Loading...
0402-348 (SFD)r LICENSED CONTRACTOR DECLARATION F ^; hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professionals Code, and my License is in full force and effect. License # Lic. Class Exp. Date 172-1 02 B. WC Date �� ``� �'7� Signature of Contractor17 ✓l OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's License Law for the following reason: ( ) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure isnot intended or offered for sale (Sec. 7044, Business & Professionals Code). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business 8, Professionals Code). () I am exempt under Section ; B&P.C. for this reason Date Signature of Owner WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: ( ) I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. (y,) I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier & policy no. are: Carrier OLD REPUBLIC L,r1SU Policy No. WC308' 7600 (This section need not be completed, if the permit valuation is for $100.00 or less): . ( ) I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with tfhos&provis"ions. ,Date: U. lr i� �i Applicant— Warning:. pplicant Warning:. Failure to secure Workers' Compensation coverage is unlawful and shall subject an employer to criminal penalties and civil fines up to $100,000, in I . addition to the cost of compensation, damages as provided for in Section 3706 of the Labor Code, interest and attorney's fees. o IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on his application. 1. Each person upon whose behalf this application is made &each person at whose request and for whose benefit work:is performed under or pursuant to any permit issued as a result of'this apXGEIton agrees to, & shall, indemnify & hold harmless the City of',La Quinta, its'officers, agents and employees. 2. Any permit issued as a result of this application! becomes null and void if ,work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is ° correct. I agree to comply with all City, and State laws: relating to the building construction, and hereby authorize representatives of this City to enter upon the above-mentioned property for inspection purposes. ' r Signature (Owner/Agent) �'�� /1 149, Date. PERMIT # BUILDING PERMIT 04(ft..348 DATE VALUATION X Y� %0 LOT 113 TRACT , JOB SITEq& , i APN ADDRESS "Z '.i•..• F..1�is�hbet j.%'✓�}e OWNER CONTRACTOR/DESIGNER/EN (NEER LE1q.k;.W-11 0Y L:'AWY:3:'t�' IM L MOTAR P f1b0.3 O1T CA TORItfsl 78.401 C Y31OH-WAY 111 '70A 01 C V_-1G:FMfXT 111 L,f'f.QuTwr1" CA. 92253 LAC UINTfJA, A 92253 (760)777-0131 r'SIX 3434 USE (VL.TIOFF PERMIT �j MHOLE 1' ML LJ7i7i`MING . :iftG%Y IdJ'I49, FL" i'Y. I�LYkNINT 1130ES NCY 11dC.:L U1& 2j1A UK WAL.i..- P-00.t, SPA 011, DRIVRWAid APPROACH 'fstA T COtd97'Iti1f:'-'i`:bt:>'1d 2,3445.00 S / PORIbI'idf L+.TIO 45.00 5i' U&PA4OCKRPOR7' t ORO 3F IM'3- d'C1Tt. CC1�:�1T3GT.[01��I.� C'rt�.'1 LI"1� APP 0 6 2004 CITY OFLA C UfNTA FiAIANCE DEPT. T 0TM,.PFMv1JT =4 E, S DUE NOW RECEIPT L'!. / ` BY X`� 1 /6) 5 4 INSPECTOR 9,36,342,M) $4,164,75 $0,00 S""r,m` "s lsihil "'Y C>ON:`>Cl?UCTION ITZ'L 101-000-418-0.00 $709.00 PLAN CHECK FEE' 101-000-439-318 WX 29 914 •C1111KNICAL, FEE 101-00,0-421-000 $47,00 ELECTRICAL, .FE'` 10: -000-420-000 $114.01 P1.i1Ma1RIO FEE 101.000.419.000 �1 �K,'N1 UTRU1?03 LAOT1011a FFR - R�.r`+'SID I €i'1-Or�0.,a41- .110 R3,8i 011ADRIGP �Q1� C�nas$f 4�fYC3!) SJ5.050 0Xr24>01PE 1MAACT FEE A4030 IM'3- d'C1Tt. CC1�:�1T3GT.[01��I.� C'rt�.'1 LI"1� APP 0 6 2004 CITY OFLA C UfNTA FiAIANCE DEPT. T 0TM,.PFMv1JT =4 E, S DUE NOW RECEIPT L'!. / ` BY X`� 1 /6) 5 4 INSPECTOR 9,36,342,M) $4,164,75 $0,00 S""r,m` "s INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPRV MECHANICAL APPROVALS Set Backs _� Underground Ducts Forms & Footings Ducts _ Slab Grade Retum Air Steel Combustion Air _ Roof.Deck r Exhaust Fans _ O.K. to Wrap v _ _ _ Framing �, F.A.U. Compressor _ _ Insulation 'r ,� Vents _ Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Lines Party Wall Firewall Exterior Lath Drywall - Int. Lath Final �O o BLOCKWALL A ROVALS Final POOLS - SPAS steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Electric Underground Plbg. Test Final Gas Piping PLUMBING AP OVA S _ Waste Lines Y _ Water Piping _ Plumbing Top Out Gas Test Electric Final Heater Final lumbing Final Equipment Enclosure Shower Pans O.K for Finish Plaster Sewer Lateral Pool Cover Sewer Connection 0 -Z Encapsulation _ Gas Piping 7 Gas Test Appliances Final Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Voltage Wiring Fixtures Main Service Sub Panels Exterior Receptacles Wv G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) COMMENTS: i HVAC INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV 51te Aaaress: to -mi I viento urive ralnm lvunwcl. Tract Number. 29323 Plan #: 2Y Lot Number: , 18 Project. , Esplanade Builder: An installation certificate is required to be posted at the building site or made avalible for all appropriate inspections. Atter completion of final inspection, a copy must'be provided to the Building Department (upon request) and the building owner at occupancy, per Section 10-103(b). HVAC SYSTEMS: ue.�+inn•Cnunmcn4 - w CF -6R` Phase: 5 Lennar Homes I of Efficiency, Duct Heating Heating Equip. CEC Certifiedr Name Identicle (AFUE, etc.) Location Duct Load Capacity Type and Model Name 'Systems (>= CF -1 R) (attic, etc.) , R -value (BTU / Hr) (BTU / Hr) FC US Air attic r`li— Gniummnnt o iclencyDuct Equip. CEC Certifiedr Name Identicle (SEER, etc.) Location Type and Model Number Systems (-CF -1R) (attic, etc.) Cooling Cooling Duct Load Capacity R -value (BTU / Hr) (BTU /1ir) Ir attic 4.2 i . 1 1, 1110 U11UC1alyncu, vcnly U10t c4U1F11 c 1L uaacu ouv.. - - ....,-, —--- -•---- ,- -- ------ efficient than that specked int rtificate of compliance (Form CF -1R) submitted for compliance with the Energy t Efficiency Standards for resid tia ui i gs, and quipment that meets or exceeds the appropriate requirements for I manufactured devices (�mt p' n E icie egulations or Part 6), where applicable. 6 . Team Heating & Air Signature, Date Installing Subcontractor(Co. Name OR General Contractor (Co. Name) OR Owner MINIMUM REQUIREMENTS FOR DUCT LEAKAGE COMPLIANCE CREDIT t Duct Diagnostic Leakage Testing Results (Maximum 6% Duct Leakage) I CFA: System . , �' of Indicate the maxlmum.aowa le Duct Leakage and the calculation used: t 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 {. 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 r x 400 x (Cooling Capacity in Nominal Tons) x(0.06) • I .. fan flow 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow ' x .06 } uct Pressurization Test Results 5 100 x Test Leakage / Fan Flow = % Leakage 2.90% Check Box for Pass or Fail (Pass = 6% or Less) Passl x Faillj �T-24 Compliance Credit was Taken for TXV TXV was installed} System . [::::] of , Indicate the maximum aowa le Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 i 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity in Nominal Tons) x (0.06) fan flow 0 I 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow x .06 '15uct Pressurization Test Results { 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or Less) Passl Faill QT -24 Compliance Credit was Taken for TXV TXV was installedf { PAGE 1 F2001-01 (4-02) Action Now T-24CF6-RTD&TXV macro i 44 ', HVAC'INSTALLATION CERTIFICATE for Tested Duct Leakage & TXV Page 2 of 2 CF -6R ' Site Address: 79-831 Viento Drive. Permit Number: 0 Tract Number:29323 _ ' Plan #: 2Y Phase: 5 Lot Nurnberg 18 Project: Esplanade Builder: Lennar Homes System =J of I Indicate the maximum owa le Duct Leakage and the calculation used: - 0:7 x Floor Area x (0.06) for Climate Zone 8 through 15 .0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 &•16 400 x (Cooling Capacity in Nominal Tons) x (0.06) fan flow 0 21.7 x (Heating Capacity in Thousands,of Output BTU per hour) x (0.06) Measured Fan Flow x.06 uct Pressurization Test Results 25 - 100 x Test Leakage/ Fan Flow, _ % Leakage Check Box for Pass or Fail (Pass = 6% or Less) Passl Faill PT -24 Compliance Credit was Taken for TXV TXV was installed System � of Indicate the maxrmum allowable Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through -15 0.5 x Floor Area x (0.06) for Climate Zones .1 through.] & 16 -__7 400 x (Cooling Capacity in Nominal Tons) x (0.06) fan flow 0 • 21.7x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow x .06 uct Pressurization Test Results 100 x Test Leakage / Fan Flow= % Leakage _ Check Box for Pass or Fail (Pass = 6% or Less) Pass Fai �T-24 Compliance Credit was Taken for TXV TXV was insta e - System , EZ] of r owa �� Indicate the maximum ale Duct Leakage and the calculation used: 4 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 400 x (Cooling Capacity in Nominal Tons) x(0.06) fan flow 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow x'.06 , uct Pressurization Test Results (CFM g? 25PAT 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or Less) Pass I Faill rJT-24 Compliance Credit was Taken for TXV TXV was installed ys em E::::] of Indicate the maximum allowable Duct Leakage and the calculation used: 0.7 x Floor Area x (0.06) for Climate Zone 8 through 15' 0.5 x Floor Area x (0.06) for Climate Zones 1 through 7 & 16 ' 400 x.(Cooling.Capacity in Nominal Tons) x (0.06)fan r' flow, 0 21.7 x (Heating Capacity in Thousands of Output BTU per hour) x (0.06) Measured Fan Flow x :O6 " uc Pressurization Test Results25 PA) 100 x Test Leakage / Fan Flow = % Leakage Check Box for Pass or Fail (Pass = 6% or Less) Pass Faill =T-24 Compliance Credit was Taken for TXV TXV was installed 1, the undersigned, verify that the above 'agnostic test results and the work I performed associated with the test(s) is in conformance with -the requirements or plia ce cr 't. (rhe builder shall provide the HERS provider a copy of the CF -6R signed by the builder employ or tra(#q certifying that diagnostic testing and installation meet the ' requirements for compliance credit.) Team Heating & Air` ' -Tests . ignature, Dikto Installing Subcontractor o. Name Performed OR General Contractor (Co. Name) OR Owner - COPY TO: Building Department HERS Provider (if applicable) Building Owner at Occupancy t. PAGE 2 F2001-01 (4-02) Action Now T-24CF6-RTD&TXV macro ' Lo OU Ce"rfificate of linsulAtion Your Home. has been insulated with CerminTeed"Fiberglass Insulation products.'which are designed • " r . for today's safety standards and to energy requirements: ti t f Fiberglass is inorganic and therefore pertmanently noncombustible, so.ii does not have to be treatedCD t w ,' with fire -retardant chernicals that will likely lose their effectiveness over tirne. It has not been treated _ CD 4 with chemicals that can corrode wiring or metal. Fiberglass will not absorb moisture nor will it ` . sertl.e over tine a`s may other insulation mater"' Ls., e r,. This also certifies that CertainTeed Fiber Glass hl ufation has been professionally installed in this home - to provide the following thermal performance:. _ 'sob Name: Tapestry Esplanade Vract: 29323 '. Fbase: S ' ' Lot Plan: 2X Address: 79 - 831 Vieoto Dr., La Quieta, CA. Ceiling Area: 11•38`131ow•n Garage Ceiling: Interior Walls: ' With Living Above Overhangs: Exterior Wafts: R71.3 Unfaced Batts - - Ceiling: - Garage Wall: Cantilevered Enaccessible to Blow + Floors W/Licinig Above - .Srbtractor iOJ Insulation Co., Inc. nt, Az ms 41702 (62 8 2.6070 License #465109 .. • V S igri e(� ' 1 r 1 Conchita Ortiz, .SecretcaryAreasurer --or R. Scott Jenkins, -President: =or-- Lou Merota, Director of CDp¢rutioras.a�cer M , j{ R- means resistance to heat flow. The higher the R- value, the greater'the insulating power. Ask your builder for the -fact sheet on R- values. Keep this certificate .N ith your 'other valued papers. If you ever sell thii home, this certificate sbould be passer on to the buyer. CD L I CITY . FLA QUINTA "o�S�• 'JQEBN' DING"&SSAFETYDEPARTMENT --s 777-7012 r INSPECT ON REQUEST LINE 777-7153 Owner LENNAR HOMES OF CALIFORNIA Contractor. LENNAR HOMES OF CALIFORNIA Permit Number 0402-348 POST ON JOB IN CONSPICUOUS PLACE INSPECTOR MUST SIGN ALL APPLICABLE SPACES JOB ADDRESS 79-831 MENTO DRIVE SFD - LOT 18, PLAN 2Y. PERMIT DOES NOT INCLUDE BLOCK WALLS, POOL, SPA OR DRIVEWAY APPROACH TYPE OF INSPECTION DATE INSP. TEMPORARY POWER SETBACKS 77 U/G PLUMBING /WASTE U/G ELECTRICAL/ GROUNDING FOOTINGS /STEEL AL - CONCRETE SLAB DO NOT POUR CONCRETE NTI ABO V IG ROOF NAIL / PRE -ROOF OKAY TO WRAP FRAMING COMBINATION ROUGH ELECTRIC ROUGH'PLUMBING .. ROUGH MECHANICAL INSULATION COVER NO WORK UNTIL ABOVE SIGNED INTERIOR GYP. BD. DRYWALL EXTERIOR. LATH GAS TEST - SEPTIC ABANDONMENT. SEWER CONNECTION SEPTIC / GREASE INTERCEPTOR MASONRY INSPECTIONS FOOTINGS / STEEL BOND BEAM POOL / SPA / WATER FEATURE INSPECTIONS PRE-GUNITE / SETBACKS U/G PLUMBING U/G GAS U/G ELECTRICAL PRE -PLASTER (ALARMS/ BARRIERS FINAL INSPECTIONS TEMP. USE OF PERMANENT POWER ELECTRICAL PLUMBING MECHANICAL PUBLIC WORKS DEPARTMENT-/ - 6 COMMUNITY DEVELOPMENT DEPT. 12 -?-/O</ NZ _ FINAL / JOB COMPLETED ABOVE APPROVALS DO NOT INCLUDE RIGHT TO TURN ON UTILITIES OR OCCUPY BUILDING 3kage & TXV Page 1 of 2 CF -6R Permit Number: Plan #: 2Y Phase: 5 .)ject: Esplanade Builder: Lennar Homes alible for all appropriate inspections. )artment (upon request) and the building Identicle 1(kFUE etc.) I Location I Duct I Load Capacity I .Svstems (>= CF -1 R) (attic, etc.) R -value (BTU / Hr) (BTU / Hr) Identicle I (SEER, etc.) I Location I Duct I Load a Capacity Ss vstem(>=CF-1R) (attic, etc.) R -value (BTU / Hr) (BTU/,Hr). pment installed, 2 equivalent to or more )miffed for compliance with. the Energy it exceeds the appropriate requirements for where applicable. Team Heating & Air Installing Subcontractor o. ame OR General Contractor (Co. Name) OR Owner .IANCE CREDIT ;t Leakage) .06) 1 x .06 0.06) x .06 P TXV was TXV wa; PAGE 1 F2001-01 (4-02) Action Now T-24CF6-RTD&TXV macro