Loading...
13031/ T ENCROACHMENT PERMIT cF F ~otis PUBLIC WORKS CONSTRUCTION See below for Finance Revenue Codes tkMR.IS_KtPEWMITS► . For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. ����®�� Subdivision Improvement Permit - Class III Minor Improvement Permit - Class IV DATE: 3/21/2013 LOCATION OF CONSTRUCTION: Madison Club; TM 33076-1; Madison Street Median and Parkway between Avenue 52 & Avenue 54 PURPOSE OF CONSTRUCTION: Madison Street Median and Parkway Landscape Improvements between Avenue 52 and Avenue 54 DESCRIPTION OF CONSTRUCTION: Madison Street Median & Parkway Landscape Improvements Per City of La Quinta and CVWD Approved Plans DIMENSION OF INSTALLATION OR REMOVAL: Median: Approximately 12'x5,280'; Parkway: Approximately 25'x 5280' APPROXIMATE TIME WHEN WORK WILL BEGIN: 4/1/2013 TIME OF COMPLETION: ESTIMATED CONSTRUCTION COST: $481,450.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occuring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time Lat(760) l 15 �`started at�r7�0) 77711 1 7097. To submit an inspection request, leave a message on the Inspection Request Hot�71b97 oriorho�1..30_P M1_at least twenty-four (24) hours prior to the anticipated inspection.lIIUJJlComply with all applicable City Ordinances, the terms and conditions of the permit and au a4dooff-thitof La Quinta and to pay for any additional replacement necessary as the result of this w A UINTA X PT Signature of A 11ficant or Agent East of Madison, LLC. 80955 Avenue 52, La Quinta, CA 92253 (602)920-7183 Name of Applicant Business Address Telephone No Valley Crest Landscape Development, Inc. 3242 Halladay St., Suite 203, Santa Ana, CA 92705 (714)327-5363 Name of Contractor and Job Foreman Business Address Telephone No. 133947 A00133947 Contractor's License Number City Business License No ACE American Insurance Company HDO G24548375 Applicant's Insurance Company. Policy Number FEES Subdivision Improvement Permit - Class I Public Improvements: 3% of estimated construction costs Minor Improvement Permit - Class I Private Improvements: 3% of estimated construction costs Finance Revenue Code Inspection Fee E_1 $0.00 Permit Fee EE=1 $19,806.00 As -Built Deposit E-A $0.00 Cash Deposit -Surety Bond, E_B $0.00 if required TOTAL $19,806.00 PERMIT NUMBER: 13031 DATE ISSUED: ".PVC-- A/ W15 EXPI TI DATE: n.e Zoll BY: WORK INSPECTED BY*: PERMIT COMPLETION DATE*: If the work is covered by a Subdivision Improvement Agreement, Subdivider shall request final acceptance of improvements from the City Council. ,,JeA,j Fe4 5"4ej'" ( e Date: Tity 4 4Qul�ra PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT Tract No: Project Name: Vic '1 - . � � = t Purp��f�tru(i.e.: ouh Grading ffs't, etc. r/��, Description of Construction i.e See Plan_ $et No.. 01234) Dimension of Installation or Removal: Approximate Construction Start Date: IYA'I— Z Approximate. Construction Completion Date: Estimated Construction Cost: $ . Estimated Construction Cost shall include the removal of all obstructions, mate -rials, and debris, back -filling, compaction an placing permanent resurfacing and or replacing improvements -" / / H 6�0 Contact Name: P -4R 09% Phone Number: 4!0.!- '709' 7/B; Name of Applicant/Owner: Applicant Address: U! / Applicant Telephone Number:. Applicant E-mail Address: /P�osfG �SGovP�� arl Go.Gow! 2, b4( , Te- Name of Contractor: U%lY� 2� 4 rs x 1 3 Contractor Address: Contractor Telephone Number: / 3;t7- s3C-3 Contractor State License Number: 7 $� 6 Contractor City Business License Number: 0/33 ¢ " Contractor E-mail Address:/L0L74�IICU , ►A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED -4 Applicant or Contractor General Liability Insurance Company: C i,naia Te�rwance Qe!'S: Anv Applicant or Contractor General Liability Insurance Policy Number: Do frZ4s�-83?S Office Use Only: Inspection Fee: d' a1 9' Permit Fee: As -Built, Deposit: . Dust. Control Deposit: Credit Amount: TOTAL FEE DUE: nve/unecKlists — orms & A-p-pTi—caffi—ons/Applicat Office Use Only: Assigned Permit Number: O Approval Date: Expiration Date: Issue Date: Administrative Authority: t ' K .t :hs ar •� • � t -aq ti r1\ . ! t�r..lY 4.'.°' ... 4 Y/4•• �+, ..` r•'; `�,.! - tf1 a .i •� YG • Is tt t'AA. `, !• • 4� ,Z45 "A w r J.. 4� .� .wr.. .•i,�„•�.•� q .C,4 \ � LANDSCAPE PROPOSAL Scope: Landscape and Irrigation Project: Madison Streetscape Perimeter & Median La Quinta, California ValleyCrest Landscape Development i LANDSCAPE PROPOSAL Scope: Landscape and Irrigation Project: Madison Streetscape Perimeter & Median La Quinta, California ValleyCrest Landscape Development F MADISON CLUB/DISCOVERY LAND Madison Perimeter Streets and Median August 19, 2010 Attn: Jeff Prevost Madison Club/Discovery Land 80-955 Avenue 52 La Quinta, CA. 92253 RE: Madison. Perimeter Streets and Median Landscape & Irrigation ValleyCrest Landscape Development (VCLD) is pleased to submit proposal for the Madison'Perimeter Streets and Median Landscape & Irrigation based on: Plans: • L1 thru L6 plot date 2/14/08, LCD1, LCD2, LS1 plot date 1/30/08 (Median Irrigation) • IR -1 dated 5/14/07, IR -1 thru IR -19, ID -1, ID -2, ID -3, IS -1 dated 5/30/07 (Perimeter Irrigation) • L7 through L-18, LCN1' thru LS4 dated 2/14/10& 4/5/10 (Median Planting) • L-0, L-1 thru L-39, LS -1 thru LS -3 dated 5/30/07 & 4/8/10 ) (Perimeter Planting) • LF -0 thru LF -7 dated 12/21/07 & 4/8/10 (Perimeter Fence), Specification sections: • On Plans Addenda: • NA Prepared by: • VITA Landscape Architecture • David Evans & Associates The following scope of work is included in this proposal:. Landscape. Planting • Irrigation • 60 Day Post -Installation Maintenance • Vinyl Fence • Boulders, Loose Deco Cobble Rock & Mortar Set Cobble Rock • Decomposed Granite Trail w/ Concrete Edging • Stamped Concrete [2of4] ................................................................................................................. 6 ValleyCrest Landscape Development, Inc. MADISON CLUB/DISCOVERY LAND Madison Perimeter Streets and Median Please note these exclusions and qualifications as part of our proposed bid: 1 Specific items shown on plans, but determined to be previously installed as of the date of our site inspection (8/16/10) are excluded. The excluded items included trees (and associated irrigation materials) planted along perimeter of Madison and Avenue 54. 2 ValleyCrest will receive the site clean, free of weeds and construction debris and in a condition plus or minus one-tenth of a foot from finish grade or sub -grade as required. Planting spoils to be spread on site. 3 ValleyCrest is to have access to the site prior to the installation of paving or walls to allow for the placement of sprinkler pipes and control wire conduits. Cutting or patching of, coring through and/or boring or jacking under pavements is excluded. 4 Irrigation components are included in pricing per Irrigation Legend on sheet IR -1 dated 5/14/07 from a previous set of plans (Irrigation legend on provided sheet IR -1 dated 5/30/07 is 'incomplete). 5 Boulder pricing includes 12 boulders (4 each 2', 4 each 3' and 4 each 5') per details. No quantities are shown on plans, only.locations of boulder clusters. 6 Bonding is not included in this pricing. ValleyCrest is bondable at a rate of 1 % should bonding be required. 7 The following items are specifically excluded: - Import or export of soils - Lighting & Electrical Concrete Rail Fencing Permits and fees Traffic control Water meter, water meter fees and water costs Electrical supply to controller location(s). Liquidated damages Proposal Amount: Please refer to attached bid forms for pricing Upon review of this document, please do not hesitate to contact me for any additional information or clarification you require. Sincerely, Jeff Mutch Business Developer ValleyCrest Landscape Development, Inc. (714) 503-5914 direct [3of4] ................................................................................................................. ValleyCrest Landscape Development, Inc. diDDERS INSTRUCTIONS, Page 2 SUBMISSION OF BIDS: Please attach this sheet to the Bidder's Proposal. LANDSCAPE: Planting 60 Day Maint Madison Street: $ 2 82, 10 0. 00 $ 7,66.0.00 Madison Street Median: ($295,-230 00 1-$74:,.29.0:00-7 Avenue 54 $ 356, 430 . 00 $ 7,800.00 Monroe Street $ 313 , 700 . 00 $ 4,110.00 TOTAL: $ 1,247,460.00 $ 23,860.00 Grand Total Planting & Maintenance $1,271,320.00 IRRIGATION Madison Street; $ 94 , 890. 0 0 Madison Street Median: � 10 7-1-6 5 0 .'0 0 Avenue 54: $ 102, 525.00 Monroe Street: $ 83,890.00 TOTAL: $ 388,955.00 PERIMETER TRAIL FENCE Madison Street: $ 50,045.00 Avenue 54: $ 41, 280.00 Monroe Street: $ 23,680.00 TOTAL: $115,005.00 GRAND TOTAL OF LANDSCAPE, IRRIGATION, & FENCE: $1,775,280.00 ALTERNATES: (3A) - Down size tree box $ ($183, 02 0 . 0 0 ) (38) - Down size shrubs $ ($7 8 ., 84 0 . 0 0 ) (3C) - Concrete fence to PVC fence $ NA _*Please see attached sheet for additional* bid items 2.9 V, Z410 t 1 o7, bs° BIDDERS INSTRUCTIONS (SUPPLEMENTAL)' SUBMISSION OF BIDS s Selected Hardscape Items Decomposed Granite Trail Madison Street $ 81,415.00 Madison Street Median NA Avenue 54 $ 82,020.00 Monroe Street $ 40,600.00 Concrete Curbing at Both Sides of Trail Madison Street $ 79,690.00 . Madison Street Median NA Avenue 54 $ 80,280.00 Monroe Street $ 39,740.00 Additional Median Work Boulders $ —5-,750.00 Loose Deco Rock $ _23,055.00 015770 Mortar Set Rock $ ^_37;550:00 ' Stamped Concrete $ 92,215.00 GRAND TOTAL SELECTED HARDSCAPE $ 482,315.00 4-02.1990 713�5`7a �����v 14, .. •, City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number 13031 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such. authorization must be secured by the permittee prior to starting work. TRACK -LAYING CONSTRUCTION EQUIPMENT: Cleated track -laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother -faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber -tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be noted twenty-four hours (24) in advance of any traffic detours or delineation. _-- CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE -WATER OPERTATIONS: If de -watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: ® R1 NOTIFICATION: Permittee shall notify the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. ® R2 UTILITY CLEARANCE. (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. ® R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. ❑ R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( ** N/A **. ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( ** N/A ** ) aggregate sub -base course having an "R" value of not less.than ( ** N/A **) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. ® R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (%") to one foot (1'). ❑ R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. ❑ R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb.and/or curb and gutter ('" N/A *") feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. ❑ R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property Tine and the existing road paving shall be two and a half inches (2 %") of A.C. paving on (** N/A "') of class (** N/A "' ) aggregate base. ® R9 SIGHT CLEARANCE: Sight Clearance of six -hundred feet (600') in all directions shall be assured and maintained at all times. ❑ R10 SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturer's specifications. P � i City of La Quinta ® R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may, conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. ® R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. ® R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. ❑ R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one -thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No.excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. ® R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. ❑ R16 BACKFILL SAND: Backfill shall be approved transit -mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. ❑ R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (6) lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. ❑ R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one - thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. ® R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC -800 shall be placed on a prepared sub -grade. The SC -800 temporary paving shall be placed after a maximum of three -thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. ® R21 PERMANENT.PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of three inches (3") of SC -800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City Of La Quinta Standard 600 shall be placed no later than ( 5 ) days after completion of temporary road repair. ❑ R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. ❑ R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. ® R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by'a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, .shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five -hundred feet (500') Many one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. N PERMIT NO. 13031 Madison Club / Median & Parkway Landscaping / TM 33076-1; Madison St } Between Ave 52 and Ave 54 In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part); 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. 2. The issuance of this permit and the City and CV WD approval of the related construction improvement plans -do not provide a vested entitlement for all design parameters that may have been utilized for the plans. As such, plans approved for this permit may be "at risk" for further modifications as it relates to any follow up improvement plan requirements as required by the city or existing errors & omissions by the architect or engineer of record. 3. This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the actual work performed. 4. East of Madison, LLC (Jeff Prevost) and Valley Crest Landscape Development, Inc., hereinafter . referred to as "Permittee",shall be responsible for providing continuous dust and erosion control. 5. ' Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more . frequently, if required. 6. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097 before 1:30 p.m. at least 24hrs prior to the anticipated inspection. 7. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1 st to April 30: Monday -Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1 st to September 30: Monday -Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) neither before 8:30 a.m. nor after 4:30 p.m. 8. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the City Traffic Signal Maintenance Technician at (760) 250-0571 if signal operation at the intersection is to be altered in any way. Special Conditions Page I of PERMIT NO. 13031 Madison Club / Median & Parkway Landscaping / TM 33076-1; Madison St Between Ave 52 and Ave 54 . 9. Pursuant to Section 14.16.110 of the. La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. 10. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, a letter from any owners of the driveways/access ways that will be closed down due to the construction. The letter must be approved by the city and at minimum state from the owner the following: A. Approval of the construction B. Plan identification C. Time Frame of Closure D. Alternative Routes 11. The permittee shall place temporary no parking signs along the parking area affected by the construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and removed immediately after the construction completion'date. 12. Pursuant to Section 14.16.250 of the La Quints Municipal Code (Ordinance 10 § 1 (part), 1982), at F residential streets, advance warning signs and traffic control shall be installed and maintained in accordance the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). On Collectors to Arterial Streets, the permittee must submit a traffic control plan which shall be from or prepared under the guidance of the latest edition of the California Manual of Uniform Traffic Control Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH). Traffic Control plans not from the CA MUTCD or the WATCH shall be signed and stamped by a civil or traffic engineer registered in the State of California. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. 13. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify.the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, . irrigation lines, electrical conduits, and storm drain facilities. 14. Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements; signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. Special Conditions Page 2 of 6 PERMIT NO. 13031 Madison Club / Median & Parkway Landscaping / TM 33076-1; Madison St Between Ave 52 and Ave 54 15. The City of La Quinta reserves the right to require modifications of the work be made at permittee's sole cost for proper sight distance requirements per guidelines in the AASHTO " A Policy on Geometric Design of Highways and Streets, .stn Edition" or latest, in the installation of all appurtenances abutting and within the. public street right-of-way. 16. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start of construction, the name of the City approved contractor, who shall submit to the City the following items: a. General Liability Insurance Company and Policy Number b. City Business License c. Contractors State License Number 17. The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts provided in the Engineering Bulletin for Indemnification & Insurance Requirements. This insurance shall be kept in full force and effect at all times by Applicant or Contractor during the prosecution of the . permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each policy shall name the City as an additional insured. 18. The permittee shall not encroach upon private property without prior written approval (submit to the Public Works Department, attention to the Assistant Civil Engineer) of the private land owner whom is being encroached upon. 19. The permittee shall haul all offsite debris to a.certified landfill. Prior to hauling debris, the permittee shall inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site. 20. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the Public Works Department, a traffic control plan for review and approval prior to start of construction or parking on the paved R/W. 21. The permittee is required, to provide an informative message board (approved by the City Engineer) informing the commuters using the affected roadways of a. Possible traffic .delays b. Time of construction c. Alternate routes. The message board shall be provided for the commuters 48 hours prior to the start of traffic delays, and the entire message should be readable at the posted speed limit. 22. Pursuant to Section 14.16.3 70 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights-of-way shall conform to Section 306-1.3 of the latest edition of the Standard Specifications for Public Works. Construction (SSPWC), except as otherwise specified herein. Special Conditions Page 3 of 6 PERMIT NO. 13031 Madison Club / Median & Parkway Landscaping / TM 33076-1; Madison St Between Ave 52 and Ave 54 Native material may be used as backfill material provided that minimum compaction, achieved in the manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection; onsite, at all times during backfill operations. Backfill compaction shall be achieved by the following conditions: A. When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such material shall be removed to the limits directed by the Geotechnical Inspector and/or the City Inspector and the resulting excavation backfilled with pipe bedding material. B. Backfill materials shall be brought to or maintained at appropriate moisture content for compaction. The appropriate moisture content range shall be established at the onset of the project and ensured prior to use of the materials through progress testing on the stockpiles. C. The first length of trench backfilled shall be backfilled in the presence of the City Inspector. Compaction shall be tested at random depths at approximate three-foot vertical intervals as backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth of lift that can be compacted. D. If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory completion of this portion of trench, the City Inspector shall establish the maximum lift thickness to be compacted for the remainder of the project. E. In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of backfill, per 300 linear feet of open trench, at randomly selected Jocations within the open length of trench. F. The depth of the randomly selected compaction tests shall also be randomly selected except that where multiple tests are required in a given.length of trench, the tests shall be no closer than three feet (vertically) from each other. G. If any compaction test fails, previously placed backfill (in the same length of open trench or previous lengths of trench) which is represented by the failing test (as determined by the City Inspector), shall be tested for compliance with compaction requirements. H. All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results shall be furnished to the City Inspector. Special Conditions Page 4 of 6 PERMIT NO. 13031 Madison Club / Median & Parkway Landscaping / TM 33076-1; Madison St Between Ave 52 and Ave 54 23. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that which can not be backfilled in the same day. Excavated trenches shall not be allowed open overnight; however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. 24. All landscaping, irrigation, decorative rock, decorative concrete, lighting, sidewalk, etc., shall be replaced to its original condition. 25. Access and egress to all local properties shall be maintained at all times. 26. , Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: A. Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall be straight and clean. B. Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard Specifications for Public Works Construction. The replaced pavement and base material shall be compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench. Verify exact structural replacement section thicknesses with the City prior to installation. C. Permanent pavement replacement shall be installed using a City approved 3/4" max medium asphalt concrete as the base course lift and a City approved '/2" max medium finish course lift for capping. Asphalt concrete mix design shall be approved by the City prior to its placement. D. Cold -Mill and Overlay - The existing pavement which was properly protected in place during the trenching operation located adjacent to the trench saw cut shall be cold -milled to a depth of 0.10 feet with butt joint created next to the existing unmilled pavement surface. The cold -milled area and base asphalt concrete in the trench area shall be overlaid with a City approved C2 -AR -4000 asphalt concrete mix. The width of the cold milling area shall be as follows: For. longitudinal trenches located in a parking lane: three (3) feet outside the sawcut removal lines. For longitudinal trenches located in a traffic lane: three (3) feet outside the sawcut removal lines, or to the lane line striping, whichever is greater. For transverse trenches across existing street: two (2) feet outside the sawcut removal lines. Special Conditions Page 5 of 6 v� PERMIT NO. 13031 Madison Club / Median & Parkway Landscaping / TM 33076-1; Madison St Between Ave 52 and Ave 54 E. If grinding and capping operations are not performed in the same day as base paving operations, the base course lift of 1/4" max medium asphalt concrete shall be installed from saw -cut edge to saw -cut edge flush with the existing street surface. The base course lift of paving shall not be left 0.10' low in anticipation of grinding and capping. F. Any existing lane striping or any existing detour lane striping affected by this resurfacing shall be replaced in kind by the Permittee, as directed by and to the satisfaction of the City Engineer. Affected traffic signal loops shall be removed and replaced in kind. The finished pavement surface shall be smooth, consistent, and shall conform to the surrounding grades. 27. The permittee is responsible for obtaining a valid separate permit from the California Department of Transportation Department (CalTrans), other City, or County jurisdictions if any of the work or traffic control devices extend into the CalTrans, other City, or County right of way. 28. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. 29. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted. street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver street construction materials and/or equipment. 30. The City of La Quinta reserves the right to revoke, suspend or void this permit at any time. 31. - The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. 32. If it is the intent of the permittee to cut the pavement and have it restored by a third party, the permittee shall postpone cutting the pavement until the intended third party has acquired a permit from the City to perform the required restoration work. Special Conditions Page 6 of 6 See below for Finance Revenue Codes `:i1?1i14t 4 etfv Qgt!4 ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. Subdivision Improvement Permit - Class III Minor Improvement Permit - Class IV DATE: 3/21/2013 LOCATION OF CONSTRUCTION: Madison Club; TM 33076-1; Madison Street Median and Parkway between Avenue 52 & Avenue 54 PURPOSE OF CONSTRUCTION: Madison Street Median and Parkway Landscape Improvements between Avenue 52 and Avenue 54 DESCRIPTION OF CONSTRUCTION: Madison Street Median & Parkway Landscape Improvements Per City of La Quinta and CVWD Approved Plans DIMENSION OF INSTALLATION OR REMOVAL: Median APPROXIMATE TIME WHEN WORK WILL BEGIN: 4/1/2013 12'x 5,280'; Parkway: Approximately 25'x 5280' TIME OF COMPLETION: ESTIMATED CONSTRUCTION COST: $481,450.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occuring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777- 7097. To submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four (24) hours prior to the anticipated inspection. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of La Quinta and to pay for any additional replacement necessary as the result of this work. Signature of Applicant or Agent East of Madison, LLC. 80955 Avenue 52, La Quinta, CA 92253 (602)920-7183 Name of Applicant Business Address Telephone No Valley Crest Landscape Development, Inc. 3242 Halladay St., Suite 203, Santa Ana, CA 92705 (714)327-5363 Name of Contractor and Job Foreman Business Address Telephone No. 133947 A00133947 Contractor's License Number-y-N5uwace CL,,w-ge4,( on ,6'/2.(1/3 City Business License No Ironshore Specialty Insurance Folom F�D f, xfa4*50N [L C 01154900 Applicant's Insurance Company Policy Number FEES Subdivision Improvement Permit - Class I Minor Improvement Permit - Class I Finance Revenue Code Inspection Fee E_1 $0.00 Permit Fee EE=1 $19,806.00 As -Built Deposit E-A $0.00 Cash Deposit -Surety Bond, EE=6 $0.00 if required TOTAL $19,806.00 Public Improvements: 3% of estimated construction costs Private Improvements: 3% of estimated construction costs PERMIT NUMBER: 13031 DATE ISSUED: _ EXPIRATION DATE: BY: WORK INSPECTED BY': PERMIT COMPLETION DATE': If the work is covered by a Subdivision Improvement Agreement, Subdivider shall request final acceptance of improvements from the City Council. t GENERAL NOTES: 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN THE TRAFFIC CONTROL DEVICES AS SHOWN ROAD WORK }.: h THRU TRAFFIC THRU TRAFFIC LANE SHARE LEFT LANE BIKE LANE CLOSED THE MUST w2a1 i eG20-2 RIGHT LANE' , MUST END ROAD WORK LEGEND: PROPOSED 42" PORTABLE DELINEATORS WITH ° REFLECTIVE BANDS (SPACED AS NOTED IN PLAN) TRAFFIC CONTROL SIGN ON 42 PORTABLE " HEREIN AS WELL AS ANY ADDITIONAL TRAFFIC ' AHEAD MERGE MERGE CLOSED TURN RIGHT d CONTROL DEVICES AS MAY BE REQUIRED TO LEFT RIGHT AHEAD ROAD TURN LEFT DELINEATORS WITH REFLECTIVE BANDS ENSURE THE SAFE MOVEMENT OF TRAFFIC AND t W PROPOSED SIGN MAY BESMOUNTED ON EXTY ISTING FACILITIES) PEDESTRIANS THROUGH OR AROUND THE WORK AREA' AND TO PROVIDE MAXIMUM PROTECTION AND W20-1 W4 -7(L) W4 -7(R) W12-1 C30(CA) W20-6(BIKE) W11-1 W16-1 R3 -7(L) Z Q R3 -7(R) J! R3-4 G2a2 d EXISTING SIGN AND POST SAFETY TO CONSTRUCTION WORKERS. W PROPOSED HIGH LEVEL WARNING DEVICE WITH SIGN 2. ALL CONES AND DELINEATORS USED FOR 500' . Q I NIGHT WORK SHALL BE EQUIPPED WITH _ x/R PROPOSED TYPE it BARRICADE / WITH SIGN(S) REFLECTIVE BANDS. DELINEATORS TO THE RIGHT HA -STOP d~- � � ALL WAY F--i/i= + PROPOSED TYPE III BARRICADE /WITH SIGN(S) OF TRAFFIC SHALL HAVE WHITE .BANDS, LO DELINEATORS TO THE LEFT OF TRAFFIC SHALL DOUBLE -POST SIGNS ON ylls y�1S cmS PORTABLE CHANGEABLE MESSAGE SIGN HAVE YELLOW BANDS. MEDIAN ISLAND 3. THE CONTRACTOR SHALL NOTIFY THE CITY»> -a FLASHING ARROW SIGN (FAS) ENGINEERING DIVISION AT LEAST FIVE WORKING MADISON ST R1-4 ,' R1-1 R1-4 PROPOSED WORK AREA DAYS IN ADVANCE OF IMPLEMENTING ANY G2a2;q ' CONSTRUCTION AREA TRAFFIC CONTROL. a � R1-1 R1-4 ,I � FLAGGER /TRAFFIC .CONTROL OFFICER 4. ALL SIGNS, STRIPING, DELINEATORS, — — — — - — — — r — — — — — — — — — — — — — - - - - .CENTERLINE/ALIGNMENT NEATION OF PROPOSED DELINEATION OS I BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES AND THEIR INSTALLATION SHALL CONFORM - 'A �, _ MAQ�SO TO THE LATEST EDITION OF THE CALIFORNIA W2a1 w4 -7(L) ; R3 -7(R N T $ M.U.T.C.D. AND THE CALTRANS STANDARD PLANS C30(CA) AND SPECIFICATIONS. R3-4 5. THE CITY ENGINEERING - DIVISION REPRESENTATIVES RESERVE THE RIGHT TO 1 W12-1�...........,0:::.....::. :- �$::::::::.':$::::::.....:�- :.[.""::::o- :.:.................p. p.... - . �� 500' - o . -• Ix --o -- ..........o b C30(CA) OBSERVE THESE TRAFFIC CONTROL PLANS IN USE - - - - - - - - - 11' MIN .............. .............. ............. ............. o W11-1 A �j \ AND TO MAKE ANY NECESSARY CHANGES AS FIELD 2 � p( W16-1 !,Y ..='=-- 12 MIN R3-4 CONDITIONS WARRANT. ANY SUCH CHANGES SHALL SUPERSEDE THESE PLANS AND THE CONTRACTOR SHALL IMMEDIATELY SEND A DETAILED DESCRIPTION W2a1 W47(L) ;. R3 -7(R) W20-5(BIKE) I W11-1 w16-1 L3W R3-7 R Ok b R1-1 OR DRAWING OF SAID CHANGES TO RIGHT OF R1-4 Silk Sii� S10P Si(� Ri -4 ' W20-1WAY, . INC. 60V 600' 600' 300' SHIFT TAPER 50't 6. THE CONTRACTOR SHALL NOTIFY ANY AFFECTED FIRE, POLICE, AND TRANSIT SERVICES AT LEAST FIVE WORKING DAYS PRIOR TO CONSTRUCTION ON CMTO BE LOCATED FRAME 1:S ROAD WORK -•.q ANY ROADWAY WHERE BUS SERVICE IS PROVIDED. SOUTH OF 55TH AVE AHEAD 500' i 250't 7. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES IN THEIR PROPER POSITION AT ALL TIMES, AND SHALL REPAIR, REPLACE, ORCMS FRAME 2: EXPECT TEXT DELAYS THE CONTRACTOR SHALL PROVIDE A CLEAN THESE DEVICES AS NECESSARY ' TO FLAGGER TO CONTROL PEDESTRIANS PRESERVE THEIR APPEARANCE AND CONTINUITY. 8. THE CONTRACTOR SHALL PROVIDE FLAGGERS AS DEEMED NECESSARY. SUCH FLAGGERS SHALL FRAME 3: USE ALT G20-2 SR Q W20-1 G20-2 HAVE BEEN TRAINED IN ACCORDANCE WITH ROUTE CALTRANS RECOMMENDATIONS. 9. ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL IMMEDIATELY BE REMOVED FOLLOWING COMPLETION OF EACH CONSTRUCTION STAGE AND THE PERMANENT' TRAFFIC CONTROL DEVICES SHALL BE .RESTORED BY THE CONTRACTOR UPON COMPLETION OF EACH STAGE.;►sG2a2 w2a1 10. - .THE 'CONTRACTOR 'SHALL COMPLY WITH THE _ 1 I REQUIREMENTS OF `THE AMERICANS " WITH DISABILITIES ACT AS RELATED . TO PEDESTRIAN W i ACCESS AND SHALL MAINTAIN .,PEDESTRIAN ACCESS Q AT ALL TIMES PER ADA REQUIREMENTS. W 11. THE CONTRACTOR SHALL COVER OR REMOVE Q ALL CONFLICTING SIGNS AND PED HEADS. 500' 12. LOCAL AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES. PHASE 2 2 i 13. NO SIGNS OTHER THAN THOSE CALLED FORLO ON THESE PLANS SHALL BE PLACED IN THE DOUBLE -POST SIGNS ON uii5 wi5 nIs 1 tliii PUBLIC RIGHT-OF-WAY WITHOUT WRITTEN APPROVAL OF THE CITY AND RIGHT OF WAY, INC. MEDIAN ISLAND a x 14. ALL DRIVEWAYS AND SIDE STREETS SHALL BE4 G20-2)0MADISON ST R1-1 R1-4 KEPT OPEN AT ALL TIMES EXCEPT WHEN a R1-1 CONSTRUCTION TAKES PLACE DIRECTLY IN FRONT R1-4 OF THE DRIVEWAY OR SIDE STREET. — — — — — — — - — — — — — — — - 15. THE CONTRACTOR SHALL AT' ALL TIMES DURING CONSTRUCTION MAINTAIN A BUFFER SPACE - _ M AO�SO/� W20-1 W4 -7(R); R3 -7(L J�4 C30(CA) J2 I --�_ S7 OF TWO FEET (2') BETWEEN VERTICAL C30(CA) _ OBSTRUCTIONS AND THE ADJACENT TRAVEL LANES AND FIVE FEET 5 OF BUFFER SPACE BETWEEN (') — — — MIN. ` _ .... o ---.........o -....� p..............p.... o ... p --•.._....-- o ........- - - -- . C30(CA) OPEN EXCAVATIONS AND THE ADJACENT TRAVEL — — — -- — — ........ :az::::::...10 .--•$ W12-1 .-..::..:::. ...__......; .--..$ $. cs•---•--�-- p------• p ----••-•----•-o---- o-•- - o_ - r I -�, 500' LANES. a�.l 16. ALL OPEN EXCAVATIONS ON PUBLIC STREETS - - - - - - - - - __... -" SHALL BE BACK-FILLED OR STEEL -PLATED FOR TRAFFIC USE OUTSIDE THE WORKING HOURS. "STEEL PLATES AHEAD" SIGNS SHALL BE PLACED W20 -1w4 11{ 7(R) I R3 -7(L) b 12' MIN I \ ON BARRICADES IN ADVANCE OF STEEL PLATES. R R 1-4 ALL STEEL PLATES SHALL BE PROPERLY g 1-1 c c R1-4 Si(� Sid Sid } " W20-1Sid INSTALLED AND . SHALL HAVE TRANSITIONS 600' 600' 600' ^ 300' SHIFT TAPER 5011 PROPERLY RAMPED. I 17. THE CONTRACTOR SHALL CONTACT THE CITY SIGNAL TECHNICIAN FOR ANY SIGNAL TIMING FRAME 1: CMS TO BE LOCATED z AND/OR DETECTION MODIFICATIONS, INCLUDING SOUTH OF 55TH AVE AHEAD 500 i 250't z cy DISABLING OF AUDITORY CROSSING SIGNALS, c� g WHILE WORKING NEAR SIGNALIZED INTERSECTIONS t FRAME 2: EXPECT g AND CROSSWALKS. CMS TEXT DELAYS w Z 18. FLASHING BEACONS SHALL BE PLACED ON K D w ALL BARRICADES AND ADVANCED WARNING SIGNS z ¢ = DURING NIGHT WORK. 19. WORK HOURS AND DATES ARE AS NOTED IN FRAME 3: USE ALT G20-2 St � � Q W20-1 ROUTE G20-2THIS LO `t PLAN OR AS SPECIFIED IN THE CITY -ISSUED LO Q PERMIT(S). a f- VI CONTRACTOR: VALLEY CREST LANDSCAPE DEVELOPMENT DATE PREPARED: 2-22-13 PLANS PREPARED BY: s CITY- OF LA QUINTA.z RECOMMENDED BY: DATE: (n e ' PROJECT LOCATION: MADISON STREET AT 54TH AVENUE SCALE: 1"=40'1Y�yd�`�C� f N o PROJECT DATES : PER THE CITY—ISSUED PERMIT DRAWN BY: BEN COLES Q A TEMPORARY TRAFFIC CONTROL PLAN FOR �T�' Q PROJECT DURATION: 30 WORKING DAYS CHECKED BY: BRAD SIMS 2 REVISIONS COMPLETED PER CITY COMMENTS BC 6-14-13 WORKING HOURS: PER THE CITY—ISSUED PERMIT SHEET 1 OF 1 APPROVED BY: DATE: SHEET NORTHBOUND LANE CLOSURES ON 1 REVISIONS COMPLETED PER CITY COMMENTS BC 3-7-=13 , THOMAS GUIDE: 5470, C-2 DRAWING N0: 1034-1 .sem ,o SCALE iN FEET- �*--40' 0 150 E. Arrow Hwy - San Dimas, CA 91773 MADISON STREET NORTH OF 54TH AVE 1 OF 1 ' . 0 NO. DESCRIPTION: BY: ` DATE:_ PROJECT NO: 1034 a Phone: (626) 930-9292 Fax: (626) 930-9220, ;6-14-13 TITLE: _ a REVISIONS 0 10 20 40 80 120 t z M OF tai D z Ld L0 a w Of V) z 0 V) 0 w 3 a GENERAL NOTES: 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN ROAD THRU THRU LANE BIKE LANE LEFT' LANE THE TRAFFIC CONTROL DEVICES AS SHOWN WORK TRAFFIC TRAFFIC SHARE CLOSED THE MUST HEREIN, AS WELL AS ANY ADDITIONAL TRAFFIC AHEAD MERGE MERGE CLOSED ��- ROAD TURN LEFT CONTROL DEVICES AS MAY BE REQUIRED TO < > LEFT RIGHT ENSURE THE SAFE MOVEMENT OF TRAFFIC AND PEDESTRIANS THROUGH OR AROUND THE WORK AREA AND TO PROVIDE MAXIMUM PROTECTION AND W20-1 w4 -7(L) W4 -7(R) W12-1 C30(CA) W20-5(BIKE) W11-1 W16-1 R3 -7(L) SAFETY TO CONSTRUCTION WORKERS. 2. ALL CONES AND DELINEATORS USED FOR NIGHT WORK SHALL BE EQUIPPED WITH REFLECTIVE BANDS. DELINEATORS TO THE RIGHT PHASE 1 OF TRAFFIC SHALL HAVE WHITE BANDS, DELINEATORS TO THE LEFT OF TRAFFIC SHALL DOUBLE -POST SIGNS ON HAVE YELLOW BANDS. MEDIAN ISLAND 3. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEERING DIVISION AT LEAST FIVE WORKING MADISON ST DAYS IN ADVANCE OF IMPLEMENTING ANY G20-2)3 CONSTRUCTION AREA TRAFFIC CONTROL. 4. ALL SIGNS, STRIPING, DELINEATORS, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES AND THEIR INSTALLATION SHALL CONFORM TO THE LATEST EDITION OF THE CALIFORNIA W20-1 W4 -7(L) R3 -7(R M.U.T.C.D. AND THE CALTRANS STANDARD PLANS AND SPECIFICATIONS. C30(CA) C30(CA) 5. THE CITY ENGINEERING DIVISION 1 i REPRESENTATIVES RESERVE THE RIGHT TO W12-1 �- ...."'�` ""-'"' '-'-"-' .�$========-� ` $ �:......:o::::.[......' 'o" _ :oc' o - .._......o. ..o_.... - -...._ .,.,,. . ... .-o- . o ..... ...-o ... -- IX �' OBSERVE THESE TRAFFIC CONTROL PLANS IN USE - - - - - - - - - 11' MIN -0""-"'-"-----.'.-•...--•-'-o------•-•-----o-------- --•• c�-------- `� I �i AND TO MAKE ANY NECESSARY CHANGES AS FIELD w2a1 � W4 -7(L) � R3 -7(R) W20-5(BIKE) � CONDITIONS WARRANT. ANY SUCH CHANGES SHALL I SUPERSEDE THESE PLANS AND THE CONTRACTOR W11-1 SHALL IMMEDIATELY SEND A DETAILED DESCRIPTION LW16-1 OR DRAWING OF SAID CHANGES TO RIGHT OF 300' WAY, INC. 600' 600' 600' 300' SHIFT TAPER 6. THE CONTRACTOR SHALL NOTIFY ANY AFFECTED FIRE, POLICE, AND TRANSIT SERVICES AT LEAST FIVE WORKING DAYS PRIOR TO CONSTRUCTION ON FRAME 1: ROAD CMS TO BE LOCATED WORK ANY ROADWAY WHERE BUS SERVICE IS PROVIDED. SOUTH OF 55TH AVE AHEAD 7. THE CONTRACTOR SHALL MAINTAIN ALL TRAFFIC CONTROL DEVICES IN THEIR PROPER POSITION AT FRAME 2: EXPECT ALL TIMES, AND SHALL REPAIR, REPLACE, OR CMS TEXT DELAYS CLEAN THESE DEVICES AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY. 8. THE CONTRACTOR SHALL PROVIDE FLAGGERS FRAME 3: USE AS DEEMED NECESSARY. SUCH FIAGGERS SHALL ALT HAVE BEEN TRAINED IN ACCORDANCE WITH ROUTE CALTRANS RECOMMENDATIONS. 9. ALL TEMPORARY TRAFFIC CONTROL DEVICES SHALL IMMEDIATELY BE REMOVED FOLLOWING COMPLETION OF EACH CONSTRUCTION STAGE AND THE PERMANENT TRAFFIC CONTROL DEVICES SHALL BE RESTORED BY THE CONTRACTOR UPON .COMPLETION OF EACH STAGE. 10. THE -CONTRACTOR. SHALL COMPLY ' WITH • THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT AS RELATED TO PEDESTRIAN ACCESS AND SHALL MAINTAIN -PEDESTRIAN ACCESS AT ALL TIMES ,PER ADA REQUIREMENTS. 11. THE CONTRACTOR SHALL COVER OR REMOVE ALL CONFLICTING SIGNS AND PED HEADS. 12. LOCAL AND EMERGENCY _ACCESS SHALL BE MAINTAINED AT ALL TIMES. 13. NO SIGNS OTHER THAN THOSE CALLED FOR ON THESE PLANS SHALL BE PLACED IN THE DOUBLE -POST SIGNS ON PUBLIC RIGHT-OF-WAY WITHOUT WRITTEN MEDIAN ISLAND APPROVAL OF THE CITY AND RIGHT OF WAY, INC. 14. ALL DRIVEWAYS AND SIDE STREETS SHALL BE G20 -2x1 MADISON ST KEPT OPEN AT ALL TIMES EXCEPT WHEN CONSTRUCTION TAKES PLACE DIRECTLY IN FRONT OF THE DRIVEWAY OR SIDE STREET. 15. THE CONTRACTOR SHALL AT ALL TIMES DURING CONSTRUCTION MAINTAIN A BUFFER SPACE W20-1 W4 -7(R) R3 -7(L OF TWO FEET (2') BETWEEN VERTICAL C30(CA) OBSTRUCTIONS AND THE ADJACENT TRAVEL LANES \ J AND FIVE FEET (5') OF BUFFER SPACE BETWEEN _ i o. _ 10' MIN � -- o• ............. ... � ... OPEN EXCAVATIONS AND THE ADJACENT TRAVEL — — — ._........., o - .o.. .0 LANES. 16. ALL OPEN EXCAVATIONS ON PUBLIC STREETS SHALL BE BACK-FILLED OR STEEL -PLATED FOR W20 -1w4 -7(R) - R3 -7(L) TRAFFIC USE OUTSIDE THE WORKING HOURS: "STEEL PLATES AHEAD" SIGNS SHALL BE PLACED ON BARRICADES IN ADVANCE OF STEEL PLATES. ALL STEEL PLATES SHALL BE PROPERLY INSTALLED AND SHALL HAVE TRANSITIONS 600' 600' v 600' 300' SHIFT TAPER PROPERLY RAMPED. 17. THE CONTRACTOR SHALL CONTACT THE CITY FRAME 1: ROAD SIGNAL TECHNICIAN FOR ANY SIGNAL TIMING CMS TO BE LOCATED WORK AND/OR DETECTION MODIFICATIONS, INCLUDING SOUTH OF 55TH AVE AHEAD DISABLING OF AUDITORY CROSSING SIGNALS, WHILE WORKING NEAR SIGNALIZED INTERSECTIONS FRAME 2: EXPECT AND CROSSWALKS CMS TEXT DELAYS a !!9 !�g W20 -1i I I I I I W I � � I Z W 500' Q I I = I I L0 �1S �1S �1S R1-1 , R1-4 PHASE 2 F9 D R3 -7(R) kb R1-1 R1-4 —50't i RIGHT LANE MUST END ?SG20-2 TURN RIGROAD WORK HT . 4 R3 -7(R) ` R34 G20-2 STOPA WAY AY R1-1 R1-1 R1-4 R1-4 a _A4,4DISOgtz V ST )a R3-4 W11-1 A' •-�_ 12' MIN R3 -4W16-1 R1-1 S11 S11� S1� R1-4 500' 250'± THE CONTRACTOR SHALL PROVIDE A I FLAGGER TO CONTROL PEDESTRIANS 4 w20-1 LEGEND: C PROPOSED 42" PORTABLE DELINEATORS WITH REFLECTIVE BANDS (SPACED AS NOTED IN PLAN) TRAFFIC °I DELINEATORS WITH OL SREFLEOCTIVE BANDS PROPOSED ED SIGN MARY BESMOUNTED ON EAXISTINGAFACILITIES) EXISTING SIGN AND POST PROPOSED HIGH LEVEL WARNING DEVICE WITH SIGN x/R PROPOSED TYPE II BARRICADE / WITH SIGN(S) PROPOSED TYPE III BARRICADE / WITH SIGN(S) ® PORTABLE CHANGEABLE MESSAGE SIGN > FLASHING ARROW SIGN (FAS) ® PROPOSED WORK AREA FLAGGER / TRAFFIC CONTROL OFFICER • ., CENTERLINE/ALIGNMENT OF PROPOSED DELINEATION \ W20-1 1 2SG20-2 W z I Q W 500' Q I 2 �1S X115 dO1S . R1-1 R1-4 R1-1 R1-4 � _ ASO C30(CA) �J � _ - I �-- � - N ST 4 o-.---------•-0.3, ...= .Q_- 0------------ v --'-----'-'--- b � �b R1-1 R1-4 50't c C30(CA) 12' IN Q R1-1 S10P S1� S1(� R1-4 250'* 500' 50V W� 1 I 44' \ G2a2 500' W20-1 18. FLASHING BEACONS SHALL BE PLACED ON ALL BARRICADES AND ADVANCED WARNING SIGNS DURING NIGHT WORK. FRAME 3: USE 19. WORK HOURS AND DATES ARE AS NOTED IN ALT G20 -25z ( I Q W20-1 �' \ THIS PLAN OR AS SPECIFIED IN THE CITY -ISSUED RouTE G20-2 PERMIT(S). CONTRACTOR: VALLEY CREST LANDSCAPE DEVELOPMENT DATE PREPARED: 2-22-13 PLANS PREPARED BY[ CITY OF QUINTA' woRECOMMENDED BY: DATE: PROJECT LOCATION: MADISON STREET AT 54TH AVENUE SCALE: 1 "=40' 11�Y 4s� r, PROJECT DATE(S): PER THE CITY -ISSUED PERMIT DRAWN BY. BEN COLES r� PROJECT DURATION: 30 WORKING DAYS CHECKED BY. BRAD SIMS '' �a TEMPORARY TRAFFIC CONTROL PLAN FOR TITLE: 2 REVISIONS COMPLETED PER CITY COMMENTS BC 6-14-13 WORKING HOURS: PER THE CITY -ISSUED PERMIT SHEET 1 OF 1* 02� NORTHBOUND LANE CLOSURES ON �P 6/30h4 * APPROVED BY: DATE: 1 REVISIONS COMPLETED PER CITY COMMENTS BC 3-7-13 THOMAS GUIDE: 5470, C-2 DRAWING NO: 1034-1O �RVIL scALE w FEET -r=am SHEET NO. DESCRIPTION: BY. DATE: PROJECT NO: 1034 150 E. Arrow Hwy - San Dimas, CA 91773 (MADISON STREET NORTH OF 54TH AVE nF 0 REVISIONS 1 OF 1 Phone: (626) 93x9292 Fax: (626) 93x9220 � ,,� 6-14-13 0 �0 20 ao so �2o TITLE• TITLE: - 21 z Cy gI', Lj D z W a LO a LiW z 0 0 W 0 a