90
Lot
42,
Tract
2
35.9
12.8
102.9
4
93
302
475-90
Lot
26,
Tract
8
38.1
3.4
105.1
4
95
Lot
23,
Tract
8
38.5
12.9
103.6
4
94
303
4-5-90
Lot
20,
Tract
8
39.5
4.6
101..7
4
92
304 4-5-90
305 4-5-90
Lot 36, Tract 8
38.0
11.4
102.4
4
93
306 4-5-90.
Lot 36, Tract 8
X9.0
7.4
102.9
4 1
93
W
0
TEST
INC.
STE 8931087
RESULTS OF
FIELD DENSITY
NO
DATE
LOCATION
Plate No. 8
307
4-6-90
Lot
2,
Tract
3
308
4-6=90
Lot
5,
Tract
3
309
4-6-90.
Lot
43,Tract
2.
310
4-6-90
Lot
24,
Tract
3
311
4-6-90
Lot
24,
Tract
3
312
4-6-90 _
Lot
37,
Tract
8
313
4-6-90
Lot
40,Tract
8
314
4-6-90
Lot
35,.Tract
80
6
315
4-9-90
Lot
47,
Tract
5
316
4-9-90
Lot
51,
Tract•5
317
4-9-90
Lot
57,
Tract
5
318
4-9-90
Lot
32,
Tract
6
319
4-9-90
Lot
30,
Tract
6
320
4-9-90
Lot 27,
Tract
6
J\j
SOIL AND TESTING ENGINEERS,
INC.
STE 8931087
RESULTS OF
FIELD DENSITY
TESTS
Page No. 23
Plate No. 8
TEST
MOIST.
DRY
REL.
ELEVATION
CONT.-
DENSITY
SOIL
COMP.
FEET
PCF
TYPE
% REMARKS
36.4
8.6
105.6
4
96 �.
36.7
5.6
103.5.
4
94
36.8
10.1
102.7
4
93
27.3
26.3
87.9
4
80
28.3
23.8
93.5
4
85 '
39.9
10.4
105.5
4
96-
40..8
7.5
105.9
4.
96
35.3
9.4
108.4
4
98
39.6
14.8
104.0
4
94 _
40.7
15.3
103.4
4
94
42.3
17.1
10703
4
97.
35.0
9.7
101.4
4
92
35.7
10.8
100.3
4
91
36.3
10.8
103.8
4
94
TEST
3-30-90
Tot
36,
Tract 1
F2
NO
DATE
LOCATION
Tract 1
321
4-9-90
Lot
7,
Tract
3-
322
4-9-90
Iot
35,
Tract
9
323
4-9-90
Tot
37,
Tract
9
324
4-10-90
Tot.16,
14.2
Tract
3
325
4-10-90
Lot.
23,
Tract
3
326
4-10-90
Lot
10,
Tract
3
F1
3-30-90
Tot
36,
Tract 1
F2
3-30-90
Lot
35,
Tract 1
SOIL AND TESTING ENGINEERS,
INC.
STE.8931087
RESULTS OF
FIELD DENSITY TESTS
Page Iib. 24
Plate No. 8•
MOIST.
DRY
REL.ELEVCOLT.
I:.TESTI
DENSITY
SOIL
COMP.FEPCF
TYPE
% REMARKS
36:1
16.1
99.5
4
90
37.1
14.2
114.6•
3
97
36•.1
8.8
107.1
4 -
97
33.5
16.1•
96.5
5
94
34.2
15.8
100.9
5
98
35.5
14.9
97.4
5
95
32.4
15.5
100.6
4
91
31.9
14.5
101.0
4
91
v