Loading...
1043n.7 ONOTE- q,,With.proper,validation. this form co6stitutes an .1 CITY OF, LA QUINTA encroachment:perrnit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) 0 For the construction of public or private curbs, drivew;ys, pavements, sidewalks, parking lots,% sewers,' water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and'APPROVED SUBDIVISIONS Subdivision Improvement Permit,— Class III DATE: 3. 28-91' Minor Improvement Permit Class IV LOCATION OF,CONSTRUCTION 50-945 calle 0131gpo 1MR'EASEMENT (Street address or Description of Location) PURPOSE OF CONSTRUCTION extend cable 2,401 Sketch (attach c6nStructioh plans if appropriate) - Z, DESCRIPTION OF CONSTRUCTION Pothole trench see attached sketcbl, DIMENSION OF INSTALLATION OR REMOVAL hand trench 3V machine ,trench 210!- j SIZE OF, EXCAVATION IFNEEDED I APPROXIMATE TIME'WHEN.WORK WILL,BEGIN 3-29-91 APPROXIMATE TIME OF,60'MPLETION' 9�14AVP200 2f,.9i 'S0.04 ESTIMATED CONSTRUCTION COST $ (Including,removal-lof all 'o'b'struction, materials;"a'nd debris, backfilling, com- 0ction and pacing p,ermarient resurfacing and/or replacing i mproVlements) In consideration of the granting of this permit, the applicant hereby agrees to: I hdemnily,-cefencand save the City, its authorized agents off icers:represeniatives, and.employeesharmless;mlessfrom and against any.and all penal ties,_1 iabi I ities or -loss resulting from claims or'court action and arising out of"any accident, loss or damage to persons'or, pro'peorty' 'happening,or occurring as -a pr6irhateqrgsult of.any-work undertaken under'the.per*m'it granted pursuant to this application.,('' Notify the-Administrat ve 'Authority at least twenty-four (24) h6urs'in advance of the'tim6 when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit,and all applicable rules and regulations ofthe City of Ca Quinta,aAd t6'pay for any additional replacement necessary as theresult of this work , q Signature of Applicant 6rAge6t Palme.t Cable 6fApplicani (please print) Business Address jelephone No. St. 3 19, 326--6778. Cochran Communication6 eon' 66 30 Cathedral Cyn. b r ;6 Name of Contractor and Job,Foreman Business Address Telephone No. 478543' 16'-ft7' 4 865 — . Contractor's; License No. • -.City Business License No., CNA 700821519 -7 Applicant's lrisurain'Ce Company Policy Number QL —Class III FEES:4 Subdivision Improvement Permit Public improvemenls:,3% of estimat6d'66nstruction,costs T - r.. 1"04-3 Private improvements: 3% of estimated construction costs Minor Improvement Permit 2 -Class IV: See attached schedule Inspection Fee $ .40. 40 PERMIT VALIDATION Permit Fee _10-.00 1043' PERMIT NO. - Penalty 3-:-28-91 Cash Deposit -Surety BondDATE APPROVED if requcired EXPIRATION DATE 4-03-91 TOTAL: $ 50.00 Receipt No. Received by Date 3-29-91 DATE ISSUEJ) By Administrative Authority Recorded by 11 TELEPHONE: (619) 564-2246 Y V rl� 4NOTE: *zWith proper validation this form constitutes an CITY OF encroachment permit APPLICATION LA QUI NTA FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS 3-28-91 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION 50-945 calleOBISPO REAR EASEMENT (Street address or Description of Location) PURPOSE OF CONSTRUCTION extend cable 240' DESCRIPTION OF CONSTRUCTION pothole & trench DIMENSION OF INSTALLATION OR REMOVAL hand trench 30' machine trench 210' SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 3-29-91 APPROXIMATE TIME OF COMPLETION ESTIMATED CONSTRUCTION COST $ (Including removal of all obstruction, materials" and debris, backfilling, com- paction and placing permanent resurfacing and/or replacing improvements) Sketch (attach construction plans if appropriate) see attached sketch WRAIi Vk1fiL V-91 50.0b4 In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximatetresult of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent Palmer Cable Name of Applicant (please print) Business Address Telephone No. Cochran Communications Const. 36-630 Cathedral Cyn. Dr. 619 328-6778 Name of Contractor and Job Foreman Business Address Telephone No. 478543 c-7 865 Contractor's License No. City Business License No. CNA 700821519 Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs Minor Improvement Permit — Class IV: See attached schedule Inspection Fee $ 40.00 Permit Fee Penalty Cash Deposit -Surety Bond if required TOTAL: Receipt No. Received by Recorded by 10.00 $ 50.00 Date PERMIT NO 1043 PERMIT VALIDATION 1043 DATE APPROVED 3-28-91 4-03-91 EXPIRATION DATE 3-29-91 DATE ISSnSUE By ' !' Administrative Authority TELEPHONE: (619) 564-2246 NOTE: z' With proper-validrdw- this form constitutes an,,CITY OF LA QUINTA ' encroachment permit APPLICATION FOR PERMIT PUBLIC,. WORKS -CONSTRUCTION_ (ENCROACHMENT) For the, construction • of, public or private curbs, driveways, pavements, sidewalks, parking • lou, sewers, watw ngim_ and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS ` Subdivision Improvement Permit — Class 111 DATE: �— 2 9� s , / - Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION ' 5n 9 � -S (Street address or Oesenption of Location) PURPOSE OF CONSTRUCTION' _J_ rs �� GSTy Sketch (attach construction pians if appropsim) . DESCRIPTION OF CONSTRUCTION 177 DIMENSION O_F �NSTA`LLATION OR REM/OVAL / ° (2G ' 1-1Gidd/ 7-SYNe,k 301 G�7 4Gbis Tw c�. cs Z0 SIZE OF EXCAVATION, IF NEEDED Z APPROXIMATE TIME WHEN WORK WILL BEGIN, 3 2Y— * APPROXIMATE TIME OF COMPLETION' ESTIMATED CONSTRUCTION COSTS R ' (Including removal of all obstruction, materials,'and debris, bacltfilling, com- paction and placing permanent ;resurfacing, and/orreplacing improvements) In 1consideration of the granting of this permit, the •applicant hereby agrees to Indemmfv,' defend, andsave the City, its authorized agents, officers, representatives and employees, harmless from and against am/ and all penalties, liabilities or loss 'r_esuiting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit grantedpursuant to•this application, } Notify the Administrative Authority at least twenty-four 124) hours in advance of the time when work will be started. , t . Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of V Quinn and to pay for any addftksnsl repleament necesartf as the result of this work. Signature of Applicant or, Agent Name of Applicant (please print) . Business Address Telephone No. c©C1�/r1211 CD%t�rhU�11�DLtS' �DD?s`�` 33dr�%����Z����� Name of Contracto and Job Foreman Business Address Telephone No. 7�s53 c Contractor's License No. r'' City Business License No. ILI /V/4 '7L90 ?'Z %si Applicant's Insurance Company Policy Number FEES:- Subdivision improvement Permit —Class III Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs 0 Minor imorovement Permit — Class IV: See attached schedule s insoection Fee, S PERMIT VALIDATION Permit Fee s ?ERM1T N0. Penalty , , .Cash Deposit -Surety BondDATE APPROVED. if required EXPIRATION DATE TOTAL: $ DATE ISSUED Receipt No. 8 Y Received by Date Administrative Authority Recorded by _ TELEPHONE: (819) 5842248 r t lv 3 3 The following General and Special Provisions are attached to and made a part- Permit No. . •F .y .GENERAL PROVISIONS, d a . The following shall always apply:' t ' • + , .,ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quinta right of way •. ,; ,` . ONLY. Whenever construction extends within private property, it shall be the responsibility of the permittee (or his contractors) to' secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work: TRACKLAYING CONSTRUCTION EQUIPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any paved surface unless fitted with smooth -f aced street pads. All mechanical outriggersshall befittedwith rubberstreet shoestoprotect r. < '� '• the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. if the existing pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request V , that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. ' ;r' • • surfacing plus appropriate seal coat as specified above. . PROTECTION OF TRAFFIC: All• excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City - 4 Engineer or La Quinta City Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for theduration a 7 of the project. The City shall be notified 24 Hrs. in advance of any traffic detours or delineations. CARE OF DRAINAGE STRUCTURES: Any drainage structure including 'corrugated metal pipe, concrete pipe, steel culvert and ' , V concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event.it becomes • ' y necessary to remove or cut existing drainage structures, City of 6'Quinta shall be notified prior to commencement of this work. `- Drainage structures and open drains shall be kept free of debris at, all times for proper drainage. c * T RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations sliall be removed from the right of way. All paved surfaces shall be broomed clean of earth and oth.er objectionable material's immediately afterbackfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed - E prior to paving;.Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used - ., + ' immediately after backfill.d `' ` t �. t " .. DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads , it shall be the responsibility of the permittee' (contractor) to control this water and to provide off-street barricades when necessary. • CLOSING STREETS: No street shall be closed. A minimum of one lane'of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for • "any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL -PROVISIONS '' The follwing shall apply ONLY when indicated: .. R1 NOTIFICATION:'Permittee•shall -notify the City at 564-2246 at least 48 hours in advance construction.' r of starting - r R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than $ ' shall be furnished in the name,of_City of La Quinta to coverall work involved in the restoration of the various La Quinta ' roads and survey monuments. This bond shall be continuous until cancelled by the City Engineer. This bond must be - ; t posted prior to commencement of any work on^this project . r UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta rightof wayauthorized i by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to.existing substructures resulting from operations conducted under this permit shall be the sole responsibility ,. •., of the permittee. f ., : "_ - R4 UTILITY CLEARANCE: (Surface structures) No work shall be done under this permit until ell utilities are clear ofthe • „ ^ proposed work site. The permittee shall notify all concerned utility companies of the proposed _work. R5 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be t y surfaced with ` inches of A.C. paving placed on inches of class aggregate subbase course having an "R" value of not less than and in conformance with City of La Quinta Road Improvement Standards 4 e and Specifications, Ordinance #461. t. •y;., R6 PARKWAY GRADING: Area between the property line and top of'the proposed concrete curb shall begraded toaslope of 1/4 inch to one foot (1'). „ R7 GRADES,& STAKES: City of La Quinta shall establish grades and stakes for the proposed concrete curb and gutter ' 4 f construction. _ F.• R8 GRADE CHECKING: City of LaQuintashallcheckgradesuponreceiptofplan and pFofileand/or grades as established by _' r • a lirensed engineer. ' R9 CURB REMOVAL FOR DRIVEWAYS: A'portion of the existing concrete curb and/or curb and gutter (' feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and t ' ' y ` • concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. y J14 J R10.1DRIVEWAYS, A.C.: Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2-1 /2 inches of A.C. paving placed on ( l of class aggregate base. Driveway construction shall conform to attached drawing.- ` R11 CULVERTS: A inch diameter (• )culvert shall be installed with the invert approximately 1-1 /2 ` ' irLches below and in line with the existing flow line. Culvert installation shall conform to the attached drawing.. ` '- ' w ' R12' SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained. 813 • SOIL STERILIZER: The area to be surfaced shall be, treated with soil sterilizer. Rate of application shall comply with the »' manufacturer's specifications. + R14 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. R15. SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the i centerline of all streets or property lineswhen involved shall be completely tied out so they may be readily and correctly - �' be replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ` } ties to these monuments shalt be furnished to the City Engineer prior to the removal of any monuments. Thisoffice shall •�� _ be notified upon completion of replacement of all survey monuments for proper project clearance: 's R16 SURVI NUMENTS: Prior to excavation or beginning of construct survey monuments shall be tied out by City of La Quinta and suitable payment or guarantee of payment shall be made as reimbursement for all work involved. R17 PAVEMENT CUTTING: Pavement will be mechanically cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as to best facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be corrected. R18 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to pavement straight edge shall be corrected, R1 LIMIT OF EXCAVATIONS: Excavations shall be limited tot,000lineal feet ofopen trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R20 BACKFILL MATERIAL: Backfill shall be free ofbrush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongyor saturated material) which is encountered during excavation shall note used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in lifts of notgreaterthan three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case a relative compaction of 95 percent shall be attained within the structural section of the roadway. R22 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. R23 COMPACTION TESTS: If so required bythe inspector, compaction tests shall be made at intervals of not more than 1,000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall.be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R24 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made asoutlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch consisting of two inches (2") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill and compaction, a temporary patch consisting of two inches (2") of cold mix paving (SC -800) shall be placed immediately. A permanent patch of three inches (3" 1 of A.C. surfacing shall be placed on six inches (6") concrete base as directed, but not later than fifteen (15) days after completion of temporary paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. P29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section 37, Standard Specifications, State of California, Division of Highways, dated January 1973. Work of pavement repair to be accomplished by a licensed contractor engaged in the business of pavement repair. R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be removed in sectionswhich can be handled safelywithout interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and/or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R32 TREE TRIMMING: a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year. All broken or weak sections within the trimming shall be removed. b. Where it becomes necessary to restrict traffic, the work shall be restricted to maximum of 500 feet at anyone time. Adequate signs, flagmen, and/or barricades shall be provided to protect the traveling public at all times. c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided by this permit. d. All tree trimming on EVERGREEN TREES, PALM TREES, and other ORNAMENTAL TREES shall be accomplished to the satisfaction of the City Public Works Inspector. e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees. f. Pruning shall, in all instances, be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches (2") and above in size. Sealant shall be applied to all cut sections as directed by the City Public Works Inspector. 46 CALLE. JACUMBAoz ri " W afA V M c -CALLE KALI MA , WASHINTON WASHINGTON m 542 704 ST .e rb N �e gar 'Z En C4 mv CAZ 0 c9 'v I pA CALLE Pqr: C LW 9z e C LE LF 7 a Iry I `r ► ,o G U 17-0 �< z o w -114 M Vp b • - '('� - ' Spy .� -' i Ry .. ..:y:. ,.. - •- . - . ". i. c - - NOTE: + = F With proper validation this form constitutes an ci CITY OF LA QUINTA' µ 'r, . 0 I `% encroachment permit , f - , j •' APPLICATION, FOR PERMIT ? �,® 4ltt 4 r 1 y ,•". , ,J PUBLIC WORKS -CONSTRUCTION (ENCROACHMENT) ( ` For the construction -of public or private 'curbs, driveways, pavements, sidewalks, parking lots, sewers,, water -mains t - '{ , �„ ;- •y and other like public works improvements in- connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS i ' Subdivision Improvement Permit - Class III ' ,. 3-28-91 .DATE: ? . Minor Improvement_ Permit Class IV w LOCATION OF CONSTRUCTION -_ 50-945 calle*ffiM OBISPO s w°..• " Ti 3 a REAR EASEMENT • • " � r (Street address or, Description of Location) � • r}, � - .. •� _ s 'PURPOSE OF CONSTRUCTION extend -cable 240' Sketch (attach construction plans if appropriate) DESCRIPTION OF CONSTRUCTION Pothole &• trench see •attachedr sketch 3,- t I DIMENSION OF INSTALLATION OR REMOVAL hand trench • = , ` •.yt •r 30'. machine trench 210' !1 .1\• 5. i • Y 1. h ` '`t + +'� J' .Ixr•` •� ` A' SIZE OF EXCAVATION, IF NEEDED `• `a ' :' t APPROXIMATE TIME WHEN WORKWILL BEGIN 3-29-91 0518$A 1 iQ2Ii0P&2P-91' 50.Ub4 ' APPROXIMATE TIME OF COMPLETION - 1.. • # ESTIMATED CONSTRUCTION COST $ " -A (Including removal of all obstruction, materials, and debris, backfilling,•com- paction and placing permanent resurfacing' and/or replacing improvements) J { "+ '' _' j In consideration of the granting of this permit, the applicant �hereby, agrees'to:. Indemnify, defend and save the City, its authorized agents, officers, representatives harmless from " and employees, and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property ,• • i ', ,`t'••' ,'c . i happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. • :. •' 'Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. _ - •of • ' "• ',;' -~ 'j� _ Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations the City of -t,,. - ' kid-• La Quinta and to pay for any additional' replacement necessary as the result of this work. 4 .c - yl. Signature of Applicant or Agent ; Palmer Cable t A ` • - - • Name of Applicant (please print) Business Address , Telephone No. Cochran Communications Const. 36-630 Cathedral Cyn. Dr. 619 328-6778 + Name of Contractor and Job Foreman Business Address Telephone No. M 478543-c-7 865 ' Contractor's License No. City Business License No-, ; r CNA 700821519 *+ 4 • , t Applicant's Insurance Company. Policy Number I " FEES: Subdivision Improvement Permit - Class III ; - Public improvements: 3% of estimated construction costs 1: 0 4 3 Private improvements: 3% of estimated construction costs ;' . Minor Improvement Permit - Class IV: See attached schedule Inspection Fee $ 40.00 ' PERMIT VALIDATION N. Permit Fee 10.00 PERMIT '�NO. 1043 ! - .,' Penalty + 3-28-91 Cash Deposit -Surety Bond DATE APPROVED ` r if required', EXPIRATION DATE 4-03-91 a.i ) TOTAL: $ 50.00 - 3-29-91' n, DATE ISSUE r• Receipt No.y/ • By � _ ' . Received by Date'--------7.,Administrative Authority Recorded byby ' TELEPHONE: (619) 564.2246' t ADDITION HMENT PERMIT NO. 1.043 ---- CC„' ITIONS' ---- ENCROois R33 Survey monumeshall be protected in place or Y re-established pursuant to City standards and the State•of ' California Land Surveyor's Act. R3.4 Work shall be coordinated with the City of La Quintals forces to ,preclude; delay or interference with . the City.of, La, s. Quinta's projects. R35 Contractor shall comply with the local'noise ordinance and construction operations and maintenance of equipment within . one half mile of human occupancy shall be performed only duiing•the'time:periods as follows: :October 1st_ to April 30; Monday -Friday 7:,00a.m:-5:30p.M. .'Saturday 8:00a.m.-5.00p..m. .May lst`tb September 30: Monday -Friday 6:00a.m.-7:00pm.`. - Saturday 8:00a.m.-5.:00p.m. Work shall be prohibited anytime on _Sunday and Federal . holiday. R36Traffic control shall be r fr • as per - Cal Trans Traffic Manual: Field adjustments in detouring shall be'accomplished as ' directed' in order. -to adjust to actual field conditions.- shall.be the contractor's responsibility to adequately . „barricade and detour .this site. A Traf'f ic':;control plan shall - • be• ,submitted .for approval • by the City • Engineer ;. u R3.7 All excavation at or;near the travel way.•shall-be backfilled at the end of -the .work day, 'for the• protection of the traveling public: R38 Street closures shall not be allowed at anytime. R39 A minimum of one travel lane shall'be maintained -at all ours. times -with flagmen during working hours.- All All work to be performed within the -existing .paved section:,' shall_be temporary paved and maintained by the Permittee,• ,- permanent'pavemen,t shall be',placed no.later."_than 15 days after completion' • of the' temporary • road .repair . `R41' Ingress and egress•for local prope rties 'shall be maintained ,at all times: ; R42 Prior to work starting,• Underground. Service Alert shall -`'be ' contacted at 1-800-422-4133 and an ."inquiry -number" shall be , provided to the City Public Works Inspector.' R43 Pavement shalf be sawcu.t•prior to -.removal. 3 Additional Conditions Encroachment Permit -No. 1043 Page 2 R44 ''All backfill subgrade soil shall be compacted'to nothing less than 90% relative dry density, all backfill soil within the top 2' of finish pavement surface shall, -be compacted to nothing less than 950 -relative dry density,,all base - material shall be compacted to nothing less than 950 relative dry density. R45 Replacement pavement sections shall'be 3 AC over 4" Class II aggregate base. R46 If the work is to be performed by forces other than that of the utility company, the contracting.company will'be required to apply,for at additional encroachment .permit and -pay the appropriate fee. R47 All landscaping, irrigation, fences etc. shall be restored to their original condition.