10035ENCROACHMENT PERMIT
PUBLIC WORKS CONSTRUCTION
See below for Finance Revenue Codes
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public
works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS.
Subdivision Improvement Permit - Class III
Minor Improvement Permit - Class IV
DATE: 6/16/2010
LOCATION OF CONSTRUCTION: Parc La Quinta; TM 21555; On Washington St and Sagebrush Avenue I FP
PURPOSE OF CONSTRUCTION: Lane Closure on Washing
DESCRIPTION OF CONSTRUCTION: N/A
DIMENSION OF INSTALLATION OR REMOVAL: N/A
APPROXIMATE TIME WHEN WORK WILL BEGIN: 6/18/2010
St for Palm Tree Pruning Iu I JUN 17 2010
TIME OF COMPLETION: 6/18/2010
ESTIMATED CONSTRUCTION COST: less than, $5,000 (Including removal of all obstruction, materials, and debris, backfilling,.compaction and placing
permanent resurfacing and/or replacing improvements)
COMMENTS Army ft
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any
and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or
property happening or occuring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777=
7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at
least twenty-four (24) hours prior to the anticipated inspection.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all apicable
,Kes and r ulations of the City
of La Quinta and to pay for any additional replacement necessary as the result of this worlf. I .
Signature of Applicant or Agent v
Wade Howery - Hort Tech Landscape Construction P.O. Box 3284, Palm Desert, CA 92261 (760) 275-1912
Name of Applicant Business Address Telephone No
Wade Howery - Hort Tech Landscape Construction P.O. Box .3284, Palm Desert, CA 92261 (760) 360-9000
Name of Contractor and Job Foreman Business Address Telephone No.
897481 5386
,Contractor's License Number City Business License No
Arch Insurance Company LCPKGO184700
Applicant's Insurance Company Policy Number
FEES Subdivision Improvement Permit - Class I
Minor Improvement Permit - Class I
Finance Revenue Code
Inspection Fee EE=1
$0.00
Permit Fee E_1
$100.00
As -Built Deposit E-A
$0.00
Cash Deposit -Surety Bond, E_B
$0.00
if required
TOTAL
$100.00
Public Improvements: 3% of estimated construction costs
Private Improvements: 3% of estimated construction costs
PERMIT NUMBER: 10035
DATE ISSUED: JU►1'e' !7+-2010
EXPIRATION DATE: ���tt n p jT c� j I
BY:
WORK INSPECTED BY
PERMIT COMPLETION DATE*:
If the work is covered by a Subdivision Improvement Agreement, Subdivider
shall request final acceptance of improvements from the City Council.
`14 1
Date:
T44f 4 4 a"
PUBLIC 'WORKS DEPARTMENT
APPLICATION FOR PERNUT
I �' tt1 � { rr � - - �!!•PR�R►rr� + I r {r IA t f
� 11{ #r��3k�k #+fr i�#il} { II rf c{ 1��+1 � � [ kt�/ a l j { :Il f'�+}+� c➢1 h Ir#1 k) ikt 1, k i�1 +t3 r:. '+
1 . !. 4 ' "'+ e #3 r rr �{ }.•_ (,{ .'t�ia:; � c� iii„� 1 'so k s { ,a. _ L !1 � ,� .,...:.:. r ,!e.�, � ...; tnfl+u l?,.�.url.4�f� ..t{l1t_ _ � _�.....r j.
of Installation
Approximate Construction Start bate:
Approximate Construction Completion Date:
11 EMI
Estimated Construction Cost: $11MM111 1 MMI'M 1,—
Estimwcd Comtruction Cost shall include the removal of all obstructions, materials, and debris, back-Slling, compaction and
placing permanent resuffacing and or replacing improvements
Contact Name: hone NumberINIMENINEMMEM
Name of Applicant/Owncr: I Mel
Applicant Address:
Applicant Telephone Number:
Bill
Applicant E-mail Address:
THE
!t'V Insurance
Office Use Only:
Inspection Fee:
Permit FCC:
lVl00
AS -Built
/Y�
beposit
Dust Conaol
Deposit:
Credit
Amount:
TOTAL, FF.F DIl]E:
$1 t%O r
Office Use Only;
Assigned Pemrit Number O O 36 -
Approval slate:
Expiration
Date'
Issue
Date:
Administrative Authority:
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number 10035
The following shall always apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper. drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicated:
® R1 NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
® R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( ** N/A ** ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course having an
"R" value of not less than ( ** N/A ") and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch (%") to one foot (1').
❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter (" N/A "') feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 '/2') of A.C. paving on (`* N/A ") of class (" N/A *" )
aggregate base.
® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet'(600') in all directions shall be assured and maintained at all
times.
❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturer's specifications.
City of La Quinta
® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
❑ R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
❑ R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one -
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
❑ R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
❑ R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC -800 shall be placed on a prepared sub -grade. The SC -800 temporary paving shall be placed after
a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
❑ R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
three inches (3") of SC -800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La
Quinta Standard 600 shall be placed no later than (" N/A ") days after completion of temporary road repair.
❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
® R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in'sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO. 10035
Parc La Quinta / Palm Tree Pruning / TM 21555; Washington St and Sagebrush
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the.La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
2. Hort Tech Landscape Construction (Wade Howery), hereinafter referred to as "Permittee", shall be
responsible for providing continuous dust and erosion control.
3. This permit or copy of it shall be on the work site for inspection during the actual work performed.
4. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, .if required.
5. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any
Arterial street (ie any 4 lane street) before 8:30 a.m. and after 4:30 p.m.
6. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. -
3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall
contact the City Traffic Maintenance Technician at (760) 250-0571 if signal operation at the
intersection is to be altered in any way.
7. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public.or private street
and for any damage to other City streets or facilities as a result of work performed under this permit.
8. The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts
provided in Engineering Bulletin on Indemnification & Insurance Requirements. This insurance shall
be kept in full force and effect at all times by Applicant or Contractor during the prosecution of the
permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each
policy shall name the City as an additional insured.
Special Conditions
Page I of 3
PERMIT NO. 10035
Parc La Quinta / Palm Tree Pruning / TM 21555; Washington St and Sagebrush
9. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097
before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection.
10. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
advance warning signs and traffic control shall be installed and maintained in accordance with the latest
edition of the Work Area Traffic Control Handbook (WATCH Manual) and the latest version of the
California Manual of Uniform Traffic Control Devices (MUTCD). A traffic control plan shall be
prepared in accordance with the WATCH Manual or under the guidance of the latest version of the
CA MUTCD and submitted to the City for review and approval prior to starting any construction.
It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall
be maintained at all times.
11. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422-
4133. It shall. be the Permittee's responsibility to notify the Public Works Department of anticipated
excavation which impact City facilities, including but not limited to traffic signal conduits and loops,
irrigation lines, electrical conduits, and storm drain facilities.
12. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall
be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to
the City of La Quinta.
13. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10.§ 1 (part), 1982),
backfill compaction within street rights-of-way shall conform with Section 306-1.3 of the latest
edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise
specified herein.
No excavation. is anticipated in the Scope of Work or within this permit.
14. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
15. All landscaping, irrigation, decorative rock, decorative concrete, lighting, etc., shall be replaced to its
original condition.
16. Access and egress to all local properties shall be maintained at all times.
Special Conditions Page 2 of 3
PERMIT NO. 10035
Parc La Quinta / Palm Tree Pruning / TM 21555; Washington St and Sagebrush
17. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
No asphalt work is anticipated within the scope of work or this permit.
18. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
19. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use.the street to deliver street construction materials and/or equipment.
20. The City of.La Quinta reserves the right to revoke,. suspend or void this permit at any time.
21. The permittee shall .indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
Special Conditions PaB e 3 of 3
11
(1) Refer to specific State requirements1tor wont on btate rreeways ana aceto rngnways.
(2) Posted Speed or observed operating speed (whichever is greater).. .
(3) Channelizer spacing shall be redu in half at areas where work is taking place, on curves, or areas of head-on conflict.
(4) Buffer space may be inserted in low speed urban areas, should be inserted in high speed urban and rural areas, and shall be
inserted in Local Agency Freeways. Buffer space, when inserted, should be increased on downgrades and should be kept clear
of equipment and materials, except for a Shadow Vehicle.
N
O
MINIMUM RECOMMENDED CHANNELIZER AND SIGN SPACING(')
SPEED "S"
MPH W
DIMENSION
A
SIGN
SPACING
ft' m
DIMENSION
B(
MINIMUM
MERGING
TAPER L
ft m
DIMENSION
C
MINIMUM
SHIFTING
TAPER 1R L
ft m
DIMENSION
D
MINIMUM
SHOULDER
TAPER 113 L
ft m
DIMENSION
E
BUFFER
SPACE
ft m
MAXIMUM
CHANNELIZER
SPACING
TAPER
ft m
MAXIMUM.
CHANNELIZER
SPACING
TANGENT f3)
ft m
25
125
40
125 40
83
42 13
158 48
25
50 15
30
180
60
180 60
90 30
60
205 62
30 9
60 18
35
245
5
245 5
123
82
257 80
35 11
70 22
40
320
100
320 i 100
160 50 -
107 35
315 100
40 13 '
80
45
540
165
540 165
270 80
180 55
378 115
48 15
98 30
50
600
180
600 180
300 90
200 60
446 130
48 15
98 30
55
660
660 10D)
330 100 ..220
65
520 165
48 .05)
98 30
60
720.
720
360 110
240 5
598 180
48 15
98 30
780
65
780
40
40
390 120
260 80 .
682 10
48 1
98 30.
Local Agency
Freeways M
1000
300
1000 300
500 150
330 100
1000 300
48 15
98 30
Pedestrians
WA
WA
1'20
10 3
6
WA . WA
3 1
6
Bioyd'rsts
Use Roadway .
Sign Spacing75
38 12
25 8
WA WA
12 4
25
(1) Refer to specific State requirements1tor wont on btate rreeways ana aceto rngnways.
(2) Posted Speed or observed operating speed (whichever is greater).. .
(3) Channelizer spacing shall be redu in half at areas where work is taking place, on curves, or areas of head-on conflict.
(4) Buffer space may be inserted in low speed urban areas, should be inserted in high speed urban and rural areas, and shall be
inserted in Local Agency Freeways. Buffer space, when inserted, should be increased on downgrades and should be kept clear
of equipment and materials, except for a Shadow Vehicle.
N
O
D
rD
{
m
-i
n
O
3
M'
a
�^ � a •1
C
a t <gt
la•�`�' See below for Finance Revenue Codes
41
r. .:. .
ENCROACHMENT PERMIT
of° PUBLIC: WORKS CONSTRUCTION
For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public
works improvements -in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS.
DATE: 6/16/2010
LOCATION OF CONSTRUCTION: Parc La Quinta; TM 21555; On Washington St and
PURPOSE OF CONSTRUCTION: Lane Closure on. Washington St for Palm Tree Prun
DESCRIPTION OF CONSTRUCTION: N/A
DIMENSION OF INSTALLATION OR REMOVAL: N/A
APPROXIMATE TIME WHEN WORK WILL BEGIN: 6/18/2010
ESTIMATED CONSTRUCTION COST: less than. $5,000
permanent resurfacing and/or replacing improvements)
COMMENTS
Subdivision Improvement Permit- Class III.:
Minor Improvement Permit -Class IV
A
ebrush Avenue
Oft
JUN I � 2010 IN
TIME OF COMPLETION: 6/18/2010
(Including removal of all obstruction, materials, and debris, bac kfilling,.compaction and.placing
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any
and all penaltiesi liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or
property happening or occuring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-
7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at
least twenty-four (24) hours prior to the anticipated inspection.
Comply with all applicable City Ordinances, the terms andbonditions of the permit and all ap icable les and r ulations.of the City
of La Quinta and to pay for any additional replacement necessary as the result of this wo
Signature of Applicant r Agent.
Wade Howery - Hort Tech Landscape Construction P.O. Box 3284, Palm Desert, CA 92261 (760) 275-1912
Name of Applicant Business Address Telephone No
Wade Howery - Hort Tech Landscape Construction P.O. Box.3284, Palm Desert, CA 92261 (760) 360-9000
Name of Contractor and Job Foreman Business Address Telephone No.
897481
.Contractor's License Number
Arch Insurance Company
%ppucanrs insurance Company
FEES Subdivision Improvement Permit Class 1.
Minor Improvement Permit - Class I
Finance Revenue Code
i
Inspection Fee E_1
0.00 '
Permit Fee E-1
100.00
As -Built Deposit E-A
0.00
Cash Deposit -Surety Bond; E_B
0.00
if required
TOTAL
I
10000
5386
City Business License No
LCPKGO184700
Policy Number
Public Improvements: 3% of estimated construction costs
Private Improvements: 3% of estimated construction costs
PERMIT NUMBER: 10035
DATE ISSUED: 'Jun e Q+ . 2 010
EXPIRATION DATE: t t' e. 1- 7
BY:
I
WORK INSPECTED BY': .
PERMIT COMPLETION DATE*:
If the work is covered by a Subdivision Improvement Agreement, Subdivider j
shall request final acceptance of improvements from the City Council.
l�e�;;tpt$r cods�ed�i�i 4 3�
Typictif App.146ation 34 .
-Chapter 6H —.Typical Applications
Part 6 — Temporary:Traffic Control.
m
n
0.
0-
(1)
-(1) Refer to specific State requirements for work on State Freeways and State Highways.
(2) Posted Speed or observed operatin speed (whichever is greater)... w
(3) Channelizer spacing shall be reducc d in half at areas where work is taking piece, on curves, or areas of head -0n conflict. a
..•t (4) Buffer space maybe inserted in low speed urban areas, should be inserted in high speed urban and rural areas, and shall be C
r•
Inserted in Local Agency Freewt ys. Buffer space, when inserted, should be increased, on downgrades and should be kept dear C
°;6• of equipment and materials, ex pt for a Shadow Vehicle,
MINIMUM
RECOMMENDED
CHANNELIZER AND SIGN SPACING")
SPEED "S"
MPH W .
DIMENSION
A
SIGN
SPACING
ft` m
DIMENSION
B
MINIMUM
MERGING.
TAP L
ft. m
DIMENSION
C
MINIMUM
SHIFTING
TAPER 1R L
ft m
DIMBJSION
D
MWI U [M
SHOULDER
TAPER 113 L
ft m
DIMENSION
E
BUFFER
SPACES
ft. m
MAXIMUM
CIW44EtIZER.
SPACING
TAPERR
ft
MAXIMUM .
CHANNEi=,
SPACING
TANGENT
25
1 125. 40
125
40
63
42 - 13
158
48
25
so 15
30
180 60
180 1(601
1 g0
60
.205 "
30 9
60 18
35
245 5
245
123
ffi
257
35 11
70
40
320 100
320.
100
160 50 -
107
315
100
40 (13)'
80.
45
540 165
540
165
270 80
180
378(116)'48
1
98
50
600" .180
.800
180
300 90
200
446
130
48 1
98
55
660
680.
200
330 100
-220 M
510
1
48 15
98
60
720. ,
720
380 110
.240.
598
180.
48 1
98 30
65
780
'780
40
390 120
260 .
682
10
48 1
98
Local Agerxy
Freeways")
1000
.
1000
300
500 150
330" 100
1000
300
48. 15
98 30
Pedestrians
WA WA
20
1.0
6
WA
WA
3 1
6
Bicyclists
Use Roadway. .
75 ..
38 12 '
25
WA.
WA
12 4
25
m
n
0.
0-
(1)
-(1) Refer to specific State requirements for work on State Freeways and State Highways.
(2) Posted Speed or observed operatin speed (whichever is greater)... w
(3) Channelizer spacing shall be reducc d in half at areas where work is taking piece, on curves, or areas of head -0n conflict. a
..•t (4) Buffer space maybe inserted in low speed urban areas, should be inserted in high speed urban and rural areas, and shall be C
r•
Inserted in Local Agency Freewt ys. Buffer space, when inserted, should be increased, on downgrades and should be kept dear C
°;6• of equipment and materials, ex pt for a Shadow Vehicle,
u�
m
n
0.
0-
(1)
-(1) Refer to specific State requirements for work on State Freeways and State Highways.
(2) Posted Speed or observed operatin speed (whichever is greater)... w
(3) Channelizer spacing shall be reducc d in half at areas where work is taking piece, on curves, or areas of head -0n conflict. a
..•t (4) Buffer space maybe inserted in low speed urban areas, should be inserted in high speed urban and rural areas, and shall be C
r•
Inserted in Local Agency Freewt ys. Buffer space, when inserted, should be increased, on downgrades and should be kept dear C
°;6• of equipment and materials, ex pt for a Shadow Vehicle,