0728rte:,-.`"',�Yn'•syl'tiRs`sx'✓.:,,u,x�.'t,NiH''''"t�+.i=..t"``7�iJ,'c^;w'i-�V"j`�.-.:'•4`,�aK`];w �+'':•,�,�._..4�0y«w� ,.,,.�J"�f•�,�t.f,':` tr.�.�
.•►-...+�+eK-,.e.+'�r+!:"a.-�.4.�a�"r.._rain-araJ�.w..ay.r4:.-..�-:a...r,P���.�.r:� -. �.++..�......4w..wc..m.`-r.,:.y.-..•w:.... �.. r ..w�.. - - -
NOTE:
With proper validation
this form constitutes an
encroachment permit
53440-749
CITY OF LA QUINTA
APPLICATION FOR 'PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
M
r
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
f
Subdivision Improvement Permit —Class I II
DATE: July 2, 1990 Minor Improvement Permit Class IV
LOCATION,OF.CONSTRUCTION Calle Barcelona and Avenida Bermudas
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION to install new gas main Sketch (attach construction plans if a
r p ppropriate)
DESCRIPTION OF CONSTRUCTION to install 306' of . 2" mediumm
pressure plastic gas main 10'
N/SPL of Calle Barcelona
DIMENSION OF INSTALLATION OR REMOVAL beginning 111' E/EPL of Avenida
Bermudas, proceeding east
SIZE OF EXCAVATION, IF NEEDED See attached tgp 224 Dl Cut earth
APPROXIMATE TIME WHEN WORK WILL BEGIN 7/9/90
APPROXIMATE TIME,OF COMPLETION 4
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of.this permit, the applicant hereby agrees to:
Indemnify, • defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising o6t of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. i
Comply with all, applicable City Ordinances, the terms and' conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this -work.
t
J.M. Snyder, Distribution Supervisor
Signature of Applicant or Agent
Southern California Gas Co PO Box 3003 Redlands, CA 92373 (714) 335-7742
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and.Job Foreman Business Address Telephone No.
Contractor's License No. City Business License No.
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit — Class I I I
• Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs q�
Minor Improvement Permit — Class IV: See attached schedule ')`�� 0728
' r
Inspection Fee $
Permit Fee
Penalty
Cash Deposit -Surety Bond '
if required
TOTAL:
Receipt No.
Received by
Date
Recorded by -- —
PERMIT VALIDATION
PERMIT NO.
0728
DATE APPROVED 7/2/90
EXPIRATION DATE 12/31/90
DATE I SSU .D 7/2/90 '
By
.Administrative Authority
TELEPHONE: (619) 564-2246
A
' ��S �f r,» 1,�,. .��''. .-� ;r-.��„r. �1 :�S.r ..- ..•..`�. �.. h. .. � .�� v'rr��u �..-. s, � ,•{-. .. r-y._:_.�.y _ . *r ..�,.. �,_�.,r� ;�. �'[� L
� - !�+e-carkr.►:".M��ti+'+« yw M Yr, G: r..... ;w�,-+++,+-...... r r..r ww Y.e ++.. i.. �. •.a. N. r ....:L .W- .i, -..r ...r i« .r..� «+ .r -� r..ny..i:...«w�+w^....r, �,..r,.'wwr w �a
�M
NOTE: '
With proper validation
this form constitutes an
encroachment permit CITY OF LA QUINTA
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
53440-749
For—the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers,' water mains
and. otherdike public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
4
t
DATE: July 2, 1990 Subdivision Improvement Permit — Class III
Minor Improvement Permit Class IV
;LOCATION,OF CONSTRUCTION Calle Barcelona and Avenida Bermudas
(Street address or Description of Location)
i to itstall new gas main
PURPOSE OF CONSTRUCTION Sketch (attach construction plans if appropriate)'
d
DESCRIPTION OF CONSTRUCTION to install 306' of 2" mediumm
pressure plastic gas main 10'
N/SPL of Calle Barcelona
DIMENSION OF INSTALLATION OR REMOVAL beginning 111:' E/EPL of Avenida
Bermudas, proceeding east
SIZE OF EXCAVATION, IF NEEDED see attached tgp 224 D1 Cut earth
APPROXIMATE TIME WHEN WORK WILL BEGIN 7/9/90
APPROXIMATE TIME OF COMPLETION f`
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend, and save the City, its authorized agents, officers,' representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or -damage to persons or property
happening or occurring as.a proximate result of any work undertaken under the permit granted pursuant to this application.
• Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result of this work.
J.M. Snyder, Distribution supervisor
Signature of Applicant or Agent
Southern California Gas Co PO Box 3003 Redlands, CA 92373 (714).335-7742
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
Contractor's License No.
City Business License No.
Applicant's Insurance Company .h Policy Number
FEES: Sdbdivision Improvement Permit —Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs��. �*•
Minor Improvement Permit — Class IV: See attached schedule �_>
0728
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
t a
$ -0-
Received by Date
PERMIT VALIDATION' f
0728 ,
PERMIT NO.
DATE APPROVED 7/2/90
12/31/90
EXPIRATION DATE
DATE ISSUED / 7/2/90 .
By C ....a
.Administrative Authority
Recorded by 11 TELEPHONE: (619) 564-2246
i
V
EXCAVATION REPORT- SOUTHERN CALIFORNIA GAS CO.
TO.:. rCTTY
77R
PERMIT NUMBER
_ OR ACCOUNT SUB. ACCT. 1 COO
DATE PREPARED 8-31-90 OR EURNO. 53400 749 1 KA.
JSIZE OF CUT KIND
100'x1.5' 4"MAC
SOUTHERN CALIFORNIA GAS CO. 2865.2B
CV/�A\IwT1AM11 OC G/lOT _ rw..ru�e..nw• ��vu.n �n� %1i0 G
TO:•d
OF LA QUINTA
L
°
CAlle barcelona x Avenida Bermudas
A
T
-
O
N
COI
77R
PERMIT NUMBER
_ OR ACCOUNT SUB. ACCT. 1 COO
DATE PREPARED 8-31-90 OR EURNO. 53400 749 1 KA.
JSIZE OF CUT KIND
100'x1.5' 4"MAC
SOUTHERN CALIFORNIA GAS CO. 2865.2B
CV/�A\IwT1AM11 OC G/lOT _ rw..ru�e..nw• ��vu.n �n� %1i0 G
TO:•d
CITY OF LA QUINTA
L
°
CA1le Barcelona x Avenida Bermudas
A
T
-
I
O
N
PERMIT NUMBER j
w
w
IS
I
it
t 1 '
100'x1.5' 411MAC q
I
SOUTHERN CALIFORNIA GAS CO. 2865-26 a
WORK ORDER
PROD. OR
OR
OR ACCOUNT
SUB. ACCT.
COI
_
DATE8-31-90EXECUTION
PREPARED ORDER NO.
53400
749
KA
SIZE OF CUT
KIND
t 1 '
100'x1.5' 411MAC q
I
SOUTHERN CALIFORNIA GAS CO. 2865-26 a
DASESr-N.TA
KETC NP SK TCN E NO.• B N CO M -. I er: I SHEET -
1 -7 \
' TIEQ. -
N
+
_ T - iiJ
_..� _.__ �_.. , _.• _ _ _ _ ..
-
'�- N
Q.
,
• .� a J, !
.F
MAtrd CDN®:
,J
•
C
obt - �=
-
, 3 _
I _
-
_ - - UT1
t
_ �� •Y. I:•' _ X11,1 ..
4 f .
�7 i
_. � t• -� ,... �tY'i - •lig -, - - - , , •�_ •_� �_ , ��. t' .
to
�t -_ �-• _ A N- LTIV S:
Q
t t =TAIL°�p'MAI R -
.. �- .. , _ IV SE YiC___.
LLQ
• P/ N' C'/-/ Y "T/�- l IV 1.� 1 R QCT A T C= t •
- f
_ ._ ._ _.._ .. _ _ ..-. _ ._.• ._ ._ _. .__. _._tit - - .. � .... .. .. .. _ _. .. ._..
SOUTHERN CALIFORNIA GAS CO. -2956.3)
-
TOTAL FEET INST' J.
3
•
S7'
INSTALL MAIN WITH AT LEAST
^ COVER BELOW__L _X/57
TOTAL FEET
RET!kED
• - ... _.. •_
"
1`�VFiI\�,0�
•.- RETIREMENT
PERMIT ISSUED BY
PERMIT NO.
DATE MOVED DATE MOVED DATE OF
COUNTY
1L1-'r� TJF'
ON JOB OFF'JOB OPER.
p� '(� �T _
f - ..
(�A AJI ��
_
CREW FOREMAN
DISTRICT
REASON
•
TRACT
PLANNED BY
COMPANY
NO.
l
STAKED ❑
COMPANY FACILITY: SO. CAL. ❑ P.L.S. ❑
ATLAS 1 j�D , Z_ •' •-
YEAR C.P. . __ ,,,__.
_..
REVIEWE BY
-
r.1t,At�1 D CM���
.
NO.
CATHODICALY
INSTALLED
20% OR OVER ❑
/2�`�1�[�%F�
STAKING REQ'D. ❑
DIVISION
-
PROTECTED YES ❑ NO ❑
OPER.
{ AT LESS THAN 20% ❑S.M.Y,S.
NO STAKES NEEDED
Q ,,, >d,q ORG.
W.O. -1 -i /`' / CODE "
DISTRICT SUPERVISOR-
SOUTHERN CALIFORNIA GAS CO. -2956.3)
ADDITION--,--ENCROACHMENT•PERMIT-'NO.0728 ---- CONDITIONS•"' "s
R33
Survey -.monuments • .,
shal'lr.be protected in place` or
re ;established pursuant to City. standards •and' the .State_,`'of t<'
California.,Land'Surveyor's-Acta
R34,
--Work shall' -be • coordinated ''with the City of La Quintals
•
forces to . preclude delay ror interference `with •the ' City, .of La`
Quinta'.s_ projects,. - }
R35
Contractor. shall -comply wiih'_tl e, -local noise ordinance and
'* i
,construction operations'•and maintenance of•equipment--within,.
one ,half..mi-le'•'of ' human •occupancy;. shall be . per_ formed only .. •.
'
x
during the'time periods as follows: 4
October ;1st, to April30: Monday -Friday �7:0Oa. m. -5 3Op,.m.
,"30:
'Saturday 8:00a.m.•-5:00-- '
May.lst.to-September 30: Monday -Friday 6:OOa.m.;=7:OOp.m.
,.
• k Saturday s - }"t 8 : 00A.m. -5 : OOp m. --
. -''Work
.'Work
shall'.be prohibited- anytime ;on Sunday and• Federal
•
`, holiday, E- _
R36
-<'Traffic control'shall be as per Call Trans Traffic Manual.. -
F
Field adjustments; in detouring rshal-l- be,'accomplished as. ,.
ti
directed' in -order to'adjust•to' actual, field conditions.., It
'
shall'be^the contractorl,s responsibility�to adequately '
;; , •' ,
barricade .and,.detour-this,- site'. A• Traffic -control plan shall, ;
be submitted` for `approval `by. -the City',Engineer.
R37
+, All' ex`cavation�'at or ,near the, travel way shall be�',backiiTled
' • -
;` at. the -'end of the work days, for the",protection of .'the
'
traveling public' y r - r
R38
Street' closures "shall not be -allowed .,at any time.;
1,
Construction access shall be''permitted from „Desert. Club -
•k
Drive only._
• R39
A minimum of one travel lane .shall be maintained'at,,all
'
times with 'f•lagmen•during-working hours.
j R40
All ,work to,tbe, performed within the.'existing paved' -,section
j shall be temporary paved and maintained by the. Permittee,,
permanent pavement shall be placed, no later, than '.15 days
.,
after completion, of'-ttie temporaryroad repair..
R41
.. Ingress •and egress; for• -local. properties shall be maintained*,
•
at all times _ ...x '
R42
Prior%to work .starting, Underground Service Alert .shall `be
contacted at 1-800=422-4133 and ;ari; "inquiry- number", shall, be ':'
f
provided•to the' -City Public Works Inspector. ,
',R4
Pavemeht shall be' sawcut- prior to • removal . „ x.
r•':
•. M1 ^ t d • �
�- .! �. 5 yr T •'
.'
.` ..
Additional Conditions 7.Encroachment Permit +iNo ' 0728 '
Southern California 'Gas„Com pany
Page 2
.f ; .R44,11
All backfill subgrade 's5oi1 shall be com acted, ^ '
p t to °nothing •,
•
Mess :than 90,% relative dry dens-ity,' all 'backfill soil within
• '
the top 2' `,of • finish ,pavementsurface shall* be: compacted: to•
•than
nothing less 95% '.relative dry density, -. all base_ ' ' I`
'
material„shall be,compacted to nothing less',than''95%,,.
relative dry density.,' 1. v
R45'
.Replacement. pavement sections ,shall be 3 x; ” AC 'over, 4”
.Class
II ' aggregate. base. '<
<If the"'"work,i's.,to be'per formed by forces other. than :that
the,,utility`,company, then. contracting:,company wi`ll be
requi-'red to apply for in, additional encroachment,- permit '9f
t
and pay --the appropriate If ee . "' •,
k +
I lr
'The•following General and Special Provisions are attached to and made apart of Permit No. e7
i f t - GENERAL PROVISIONS
.I• ` `• The following shall always apply. f .. •': }~ ••r .r � � , ,•
'ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way '
ONLY. Whenever construction extends within private property, it shall be theresponsibility of the permittee (or his contractors)to
secure permission from abutting property owners.'Stich authorization must be secured by the permittee prior to starting work.
n ' TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted tooperateonany
+ } paved surface unless fitted with smooth -faced street pads: All mechanical outriggers shall be fitted with rubber street shoes to protect
j. the pavirig during excavation's: Rubber -tired equipment, only shall be used in backfill operations in paved areas. If the existing -
pavement is scarred; spatted, or broken during the term of this contract,.or if the pavement is marred, City of La Quinta shall request
' that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C.. , t,
surfacing plus appropriate seal coat as specified'above. r ,
PROTECTION OF TRAFFIC: All excavations'and work areas shall be properly lighted and barricaded as deemed necessary by the City
t Engineer or La Quinta City Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration
of the project. The City shall be notified 24 Hrs. in advance of any traffic detours or delineations.
CARE OF DRAINAGE STRUCTURES: Any drainage structure includingcorrugated metal pipe, concrete pipe, steel culvert and .
concrete structures encountered during excavation which r;ec_ essitate removal shall be replaced, in kind. In the event.it becomes
t f necessary'to-remove'or"cut existing drainage structures,'Ciry of La'Quinta shall be notified prior to commencement of this work. '
r Drainage structures and open drains shall be kept free of debris at all times for proper drainage. { .
.. ,
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of -
i way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately afterbackfill and compaction.
+ Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed
„ prior., to.paving.,Water tanker shall be used, as required; to sprinkle the job site to keep down dust conditions and shall be used
immediately after backfill. ,.
` DE -WATER OPERATIONS: If de -watering operations are required•and pumps are forcing water on City of La Quinta roads, it shall be
t the responsibility of the permittee (contractor) to•control this water and to provide off-street bar;icades when necessary.
` y CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited -
access for the adjoining property owners and emergency vehicles. In the event it isfelt bythe permittee that he must close a streetfor
•� any length of time, permittee shall contact this office to obtain the necessary permission. '
r. SPECIAL PROVISIONS
The fol Wing shall apply ONLY when indicated: R
R1 NOTIFICATION: Permittee "shall notify the City at 564-2246 at least 48. hours in advance of starting construction.
'" CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than $
l , shall be furnished in the name of City of La Quinta to cover all work involved in the restoration of the various La Quinta
,t • , roads and survey monuments. This bond "shall be continuous until cancelled by the City Engineer. This bond must be '
i posted prior, to commencement of any work on this project.'
• ,, R3 TILITY CLEARANCE: (Substructures) Priohomaking ary excavation within the City of La Quinta right of way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility
of the permittee. `
( TILITY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilities are clear of the
'
` 9l proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R5 PAVEMENT WIDENING: Area between the proposed concrete gutter line -and the existing road pavement shall be
T surfaced with ' inches of A.C. paving placed on inches of class . aggregate subbase course
having an "R"value of not less than and in conformance with City of La Quinta Road Improvement Standards
and Specifications, Ordinance #461. r t +
86- PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of . �•
1 /4 inch to one foot (1').
R7 GRADES & STAKES: City of La Quinta shall establish grades and stakes for the proposed concrete curb and gutter
i . construction.:
.w R8 RADE CHECKING: City of La Quinta shall check grades upon receipt of plan and pFofile and/or grades as established by
+ r a licensed engineer.
R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete -'curb and/or curb and gutter ( feet) shall be
4 •t ±. „ removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
R10 DRIVEWAYS, A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the
property line and the existing road paving shall be 2-1 /2 inches of A.C. paving placed on ( ") of class
-
I aggregate base. Driveway construction shall conform to attached drawing. • ,
R11 CULVERTS:A inch diameter( )culvert shall be installed with the invert appioximately 1-1/2,
inches below and in line with the existing flow line. Culvert installation shall'conform to the attached drawing.
• R12 SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained.
- R 13" SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall complywith they
c' manufacturer's specifications. `
+R14 OORDINATE WORK: The proposed work shall be subordinatedtoany operation which the State of California or
City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated `with the State or
" } ` City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects..
�i
R15 URVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
+• r.. ,� centerline of all streets or property lines when involved shall be completely tied out so they maybe readily and correctly
be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the p
` ties to these monuments shall be furnished to the City Engineer prior tothe removal of any -monuments. This office shall, j
be notified upon completion of replacement of all survey monuments for proper project clearance.
RD -31 "
R16 IVEY MONUMENTS: Prior to excavation or beginning of c fiction, all survey monuments shall be tied out by City
.a Quinta'and suitable payment or guarantee of paymei II be made as reimbursement for all work involved.
R17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment
be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best
facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be
corrected.
R18 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to
pavement straight edge shall be corrected.
(.R19 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1,000 lineal feet of open trench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of
the traveling public. The Public Works inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on 'hew
site.
R20 ACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in lifts of notgreaterthan
three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods maybe substituted, but in any
ase a relative compaction of 95 percent shall be attained within the structural section of the roadway.
(t�bbefore
ACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care isto be exercised thatthe
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater
compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain
the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuous.
R23 COMPACTION TESTS: If so required bythe inspector, compaction tests shall be made at intervals of not more than 1,000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
624Standard Specifications, Division of Highways, State of California, dated January 1973.
OMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
ne (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made asoutlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
�C.ftera
25 EMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
onsisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed
maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed, but in no case shall
the placement of the temporary pavement exceed a five (5) day limit.
R26 ERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch
onsisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C.
surfacing placed on a inch class baind
all be pl cod no later than days after completion of
temporary road repair. (► � 0 �
R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill compo ion, a temporary patch consisting of two inches (2")
of cold mix paving (SC -800) shall be placed immediately. A permanent patch of three inches (3") of A.C. surfacing shall
be placed on six inches (6") concrete base as directed, but not later than fifteen (15) days after completion of temporary
paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards
and Specifications, Ordinance #461.
R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas
where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section
37, Standard Specifications, State of California. Division of Highways, dated January 1973. Work of pavement repair to
be accomplished by a licensed contractor engaged in the business of pavement repair.
R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public.
It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be removed in sectionswhich can be handled safelywithout interferenceor hazard to highway
traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the
highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it
becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate
signs, flagmen and/or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent tothe
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction
tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated
January 1973.
R32 TREE TRIMMING:
a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year.
All broken or weak sections within the trimming shall be removed.
b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500feet at anyone time.
Adequate signs, flagmen, and/or barricades shall be provided to protect the traveling public at all times.
c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own
arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided
by this permit.
d. All tree trimming on EVERGREEN TREES, PALM TREES, and other ORNAMENTAL TREES shall be accomplished to
the satisfaction of the City Public Works Inspector.
e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees.
f. Pruning shall, in all instances, be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches
(2") and above in size. Sealant shall be applied to all cut sections as directed by the City Public Works Inspector.
,..f441J& rT
53440-749
NOTE: '
With proper validation
this form constitutes an CITY OF LA QUINTA
encroachment permit -
APPLICATION FOR PERMIT
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways. pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
Subdivision Improvement Permit — Class III
DATE: ng/P S l Q n Minor Improvement Permit Class IV
LOCATION OF CONSTRUCTION Calle Barcelona and Avenida Bermudas
(Sam address or Description of London)
PURPOSE OF CONSTRUCTION Sketch (ate construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION To install 306' of 2" medium pressure
plastic gas main,10' N/SPL of
Calle Barcelona, beginning 111' E/EPL of
DIMENSION OF INSTALLATION OR REMOVAL Avenida Bermudas, proceeding east .
see attached tgp 224 D1 GUT EARTH
SIZE OF EXCAVATION, IF NEEDED
APPROXIMATE TIME WHEN WORK WILL BEGIN 07/09/90
APPROXIMATE TIME OF COMPLETION 3972 5 �/9 0
ESTIMATED CONSTRUCTION COST S
(Including removal of all obstruction, materials, and debris, beckfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit. the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, foss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at Mast twenty-four (241 hours in advance of the time when work will be started.
Minor Improvement Permit — Cuts IV: See attached schedule
Inspection Fee $
Permit Fee
Penalty
Capt Deposit -surety Bond
if required
. TOTAL:
Receipt No.
Received by Date
Recorded by
PERMIT VALIDATION
PERMIT NO.
DATE APPROVED
EXPIRATION DATE
DATE ISSUED
By
TELEPHONE: 1819) 564-2246
Administrative Authority
,� ! 4
Mg
Vj