0999+�wts., ����`'��.•a�; Lw ti yFo � +I i_ h1 ..�.e.,. ���.� v�.�st rW��i �,+��k�.fi-�.., �+2i-_�+��Yr �a\• `��,�e.�..T. .''„d+.Y'St '..t,.�t..-•�ir- ' `4-.,►.�`1f✓' `' • �"���,.. ..c�,
NOTE,-)
With proper validation .
thiVorm constitutes an
encroachment permit
CITY OF . LA QUINTA
APPLICATION FOR PERMIT
PUBLIC • WORKS CONSTRUCTION (ENCROACHMENT)•
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
- 91
2.-- Hl .
DATE:
LOCATION OF CONSTRUCTION
EI'SEN HOW ER
Subdivision Improvement Permit —Class 111
Minor Improvement Permit Class IV
40 TAM PI CO
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION REPLACE EX157IW2 : 300 FE Sketch ,(attach construction plans if appropriate)
L' ABLE
DESCRIPTION;OF CONSTRUCTION PER GTE DRAW I NU M O.. AT
REF C -►TF PEZIMIT 0993
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED 1135' 1 KrAl"t 321 L)KEP
SX/0 45?Ve_E P/T kin WORK Ian lTk-t i U
APPROXIMATE.TIME,WHEN WORK WILL BEGIN G
! APPROXIMATE TIME OF COMPLETION
ESTIMATE_ D CONSTRUCTION COST $
(Including removal of all obstruction; materials, and debris, backfilling, com-
paction and .placing permanent resurfacing and/or`replacing improvements)
SECTION OF TRE
PEP, AA 1-C 7 ED
Inconsideration of the granting of this permit, the applicant hereby agrees to:
TrtE PAVF—V
KOA D is
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from. and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of. the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the resultoNthis work.
Signature of Applicant or -Agent 1/800 - 96-G-- OW 7
FLOWMAE I -DRP NO W. /0 PL' 5TF ,8121 TEMtPE BIZ.
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman - Business Address Telephone No.
y9yZ6lo 1S2(e
Contractor's License No. City Business. License No.
LIBERTY MUTUAL LGI - 131- N39 SZZ -6Z0
Applicant's Insurance Company Policy Number
FEES:' Subdivision Improvement Permit — Class'l II
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Inspection Fee $
Permit Fee /0,00
Penalty
Cash' Deposit -Surety Bond
if required
TOTAL: $ 120,60.
Receipt No.
Received by Date
Recorded by
??"'CAM i�i^ITALr 3Q~g100 A'
0
PERMIT VALIDATION
PERMIT NO. 99
DATE APPROVED
EXPIRATION DATE
2 -IS -91
DATE
/ISSUED'
By
Administrative Authority
TELEPHONE: (619) 564-2246
Iq
�VawM-�lk•Mr�ti •+.. %L r1 ar rc.r ,r w ++i.— w r wn �+ Tr s?nr �±. w� .} a+ ted. w e. w, ms's a► w �d b ii wry+. �r ._r �F �! +h Ms r .�+�a .. ilr ro� e� rim, a+r •
i..
NOTE: - �m
With roper validation 4 �+► 2
this'form constitutes an
encroachment permit CITY OF LA QUINTA
APPLICATION FOR PERMIT _
PUBLIC WORKS CONSTRUCTION (ENCROACHMENT)
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE:
7-Lj_ 91
LOCATION OF CONSTRUCTION
Subdivision Improvement Permit - Class III
Minor Improvement Permit Class IV
EI`,ENHOWCK M/D 7AMPIC0
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION REPLACE EXIST 1A)b D M Sketch (attach construction plans if appropriate)
0AP-)LE FtR GTE. r-'ZAWIWb MO. AT
DESCRIPTION OF CONSTRUCTION
- F EF C -i -i E P F— CM 1-T 0 9 S3
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED 1135'
LkrAICH 3011 DY?
::j X iu -_;1r1, i Gtr r/ I1 10
APPROXIMATE TIME WHEN WORK WILL BEGIN Z-5- 1 `-�ECT IQ M GIS. 'THE UA D 15
APPROXIMATE TIME OF COMPLETION Z-7" q 1 PEP, RA IT -T Lr1l)
ESTIMATED CONSTRUCTION COST $
(Including removal of all obstruction, materials, and debris, backfilling, com-
paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, • defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quinta and to pay for any additional replacement necessary as the result o 'this work.
Signature of Applicant or Agent �✓ I/800 - 9S6— 09l7
FLOWMOL E BURP /4.103 W. ID TN PL 5rE 8/2/ TEMPE x17.
Name of Applicant (please print) Business Address Telephone No.
Name of Contractor and Job Foreman Business Address Telephone No.
q9y ZO& 10 ZL
Contractor's License No. City Business License No.
Lh3ERTY MUTUAL LGI - l3/- N39 57-Z -OZO
Applicant's Insurance Company Policy Number
FEES: Subdivision Improvement Permit - Class III
Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit - Class IV: See attached schedule
Inspection Fee
Permit Fee
Penalty
Cash Deposit -Surety Bond
if required
TOTAL:
Receipt No.
$ /Z.0.0o
A0,00
Received by Date
7
PERMIT VALIDATION
PERMIT NO. 0 99 q
DATE APPROVED Z" 44 - Cl 1
EXPIRATION DATE
DATE//ISSUUE-D
By X10 111'1 /S /.l�/N�A�►'�
Administrative Authority
Recorded by 11 TELEPHONE: (619) 564-2246
.-, 11 -1 ( ex
ADDITION-- CROACHMENT `\PERM_ IT NO.:ci9CONDITIONS .
f r' R33-
Survey; monuments sAkl.be protected in place or
re-established, pursuant-'oto+_City standards,.and' the State of
California Land' --S Act . _ -
^R3.4
Work.shall .be coordinated with' the City of La Quint'a'l '; {
s
`..
�:
forces to ''preclude.'delay. or\ interferencer•withr-the City"sof Lar:. _� =
._ ;� •' 'i -.'Quinta's.:'p'rojects :. *r �-
-t-R35
. Contractor shall'• comply' with the local•^noise ordinance' and -
construction operations , and ,•maintenance of equipment_ within t,Y
one halfmile of.,human' occupancy shall Abe' -performed only ,
during the time periods as: follows: -
October. -1st: to`"April 30. Monday -Fr iday•;.7.:'00a•m.75 30p. -m.' �-
_ ;
• . ;Saturday ' ,, , 8.6Oa:m:.-5�: OOp.'m.
May_1'st,to,September 30c Monday-Friday'6:OOa..m.-T:00p.m. -
r
F
*..y . • Saturday 8 .O0a.m:=-S OOp.m.
Work shall• be. prohibited 'anytime, on, Sunday and Federal '' r
holiday. r -
• R36" •
Traffic •control 'shallybe as, per. �Ca1 =Trans Traffic nual
Ma
r - ,y
.Field adjustments in detouring shall'be'•accompli`shed- as
directed in order,,, to adjust''to :actual- field' conditions. It
` ="shall
be the, contractor 's;responsibility,_ toyadequately, -
barricade and detour •this• site ,,A Traffic tcontrol plan shall �, '•
-.-_,be
,
�,siubmitted ; for approval by the' City ' Engineer :
! :R37
c All excavation ,at or near 'thetravel= way shall ;be backfilled
' at tli&' end of"the work day, for the--protection^of _the ` '
traveling, public.!->.'.; .. r
_ R38
Street closures• shall not be; allowed 'a`t any., time
= . "y, R3.9,'A
A minimum ,'of `two' paved travel lanes shall be' maintained �'at.-, '.
all times *with • f lagmen during working hours.--- s
°' -'-R40
All work to Abe performed..within' the existing ,paved section "
r
shall 'be`'temporary paved and maintained, by,"fthe Permittee,
. = ,
,
permanents pavement shall be placed kno later, -,than 15 ` days
after. -completion of the temporary, -road --repair.
R41'-.
Ingress and -egress' fol ,local properties sha•11 be maintained`
' ' ~
at . all times S. M .
r
! •,
" R42 "•`*•
-Prior, -to._work ,.starting,' Underground Service Alert sha•11• be a
contacted tat 1-800-422-4133 and pan "inquiry 'number" be
z'
,shall
-provided.to .the, -City 'Public Works 'Inspector. '
' R43-,
Pavement shall •be 8,awcut prior to removal ., �- • ; ' '
'
•'.fir a4
,:
- i- 'ft .'y y • • rid .
-•+ +.. ')r - -
• r r{I,. .
•�it •-C�
` M � � t Y ' } t -
• • • - s .•r • .y
'. •.T � `�
- r 'S�
• ' k -' .. , • {•4 k 9-+ , Y', + •
,• ..
{ w i` • �r y Y. , S
:Additional,.Conditions - Encroachment`s Permit No. a99°►
-
P age1
2
;
�
-moi' S `i
n ��, 4• • . ..��' - , ., f, i-' - j '
a
}
R44 i
A11 backfill subgrade.,soil shall: be' compacted- to nothing
'`• t.
•
less -than' 90 0` relative dry -. density, all' ,backfirll"soil within
the ,top '2,' . of finish pavement usurface_ shall` 'be- compacted to Y
not in" less than`95o relative dr-y,dens' t a'll base
' .
materrAl'. shall be;.c,omp•acted t6'7nothin9 less than 95%
,
* `
relative dry_ density.
1.'•�
,r`'be.
' . R45='
S
Replacement `pavement r sections . shall. beAC over• 4"`• Class•
II, aggregate base., �.
`
t -
aR46
If the .work `is' to bei performed 'forces other, than thaf,. K
•
.by t of
` n
the uti-bits, company, the 'contracting coinpariy' will''be.
r
1
required`..to, apply; fors an :add'itional- encroachment permit- 5
-
ands -pay the appropriate °-fee.
..
�.r
` I� 1, rs•
' ,
My
1 .
- ,.• - t , .
71
-;-r"
pj. J: ? fY ` ..
-
..
•� .. I•a �- �• `t •s .
, �+. �'... �j -' F'
L '
•
t'
1 i Y
f T F �
4
-
♦ �: . f '
a . } r f h ^ t � '
r �
, '
�
i
1 , + • • s
/'`Ya
'a ^1.'
J
�,
.'r
- t ` •..
p f a ..," 1, -
•�, a
•
1
�_
.� _r" . r
- -
-E
�.. >t• .l.' i..•
. r .,w' - . -�'
"; fir. e.'r .a
y{t
�
+'
r!'� a
: 4 4t r - , •. ; r t _ � 4 ,'1 L '+ r -. ' f . 9 ,
' �� ,r_ i r_ �r•tata,�r_•fa�rar•':'i. !tae i bra �� �� rr•.. �,� �ffa �� ��-fr.'��
... _NOTE. .f• A _ '• '
With proper validation
this form constitutes an
LA
encroachment permit CITY. OF OUINTA:
APPLICATION FOR ,PERMIT
^ *PUBLIC, WORKS CONSTRUCTION '(ENCROACHMENT) '
For the construction of public or _private. curbs, driveways, pavements, sidewalks, parking lots, sewers,"water mains
and:other like public works improvemets in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS .
n / Subdivision Improvement Permit Class.iIl .
' DATE: 41 L �� '. Minor Improvement Permit Class IV
LOCATION OF. CONSTRUCTION / ��� L
(Street address or Description of Location)
PURPOSE OF CONSTRUCTION _ Sketch (attach construction plans if appropriate)
DESCRIPTION OF CONSTRUCTION E& C '700
DIMENSION OF INSTALLATION OR REMOVAL
SIZE OF EXCAVATION, IF NEEDED t.
0�
APPROXIMATE TIME WHEN WORK WILL BEGIN
APPROXIMATE TIME OF COMPLETION
ESTIMATED CONSTRUCTION COST $
(Including removal of•all.ot stryaion, materials, and debris, ba -*filling, com-
paction and placing permanent resurfacing and/or. replacing improvements)
In consideration of .the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents; officers, representatives and employees; harmless from and against any arod-ail
penalties, liabilities or loss resulting from claims or court action and,arising out of any accident, loss or damage to persons. or property ,
happening or occurring as a proximate result of any'work undertaken :under.the permit granted pursuant to this application.'
inistrative' Authority at least twenty-four 1241 hours in advance of the time when work will be started.
Notify the, the, Adm:.
Comply with all appliable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of
La Quints and to'pay, for any additional•repia"rit necessary as the result of this work.
Signature of Applicant or Agent ,
vL
AV TY Z. SV12 8o 7V,!!)92
Name of Applicant (please print) Business Address. _ 2 Telephone No. '
Name of Contractor and Job Foreman Business Address Telephone No.
Cont actor's License NhrIAL
f City Business License No.
G 2 / 31= 3gszz -020
Applicant's Insurance ante Company - Policy Number
FEES: Subdivision Improvement Permit —Class 111
,Public improvements: 3% of estimated construction costs
Private improvements: 3% of estimated construction costs
Minor Improvement Permit — Class IV: See attached schedule
Insoectlon Fee S ;
Permit Fee
Penalty
Cash Deposit -Surety Bond .
if required .
TOTA L: $
Receipt No.
Received by Date'
,f ,
Recorded by
•
PERMIT VALIDATION
PERMIT NO.
DATE APPROVED
EXPIRATION DATE
DATE ISSUED
Administrative Authority.
TELEPHONE: (6191664.2246
A-S—UNDGR. UTI.L I+NC
P` 0,1
"T A -S,
J
•
.
`,.r •YF
y '.
��%/y, ,/�C.- �/{- `
.,n,�J s
�.V" J/jam"/ Z //!-,,/ %%/% 4 0,?i
�, __ � �•�«� E
►'t4Si-'l/
r71/
- • J ^0. iJSTVJ Rj,r*s6,d,,
G.aitJfj .i(714-} '8.,-389 -
R. A` � •' }
..4
Februar_y 6, 1991,''}
NN
CITY .OF I;A QWNTA
(PELT #0983)
-
k• `�+.
�',
�,
e�Y
`
« i -•• wtr
• +_^ -�;,'^-
- - .rte. ' Y
^•i'
PER -YOUR REQUEST THE .FOLLOj7'TNG .INFORMATION 'TO'EE FAX,(619-564-5617)
� K"
PRDIE, CONTRACTOR:
'PLOWMOAE :INCORPORAT'ION,,
JO'BILOCATIM,
E/S/0 EISENFIOWER.N/O'-TAMPlCO' `
Y
-"k r
SUB—CONTRACTOR:
'MATA'SMUNDERGROUND UTILITIESa INC.
..
PONTRA.GTOR' $ NUMBER 570027
5
TIPTON,& COMPANY INSURANCE AGENT.
POLICY ��CCP.132080
.
-
3409 =TEMPLE -;STREET
F 4.
LOS ANGELES, CA' -90026
•*
- ✓ i t
� . - �.'
.• *•. . - , �.
• • • '.t • i� »
ice•.. j . -
,
' '.. 4 `fir. i _ - '�•
; •• Z i �
1~.• -,4 �
�n ^f`•• �} .' .. ca
:;
It
''
- ... lei.. .w�• .. ' 'r.
,#�«.
.e<-
.� •.. -.
., 1.. ;
The following General and Special Provisions are attached to and made a part of Permit No.
`- s•
~ i • ,,.GENERAL PROVISIONS.
'
•'
;'��� ,?, r
The following shall always apply. , `' • ' .r r rl i
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of'way
ONLY. Whenever construction extends within private property, it shall be the responsibility of the.permittee (or his contractors)to',
}:e
^ r • , -�.
secure permission from abutting property owners. Such authorization must,be secured by the permittee prior to starting work.
`
TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permi.tted to operate on any
= ; d
paved surface unless fittedwith smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect
the paving during excavations. Rubber-tired`egdipment only shall be used in backfill operations in paved areas. `If the existing
'r
pavement is scarred, spelled, or broken during ttie term of this contract, or if the pavement is marred. City of La Quinta shall request
s
that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2'•) of A.C. '
surfacing plus appropriate seal coat as specified above. r
` f
PROTECTION OF TRAFFIC. All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
`
Engineer or La Quinta City Public Works Inspectors. Suitable detours and detour signsshal(beplaced and maintainedfortheduration s4
• r" ',
of the project.`The City shall be notified 24 Hrs. in advance of any traffic detours'or delineations. �.• ,
`r
CARE OF DRAINAGE -STRUCTURES: Any drainage structure including corrugated' me tal pipe concrete pipe, steel culvert and
` -
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the eventit becomes
necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work.
Drainage structures and open drains'shall be kept free of debris at all times for proper drainage. '
l v` ir:r•
• :.
'
RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of
�3' way. All paved surfaces shall be broomed clean of earth and other objectionable.rna' iials immediately after backfill and compaction.. -.
aTy,
> ---
r
• Existing gutter line and drainage ditches shall be replaced to" original standard or; better. All excess material shall be removed'
r
-prior to paving. Water tanker shall be used, as required, to sprinkle the job site to, keep down dust conditions and shall be used
a F
immediately after backfill.
7b
DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads. it shall be'
"thepermittee
r=
•'t'
the responsibility of(contractor) to. control this water and to provide off-street barricades when necessary.
` • ! CLOSING STREETS: No street shall be closed. A minimum of one lane.of traffic shall be maintained at all times to provide limited
A.
access for the adjoining property owners and emergency vehicles. 1n the event it isfelt bythe permittee that he must close a street for '
any.length of time, permittee shall contact this office to obtain the "necessary permission.
SPECIAL PROVISIONS F '
The follwing shall apply ONLY,when indicated: ` • - j
±
_
4 R1 NOTIFICATION: Permittee shall notify the City at 564-2246 at least 48 hours in advance of. starting construction.,
R2 ,CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than $
shall be furnished in" the name of City of La Quinta to cover all work involved in the restoration of the various La Quinta '
' •• -�
i
goads and survey monuments' This bond shall'be continuous until cancelled by the City Engineer. This bond must be
•
posted prior to commencement of any work on this project .
UTIUTYCLEARANCE: (Substructures) Prior to making any excavation within the City of La Quints right of way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
r ^ +�'•
'Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility
-
of the permittee.
• ,
R4 . UTILITY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
+ R5 PAVEMENT5WIDENING: Area between the proposed concrete gutter line and the existing road' -pavement shall be
' surfaced with inches of A.C. paving placed on -'inches ofclass' aggregate subbase course
' having an . R value of not less than and in conformance with City of La Quinta Road Improvement Standards
and Specifications, Ordinance #461..
r`
R6 Area between
F
r •.
" ' ' -1 /4 inch to one foot (1').- `� ti rri . '
R7 GRADES & STAKES: City of La Quinta shall establish grades and stakes for the proposed concrete curb and gutter _
construction.. ; ;:• i"
R8 GRADE CHECKING:CityofLaCl into: shall' check grades upon receipt of plan and profile and/or gradesasestablishedby •+
a licensed engineer.
R9 CURB REMOVAL FOR DRIVEWAYS': A portion of the existing concrete curb -and/or curb and gutter( ' feet)shall be ,
} �' , •1 �.,
J• •
' removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and "
r *
concrete driveway approach shall be.'constructed in conformance with City of La Quinta Standard#207.
R10 DRIVEWAYS, A.C.: Driveways shall be constructed as not to drainage Surfacing between the
alter existing pattern.
property line and the`existing road paving shall be 2-1/2 inches of A.C. paving placed on ( ") of class
' s "
'aggregate base. Driveway construction shall conform to at!ached drawing.,
s s�.
R11 CULVERTS: A - -inch diameter( r )culvert shall be installed with the invert approximately) -1/2
c 'inches below and in line with the existing flow line. Culvert installation shall conform to the attached drawing. 5
ZSIGHT CLEARANCE%Sight clearance of 600 feet in either direction shall be assured and maintained.
SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall comply with the
'
manufacturer's specifications.
R14 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or '
O
''•_. - f
City of La Quinta may conduct in.this area during the period of this permit. Work shall be coordinated with the State or
:3
City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects.
R15 SURVEY MONUMENTS: Prior to'excavation or beginning of construction, all survey monuments which exist on the .
Y
centerline of all streets or property lines when involved sfie 11 be completely tied out so they may be readily and correctly
.' be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the
ties to these monuments shall be furnished to the City Engineer prior tothe removal of any monuments. This office shall r
c� be notified upon completion of replacement of all survey monuments for proper project clearance.
R16 � � JEY MONUMENTS: Prior to excavation or begrnninq of cr,,...,. --tion, all survey monuments shall be tied out by City
of La Quinta and suitable payment or guarantee of payment shall be made as reimbursement for all work involved.
R17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment
be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best
facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be
corrected.
F21 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to
pavement straight edge shall be corrected.
R19
LIMITOF EXCAVATIONS: Excavations shall be limitecito 1.000 lineal feet of open trench before backfitt operations must,
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of
the traveling public. The Public Works inspector shall determine the suitability of excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R20 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in liftsof notgreaterthan
three feet (31 and vibrated using vibrotamper or equivalent equipment. Alternate methods maybe substituted, but in any
case a relative compaction of 95 percent shall be attained within the structural section of the roadway.
R22 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater
compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain
the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuous.
R23 COMPACTION TESTS: If so required bythe inspector, compaction tests shall be made at intervalsof not more than 1,000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made asoutlined in Section 6.3.01 of the
Standard Specifications, Division of Highways, State of California, dated January 1973.
R24 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed
after a maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed, but in no case shall
the placement of the temporary pavement exceed a five (5) day limit.
R2 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch
consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C.
surfacing placed on a inch class base shall be placed no laterthan days after completion of
temporary road repair.
R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill and compaction, a temporary patch consisting of two inches (2")
of cold mix paving (SC -800) shall be placed immediately. A permanent patch of three inches (3") of A.C. surfacing shall
be placed on six inches (6") concrete base as directed, but not later than fifteen (15) days after completion of temporary
paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards
and Specifications, Ordinance #461.
R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas
where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section
37, Standard Specifications, State of California, Division of Highways. dated January 1973. Work of pavement repair to
be accomplished by a licensed contractor engaged in the business of pavement repair.
R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public.
It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to highway
o traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the
highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it
becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate
signs, flagmen and/or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction
tests shall comply with Section 6.3.01 of the Standard Specifications. Division of Highways, State of California, dated
January 1973.
R32 TREE TRIMMING
a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year.
All broken or weak sections within the trimming shall be removed.
b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at anyone time.
Adequate signs, flagmen, and/or barricades shall be provided to protect the traveling public at all times.
c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own
arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided
by this permit.
d. All tree trimming on EVERGREEN TREES, PALM TREES, and other ORNAMENTAL TREES shall be accomplished to
the satisfaction of the City Public Works Inspector.
e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees.
I. Pruning shall, in ail instances, be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches
(2") and above in size. Sealant shall be applied to all cut sections as directed by the City Public Works Inspector.
.1 _.. ..yz..v_ .. `...ie,•�'—r_..m:a,rrts�Z•4..�.tfvv:wf:a:�Vr
S'--',.=.cr�ov� y,ia:+•,;- _ "�''w�'a�i, :,;�.t�.: - •'cro:f.S�,.
NOT�j
With!proper validation
this'form constitutes an CITY OF LA QUINTA
encroachment permit
APPLICATION FOR PERMIT
PUBLIC -WORKS CONSTRUCTION (ENCROACHMENT)
9`� q
For the construction of public or private- curbs, driveways, pavements, .sidewalks, parking lots, sewers, water. mains
and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS
DATE:
2. -Ll- 91
LOCATION OF CONSTRUCTION _
Subdivision Improvement Permit — Class II I
Minor Improvement Permit Class IV
EISENHOWEK M/0 TAMPICO
(Street address or Description of Location)
PUREQSg OF CONSTRUCTION REPLACE EX 157 //V C3 : 300 PE Sketch (attach construction plans if appropriate)
LL
DESCRIPTION OF CONSTRUCTION
DIMENSION OF INSTALLATION OR REMOVAL
SIZE -OF EXCAYA-TION J F N -E UED FP
PEK GT E L)KA1N 1 NU W 0 . AT
RIF -F Ci -TE PEEM 1T O9 s3
� X /u moil_/Gr_ riO WORK (k) 1TH I K) TRE PAVE D
APPROXIMATE TIME WHEN WORK WILL BEGIN _ (xSECT ID N OP -57 T" E %DAD IS
APPROXIMATE TIME OF COMPLETION P ERf1A I77 hV LW rl 1i- T 1��4FF_1(�-
ESTIMATED CONSTRUCTION COSTS
(Including removal of all obstruction,- materials, and debris, backfilling, com-
paction
om paction and placing permanent resurfacing and/or replacing improvements)
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, -defend and save the City,. its authorized agents, officers, representatives and employees, harmless from. and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four 11241 hours in advance of the time when work will be started.
Comply with all applicable City.drdina. , the terms and conditions of: the permit and all applicable rules and regulations of ity
La nuinta and to 'pay for any additional replacement necessary as the resul this work. �' g?jL�q C%d
Signature of Applicant or Agent /800 - 9S -S-- O9Z
FLDWMOLE OLDRP NO W. IOTM PL STE B/ZI TEMIPE AZ.
Name of Applicant (please print) Business Address Telep¢one NCO.
t2'92&5 fes, wfks/y t <, y�'sa7 C"J�yl -� �
Name of Contractor and Job Foreman Business Address Telephone No.
y9y 20l� SN.g�-�•7t�oZ�• - . ... - :. 18 ZL
Contractor's License No. *r: 4 ` _ ,:: i- City Business -License No.
LIBERTY MUTUA'�' • `:...: '..�� •:::: ...-: :;--�..•�..=t-.. _ . _.. _.-.
saB= %wTyN :Ziys�izow� LGI l3/ - H39 5ZZ OZO
Applicant's Insurance Company :;; ;:...>>';;.: po,;..., p. Policy Number
FEES:' Subdivision Im rovement_Permit.`=Class III
P __ - :"-{I.:"`".y;p.2'�• M�J♦ -;yip. '� 4�:: 4 - .
Public improvements' of estimated construction costs
18Coo 22 MUTE UTE e i 9i i30.060
Private improve >Fi„:34f o1�`eatirttated: oonatrMIOn. costs
� :a:.r: ..,,: av;'„y'.,, a`2'.'`,{ -':"FE:o.. ^tT.' �oc:rtdt{� '•l�i...:.j2.
.. `•;�5!��.t--�. ” q:;.� trk9p,3f..ti��.o:.i„s;:.-.7.a9,'. .. �f;,�.`�'S'�` , : _ .. .cidi6_:�R� i�•W ,i , V �: '>.:..• r ..
Minor Improvement PermiitIV See attachT schedule
Inspection Fee'
Permit Fee • oo 99
:::
. ,
PERMIT NO.
au20?5
iPt N
ADDITION-,=- CROACHMENT'PERMIT 'PERMIT -NO, CONDITIONS
-.Survey' monuments shall be„protected,`in place or• {
yk.Y a
...R33-
re-established pursuant to-, City standards and ;the State of,,'
` • ,
Caiifor.nia. Land .Surveyor's Act':
}n R34.:
Work, -shall be -'coordinated with the City of La- Quintals
.'”
forces to,-p'reclude'-del'ay or interference with the City; -of Li
`
µ
Quintal's,project
S,
% •:��y�:Ufa.
R35
z'
•1{• f { -• ♦ .. .. y y 4
Contractor; shall comply with` -the% local noise ordinance`•and
.
construction operations and' maintenance of equipment within .-
`
one half -mile of human occupancy ,shall be performedy.only-
during .the time periods as fo.11ows`,6 f ..
= October,, lst 'to -April• 3,0 ,Monday -Friday 7:00LM.-5.:30p.m:'r.r
Saturday --'4 8:00a,.m.-5:00P.•m..
May.lst to.September 30: --Monday-Friday L 6:00a.m.-7:00p.m.
Saturday; 8 : 00a.'m. -5 : 00p.m.
{
work- `sh'al`l' be, prohibited anytime on Sunday and Federal
-
. holiday.
- R36.-
f is control' ,shall. be as per' Cal . Trans Traffic' Manual
'
�`Tfaf
Field adjustments` in detouring:'shall be accomplished as" _
`
',~directed' in' order'to. adjust ,to'.,actual. field• conditions".- It
'
' ..
shal-I be l'the contractor' s' responsibility, to adequately;.
f4,,
barricade..•and detour this �site.�'A Traffic, control• plan.
'
= be -submitted for,zapproval' b-- the•'City,,Engineer;
-
.�
N
` . -R37•
All',exc1avation' at. or' near the travel: way shall be backfilled -.4
• s,i tat'
the end• of` the work'_ day, for' the. protection,ti of
`
traveling. publicl.,
4.
`•
- R38
a I.
Street" closures' shall; not be allowed` at any time.
` R39
F. a
.` A minimum. of, two 'paved travel lanes shall be maintained at
v
all •times with .flagmen during working
R40
.:hours. -
All work•, to be -'performed within the' existing ,paved section_
.•
Sfiall-be temporary paved and:'maintained by -the Permittee, Y•
;
-
permanent pavement shall ' be placed, no ''later than 15"*days
f
_after -completion of,the temporary road repair. ai
'
R41
�Ing,'ess'- and egress for, local 'properties shall'a be maintained-�•=
at; all, times.
R42
Prior. ,.to work starting, Underground^' Service Alert,. shall be
.",contacted, at 1::-800=422=4133` and an. "'inquiry number" 'shall be
4l
'pr provided •to. tH6 City` Public Works Inspector .
.R43
emoval.'_
"Pavement shall • be 'sawcut->.prior to removal'.'-
- - .. wr
... ,
`b}`e" .',. '�
� .N
j �
111• b i
� a.F •.
Y'ti• f
it j f - { , t - ♦ ti* .'
4,
5
' -
` > .. ♦'S,u. '..r..wi ..r"b'-'y'b:+i.. v .r l•. ... 4 �, .fa'Si ".+wi{ y .Y -plr'� �r iY>..f'� h�.:.'It .•1�.'..�. "Y.' ..aM. 1: RfS'n:G .:.4..,
Additional Conditions: - Encroachment Permit, -No. 0 110
Page
2
R44
All-backfill,subgrade soil shall be compacted to nothing
``-less.'thari: 90% relative dry: density, , all backfill .soil within -
the top.2! of finish pavement surface,shall be compacted -to
:nothing less than'9.5%'relative dry density; all .base
material shall be.compacted to nothing less than 950
relative dry density.,
R45
Replacement pavement sectioirs shall .:be 3 " AC over- :4" Class
II aggregate base."'
R46
If'the work is to be'performed by'forces'other than that of
theutilitycompany;, the contracting company.,will be:
.
required .to apply for ani.additi'onal encroachment permit .
and pay the appropriate,fee.
Y�}
wfi
F �.YFF K� �'"-�'W Atap�J•-Zt, � �c _` Y 5R!� y � - '�i. �F
- ?• c i 67�
,y .. Aid• ��
;f
K -
�
4wi4•u a,tva' b �i..� � ^f •r ti+ • . r
a �
Im
��u�i
N-,
�
f
1
�
.
I
.j
}
. -' _ Y_ •� _fib V'ti,. . , ' - ..
CIOLL'7n'tiLSNO'J f
ova 2S I
0
.51
r4;
.�' .. -'f` '•y }•Y` � s t x^ -_ r ..i ..{;,, ,
✓ y k YO; O •' , i
� . ,lti J f + 3 � x t'X4 3"1.. . s r '�?�• } r # ,� , � .i .. - - � �.. t 1Zi r .. ` • a : �. ��.t
�� u t;'{'r?� "�� � aR 43.� t 1II111JJJ( �. 7.., - �."�YR• � ':��t, .# �yye��f _
' s :"L'1 a -•/}ti,k �'G•-IF � S � 'r' r �'_r O �.�L.i' -- - � �'�'i'��r °�' � - F ! .. t V��°N-
> �� r}' rp'v } i.J 6, �..!yo.-;-t� '• � 5#,1�:$- f � r*. � _ �'2 ,t. �h+Ay t,.{ Y•,.r x• "r �; , f.. ' '�1�
ff>!- '1'• - "' k i ... S t� Y i. xx 1 1 .rt ',,.' -' ,�', .�r �- -✓ i' K � �t,
r+..,i' y, � 4t. 4 - -+. t' ` > xytt ..'j `. '..Xr �• .. �� 23�r'� ., h��Tt'Ri i�`�Tr�. z, +ifg4� +.,.�i ,r• �q
^.,p �yr, r7�jr• y,} '•.•�- ,t< t mss. ni't """ +�i •.. st 'F x¢
' t{ .� ��. �y, A� t ,�+'�•• f � � O',�?' T•.� O#��4 t % �` WM„"i{tWii,W^,�� T �y�, ""-' '� 'il
:.'r'ki� , � .�il4�,.arta. .r. t, �''=' ...i.' '#�_' d'k+fN.. �. j .+►' k. �...r ,:�. 3• a..ew Ui,' d� �. 7 .%?tK _:U,lwt 7k
�yr'�':� :,,��" ' .- it �.�-• _
�et
r ;---� kl.r.:1
- ?• c i 67�
,y .. Aid• ��
K -
�
4wi4•u a,tva' b �i..� � ^f •r ti+ • . r
a �
��u�i
�
f
}
. -' _ Y_ •� _fib V'ti,. . , ' - ..
CIOLL'7n'tiLSNO'J f
ova 2S I
0
.51
r4;
.�' .. -'f` '•y }•Y` � s t x^ -_ r ..i ..{;,, ,
✓ y k YO; O •' , i
� . ,lti J f + 3 � x t'X4 3"1.. . s r '�?�• } r # ,� , � .i .. - - � �.. t 1Zi r .. ` • a : �. ��.t
�� u t;'{'r?� "�� � aR 43.� t 1II111JJJ( �. 7.., - �."�YR• � ':��t, .# �yye��f _
' s :"L'1 a -•/}ti,k �'G•-IF � S � 'r' r �'_r O �.�L.i' -- - � �'�'i'��r °�' � - F ! .. t V��°N-
> �� r}' rp'v } i.J 6, �..!yo.-;-t� '• � 5#,1�:$- f � r*. � _ �'2 ,t. �h+Ay t,.{ Y•,.r x• "r �; , f.. ' '�1�
ff>!- '1'• - "' k i ... S t� Y i. xx 1 1 .rt ',,.' -' ,�', .�r �- -✓ i' K � �t,
r+..,i' y, � 4t. 4 - -+. t' ` > xytt ..'j `. '..Xr �• .. �� 23�r'� ., h��Tt'Ri i�`�Tr�. z, +ifg4� +.,.�i ,r• �q
^.,p �yr, r7�jr• y,} '•.•�- ,t< t mss. ni't """ +�i •.. st 'F x¢
' t{ .� ��. �y, A� t ,�+'�•• f � � O',�?' T•.� O#��4 t % �` WM„"i{tWii,W^,�� T �y�, ""-' '� 'il
:.'r'ki� , � .�il4�,.arta. .r. t, �''=' ...i.' '#�_' d'k+fN.. �. j .+►' k. �...r ,:�. 3• a..ew Ui,' d� �. 7 .%?tK _:U,lwt 7k
- J _
* '.` r +}4: _. • ., t,`{�.. tr .,'"='k z y«r •-yf( ,x'ryr�` ''S> y�.E..A,a-r '.
�'r�It: '' �`"' ' _, ��'.. � ,a'r � ,� �i' � �a �,: ,� +�' .' { �3 it .FKt �� .. ,t'i"4 �Ta t + t• i` ��y Y._ {,
�R' � a� - Y r t . t •ti '.Ft�fS, 1 ' • � r'i' 4.'e F ' r � f i... � '�`. V {i` .-OR
.� - F4 r,• ,� _ .., W' tr � y -'•r S i '
�� .:"t �+e.•.•e.W*..•t-lea. r+. i.".'.t.�,r+.a[ •w�.. �•-e. w* ..,•,.r �z.q.+ . .da....k`y.+r+_""tv^ „nA'nw.�.
' _r .'• ' .. �. ' `r ' r � r + •Y ' . iii t+. vD r ` k }A.F,A'... ` 1a 7`.l y� "4t �'+v s . ..� t i c +. ) , N - .3' „aaf'arl' '► ,,ti i 5.1
•r. .. - �� . =i «*-. - i � 1' � i �}.-kt,.�� .• ,r .l'P;o ,,�1 t •, �'i. � ,`l�'t� ekt . � .,' �t,'^'t +, "tr � �i, .. `� s�`fb,� � 4'� �+•' �v-�`�j ��`•� ��a" .
t
m
FIS�NF�,O�.lEtZ
k��a :..« ,_�. '` "rj�,*�'��-t�i`�?y�•# �`���+ lJ-�i � 7��'`�!W'`�';�t�'� ``•s,�, �c' ia:Kr�+�j
�`a �S, may" .'4.y y* ,a•�xi'�i.��''� � * Y ���r��a V„� ? � 3�. asr"sii��""�,,,�� t+�' R��...•��{
-
.� :„e'.•1
,J
� {�_
j
t •.a'� ��• ��_,�
k., r b.
-i'"t..�'.P'+t�+�...�"
I
s w,
_ ,.a.f�• �. R,I
µ.a
r•..��
ir'O ♦,`�:
per•
ti� �'� tR ie. l
tf
••
•
.;�: �lv�e rt'tt• +t.�4'��'C ni' -r-.-
'j.,,.""�,,,,,r �'-76
�L.
•�.. _ Y
$
'X
,;
-r.
r ,y+l,�.. _,.rte r wi.:i.
,,.. ++i yP r >�� : R
�:,t
'�5 "`,. k' h'. 4t;...
(
}
.. } + f F• s'MS�,�{S .Y.�{�Fy�' �
to
pp
�{ X R� °,'
�,5
rss•
}-4��1- ,R .�{'"�
_
1 .Y �
nr
ey
•6,sf'1�. 'M"ta��
��i�.t�'
r
�.. iI'f
'�
;i.
�•.
Y l-
�
��.i
�i" ��%. ���"-1,�1F. ^7'"
'f y e
��1
?r�� � }����
'+y #�
. � _ .�,� «1i.i :M1
S'.. { J + {
.�;
t
1 S .t
ae' A R +
�•v
•�
•ZYi{. ..
� �
: ;i„s�.i•7YY.`k '
�} � t A A• t.'+� Jy
u22 }�/�'�'Y` i i1 .�.i• ,R,x'� 1{ i", .
�C�y 'i�.s�a
-4 .3 4 :�.'� Y"Mr.� 1i 'i Wi' i'S.� � iT! � E yilf . 1_�,'�
• +
' �*-.,'L'"({.^<'e�
4. 4�'{'�.
,.Q
�'w. -.`"i
SFr . � .l � ^�ttt't e
f��
' . `Sf ` '�•.,+ ,fi�' ' f'e'S r:.�
� �'S'r ,!
•
-r���J�Yk ,.
10.
s ..0 n:'
. kRtj ' a. �4r.�,+ �
r
1 ,'O
� �
'k-l•..t��r. �` 5 *:.
�
f'.t n,'
+R y. yfir �.,.�,+c.�y� r�
.1r+e J-e'+,t" vj�t �W
y+�' {,,. u : _ �,� • G f• -
�!x 'r a(�#µms
"r } W,�' { :,a�",!
�.�.�� Sh.s �+��,aE"i• fj
k��a :..« ,_�. '` "rj�,*�'��-t�i`�?y�•# �`���+ lJ-�i � 7��'`�!W'`�';�t�'� ``•s,�, �c' ia:Kr�+�j
�`a �S, may" .'4.y y* ,a•�xi'�i.��''� � * Y ���r��a V„� ? � 3�. asr"sii��""�,,,�� t+�' R��...•��{
r The following General and Special Provisions are attached to and made a part of Permit No. r1_9 -(
s:-•3All ^o ta.' � GENERAL PROVISIONS:
. . `,r .. .. ter% '. '-, . ,;�;�� .,n••^•;� .. •• - +.y....:: -
`. , The following shall always apply: ^ ;
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way *,
• ONLY. Whenever construction extends within private property, it shall be the responsibility of the permittee lot his contractors) to
secure permission from abutting, propenyowners. Such authorization must be secured by the permittee prior to starting work.
TRACKLAYING CONSTRUCTION EQUIPMENT: 'Cleated tricklaying construction equipment shall not be permitted to operate on any
paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protea
the paving during excavations, Rubber -tired equipment only shall be used in backfill operations in paved areas. If the existing
pavement is scarred, spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request
that these ponions of road be resurfaced over their entire width.. Resurfacing shall consist of one coat of two inches (2") of A.C. •
surfacing plus appropriate seal coat'as specified above. ,
PROTECTION OF TRAFFIC- All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City,
Engineer or La Quints City Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration
Of the project. The City shall be notified 24 Hrs. in advance of any traffic detours or delineations.
CARE OF"ORAINAGE STRUCTURES: Any'drainage structure including"corrugated metal pipe. concrete pipe, steel culvert and
concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event.it becomes
necessary to remove or cut existing drainage structure's. City of La Quints shall be notified prior to commencement of this work.
i • .at- r' f , Drainage structures and.opan drains shall be kept free of.debris at all times for proper drainage.
t RIGHT OF WAY CLEAN UP' Any surplus material resulting from excavation and backfill operations shall be removed from the right of
way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction.
t i Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed
'prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used
iinmediatelyIafter backfill. .•.
6E -WATER -OPERATIONS: If de -watering operations are required and pumps are forcing water on Cityof La Quints roads, it shall be
the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited
access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for
l_ any length of time. permittee shall contact this office to obtain the'necessary permission.
SPECIAL PROVISIONS
` The follwing shall apply ONLY when indicated: t ¢r
R1 NOTIFICATION: Permittee shall notify the City at 564-2246 at -least 48 hours in advance of starting construction.
R2 CASH DEPOSITS OR 80NDS: A cash bond or an approved surety bond in an amount of not less than S
shall be furnished in the name of City of La Quinta to coverall work involved in the restoration of the various La Quints
- roads and survey monuments. This bond shall be continuous until cancelled by the City Engineer. This bond must be
posted prior to commencement of any work on this project . r'
.r
R3 UTILITY CLEARANCE:(Substructures) Prior to making any excavation within the City of La Quints right of way authorized
_by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
f. + Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility
t * of the permittee.
. R4 UTILITY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilities are dear of the
• proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R5 PAVEMENT. WIDENING:, Area between the proposed concrete gutter line and the existing road pavement shall be ,
surfaced with ' iches of A.C. paving placed on "" inches of class aggregate subbase course
`Y having an"R"value of not less than and in conformance with City of La Quints Road Improvement Standards
and Specifications: Ordinance #461.
r R6 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall begradedtoa slopeof
1/4 inch to one foot (1').
R7 GRADES l9 STAKES: City of La Quints shall establish grades and stakes for the proposed concrete curb and gutter
r construction. k '
R8 GRADE CHEC(ING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
' • R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter( feet)shall be
;
'removed. Curti and/or curb and gutter ihall be'saw cut prior to removal. Depressed curb, matching concrete gutter and
'c r . '1 1 concrete driveway approeih shall be constructed in conformance with City. of La Quints Standard #207.
R10 DRIVEWAYS, A.C.: Driveways shall be constructed as not-to,alter_existing drainage pattern. Surfacing between the
n" `"', `property line and the Mining road paving shall be 2-1 /2 inches of A.C. paving placed on ( 1 of class
„ aggregate base. Driveway construction shall conform to attached drawing.
..M wyl'sw r -..V v<. ... .. rt«;LY;: b;,g:�, ern:•+ , -. ,..•.._.. ,. �.. .,:.... `_
• R11 CULVERTS:A ' inch diameter(')isuhhihshalibeinstalled with the invert approximately 1-1/2
inches beloWand in line with the existing flow line. Culvert installation shall conform to the attached drawing.
t r
TR1 SIGHT CLEARANCE%Sight clearance. of 600 feet in either, direction shall be assured and maintained.
SOIL STERILIZER: The area to be surfaced shall be treated with soil sterilizer. Rate of application shall comply with the
• s . ,,•, , :, - manufacturer's specrfications.`. t: •; : ,. -w.. r...t :.arivd.. '_
d" R1 COORDINATE WORK: The proposed.work•shall be subordinated to any operation which the State of California or
City of La,Quinta may conduct in this area during the period ohthis permit. Work shall be coordinated with the State or
r City of La Quinti forces to preclude delay or interference -with State or City of La Quints projects.
R15 SURVEY MONUMENTS: Prior to excavation or beginning of construction; all surrey monuments which exist on the •
sy �•.t e. is �. `i<y _.�. t !e -it, �.._,.
,.: • centerline of'all streets or property lines when involved shall be completely tied out so they may be readily and correctly
be replaced by ai licensed civil engineeror surveyor at the exp`en`se of the permittee: A complete set of notes showing the
�� s .s • ►sts sq t�,tnt�ii+ttf•�,f 1n+tieatatheaeiriortwnemttah611b6fuiihmq dtotheGilyEttpi 'pno►tofhe"""ovale}artymonumarro ifiiioHbsahall •'
R16 SURVEY MONUMENTS: Prior to excavation or beginninq of c...a uction, all survey monuments shall betiedout by City
of La Quinta and suitable payment or guarantee of payment shall be made as reimbursement for all work involved.
q17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavatk:lg,equipment
be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best
facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be
corrected.
fit PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to
pavement straight edge shall be corrected.
R19 LIMIT OF EXCAVATIONS: Excavations shall be limited to 1.000 lineal feet of opentrench before backfill operations must
begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of
the traveling public. The Public Works inspector shall determine the suitabilityof excavation barricading in each case. No
excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction
material is actually on the work site.
R20 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in lifts of notgreaterthan
three feet (31 and vibrated using vibrotamper or equivalent equipment. Alternate methods maybe substituted, but in any
case a relative compaction of 95 percent shall be attained within the structural section of the roadway.
R22 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench
before flooding or a maximum of five-foot (5') liftswhere trenches are of excessive depths. Care is to be exercised that the
backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater
compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain
the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuous.
R23 COMPACTION TESTS: If so required bythe inspect6r, compaction tests shall be made at intervals at not more than 1.000
feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for
approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the
Standard Specifications. Division of Highways. State of California. dated January 1973.
R24 COMPACTION TESTS: if so required by the inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests snall be made asouthned in Section 6.3.01 of the Standard Specifications. Division of Highways. State
of California, dated January 1973.
25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch
consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed
after a maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed. but in no case shall
the placement of the temporary pavement exceed a five (5) day limit.
R2 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch
consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C.
surfacing placed on a inch class base shall be placed no later than days after completion of
temporary road repair.
R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill and compaction, a temporary patch consisting of two inches (2")
of cold mix paving ISC-800) shall be placed immediately. A permanent patch of three inches (3") of A.C. surfacing shall
be placed on six inches (6") concrete base as directed, but not later than fifteen It 5) days after completion of temporary
paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards
and Specifications. Ordinance #461.
R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be appliedover all patch areas as
determined by the City Engineer.
R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas
where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section
37, Standard Specifications, State of California, Division of Highways, dated January 1973. Work of pavement repair to
be accomplished by a licensed contractor engaged in the business of pavement repair.
R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished
by a licensed, bonded and insured tree service. and handled safely without interference or hazard to the traveling public.
It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to highway
a traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the
highway. The stump hole shall be backfilled and thoroughly compacted as specified in thefollowing paragraph. Where it
becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate
signs, flagmen and/or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not fess than 90 percent or equivalent to the
surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction
tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated
January 1973.
R32 TREE TRIMMING:
a. -Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year.
• All broken or weak sections within the trimming shall be removed.
b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500feet at any one time.
Adequate signs, flagmen, and/or barricades shall be provided to protect the traveling public at ail times.
c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own
arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided
by this permit.
d. All tree trimming on EVERGREEN TREES, PALM TREES. and other ORNAMENTAL TREES shall be accomplished to
the satisfaction of the City Public Works Inspector.
cke� e.1 Abutting property.ownera-shall be contected;,in all instances, prior to trimming or topping trees.
t• a�, wz> a: 1.s•Pruning shall, in all, instances, be it the shouldei 6f the, crotch to insure even, fast heeling in all cuts of two inches
12"1 and above in size. Sealant shell he ann6ad to all n,t .,.a as d.. - • tw. r:. o..t.i:,. t �...i..
3 4 Ir
% S ,A
in
In
_EDO. scb cc
Z
SI -7-7- OF E-)FUCLE 'PtT WI1..-1- DE -9 -EM
ON 71-�E LDC-ATl0110 OF TI -A7--: EX15TINN&
E�W_k =- jt� C)�
Ti FILL- FC*_-<_ 7AT- �RII)GE_
A\, ` L3E i\) � r-. a --2s S A. y,
COAJ , -FA KC A --7D7-,---
70 +DD I
rl
_7n,
Z!, " A
rl"
I E Y T
7Z.L,-')D 7ai-DO
cz
15 1 17 18= 19 20
f
Ai G
_T_
Z_//V -------
6�3_7 I- D D ------- - i
C- " A. C. 7-)11<.,E
I
_T
T lKh. C, 0 V) f __ il:
C�
o y 10 11 12 13 14 15 16 17 18 19 20 FORM 80953,
---- ------ -
A
B
C
D
E
F
G
H
I
J
K
L