05-2052 (SFD)IN
a rtirica �e f Occupancy
OF T19wJ Building & Safety Department
This Certificate is issued pursuant to the requirements of Section 109 of the California Building
Code, certifying that, at the time of issuance, this structure was in compliance with the
provisions of the Building Code and . the various ordinances of the City .'regulating building
construction and/or use.
BUILDING ADDRESS: 56-605 VILLAGE DRIVE
Use classification: SFD Building Permit No.- 05-2052
Occupancy Group: R3 Type of Construction: VN Land Use Zone: RL
Owner of Building: KEITH & GENEVIEVE BUTENSHON Address: 682 34TH ST
City, ST, ZIP: ASTORIA ORE 97103
By- STEVEN WILLETT
-r" Date: 4-28-2006
uilding Offic,41
POST IN A CONSPICUOUS PLACE
i
-
rw
TITLE 24 REPORT
Title 24 Report for:
a Mr. & Mrs BUTENSCHON
56-605 VILLAGE -DRIVE
La Ouinta, CA 92253
Project Designer:
'TELLEZ DESIGN AND ASSOCIATES
440 North Palm Canyon Dr.
Palm Springs, CA 92262
(760) 778-0078
Report Prepared By:
S.L.O.
Santiago Lopez-Ocampo
..P.O. Box 1018
La Quinta, CA 92247
(760) 485-8927
Job Numbe CITY OF ,(_q a
QULNTA
. BUILDING & SAFETY DEPT.
• LQ060105 APPROVED.
FOR CO TRUCTIO
Date: oA
8/23/2005
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC (415) 897-6400.
EnergyPro 3.1 By EnergySoft Job Number: LQ060105 User Number: 5732
Certificate of Compliance:
Residential
(Part 1 of ?L CF -1 R'
Mr. & Mrs BUTENSCHON
Component
8/23/2005
Project Title
Location/Comments
Date
56-605 VILLAGE DRIVE
La Quinta
(attic, garage, typical, etc.)
Project Address
Wood
Building Permit #
Santiago Lopez-Ocampo
(760) 485-8927. Plan check / Date
Documentation Author
Telephone
-Exposed Slab w/R-0.0 Perimeter Insulation
Computer Performance
15
Field Check / Date
Compliance Method (Package or Computer) Climate zone Enforcement Agency Use Only
GENERAL INFORMATION
n/a
0.756
Total Conditioned Floor Area:
2,806 ft2 Average Ceiling Height: 11.0 ft,
Total Conditioned Slab Area:
2,806 ft2
Exterior Door
Building Type:
Wood
0.060
(check one or more)
0.45
0.38
Single Family Detached
❑ Addition
❑
❑ Single Family Attached
❑ Existing Building
`
❑ Multi -Family
❑ Existing Plus Addition
0.40
Front Orientation: (East) 90 de- Floor Construction Type:
® Slab Floor
Number of Dwelling Units:
1.00
_
Number. of Stories:
1
❑ Raised Floor
FENESTRATION
Shadina Devices
Type
Orientation
Const.
Component
Frame
Assembly
Location/Comments
Type
Type
U -Value
(attic, garage, typical, etc.)
R-38 Roof (R.38 2x4.24)
Wood
0.024
Exterior Roof
Slab On Grade
n/a
0.756
-Exposed Slab w/R-0.0 Perimeter Insulation
R-19 Wall w/1" EPS
Wood
0.045
Exterior Wall
Slab On Grade
n/a
0.756
Covered Slab w/R-0.0 Perimeter Insulation
Solid Wood Door
None
0.387
Exterior Door
R-19 GarageWall GYP + 5/8" GYP
Wood
0.060
Exterior Wall
0.45
0.38
FENESTRATION
Shadina Devices
Type
Orientation
Area
Fenestration
Exterior
Overhang Side Fins
SF
U -Factor
SHGC
Shading
Yes / No
Yes / No
Front
(East)
7.1
0.45
0.38
Bug Screen
x❑
❑
❑ 0
Front
(East)
43.0
0.60
0.39
Bug Screen
Q'
.❑
❑ x❑
Left
(South):
16.0
0.45
0.38
Bug Screen[g]
❑
❑ X❑
Rear
(West)
208.0
0.59
0.40
Bug Screen
0
❑
❑X❑
Right
(North)
52.0
0.45
0.38
Bug Screen
x❑
❑
❑ Q
Left
(South)
79.0
0.60
0.39
Bug Screen..x❑
❑
❑ x❑
Left
(South)
6.0
0.59
0.39
Bug Screen
X
❑
❑ x❑
Rear
(West)
119.8
0.45
0.38
Bug Screen
0
❑
❑ Q
Right
(North)
72.0
0.60
0.39
Bug ScreenX❑
❑
❑ 0
❑
❑
❑ ❑
❑
❑
❑ ❑
❑❑
❑❑
Run Initiation Time: 08/23/05 18:53:12 Run Code: 1124848392
Ener
Pro 3.1 6y Ener
Soft '
User Number: 5M
Job Number: LQ060105
Page: 3 of 14
Certificate,of Compliance:* Residential (Part 2 of 2) CF -1 R
Mr. & Mrs BUTENSCHON 8/23/2005
Project Title Date
HVAC SYSTEMS Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load.
Distribution
Heating Equipment Minimum Type and Duct or
Type (furnace, heat Efficiency Location Piping Thermostat Location /
pump, etc.) (AFUE/HSPF)(ducts, attic, etc.) R -Value Type Comments
f.Pntral Furnace 80% AFUE Ducts in Attic, 4.2 Setback HVAC System
Cooling Equipment Minimum Duct
Type (air conditioner; Efficiency Location Duct . Thermostat Location /
heat pump, evap. cooling) (SEER) (attic, etc.) R=Value Type Comments
Split Air Conditioner 12.0 SEER Ducts in Attic 47 Setback HVAC System
WATER HEATING SYSTEMS Rated 1 Tank Energy Facti 1 ' External
Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby. Tank Insul.
System Name Type Type' Syst. Btu/hr (gal) Efficiency Loss (%) R -Value
A.Q- SMITH FPS -75-230 Small Gas Standard 1 7000 75 0.52 nia 12
11 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor. ,
For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input and Recovery Efficiency.
RGMARKC
:OMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to implement them. This certificate' has been signed by the individual with
overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification
and field verification by an approved HERS rater.
Designer or Owner (per Business & Professions Codej Documentation Author
Name: Name: 1 Name: S.L.Q. '
Title/Firm: TELLEZ DESIGN AND ASSOCIATES Title/Firm: Santiago Lopez-Ocampo
Address: 440 North Palm Canyon Dr. Address: P.O. Box 1018
Palm Springs, CA 92262 La Quinta, CA 92247
Telephone: 078 Telephone: (760) 485-8927
Lic. #: -
(signature) (date) (signature) :. (date)
Enforcement Ag cy
Name:
Title/Firm:
Address:
Telephone:
(signature/stamp) (date)
Run Initiation Time: 08/23/05 18:53:12 Run Code: 1124848392 .
:nergyPro 3.1 By.EnergySoft User Number: 5732 , Job Number: LQ060105 . Page:4 of 14
Certificate of Compliance: Residential (Addendum) CF -1 R
Mr. & Mrs BUTENSCHON - 8/23/2005
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
oases on ine adequacy or ine special Jusuncaaon and documentation submitted.Plan----f Field
The DHW System "A.O. SMITH FPS -75-230" Energy Factor = 0.520. An EF below 0.58 requires an R-12 External Blanket.
The HVAC System "HVAC System" includes credit for a Radiant Barrier installed per Section 8.13 of the Residential Manual.
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 428 sgft Exposed Slab Floor, 3.50" thick at Whole House.
HIGH MASS Design(see C -2R) -Verify Thermal Mass: 518 sgft Covered Slab Floor,. 3.50" thick at Whole House
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 1860 sgft Exposed Slab Floor, 3.50" thick at Whole House
HERS Required Verification
These features must be confirmed and/or tested by a.certified HERS rater under the supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic testing of these measures on a form CF -6R: Plan Field
i
t
Run Initiation Time: 08/23/0518:53:12 Run Code: 1124848392
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: LQ060105 Page:5 of 14
Mandatory Measures Checklist: Residential (Page 1 of 2) MF -1 R
NOTE: Lowrise residential buildings subject to the,Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instructions: Check or initial applicable bones or enter NIA if not applicable.
DESIGNER
ENFORCEMENT
Building Envelope Measures
'§150(a): Minimum R-19 ceiling insulation.
§ 150(b): Loose fill insulation manufacturer's labeled R -Value. .
Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does
❑§150(c):
X not apply to exterior mass walls).
❑'§150(d): Minimum R-13 raised floor insulation in framed floors or equivalent.
-'§150(1)- Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no
❑
greater than 2.0 perm/inch.
§118: insulation specified or installed meets insulation quality standards. Indicate type and form.
IAI
® § 116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain,
Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
❑ §150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
❑X § 150(0: Special infiltration barrier installed to comply with Section 151 meets Commission quality standards.
❑%�
§150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning gas pilots allowed.
Space Conditioning, Water Heating and Plumbing System Measures
§110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
❑X §150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or RCCA.
§ 150(i): Setback thermostat on all applicable heating and/or cooling systems.
❑X § 1500): Pipe and Tank Insulation
1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater tank, non -recirculating systems, insulated (R-4 or greater)
3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external
insulation or R-16 combined internal/external insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55 degrees F. insulated.
6. Piping insulating between heating source and indirect hot water tank.
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: LQ060105 Page:6 of 14
Mandatory Measures Checklist: Residential (Page 2 of 2) MF -1 R
NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents;the features noted shall be considered. by all parties as minimum component performance specifications for'the mandatory measures
whether, they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instructions: Check or initial applicable boxes or enter NIA if not applicable.
DESIGNER
ENFORCEMENT
.Space Conditioning, Water -Heating and Plumbing System Measures:`(pontinued)
X],'§150(m): Ductdand Fans
�•: 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601,
'603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in
conditioned space. Openings 'shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system
that meets the applicable requirements of UL181, UL161A, or IJU81 B. If mastic or tape is used to seal openings
greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not
be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be
sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and
drawbands.
2. Building cavities, support platforms for air handlers, and plenums'defined or constructed with materials other
than sealed sheet metal, duct,board or flexible duct shall not be used for conveying conditioned air. Building
cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be
compressed to cause reductions in the cross-sectional area of the ducts.
3. Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive
duct tapes unless such a tape is used in combination with mastic and drawbands. ,
4. Exhaust fan systems have back draft or automatic dampers.
• 5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually
operated dampers. „
6. -Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight; moisture,
equipment maintenance,- and'wind but not limited to the following: Insulation, exposed to weather shall be suitable '
for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam
insulation shall be protected as above or painted with a coating that is water+ retardant and provides shielding
from solar radiation that can cause degradation of the material.
a§114: Pool and Spa Heating Systems and Equipment [
1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance
heating, and no pilot.
2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or
spas.
a. At least 36" of pipe between filter and. heater for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation pump time switch.
X❑ §115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no
continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr)
EI§118 (f): Cool Roof material meet specified criteria
Lighting Measures
® § 150(k)1: Luminaires for general lighting.in kitchens shall have lamps with an efficacy 40'lumens/watt or greater for .
general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting
control panel at an entrance to the kitchen.
a§150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of.
40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement
allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved.
.
Computer Method Summary
(Part 1 of 3)* C -2R
Mr R Mrs RIJTFNS(.HON
Project Title
8/23/2005
Date
56-605 VII I AGE DRIVE I a
-(Minta
Project Address
Building Permit #
,Santiago Lopez-0rampo
(760) 485-8927
Documentation Author
Telephone
Plan Check/Date
Computer Performance
Compliance Method (Package or Computer)
15
Climate Zone
Field Check/Date
Source Energy Use Standard
Proposed
Compliance
(kBtu/sf-yr) . Design
Design
Margin
Space Heating 4.35
4.98
-0.64
Space Cooling 40.22
38.29
1.92
Domestic Hot Water 10.16
10.24
-0.09
Totals 54.72
53.52
1.20
Percent better than Standard:
2.2
Total Conditioned Floor Area: 2,806 ft 2 Floor Construction Type: ❑ Raised Floor ❑X Slab Floor
Building Type: Single Fam Detached
Building Front Orientation: (East) 90 deg Total Fenestration Area: 21.5%
Number of Dwelling Units: 1.00 Total Conditioned Volume:. 30,866 ft 3
Number of Stories: 1 Total Conditioned Slab Area: 21806 ft 2
BUILDING ZONE INFORMATION # of Thermostat Vent
Zone Name Floor Area Volume Units Zone Type Type Hgt. Area
HVAC: System 9 80M$6b 1 00 CnnrlifinnPri Sethnnk _2 n/a
OPAQUE SURFACES Act.
Type Area U -Fac. Azm. Tilt .
Rnnf 428 0.024 0 18
wall 151 0 045 _90_ 90
Wall 94 0 045 180 90
Wall 6 0.045 270 90
Wall 203 0-045 180 _90
Wall 122 0 045 270 90_
Wall 301 0.045 _0 90
Rnnf 2-378 0.024 Q 18
Wall 107 0 045 90_ 90_
W la I 28 0 045 180 90
Wall 80 0.045 90 90
Door 24 0.387 _90 _90
wall 140 0 045 90
Wall 6 0.045 270 90_
Wall 112 0 045 0 _90_
Wall 262 0 060 90 9.d
nnnr 24 0 387
Wall 504 0 045 180 _990_
wall 52 0.045 270 90
(all 116 0.045 180 90
Wall 133 0.045 270 90
WaII 48 0 045 180 _9.Q
WaII 52 0 045 270 -90
Wall 416 0 045 _(L _9.0_
Solar
Gains
Y / N Form 3 Reference Location / Comments
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: LQ060105 Page:8 of 14 1
Computer Method Summary (Part 2 of 3) C -2R
Mr. & Mrs BUTENSCHON 8/23/2005
Project Title Date
FENESTRATION SURFACES
# Type
Area
U-
Factor
SHGC
Act.
Azm.
Glazing Type
Tilt
Location/
Comments
1-
Window Front
(Fac
-3.5
0 450
0.38
g0_
qQ GENERAL Aluminum Corp
Low-FWhole House
2
Window Front
(East)
9.0
0.600
0.39
90
90 GENERAL Aluminum Corp.Low-E
Whole House
3
Window Front
(East)
3.5
0.450
0.38
90
90 GENERAL Aluminum Corp.Low-E
Whole House
4
Window Front
(East)
9.0
0.600
0.39
90
90 GENERAL Aluminum Corp.Low-E
Whole House
5
Window Left
(South)
2.0
0.450
0.38
180
90 GENERAL Aluminum Corp.Low-E
Whole House
6
Window Left
(South)
2.0
0.450
0.38
180
90 GENERAL Aluminum Corp.Low-E
Whole House
L
Window Rear
(West)
48.0
0.590
0.40
270
90 GENERAL Aluminum Corp.Low-E
Whole House
8
Window Front
(East)
25.0
0.600
0.39
90
90 GENERAL Aluminum Corp.Low-E
Whole House
6
Window Right
(North)
18.0
0.450
0.38
0
90 GENERAL Aluminum Cor
ow- Whole House
1Q
Window Right
(North)
18.0
0.450
0.38
0
90 GENERAL Aluminum Cor
ow- Whole House
11
Window Right
(North)
4.0
0.450
0.38
0
90 GENERAL Aluminum Corp.Low-E
Whole House
12
Window Left
(South)
30.0
0.600
0.39
180
90 GENERAL Aluminum Corp.Low-E
Whole House
13
Window Left
(, out
25.0
0.600
0.39
180
90 GENERAL Aluminum Corp.Low-F
Whole House
14
Window Left
(South
6.0
0.590
0.39
180
90 GENERAL Aluminum Corp.Low-E
Whole House
15
Window Left
(South)
6.0
0.450
0.38
180
90 GENERAL Aluminum Corp.Low-E
Whole House
16
Window Left
(South)
6.0
0.450
0.38
180
90 GENERAL Aluminum Corp.Low-E
Whole House
17
Window Rear
(West)
16.0
0.450
0.38
270
90 GENERAL Aluminum Corp.Low-E
. Whole House
18
Window Rear
(West)
64.0
0.590
0.40
270
90 GENERAL Aluminum Corp.Low-E
Whole House
_JR
Window Rear
(West)
24.0
0.450
0.38
270
90 GENERAL Aluminum Cor
Low -E Whole House
20
Window Rear
(West)
96.0
0.590
0.40
270
90 GENERAL Aluminum Corp.Low-E
Whole House
21
Window Left
(South)
24.0
0.600
0.39
180
90 GENERAL Aluminum Corp.Low-E
Whole House
22
Window Rear
(West)
16.0
0.450
0.38
270
90 GENERAL Aluminum Corp
Low -E Whole House
23
Window Rear
(West)
21.3
0.450
0.38
270
90 GENERAL Aluminum Corp.Low-E
Whole House
24
Window Rear
(West)
21.3
0.450
0.38
270
90 GENERAL Aluminum Corp.Low-E
Whole House
25
Window Rear
(West)
21.3
0.450
0.38
270
90 GENERAL Aluminum Corp.Low-E
Whole House
26
Window Right
(North)
24.0
0.600
0.39
0
90 GENERAL Aluminum Corp.Low-E
Whole House
27
Window Right
(North)
24.0
0.600
0.39
0
90 GENERAL Aluminum Corp.Low-E Whole House
28
Window Right
(North)
6.0
0.450
0.38
0
90 GENERAL Aluminum Corp.Low-E
Whole House
29
Window Right
(North)
6.0
0.450
0.38
0
90 GENERAL Aluminum Corp.Low-E
Whole House
INTERIOR AND EXTERIOR SHADING
Window
Overhang Left Fin
Right Fin
#
Exterior Shade Type
SHGC
Hgt.
Wd.
Len. Hgt.
LExt. RExt. Dist. Len.
Hgt. Dist. Len. Hgt.
1
Bug Screen
0.76
1.5
3.0
2.0
0.1
2.0 2.0
2
Bug Screen
0.76
3.0
3.0
2.0
0.1
2.0 2.0
3
Bug Screen
0.76
1.5
3.0
2.0
0.1
2.0 2.0
4
Bug Screen
0.76
3.0
3.0
2.0
0.1
2.0 2.0
5
Bug Screen
0.76
2.0
2.0
2.0
0.1
2.0 2.0
6
Bug Screen
0.76
2.0
2.0
2.0 0
2.0 ---2-0
7
Bug Screen
0.76
8.0
6.0
2.0
0.1
2.0 2.0
8
Bug Screen
0.76
5.0
5.0
2.0
0.1
2.0 2.0
9
Bug Screen
0.76
6.0
3.0
2.0
0.1
2.0 2.0
10
Bug Screen
0.76
6.0
3.0
2.0
0.1
2.0 2.0
11
Bug Screen
0.76
2.0
2.0
2.0
0.1
2.0 2.0
12
Bug Screen
0.76
5.0
6.0
2.0
0.1
2.0 2.0
13
Bug Screen
0.76
5.0
5.0
2.0
0.1
2.0 2.0
14
Bug Screen
0.76
3.0
2.0
2.0
0.1
2.0 2.0
15
Bug Screen
0.76
2.0
3.0
2.0
0.1
2.0 2.0
16
Bug Screen
0.76
2.0
3.0
2.0
0.1
2.0 2.0
17
Bug Screen
0.76
2.0
8.0
13.5
0.1
2.0 2.0
18
Bug Screen
0.76
8.0
12.0
13.5
0.1
2.0 2.0
19
Bug Screen
0.76
2.0
12.0
16.5
0.1
2.0 2.0
20
Bug Screen
0.76
8.0
12.0
16.5
0.1
2.0 2.0
21
Bug Screen
0.76
8.0
3.0
25.0
0.1
2.0 2.0
22
Bug Screen
0.76
2.0
8.0
2.0
0.1
2.0 2.0
23
Bug Screen
0.76
8.0
2.7
2.0
0.1
2.0 2.0
24
Bug Screen
0.76
8.0
2.7
2.0
0.1
2.0 2.0
25
Bug Screen
0.76
8.0
2.7
2.0
0.1
2.0 2.0
26
Bug Screen
0.76
8.0
3.0
2.0
0.1
2.0 2.0
27
Bug Screen
0.76
8.0
3.0
2.0
0.1
2.0 2.0
28
Bug Screen
0.76
2.0
3.0
2.0
0.1
2.0 2.0
29
Bug Screen
0.76
2.0
3.0
2.0
0.1
2.0 2.0
Run• Initiation Time: 08/23/0518m5312 Run Code: 1124848392
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: LQ060105 Page:9 of 14
ti
Computer Method Summary (Part 2 of 3) C -2R
Mr. & Mrs BUTENSCHON 8/23/2005
Project Title Date
FENESTRATION SURFACES
U- Act.. Glazing Type Location/
# Type Area Factor SHGC Azm. Tilt Comments
8.0. Window Right (North) 19n 0 600 0 39 0 q0 GFNFRAL Aluminum Corp Low-FWhole House
• 31 Window Right (North) 12.0 0.600 0.39 0 90 GENERAL Aluminum Corp.Low-E Whole House
I
t
INTERIOR AND EXTERIOR SHADING Window Overhang Left Fin Right Fin
#' Exterior Shade -Type SHGC Hgt. Wd. Len. Hgt. LExt. RExt. Dist. Len. Hgt. Dist. Len. Hgt.
30 Bug Screen 0.76 6.0 2.0 2.0 0.1.— 2.0 2.0
31 Bug Screen 0.76 6.0 2.0 2.0 0.1 2.0 2.0
Run In* T*mem 08 Run Code* 1124848392
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: LQ060105 Page: 10 of 14
Cooling Equipment . Minimum Duct
Type (air conditioner, Efficiency. Location Duct Thermostat Location /
heat pump, evap. cooling) (SEER) (attic, etc) •R -Value Type Comments
Split Air Conditioner 12.0 SEER .Ducts in Attic 4.2 'Setback HVAC System
.WATER HEATING SYSTEMS Ratedl Tank 'Energy Facts 1 Tank lnsul.
Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value
System Name .Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%). Ext.
A.O. SMITH FPS -75-230. Small Gas Standard 1 75,000 75 0.52 n/a 12
1 For small gas storage,(rated input <= 75000 Btu/hr), electric resistance and heat pump water.heaters, list energy factor.
For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency.
REMARKS '
Computer Method Summary
(Part 3 of 3) C -2R
Mr. & Mrs BUTENSCHON
8/23/2005
Project Title
Date
THERMAL MASS FOR HIGH MASS DESIGN
'
4
Area Thick. Heat
Inside Location
Type
(so (in.) Cap._
Cond. Form.3 Reference
R -Val. Comments
Concrete Heavyght
428 3 50 98
0_ 98 njan
Whole Houc - / Slah on ,rad
Concrete. Heavyweight
518 3_50 28
0_98 n/a
2 Whole House / Slab on Grade
Concrete, Heavyweight
1,860 3.50
0.98 n/a
0 Whole House / Slab on Grade +
PERIMETER LOSSES
F2 Insulation
Type
Length Factor R -Val
Depth Location / Comments
Slab Perimeter
86 0.76 0.0
0 Whole House
a .
Slab Perimeter
59 0.76 0.0
_ 0 Whole House
Slab Perimeter
180 0.76 0.0
0 -Whole House
-
HVAC SYSTEMS
r -
Heating Equipment
Minimum' Distribution Type
Type (furnace, heat
Efficiency and Location Duct
Thermostat - ..Location/,
pump, etc.) .
(AFUE/HSPF)(ducts/attic, etc) R -Value•
Type Comments
Central Furnace
80%AFUE Ducts
in Attic 4.2
Setback HVAC item e
Hydronic Piping
Pipe Pipe
Insul.
System Name
Length Diameter
Thick. .
Cooling Equipment . Minimum Duct
Type (air conditioner, Efficiency. Location Duct Thermostat Location /
heat pump, evap. cooling) (SEER) (attic, etc) •R -Value Type Comments
Split Air Conditioner 12.0 SEER .Ducts in Attic 4.2 'Setback HVAC System
.WATER HEATING SYSTEMS Ratedl Tank 'Energy Facts 1 Tank lnsul.
Water Heater Water Heater Distribution # in Input Cap. or Recovery Standby R -Value
System Name .Type Type Syst. (Btu/hr) (gal) Efficiency Loss (%). Ext.
A.O. SMITH FPS -75-230. Small Gas Standard 1 75,000 75 0.52 n/a 12
1 For small gas storage,(rated input <= 75000 Btu/hr), electric resistance and heat pump water.heaters, list energy factor.
For large gas storage water heaters (rated input > 75000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input, and Recovery Efficiency.
REMARKS '
Computer Method Summary (Addendum) C -2R
Mr. & Mrs BUTENSCHON 8/23/2005
Project Title Date
Special Features and Modeling Assumptions
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies
based on the adequacy of the special justification and documentation submitted. Plan Field
The DHW System "A.O. SMITH FPS -75-230" Energy Factor = 0.520: Ain EF below 0.58 requires an R-12 External Blanket..
The HVAC System "HVAC System" includes credit fora Radiant Barrier installed per Section 8.13 of the Residential Manual.
HIGH MASS Design(see C -2R) - Verify Thermal Mass`. 428 sgft Exposed Slab Floor, 3.50" thick at Whole House
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 518 sgft Covered Slab Floor, 3.50" thick at Whole House
HIGH MASS Design(see C -2R) - Verify Thermal Mass: 1860 sqft Exposed Slab Floor, 3.50" thick at Whole House
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the'supervision of a CEC approved HERS
provider. The HERS rater must document the field verification and diagnostic. testing of these measures on a form CF -6R. Plan Field
Run Initiation Time:"08/23105 18:53:12 Run Coder 1124848392
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: L0060105 Page:12 of 14
i
PROPOSED CONSTRUCTION ASSEMBLY ENV=3
PROJECT NAME
Mr. & Mrs BUTENSCHON
DATE
8/23/2005
COMPONENT DESCRIPTION
DESCRIPTION
FRAMING
OUTSIDE SURFACE AIR FILM
1
Membrane, Vapor -Permeable Felt
2
Gypsum or Plaster Board
3
Insulation, Mineral Fiber, R-19
4
Gypsum or Plaster Board
5
ASSEMBLY NAME
R-19 Gara eWall GYP + 5/8" GYP
1.06
7
0.26
6
ASSEMBLY
Floor
INSIDE SURFACE AIR FILM
0.680
TYPE
(check one) ,
X Wall
LU
W
Ceiling I Roof
FRAM
FRAMING MATERIAL
Wood
2.3
p
Z
FRAMING %
15 %
Framingo
/o
15% (16" o.c. Wall)
12% (24" o.c. Wall)
10% (16" o.c. Floor/Ceil.)
SKETCH OF ASSEMBLY
7% (24" o.c. Floor/Ceil.)
SUBTOTA
Rc Rf
R -VALUE
DESCRIPTION
FRAMING
OUTSIDE SURFACE AIR FILM
1
Membrane, Vapor -Permeable Felt
2
Gypsum or Plaster Board
3
Insulation, Mineral Fiber, R-19
4
Gypsum or Plaster Board
5
2.87
6
1.06
7
0.26
6
s
INSIDE SURFACE AIR FILM
SUBTOTA
Rc Rf
R -VALUE
THICK-
NESS
(in.)
FRAMING
❑
❑
El
El
El
El
0.170
0.010
0.625
6.000
0.500
19.002
5.940
0.450
0.450
2.87
0.37
SUBTOTA
Rc Rf
R -VALUE
CAVITY .
R -VALUE
(Rc)
WOOD
FRAME
R -VALUE
0.170
0.170
0.0601
0.060
0.562
0.562
19.002
5.940
0.450
0.450
2.87
0.37
1.06
2.081
0.26
0.54
0.680
0.680
.20.92
7.86
-HEAT CAPACITY (Optional)
WALL
WEIGHT
(lbs/sf) ,
SPECIFIC
HEAT
(Btu/F-Ib)
HC
(A X B)
(Btu/F-sf)
[ 0.0478 X
0.85 ]
0.06
0.35
0.02
2.60.
0.26
0.68
2.87
0.37
1.06
2.081
0.26
0.54
7.6
TOTAL HC
2.3
'NOTE: Weight and Specific Heat values for materials
penetrated by wood framing
include the effects of the framing
members.
[ 0.0478 X
0.85 ]
+
[ 0.1272I
X 0.15 ]
_
. 0.060
1 / Rc
1 - (Fr% / 100)
1 / Rf
Fr% / 100
ASSEMBLY U -VALUE
EnergyPro 3.1 ByfnergySoft User Number: 5732 Job Number: LQ060105 Page: 13 of 14
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Mr. & Mrs BUTENSCHON 8/23/2005
SYSTEM NAME
FLOOR AREA
HVAC Svstem 9 Rna
Number of Systems
2
Heating System
Output per System
65,000
Total Output (Btuh)
130,000
Output (Btuh/sqft)
46.3
Cooling System
Output per System
58,500
Total Output (Btuh)
117,000
Total Output (Tons)
9.8
Total Output (Btuh/sqft)
41.7
Total Output (sgft/Ton)
287.8
Air System
CFM per System
2,000
Airflow (cfm)
4,000
Airflow (cfm/sqft)
1.43
Airflow (cfm/Ton)
410.3
Outside Air (%)
0.0
Outside Air (cfm/sgft)
0.00
Note: values above given at ARI conditions
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
ISensiblel
Latent
CFM
I Sensible
1,585
28,609
0
1,230
38,796
0
1,430
1,940
0
0
0
0
0
0
0
0
0
1,4301
1,940
31,47:0[==0 42 676
York H4DH060/PDHUCO20L60 U&H 75,072 24,842 130,000
Total Adjusted System Output 75,072 24,842 130,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Aug 2 pm Jan 12 am
EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak
26.0 of 69.5 of 69.5 of 100.10F
Supply Air Ducts
Outside Air rr
0 cfm 99.6 of
Supply Fan Heating Coil
4000 cfm ROOMS
69.5 of 70.0 of
Return Air Ducts
m Temoeratures at Ti
111.0/77.6OF 74.3/62.1OF 74.3/62.2OF . 56.7/55.7OF
Outside Air
0 cfm
74.3/62.10F
Supply Fan Cooling Coil
4000 cfm
h Return Air Ducts `S
Supply Air Ducts
57.0 / 55.9 of
51.3% R.H. ROOMS
74.0 / 62.0 of
EnergyPro 3.1 By EnergySoft User Number: 5732 Job Number: LQ060105 Page: 14 of 14 1