Loading...
10020- , See below for Finance Revenue Codes ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. Subdivision Improvement Permit - Class III Minor Improvement Permit - Class IV DATE: 4/12/2010 LOCATION OF CONSTRUCTION:. Washington Street and Simon Drive. PURPOSE OF CONSTRUCTION: Pot Holes To Locate Utilities Q UtuJ DESCRIPTION OF CONSTRUCTION: Pot Hole To Locate Utilities DIMENSION OF INSTALLATION OR REMOVAL: 3-8" Hole in Landscape Areas APPROXIMATE TIME WHEN WORK WILL BEGIN: 4/19/2010 TIME OF COMPLETION: 4/20/2010 ESTIMATED CONSTRUCTION COST: $2,800.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS Badger Daylighting Corp. will be doing work for NAI Consulting; CIP 2009-15 In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and. against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occuring as a proximate result of any work undertaken under the permit granted pursuant to this application. . Notify the Administrative'Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777- 7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four (24) hours prior to the anticipated inspection. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicableruled and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Badger Daylighting Corp - Brian Name of Applicant of AppFfc'irnt or Agent 1300 E. US Hwy 136 Ste E, Pittsburg, IN 46167 559-341-2461 Business Address Telephone No Badger Daylighting Corp. 1300 E. US Hwy 136 Ste E, Pittsburg, IN 46167 317-892-2666 Name of Contractor and Job Foreman Business Address Telephone No. N/A Contractor's License Number Nat'l Fire Ins Co of Hartford 107321 City Business License No 2099346571 Applicant's Insurance Company Policy Number FEES Subdivision Improvement Permit - Class I Minor Improvement Permit - Class I Finance Revenue Code Inspection Fee E_1 $0.00 Permit Fee E_1 $0.00 As -Built Deposit E-A $0.00 Cash Deposit -Surety Bond, EE=B $0.00 if required TOTAL $0.00 Public Improvements: 3% of estimated construction costs Private Improvements: 3% of estimated construction costs PERMIT NUMBER: 10020 DATE ISSUED: Y'LO . (9 j EXPI ON ATE: / BY: WORK INSPECTED BY*: a4 /dC PERMIT COMPLETION DATE*: zo o If the work is covered by a Subdivision Improvement Agreement, Subdivider shall request ficial acceptance of improvements from the City Council. 0,�(� `w• See below for Finance Revenue Codes ENCROACHMENT PERMIT �OF•��` PUBLIC WORKS CONSTRUCTION For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. Subdivision Improvement Permit - Class III L� L! Minor Improvement Permit - Class IV DATE: 4/12/2010 LOCATION OF CONSTRUCTION: Washington Street and Simon Drive PURPOSE OF CONSTRUCTION: Pot Holes To Locate Utilities DESCRIPTION OF CONSTRUCTION: Pot Hole To Locate Utilities DIMENSION OF INSTALLATION OR REMOVAL: 3-8" Hole in Landscape Areas APPROXIMATE TIME WHEN WORK WILL BEGIN: 4/19/2010 TIME OF COMPLETION: 4/20/2010 ESTIMATED CONSTRUCTION COST: $2,800.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS Badger Daylighting Corp. will be doing work for NAI Consulting; CIP 2009-15 In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occuring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777- 7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four (24) hours prior to the anticipated inspection. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicableles and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this wo Badger Daylighting Corp - Brian Name of Applicant Si ure of Applicant or Agent 1300 E. US Hwy 136 Ste E, Pittsburg, IN 46167 559-341-2461 Business Address Telephone No Badger Daylighting Corp. 1300 E. US Hwy 136 Ste E, Pittsb Name of Contractor and Job Foreman Business Address N/A Contractor's License Number IN 46167 317-892-2666 Telephone No. 107321 City Business License No Nat'l Fire Ins Co of Hartford 2099346571 Applicant's Insurance Company Policy Number FEES Subdivision Improvement Permit - Class I Minor Improvement Permit - Class I Finance Revenue Code Inspection Fee E_1 $0.00 Permit Fee EE=1 $0.00 As -Built Deposit E-A $0.00 Cash Deposit -Surety Bond, EE=B $0.00 if required TOTAL $0.00 Public Improvements: 3% of estimated construction costs Private Improvements: 3% of estimated construction costs PERMIT NUMBER: 10020 DATE ISSUED: Y.• V • (O EXPITTJQN WE: - �(• W . ( J BY: ((�J ��CC WORK INSPECTED BY*: PERMIT COMPLETION DATE`: ' If the work is covered by a Subdivision Improvement Agreement, Subdivider shall request final acceptance of improvements from the City Council. JA- ccs aaoy-t5 PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT Purpose of Construction (i.e.: Rough Grading, Offsite Street, etc.)_ Description of Construction (i.e.: See Plan Set No. 01234^ s . �t .; Dimension of MMI Approximate Construction Start Date:. —1 , •�,.�o,. Approximate, Construction Completion Dates 1d1 Estimated Construction Cost: $ O " "x Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back -filling, compaction and placing permanent resurfacing and or replacing improvements Apr.12. 2010 4:08PM No. 8242 P. 5 �Fo® CERTIFICATE OF LIABILITY INSURANCE OP ID R2 BADGE -2 DATE(MMIDDIVYYY) 04412410 PRouucER ERT F T ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Neace Lukens - Indianapolis 6510 Shadeland Ave HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW TYPEOPINSURANCE Indianapolis IN 46220 Phone: 600-664-3930 Fax:317-577-1675 INSURERS AFFORDING COVERAGE NAIC # INSURED INSURER A: Nat'l Fire Ina Co of Hartford INSURER 0: Trane nation Ineurence Co. GENERAL LIABILITY INSURER C; Valle Forge Insurance Co, Badger Dayligjtting Corp. 1 0v 9 'US HiAway 136, Suite E Pitts oro IN 461b7 INSURER D: Continental CaBuaxty rAmany INSURER E: PREMISES Enoavrenca *300 000 fa%1T/ d c7.RN THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OP ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES OESCRISED HEREIN IS SUBJECT TO ALL THE TORMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, LTR N9R TYPEOPINSURANCE POLICY NUMBER UATECLI MMIDFEC Y MID T LINIT3 GENERAL LIABILITY EACHOCCURRENCE S1,0-0-0,000 PREMISES Enoavrenca *300 000 A X COMMERCIALGENERALLIABILTTY 2099346571 07/02/09 07/02/10 --]CLAIMS MADE Q OCCUR MEDEXP(Arty onepersw) S 5r000 PERSONAL &413V INJURY $1,000,000 Gen-- g Applie8 GENERAL AGGREGATE $2,000,000 Per Projeot OEOLAGGREGATELIMIT APPLIESPER: PRODUCTS -COMPIOPAW S2 00O 000 � POLICY PET X LOC EEw Ben 1r000,000 a AUTOMOBILE LIASIUTY X ANYAVYD . 2099346652 07/02/09 07/02/10 COMBINED SINOLE LIMIT (EaeDwenl) s 1,000,000 BODILY INJURY (Pe(perean) S ALL OWHEO AUTOS SCHEDULEOAUTOS BODILY INJURY (Peracdaeng S X HIRE DAUTOS X NON-OWNEOAUTOS PROPERTYDAMAGE S (Pd acddang OARAOELIABILITY AUTO ONLY -EA ACCIDENT S OTHER THAN EA ACC $ AUTO ONLY: A130 S ANY ALTO FXC999IUMBRELLA LIABILITY EACH OCCURRENCE S5,000,000 D X I OCCUR F-1 CLAIMS MADE 2099346750 07/02/09 07/02/10 AGGREGATE S5,000,000 s S DEDUCTIBLE S X RETENTION shone C WORKER COMPENSATION AND EMPLOYERS' LIABILITY ANY PROOPPRI AREMSER CINERRE ECUTNEWN OFFI(MandataryIn NH) L�J 2099346795 07/02/09 07/02/10 X TORY LIMITS ER E.LEACH ACGOEW $500,000 E,L DISEASE - EA EMPLOYEE a 500 , 0 00 Mdasrnbo ur.ft IALPROVISIONSOalm E.LDISEASE- POLICYLIMTT s 500 000 OTHER C CA Work Comp/ 2099343105 07/02/09 07/02/10 Work Comp Statutory jEmployerla Liab. I ERE Liab $iM/$1M/$1M DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENOORSEMENYI SPECIAL PROVISIONS CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BEFORE THE EXPIRATION CITTA -0 DATE THEREOF, THE ISSUINO INSURER WILL ENDEAVOR TO MAIL DAYS WRR7EN NOTICE To THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TD DO 90 SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR City of La Quinta P.O. Box 1504 REPRESENTATIVES - La Quinta CA 92253 AUTHORIZED UP NTATNE ACORD 26 (2009101) @ 19MIEWCCO P RATION. All rights reserved. The ACORD name and logo are registareftlirks of ACOAD r Apr. 12. 2010 4:08PM No. 8.242 P. 6 IMPORTANT If the certificate holder is an ADDITIONAL. INSURED, the.policy(ies) must be endorsed. A statement on this certificate does.not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER This Certificate of Insurance does not conslitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 26 (2009101) City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 10020 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better: All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. . DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing. water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of -one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated. ® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( " N/A " ) inches of A.C. paving placed on ( "' N/A " ) inches of ( " N/A " ) aggregate sub -base course having an "R" value of not less than ( " N/A") and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. . ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ('* N/A ") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 Y:") of A.C. paving on (" N/A `*) of class (" N/A " ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 • SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. Citv of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of 'construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed. in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The.Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January -1973.. ❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC -800 shall be placed on a prepared sub -grade. The SC -800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of three inches (3") of SC -800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La Quinta Standard 600 shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22. FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ❑ R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled.safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The. entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not. less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO. 10020 City Project No. 2009-15 / Potholing for Utilities / Washington St and Simon Dr. In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer: 2. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 3. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its original condition. 4. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Engineer II) of the private land owner whom is being encroached upon. 5. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097 . before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection. 6. Badger Daylighting Corn (Dale Burtner), hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. 7. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1992), throughout the work site, the Permittee shall comply with City.regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30:. Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:00 a.m. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. = 3 p.m. Traffic control shall be set up after 9 a.m. and removed before.3 p.m. The Permittee shall contact the City Traffic Signal Maintenance Technician at (760) 250-0571 if signal operation at the intersection is to be altered in any way. 9. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. Special Conditions Page I of 4 PERMIT NO. 10020 City Project No. 2009-15 / Potholing for Utilities / Washington St and Simon Dr 10. The permittee must compact any disturbed soil within the paved right of way back to its original condition or compact to a minimum density of 95% based on ASTM D1557 and be placed while the soil is at +/- 2% of optimum moisture, which ever compacting effort produces the greatest density. 11. Any asphalt removed during potholing shall be replaced with City approved mix asphalt or equivalent. Temporary (Cold Patch) is not acceptable as an approved asphalt mix. The asphalt shall have a thickness equivalent or greater than the removed asphalt thickness and shall obtain a density of 95% or greater based on maximum density obtained by the ASTM Marshall Mix Design Method. 12. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 13. The permittee shall place temporary no parking signs along the parking area affected by the construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and removed immediately after the construction completion date. 14. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), at residential streets, advance warning signs and traffic control shall be installed and maintained in accordance the latest version of the California Manual of Uniform Traffic Control Devices (MUTCD) . On Collector to Major Arterial Streets, the permittee must submit a traffic control plan which shall be prepared under the guidance of the latest version of the California Manual of Uniform Traffic Control Devices (MUTCD). It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code.(Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 15. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities. 16. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. 17. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe random pothole backfill compaction and testing if requested by the inspector. If the inspector's phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or the Assistant Engineer II at 777-7047 to determine the city inspector's phone number. The inspector shall determine the number and location of the test location/s. The above testing does not relieve the permittee's responsibility for future repairs due to settlement at and near the locations of the work area. Materials testing must be performed under direct supervision of a California Registered Civil Engineer. Special Conditions Page 2 of 4 PERMIT NO. 10020 City Project No. 2009-15 / Potholing for Utilities / Washington St and Simon Dr 18. The issuance of this permit and the City approval of the related construction improvement plans do not provide a vested entitlement for all design parameters that may have been utilized for the plans. As such, plans approved for this permit may be "at risk" for further modifications as it relates to any follow up improvement plan requirements as required .by the city or existing errors & omissions by the architect.or engineer of record. 19. The permittee is responsible for obtaining a valid separate permit from other city, county, or state agencies if any of the work or traffic control devices extend into the agencies right of way. 20. This permit is not valid until the permittee submits; to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 21. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, a traffic control plan for review and approval prior to start of construction or parking on the paved R/W. 22. The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts provided in the Engineering Bulletin for Indemnification & Insurance Requirements. This insurance shall be kept in full force and effect at all times by Applicant or Contractor during the prosecution of the permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each policy shall name. the _City as an additional insured. 23. The permittee is required. to provide a changeable message board informing the commuters using the affected Major and Primary Arterial roads of major construction and possible traffic delays, time of construction, and if possible alternate routes. The message board shall be provided for the commuters 48 hours prior to the start of traffic delays. 24. The City of La Quinta reserves the right to require modifications of the work be made at permittee'.s sole cost for proper sight distance requirements per guidelines in the AASHTO " A Policy on Geometric. Design of Highways and Streets, 5`" Edition" or latest, in the installation of all appurtenances abutting and within the public street right-of-way. 25. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open .trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight; however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 26. Access and egress to all local properties shall be maintained at all times. Special Conditions Page 3 of 4 . PERMIT NO. 10020 City Project No. 2009-15 / Potholing for Utilities / Washington St and Simon Dr 27. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10'§ 1 (part), 1982), permanent pavement replacement shall be completed no later than seven.(7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/" max medium asphalt concrete as the base course lift and a City approved Y2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 28. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 29. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 30. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 31. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 32. If it is the 'intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 4 of 4 HWY. 111 W20-1 Z A y ROAD YV WORN AHEAD NO SCAL C3( SIMON DR. EDUCED TO FIT) MUST MUST W4-2 AVE. 47 BUS STOPI ..... I M V ,a TR l LVJCU 0 LY 0 0 � ;V5 \) _ tL' 96 --EM3— C;� '=;� G=2 Cz �p��� CSC -Nw�tm Cp [off WORK AR = a o p r� � C=C= o�vc+oa C� cvesc r�v� a 02 �5�0 Ceps moo �o �a�o LIP y7 3Oo or o ooc000va � 0p ovvv oovovovv � uo� pI 0 0 ; 0 D t RI-1 r ROAD WORK AHEAD 500' M1 (RT) C17 (CA) pC=pC=dpO �aQaQao av a HIGHLAND PALMS NOTES: 1. ALL TRAFFIC CONTROL DEVICES FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH 2006 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.TC.D.) 2. TRAFFIC CONTROL SHOWN HEREIN IS THE MINIMUM REQUIRED. ADDITIONAL TRAFFIC CONTROL MAY BE REQUIRED TO FACILITATE PUBLIC SAFETY AND TRAFFIC FLOW IF DEEMED NECESSARY BY CITY OF LA QUINTA REPRESENTATIVE. 3. THROUGHOUT EACH WORK PERIOD, CONTRACTOR SHALL INSPECT TRAFFIC CONTROL (SIGNS, BARRICADES AND DELINEATORS) AND MAINTAIN SAME IN ACCORDANCE WITH TRAFFIC CONTROL PLANS, 4. CONTRACTOR SHALL MAINTAIN A MINIMUM 10'(12' TYP.) TRAFFIC LANE WIDTH ATALL TIMES AND A MINIMUM 2' BETWEEN THE EDGE OF CUT AND THE NEAREST TRAFFIC LANE. 5. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 6. THIS TRAFFIC CONTROL SHALL BE IN PLACE DURING WORK HOURS ONLY. AT END OF THE WORK HOURS, THE ROAD SHALL BE CLEAR OF DEBRIS AND RETURNED TO NORMAL. 7. THE WORK HOURS SHALL BE BETWEEN 9 AM & 3 PM (INCLUDING TRAFFIC CONTROL SET UP) UNLESS OTHER ARRANGEMENTS ARE MADE WITH THE CITY OF LA QUINTA, " "-' VIA MARQUESSA ROAD WORK AHEAD R r Qo4p=p4q <:= DOp aO4Q&meq IAv Op oQ CO �Q�pavOpOpcz:,C - aaQa�acooQapp p� worn— �tDctQ"> �o --J -3.0 50 Pot Holing for Storm Drain Mm O Contractor 9asw on Stanaara Badger Daylighting CALTRANS T-11 Tops N Barricades, Inc. (800)852 -TOPS Ron Fifield 104/08/10 To Be Issued on Approval