Loading...
11-1096 (SOL)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: 11-00001096 Property Address: 80108 VIA TESORO APN: 777 -310 -004 - Application description: SOLAR Property Zoning: LOW DENSITY RESIDENTIAL Application valuation: 46500 Applicant: T4ht 4 4 Q" BUILDING & SAFETY DEPARTMENT BUILDING PERMIT Owner: SHERMAN FARNHAM 80108 VIA TESORO LA QUINTA, CA 92253 VOICE (760) 777-7012 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 10/17/11 Contractor: Architect or Engineer: RENOVA ENERGY CORP 75181 MEDITERRANEAN AVENUE PALM DESERT, CA 92211 1 Gij 0� (760)568-3413 G I al/` Lic. No.. 910836 CITY 0s: LA QLiN'TA LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License Class: B C10 C46 License No.: 910836 ate !?7 / rr Con ctor, OWNER -BUILDER DECLAR TIO I hereby affirm under penalty of perjury hat I am exempt from the Contracto tate cense Law for the following reason (Sec. 7031... 5, Busine and Professions Code: Any city or county at requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). (_ 1 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractorls) licensed pursuant to the Contractors' State License Law.). I—) I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency.for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Address: LQPERMIT WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Y-1 have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier NORGUARD INS Policy Number REWC242277 _ I certify that, in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall f hwith comply with those provisions. Oate: /O / /(pplicant: WARNING: FAILURE TO SECURE WO KERS' COMPENSATIO AGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMIN PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building wid Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this ounty to enter upon the abo -mentioned property for i pectionpyrrp ses. / ! f Signature pplicant or Agent . l//L, Application Number . . . . . 11-00001096 Permit . . . ELEC-MISCELLANEOUS Additional desc . Permit Fee . . . . 22.50 Plan Check Fee 5.63 Issue Date . . . . Valuation . . . . 0 Expiration Date 4/14/12 Qty Unit Charge Per Extension BASE FEE 15.00 1.00 7.5000 EA ELEC PWR APP >1 TO <=10 ----------------------------------------------------------------------------- 7.50 Permit . . . SOLAR PERMIT Additional desc . Permit Fee . . . . 22.50 Plan Check Fee 5.63 Issue Date . . . . Valuation . . . . 46500 Expiration Date . . 4/14/12 Qty Unit Charge Per . Extension BASE FEE 15.00 1.00 4.5000 EA SOLAR COLLECTOR < 1000 4.50 1.00 3.0000 EA SOLAR EQUIP MISCELLANEOUS 3.00 ------------------------------------------------- -------------------------- Special Notes and Comments 9.2kW SOLAR ARRAY - (38) 240W SHARP PANELS W/ (38) M215 MICRO -INVERTERS [646SF) 2010 CALIFORNIA ELECTRICAL CODE. October 14, 2011 2:58:26 PM AORTEGA ---------------------------------------------------------------------------- Other Fees . . . . . . BLDG STDS ADMIN (SB1473) 2.00 Fee summary Charged Paid Credited ----------------- Due ---------------------------------------- Permit Fee Total 45.00 .00 .00 45.00 Plan Check Total 11.26 .00 .00 11.26 Other Fee Total 2.00 .00 .00 2.00 Grand Total 58.26 .00 .00 58.26 LQPERMIT OPTIONAL CALCULATION SINGLE-FAMILY DWELLING (NEW OR EXISTING) OTHER LOADS -220-30(b) General 1i Ming loads --220-30(b)(2) l sq. ft. x3 VA= Small appliance and laundry loads --220-30(6)(1) 1500 VA x b. circuits = Special loads --220-30(b)(3)(4) Dishwasher = Disposal = Compactor = Water heater = Q1/CAI = 1�c101,. Ey /"&'-T- C Q 0 = FRS t3 G -C = Applying demand factors --Table 2.20-30(4) First 10,000 VA x 100% = Remaining2D Z qS VA x 40%= 2. HEATING OR A/C LOAD—Table 220-30(1)(2)(3) Heating units (3 or less) = Zx /$b0_VA x 65%= Heating units (4 or more)=� VA x 40% = A/C unit 2X'7z00 VA x 100%= Heat piunp = ✓SIA VA x 100°/o 3. 8,000 VA NON DERATED FUTURE SERVICE: 1= VA V SERVICE: I = 053$VA = ! A 240 Service amperes required /7S A Service amperes provided 2-00 A AAix n1 515R J.`C.11 8QEAKetz j /S At Zyg5 VA 30OD VA 9UD VA L100 VA VA W:—: --VA 2 2 -OO VA 7206 VA 1500 VA 400 VA (Total) z`/S VA 10,000 VA FO n VA (Total) _.LVA Z'119 VA Nd VA / J/ yYo VA d_V A (Largest Load) / "-/ D VA 3,000 VA TOTAL = Y — CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATEj4-11 BY 0. _.. I 0102 \JTR Te5o20 LA au-rW7`A rA , 722 53 Bin. # . 0ty Of is QUIf1 7 Bullding a Safety Dit+fm P.O. Box 1504,78-495 Calle Tamplco Permit # /�, b .10 La.Qulnta, CA 92253 - (760) 777-7012 Building Permit Application and Tracking Sheet Project Address: � o l 0 g V ( Gk %f 5P FO 'owner's Name: A P. Number. Address: -e S0 09 Legal Description: City, ST, Zip: Q vJ,^ Cq q �S -3 ' Contactor. !Z A-0 V., /=N er CO f Telephone: % Address: % ee� 4 c f Project Description: `�� 5 l I 0/ lar City, ST, Zip: 'i oL f el- C Q t . kO -�o CL O e I5 00,1 Telephone: -7 6 0 - S6 g A117 State Lie. #: City Lic. #; 1'ri01.1 S {D Arch., Engr., Designer Address: Lie City, ST, Zip: Telephone: Construction Type:. Occupancy: State Lic. #: r Project type (circle one): New Add'n Alta Repair Demo Name of Contact Person: q t4 o m.4 44 t t` #Stories: #Unit$ Telephone # of Contact Person: 6 -'z`� S—Z D Z S Estimated Value of Project ti S O• APPLICANT: DO NOT WRITE BELOW THIS LINE N Submittal Req'd Recd TRACMG PERbffrFEES Plan Sets Plan Check submitted lo� I Item Amonat S"ctural Calci. Reviewed, ready for corrections Plan Check Deposit. —� Truss Cslu. Called Contact Person Ptaa Check Balance �+ Title 24 Calci. Plana picked up Construction Flood plain plan Plans resubmitted Mecharikil Grading plan 2'' Review, ready for correctionstissue Electrical r7. u` . Subcontactor Idst Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- ''' Review; ready for correctionvlssuc Developer Impact Fee Planning Approval. Called Contact Person AXP,P, Pub. Wks. Appr Date of permit Issue School Feu Total Permit Fees ISM 101,141"t1 — ft^ls A*-" (tkz WK+ L.Q. Cft,0-wh'k WAR+NINE ELECT= SHOCK HAZAR+D IF A GRW©UND FAULT IS INDICATED, NOR+MALLY GROUNDED CONDUCTOR*S MAY BE UNGROUNDED AND ENERGIZED 690.5(C) - INVERTER WATR+NIIIN1G] Ell OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURR+ENT DEVICE 690.64(B)(7) - PANELBOARD WARNING ELECTRIC SHOCK HAZA=+D DO NOT TOUCH TER+MI. TER+MINALS ®N IM011W T1HE LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN PO�S�I1T1110IN� EC��yU1T1Pjuff- (U RR E NiTj [O PER'ATI N GSC-�QLTAG E1 690.17/690.54 - AC DISCONNECT WAR+NING ELECTRIC SHOCK HAZARD DO NOT TOUCH TER+MINALS, TER+MINALS ON BOTH THE LINE AND LOAD S�IDTE�S IVI�AY BE ENERGIZED IN THE OPEN 'MS-111MAIN� Mpp C-TR'R'ENT Mpp VOLTAGE SYSTEM VOLTAGE 690.17/690.53 - DC DISCONNECT WG°aRMON(o THI►S SERVICEI�S $UPPLIED FROM MULITPLE SOURCES: MA11IL 11TMATNIDIP H;OITAMAT0A11MR 690.56(B)/705.10 - SERVICE CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVE® FOR CONSTRUCTION DATE BY. SHARP solar electricity 240 WATT MULTI-PURPOSE MODULE NEC 2005 Compliant NU-U24OF1 MULTI-PURPOSE 240 WATT MODULE FROM THE WORLD'S TRUSTED SOURCE FOR SOLAR. Using breakthrough technology, made possible by nearly SO years of proprietary research and development, Sharp's NU-U240F1 solar module incorporates an advanced cell surface texturing process to increase light absorption and improve efficiency. Common applications include commercial and residential grid -tied roof systems as well as ground mounted arrays. Designed to withstand rigorous operating conditions, this module offers high power output per square foot of solar array. Sharp's most powerful commercial module manufactured today. ENGINEERING EXCELLENCE High module efficiency for an outstanding b.Aance of size and weight to power and performance. DURABLE Tempered glass, EVA lamination and weatherproof backskin provide long -life and enhanced cell performance. RELIABLE 25 -year limited warranty on power output. HIGH PERFORMANCE This module uses an advanced solar cell surface texturing process to increase light absorption and improve efficiency. INNOVATIVE 156 mm pseudo -square monocrystalline sclar cells provide high power output. Ideal for 13rge commercial rooftops where space is a premium. The Nu-U240F1 offers Improved Frame rechnology industry-leading performance for a variety of applications. SHARP: THE NAME TO TRUST When you choose Sharp, you get more than well -engineered products. You also get Sharp's proven reliability, outstanding customer service limited I j the assurance of our 25 -year waanty o rr power output. A global leader in solar eFrctricit 40, Sharp powers more homes and businesses tharl;_ any other solar manufacturer worldwide. D amp i BECOME POWERFUL i i 240 WATT NU-U240F1 NEC 2008 Compliant Module output cables: 12 AWG With locking connectors ELECTRICAL CHARACTERISTICS Maximum Power (Pmax)' 240 W Tolerance of Pmax +10%/-5% Type of Cell Monocrystalline silicon Cell Configuration 60 in series Open Circuit Voltage (Voc) 37.4 V Maximum Power Voltage (Vpm) 30.1 V Short Circuit Current (Isc) 8.65 A Maximum Power Current (Ipm) 7.98 A Module Efficiency (%) 14.7% Maximum System (DC) Voltage 600 V Series Fuse Rating ISA NOCT 47.5"C Temperature Coefficient (Pmax) -0.485%/°C Temperature Coefficient (Voc) -0.351%/°C Temperature Coefficient (Isc) 0.053%/°C 'Measured at (STC) Standard Test Conditions: 251C.1 kW/m'irtsolation, AM 1.5 L MECHANICAL CHARACTERISTICS Dimensions (A x B x C below) 39.1" x 64.6"x 1.8"/994 x 1640 x 46 mm Cable Length (1) 43.371100 mm Output Interconnect Cable" 12 AWG with MC4 Locking Connector Weight 44.1 lbs / 20.0 kg Max Load 50 psf (2400 Pascals) Operating Temperature (cell) -40 to 194°F / -40 to 90°C "A safety lock clip (Multi Contact part number PV-SSH4) may be required in readily accessible locations per NEC 2008 690.33 (C) QUALIFICATIONS UL Listed UL 1703 Fire Rating Class C c �L us I WARRANTY 25 -year limited warranty on power output Contact Sharp for complete warranty information Design and specifications are subject to change vriihout notice. Sharp is a registered trademark of Shap Corporation. All other trademarks are property of their respective owners. Contact Sharp to obtain. the latest product manuals before using any Sharp device. Cover photo: Solar Installation by SPG Solar. I 4 l DIMENSIONS BACK VIEW SIDF VIEW B I i H i -- I F— C A B C D E 39.1"/994 mm 64.6"/1640 mm 1.9"/46 mm 79"/200 mm 14.4"/365 n -m F G H 1 32.3"/820 mm 3.97100 mm 37.7"/958 mm 43.3'/1100 mm Contact Sham for tolerance specifications Sharp solar modules are manufactured in the Unite) States and Japan, and qualify as "American" goods under the "Buy American" clause of the American Recovery and Reinvestment Act (ARRA). SHARP r SHARP1Bolsa venue, CS CORPORATION Beach, C 5901 Bolsa Avenue, Huntington Beach, CA 92647 1 -800 -SOLAR -06 • Email: sharpsolar@sharpusa.com www.sharpusa.com/solar O 2010 Sharp Electronics corporation. All rights reserved. 09L-058. PC -03-10 [ -dwwr Mmmmm ENPHASE MICROINVERTER [()] enphase L E N E R G Y M 21 %5 The Enphase Energy Microinverter System improves energy harvest, increases reliability, and dramatically simplifies design, installation and management of solar power systems. The Enphase System includes the microinverter, the Envoy Communications Gateway, and Enlighten, Enphase's monitoring and analysis software. - Maximum energy production PRODUCTIVE - Resilient to dust, debris and shading - Performance monitoring per module - System availability greater than 99.8% R E T A B L E - No single point of system failure SMART - Quick & simple design, installation and management - 24/7 monitoring and analysis S A F E - Low voltage DC - Reduced fire risk C16c us MICROINVERTER TECHNICAL DATA klAput` Data �(DC}' c �s� Y C?sM215 60 2LL522/$23 r r t ��t t' r2ctr 3b y i r� r:r71. ti M215 60-2LL S22 NA/S23-NA (Ontario) Recommended maximum input power (STC) 26OW Maximum input DC voltage 45V Peak power tracking range 22V -36V Operating range i6V— 36V Min./Max. start voltage 26.4V/45V Max DC short circuit current 15A Max. input current 10.5A 0.:.4uwrt«p. ,wt� Dcyc>a,^..t.ea.•sroGr.(.A.C.� _... . s.�iC.v..•Y3f.L1•t�'•1.yZ�'Yv.;-:2+r0.:8,kV�ia.cS,�.`rrO`,.`,J. "Ma 240 Vac' :f K ..,+•.�i....:..�:�u� .z.' .r.>.C:. .. .,i,)tht..�l_� vxii�+ Maximum output power 215W 215W Nominal output current 1.0 A* 0.9 A* Nominal voltage/range 208V/183V-229V 240V/211V-254V Extended voltage/range 208V/179V-232V 240V/206V-269V Nominal frequency/range 60.0/593-605 60.0/593-605 Extended frequency/range 60.0/59.2-60.6 60.0/59.2{60.6 Power factor >0.95 >0.95 Maximum units per 20A branch circuit 25 (three phase) 17 (single phase) Maximum output fault current 195 Arms, over 3 cycles 252 Apeak,1.74ms duration "Amu at nominal voltage �'a:�,r.7iss��c ^�� �� �'"q .a : � 'ta'• ♦# t S ` � 4�"'hy 1 'ayA tia•a *r. �''}fr r� e,'���� Efficiency77, CEC weighted efficiency 96.0% Peak inverter efficiency 96.3% Static MPPT efficiency (weighted, reference EN 50530) 99.8% Dynamic MPPT efficiency (fast irradiation changes, reference EN 50530) 99.9% Nighttime power consumption 46mW crr az, �: , .. � -� a �.. .. Mechanrcal Data k} trr . "" j r' ,�� � w.. -" ,� li111� SIU. ,,. _Y, .�.r� k3..i�,...»'.�C... ..+ti..w - r1,Arwi ..3+rw..eiG—Ik.�irc. Ambient temperature range -40°C to +65°C Operating temperature range (internal) -400C to +85°C Dimensions (WxHxD) 17.3 cm x 16.4 cm x 2.5 cm (6.8" x 6.45" x 1.0")* Weight 1.6 kg (3.5 lbs) Cooling Natural convection — no fans Enclosure environmental rating Outdoor — NEMA 6 *without mounting bracket Featu'res`.q �x4� +6 ' °Sc+ea s �y:iC+t� er'"°� ..:',.Xr,. i t. � .a7 Compatibility Pairs with most 60 -cell PV modules Communication Power line Warranty 25 -year limited warranty Compliance UL1741/IEEE1547, FCC Part 15 Class B CAN/CSA-022.2 NO. 0-M91,0.4-04, and 107.1-01 Enphase Energy, Inc. 05117/2011 201 1st Street, Petaluma, CA 94952 877 797 4743 www.enphase.com ® Printed on 100 percent recycled paper. [e] enphase ENERGY Application Note Grounding Washer Installation Procedure for Enphase Microinverters Purpose As an alternative to installing a continuous grounding electrode conductor connected to each microinverter chassis, a grounding washer may be used to ground the microinverter to grounded racking. CSA recently completed the evaluation and approval of the Wiley Electronics "WEEB" grounding washers for use with the Enphase Microinverter. This document provides the installation procedure and torque specifications. The Enphase compatible racking models that have listed grounding washers available are included on the last page of this App.Note. Installation Procedure • Install a minimum of one grounding washer per microinverter. Each microinverter requires a stainless steel fender washer on the topside of the Enphase Microinverter mounting bracket for the bolt that passes through the grounding washer. Torque the microinverter fasteners. The values listed below are minimum torque requirements. Wiley Electronics and the racking manufacturers will have specific torque specifications in their installation documents. We recommend using the highest of the recommended values. 1/4" mounting hardware - 45 in -lbs minimum 5/16" mounting hardware - 80 in -lbs. minimum Copyright Enphase Energy, Inc. 2010 Rev 2 Last Updated 01/08/10 enphase OF STAINLESS FENDER WASHER GROUNDING WASHER The Enphase Microinverter model D380 is shown. The installation procedure and grounding washer model numbers also apply to the Enphase Microinverter models M190 and M210. Copyright Enphase Energy Inc. 2010 Rev 1 Last Updated 01/22/10 C��nphase ENERG'Y Compatible Racking/Washers AEE Module Rail Fastener Information Grounding Washer SnapNRack Slide nut with 5/16 hex head bolt WEEB-PMC Conergy Module RailFastener Information Grounding Washer Suntop Quickstone slide nut with M8 socket head cap screw WEEB-CMC Direct Power and Water Module Rail Fastener Information Grounding Washer Power Rail '/a" hex head bolt, washer, nut for top rail mount WEEB-DMC IronRidge Module Rail Fastener Information Grounding Washer Light Rail XRL '/a" hex head bolt, washer, nut for top rail mount WEEB-DMC Krannich Solar Module Rail Fastener Information Grounding Washer K2 Systems Slide nut with M8 socket head cap screw WEEB-KMC ProSolar Module Rail Fastener Information Grounding Washer Rooftrac Slide nut with 5/16" hex head bolt WEEB-PMC Unirac Module Rail Fastener Information Grounding Washer Solarmount Light '/a" hex head bolt, washer, WEEB-DMC nut for top rail mount Solarmount Standard 1/4" hex head bolt, washer, WEEB-DMC nut for top rail mount Solarmount HD '/a" hex head bolt, washer, WEEB-DMC nut for top rail mount Copyright Enphase Energy Inc. 2010 Rev 1 Last Updated 01/22/10 Tile Roof Hook Universal Mount Installation Manual ENUNIRAC ■N■ ON Bright Thinking in Solar Unirac welcomes input concerning the accuracy and user-friendliness of this publication. Please write to publications@unir<c.com. professional SOLAR products, AAWARNING All Professional .Solar Products (ProSolar) are engineered and tested to withstand stated specifications (as stated on published specification sheets) when installed properly. Fail- ure to install properly may decrease the performance of in- stallation. ® SAFETY All regional safety requirements should be followed when installing Professional Solar Products. All tools and equip- ment located on the roof should be secured to avoid falling object hazards. All equipment/tools should be properly maintained and inspected prior to use. Any exposed studs should be protectively capped to help avoid injury. This installation manual is intended for use by professional installers with a working knowledge of construction princi- ples. Tool List • Chalk line • 3/16" carbide masonry drill bit • 3/8" masonry drill bit (for tile roof) • Cordless drill • Cordless impact wrench with 1/2" socket RoofTrav Installation Manual Date Modified: 08/13/07 APPLICATION: The RoofTrac mounting system consists of sup- port rails and top-down clamping hardware which is integrated with either a TileTrac or Fastlack attachment device. The RoofTrac mounting sys- tem can be utilized on virtually all standard con- struction residential roof -tops, mounting 4' on center, to install the majority of popular framEd solar modules. Page 1 of 7 COPYRIGHT PROFESSIONAL SOLAR PRODUCTS 2007: All information contained in this manual is property of Professional Solar Products (PSP). TileTrac® is a registered trademark for PSP and is covered under U.S. patent #5,746,029. RoofTracO and FastJack® is a registered trademark for PSP and is covered under U.S. patent #6,360,491. Wiley Electronics LLC Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Pro Solar Installations WEEB-PMC WEEBLUG Products are tested to UL 467 30;`8,77 UL standard for safety grounding and bonding equipment Document Number 104-0404-000008-005 Wiley Electronics LLC. 2006© —All Rights Reserved , wiLet Advancing Renewable Technology ACCACIVIE Cable Clips ACME Cable Clips simplify wire management and create a cleaner aesthetic to solar PV arrays. The clips are made of corrosion resistant stainless steel and are designed to prevent damage to cable insulation. The design is easy to install and remove with a flat head screwdriver and can be reused, unlike zip ties. The universal design fits most modules and can hold one or two wires of various diameters. • Made with corrosion resistant 304 Stainless Steel • Dual wire compartments • Special tab for easy installation and removal with flat -head screwdriver • Designed to prevent damage to cable insulation ACC • Clips onto modules • Holds USE -2 or PV wire • Wire diameters: 2 wires: 5.0-5.7mm 1 wire: 5.0-7.2mm r_'WeMaLh • Clips onto modules • Holds PV wire • Wire diameters: 2 wires: 6.8-7.2mm 1 wire: 6.8-8.Omm Contact us at: 845.247.4708 www.we-llc.com DC SOLAR SYSTEM SIZE: 9.12 kW DC AC SYSTEM SIZE: 8.02 kW AC �/� TFS0RO N W E S SCALE: 1" = 20' / EXISTING Off46 A-1— SOLAR SOLAR MODULES CITY OF LA QUINT THERMAL BUILDING & SAFETY DEPT. SYSTEM APPROVED FOR CONSTRUCTION a ,DATE L0"A 11 BY 125 Amp AC Combiner _A9k=J � wile"A e"` 240 Volt 0 � LWT 100 Amp AC Disconnect Lit -C L+ -,s 240 Volt SaLwLe t> * Du•z22" Meter # 1 B4SR-115327 CO � Existing 200 Amp Main Service W/ 175A Main Breaker 2 (A 0 3 Q� o 120/240 Volt U o N NOTES: Cl) ��j af0i rn "k, 1. THIS IS A 9.12 KW SOLAR ELECTRIC SYSTEM USING c a, °'t U °' a w . �' r � `—' (38) SHARP NU-U240F1(240 WATT) PHOTOVOLTAIC MODULES. �i Cu N LA J 2. THIS SYSTEM IS GRID-INTERTIED VIA UL -LISTED POWER M a) 3 m2 ° 2 o CONDITIONING INVERTERS: (38) ENPHASE ENERGY �'o��� m 12 M215 -60-240-S22 (215 WATT) MICRO -INVERTERS 3. THIS SYSTEM HAS NO UPS, NO BATTERIES. r --a Y U CHIMNEY 4. THIS IS A ROOF MOUNTED SYSTEM, ADDING 2.68 LB/SQ FT. m E FOLLOWING THE ROOF SLOPE. ROOF IS (1) LAYER SPANISH TILE (ROOF IS AT 15° PITCH). 5. LAG SCREWS ARE 3/8" X 4" AT 72" O.C. MAX, W/ 3" INTO FRAMING. _ 6. BUILDING IS (1) STORIES. / EXISTING Off46 A-1— SOLAR SOLAR MODULES CITY OF LA QUINT THERMAL BUILDING & SAFETY DEPT. SYSTEM APPROVED FOR CONSTRUCTION a ,DATE L0"A 11 BY 125 Amp AC Combiner _A9k=J � wile"A e"` 240 Volt 0 � LWT 100 Amp AC Disconnect Lit -C L+ -,s 240 Volt SaLwLe t> * Du•z22" Meter # 1 B4SR-115327 CO � Existing 200 Amp Main Service W/ 175A Main Breaker 2 (A 000 120/240 Volt U o N ProFOSCd P>i - dtrec.tiDVOA me+er � Cl) c U �i Cu Cu 4- UNI1l120-1P j00 KV A A P Ka.sE tkit -1.2 kV Low 0_0I240v " CO cu Z o 2 (A 000 J a Drawn By: M. D. Checked By: T. H. Date Drawn: 10/04/2011 Revision No. 446 dow Sheet No. 10 S� 01 3" THIS PANEL IS FED BY TWO SOURCES: SOLAR PHOTOVOLTAIC SYSTEM ON PREMISES NOTE: MOUNT ON SERVICE PANEL AND ON AC COMBINER AND ON AC DISCONNECT O BACKGROUND WARNING: "RED" AND ELECTRIC SHOCK HAZARD. DO NOT TOUCH "WHITE" TERMINALS. TERMINALS ON BOTH THE LINE LETTERING. AND LOAD SIDES MAY BE ENERGIZED IN 125 A THE OPEN POSITION. : LONG -CONTINUOUS MAX AC OPERATING CURRENT: 34 Amps OPERATING AC VOLTAGE: 240 Volts WARNING: THIS FACILITY IS EQUIPPED WITH A PHOTOVOLTAIC GENERATOR LOCATED ON THE ROOF AS SHOWN. THE SYSTEM MAY BE DISCONNECTED FROM THE FACILITY PER THE AC DISCONNECT AS SHOWN. F'V ROOF TILTED MOUNTED ARRAY AC SAFETY SWITCH ON ROOF ROOF PLAN 125 A AC COMBINER 100A AC DISCONNECT SWITCH 200A MAIN PANEL FLOOR PLAN NOTE: QUANTITY 1. MOUNT ON MAIN BACKGROUND "WHITE" PANEL, SEE SINGLE LINE DIAGRAM. AND "BLACK" LETTERING: NOTE: MOUNT ON AC COMBINER AND ON AC DISCONNECT Sticl.j Of -L Zeo c �Lo Ot t A�.g >I CITY OF LA QUINTA BUILDING & SAFET. TY DEP APPROVED FOR CONSTRUCTION DATE BY. EQUIPMENT KEYED NOTES O38 ENPHASE MICRO- INVERTERS #M215 -60-240-S22. O38 SHARP PHOTOVOLTAIC MODULES #NU-U240F1 O21"H x 14.31"W x 3.88"D EATON 125A LOAD CENTER WITH 10kAIC MAIN CIRCUIT BREAKER, 120/240V, 1 PH. 3W. MODUL #BR162413125. O4 (1) SQUARE -D AC DISCONNECT, 60A NON -FUSIBLE, 2 -POLE PART # DU222RB SOLAR PRODUCTION SUMMARY GROSS NAMEPLATE RATING (38 x 240/1000) 9.120 kW AC SYSTEM SIZE (USING PV WATTS) 8.020 kW I "PV" -5.7 I "PV" -2,4 F "PV" -1,3 OTYPIAL • NUMENEENCIR Q N 111MIMIM1111 CIRCUIT #2 - as as as s as as as as as as as as as as -as as P.V. PLAN IL Lt: 2 N/A PANEL: AC COMBINER PANELVOLTAGE: 120240 1P,3W CIRCUITCODE: :NON -CONTINUOUS LO LOCATION: EAST BUS: 125 A L : LONG -CONTINUOUS ` 0M:* MOUNTING: SURFACE MAIN , ) cu :t:DEMANDABLE RECEPTACLES AIC RATING: 10,000 _N i N w 0) � p N m>�CO <1 KITCHEN 00 C � U E VA LOAD W TYPE C.B. BUB C.B. TYPE W VA LOAD 00 LOADDESCRIPTION o a Drawn By: ° LOADDESCRIPTION rc A B w N R L TR P AR TR P L R N u A B 1 1827.5 17 ENPHASE INVERTERS CHAIN NJ 117120 2 x 20 2 1 1131N 13 ENPHASE INVERTERS CHAIN 11397.51 1 2 TOTAL PHASE B: VA PROJECT SIGNAGE SNACALE. 4 NOTES+ SOLAR PRODUCTION STATS. SNAE. 3 AC COMBINER SCHEDULE sNALE. 3 Sheet No. E.1 o LO �CN Q7 L 0 ` 0M:* 0ami , ) cu 2) c? a� 0) 1n J _N i N w 0) � p N m>�CO Cu E E 00 C � U E c ` z O -r-- (� a) O cWrn- o U o U) 00 E Sheet No. E.1 co LO N L 0 O CO Q cu U _N i Cu C_ Cu E E 00 S c ` z O -r-- (� a) O o U) 00 J a Drawn By: M.D. Checked By: T.H. Date Drawn: 10/04/2011 Revision No. .,.0 . Sheet No. E.1 (2) #6 THWN-2 (1) #6 THWN-2 NEUTRAL (1) #8 THWN-2 EGC 3/4" EMT CIRCUIT #1 CIRCUIT #2 CIRCUIT #3 11 7) SHARP NU-U240F1 MODULES (13) SHARP NU-U240F1 MODULES (8) SHARP NU-U240F1 MODULES (17) ENPHASE ENERGY INVERTERS (13) ENPHASE ENERGY INVERTERS (8) ENPHASE ENERGY INVERTERS M215 -60-240-S22 M215E0-240-S22 M215E0-240-S22 SAFETY SWITCH BOX (6) #6 THWN-2 (OUTDOOR BOX) (3) #6 THWN-2 NEU. (3) 20A 2 -POLE SWITCHES (1) #8.THWN-2 EGC , (1) #8 THWN-2 GEC 1 1/4" EMT (2) #6 THWN-2 (1) #6 THWN-2 NEU. 60AMP / 240 V, 2 -POLE NON -FUSIBLE (1) #8 THWN-2 EGC 2 AC DISCONNECT MOUNTED NEXT (1) #8 THWN-2 GEC O TO MAIN PANEL, PER CODE, NO 3/4" EMT 1 MORE THAN 10' FROM MAIN PANEL. SQUARE D #DU222RB SINGLE LINE DIAGRAM SNA�LE: 2 ENPHASE AC INTERCONNECT CABLE BLACK - L1 RED - L2 ORANGE- UNUSED BL -UE - NEUTRALS JUNCTION r1.f Fairbiffallwim �■■■■■■■■■■■■■■■1 mom i0 mmmmm1111111Iimmmmiiiii --. ■■■■i SEE SHEET 1, DETAIL 4 FOR SIGN DETAILS,2 125A 3 (�Ntll l20'1P TYPICAL 1 AC 240 Volt COMBINER (3) 20A 2 -Pole Breakers 100 Kv,* A P"PPGIE 1: �• I,A!cp -1,2 kY C: 0r� l.Dw iuiZAOV 73 '0w0yo D D D EXISTING MAIN PANEL (2) #6 THWN-2 120/240V 1 PH 3W 200A BUSS(1) #6 THWN-2 NEU. E DOWNSIZE MAIN (1) #8 THWN-2 EGC BREAKER TO 175A BREAKER (1) #8 THWN-2 GEC D D D 3/4" EMT Me*e r No. 69sK-115 M 1 Prof" gi-di cAiovlal E.2 D D D 60 AMP (2) #6 THWN-2 N BAR \ 2 -Pole ) #6 THWN-2 Breaker ITY OF LA QUINTA G BAR E(1) BL ILDING & SAFETY DEPT APPROVED OR CONSTRUCTION (1) #8 THWN-2 EGG (1) #8 THWN-2 GEC Fy DATI! (2) #6 THWN-2 (1) #6 THWN-2 NEU. 60AMP / 240 V, 2 -POLE NON -FUSIBLE (1) #8 THWN-2 EGC 2 AC DISCONNECT MOUNTED NEXT (1) #8 THWN-2 GEC O TO MAIN PANEL, PER CODE, NO 3/4" EMT 1 MORE THAN 10' FROM MAIN PANEL. SQUARE D #DU222RB SINGLE LINE DIAGRAM SNA�LE: 2 ENPHASE AC INTERCONNECT CABLE BLACK - L1 RED - L2 ORANGE- UNUSED BL -UE - NEUTRALS JUNCTION r1.f Fairbiffallwim �■■■■■■■■■■■■■■■1 mom i0 mmmmm1111111Iimmmmiiiii --. ■■■■i SAFETY ❑ o ❑ 0 0 SWITCHES — — MOUNTED ON ROOF, 20 A. 240V. THE FIRST AC CONNECTOR IN EACH BRANCH CIRCUIT 110-79 IS SUITABLE AS A DISCONNECTING MEANS. B I THE AC LOAD CENTER BREAKER SHOULD BE OPENED PRIOR TO DISCONNECTING AC CONNECTORS. UTRAL GROUNDI AC COMBINER REFER TO SINGLE LINE DIAGRAM. NnTF 1 • FAr:H mnni II F IS ?An WATTS FFFnINr; INTn A 715 WATT IN\/FRTFR END CAP INSTALLED ON LAST INVERTER CABLE OF BRANCH CIRCUIT — ETHERNET CABLE TO BROADBAND ROUTER IMPORTANT: MAKE SURE THAT YOU MEASURE THE LINE -TO -LINE AND LINE -TO -NEUTRAL VOLTAGE OFALL SERVICE -ENTRANCE CONDUCTORS PRIOR TO INSTALLING ANY SOLAR GENERATION EQUIPMENT. THE VOLTAGES FOR THE 240 Vac RATED MIRCO-INVERTER MODELS SHOULD BE WITHIN THE FOLLOWING RANGES: L1 TO L2 - 211 TO 264 Vac, L1 OR L2 TO NEUTRAL - 106 TO 132 Vac. WIRING DIAGRAM 21 r O D D D > cc C C14 o_ D D D �• 2) a v1tU�"' C: 0r� CM 73 '0w0yo D D D Revision No. Z D D D E 0 D D D D D D �� E.2 D D D SAFETY ❑ o ❑ 0 0 SWITCHES — — MOUNTED ON ROOF, 20 A. 240V. THE FIRST AC CONNECTOR IN EACH BRANCH CIRCUIT 110-79 IS SUITABLE AS A DISCONNECTING MEANS. B I THE AC LOAD CENTER BREAKER SHOULD BE OPENED PRIOR TO DISCONNECTING AC CONNECTORS. UTRAL GROUNDI AC COMBINER REFER TO SINGLE LINE DIAGRAM. NnTF 1 • FAr:H mnni II F IS ?An WATTS FFFnINr; INTn A 715 WATT IN\/FRTFR END CAP INSTALLED ON LAST INVERTER CABLE OF BRANCH CIRCUIT — ETHERNET CABLE TO BROADBAND ROUTER IMPORTANT: MAKE SURE THAT YOU MEASURE THE LINE -TO -LINE AND LINE -TO -NEUTRAL VOLTAGE OFALL SERVICE -ENTRANCE CONDUCTORS PRIOR TO INSTALLING ANY SOLAR GENERATION EQUIPMENT. THE VOLTAGES FOR THE 240 Vac RATED MIRCO-INVERTER MODELS SHOULD BE WITHIN THE FOLLOWING RANGES: L1 TO L2 - 211 TO 264 Vac, L1 OR L2 TO NEUTRAL - 106 TO 132 Vac. WIRING DIAGRAM 21 r O ai 3 Qo > cc C C14 o_ m0 m00M Date Drawn: 2) a v1tU�"' C: 0r� CM 73 '0w0yo co,,Uo'0 c a; i4)�F` Revision No. Z 3 E co LO E N M O 0) E 0 Q tCu U ro cu N i C EE 00 Cu Z o Co o 00 CY J o_ Date Drawn: Drawn By: M.D. Checked By: T.H. SCALE: N/A Date Drawn: 7pN 10/04/2011 q )F��PF�c1 Revision No. Z 3 0 Sheet No. �� E.2 • - Solar System Size: 9.120 kW DC Solar System Size: 8.020 kW AC SYSTEM SIZE � (38) Sharp NU-U240F1 Modules >C FNM (38) Enphase Energy M215-60-240-S22 Micro-Inverters a�,@�M= N Nw'�,U � C'O NtA J W CIRCUIT CURRENT CALCULATION: AC CIRCUITS: �p� N DN v> oho INVERTERS TO SUB PANEL WIRE SIZING a) �� vm CIRCUIT #1 - MAXIMUM OUTPUT POWER PER INVERTER = 215 WATTS AC PER INVERTER CIRCUIT #1- (1) INVERTER PER EVERY (1) MODULES= (17) MODULES & (17) INVERTERS PER STRING a c00 215 WATTS PER INVERTER X 17 INVERTERS PER STRING = 3655 WATTS E 215 W / 240 V =.896 AMPS PER INVERTER 3655 W / 240 VOLTS = 15.23 X 1.25 = 19 A (20 AMP 2 POLE BREAKER) 896 X 17 INVERTERS PER PHASE = 15.2 AMPS PER PHASE #6 WIRE = 75 AMPS X.41 [PER NEC TABLE NEC TABLE 310.15(13)(2)(c)[ 0.5"- 3.5" ABOVE ROOF] & PER NEC TABLE 690.31(c)] = 30.75 AMPS 30.75 AMPS X .70[CONDUIT FILL PER NEC TABLE 310.15(13)(2)(a)]= 21.5 AMPS=OK CIRCUIT #2 - MAXIMUM OUTPUT POWER PER INVERTER = 215 WATTS AC PER INVERTER 215 W / 240 V =.896 AMPS PER INVERTER .896 X 13 INVERTERS PER PHASE = 11.6 AMPS PER PHASE CIRCUIT #2 AND CIRCUIT #3 WIRE SIZING THE SAME- SMALLER CIRCUIT OUTPUT (1) CONDUITS TOTAL CIRCUIT #3 - MAXIMUM OUTPUT POWER PER INVERTER = 215 WATTS AC PER INVERTER CONDUIT = 3 STRINGS = (6) #6 THWN-2 AWG WIRE, (3) #6 THWN-2 AWG NEUTRAL, 215 W / 240 V =.896 AMPS PER INVERTER + (1) #8 THWN-2 EGC + (1) #8 THWN-2 GEC IN 1 1/4" EMT 896 X 8 INVERTERS PER PHASE = 7.2 AMPS PER PHASE CITY OF LA QUINTA BUILDING & SAFETY DEPT. AC COMBINER TO MAIN PANEL WIRE SIZING OVERCURRENT PROTECTION: APPROVED (3) 20 AMP BREAKERS = 60 AMPS (60 AMP BREAKER OK) FOR CONSTRUCTION #6 WIRE = 75 AMPS X.82[ (on wall) PER NEC TABLE 690.31(c)] = 61.5 AMPS (OK) CIRCUIT #1 - 15.2 AMPS X 1.25 = 19 AMPS MAX CONDUIT = (2) #6 THWN-2 AWG WIRE, (1) #6 THWN-2 AWG NEUTRAL, (1) 2 POLE 20 AMP BREAKER PER CIRCUIT DATE y4Q- + (1) #8 THWN-2 EGC + (1) #8 THWN-2 GEC IN 3/4" EMT CIRCUIT #2 AND CIRCUIT #3 OVERCURRENT PROTECTION THE SAME- SMALLER CIRCUIT OUTPUT MAIN PANEL DOWNSIZING CALCULATION 200 AMP MAIN BREAKER -175 AMP MAIN BREAKER 38 MODULES TOTAL = 38 INVERTERS = (3) CIRCUITS LO 25 AMPS EXTRA + 40 AMPS BACKFED IN 200 AMP BUSS = 65 AMPS ALLOWABLE (1) CIRCUIT OF 17 INVERTERS + (1) CIRCUITS OF 13 INVERTERS + (1) CIRCUIT OF 8 INVERTERS 60 AMP BREAKER = OK N O (V 0 d) (3) 2 POLE 20 AMP BREAKERS LOCATED IN AC COMBINER Q CALCULATIONS SCALE: � U N/ALL Cu� SAFEGUARDS Cu i C GENERAL NOTES SUPPORT SYSTEM * WILEY CABLE CLIPS a� EE CO 5 * * EMT CONDUIT WHERE EXPOSED / ALL METAL CONDUIT-NO SET SCREWS 1. THE PV SOURCE CIRCUIT IS NEGATIVELY GROUNDED. WIND LOAD: BASIC WIND SPEED (3-SECOND GUST, 95 MPH) z t3 (D T tvf * WIND EXPOSURE C * ALL EMT IS TO BE USING OUTDOOR COMPRESSION FITTINGS 2. WIRE AND SIZES ARE AS INDICATED OR LARGER. o (n CDD J * CONDUIT SUPPORT BY COOPER/BEELINE OR CADDY * SERIES CIRCUITS FUSED AT 15 AMPS DC 3. ALL EQUIPMENT IS BONDED BY MECHANICAL o Drawn By: * VISIBLE AND ACCESSIBLE *ALL EQUIPMENT TO BE LABELED PER DRAWING MEANS OR BY AN EQUIPMENT GROUNDING CONDUCTOR. M.D. *PROSOLAR DEEP RACKING SYSTEM, LAG * ADD COMBINER / JUNCTION BOX AS NEEDED 4. THE GROUNDING ELECTRODE CONDUCTOR SHALL Checked By: * BLOCKING DIODE INTERNAL IN EACH MODULE (FESS/ 0�rgl BOLTED DIRECTLY INTO RAFTERS. BE #8 AWG COPPER GROUND WIRE AND BONDED oPREl L o * GROUND FAULT PROTECTION DEVICE BUILT INTERNALLY <<�Fy T.H. ELECTRODE SYSTEM��' INTO ENPHASE INVERTERS TO THE EXISTING GROUNDING ELE. m Date Drawn: r *MODULE GROUNDING PERFORMED WITH ILSCO GBL-4DB 5. CHANGES TO DESIGN NEED PRIOR ENGINEER 9 93 M 10/04/2011 LUGS WITH #8 SOLID BARE COPPER AND WEEB CONNECTIONS. APPROVAL. RevI No. *ALL NEUTRAL TO GROUND CONNECTIONS ARE TO OCCUR IN `P 0fCTRtCP� ��P 9TF MAIN PANEL LOCATION 0 CA��F(� 0 *3/4" EMT MINIMUM Sheet No. * JUNCTION BOX/ COMBINER BOX ENTRY TO BE SEALED WITH COMPRESSION FITTINGS NOTES 1 E.3 ALE• N 690.5(C) - INVERTER 690.64(B)(7) - PANELBOARD 690.17/690.54 - AC DISCONNECT 690.17/690.53 - DC DISCONNECT 690.56(B)/705.10 - SERVICE CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY