Loading...
BSOL2015-01917f:-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 c&(t 4 4� Qumro COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT Application Number: BSOL2015-0191 Property Address: 61499 TOPAZ DR APN: 764530010 Application Description: GIESE/11.77 kW PV SYSTEM - (36) 327W PANELS/(2) IN Property Zoning: Application Valuation: $52,320.00 Applicant: SMART ENERGY SOLAR INC 1641 COMMERCE STREET CORONA, CA 92880 LICENSED CONTRACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my License is in full force and effect. License Class: C46 License No.: 990049 Date: L Contractor's I �)_/__ OWNER -BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).: (_) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). ( ) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s) licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.). Lender's Name: Lender's Addre! i 11111111111,11111111- 42 VOICE (760) 777-7125 FAX (760) 777-7011 INSPECTIONS (760) 777-7153 Date: 12/1/2015 Owner: ALFRED GIESE 61499 TOPAZ DR a, QUINTA, CA 92253 ri C Contractor: N —SMART ENERGY SOLAR I (� 1�1 COMMERCE STREE I C,RONA, CA 92880 i ��--�=(•951)273-9595 LIc. No.: 990049 WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. ✓ I have and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: Carrier: _ Policy Number: _ I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if I should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. Date: Alit, Applicant: WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEAENT IMPORTANT: Application is hereby made to the Building Official for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application , the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above-mentioned property for inspection purposes. Date: Signature (Applicant or Age FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE BSAS SB1473 FEE 101-0000-20306 0 1 $3.00 $3.00 10/12/15 PAID BY METHOD RECEIPT # CHECK # CLTD BY SMART ENERGY SOLAR INC CHECK R9928 21303 SGU Total Paid for BUILDING STANDARDS ADMINISTRATION BSA: $3.00 $3.00 DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - ARRAY, FIRST 20 101-0000-42403 0 $24.17 $24.17 10/12/15 PAID BY METHOD RECEIPT # CHECK # CLTD BY SMART ENERGY SOLAR INC CHECK R9928 21303 SGU DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - ARRAY, FIRST 20 PC 101-0000-42600 0 $24.17 $24.17 10/12/15 PAID BY METHOD RECEIPT # CHECK # CLTD BY SMART ENERGY SOLAR INC CHECK R9928 21303 SGU DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - MISC EQUIPMENT 101-0000-42403 0 $24.17 $24.17 10/12/15 PAID BY METHOD RECEIPT # CHECK # CLTD BY SMART ENERGY SOLAR INC CHECK R9928 21303 SGU' DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PV SYSTEM - MISC EQUIPMENT PC 101-0000-42600 0 $24.17 $24.17 10/12/15 PAID BY METHOD RECEIPT # CHECK # CLTD BY SMART ENERGY SOLAR INC CHECK R9928 21303 SGU Total Paid for ELECTRICAL: $96.68 $96.68 DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE PERMIT ISSUANCE 101-0000-42404 0 $91.85 $91.85 10/12/15 PAID BY METHOD RECEIPT # CHECK # CLTD BY SMART ENERGY SOLAR INC CHECK 119928 21303 SGU Total Paid for PERMIT ISSUANCE: $91.85 $91.85 OF Ttn Description: GIESE/11.77 kW PV SYSTEM - (36) 327W PANELS/(2) INV/225A MSP Type: SOLAR Subtype: Status: APPROVED Applied: 9/25/2015 MFA Approved: 10/5/2015 JFU Parcel No: 764530010 Site Address: 61499 TOPAZ DR LA QUINTA,CA 92253 Subdivision: TR 30023-7 Block: Lot: 16 Issued: 10/12/2015 SGU Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: Valuation: $52,320.00 Occupancy Type: Construction Type: Expired: 4/9/2016 SGU No. Buildings: 0 No. Stories: 0 No. Unites: 0 MARY FASANO Details: 11.77 kW SOLAR ARRAY- (36) 327W SPR327NE-WHT-D PANELS W/ (2) SMA SBSOOOTL-US-22 INVERTERS + MAIN SERVICE PANEL UPGRADE TO 225A W/ 200A MAIN. [720SF] 2013 CALIFORNIA ELECTRICAL CODE. ;J Applied to Approved EM ApprovedXtoIssued ADDITIONAL CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES PLAN CHECK SUBMITTAL MARY FASANO 9/25/2015 9/25/2015 RECEIVED RESUBMITTAL STEPHANIE GUMPERT 11/24/2015 11/24/2015 NOTIFIED ISHMEL W/ SMART ENERGY SOLAR THAT PLANS TELEPHONE CALL JAKE FUSON 10/5/2015 10/5/2015 WERE APPROVED AND PERMIT WAS READY TO ISSUE. LEFT MESSAGE W/ EBONY OF SMART ENERGY SOLAR INC TELEPHONE CALL JAKE FUSON 12/1/2015 12/1/2015 STATING THE REVISED PERMIT WAS APPROVED AND READY TO RE -ISSUE. CONDITIONS Printed: Tuesday, December 01, 2015 4:33:29 PM 1 of 3 CR SYSTEMS INSPECTIONS Printed: Tuesday, December 01, 2015 4:33:29 PM 2 of 3 RW YS TEM S FINANCIAL CONTACTS INFORMATION NAME TYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT SMART ENERGY SOLAR INC 1641 COMMERCE STREET CORONA CA 92880 (760)564-3823 METHOD PAID BY CONTRACTOR SMART ENERGY SOLAR INC 1641 COMMERCE STREET CORONA CA 92880 (760)564-3823 OWNER ALFRED GIESE 61499 TOPAZ DR I LA QUINTA I CA 1 92253 1 (760)564-3823 R9928 21303 INSPECTIONS Printed: Tuesday, December 01, 2015 4:33:29 PM 2 of 3 RW YS TEM S FINANCIAL INFORMATION CLTD DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY BSAS SB1473 FEE 101-0000-20306 0 $3.00 $3.00 10/12/15 R9928 21303 CHECK SMART ENERGY SGU SOLARINC .Total Paid for BUILDING STANDARDS ADMINISTRATION $3.00 $3.00 BSA: PV SYSTEM - ARRAY, 101-0000-42403 0 $24.17 $24.17 10/12/15 R9928 21303 CHECK SMART ENERGY SGU FIRST 20 SOLAR INC PV SYSTEM - ARRAY, 101-0000-42600 0 $24.17 $24.17 10/12/15 R9928 21303 CHECK SMART ENERGY SGU FIRST 20 PC SOLAR INC PV SYSTEM - MISC 101-0000-42403 0 $24.17 $24.17 10/12/15 R9928 21303 CHECK SMART ENERGY SGU EQUIPMENT SOLAR INC PV SYSTEM - MISC 101-0000-42600 0 $24.17 $24.17 10/12/15 R9928 21303 CHECK SMART ENERGY SGU EQUIPMENT PC SOLAR INC Total Paid for ELECTRICAL: $96.68 $96.68 PERMIT ISSUANCE 101-0000-42404 TO $91.85 $91.85 10/12/15 R9928 21303 CHECK SMART ENERGY SGU SOLAR INC Total Paid for PERMIT ISSUANCE: $91.85 $91.85 TOTALS: INSPECTIONS Printed: Tuesday, December 01, 2015 4:33:29 PM 2 of 3 RW YS TEM S Permit Details PERMIT NUMBER' . n r City of La Quinta BSOL-20115=0191 Printed: Tuesday, December 01, 2015 4:33:29 PM 3 of 3 CR SYSTEMS REMARKS NOTES REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE REVIEWS STATUS NON-STRUCTURAL - BUILDING 9/25/2015 10/2/2015 10/5/2015 APPROVED 1 WK BUCKET 1ST BLDG NS (1 WK) JAKE FUSON 11/24/2015 12/3/2015 12/1/2015 APPROVED REVISION 1- REVISIONS TO PERMIT THAT HAS ALREADY BEEN ISSUED. Printed: Tuesday, December 01, 2015 4:33:29 PM 3 of 3 CR SYSTEMS 11.77kW DC�ROOF MOUNTED PHOTOVOLTAIC ARRAY FOR THE GIESE RESIDENCE 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE LATEST CALIFORNIA CODE OF REGULATIONS (CCR), NATIONAL ELECTRICAL CODE EDITION AND ALL APPLICABLE LOCAL CODES AND REGULATIONS. (Construction shall comply with 2013 CBC, CMC, CPC, CEC, CRC, CFC) 2. ALL PANELS, SWITCHES, ETC. SHALL HAVE SUFFICIENT GUTTER SPACE AND LUGS IN COMPLIANCE TO UL REQUIREMENTS TO ACCOMMODATE CONDUCTORS SHOWN 3. WHERE WIRE SIZES ARE INDICATED ON PLANS FOR INDIVIDUAL CIRCUITS, THE WIRE SIZE INDICATED SHALL APPLY TO THE COMPLETE CIRCUIT, UNLESS OTHERWISE NOTED. 4. CONTRACTOR SHALL EXTEND WIRING FROM ALL JUNCTION BOXES, SWITCHES, ETC. AND MAKE FINAL CONNECTIONS AS REQUIRED TO ALL BUILDING EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS. 5. DRAWINGS AND DIAGRAMMIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK INCLUDED. FOLLOW DRAWING AND LAYOUT WORK AND CHECK DRAWINGS OR OTHER TRADES RELATING TO WORK TO VERIFY SPACE IN WHICH WORK WILL BE INSTALLED. MAINTAIN HEADROOM AND MINIMUM CODE REQUIRED WORKING CLEARANCES AT ALL TIMES. 6. ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT INCLUDING THOSE THAT ARE EXPOSED TO OUTSIDE ENVIRONMENT SHALL BE WEATHERPROOF TYPE NEMA 3R 7. DISCONNECT SWITCHES SHALL BE MOUNTED ON INDIVIDUAL SUPPORTS, OR OTHERWISE DIRECTLY ON EQUIPMENT, PROVIDED NO MODIFICATION TO EQUIPMENT IS NECESSARY. 8. ALL ELECTRICAL MATERIAL SHALL BE LISTED BY "UL" FOR THE TYPE OF APPLICATION AND "UL" LABEL SHALL APPEAR ON ALL ELECTRICAL EQUIPMENT. 9 WIRING METHOD SHALL BE EMT ABOVE GROUND MOUNTED IN CONCEALED SPACES (UNLESS APPROVED OTHERWISE) AND Sheet Index PV1 Cover Sheet PV2 Details PV3 Roof Layout / Plan View PV4 Single Line Diagram PV5 Typical Signage Cut V 77 Spec Sheet - (36) Sunpower SPR327NE-WHT-D Modules Spec Sheet - (2) SMA SB5000TL-US-22 Inverters Engineering Report Sample Placard Design Criteria Planning Criteria BUILDING CODE DATA APN #: 76453 (E) Occupancy Group R-3 No. o A UOj�ITA (E) Type of Construction V OF t (E) Sprinklers NJ r V pEP PANEL UPGRADE NEEDED? Y Lo � SAOv�D APCF TRUCTION FOR � _1 MMI 12W SCHEDULE- 40 PVC FOR BELOW GROUND INSTALLATION UNLESS NOTED OTHERWISE. �^ 10. AN OSHA APPROVED LADDER PROVIDING ACCESS TO ALL PORTIONS OF THE ARRAY SHALL BE SECURED IN PRIOR TO REQUESTING INSPECTION. 11. SMOKE ALARMS AND CARBON MONOXIDE DETECTORS WILL MEET THE NECESSARY REQUIREMENTS PER CRC R314, R315 120' 12. UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM. 13. ALL EXTERIOR CONDUIT PAINTED TO MATCH EXTERIOR SURFACE. (IF APPLICABLE) 14. NO PLUMBING, MECHANICAL OR BLDG VENTS TO BE COVERED OR OFFSET AROUND 15. MODULES ARE FIRE CLASSIFIED AS CLASS A TYPE 2. - 'n. naioa lua�isa e • � . �:. e� � v J� g 11 el a.e. iSdF•a • - � ----L. `ll.----- t aero.w . .--i vaaw § 1C o r Vicinity Map Scale =NTS Mon North i � c0 i 0 0 v U N tT �t (E) Single Family Residence Driveway j fool ` (N) Main Service Panel (N) AC Disconnect Site Plan Scale: NTS Plert Nath -o E U W ID CO�1 U cV v Z 10 E <a) 7 o U r w U 0w a ° 'CD°Lo U —Inn v)y�'. [) �Q N (D _ o m ®�� ¢ a w O 'o Lu co � O o > (n Z SO ma OWS', a2�u vmv N2�N o� u N � 0 N N N 0) oto C3 N Ec � o N to T U) �> N W � O Z W M L to Z 0NcM N ILL!Q Q 00 0 a I— eco +- u?a (n 0) fY J � iu W a f Z j J 0 Prciea I Giese Date 0911712015 sneer PV1 scwe As Noted °BY ML Typ. Truss @\" O.C. wi v v- v / \ SS Lag Bolt w/ 2.5" Min. Penetration B Prosolar TileTrac PV Attachment w/ Unirac Solarmount Railing NTS Weight of Materials Module Weight (Sunpower): 41 lbs Module Area: 17.55 SF Module Array Area: 702 SF Mounting Hardware weight: 3.56 LB/MODULE Roof Load (Module Weight/Module Area): 2.33 PSF MOUNTING SYSTEM 1. The mounting structure is an engineered product designed to mount PV modules. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer: Prosolar Tiletrac b. Total Weight of PV Modules and Rails: 1782.4 LB c. Total Number of Attachment Points: 80 d. Weight per Attachment Point (b/c): 22.28 LB e. Maximum Spacing Between Attachment Points: 48 INCH f. Total Surface Area of PV Modules: 702 SF g. Distributed Weight of PV Module on Roof (b/f): 2.53 PSF Notes: 1. Prosolar Tiletrac to be attached to roof using 5/16" x3-1/2" SS Lag Screws 2. Roof Penetrations to be made every 48" Max -See attached Spec Sheet & Engineer Report for more information. Tiletrac Roof Attachment Unirac Solarmount Solar Modules w/ 6" Threaded Stud L -Foot Unirac Solarmount Railing . 0 0 E O O N ALJ�. _ E N aate,, U OD in V (1)5/16" x 3-1/2" SS Lag Bolt Typ. Truss @ 24" O.C. Concrete Tile/S-Tile Roofing Typical 4'-0" Span Front View Mounting Detail A NTS Solar Module Typical Roof Elevation for Solar Array �' NTS ................... . O.� E O O N ALJ�. _ E N aate,, U OD in V Uj �15 MN p> il') N 2 EQm �- Eo U r u� tON U c o E o LO U n cn` N ,q Q Lw Y � c O o' aEi �o O o 5, N�rn ZtrU) ooa �o 0 L a m V mU Y o U r- (n E (n (3 N z J Wr U N Q N O 0 CO \1 E co NN >, N '> a) 1-1 o Z W 2 m Q` LO Z -p0NM ~ N O U 00 c4 Q M Q o U O - co m a rnO c� O — O O 0 W CY r,- Z O CO J O Project Giese Date 09/17/2015 suet V2 PV2 1 s -ie As Noted Dram ML BY y_ � (12) #10 THWN-2 & (2) #8 AWG THWN-2 Ground (See 2013 CEC Table 250.122 Conductors in 1.25" EMT Conduit Min. (12) #10 USE -2 Conductors (See Amp. Calc. A) & (2) #8 Bare Copper Ground (See 2013 CEC Table 250.122 (18) Sunpower SPR-327NE-WHT-D Panels 3 Strings of 6 _ Input 1: 6 @ 166° S Input 3: 6 @ 166° S Input 2: 6 @ 166° S Input 4: (18) Sunpower SPR-327NE-WHT-D Panels 3 Strings of 6 Input 1: 6 @ 166° S Input 3: 6 @ 166° S Input 2: 6 @ 166'S Input 4: Grounding to be installed per module manufacturers' instructions Ground Method. WEEB UMC DC & AC Calculations Vmpp = (54.7Vdc mpp) * (6 Panels) = 328.2Vdc Voc= (64.9Voc) * (6 Panels) = 389AVdc Vmax= (389.4) * (114%)= 443.91 Vdc Imp = (5.98A) * (1 String) = 5.98A Isc = (6.46A) * (1 String) = 6.46A A -design = (6.46A) * (1.56) = 10.07A ------> USE -2#10 Max. OCPD: (6) #10 THWN-2 Single Line Diagram (225A Bus) * (1.2)= 270A Max Rating (120% of Bus) (See Amp. Calc. B) PV Backfeed (60A) + Main Breaker (200A) = (260A 5 270A) & (2) #8 AWG THWN-2 Ground See 690.64 (13)(2) of 2013 CEC (See 2013 CEC Table 250.122 Conductors in (2)3/4" EMT Conduit -� W System AC Wiring INV1/INV2 Pmax= (301.4 PTC Rating) * (18 Panels) * (97% Inv. eff.)= 5262.44 Wac Imp= (5262.44 Wac) / (240Vac) = 21.92A Inverter Maximum Output Current = 22A B -design = (22A) * (1.25) = 27.5A #10 THWN-2 (30A 2P C/8) TOTAL System AC Wiring Pmax= (5262.44 Wac) + (5262.44 Wac) = 10524.88 Wac Imp= (10524.88 Wac) / (240Vac) = 43.85A Inverter Maximum Output Current = (22A) + (22A) = 44A C- design = (44A) * (1.25) = 55A #6 THWN-2 (60A C/B) 3) #6 (1_112.Neutral) THWN-2 (See Amp. Calc. C) & (1) #6 AWG THWN-2 Ground (See 2013 CEC Table 250.122) Conductors in 1" EMT conduit min. r - I NV1 - LC Q I New rti 30A r 30A I I _ I N V2 ---- Ampacity Calculations ,) PV to Inverters LC E Solar Load Center (125A Rated) with (2) 35A Breakers Wire Ampadry Thermal Derate Factor Number of Conductors 2013 CEC (310.16) (CEC 310.16) CEC 310.15(B)(2)(a) #10 USE -2, 90 degrees C 50 + (22) degrees C (10.20) Max e 310.15(BM3xc) (40 Amps) '(0.58) '(0.50) (40 Amos)' (0.58)' (0.50) = 11.6A - PV A -design (10.07A) Wire Ampadry Thermal Derate Factor Number of Conductors 2013 CEC (310.16) (CEC 310.16) CEC 310.15(B)(2)(a) #10 THWN-2, 90 degrees C 1 50 degrees C (3) Max (40Amps) I *(0.82) I * (1.00) (44,0Amps) * (0.82)' (1.00) = 32.8A � PV 8 -design (30A) C) Sub -Panel to Main Service Panel Wire Ampadry Thermal Derate Factor Number of Conductors 2013 CEC (310.16) (CEC 310.16) CEC 310.1(B)(2)(a) ((1JJ]III #6 THWN-2, 90 tlegrees C 50 degrees C (3) Max (75Amps) I '(0.82) I '(1-00) (75Amps) • (0.82) • (1.00) = 61.5A > PV C -design (60A) (N)225A Rated Bus NOTE: PV Breaker to be installed on 0000site end of Main Breaker. t 200A Main 120/240V r--ol AC_J New V 60A 1 OCPD I `O General Notes: PANEL UPGRADE FROM 200A TO 225A RATED BUS If the existing Main Service Panel does not have verifiable ground electrode. It is the PV contractors responsibility to install a supplemental grounding electrode I LEGEND f JB Junction Box NEMA 3R INV1 SMA SB5000TL-US-22 Inverter with Intergral DC Disconnect (240V) INV2 SMA SB5000TL-US-22 Inverter with Intergral DC Disconnect (240V) LC E Solar Load Center (125A Rated) with (2) 35A Breakers 0 Solar Loads ONLY AC AC Disconnect "Knife Blade Type" 100A / 240V Rated MSP Main Panel & Utility Electrical Service 200A Main / 225A Bus 1. (36) Sunpower SPR327NE-WHT-D Modules: (327) Watt Modules wired and listed to UL1703 standards 2. (2) SMA SB5000TL-US-22 Inverters. Attached with system electrical specifications and ground fault protected & listed to UL1741 standards. Photovoltaic system ground will be tied into existing ground at main service from DC Disconnect/Inverter as per NEC Sec. %250.166(13). "The Grounding Electrode Conductor shall not be smaller than the largest conductor supplied by the system and not smaller than #6AWG." 4. Equipment operating 150 volts or greater shall only be serviced or replaced by qualified personnel. Field protection may be in the form of conduit, closed cabinet or an enclosure which requires use of tools to open. 5. Solar Photovoltaic System equipment will be installed in accordance with requirements of Art. 690 of the 2013 CEC. 6.Minimum height of conduit above roof to match temperature derating factor. 7.Photovoltaic do conductors entering the building shall be installed in metal conduit AND THE CONDUIT SHALL BE LABELED "CAUTION DC CONDUIT"OR EQUIVALENT EVERY 5 FT. 8. System Grounding Electrode conductor for PV system to be sized to meet the requirements of both 250.66 (AC) and 250.66 (DC), 690.47(C) not smaller than #6 CU AWG. 9. If the existing main service panel does not have a ground rod or ufer, it is the pv contractors responsibility install one. 10. UTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVATION OF THE SOLAR PV SYSTEM. 11. Smoke alarms and carbon monoxide detectors will meet the necessary requirements per CRC R314, R315. 12. Each module shall be grounded using the supplied connection points identified on the module and the manufacturers instructions. All solar components are to be bonded. 0 0 E 0 e rn ZU aaE, 00 lt7 V LU EQ2= i 0 U n N e U 2� € 0 LO o. V)(y, `1 .1[ p� N coti (a 41 ¢ a w Y � 00E a) _j yoy aoU po ZWU yarn 2C oo> oW. IL � � R Y o E Z J o o7 U M N � Q d N N 3 a) in 0 � 0 rn E v .2 0 y cn o Z W M L0 Z -00NM ~ N N O') 00 U Q M � Q 0 U 0 a;F- (6co tln N C IL 1 a) O _ ♦O V-- /( LU / Z (0 (6 J O Project I Giese Date 09/17/2015 sheet PV4 nate As Noted D- ML By PHOTOVOLTAIC REQUIREMENTS PER CALIFORNIA ELECTRICAL CODE ARTICLE 690 WARNING PV SYSTEM AC DISCONNECT DO NOT TOUCH TERMINALS ON BOTH RATED AC OUTPUT CURRENT 44 AMPS LINE AND LOAD SIDES MAY BE AC NORMAL OPERATING VOLTAGE 240 VOLTS ENERGIZED IN THE OPEN POSITION MAIN SERVICE ON SERVICE METER AC METER SOCKET DISCONNECT if applicable WARNING i DUAL POWER SOURCES SECOND SOURCE IS PHOTOVOLTAIC SYST R!lv--,--,_ RATED AC OUTPUT CURREN/' 44 AMPS AC NORMAL OPERATING VOLTARE 240 VOLTS WARNING: \_ PHOTOVOLTAIC POWER SOURCE WARNING INVERTER OUTPUT CONNECTION. DO NOT 1 RELOCATE THIS OVERCURRENT DEVICE CEC 690.35 (F) WARNING ELECTRIC SHOCK HAZARD. THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED. WARNING DO NOT TOUCH TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION Marking shall be placed on interior and exterior DC conduit, raceways, enclosures and cable assemblies every 10 ft (3048 mm), within 1 ft (305 mm) of turns or bends and within 1 foot (305 mm) above and below penetrations of roof/ceiling assemblies, walls or barriers. WARNING: PHOTOVOLTAIC POWER SOURCE PV SYSTEM DC DISCONNECT RATED MAX POWER POINT CURRENT - 11.96 AMPS RATED MAX POWER POINT VOLTAGE - 328.2 VOLTS MAXIMUM SYSTEM VOLTAGE - 443.91 VOLTS SHORT CIRCUIT CURRENT - 10.07 AMPS INVERTER 1 & 2 .L NOTE: If the Photovoltaic Disconnect is remote and not within sight from the Main Service Disconnect, then a directory 36" to 75" above the floor or grade showing the locations of the Main Service Disconnect and the level to center of performance meters Photovoltaic Disconnect must be installed at the Main Service Panel (IF APPLICABLE) location. (SEE SAMPLE DIRECTORY IF APPLICABLE) Recommended signage or labeling specifications A, Red background with white lettering B. 3/8" letter height WARNING C. All capital letters ELECTRIC SHOCK HAZARD. D. Arial or similar font IF GROUND FAULT IS INDICATED - E. Weather resistant material (i.e engraved plastic) NORMALLY GROUNDED F. Reflective CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. u ®G &SAFE D B\p-OA Ofpv)FOJGTIOG BY oA�E/ ........................ COMBINER / INVERTER E .,� JUNCTION U� N IJJ BOX .z'a5 w N Na.) 211 ON oQ26= U y O � O 'r) w n DC DISCONNECT U (if applicable) WARNING ' E e Q'4 � t E a rL w DO NOT TOUCH TERMINALS ON BOTH DC DISCONNECT O o E LINE AND LOAD SIDES MAY BE m —� , O o >+ Zo7 4 OFF1 ENERGIZED IN THE OPEN POSITION PV SYSTEM DC DISCONNECT RATED MAX POWER POINT CURRENT - 11.96 AMPS RATED MAX POWER POINT VOLTAGE - 328.2 VOLTS MAXIMUM SYSTEM VOLTAGE - 443.91 VOLTS SHORT CIRCUIT CURRENT - 10.07 AMPS INVERTER 1 & 2 .L NOTE: If the Photovoltaic Disconnect is remote and not within sight from the Main Service Disconnect, then a directory 36" to 75" above the floor or grade showing the locations of the Main Service Disconnect and the level to center of performance meters Photovoltaic Disconnect must be installed at the Main Service Panel (IF APPLICABLE) location. (SEE SAMPLE DIRECTORY IF APPLICABLE) Recommended signage or labeling specifications A, Red background with white lettering B. 3/8" letter height WARNING C. All capital letters ELECTRIC SHOCK HAZARD. D. Arial or similar font IF GROUND FAULT IS INDICATED - E. Weather resistant material (i.e engraved plastic) NORMALLY GROUNDED F. Reflective CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED. u ®G &SAFE D B\p-OA Ofpv)FOJGTIOG BY oA�E/ ........................ E .,� U U� N IJJ O E U V .z'a5 w N Na.) 211 oQ26= U y O � O 'r) w n U ' E e Q'4 � t E a rL w Y c O o E m Q o! O o >+ Zo7 yarn E -M Ooa OW0) r-- a c6 m U Sc O E N Q z J O U C N � +� a7 o a) N N 3 a) O 0 N N. E 2o c m to T V) •> Q) � o z W :2 M Z -p 0 N CM I— N O OD W o G( M Q 0U4 O ai 1— ca � Cif rn O C LO d � O • — O lY c0 W 0 I - -z O M J O PfOlan Giese Date 09/17/2015 5'"t PV5 s-ta As Noted D— ML lay 20% EFFICIENCY SunPower E20 panels are the highest efficiency panels on the market today, rovidinq more power in the same amount of space MAXIMUM SYSTEM OUTPUT Comprehensive inverter compatibility ensures that customers can pair the highest - efficiency panels with the highest -efficiency inverters,. maximizing system output REDUCED INSTALLATION COST More power per panel means fewer, panels per install: This saves both time and money. i s RELIABLE AND ROBUST DESIGN , SunPower's unique MaxeonTMcell 1 technology and advanced module design ensue in reliability MAXEONTM CELL TECHNOLOGY Patented oll-bock-contoct solar cell, providing the industry's highest efficiency and reliability THE WORLD'S STANDARD FOR SOLARTM 5unPuwerr" E20 Solar Panels provide today's highest efficiency and performance. Powered by SunPower Maxeon' cell technology, the E20 series provides panel conversion efficiencies of up to 20.1 %. The E20's low voltage temperature coefficient, anti -reflective glass and exceptional low -light performance attributes provide outstanding energy delivery per peak power watt. SUNPOWER'S HIGH EFFICIENCY ADVANTAGE 20% 15% 10% 5% SERIES SERIES SERIES sunpoweii•wrp.cvm C UL US MODEL: SPR-327NE-WHT-D ELECTRICAL DATA Meamred of Standard Test conditions ISTCJ: irradiance of 1DDOW/m2, AM 1.5, and cell temperature 250 C Peak Power (+5/-3%) Pmax 327 W Cell Efficiency Panel Efficiency n n _ 22.5% 20.1 Rated Vultage vmpp 54.7 V Rated Current Impp 5.98 A Open Circuit Voltage voc 64.9 V Short Circuit Current I5e 6.46 A Maximum System Voltage UL 600 V Temperature Coefficients Power (P) - 0.38%/K Voltage (Voc) -176.6mV/K Current (Isc) 3.5mA/K NOCT V 45e C +/- 2' C Series Fuse Rating 20 A Grounding Positive grounding not required TESTED OPERATING CONDITIONS Temperature - 40' F to +185' F (- 40' C to + 85' C) Max load 113 psf 550 kg/m2 (5400 Pa), front (e.g. snow) w/specified mounting configurations 50 psf 245 kg/m2 (2400 Pa) front and back (e.g. wind) Import Rip0itanco Haiti (25 mm) at 51 inph (29 H1/s) WARRANTIES AND CERTIFICATIONS •- WarrantiesW 25 -year limited power warranty 10 -year limited product warranty Certifications Tested to UL 1703. Class C Fire Rating DIMENSIONS r MECHANICAL DATA Solar Cells 96 SunPower Maxeon'"" cells Front place High -transmission tempered glgm with 1000 W/m? at 50° C anti -reflective (AR) coating Junction Box IP -65 rated with 3 bypass diodes Dimensions: 32 x 155 x 128 mm Output Cables 1000 mm cables / Multi -Contact (MC4) connectors Frame Anodized aluminum alloy type 6063 (black) Weight 41.0 lbs (18.6 kg) TESTED OPERATING CONDITIONS Temperature - 40' F to +185' F (- 40' C to + 85' C) Max load 113 psf 550 kg/m2 (5400 Pa), front (e.g. snow) w/specified mounting configurations 50 psf 245 kg/m2 (2400 Pa) front and back (e.g. wind) Import Rip0itanco Haiti (25 mm) at 51 inph (29 H1/s) WARRANTIES AND CERTIFICATIONS •- WarrantiesW 25 -year limited power warranty 10 -year limited product warranty Certifications Tested to UL 1703. Class C Fire Rating DIMENSIONS r IN CURVE •iii ♦ ♦ ♦ ♦ ♦ ♦ ♦�il �i•���•iiiiil 7 1000 W/m? at 50° C 6 i000w/m' --- -- : 4 800 w/m3 3 `) f V 500 w/m? f 2 I_. ...._.-._ ..__.t... 200 w/m' 0 I 0 10 20 30 40 50 60 70 Voltage M Currant/voltage I characteristics wills dependence on irradiance and module temperature. TESTED OPERATING CONDITIONS Temperature - 40' F to +185' F (- 40' C to + 85' C) Max load 113 psf 550 kg/m2 (5400 Pa), front (e.g. snow) w/specified mounting configurations 50 psf 245 kg/m2 (2400 Pa) front and back (e.g. wind) Import Rip0itanco Haiti (25 mm) at 51 inph (29 H1/s) WARRANTIES AND CERTIFICATIONS •- WarrantiesW 25 -year limited power warranty 10 -year limited product warranty Certifications Tested to UL 1703. Class C Fire Rating DIMENSIONS r •iii ♦ ♦ ♦ ♦ ♦ ♦ ♦�il �i•���•iiiiil - 2X 11.0' 43J " 2x577(22.70) Iso 322(12.69) J- I 4X 230.8[9.091 I — (A)--- 1 k (— 915[36.02] I . ..- — 1200[47.241 —..... _. 12[.471 535[60.45] Please rend SnfPtyr and installation in3tructions befule usilly this product, visit sunpowercorp.com for more details. ® 2011 SunPower corporation. SUNPOWER, the SunPower logo, and THE WORLD'S STANDARD FOR SOLAR, and MAXEON are trademarks or registered eademarks s u n p o we re o r p . e o m of SunPower Corporation in the US and other countries as woo. Ali Rights Reserved. Specifications included in this datoshoot aro subject to change without notice. Document #001.65484 Rev•B / LTR EN CS 11 316 Technical data Sunny soy 30 WfL-Us sunny uoy 3801.11L•US sunny Bey 4000IL Ub SWDM-US-10 208 V AC 240 V AC 208 V AC 240 V AC 208 V AC 240 V AC Input (DC) 6300 W 4000/5000TL-US22 8000 W Max. usable DC power (@ cos p = 1) 3200 W 4200 W 4200 W Max. DC voltage 600 V 600 V 600 V Rated MPPT voltage range 175 - 480V 175 - 480 V 175 - 480 V MPPT operating voltage range „ , 125 - 500 V 125 - 500V 12.5 - 500V Min. DC voltage / start voltage 125 V / 150 V 125V/ 150V 125 V/ 15U V Max. operating input current / per MPP tracker 18 A / 15 A 24 A'/ 15 A 24 A / 15 A Number of MPP trackers / strings per MPP tracker 5200 W, 6000 W 2/2 6650 W 7680 W Output (AC) 5200 VA 6000 VA 6000 VA 7000 VA 6650 VA 7680 VA AL no-minol power 3000 W 3330 W 3840, W -- ` d000 W Max. At apparent power 3000 VA 3330 VA 3840 VA 4000 VA Nominal AC voltage / adjustable 268 V / • 240V/0 . ' 208 V / • 24U V % • LUN V/ • 24U V / AC voltage r9nge _ 183 - 229 V 211 - 264 V 183 - 229 V 211 - 264 V 1.83_ -_229 V . 211 - 96.4 V AC grid frequency; range 60 Hz / 59.3 - 60.5 Hz 60 Hz / 59.3 - 60.5 Hz _ 60 Hz / 59.3 -60.5 Hz Max. output current 15 A 16 A 20A Power factor (cos (P) 1 1 1 Output phases / line connections 1 /2 1/2 1/2 Harmonics <4% <4% <4% Efficiency Max. efficiency 97.2% 97.6% 97.2% 97.5% 97.2% 97.5% CEC efficiency 96.5% 96.5% 96.5% 97.0% 96.5% 97.0% Protection devices DC disconnection device • UC reverse-polarily proleclion - _ _ _ _ _ __ _ _ _ _ _ ._ _ • hP60d! f6dll m6nd6nng % Und monitoring • / • Al, sh9rl cucvit or9tech9n All -pole sensitive residual current monitoring unit • Arr Inulf nrrnit mtrrriipfpr tAH 1) rnmplinnt In 111 I h4VA _ • Protection class / overvoltage category I / IV General data Dhnmuluii3 1 11 I' D) fu mni (la) 490/'319/163 - J19.31'20.3/7.3i DC Disconnect dimensions (W / H / D) in mm (in) 187 / 297 / 190 (7.4 / 11.7 / 7,5) Packing dimensions (W / H / D) in mm (in) 617 % 597 % 266 (24.3 / 23.5 /_10.5) DC Disconnect packing dimensions (W / H / D) in mm (in) 370 / 240 / 280 (14.6 / 9.4 / 11.0) Weight / DC Disconnect weight 74 kg (.53 Ik) / 3 5 k0 (A lb) Pnrkin0 weight/ Il(- Ilisrnnnert fvirkin0 weight _ - _ 27 ka 160 lb),' 7t?. kg (0 16) Operating temperature range -40 *C... +60 °C (-40 IF... +140 °F) Noise emission (typical) 5 25 dB(A) < 25 dB(A) < 25 dB(A) Internal consumption at night < 1 W < 1 W < 1 W Topology Transformerless Transformerless Transformerless Cooling Convection Convection Conveciion Electronics protection rating NEMA 31? NEMA 3R NEMA 3R Features Secure Power Supply • • Display: graphic • • • Interfaces: RS485 / Speedwire/Webconnect 0/0 0/0 0/0 Warranty: 10 / 15 / 20 years 0/0/0 •/0/0 •/0/0 Certificates and permits (more available on request) UL 1741, UL 1998, UL 16998, IEEE 1547, FCC Part 15 (Class A 8. B), CAN/CSA C22.2 107.1.1 NOTE: US inverters ship with gray lids Type designation SB 3000TL-US-22 SB 380OTL-US-22 SB 4000TL-US-22 r; curve SUNNY BOY 5000TL-US-22 'aFA J...................................... - 400 V)„ - 480 V)-1 0.0 0.2 0.4 0.6 0.8 1.0 Output power / Rated power Accessories tre/Webconnect RS485 interfoce niedoce QDSpeedv DM-485CB-U&10 SWDM-US-10 208 V AC 240 V AC 208 V AC 240 V AC 208 V AC 240 V AC Fan kit for SB 3000/3800/ 6300 W 4000/5000TL-US22 8000 W FANKIT02-10 600 V • Standard feature O Optional feature - Not available Data at nominal conditions bunny Boy S000'IL-US Sunny Boy, 60007L -US Sutvty Boy 7000TL•US Suimy Boy 770OTL•US 268 V AC 240 V AC 208 V AC 240 V AC 208 V AC 240 V AC 208 V AC 240 V AC 5300 W 6300 W 7300 W 8000 W 600 V 600 V 600 V 600 V 175 - 480 V 210 - 480 V 245 - 480 V 270 - 480 V 125 - .500 V 125 - 500 V 125 - 500V 125 - 500 V 125Y/150Y 125.V/150V 125V/ 150V 12.5V/150V 30A/15 A. 30A/15A 30A/18A 30A/18A <1W 2/2 Tronsformerless Tronsformerless Transformerless 4550 VV 5000 W 5200 W, 6000 W 6000 W 7600 W 6650 W 7680 W 4550 VA 5000 VA 5200 VA 6000 VA 6000 VA 7000 VA 6650 VA 7680 VA 208 V / • 240 V / • 908 V / • 9d0 V / • 908 V/ • 240 V / • 208V/ • 240 V / • 1133-799V . 711 = 76A V 1A2 . 779V ?11 _?AAV 1 A4 _ ??QV 91 1 - 964 V 183 - 229 V 211 _ 264 V 60 Hz / 59.3 - 60.5 Hz 60 Hz / 59.3 - 60.5 Hz 60 Hz / 59.3 - 60.5 H7 60 Hz /59.1 - h0.5 H7 22A 25A 29.2A 32A 1 1/2 1 1/2 1 1/2 1 1/2 <4% <4% <4% <4% 97.2% 97.6% 97.0% 97.4% 96.8% 96.8% 96.8% 97.3% 96.5% 97.0% 96.5% 97.0% 96.5% 96.5% 96.5% 96.5% • • I/ IV 4YU.1JIY-/ ISJ 187/997/190 (7.4/11.7/7.5) 617 / 597 /.266 124,3 / 23.5 L 10.5) 370/240/280 (14.6/9.4/11.0) 24 kg (53 Ib) / 3.5 kg (8 Ib) 27 Im 160161 115 Iia 10 Ib) -40-C...+60eC (-40-F...+140°F) < 29 dBIA) < 29 dB(A) < 29 dB(A) < 29 dB(A) <1W <1W <1W <1W Transformerless Tronsformerless Tronsformerless Transformerless Convection fan Fan Fan NEMA 3R NEMA 3R NEMA 3R NEMA 3R 0/0 0/0 0/0 0/0 •/O/O 0/0/0 •/0/0 •/0/0 UL 1741, UL 1998, UL 1699B, IEEE1547, FCC Part 15 (Class A 8 B), CAN/CSA 022.2 107.1-1 SB 5000TL-US-22 SB 6000TL-US-22 SB 7000TL-US-22 SB 7700TL-US22 k par ThirstedT�l IeTlro 3 C j,raV Te /4,50U bs II lijk logy+ — - Patent #5,746,029 lb. d 1,1001bs f ested V��r°bract - - Tile Roof Structural Attachment NF, W1 Q'rA INI,ESS STEEL TILE FLASHING The utunled TiluTIUIV ulludnimil ulluws tui a sli,uclural roof rafter connection with optimal P ti P attachment stud location adjustability. Design results in the best looking systems in the industry. TileTrac ° for s -curve Tile Trac ° for flat concrete the concrete tile (G" Tall Threaded Stud) Ahn, (4" Tall Threaded Stud) profe--ssional SOLAR product► -sing (805) 486-4700 (805) 486 4799—fax 1551 S. Rose Ave. Oxnard, GA 93033 View more info on our website at: www.prosolar.com Part # TT -18-T6 Benefits of 7iMe7raco Part # TT -18-T4 • Easiest and lowest cost waterproof tile roof • Includes Stainless Steel tile flashing and attachment Stainless Steel lag bolt • Over 15 years of industry preferred single lag • Aluminum and Stainless Steel components for bolt design, maximum corrosion resistance and strength • 3rd party lab waterproof and load tested • Large roof surface contact area evenly • Compression sealed at underlayment and top distributes load of tile The TileTrac® Design Structurally attaches to roof rafter and allows the rail attachment stud to be located at the strongest point of the tile (the crown) where water does not flow. Without TileTrac® With TileTrac Water Flows High Point/ Crown Sealed at top of the in the Valley of the Tile :::3 of the Tile j (optimum) Katter attached to the rafter Rail 0 Sealed at --1 _nderlayment Rafter TileTrac® assembi structurally attached to the rafter Installation steps fo'- botly s-cittrve anti• flat concrete tile* STEP 1: Select a file in the area at the root ratter. Step 4: Seal the initial file nail hole. Using a 3/16" drill bit and drill guide (FJ -Drill), drill pilot hole along the rafter center SItP 2; Remove the tile by Dushing gnd Dulling II is usually held in place by a small nail. Step 5: Insert the lag bolt and washer through the TileTrac° and apply fresh compatible sealant to the base. IN Step 7: After bolting the base to the roof, slide the upper carriage Step 8: Replace the tile by lining up the snap lines into the correct position under the crown of the tile. For Flat tile, and mark the drill location accordingly. slide the upper carriage near the middle of the tile. el Tip: R,�dd--jZ3/8" nuts to top' of stud PrIk to roof work jILP 3: Using an electronic stud finder (recommended), or other means, locate the rafter center. Mark a reference point an the file above. Step 6: Using a 1/2" socket, install the lag bolt until seated. Do not overfighten. The sealant should flow outward sealing any holes. r� - r-� U e a RoUty Hummer drill for a 5 seta d drill time. Step 9: Using a 1/2" carbide drill bit and ROTARY HAMMER DRILL in hammer mode, drill through the tile. See online video at www.prosolar.com for details. Step 10: Insert threaded stud through file and hand -tighten Step 11: Unbind nuts and remove from stud. Apply Step 12: Fasten rail with lower and upper to engage with base. Bind two 3/8" nuts (included) using sealant around stud at tile opening and compress 3/8" nuts/washers as shown. 9/16" wrenches and tighten. with Stainless Steel flashing (included) until seated. `Not recommended for clay or slate tiles. ©Professional Solar Products, Inc. Mar. 2011. TileTrac is a registered trademark and covered under Pat. #5,746,029 CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN SERVICE -POINT UTILITY METER'. PV DISCONNECT SO�aRMourrr Top Mounting UniRac Grounding Clips and WEEBLugs - 225.6 UGC -1 Intertek Conforms to UL Standard 467 WEEBLug Stainless Steel Flat Washer (WEER) To93 MO, Hing Clamps L�.t I I Module T -bolt UGC-1Ij t I SolorMount® rail (any type) Figure 27. Insert a bolt in the aluminum rail or through the clearance hole in the stainless steel flat washer. Place the stainless steel flat washer on the bolt, oriented so the dimples will contact the aluminum rail. Place the lugportion on the bolt and stainless steel flat washer. Install stainless steel flat washer, lock washer and nut. Tighten the nut until the dimples are completely embedded into the rail and lug. The embedded dimples make a gas-tight mechanical connection . and ensure good electrical connection between the aluminum rail and the I thr u h the WEEB 1Clipsand lugs are sold separately. O g Figure 28. UGC -1 layout for even a. -ed odd number of modules in row. `d" denotes places to install UGC -1. Pvert Number Of MOduLeS in row Odd Number of Modules in row Figure 26. Slide UGC -1 grounding clip into top mounting slot of rail. Torque modules in place on top of clip. Nibs will penetrate rail anod- iaation and create groundingpath through rail (see Fig. 3, reverse side). t� WEEBLug f dam" zSbf�t�® rail (any type) •on June 201 U N I RAC Pub 2cc 1 e 2011 N� © 2011 by Unirac, Inc. A HILTI GROUP COMPANY All rights reserved. Revision Letter SMART ENERGY SOLAR ry j � Qca o • � FROM. 1641 Commerce Street Corona, CA 92880 P 951-273-9595 ext. 211 TO: City of La Quinta Building and Safety Site Address: 61499 Topaz Dr Project Type: Solar Photovoltaic System Plans are being resubmitted with changes with the following: 1. System downsized from 40 to 36 panels. (See clouded) 2. Inverter change from (2)Fronius 6kW inverters to (2)SMA SB5000TL-US-22 Inverters. 3. All changes have been clouded If you have any questions or want to reply with a job status, feel free to contact me by phone at 951-273-9595 ext. 235 or by email at matt@smartene=usa.com T4hay RECEIVE® NOV 2 4 2015 M�� t ay CCTV OF LA QUINTA Sellar PV Designer COMMUNITY DEVELOPMENT 0 <7 SMART ENERGY SOLAR 1 of 1