Loading...
1081NOTE: With proper validation this form constitutes an encroachment permit a ` Az; : r. CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS April 25, 1991 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV LOCATION OF -CONSTRUCTION Avenida Bermudas at Calle Nogales Mtreet address or Description of'Location) PURPOSE OF CONSTRUCTION to install new gas main Ske ru ion ns ' ,1 1ZEV 1 � IDIJ •• DESCRI,PTI. N OF CONSTRUCTION to install 230 of 2" plastic TAP I N TO MAIN (d, -KI L CORNER medgam -pressure gas main 17 w epl of Avenida Bermud OF W0C7ALE9 akiD 1VAVAIZV-0 DIMENSION INSTALLATION OR REMOVAL T EARTH E '5EI;L REV ISED 83' Conc and Mac PLArIl 6t3TA t1U- W ve DNA TGP 224, D-1 & 2 C.QEW FDeEMAN SIZE OF EXCAVATION, IF NEEDED OB St TIG F �) APPROXIMATE TIME WHEN WORK WILL BEGIN 5/2/91 NO PAVEMENT OR CONCRET " C CUTTING SHALL BE f' APPROXIMATE TIME OF COMPLETION 11/2/91 PERMITTED 9� ESTIMATED CONSTRUCTION COST $ BORE 1k & X==%. C UMgR ALL MaSTING .(Including removal of all obstruction, materials, and debris, backfilling, com- STmm IIrII'ROVwPTS. paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or propeity happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Gail Thompson, Permit Coordinator L Signature of Applicant or Agent Southern California Gas Co. PO Box 3003 Redlands, CA 92373 714/335-7742 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number FEES: Subdivision Improvement Permit — Class 111 Public improvements: 3% of estimated construction costs Private improvements: 3% of estimated construction costs 1081 Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee Penalty Cash Deposit -Surety Bond ,if required TOTAL: Receipt No. Received by 10 to 0.00 Date PERMIT VALIDATION PERMIT NO. 1081 DATE APPROVED 4/25./91 EXPIRATION DATE 12/31/91 DATE ISS�UEED.� 4/25/91 By� IV Administrative Authority Recorded by TELEPHONE: (619) 564-2246 -,, - ti � , .. .. , j h-.. _ _ - .. �, �. . � -.�.�, NOTE: With proper validation this form constitutes an encroachment permit 40. CITY OF LA QUINTA APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) R For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS April 25, 1991 Subdivision Improvement Permit - Class III" DATE:. Minor Improvement Permit Class IV LOCATION OF CONSTRUCTION Avenida Bermudas at Calle Nogales (Street address or Description of Location) PURPOSE OF CONSTRUCTION to install new gas main Ske taskveon ru ion ns prgpriate.) DESCRIPT OON OF CONSTRUCTION to install 230' of 2" plastic mediam pressure gas main w epl of Avenida Berm DIMENSION OINSTALLATION OR REMOVAL SIZE OF EXCAVATION, IF NEEDED RE=V I � IAIJ^ TAP 1N TO MA -IOU mke CORNER OF WO&ALES aN0 A/A VA 2IZ 0 T =onc TH 5EE RE.V ISE0 83' and Mac P L A KI 6B7 -AIN. ED P-eom TGP 224, D-1 & 2 CHEW FDe�M�1AJ -TOB SI1- APPROXIMATE TIME WHEN WORK WILL BEGIN 5/2/9r-' NO PAVEMENT OR CONCRETE" CUTTING SHALL BE APPROXIMATE TIME OF COMPLETION 11/2/91 PERMITTED r 91 XAa ESTIMATED CONSTRUCTION COST $ BORE 6'ARIMM UMER, ALL MSTING (Including removal of all obstruction, materials, and debris, backfilling, com- STREET DWROVEMENT3. paction and placing permanent resurfacing and/or replacing improvements) In consideration of the granting of this 'permit, the applicant hereby agrees to: Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss oi• damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. w Notify the'Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started. ' � R Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Gail Thompson, Permit Coordinator Signature of Applicant or Agent Southern.California Gas Co. PO Box 300 Redlands, CA 92373 714/335-7742 Name of Applicant (please print) Business Address Telephone No. Name of Contractor and Job Foreman Business Address Telephone No. Contractor's License No. City Business License No. Applicant's Insurance Company Policy Number a FEES: Subdivision Improvement Permit -Class Ill r ,f,'l Public improvements: 3% of estimated construction costs) • . Private improvements: 3% of estimated construction costs 1081 Minor Improvement Permit - Class IV: See attached schedule -0- Inspection Fee $ - PERMIT VALIDATION Permit Fee PERMIT NO. 1081 Penalty Cash Deposit -Surety Bond - if.required iII 0.00 � TOTAL: $ Receipt No. Received by Date Recorded by DATE APPROVED 4/25/91 EXPIRATION DATE 12/31/91 4/25/91 DATE ISSUED By Administrative Authority TELEPHONE: (619) 564-2246 CTl HOT 3 , :� L1 i --I 1-A� CYTE CD. CDPJV . LJ TL-'. GTV C.UT, 3ET 'i3 �� �_..._._ _ T) LLrI- Ctit1CC7?i G ST 11 ` MAN COND. f] W �/ 1 04D" E XT • ,�,IE ti1IDA �� I N141Ci�.S y��.LG ZI. 1-4 H. -� .5-6--Dn. 06)7' .-Z __ .-.... �l. LYFi�. 1 iAldD(_rrdt=r —_ .._-..-._---. _ �\ f01` !?LTERA i /GiAl A111Jl1iUl) �4.1ST/ I -L 117! :ISI/ 11 �L:ev1 CE , r.E ST __._ RT LDC-. 1, iVD T 7;iA P A" ',N 2 13 _ S cin SIE D.U.• 5C,0.5 ELL hit) " �:. 11l` . l ->?5 �;a'.IyJ -111rJc�Ly� FDk ALT RAT jD . -- -- �4 s� Aa0UlVCl GfiTCiY BASIN � Ia AF Z hfLvl C..fT :f f -;h: 1: 5 4 C -&TR. �, }- - - TOTAL FEET INSY •0.._,—_-__-.-___ i cr bmiatior+ Area Allected Yes D NOD , rovrR ecLow C C FL . . P - b IN�TALI. MAIN WITH AT LEAsr- , _ TOTAL FEET RYTIREO—_-- ressure (So ICI Aflecled Yee ❑ No O 'business bistricl Alfected Yes ❑ No C] 8upply Una Affected Yes ❑ No ❑ Vatveis) Required Yes ❑ No ❑ Reviewed Sy: _ ------ . iVG�. S� - RETIREMENT ' PER"tT ISSUED BY PEAMITNO. DATE MOVED- - DATE MOVED DATE OF COUNTY 3 t't'�•L>E DN JOB OFF �p�•- opaq._ - - ��— Ots r.EnsflN PIANNEO BY _ TRACT COMPANY_ .. LAO � Z STAKED 0 Cn6%PAIIY PACT ILITY: SA. CAI , fa P 1 S n ' ATLAS Yf AR r, 9 - _ _- ,_ t • -+` .t- ^�r4. •.. •`a 4 - . �'~ i .' --.r T w ..�'. t�^fir-••3«��. +Z • .,. + .. + , «,.... •` ` - ±'�. -'-----'--... •S .:._s.:�j_...—- —.--,_ ,+-jam ,,. -r".-' -� °� __.. .��_ .._, ` NOTE: " • Y With proper validation; _ ' '. ,• t` i ~ f this form constitutes an �' ` •;_ ' CITY OF :LA QUA encroachment permiINT t ` - • e APPLICATION FOR PERMIT • PUBLIC -WORKS CONSTRUCTION,,(ENCROACHMENT) For the construction of ° ublic or L • p private'curbs, driveways, pavements, - sidewalks, parking lots, sewer; water -mains. and. other like public•works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. { , April- 25,' 1.991 Subdivision Improvement Permit — Class 111 DATE: w 'Minor Improvement Permit Class IV • ' LOCATION OF CONSTRUCTION Avenida Bermudas at,Calle Nogales t �� ,' .r ;R ,:� r .tit s. ,• f • . e - - (Street address or Desctipnon of Location) + ' . - . ' - `',, , I • i - + PURPOSE OF CONSTRUCTION to install new. gas' main Sketch (attach construction plans if appropriate)' to install 230 of 2 lastic r ' .'"DESCRIPTION OF CONSTRUCTION � • mediam pressure gas..main 17 w epi of Avenida Bermudas.'; '' 1 beginning • n spl •of- Calle Nogales,' proceding inorth , CUT-,EARTH''AND `JET''.. •e - 93' Conc and Mac,*, •if r +DIMENSION OF INSTALLATION OR REMOVAL- s , . r TCP 224,'D-1- & �2, V ' SIZE OF EXCAVATION, IF NEEDED'' ' ': "APPROXIMATE TIME WHEN WORK WILL BEGIN '-5/2/91 ' -- ,NO- PAVEMENT_OR CONCRETE :+ , ' _ CUTTING SHALL BE ` 'APPROXIMATE TIME OF COMPLETION 11/2/91 ` ; PERMITTED-/ ; _ ESTIMATED CONSTRUCTION COSTS ' f 'y k BORE &'JACK UNDER',ALL EXISTING'- ' ` (Including removal of all obstruction, materials, and debris, backfilling, com-. , , ' « + STREET IMPROVEMENTS., .: + i paction and placing permanent resurfacing and/or replacing improvements) + In consideration of the granting of this permit,;the applicant,hereby agrees to: + J i ` • f Indemnify. defend and save the Cit s _ - , s , • ♦ y; its authorized agents, olficers, representatives and employees, harmless from and against any and all • '� + Penalties, liabilities or lou resulting from claims or court action and arising o" of any acc,dem. lou or damage to persons Or property } - - _ happening or occurring at a proximate result of any -work undertaken under the Permit granted Dursuant to this application, , Notify the Administrative Authority at least twenlV-lour f241' hours in,advance of the time wrsen work will be started. ., + _ • Comply with all applicable City Ordinances, the terms and conditions of the permit and all soo•cable rules and 'regulations df the city of, La Quints and to pay for any additional replacement necessary as the result of this work.. - • + s' • Gail Thompson. Permit Coordinator Signature of Applicant or Agent Southern California Gas Co. PO Box 3003•Redlands, CA 92373 714`/335-7742 ;' H Name of Applicant (please rint) _ Business Address Tele • - e,, Pp lease P P phone No. y' • Nameof Contractor and Job Foreman r Business Address Telephone No. ' Contractor's License No. _ , City Business License No.,; , .. Applicant's Insurance Company ? n • • 4 r y Policy Number t' , a' f r ,. FEES:.' Subdivision Improvement Permit —Class III' jr�+,.. i ' '• SJ . , • I Public improvements: 3% of estimated construction costs• _ s to ~1 } N. Private improvements: 3%'of estimated construction costs r• r -Minor Improvement Permit — Class IV: See attached schedule r r e-' Inspection Fee , St' •' a PERMIT VALIDATION ; 1 Permit Fee',- _ , r , tri `PERMIT NO. '1081 ! r• ~. _"•. - •i _ Penalty 4/25/91! r, ✓ '.� Cash Deposit -Surety Bond r, DATE APPROVED c- i •.' if required F Q t® 0.00 �' EXPIRATION DATE 12 71/91 ' T a f TOTAL:' ° S ° i * DATE IS UED ` 4/25/91 '>~ f.. I 'Receipt No. i. .s. + Received by y ` Date' �' i Administrative Authority 'r f I i Recorded by s .0 T TELEPHONE: (619) 564.2246 .� , ' V ,.` .ADDITION ---- ENCROACHMS PERMIT NO.1081--==CONDITOS R33 Survey monuments shall'be protected in place or ' re-established pursuant to City'standards and the State'of `.. .California Land Surveyor's. Act. s R34 Work :shall" be coordinated -with "the City of. La Quintals r' forces to preclude .delay or..interference with thez'City.of La Quintals projects. - rojects.R35 R3 5 Contractor-shall comply with the local' noise ordinance and r construction operations and maintenance -of equipment'within one half mile' of -.human occupancy shall be, performed. only , during the, time periods as follows: October lit' to' April 30:. Monday -Friday `7: 00a.m., 5: 30p..m. : -Saturday" , 8: 00a.m..-5: 00p.m. ' -May•lst to September 30: Monday-Friday`6':OOa:m.:7:00P-m. -.Saturday 8:00'-5tHp.m.' • Work shall be,prohibited'anytime on.Sunday and Federal, " holiday. R36 .`Traffic control shall be as per Cal.Trans Traffic Manual. ' Field adjustments in,detouring•shall.be accomplished as.., ` 'directed in 'order ' to adjust to actual `, fieldconditions.-It shall be the contractor's responsibility. -to adequately ` barricade and detour this site. A Traffic..control plan shall be submitted for approval by the City Engineer.'A. .: R37: A11_ excavation at. or near the travel -`way shall be backfilled ` at the end; -of the.work day, for the protection of -the' traveling public. a R38 Street closures shall not be allowed at any,time.- R39 A minimum of one .travel lane shall be maintained,at all times with flagmen during working hours.' R40 All work to be performed within the existing paved section -' 'shall be temporary paved and maintained'by.*the Permittee,. permanent pavement shall be,placed no later,than 15 days ' aftercompletion of the temporary road.repair. , <R41 Ingress and egress for•local properties shall -be maintained r at -all times.,' R42•1 -.Prior to work starting, Underground Service. - Alert shall be - contacted at 1-800-422-4133 and an "inquiry number" -shall be • provided to the City Public Works Inspector. 4 , , ''Additional Conditions - Encroachment Permit:No. 1081 page` 2 R43 .".` All backfill subgradesoil shall be compacted to "0% nothing.,. less than 9 xelative dry density, all backfill soil within the :top 2`' `of finish" pavement surface shall be compacted to nothing less.than 95% relative dry density, all base material shall be 'compacted. to nothing less than 95% relative dry density.: ' R44, If the work is to be `performed by.forces other than that of -the, -utility company;' the, contracting company will be.. ' required.to apply for an additional encroachment permit - and pay the appropriate.tee. -and R45', All, landscaping, and 'irrigation shall -be replaced -to its. original, condition. A Y• Y ••+.'. 13' ?`'" The followinral and Spec isI Provisions are attached to and made a F Permit No. GENERAL PROVISIONS • ~ r t The following shall always apply: w,a - , • '+ • • " • - ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within City of La Quints right of way* . +" *',: " . ,• ` ONLY. Whenever construction extends within private property, it shall be the responsibility of the permittee lot his contractors) to ` ,^ • ? securepermission from abuning property owners. Sucfi authorization must be secured by the permittee prior to starting work. TRACKLAYING CONSTRUCTION EQUIPMENT: " Cleated tracklaying construction equipment shall not be permitted to operate on any !' • ' `' '"'r' ` paved surface unless fitted with smooth -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect' . the paving during excavations. Rubber•tired.equipment only shall be used,in backfill operations in paved areas. If the existing • X, r` ° + pavement is scarred, spelled, or broken during the term of this contract, or if the pavement is marred, City of La Quints shall request } •" + that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing -plus appropriate seal coat as specified above. r • ;' , A , ., PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by th"e City . YI, �.: , _. • �ti Engineer or La Quints City PublirWorks Inspectors: Suitable detours and detour signs shall be placed and maintained for the duration of;the project. -The City shall be notified 24 Hrs. in advance of any traffic detours or delineations. ' -CARE OF DRAINAGE STRUCTURES: Any drainage structure including corrugated metal pipe, concrete pipe, steel culvert and - r concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event -it becomes t +% r " • ' 'necessary to remove or cut existing drainage'structu' s, City of. La Quints shay be notified prior -to commencement of this work. Drainage structures and open drains shall be kept tree of debris at all times for proper drainage. • . } s .6 J. RIGHT OF WAY,CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of ` way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction: Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed {' - rior to vin Water tanker shall be used, as required, to r p paving. q sprinkle the lob site to keep down dust conditions and shall be used L- immediately afteribackfill. _ ' 1•^ DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quints roads, it shall be t a ' �• + the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary: CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt bythe permittee that he must close a street for , any length of time, permittee shall contact this office to obtain the necessary permission. j ~.« y , t •.t .r:• , ` r -SPECIAL PROVISIONS _ The follwing shall apply ONLY when indicated: ,, y • + 1 ;f `• H NOl'IFICATIUN: Permittee shall notify the City at 564-2246 at least 48 hours in advance of starting construction. ., r •� r R2_ CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than s • shall be furnished in the name of City of La Quints to cover all work involved in the restoration of the various La Quints roads and survey monuments. This bond shall be continuous until cancelled by the City Engineer. This bond must be ^ posted prior to commencement of any work on this project . + ; R3 UTILITY CLEARANCE:(Substructures) Prior to making any excavation within the City of La Quints tight of way authorized ' ^' by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. . ' Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee.' r R4 UTILITY CLEARANCE: (Surface structures) No work shall be done under this permit until all utilities are clear of the Y a iproposed work site. The permittee shall notify all concerned utility companies of the proposed work. • '" • PAVEMENT WIDENING: Area between the proposed concrete. gutter. line _and'.the existing road pavement shall be " ' A • t . • i ' 4 .xRS� ,l surfaced with in of A.C. paving placed,on inches of class aggregate subbase course , ' - having aLn "R;Va.iueof not less than and in conformancewith City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R6 PARKWAY -GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of. , ` ' a 1 /4 inch to one foot 01 + + ' R7' GRA DES STAKES: City of La Quints shall establish grades -and stakes for the proposed concrete curb and gutter construction.. - , , ' R8 GRADE CHECKING: City of La Quints shall check grades upon receipt of plan and profile and/or grades as established by • �• k. ' " a licensed engineer. r r t R9 CURB REMOVAL.FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( feet) shall be removed. Curb and/or curb'and gutter shall be saw cut prior to removal. Depressed curb, matching concrete: gutter and J. +. ' concrete driveway approach shall be constructed in conformance with .City of La Quints Standard #207. ',f. s R10 .DRIVEWAYS,. A.C.. Driveways shall be constructed as not to alter existing drainage pattern.. Surfacing between the ,• property line andthe existing "road paving shall be 2-1/2 inches of A.C. paving placed on ( . 1 of class aggregate base. Driveway construction shall'confoim to attached dravJing. R 11 CULVERTS: A inch diameter ( ) culvert shall be installed with the invert approximately 1-1/2 ,inches below and in"line with the existing flow line. Culvert installation shall conform to the attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained. ' ^ R13 SOIL STERILIZER: -The area to be surfaced shall be treated with soil sterilizer. Rate of application shall comply with the '• t ` ' Ir. µ 'manufacturer's specifications. R14.000RDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quints may conduct in this area duffing the period of this permit. Work shall be coordinated with the State or City of La Quints forces to preclude delay or interference with State or City of La Quints projects. R1 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the _ centerline of all streets or property lines when involved shall be completely tied out so they maybe readily and correctly be replaced by a licensed civil engineer or surveyor at tl'e expense of the permittee. A complete set of notes showing the • ' �' ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall ,• be notified upon completion of replaceirieni of all survey monuments for proper project clearance.' R16 SURVEY MONUMENTS: Prior toe xcavation or beqinning of construct ion. all survey monuments shall be tied out by City of La Quinta and suitable payment or guarantee of paymen- ---"be made as reimbursement for all work involved. R17 EMENT CUTTING: Pavement will be mechanically cut to ight edge prior to excavation. Method of pavement ng shall be approved through the office of the City Engin. ,_nder no circumstances shall excavating equipment be used to excavate prior to cutting of pavement). Excavation material shall be placed in such a position as -to best facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be corrected. R18 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations, any damage to pavement straight edge shall be corrected. .� LIMIT OF EXCAVATIONS: Excavations shall be limited to 1.00Olineal feet of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works inspector sha11 determ ine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. Ob BACKFILL MATERIAL: Backfill shall be free of brush, rocitsor other organic substance detrimenialto its use forpurposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongyor saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R21 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed in liftsof notgreaterthen three feet (3') and vibrated using vibrotamper or equivalent equipment. Alternate methods maybe substituted, but in any case a relative compaction of 95 percent shall be attained within the structural section of the roadway. 22 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of f ive-foot (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90percent or equivalent to thesurrounding ground, whichever isthegreater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. COMPACTION TESTS: If so required bythe inspector, compaction tests shall be made at intervals of not more than 1,000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways. State of California, dated January 1973. R24 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded tothe City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3,000 lineal feet of trench has been excavated and backfill operations completed. but in no case shall ma Nlaca-cr.: c-' ima terrnytrary pavemeiii exceed a five (5) day limit. R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch consisting of two inches 12") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed ona inch class base shall be placed no later than days aftercompletionof temporary road repair. R27 PAVEMENT REPAIR: F.A.S.: Upon completion of backfill and compaction, a temporary patch consisting oftwo inches (2'1 of cold mix paving (SC -800) shall be placed immediately. A permanent patch of three inches (3'1 of A.C. surfacing shall be placed on six inches (6") concrete base as directed, but not later than fifteen (15) days after completion of temporary paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards and Specifications. Ordinance #461. R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section 37. Standard Specifications. State of California. Division of Highways. dated January 1973. Work of pavement repair to be accomplished by a licensed contractor engaged in the business of pavement repair. R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated, such striping shall be replaced upon completion of permanent repairs. R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shall be accomplished by a licensed, bonded and insured tree service. and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and/or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R32 TREE TRIMMING: a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year. All broken or weak sections within the trimming shall be removed. b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500feet at any one time. Adequate signs. flagmen, and/or barricades shall be provided to protect the traveling public at all times. c. If tree trunks are partially outside of the City of La Quinta road right of way, permittee shall make his own arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided by this permit. d. All tree trimming on EVERGREEN TREES, PALM TREES, and other ORNAMENTAL TREES shall be accomplished to the satisfaction of the City Public Works Inspector. e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees. f. Pruning shall, in all instances, be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches 12'1 and above in size. Sealant shall be applied to all cut sections as directed by the City Public Works Inspector. 47 I ae•.pm - a - 4 '} r - •1- ' ..:.-...,p•• - }•i LiT 'i tjr�.. r .. dul OTE 'CD. CDPJV.oZ,.X'�.' LA Qt31�r�1j,� ' • . • _ . D Tj tLrH R Ct�rJ Tr, 9 r f CUT, Owl-/p.f y f., r _ � y� 1t, „ • � .� , -- G a.t-l.E PJt�lslsao , CODE CA SITE "E- ELLS '• Lim 1 t Z v •.r Ver S-a t. _ v '�� / � ��•� -� � , .. 1; j. �rr C= t s Ln .�c E'IDO -,0674 Z X. � GrHS t lHfJD J!'JG ` t� Fr11: I-?LTFP%-A-JIbN 19WIvUl), sT19t-L 1.�j :�ITf ► ��:�v10E Tc ST I3 _ S O r .... , _(, :SSE DU. �nGc�Sj ELL' _ .� �'a r . r, 1!�-G_ 1r1ht Td,.`lR'�':'CL- _ `AUDI IN f fiTC L-�!5 hr I,. 1 I =!! t r°J StaE 1Y PASrIUdr .L .NLvf L 1 �-:�'.J r'_i._,/: c ! CCzTR, . , � � • . • ' f,,V.� t�.11 �-+" '• - • ' �� •► l , I!� Y Tri` '''� �• � ' , t�-T.^ •,, IiN �i. [ V%� ` `Ly��\ `l f ,Iv �YY`�L�l�:/ 1 ' w ,� + ` - . r , Cr >- Isolation Area Affected _ — INS — _ Yes- D No , - •i 11 ` _ 1 • c e ' �. w 70TAL FEET T•0 1 . INYTALI. MAIN WIT1{ AT EE,Ib-T -Lz • .r Tl1 +• { - f:ONER BLOW C C' TOTAL FEET RYTIR.EOL z rF Pressure District A}tected Yes ❑ No Q �) •+x p ✓' '�I V C� �I ; r� PERittT ISSUED BY PERMITHO. - -.t; ] +r lousiness ENstricl• Affected yYe$ -❑ -No. ❑ 'COUNTY -- •� - • RFTIREM'EkT � � ,DATE MOV90 DATE MOVED DATE OT a 8upply Line Aftecied You n No ❑ 1 'pF . ON JGB—_ ._ OFF JOEL—' OPER._ Valvejs) Required • . Yes O No ❑ DISTRICT_ ---'rEASDN_ -- -- �A Q �+y CREW FORE/7A•N_- - -T. i • f,. _ TRACT PLANNED 8Y NU_____.—.-_.-- 'COMPANY-_' ftevfewed, Y: -- — V.. - - AYI..n •: L. ACS 7_ n n TC7 �••f�f STAKED nn..P, [.> cs ' . + .L. .• .T.. ........ SOUTH ERN .CALIFORNIA►- -gqS :;';COMPANY- - W LLIGONM AWENUE • FIED1ANO& CAUFORNIA MAILING ADDRESS: P, Q SOX 3= REDLANDS CAUFORNIA 923r.i-MOO ,,.... •..�._WA...x.:•...::+•:...•......::.sem.:.: .,....�.,:..�.....:. .. ....-..:..e TRANS : I TAL S P ]EiEET NJ 6. 74�1�6 ATTENTION DEPARTMENT / DIVISION MAIL LOCATION i + FAX NO. NUMBER OF ES (INCLUDING TRANSMITTAL SHEET) ✓_ o f SPECIAL INSTRUCTIONS _ FROM D PARTMENT i DIVISION. FAX NO. MAIL LOCATION r (714)335-7990 IF ALL PACES ARE NOT RECEIVED, CALL THE FOLLOWING NUMBER($) -- "ANTER'COMPANY TELEPHONE NO: OUTSIDE TELEPHONE NO. - ASK FOR: � } J �O• n � :.:�-..: s� = d _181dW3 QNd-NI Sd9 JI711dD,oS_SZ.aS Z6. .LZ A SiS' LOCATION OF CONSTRUCTION „A eni4j,,8ermudas at Calle PW" or bvwidption of is wabon) PURPOSE OF CONSTRUCTION To install new aa� main es Sketch (attach oonstructioet parts if appropriate) DESCRIPTION OF CONSTRUCTION 7.2 QS -121 260'. of "blastic medium pressure gas main 17' W/EPL. of Avenida Bermudas, beginning 71 N/SPL of Cal 1p ag g"P , proceeding north.. SEE SKETCH TGE 224. D-1 & 2 CUT EARTH.AND JET DIMENSION OF INSTALLATION OR REMOVAL 931 Conc and Mac SIZE OF EXCAVATION, IF NEEDED APPROXIMATE TIME WHEN WORK WILL BEGIN 5-1-91 .rte APPROXIMATE TIME OF COMPLETION.. ESTIMATED CONSTRUCTION COSTS (includina rentoira( of all obstruction, materials, and dobris, baftfillift ooco- pwdon and plWng permmnord roamlr cing aftdlor replat Ing inwoe►eftterita) In consideration of the garenting of ibis permit, the X*icant hereby oWns to: Ir4arnoify. deferW end raw the City, its and Wol agents. off ion, rsgresergta0w; and employers, hwwdm from &W swinst any and ala r pownim liabilities or ices fewitirss from cieirrw or court action w4 afisimp out of any accident. ION of derm p to psrtons or..property hlppsnirq or:00curri0g) ei a proxo a recut of arw work wKWtak.n.undw the permit gfrertted purpNnt to this appfkation. Notify the Admiaistretow Authority at krost twenty-four (24) hewn in adranpf of tM time when wofk wUl be sunw. CoNOW wilt all gvwiasb City 00d4mmm, the tefrrw and omdi{i 0 of Ver Permit and sit a6itkebie noss and repanioft of the City of Yi t MIM said sm pay for my admineraf met "80N Wv ere Me Mwk at w1rOt.' _ -- of Anti' GAT ,`SHOMPSONp :a6ExM3•T : `SoiTt�IERiQ Cx, 'GAS .;� p b wy -Anna' .ttmv (714)9wW335�'T742 mal � u�r n�rrrrrr� �_ "Monte of! print): ;s . Ye�plsorse Na Sbm of C491Raaw and Job F*rfrtMl - bainm A*Irsw . Telepholte 401Fmr SWI; U011ge No. City &ainaa Lioafae No. Apocis es iesurem Gamwy !"otit y Number FM- 8l0<fwisiat Itngro aniiint Perfrtit — Claes III Public improvetenrtts: 3% of estitrieted pp a ructim costs f~tlraa ifttl a enwrtea: 3% of estimated con at Minor tmprsiVwmnt Perfetit—.Claait IV: Sw attached "ha k" FOR S f s"Nit Foe hetelty CatoOt Depasit�ttroty Bond .if rreit+irrd TOTAL:- Raab," OTAL: Raab," by PEIUT VALIDATION PERMIT NO. DATE APPROVED EXPIRATION DATE DATE HIED ev At#fniribtfatiye Authrity TELEPHONE: 1619) 6"2246 I....• FiZ'd AIG 3dIdW3 GWINI SUD JI-1UDOS 9Z:0Z 1:6, ZT AUW _. �:7.v.. - b,. •::.�,'.�" s�''-"'',:".5> .. 7 Vy, �. ,R ":-�kXyy'�c.i. '.'��' 7M LM1 }i V'� .� 7a:. �.�r J .. �� • � '' , �.o may.. � .,1"�F, .+.t rs='ia: ..- ,.. 1 ii V^ -e' �'' - . �:--. -7 •..r' NOTE: With proper validation this form constitutes an CITY OF LA QUINTA encroachment permit APPLICATION FOR PERMIT PUBLIC WORKS CONSTRUCTION (ENCROACHMENT) For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS April 25, 1991 Subdivision Improvement Permit — Class III DATE: Minor Improvement Permit Class IV . LOCATION OF CONSTRUCTION Avenida Bermudas at. Calle Nogales (Street address or -Description of'Location) PURPOSE OF:CONSTRUCTION to install new gas main DESCRWT`ON OF CONSTRUCTION to install 230 of 2 latic meaaiiam...pres.sure gas main 17 w epl of Avenida Berm TAP I lit .TD ,MAIIU @ AI.�L'.;:: CO..I'MFER OF W0t7ALES akin A/AV.4 I:0 0 bill 16 T EARTH E gEE.:: r<F-V I51 DIMENSION OF INSTALLATION OR REMOVAL 83' Conc and Mac QLAKl. OBTA i TGP 224, D-1 & 2 C. rw. "ecmo SIZE OF EXCAVATION, IF. NEEDED 5 St,Tz APPROXIMATE TIME WHEN WORK WILL BEGIN 5-/2/91 NO PAVEMENT OR CONCRET CUTTING SHALL BE' APPROXIMATE TIME.OF COMPLETION 11/2/91 PERMITTED 6"' ESTIMATED CONSTRUCTION COST $ BORE & UNDER ALL E%ISTIKG (Including removal of all obstruction, materials, and debris, backfilling, col STRBET IIWRAVEIGMS. • paction and placing permanent resurfacing and/or replacing improvements) ..lit' consideration of the granting of this permit, the applicant hereby agrees to. Indemnify, -defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any<an-&-all• penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons.or. property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. . "Notify the Administrative Authority at least -twenty-four (24) hours in advance of the time when- work will be started. Comply -with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the -City of LaQuinta and to pay for any additional replacement necessary as the result of this work. Gail Thompson, Permit Coordinator Signature of Applicant or Agent Southern California.Gas. Co. PO Box 3003 Redlands, CA..,923.73: 7.14/335-7742. : - Name of. Applicant (please print). Business Address Telephone No. :.,.Name of Contractor and Job Foreman ;Business Address Telephone No..• • '.-Contractor's License No.: :; .City Businias License No. •=Applicant's Insurance Company 7 Policy Number f.• - _FEES:. Subdivision Improvemeht Permit —Class III' Public improvements: 3% of estimated construction costs (�p Private improvements: 3% of estimated construction costs O Minor Improvement Permit — Class IV: See attached schedule Inspection Fee Permit Fee PERMIT VALIDATION PERMIT NO. 1081 '—NWLAN FILE NO. BASE SKETCH CONSTR. SKETCH jC01PL, SKETCH G vJfj II Br:_ '�-+1 � I er: � cv: I SHEET___L_OF i -I D T -7_ 9 !:zl ill x1. a:S . tr ; '1� CU iJ C . �� T b n/ c, CU G Sj \ 1�'1 /� I (�' COND. - - -_.. -- - - - - - - - - -- -- --- -- - - -- - - -- -- - - - - - - - ;.- INN C >\ : �-.�� til ! i7A • .. � .. � 1'` .. �� Com- f`!11.� ��.� L.� j 1� � - -- _-- . - -17 /0-0' No 7.5 I , \" SEE �P,S h';l�lDL11'�IG o� z r - i _ FQk P.LFEpAT,!!�iV J?lcOif-D IVST/?LL I+j�?li�✓ S �'.L1 C� , T�_� i- `�V (� C/3 T E Iti 1 f :. t N9 T LOG . , , /-/D T 7-/-) P, A" XP- ,, . S �� 11jU Rr N F EP/I h I ri/ d -S ER -VI L - ®t �19d�+ 5zLc_. D, O.-�FGDSj I _ ELL C rl .1`^t-„Aj 014'?!'1 SIQ FOP /gLTL R!3 T /DIV X11 — - c. r T -/9/ZD U, N CU- C 1h -1y 13 AS f N >r vV , C �`�. 6 1- Z. N � � I e_ h f� n � r fig{ '- ' G-- _-�� :: • :. .:: . , .: ' - ;�\�� til tT7l� �'� . ��r S) - , . ; ... _ . : ;;�A\lP`� r.1� - • . _ "_ . I TOTAL FEET INST'D:_ Isolation. Area Affected Yes. ❑ No GA! • - - - ^/ f INSTALL MAIN WITH AT LEAST 3 d� ' I^ COVER BELOW C G' T� TOTAL FEET RETIRED I Pressure District Affected- Yes ❑ No LK' ! PERMIT ISSUED BY PERMIT NO. 1 [\ I V RETIREMENT r DAT AT£ MO DATE F Business District Affected Yes ❑ NO U COUNTY j Wit= C� ON O80 E r OFF JOB— VEOP£R.O r I D Supply Line Affected Yes ❑ No CY I��A J/ v I CREW FOREMAN N DISTRICT I REASON — Valve(s) Required Yes ❑ No L� PLANNED BY COMPANY r'I- 1 i TRACT Reviewed .B L J tiM� AL�1G ��� NO• To '\j STAKED ❑ COMPANY FACILITY SO. CAL. P.L.S. ❑ .. - y: I ATLAS .. L AQ - Z - � YEAR C.P. .. - - REVIEWED, BY fps •� - _ NO. INSTALLED - STAKING REQ'D. ❑” III-.�l�.�'7G-SMI V -DIVISION C.P. "Reviebved B �- L-- CATHODICALY YE NO ❑ OPER. 20% OR OVER ❑ S"S ORG By: s. ❑ M ' {�� � v� PROTECTED - AT - LESS THAN 20%. ❑ DISTRICT SUPERVISOR i NO STAKES NEEDED, I W.O. CODE' SOUTHERN CALIFORNIA GAS CO. -2956.3) AID tollowin�.eral Provisions and made Permit f�g The and Special are attached to a p. ,f No. -•• `' + GENERAL PROVISIONS The following shall always apply: ENCROACHMENT ON PRNATE PROPERTY: This per authorizes work to be accomplished within City of la Quinta right of way • w y ' ONLY. Whenever construction extends within private property. It shalt be the responsibility of the permittee (or his contractors) to secure permission from abunmg property owners. Such authorization must be secured by the permittee prior to starting work. ;'• ' 'f TRACKLAYING CONSTRUCTON EQUPMENT: Cleated tracklaying construction equipment shall not be permitted to operate on any , paved surface unless fittedwith smooth -faced street pads: All mechanical outriggers shall be fitted with rubber street shoes to protect . the paving during excavations. Rubber -tired equipment only shall be used in backfill operations in paved areas. H the existing pavement is scarred. spalled, or broken during the term of this contract, or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width: Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. t ' All ± PROTECTION OF TRAFFIC: encavations and work areas shall be property lighted and barricaded as deemed necessary by the City • , r Engineer or La Quinta City Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration • " of the project. The City shall be notHied 24 Mrs. in advance of any traffic detours or delineations. ' CARE OF DRAINAGE STRUCTURES: Any,drainage structure -including corrugated metal pipe, concrete pipe, steel culvert and t ' * concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event.it becomes = necessary to remove orcut existing drainage structures. City of La Quinta shall be notified prior to commencement of this work. ^ ' • +`� • Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT OF WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of -way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. - Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used.. as required, to sprinkle the lob site to keep down dust conditions and shall be used ,• i • j 5. immediately after backfill: 4` DE -WATER OPERATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, t shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed: A minimum of one lane of traffic shall be maintained at all times to provide limited _ access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for ♦,'. i, + length of time, permittee shall contact this office to obtain the necessary permission. •~r • . `any •. .v . ;f :f'' . r 'SPECIAL PROVISIONS 1 , . The fol lwing shall apply ONLY when indicated: - NOl'IFICATIUN: Permittee shall notify the City 564-2246 at least 48 hours in at advance of starting construction. R2 CASH DEPOSITS OR BONDS: A cash bond or an approved surety bond in an amount of not less than S shall be furnished In the name of City of La Quinta to cover all work involved in the restoration of the various La Quinta �• ,roads and survey monuments' This bond shall be continuous until cancelled by the City Engineer. This bond must be j posted prior to commencement of any work on this project . • r: i `y R3 UTILITY CLEARANCE: (Substructures) Prior to making any excavation within the City of La Quinta right of way authorized-'. •- --� �+ - by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility ' of the permmee. . —• , ; '� R4 UTILITY CLEARANCE: (Surface structures) -No work shall be done under this permit until all utilities are clear of the .• .; : ,. •. ,, ++ ' ^• proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R5• PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with inches of A.C. paving placed on inches of class aggregate subbase course + having an"R' value of not less than = Y' and in conforman cewithCityof La Quinta Road Improvement Standards and Specifications, Ordinance #461.t ` - R6 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of f ,- +•° ` -,� - 1 /4 inch to one foot (11. w , - 'E - R7 GRADES & STAKES: City of La Quinta shall establish grades and stakes for the proposed concrete curb and gutter - construction. J ~ Re GRADE CHECKING: City of La Quinta shal I check grades upon receipt of plan and pFofile and/or grades as established by a firensed engineer.; ' r r `•' R9 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( feet) shall be 1-. removed, Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb. matching concrete gutter and _ concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. fR10 DRIVEWAYS, A.C..-Driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be 2-1/2 inches of A.C. paving placed on ( ") of class aggregate base. Driveway construction shall conform to attached drawing.' . R11 CULVERTS`.A inchdiameter( )culvert shall be installed with the invert approximately 1- 1 /2 inches below and in line with ttie, exfsung flow line. Culvert in shall conform to the attached drawing. SIGHT CLEARANCE: Sight clearance of 600 feet in either direction shall be assured and maintained. R13 r SOIL STERILIZER: The area'to be surfaced shall beareated with soil sterilizer. Rate of application shall comply with the manufacturer's specifications.: s -,,, • . R14 COORDINATE WORK: The proposed work shall be subordinated to any operation which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La• Quinta forces to preclude delay or interference with State or City of La Quinta projects. F At 'SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the . centerline of all streets or property lines when involved shall be completely tied out so they may be readily and correctly be -replaced by a licensed civil engineer surveyor at the expense of the A complete set of notes showing the or permittee. ' ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. Thisoffice shall .. • t...'.. a ^I.._�. be notified upon completion of replacement of all survey monuments for proper project clearance. ..... �. RD =31 _ - offlulam-,'" R16 SURVEY MONUMENTS. Prior to excavation or beginning of construction. all survey monuments shall be tied out by City -`' i Ouinta and suitable payment or guarantee of paymen- " be made as reimbursement for all work irwsfo..ved. R17 :MENT CUTTING: Pavement will be mechanically cut tc ight edge prior to excavation. Method of pavement ...ng shall be approved through the office of the City Engine.. %-nder no circumstances shall excavating equipfnem be used to excavate prior to cutting of pavement►. Excavation material shall be placed in such a position as to best facilitate the general flow of traffic. Prior to final paving operations, any damage to pavement straight edge shall be corrected. R18 PAVEMENT CUTTING: Pavement shall be saw cut prior to removal. Prior to final paving operations. any damage to pavement straight edge shall be corrected. ! UMIT OF EXCAVATIONS: Excavations shall be fimitedici 1,0001ineaiieetol open trench before backlill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works inspector shall determine the suitability of excavation barricading in each ease. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. q® BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing an adequately consolidated backfill. Any material which the City of La Quinta deems unsuitable (spongyor saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R21 BACKFILL SAND: Backfill shall be approved transit mix sand or equivalent and shall be placed in lifts of notgreaterthan three feet (31 and vibrated using vibrotamper or equivalent equipment. Alternate methods may be substituted, but in any case a relative compaction of 95 percent shall be attained within the structural section of the roadway. 22 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than 50 percent of the total depth of the trench before flooding or a maximum of five-foot (5') lifts where trenches are of excessive depths. Care is to be exercisedthat the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall be not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used. the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuous. COMPACTION TESTS: If so required bythe inspector, compaction tests shall be made at intervalsof not more than 1,000 feet and a minimum of one (1) test on each road. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications. Division of Highways. State of California, dated January 1973. R24 COMPACTION TESTS: If so required by the inspector, compaction tests shall be made for each crossing or service line. One (1) copy of eachtest shall be forwarded to the City Engineer for approval andfiledprior to making permanent repairs. Compaction tests shall be made asoutlined in Section 6.3.01 of the Standard Specifications, Divisionof Highways, State of California. dated January 1973. R25 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations. a temporary patch consisting of 2 inches of SC -800 shall be placed on a prepared subgrade. The SC -800 temporary paving shall be placed after a maximum of 3.000 lineal feet of trench has been excavated and backfill operations completed, but in no case shall trio placa-ur.: c: una tornpofary pavemeiki exceed a five (5) day limit. R26 PERMANENT PAVEMENT REPAIR: After backfill and compaction operations have been completed, a temporary patch consisting of two inches 12") of SC -800 shall be placed immediately. A permanent patch of inches A.C. surfacing placed on a inch class base shall be placed no later than days after completion of temporary road repair. R27 PAVEMENT REPAIR: F,A.S.: Uponcompletibn of backfill and compaction. a temporary patch consisting oftwo inches (2-) of cold mix paving ISC-800) shall be placed immediately. A permanent patch of three inches (31 of A.C. surfacing shall be placed on six inches (6'1 concrete bass as directed, but not later than fifteen (15) days after completion of temporary paving. Concrete base shall be of five -sack mix and shall conform to the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R28 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R29 SEAL ARMOR COAT: A seal coat consisting of an application binder and screenings shall be applied on all patch areas where such seal coats existed prior to issuance of this permit. Seal or armor coats shall be applied as specified in Section 37. Standard Specifications. State of California. Division of Highways, dated January 1973. Work of pavement repair to be accomplished by a licensed contractor engaged in the business of pavement repair. R30 STREET RESTRIPING: Where street striping is still visible on streets to be excavated. such striping shall be replaced upon completion of permanent repairs. R31 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right of way shalt be accomplished by a licensed, bonded and insured tree service. and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permittee to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be removed in sections which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500 feet at any one time. Adequate signs, flagmen and/or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than 90 percent or equivalent to the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R32 TREE TRIMMING: a. Only the necessary trimming shall be accomplished to provide clearance of the facility for one calendar year. All broken or weak sections within the trimming shall be removed. b. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of 500feet at any one time. Adequate signs. flagmen, and/or barricades shall be provided to protect the traveling public at all times. c. If tree trunks are panially outside of the City of La Ouinta road right of way, permittee shall make his own arrangements with adjoining property owners for consent to the trimming in addition to the authorization provided by this permit. d. All tree trimming on EVERGREEN TREES, PALM TREES. and other ORNAMENTAL TREES shall be accomplished to the satisfaction of the City Public Works Inspector. e. Abutting property owners shall be contacted, in all instances, prior to trimming or topping trees. I. Pruning shall, in all instances. be at the shoulder of the crotch to insure even, fast healing in all cuts of two inches (2'1 and above in size. Sealant shall be applied to all cut sections as directed by the City Public Works Inspector. M + ADDITION--ENCROAC%II�IPERMIT NO.1081---CONDITl iS y ` R33`,,.Survey monuments•shall be protected in place or �'fre-established pursuant to City•standards and.the,State of••F. "�'•California'Land Surveyor's Act. _ ;R34',-- Work shall=•be .coordinated with .the City of La Quintals forces'to preclude` delay`or interference with the. City of. La,. ' Quinta' s -projects > f•.' ' • - - - .. - ` - t R35Contractor`shall comply with the local noise ordinance -and.' ' construction -operations and' maintenance of -equipment within • one half .mileof human. -occupancy shall--be-performed only - during the., peri follows: i October,lst to April 30: 'Monday -Friday 7:00a.m.-5:30p.m. Saturday 8 OOa.m: -5: OOp.m'.' . May•1st to~'September 30: Monday-Friday-6:00a.m'-7:00p.m. - Saturday 8:00a°.m.-5:00p.m. v' _Work shall be prohibited anytime on Sunday and Federal. holiday. R36 Traffic control shall be .as per Cal, Trans- Traffic. Manual `Field-.adjustmentsin_ detouring,- shall..be accomplished'. as - - directed' in -order.! to -adjust - to ' actual field conditions. -It shall, be _tYie_ contractor' -s' responsibility,,to. adequately '-barricade and detour,this site. A Traffic control plan=shall ` be ,submitted for approval., -by the City Engineer. }R37 _,_'All excavation at ornear the travel` wayy-shall be backfilled -- a t ackfilled-at the `end : of the work day, for- tile' protection of the traveling -public iv` ,:. R38 Street closures shall not be ,allowed at any time. . R391,:I wA •-minimum of. -one. travel lane shall be• maintained, at: all ,'•' times.with.flagmei during working hours. R40',`, .All'work .to=be,performed with_ iri;the existing -paved section `.shall'bd.temporar.y paved -and maintained by•the',Permittee,. s permanent,tpavement-,shall. be placed no, later than 15, days after' completion•ofytheY.temporary road repair. R4r ,' ingress +andegress for local -properties.. shall be maintained .-..• at all'.tim_ es: r R42', Prior ':to work starting, underground,Service.-Alert shall be , contacted ,at" 1-800=422-41-33 and 'an: ';inquiry number" -,shall. be . ��." provided.'tolthe City Public'Works Inspector. " :T: ti sfAdditional Conditions -Encroachment ermit, No.. 1081 na1� Page_ _Py {,, R43 A1'l:.backfilT`.'subgrade' soil shall .be' compacted,to'nothing '2 •than, 90$ -.relative ,dry density, '_all backfill' :soil• within"*",:, }` the .top '2' of •finish.. pavement` surface - shall: be compacted to �' ty nothing. less.than 95� relative' dry` density, Tall :base'':, mater al; shall-. be compacted -`-.to ,nothing .less':than ?951 relative. dry density:" R44 �'If.the work 'is. to be performed by ,forces other .than' -that of .the utillt' company,-the...cohtracting company; will be~:., required to apply, for an additional• encroachment permit' and- .pay ythe appropriate fee. R45.. All. landscaping and. irrigation shall--=