9704-139 (SFD)LICENSED CONTRACTOR DECLARATION,
I'hereby affirm under penalty of perjury that I arrificensed under provisions of
-Chapter 9 (commencing with Section 7000) of Division 3 of the Business'and
P(ofessionals Code, and my, License is in full force and effect:,
;License # LiE'Class Exp. ate
131
51/9
Date ��ig�nature of Contractor
.1 7
OWNER -BUILDER DECLARATION.
1 hereby affirm under penalty of,perjury that I aien.exempt from the Contractor's
License Law for the following reason:
.1, as. owner of the property, or my, employees With wages as their.SO16
compensation, will do the work, and the structure.is not intended -or offered for
sale (Sec. 7044, Business & Pribfessiooals C6de).
( , ) 1, as owner of th6 property, am exclusively contracting with. licensed
.contractors to constnict'the project.(Sec. .7044, Business, & Professionals
Code).
I am 42zempt.uncl6r Section B&P.C, for thisreason
Date Signatu.re;of, Owner
WORKER'S COMPENSATION DECLARATION
I hereby affirm under.�penalty'ofperjury one of the. following -.declarations-
•
.1 have and will maintain.a certificate of consent to self-insure.for:workers'
compensation, as provided for 'by. Section 3700 of the Labor Code, for the
performance of the Work for which thisp ermit is issued.
I have and.will maintain workers' compensation. insurance,.as required by
56ctioh.3700 of the -Labor Code, for.the-pprformance of the work for which'this
permit is issued. Lied. My workers' compensation insurance carrier*& policy no. are:
Career, -Policy No..
LwIcAlw, INS Co
(This section need not be completed if th6 permit valuation is for $100.6016r. less).
O. I certify that in -the performance of the work for which this permit t is issued,
I' shall not employ any person in any manner so as to become subject to `thb
workers', compensation laws of California, and agree that if I should become
16ject.to the workers' compensation 6 'of Se ion 3700 of the. Labor
6
Wit comply With ' i ion
Code all ��ZE�XV SO.
Xpplicait 2
Date:
Warning: Failure to secure Workers' Cdmpensati I on'coverage is- unlawful and
shall subject an employer to criminal penalties avid civi,l'f ines up to $10000, in
addition to the cost of compensation, damages as provided for in Section 3706
of the Labor Code, interest and attorney's f6es.',
IMPORTANT Application is hereby made to the Direbtor of -Building and Safety
for a permit' subject to the conditions* and "restrictions set : forth . on his
application.
1. Each person upon whose,behalf this application, is made &.each person Ia't
whose reqbest-and for whose benefit work is performed under or p6rsuant'to
any permit issued as a result o ' f. this app1jicaton agrees to, & shall, indemnify
,A hold harmless the City of La Quinta; its officers, -agents and employees.
.2. Any permit issued as a.resuit of this application becomes null and voidi.if
.work .is not commenced within , 180 - days .from date of- issuance -of -Such
.permit, or cessation of work for -180 days will subject permit to cancellation.
I certify that I have read this application and state that the above information is
correct. I agree to comply With all City, and State laws -relating to the building
construction, and hereby authorize re re5pntatiyeV?-,bf this City to enter upon
/the above-mentioned property f( 7!�1/1,6n urposescfiSignature (OwnerAgent) D
& A*
PERMIT # CONTROL"
BUILDING PERMIT
9744-139 5383
DATE VALUATIONTRACT-
LOT
M 84.:x:5'.>.
(vio/97SO
50B SITE
ADDRESS 47y9410 VIACORDOVA
APN
OWNER'
CONTRACTOR DESIGNER ENGINEER
.CARAOXY 4 COTOPAW.
CAPADAY & CONNIPANY
t 37ore-RooKj-iouo%1 ba. tog
t570 mool'-HOLLOW DIUVE, SUM28
SANTA.AKA CA- X2705
SW.(A. ANA, CA 92705
USE OF PERMIT
813 L
NOTTif OM WA S 0-t L. X .
10N '1;3 L'OVEALFL '0R 9rAWI ING W01M WtITIGUT PEW1717.
`MACJTGNSTRWUVION SF
f-1<).4CfVPAT10
EVIIN"TED ('1101SWOF colmsa ra)ma-14
CONS1:RUC-110N 1:.813 101-0004M-000 $937;00
PLAN C141-b"M F-01' $787.26
47MI.011)
AL VICE
101-000-4204M S193,45
M -11.11N Q� M 771 -?_11
=14GANIOTIOIN.MS RFS11) 101-000-241-000. $13.44
0V Al D4014.6 10J-000423-000
-.225-000-443-342 54,028.. 9
Ak"r IN PIMMUC FSACPS.- RESID 70 •-000.2;st-M-O
C. $937.150 Q-, 4 1A U CT 10 N F l'=
C0.,NS1'RU.C17.0N.AND PLAN CIfECK.
t
$7,408.79
E$S PRE-VAID�FEES
-$750.00
VE ` NOW
JUN 2'0 1997' (YrAl1,TERMW$. WS 00�,
$6,6M,.79 -
G, lY OF L A 0U INTA
)ff ECE(PT
DATE
By/i'.
FINALED
INSPECTOR
a
pm_z�
INSPECTION RECORD
OPERATION
DATE
INSPECTOR
OPERATION
DATE
INSPECTOR
DING APPROVALS
MECHANICAL APPROVALS
Set B
Underground Ducts
ootings
Ducts
lab Grade
Return Air
Steel
Combustion Air
0o Deck
Exhaust Fans
OX to Wrap
F.A.U.
Framing
Compressor
Insulation
Vents
Fireplace P.L.
Grills
Fireplace T.O.
Fans & Controls
Party Wall Insulation
Condensate Lines
Party Wall Firewall
Exterior Lath
Drywall - Int. Lath
Final -
Final
BLOCKWALL APPROVALS
POOLS - SPAS
Steel
Set Backs
Electric Bond
Footings
Main Drain
Bond Beam
Approval to Cover
Equipment Location
Underground Electric
Underground Plbg. Test
Final
Gas Piping
ING APPROVALS
Gas Test
Electric Final
Waste Lines
Heater Final
Water Piping-----
Plumbing Final
Equipment Enclosure
Pans
O.K. for Finish Plaster.
ewer Lateral
Pool Cover
Sewer Co
Encapsulation
Gas Piping
Gas Test
Appliances
Final -
Final
Utility Notice Gas
ELECTRICAL APPROVALS
Temp. Power Pole
Underground Conduit
Rough Wiring
Low Voltage Wiring
Fixtures
Main Service
Sub Panels
Exterior Receptacles
G.F.I.
Smoke Detectors
Temp. Use of Power
rnai
lily Notice (Perm
COMMENTS:
�jdfAv �Ae,A
�i�
1464- •
P.O. BOX 1504 APPLICATION ONLY
Building Y 7 Y10 j f r 41A
78 105 CALLS ORNIAESTADO9Address //// vv if/G L.O, LA QUINTA, CALIFORNIA 92253
Owner /
C4 041 �Mailing
Address/3 -70� raof�►6to OsJ
y^ Zi 1p`,,'70, Tel.
7�° ? 57 1
Contractor
Addressr� % r
w/ _ry1 C/
C'ty Zi$;7749> cy �I�1C ;774 `l
State Lic.
& Classif.
Arch., Engr.,
-s-/r -C2 00
BUILDING: TYPE CONST. OCC. GRP.
A.P. Number
Legal Description
Project Description
City
Lic. # Sq. Ft. No. No. Dw.
Size Stories Units
Designer G fsq �A <e, -. r '�/-.*T cy.-Vuf.J 1 e. G New ❑
Address_ n Tel. °
760 3.2042x/
City % Zap State
/J/h+/7r /ot $ �ra' Lic. #
fG �.2 c a7
LICENSED CONTRACTOR'S DECLARATION'
I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section
7000) of Division 3 of the Business and Professions Code, and my license is in full force and
effect.
SIGNATURE DATE
OWNER -BUILDER DECLARATION
1 hereby affirm that I am exempt from the Contractor's License Law for the following
reason: (Sec. 7031.5,Business and Professions Code: Any city or county which requires a
permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also
requires the applicant for such permit to file a signed statement that he is licensed pursuant to
the provisions of the Contractor's License Law, Chapter 9 (commencing with Section 7000) of
Division 3 of the Business and Professions Code, or that. he is exempt therefrom, and the basis
for the alleged exemption. Any violation of Section 7031.5 by 'any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars ($500).
l7 1, as owner of the property, or my employees with wages as their sole compensation, will
do the work, and the structure is not intended or offered for sale. (Sec. 7044, Buisness and
Professions Code: The Contractor's License Law does not apply to an owner of property who
builds or improves thereon and who does such work himself or through his own employees,
provided that such improvements are not intended or offered for sale. If, however, the building
or improvement is sold within one year of completion, the owner -builder will have the burden
of proving that he did not build or improve for the purpose of sale.)
I: 1 I, as owner of the property, am exclusively contracting with licensed contractors to con-
struct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law
does not apply to an owner of property who builds or improves thereon, and who contracts for
such projects with a contractor(s) licensed pursuant to the Contractor's License Law.)
i 7 I am exempt under Sec. B. & P.C. for this reason
Date Owner
WORKERS' COMPENSATION DECLARATION
I hereby affirm that I have a certificate of consent to self -insure, or a certificate of
Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800. Labor Code.)
Policy No. Company
0 Copy is filed with the city. ❑ Certified copy is hereby furnished.
CERTIFICATE OF EXEMPTION FROM
WORKERS' COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars ($100) valuation
or less.)
I certify that in the performance of thg work for which this permit is issued, I shall "not
employ any person in any manner so as to become subject to the Workers' Compensation
Laws of California.
Date Owner
NOTICE TO APPLICANT: If, after making this Certificate of Exemption youshould become
subject to the Workers' Compensation provisions of the Labor Code, you must forthwith
comply with such provisions or this permit shall be deemed revoked.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the
work for which this permit is issued. (Sec. 3097, Civil Code.)
Lender's Name
Lender's Address
This is a building permit when properly filled out, signed and validated, and is subject to
expiration it work thereunder is suspended for 180 days.
I certify that I have read this application and state that the above information is correct.
I agree to comply with all city and county ordinances and state laws relating to building
construction, and hereby authorize representatives sof this city to enter the above-
mentioned property for inspection purposes.
Signature of applicant Date
Mailing Address
City, State, Zip
BUILDING DIVISION
Add ❑ Alter ❑ r Repair ❑ Demolition ❑
1 Z old h2o6 _l //3
Ar_JUALWPO�I_r
+-150 -
Estimated Valuation
PERMIT AMOUN
Plan Chk. Dep.
Plan Chk. Bal.
Const.
Mech.
Electrical
Plumbing
S.M.I.
Grading
Driveway Enc.
Infrastructure
TOTAL
REMARKS
ZONE: BY:
Minimum Setback Distances:
Front Setback from Center Line
Rear Setback from'Rear Prop. Line
r Side Street Setback from Center Line
Side kCAtom Property Line
FINAL DATE I op NSPECTOR
Issued by: AND. DatetnfL7-_Permit
Validated by: -p�
Validation: CITY OF LA QUIRTA
I
CONSTRUCTION ESTIMATE
NO, ELECTRICAL FEES
NO. PLUMBIN
S
$
SLAB GRADE
ROUGH PLUMB.
BONDING
1ST FL. SO. FT.
UNITS
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING
DUCT WORK
ROCK STORAGE
FOUND. REINF.
2ND FL. SQ. Ff. titi
METER LOOP
YARD SPKLR SYSTEM
OTHER APPJEQUIP.
POR. SO. FT. @
MOBILEF-OME SVC.
BAR SINK
GAR. SO. FT.
POWER OUTLET
ROOF DRAINS
SERVICE
CAR P. SD. FT.
DRAINAGE PIPING
WATER SYSTEM
WALL SO. FT. r@
GRADING
cu. yd.
$ plus x$
DRINKING FOUNTAIN
LUMBER GR.
SO. FT. @
FINAL INSP.
URINAL
FINAL INSP.
ESTIMATED CONSTRUCTION VALUATION $
ROOFING
WATER PIPING
NOTE: Not to be used as property tax valuation
REMARKS:
FLOOR DRAIN
VENTILATION
MECHANICAL FEES
WATER SOFTENER
VENT SYSTEM FAN EVAP.000L HOOD
SIGN
WASH ER(AUTO)(DISH)
FIREPLACE
APPLIANCE DRYER
GARBAGE DISPOSAL
FURNACE UNIT WALL FLOOR SUSPENDED
LAUNDRY TRAY
GAR. FIREWALL
AIR HANDLING UNIT CFM
KITCHEN SINK
ABSORPTION SYSTEM. B.T.U.
TEMP USE PERMIT SVC
WATER CLOSET
COMPRESSOR HP
POLE, TEM/PERM
LAVATORY
HEATING SYSTEM FORCED GRAVITY
AMPERES SERV ENT
SHOWER
BOILER B.T.U.
SO FT. @ c
BATH TUB
SQ. FT, p c
WATER HEATER
MAX. HEATER OUTPUT, B.T.U.
SO. FT. RESID ® 1V. c
SEWAGE DISPOSAL
INSPECTOR'S SIGNATURESIINITIALS
SO. FT GAR f 3/ac
HOUSE SEWER
GARDEN WALL FINAL
GAS PIPING
PERMIT FEE
PERMIT FEE
PERMIT FEE
DBL
TOTAL FEES
MICRO FEE
MECH.FEE PL.CK.FEE
CONST. FEE ELECT. FEE
SMITE
PLUMB. FEE
STRUCTURE PLUMBING ELECTRICAL HEATING & AIR COND. SOLAR
SETBACK
GROUND PLUMBING
UNDERGROUND
A.C. UNIT
COLL. AREA
SLAB GRADE
ROUGH PLUMB.
BONDING
HEATING (ROUGH)
STORAGE TANK
FORMS
SEWER OR SEPTIC TANK
ROUGH WIRING
DUCT WORK
ROCK STORAGE
FOUND. REINF.
GAS (ROUGH)
METER LOOP
HEATING (FINAL)
OTHER APPJEQUIP.
REINF. STEEL
GAS (FINAL)
TEMP. POLE
GROUT
WATER HEATER
SERVICE
FINAL INSP.
BOND BEAM
WATER SYSTEM
GRADING
cu. yd.
$ plus x$
=$
LUMBER GR.
FINAL INSP.
FRAMING
FINAL INSP.
ROOFING
REMARKS:
VENTILATION
FIRE ZONE ROOFING
FIREPLACE
SPARK ARRESTOR
GAR. FIREWALL
LATHING
MESH
INSULATION/SOUND
FINISH GRADING
FINAL INSPECTION
CERT. OCC.
FENCE FINAL
INSPECTOR'S SIGNATURESIINITIALS
GARDEN WALL FINAL
NY -23-9 H 1 9:58 CONTINENTAL TITLE FAX N0. 6193414012
. RECof R=09Sf Eo By
'Vol, r j� �cont►n0�tdl tewyetc Ti(fr. con . -any
062521
NO CM MAD
AE"'YED FOR RECORD
Aft"""" aow�a AT 2'00GCLOCK
P. 02
w�
•
e.
. L
lug
,r tar
slur 0!7
r ' s; ��rrtn �•1 n Ta ,
FRANK K. JOHNSON N�:! Cbrtna, CA 91Tl0fiN. CO. "�"'�'a.e►.e.W,i
CPN lk GRANT DEED Aeove nes urs roa IQs
' UNDERSIGNED M0,
Q� Oft(t)
DECLARE(S) Isc:pw No. ?•J230s
.4 p ARY TpM�ER TAX is s 14t
mpNed Cin hd � S0 �
VF �A rake LosP(It Mug of Om v0M of . or CRY TAY 9
OM*ctod area: m C ons or emcurnbror"I 1-711
�'. p0A^YA KYoI LA QUINTA otthtg
T : IUABLE CONSrpERAit o1 s0�o, �e
ON,
{pt
Of wtlkh IS her and . •.
WILKA-Le. ftYac
�• : •.. QVIIITA A DELAWARE
�YGRAM(J)ty Jri. l.1s,� :LI!lITEO PARTt18RSH2P F
�'""...; • ramie .. .f }:�`• �
r ff10 falow(np destlR�od ,
a CofYOf 'RTVB$SIDa "w.w�..
Sf ote Of c0r
as >3xNIATTAc.Ntp
T 11 '
LMA -Lk lAQLI!ITER RUTINNBTJAlSHL i• tP'A DiL
AWAREaYt• "NTRDkPORT PAVILIOs7A OARB LTD.,CORPORATION,PARTNgR
`' `^•;;`:;• r:t~
'
GENERAL
e bY: WILMA SOUTt{ MANAGE •.,'A{�e1
ri.. ORP. yy
ITS ATTORNEY
of
rul
IL
aayopaeaod ran Gra am c
'f!y �►+� (apra�b
Few")nMby P*tWAhv*. �
Ifs) be r
"' IiMr,'s�. • ... �++r07
Oft
ft � 11 �0 Rroi� '�QuMlrl► .: � ;: • l!..,`%':;
'� • . �00�� X1!011
oe aw I '.o:.. ,� �. •. `�
COIJIRT. 911 t i� ` ,actin
,= S.
;.'.... 08
6q3 o.
•��•, -s,em,•$$`
x% 11,6
i 7
EXHIBIT "A"
q
..PARCEL I
LQfj 200 of jr-act No., 26152, in i C i t y -of La Quints, County of f
•as 10 Book 127.1
4
is per, mpp* recorded.
, - '0 f C a f r a
ide I.- state amain the Office -of the
85 inclusive of m8P 10 8
9 1
0
page's ttv ugh
and' by Resolution No'
of said.County an f official
a. t cordir
C ov re N 0 , 1051761
Tl Corded Mauch 26, 19 92 a a Instri3ment
cacbons substanccs
skeepting thevefTOM a g as and other hydrocarbons ro
Iand lying eo�
*
I Wjthin avd UrA that porti6n,.of said
surface of said land
tically.from-the
depth 0 1 500 feet, measured v d r of , lying belowa depth
the subsurface •there
that portion of
or into. t said surface, as reserved in
W., . red vatticAllY from
500 feet, measu Official Records
303830 0
of
recorded August 4, 1993 as Instrument No,
tiltCEL 2:
J
a.o8g1clusive easement for ingress. egress, use &nd eft joyment a[.
declaratin f Conditios, ovenant$
the CoMmOn area as defined In the tnNo.C
Novembr 27, 1991oasoInstfume"
Restrictions recorded
."$,ad
KIS :CONVEYANCE TS MADE AND ACCEPTED AND ShtD PROPERTY IS HEREBY
DECLARATION OF RESTRICTIONS
UPON AND SUBJECT To THOSE CERTAIN
... :GRANTED U 91 AS INSTRUMENT No. 415112 OF OFFICIAL
27. 19
111001M Oil WO.VEMBER
-COUNTY, CALIFORNIA, WHICH BY THIS REFERENCr
,TRE GRANT AS THOUGH
RECORDS. OF RIVERSIDEARE
INCORPORATED HEREIN AND MADE PART 0F
fULLY SET FORTH AT LENGTH HEREIN.
Date:
To:
Re: Lot No. 020
Address:
Your request for approval of ?e_A-Ay-,S
Has been:
Approved
Subject to: 0- A-Wkaj- 6
Denied
Reason for denial:
iai of Architectural Committee
2 l/
� f iV►
C10 OF A OUINTA
\INUILDI G 6�FETY DEPARTMENT
G 777-7012
ION REQUEST LINE
• O�p�k-777-7153
.
�AY & COMPANY
Owner—. i� -
Contractor CANADAY & COMPANY
Permit Number 9704-139
' POST ON JOB IN CONSPICUOUS PLACE
INSPECTOR MUST SIGN ALL APPLICABLE SPACES
JOBADORESS 47-410 VIA CORUC'VA
SFD - PERMIT DOES NOT INCLUDE BLOCK
WALLS OR POOL
';fit....._ ..,. .. -•
ABOYE APPROVALS 00 NOT INCLUDE RIGHT TO
TURN ON UTILITIES OR OCCUPY BUILDING
0
HOAK & SHAH ASSOCIATES, Inc.
CONSULTING ENGINEERS
3920 E. Coronado Street, Suite 203, Anaheim, CA. 92807
Phone: (714) 632-1865 Fax: (714) 632-1314
May 19, 1997
City of La Quinta
Department of Building & Safety
78495 Calle Tampico
La Quinta, Ca. 92253
RE: 47-410 Via Cordova (LOT 208)
La Quinta, Ca. 92253
To Whom It May Concern:
We have reviewed the truss drawings and calculations by Truss Works @
P.O. Box 626, Thousand Palms, Ca.,92276 for the above referenced
project and find them in substantial conformance with the structural
framing plan and design.
Respectfully
Hoak & Shah Associates, Inc
Lawrence W. Hoak, P.E.
President
o QROFESS/pN� �'
LU Q yo
No. 34803
ev- 0�59
C / V 1
F OF OAS\F�(�
REVISED
TITLE 24
Energy Conservation
Standards Compliance Report
f
CUSTOM RESIDENCE
LOT 208, LAKE LA QUINTA
47-410 VIA CORDOVA, LA QUINTA
February 1, 1998 • Job Number: 16945B
aF
b
Prepared For:
CANADAY & CO.
1570 BROOKHOLLOW DR. SUITE 208
SANTA ANA, CA 92705
Madlin's
enterprises
vvvvvvv
Catherine M. Madlin, Certified Enemy Analyst
Post Office Box 1443 v Palm Springs, CA 92263
760-322-5004 / 323-3644 (fa)e,
E-mail: CMadlin@aol.com
Madlin's
en terpfises
Catherine M. Madlin, Certified Energy Analyst . 760-322-5004 l 323-3644 (fax) . v .....
REVISED
Title 24 Energy Conservation Standards
Compliance Report
This proposed project has been reviewed for compliance with the 1995• State of California
Energy Conservation Standards, Title 24, by Madlin's Enterprises. The building design
described in this compliance portfolio is in conformance with the standards as outlined in
the attached compliance forms and documentation.
Date: February 11, 1998
Job Number: 16870B
Prepared For: . CANADAY & CO.
Project Name: CUSTOM RESIDENCE - LAKE LA QUINTA
Project Location: LOT 208, 47-410 VIA CORDOVA, LA QUINTA
Method of Compliance: MICROPAS V4.5 CERTIFIED COMPUTER PROGRAM
Orientation Of Entry: NORTH (342°)
Certified Eeergy Analyst
Catherine M. Madlin
NR 92-90.544
r r R 92.94144
rl'rr
CA0EC
CalfforMa Amck tion of Building Energy Combanrs
• Post Office Box 1443 • Palm Springs, Ca 92263 •
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 / 323-3644 (fax) . v .....
Note To Plan Checker
Date: February 11, 1998
Job Number: 16870B
Prepared For: VVH MA LA QUINTA
Project Name: 2591 SQUARE FOOT RESIDENCE
This compliance calculations reflects the change of wall insulation from R13 with powerwall
system to R19 batts in 2x6 wood framing and the elimination of light colored blinds on any
fenestration product.
Please call me if you have any questions.
Cathy Madhn
• Post Office Box 1443 • Palm Springs, Ca 92263 •
Madlin's
enterprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 / 323-3644 (fax) . V ... V .
Thermal Mass Schedule
Date: April 1, 1997
Job Number: 16870B
Prepared For: CANADAY & CO.
Project Name:_ LOT 208, LAKE LA QUINTA
The following mass data was included in the attached Title 24 calculations to assist this project in demonstrating
compliance with the standards.
TYP........
DESGRI IOM 4F MAS5
SQ FEET.-
> ,OC i I LV OF MASS
One
Exposed hard surface over
1077
Entry, hallway, powder room, laundry,
heavyweight concrete slab
kitchen, nook, family room perimeter,
fireplace hearth, master bath shower
Two
Covered hard surface over
1950
Remainder of house
heavyweight concrete slab
Three
Lightweight tile on counters
100
Kitchen or bathrooms
or walls or granite counter
tops
NOTES:
1. Pursuant to the standards, areas under cabinets and closets are not included in the square footage figure
listed above.
2. The hard surface listed in the description column above may be ceramic tile, -inyl tile, marble, or paint
directly applied to the heavyweight concrete slab.
3. All surfaces covered by carpet, cabinets, or walls are included in the attached calculations as covered
mass.
v Post Office Box 1443 • Palm Springs, Ca 92263 v
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) . V .....
xi�
BJLUiN :;;::::.;;;;;
: .:: WE! X..:;;;;:.;:.;>;>;;;:.: ::::.R
.......::::..:::.:.:.::::.:::.....................................................:::.:::::::::::::Q........................................................::..:..:.:::::::.::
................ .
MST CL?i�T�1E:;RE...:IlZEMET
VYS I!;: UiR) J iT rii Bt�Lri
Job Name
Lot 208, Custom Single Family Resicence
Job No. / File No.
16945B3
Method of Compliance
Micropas 4.5 Computer Simllation
Total Conditioned Square Footage
3027 Sq. Ft.
Total Glazing % (Floor/Glass Area Ratio)
15.6%
Insulation: Roof / Ceiling
R-38
Insulation: Walls
R-19 (Typical)
Insulation: Floor - Raised
n/a
Insulation: Floor - Slab on Grade
None Required
Insulation: H.V.A.C. Ducts/Location
R-4.2 / Attic
Glazing U Value / Type: Operable
0.87, Dual, Alum. Frame (CEC Default Value)
Glazing U -Value / Type: Fixed
0.72, Dual, Alum. Frame (CEC Default Value)
Glazing U -Value / Type: Patio
0.77, Dual, Alum. Frame (CEC Default Value)
Glazing U -Value / Type: Glass Block
0.57 (CEC Default Value)
Glazing: Shade Coefficient (TINT)
Clear
Glazing: Exterior Shading
Overhangs as Shown
Glazing Interior Shading
None Required
Thermal Mass Square Footage / Mass %
1077 Sq.Ft. / 36%
100 Sq.Ft. of lightweight mass (tile or granite
counter tops or shower!tub wall tile)
H.V.A.C. System Type
Gas Heating / Electric Coding
HVAC System Efficiencies (heating/cooling)
78% AFUE / 11.0 SEER
Domestic Hot Water Heater
(1) 50 Gal. Gas and (1) 40 mal. Gas
Energy Factor / Efi: / Standby Loss
.53 or better
R12 Blanket on Tank
Yes
Recirculating Pum for DHW
n/a
• Post Office Box 1443 v Palm Springs, Ca 92263 v
f
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 1323-3"4 (fax) . V .... S
Title 24 Compliance Forms
1;
i
CERTIFICATE OF COMPLIANCE: RESIDENTIAL
Page 1
CF -1R
Project'Title ........
CANADY.LOT208.LAKE L.Q.
Date ........
02/11/98
Project Address.......
47-410 VIA GORDOVA
*******----------_
Wall
LAKE LQ, LA QUINTA
*v4.50*
R-0
-----------,---
R-19
Documentation Author..:
CATHERINE M. MADLIN
buliding ermi
Madlin's Enterprises
R-0
R-n/a
R-0
P.O. Box 1443
Plan CnecK
/ Da
Palm Sprins, CA 92262
R-11
R-27
-e
Climate Zone. .....
619-324-173g1
15
EMU Meck/Date
_________________
----------------------
-_Compliance
ComplianceMethod......
-------------------------------------------------------------------------
MICROPAS4 v4.50 for 1995
Standards by Enercomp,
Inc.
I MICROPAS4 v4.50
File -16945B3 Wth-CTZ15S92
Program -FORM CF-1R
--------User#-MP0207
---------------------------------------------------------------------
User-Madlin's Enterprises
Run -REVISED CALC FINAL
R-0
GENERAL
Conditioned Floor Area.....
Building Type ..............
Construction Type ........
Building Front orientation.
Number of Dwelling Units...
Number of Stories.. .....
Floor Construction Type....
Glazing Percentage.........
Average Glazing U -value....
INFORMATION
3027 sf
Single Family
New
Front Facing
1
1
Detached
342 deg (N)
Slab On Grade
15.6 % of floor area
0.77 Btu/hr-sf-F
BUILDING SHELL INSULATION
Component
Frame
Cavity Sheathing Insul Assembly
--Type------
-------
Type
R -value R -value R -value U -value
Location/Comments
Wall
Wood
----------------
R-19
R-0
-----------,---
R-19
------------------------
0.063
Dilor
Wood
R-0
R-n/a
R-0
0.330
Roof
Wood
R-11
R-27
R-38
0.025
SlabEdge
n/a
R-0
R-n/a
R-0
0.900
SlabEdge
n/a
R-0
R-n'/a
R-0
0.720
SlabEdge
n/a
R-0
R-n/a
R-0
0.550
SlabEdge
n/a
R=0
R-n/a
R-0
0.500
FENESTRATION
------------
# of
Interior
Over -
Orientation
Area
(sf)
U-
Value
Pan-
es
Shading
Description
Exterior
hang/ Framing
---------------
-----
-----
----
---------------
Shading
Fins
Type
Window
Left
SS)E)
12.0
0.720
2
Default.dra
-----------
None
----
Yes
---------
Metal
Door
Back
64.0
0.770
2
Default.dra
50% bug scr
Yes
Metal
Window
BackSW)
12.0
0.720
2
Default.dra
None
Yes
Metal
Door
Back
S
64.0
0.770
2
Default.dra
50% bug scr
Yes
Metal
Door
Window
LeftE;
Left
SE)
64.0
12.0
0.770
0.720
2
2
Default.dra
Default.dra
50% bug scr
None
Yes
Yes
Metal
Metal
Window
Back
S)
18.0
0.870
2
Default.dra
50% bug scr
None
Metal
Window
Back
SW)
12.0
0.720
2
Default.dra
None
Yes
Metal
Window
Back
S)
12.0
0.720
2
Default.dra
None
Yes
Metal
Window
Left
SE)
12:0
0.720
2
Default.dra,
None
Yes
Metal
Door
BackS)
64.0
0.770
2
Default.dra
50% bug scr
None
Metal
Window
Back
SW)
12.0
0.720
2
Default.dra
None
Yes
Metal
Window
Right
W)
1.8
0.720
2 'Default.dra
None
None
Metal
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R
Project Title.......... CANADY.LOT208.LAKE L.Q. Date........ 02/11/98
_____________________________________________________
I MICROPAS4 v4.50 File -16945B3" Program -FORM CF-1R
--------User#_MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL
------- -----------------------------------
Type
S1abOnGrade
S1abOnGrade
InteriorVert
InteriorHorz
Exposed
Yes
No
Yes
Yes
FENESTRATION
# of
Interior
Duct
Area
U_
orientation
-------------------
Exterior
(sf)
Value
Window
Right
W
-----
1.8
-----
0.720
Window
Right
W
1.8
0.720
Window
Right
W
1.8
0.720
Window
Right
W
22.5
0.870
Window
Right
W
7.5
0.870.
Window,
Right
W
22.5
0.870
Window
Front
N
17.9
0.720
Window
Front
N
IN
17.9
0.720
Window
Left
E
15.0
0.720
Window
Front
Yes
1.0
0.570
Window
Front
N
1.0
0.570
Window
Front
N
1.0
0.570
Window
Front
N
1.0
0.570
Type
S1abOnGrade
S1abOnGrade
InteriorVert
InteriorHorz
Exposed
Yes
No
Yes
Yes
FENESTRATION
# of
Interior
Duct
Over-
Pan-
Shading/
Exterior
hang/ Framing
es
----
Description
---------------
Shading
-----------
Fins
Type
2
Default.dra
None
----
None
---------
Metal
2
Default.dra
None
None
Metal
2
Default.dra
None
None
Metal
2
Default.dra
50% bug scr
None
Metal
2
Default.dra
50% bug scr
None
Metal
2
Default.dra
50% bug scr
None
Metal
2
Default.dra
None
None
Metal
2
Default.dra
None
None
Metal
2
Default.dra
None'
Yes
Metal
2
Default.dra
None
None
None
2
Default.dra
None
None
None
2
Default.dra
None
None
None
2
Default.dra
None
None
None
THERMAL MASS
------------
Area Thickness
(sf ) (in) Location/Co..mnents
--------------- ------------------------
1077 3.5 SEE SCHEDULE
1950 3.5
50 1.0
50 1.0
HVAC SYSTEMS
Tank Type
DHW1
Storage
DHW2
Storage
WATER HEATING SYSTEMS
---------------------
Number
in
Heater Type Distribution Type System
----------- ------------------- ------
Gas Standard
Gas Standard
Tank
Energy Size
Factor (gal)
-------- ------
1 0.53 EF
1 0.53 EF
50
40
External
Insulation
R -value
R-12
R-12
Minimum
Duct
Duct
Thermostat
Equipment Type
---------------
Efficiency
------------
Location
-------------
R -value
Type
Furnace
0.780 AFUE
Attic
-------
R-4.2
------------
Setback
ACSplit
11.00''SEER
Attic
R-4.2
Setback
Tank Type
DHW1
Storage
DHW2
Storage
WATER HEATING SYSTEMS
---------------------
Number
in
Heater Type Distribution Type System
----------- ------------------- ------
Gas Standard
Gas Standard
Tank
Energy Size
Factor (gal)
-------- ------
1 0.53 EF
1 0.53 EF
50
40
External
Insulation
R -value
R-12
R-12
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF -1R
Project Title Title.......... CANADY.LOT208.LAKE L.Q. Date..... 02/11/98
-------- ___________________---------
____________-----------
I-----MICROPAS4
- Program -FORM CF -1
v450 File -16945B3 Wth-CTZ15S92 R I
User#-MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL
------------------------------------------------------------
SPECIAL FEATURES/REMARKS
THIS REVISED TITLE 24 COMPLIANCE REPORT IS ISSUED TO REFLECT
THE INSTALLATION OF R19 BATT INSULATION IN THE WALLS INSTEAD
OF R13+POWERWALL AND THE ELIMINATION OF LIGHT COLORED INTERIOR
BLINDS THAT WERE REQUIRED FOR COMPLIANCE IN PREVIOUS CALCULATIONS
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his option) install
better Materials without additional compliance calculations.
The installing hvac contractor shall provide the required CF -6R
with the installed hvac equipment model numbers. .
A Night setback thermostat is required to be installed with the
HVAC system.
For additional information on the proposed thermal mass locations
see the Mass Schedule and Notes in this compliance report.
The installed plumber shall provide the required CF -6R listing
the water heater model number(s) and the certified plumbing
fixtures.
-CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF -1R
Project Title.......... CANADY.LOT208.LAKE L.Q. Date........ 02/11/98
______________
MICROPAS4 v4.50 File -16945B3 Wth-CTZ15S92 Program -FORM CF -1R I
--------User#-MP0207 User-Madlin's Enterprises Run-REVISED;CALC FINAL
---------------------------------------------------------------------
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24t Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multip=e orientations,
any shading feature that is varied is indicated in the Special Features/
Remarks section.
DESIGNER or OWNER
Name....
Address. 1570 Brookhollow Dr #208
Santa Ana, CA 92705
Phone...
License.
Signed..
(date)
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(ciate)
DOCUMENTATION AUTHOR
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs; CA 92262
Phone... 6+.9-324-1731
760 .
Signed..
(clate-y-
17 //-fi
Certified Energy Analyst
Catherine M. M"in
NR 92-90-W
r r R 92-90-144
rr
CABEC
Cohfornio Association of Budding i£nergy Cons&*ants
P
le
a
�se0*0
9n Her
Initial Here
Notarize Here
Read This
M 992
Mandatory Features & Devices Checklist: Residential MF -1 R
DOCUMENTATION AUTHOR: MADLIN'S ENTERPRISES
CERTIFIED ENERGY ANALYST: CATHERINE M. MADLIN
TELEPHONE NUMBER: 760-322-5004 / 323-3644 FAX
For Enforcement Agency Use ;Only
Building Permit Number
NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach. items marked with
an asterisk (6) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated
Into the permit documents, the features noted shall be considered by all parties as binding minimum component performance specifications for the
mandatory measures whether they are shown elsewhere In the documents or on this checklist only.
BUILDING ENVELOPE MEASURES BLDG.DEPT.
• §150(a): Minimum R-19 ceiling insulation ...........................................
• §150(b): Loose fill insulation manufacturers labeled R -Value ............................
• §150(c): Minimum R-13 wall insulation in framed walls (does not apply to exterior mass) ........
• §150(d): Minimum raised floor insulation: R-13 framed floors;' R-8 concrete raised floors ........
• §150(1): Slab edge insulation - meets maximum water absorption rate & water vapor transmission rate
• §118: Insulation specified or installed meets C.E.C. quality standards. Indicate type and form. .. .
• §166-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls ............
a. Doors and windows between conditioned and unconditioned spaces designed to limit.air leakage
b. Manufactured fenestration products have label with certified U -value, and infiltration oertification
c. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed
• §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only ............... . ...... .
• §150(f): Special infiltration barrier installed to comply with §151 meets Commission quality standards
• §150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs ................
1. Masonry and factory -built fireplaces have:
a. Closeable meatal or glass door.
b. Outside air intake with damper and control.
c. Flue damper and control.
2. No continuous burning gas pilots allowed.
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
• §110-13: HVAC equipment, water heater, showerhead and faucets certified by the commission ...
• §150(i): Setback thermostat on all applicable heating systems ...........................
• §1500): Pipe and Tank Insulation ............................................... .
1. Indirect hot water tanks have insulation blanket R-12 or greater or combined intJezt. R-15 or greater.
2. First 5 feet of pipes closest to water heater tank, non recirculating systems, insulated (R-4 or greater).
3. All buried or exposed piping insulated in recirculating sections of hot water system.
4. Cooling system piping below 55° F insulated.
5. Piping insulated between heating source and indirect hot water tank.
•§150(m):Ducts and Fans ............................................. ........
1. Ducts constructed, installed and sealed to comply with UMC Sections 1002 and 1004; ducts insulated
to a minimum installed value of R-4.2 or ducts enclosed entirely with conditioned spaca.
2. Exhaust fan system have backdraft or automatic dampers
3. Gravity ventilating systems shall have automatic or readily accessible, manually operat.3d dampers.
• §114: Pool and Spa Heating Systems and Equipment .................................
1. System shall be 78% thermal efficiency, have an on-off switch, & weatherproof operatingi instructions.
No electric resistance heating and no pilot light.
2. System is installed with:
a. At least 36° pipe between filter and heater for future solar heating.
b. Cover for outdoor pools or outdoor spa.
3. Pool system has directional inlets and circulation pump time switch.
• §115: Gas-fired fau, pool heater, spa heater or household cooling appliance have no continuously
burning pilot light. (Exception: Non -electrical cooking appliance with pilot < 150 btu/hr.) ........
LIGHTING MEASURES
• §150(k): 40 lumens /watt or greater for general lighting in kitchens and rooms with water closets; and
recessed ceiling fixtures IC (insulation cover) approved ...............................
COMPUTER METHOD SUMMARY Pace 1 C -2R
------------------ -------------------------------------------------
-------------------------------------------------------------
Project Title.......... CANADY.LOT208.LAKE L.Q. Date......__02/11/98
Project Address........ 47-410 VIA GORDOVA *******----------
-
"LAKE LQ, LA QUINTA *v4.50*
Documentation Author... CATHERINE M. MADLIN EulIdIng Permit
Madlin's Enterprises
P.O. Box 1443 Fian Mieck / Da e
Palm Springs, CA 92262
619-324-1731 Fleid check7Date
Climate Zone. ..... 15 ---------------------
Compliance Method ... .._-MICROPAS4 v4.50 for 1995 Standards by Enercomp, Inc.
I
-----------------------------------=-------------------------------------------
----------------------------
MICROPAS4 v4.50 File -16945B3 Wth-CTZ15S92 Program-FO.RM C-2R
--------User#-MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL
------------ --------------- ------------ ------------- ----- --------------
----------------------------
MICROPAS4 ENERGY USE SUMMARY
= Energy Use
Standard
Proposed
Compliance =
_ (kBtu/sf-yr)
----------------------------------
Design
Design
Margin =
- Space Heating..........
2.99
----------
1.98
--=------- _
1.01 =
= Space Cooling..........
29.81
28.51
1.30 =
Water Heating..........
8.63
--------
10.89
-2.26 =
= Total
41.43.
----�---
41.38
-------- _
0.05 =
_ *** Building complies
---------------------------
with Computer
Performance
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 3027 sf
Building Type... Single Family Detached
Construction Type,......... New
Building Front Orientation. Front Facing 342 deg (N)
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type.......... FullYear
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Footprint Area.. ..........
Ground Floor Area..........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -value....
Average Ceiling Height.....
Slab On Grade
1
33297 cf
3027 sf
3027 sf
3027 sf
15.6.% of floor area
0.77 Btu/hr-sf-F
11 ft
COMPUTER METHOD SUMMARY Pace 2 C -2R
------------------ _________--- ___________________
Project Title.......... CANADY.LOT208.LAKE L.Q. Date ..._____-02/11/98
I
===____________________________________________________________________________ MICROPAS4 v4.50 File -16945B3 Wth-CTZ15S92 Program-FCRM C -2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL
------=- ----------------------------------------------------------=----------
BUILDING ZONE INFORMATION
-------------------------
Floor # of Vent Special
Area Volume Dwell Cond- Thermostat Heigght Vent Area
Zone Type --(sf) (cf)--- Units itioned Type (ft) (sf)
-------------- ----- ---------------=-------- ------ ---------
HOUSE
Residence 3027 33297 1.00 Yes Setback 2.0 n/a
OPAQUE'SURFACES
-----------
Area U- Insul Act Solar Form 3 Location/
Surface (sf) value R-val Azm Tilt Gains Reference Comments
-------------- ------ ----- ----- --- ---- ----------------- -----------
HOUSE
1
-
1 Wall 292 0.063 19 342 90 Yes W.19.2X6.16
2 Wall 388 0.063 19 72 90 Yes W.19.2X6.16
3 Wall 345 0.063 19 162 90 Yes W.19.2X6.16
4 Wall 462 0.063 19 252 90 Yes W.19.2X6.16
5 Wall 520 0.063 19 342 90 Yes W.19.2X6.16
6 Wall 457 0.063 19 117 90 Yes W.19.2X6.16
7 Wall 47 0.063 19 207 90 Yes W.19.2X6.16
8 Door 48 0.330 0 342 90 Yes None
9 Door 24 0.330 0 342 90 No None
10 Roof 3330 0.025 38 342 18 Yes R..38.2X4.24
PERIMETER LOSSES
----------------
Lenggth F2 Insul Solar
Surface (ft) Factor •R-val' Gains Location/Comments
------------ --------------------- ----- ----------------------
HOUSE
11 S1abEdge 53 0.900 R-0 No
12 S1abEdge 103 0.720 R-0 No
13 SlabEdge 35 0.550 R-0 No
14,SlabEdge 66 0.500 R-0 No
FENESTRATION SURFACES
---------------------
# of Vent SC SC Interior
Area Pan- Frame Open U- Act Glass Int Shading/.
Surface---- (sf) es Type Type value Azm Tlt Only Shade Description
------- ----- ------------- ------ ----- --- --- ---- ---- ---------------
HOUSE
1 Window 12.0 2 Metal Std 0.720 117 90 0.88 0.:8 Default.dra
2 Door 64.0 2 Metal Std 0.770 162 90 0.88 0.;8 Default.dra
3 Window 12.0 2 Metal Std 0.720 207 90 0.88 0.,8 Default.dra
4 Door 64.0 2 Metal Std 0.770 162 90 0.88 0.A8 Default.dra
5 Door 64.0' 2 Metal Std 0.770 72 90 0.88 0.58 Default.dra
6 Window 12.0 2 Metal Std 0.720 117 90 0.88 0.58 Default.dra
7 Window 18.0 2 Metal Std 0.870 162 90 0.88 0.78 Default.dra
8 Window 12.0 2 Metal Std 0.720 207 90 0.88 0.'8 Default.dra
9 Window 12.0 2 Metal Std 0.720 162 90 0.88 O.iB Default.dra
10 Window 12.0 2 Metal Std 0.720 117 90 0.88 0.78 Default.dra
COMPUTER METHOD SUMMARY Pace 3 C -2R
-------------------------------------------------------------------------------
. CANADY.LOT208.LAKE L�
Project Title......... ., Date........ 02/11/98
MICROPAS4 v4.50 File -1694583 Wth-CTZ15S92 Program-FCRM C -2R
I I
--------User#_MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL
----------------------------------------------------------------
FENESTRATION SURFACES
EXTERIOR SHADING
Area
# of
SC of
Vent
(sf)
------
Type
SC
SC
Interior
---------------
Area
Pan-
Frame
Door
Open
U- Act
Glass
Int
Shading
Surface----
------
64.0
(sf)
- ----
es
--
- -
Type-----
---
5
Type
---
value Azm
-----
Tlt
Only
Shade Description
11
12
Door
Window
64.0
2
Metal
0.84
Std
---
0.770 162
---
90
----
0.88
----
0.78
---------------
Default.dra
13
Window
12.0
1.8
2
2
Metal
Metal
0.84
Std
Std
0.720 207
0.720 252
90
90
0.88'0.78
0.88
0.78
Default.dra
Default.dra
14
15
Window
Window
1.8
1.8
2
2
Metal
Metal
Std
Std
0.720 252
0.720 252
90
.90
0.88
0.88
0.78
0.78
Default.dra
Default.dra
16
17
Window
Window
1.8
2
Metal
Std
0.720 252
90
0.88
0.78
Default.dra
18
Window
22.5
7.5
2
2
Metal
Metal
Std
Std
0.870 252
0.870 252
90
90
0.88
0.88
0.?8
0.'?8
Default.dra
Default.dra
19
20
Window
Window
22.5
2
Metal
Std
0.870 252
90
0.88
0.78
Default.dra
21
Window
17.9
17.9
2
2
Metal
Metal
Std
Std
0.720 342
0.720 342
90
90
0.88
0.88
0.78
0.18
Default.dra
Default.dra
22
Window
15.0
2
Metal
Std
0.720 72
90
0.88
0.78
Default.dra
23
24
Window
Window
1.0
2
None
Std
0.570 342
90
0.88
0.78
Default.dra
25
Window
1.0
2
None
Std
0.570 342
90
0.88
0.8
Default.dra
26
Window
1.0
2
None
Std
0.570 342
90
0.88
0.78
Default.dra
1.0
2
None
Std
0.570 342
90
0.88
0.78
Default.dra
OVERHANGS
AND SIDE FINS
-----------------------
---Window--
------Overhang---------Left
Fin---
---Right Fin--
.
Area
Left Rght
Surface
-----------
(sf)
-----
Hght
-----
Wdth
-----
Dpth
----
Hght
----
Ext Ext
----
Ext
Dpth
Hght
Ext Dpth Hght
HOUSE
----
----
----
----
---- ---- ----
• 1
Window
12.0
6
2
12
1.5
n/a n/a
n/a
n/a
n/a
n/a n/a n/a
2
3
Door
Window
64.0
12.0
8
6
8
2
10
1.5
n/a n/a
n/a
n/a
n/a
n/a n/a n/a
4
Door
64.0
8
8
12
12
1.5
1.5
n/a n/a
n/a n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a n/a n/a
n/a n/a n/a
5
6
Door,
Window
64.0
12.0
8
6
8
2
30
1.5
n/a n/a,
n/a
n/a
n/3
n/a n/a n/a
8
Window
12.0
6.67
2
1.5
1.5
1.5
1.5
n/a n/a
n/a n/a
n/a
n/a
n/a
n/a
n/a
n/3'
n/a n/a n/a
n/a n/a n/a
9
10
Window
Window
12.0
12.0
6
6
2
2
2
1'.5
n/a n/a
n/a
n/a
n/a
n/a n/a n/a
12
Window
12.0
6
2
1
1
1.5
1.5
n/a n/a
n/a n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a n/a n/a
n/a n/a n/a
22
Window
15.0
6
2.5
7.75 1.50
n/a n/a
n/a
n/a
n/a
n/a n/a n/a
EXTERIOR SHADING
Area
Shading
SC of
Surface
------------
(sf)
------
Type
Ext Shade
HOUSE
---------------
---------
2
Door
64.0
50% bug
scrn
0.84
4
Door
64.0
50% bug
scrn
0.84
5
Door
64.0
50% bug
scrn
0.84
7
Window
18.0
50% bug
scrn
0.84
11
Door
64.0
50% bug
scrn
0.84
17
Window
22.5
50% bug
scrn
0.84
COMPUTER METHOD SUMMARY Page 4 C -2R
______________________________________
Project Title.......... CANADY.LOT208.LAKE L.Q. Date
• _I Date........ 02/11/98
________________________
MICROPAS4
v4.50 File -16945B3 Wth-CTZ15S92 Program -FORM C -2R I
--------User#-MP0207 User-Madlin's Enterprises 'Run -REVISED CALC FINAL
--------------------------------------------------------------------
EXTERIOR SHADING
----------------
Area Shading SC of
Surface (sf) Type Ext Shade
------------ -----= --------------- ---------
18 Window 7.5 50% bug scrn 0.84
19 Window 22.5 50% bug scrn 0.84
THERMAL .MASS
WATER HEATING SYSTEMS
•
Area
Thick Heat Conduct- Surface
^ank
Mass Type
---------------
(sf)
------
(in) Cap ivity R -value
----- ---------------------
Location/Comments
HOUSE
Insulation
Tank Type
------------
--------------------------
1 S1abOnGrade
1077
3.5 28.0 0.98 R-0.0
SEE SCHEDULE
2 S1abOnGrade
1950
3.5 28.0 0.98 R-2.0
----------
3 InteriorVert
50
1.0 24.0 0.67 R-0.0
50.
4 Inter-iorHorz
50
1.0 24.0 0.67 R-0.0
HVAC SYSTEMS
Gas Standard 1
0.53
40
------------
Minimum Duct
Duct Duct
System
----------------
Type
Efficiency Location
-------------------------
R -value Efficiency
-------
HOUS E
----------
Furnace
0.780 AFUE Attic
R-4.2 0.830
ACSplit
11.00 SEER Attic
R-4.2 0.810
WATER HEATING SYSTEMS
•
Number
^ank
External
in
Energy
Size
Insulation
Tank Type
------------
Heater Type Distribution Type System
----------- -------------------
Factor
igal)
R -value
DHW1
------
--------
------
----------
1 Storage
Gas Standard 1
0.53
50.
R-12
DHW2
2 Storage
Gas Standard 1
0.53
40
R-12
SPECIAL FEATURES/REMARKS
------------------,------
THIS REVISED TITLE 24 COMPLIANCE REPORT IS ISSUED TO REFLECT
THE INSTALLATION OF R19 BATT INSULATION IN THE WALLS INSTEAD
OF R13+POWERWALL AND THE ELIMINATION OF LIGHT COLORED INTERIOR
BLINDS THAT WERE REQUIRED FOR COMPLIANCE IN PREVIOUS CALCULATIONS
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his option) install
better materials without additional compliance calculations.
The installing hvac contractor shall provide the required CF -6R
with the installed hvac equipment model -numbers.
COMPUTER METHOD SUMMARY Page 5 C -2R
-------------------------------------------------------------------------------
Project Title.......... CANADY.LOT208.LAKE L.Q. Da=e........ 02/11/98
---------------------------------------------------------- -----------------------------
MICROPAS4 v4.50 File -16945B3 Wth-CTZ15S92 Program -FORM C -2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL I'
--- -----------------------------------------------------------------
SPECIAL FEATURES/REMARKS
------------------------
A Night setback thermostat is required to be installed with the
HVAC system.
For additional information on the proposed thermal mass locations
see the Mass Schedule and Notes in this compliance report..
The installed plumber shall provide the required CF -6R listing
the water heater model number(s) and the certified plumbing
fixtures.
CONSTRUCTION ASSEMBLY Pace 1 3R
---------- -------------------------------- ---------------------------
Project Title.......... CANADY.LOT208.LAKE L.Q. Date ...
------_-02/11/98
I MICROPAS4 v4.50 File -16945B3 Wth-CTZ15S92 Program-FCRM 3R
User#-MP0207 User-Madlin's Enterprises Run -REVISED ;CALC FINAL
--------
------------------------------------------------------------------
Parallel Path Method
Reference Name .'W.19.2X6.16
Description .... Wall R-19 2x6 16oc
Type ........... Wall
R -Value ........ 19 Hr-sf-F/Btu
Framing
Material FIR.2X6
Type.. Wood
Description .. 2x6 fir
Spacing .... 16 inches on center
Framing Frac.. 0.15
I
---------------------------------
Sketch of Construction Assembly
LIST OF CONSTRUCTION COMPONENTS
Material
cavity
Frame
Name
-------- -----
Description
----------------------------------------
E -Value R
-Value
0.
FILM.EX
Exterior air film: winter value
------------------
0.17
0.17
1.
STUCCO.0.88
0.875 in stucco
0.17
0.17
2.
BLDG.PAPER
Building paper (felt)
0.06
0.06
3c.
BATT.RI9.0
R-19 batt insul (cavity > 5.5 in)
19.00
--
3f.
FIR.2X6
2x6 fir
--
5.45
4.
GYP.0.50
0.50 in gypsum or plaster board
0.45
0.45
I.
FILM.IN.WLL
Inside air -film: heat sideways
0.68
0.68
Total Unadjusted R -Values
--------- ---------
20.54
6.98
FRAMING
ADJUSTMENT
CALCULATION
Cavity Framing Total
------------------- ------------------- ----------------
U-Value.:
(1 / 20.54 x 0.85) + (1 / 6.98 x 0.15) 0.063
Btu/hr-sf-F
Total
R -Value:
1 / 0.063 = 15.90
br-sf-F/Btu
Madlin 's
enterprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 / 323-3644 (fax) v v v v v v v
H. V.A. C. Load Calculation
HVAC SIZING Page 1 HVAC
Project Title.......... CANADY.LOT208.LAKE L.Q. Da -e........ 02/11/98
Project Address........ 47-410 VIA GORDOVA ******* ---------------------
LAKE LQ, LA QUINTA *v4.50*
Documentation Author... CATHERINE M. MADLIN Buliding ermi
Madlin's Enterprises
P.O. Box 1443 Plan Check / Da e
Palm Springs, CA 92262
619-324-1731 le eck/ Da e
Climate Zone. ..... 15 ---------------------
Compliance Method...... MICROPAS4 v4.50 for 1995 Standards by Enercomp, Inc.
---------- __________________________________________________________________
-------------------------------
I MICROPAS4 v4.50 File -16945B3 Wth-CTZ15S92 Program -HVAC SIZING
User#k-MP0207 User-Madlin's Enterprises Run -REVISED CALC FINAL
-------------------------------------------------------------------------
GENERAL INFORMATION
INFORMATION
Floor Area...... .........
Volume.. ....... ....
3027 sf
33297 cf
Front Orientation......... .
Front Facing
342 deg (N)
Sizing Location............
PALM DESERT
Latitude. .
33.7 degrees
Winter outside Design
32 F
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range ....... ......
34 F
Interior Shading Used......
No
Exterior Shading Used......
No
Overhang Shading Used......
No
Latent Load Fraction.......
0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
------------------
(Btuh)
-----------
(Btuh)
Opaque Conduction and Solar......
-----
16643
----
10210
Glazing Conduction... ..........
13792
12340
Glazing Solar....................
n/a
1'7084
Infiltration .....................
Internal Gain
17582
11536
....................
n/a
3350
Ducts ............................
4802
5462
Sensible Load ....................
52819
60082
Latent Load......... ...........n/a
12016
Minimum Total Load
----------------------
52819
72099
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outdoor design temperatures, coil Sizing, availability of
equipment, oversizing safety margin etc., must also be considered. It is
the HVAC designer's responsibility �o consider all factors when selecting
-the HVAC equipment.